1 CHAMBERS CREEK REGIONAL WASTEWATER TREATMENT PLANT FACILITIES PLAN 4. POPULATION, FLOW, AND LOADING PROJECTIONS The Chambers Creek Regional Wastewater Treatment Plant Facilities Plan (Facilities Plan) provides a roadmap to prepare for future needs of the Chambers Creek Regional Wastewater Treatment Plant (Plant). Consequently, it is necessary to understand the current and future demands on the Plant to best anticipate what improvements will be necessary and when they will be needed. For a wastewater treatment plant, the demands are largely a function of the number and type of customers, condition of the system, and an understanding of the regulatory framework. This chapter specifically addresses the number and type of connections through population and service projection, and indirectly addresses the system condition by estimating the inflow and infiltration. The Facilities Plan is developed using population and employment projections for the service area coupled with historical flow records to generate a flow and loading forecast for the Plant. These population, flow, and loading projections correlate with the Pierce County (County) Unified Sewer Plan, (projected to be updated in 2010) and was generated based upon flow data collected through Data Sources Projections of the future service population are based upon the Pierce County Environmental Services Planning Division s service area map, which was updated in January 2007 for use in the new Unified Sewer Plan. These projections were combined with population and employment projections published by the Puget Sound Regional Council (PSRC) in Estimates of the current service population and sewered area were drawn from the County sewer model, and a GIS-based shapefile of sewered parcels. The Pierce County Sewer Utility (Sewer Utility) has estimated base sewer flow for each parcel within the service area. Historical Plant flow data have been provided by the County. 4.2 Existing Service Area Population and Employment The County sewer model identifies 48,840 sewered parcels within the Plant service area (Figure 4-1). This does not include the residential parcels belonging to the Steilacoom Sewer Utility, which feed the Plant via a dedicated pump station through a wholesale agreement with the County. These connections are managed by the Steilacoom Sewer Utility. This also does not include the area of southwest Tacoma referred to as the Western Slopes Service Area in the Unified Sewer Plan. The Western Slopes service area discharges to the Plant via a pair of dedicated pump stations under a contracted flow agreement. The PSRC publishes population and employment projections for 10-year intervals between 2000 and 2040 based on the economic and population models developed and maintained by the Washington State Office of Financial Management (OFM). OFM has been charged with developing accurate and fair population estimates since the 1940 s for the allocation of state revenues and program administration. The population and employment figures represent the resident population/employment of an area as defined by the federal Census Bureau (forecast analysis zones or FAZ). The figures include all persons usually residing in an area including military personnel and dependents, persons living in correctional institutions, and persons living in nursing homes or other care facilities. 4-1 November 2010

2 CHAPTER 4 Chambers Creek Regional Wastewater Treatment Plant Facilities Plan Figure 4-1. Sewered parcels, Future Service Area Population and Employment Future population and employment projections were based upon the PSRC data, which are forecast through A gradual expansion of the current sewered area to the extents of the future service area was assumed, with the rate of expansion dependent upon location relative to existing infrastructure and current sewer utility plans to extend service (Figure 4-2). By 2040, the entire service area is assumed to be sewered. The 2006 PRSC publication details this information by FAZ. Combining the map of sewered parcels with the PSRC data, the existing service population of the Plant is estimated at 155,500 residents plus 46,000 employees as indicated in Table 4-1. November

3 Chambers Creek Regional Wastewater Treatment Plant Facilities Plan CHAPTER 4 Figure 4-2. Expansion of sewering, Table 4-1. Service Population and Employment Projection, Year Population Total employment Manufacturing WTCU Retail Services Gov./Ed ,531 46,014 2,947 3,644 9,779 17,321 12, ,622 50,605 3,336 3,953 10,843 19,191 13, ,812 59,068 4,042 4,639 12,687 23,290 14, ,003 67,531 4,749 5,325 14,531 27,388 15, ,992 82,781 5,883 6,576 17,899 35,281 17, , ,695 7,333 8,414 21,949 45,710 19,289 Category codes: Manufacturing = SIC WTCU = Wholesale trade, transportation services, communication, and utilities, SIC 40 42, Retail Trade = SIC Services = SIC 07, 60 67, 70, 72 74, 75 76, 78 81, 83 84, 86, 89. Government/Education = SIC 43, 82, November 2010

4 CHAPTER 4 Chambers Creek Regional Wastewater Treatment Plant Facilities Plan 4.4 Current Base Sanitary Flow Plant flow is a combination of a base sanitary flow (BSF) plus infiltration and inflow (I/I). BSF represents the direct wastewater contribution by the customers (also referred to the billable flow from which revenues can be generated) and I/I represents indirect contribution from customers and the system in response to changing hydrologic conditions (also referred to as unbillable flow since the costs to manage this material must be recovered through other means). BSF to the Plant has varied from approximately 13.2 million gallons per day (mgd) in 2000 to 15.7 mgd in While BSF by definition does not include any I/I, measurement of a pure BSF is rarely achieved. Even the driest weeks of the year will be influenced by long-term factors such as the groundwater level, and other less seasonal sources of I/I such as artesian springs and natural lakes, ponds, and rivers. Figure 4-3 depicts the 7-day average flow recorded at the Plant. The BSF generally increases approximately 3.3 percent a year and follows a line drawn between the relatively dry years of 2000, 2001, and 2005, resulting in a 2006 BSF of 15.7 mgd. The Sewer Utility has estimated the relative BSF for each of the sewered parcels highlighted on Figure 4-1. These estimates are based upon the County s standard of 8.3 hundred cubic feet (ft 3 ) of flow per month (204.5 gallons per day (gpd)/household unit), with nonresidential units estimated on a case-by-case basis. The sewer model is designed to be somewhat conservative, and outputs a total BSF of mgd. To calibrate to the actual measured BSF at the Plant (15.70 mgd), the flow estimates for each parcel were scaled by a factor of From the sewer model, a total of six commercial sources generating flows in excess of 30,000 gpd were identified. These are listed in Table 4-2. Table 4-2. Major Commercial and Industrial Sources Point source Flow (gpd) Western State Hospital 330,700 James Hardie Building Products, Inc. 132,783 Pacific Lutheran University 120,904 Boeing Skin and Spar 59,762 Clover Park Technical College 32,875 St. Claire Hospital 32,530 Table 4-3 summarizes the breakdown of 2006 residential and employment-related wastewater flows. Table 4-3. Wastewater Flow Generation Profiles Base sanitary flow (gpd) Population gpd/capita Residential 13,305, , Employment 2,394,292 46, Total 15,700,000 Figure day average flow recorded at the Plant Parshall flume, The employment-related flow was broken down into five major categories, matching the five commercial categories which the PSRC uses for its employment forecasts. These flows, plus the corresponding population and generation rates, are outlined in Table 4-4. BSF projections for the Plant are shown in Table 4-5 through November

5 Chambers Creek Regional Wastewater Treatment Plant Facilities Plan CHAPTER 4 Table 4-4. Nonresidential Wastewater Flow Generation Profiles Type a Base sanitary flow (gpd) b Population c gpd/capita Manufacturing 228,541 2, WTCU 98,608 3, Retail trade 848,936 9, Services 773,649 17, Government/education 444,557 12, Total 2,394,292 46, a. Category codes: Manufacturing SIC WTCU Wholesale trade, transportation services, communication, and utilities, SIC 40 42, Retail Trade SIC Services SIC 07, 60 67, 70, 72 74, 75 76, 78 81, 83 84, 86, 89. Government/Education SIC 43, 82, b. Flow is based upon Pierce County S ewer Model, adjusted to BS F of 15.7 mgd. c. Population is from PSRC projections, published October Year Table 4-5. Plant BSF Projections, Population Total employment Base sanitary flow (mgd) ,531 46, ,622 50, ,812 59, ,003 67, ,992 82, , , Infiltration and Inflow I/I can represent a substantial portion of the Plant influent total wastewater flowrate. Estimating I/I is necessary to establish the peak hydraulic conditions for the Plant. Hourly influent flow records and rainfall data were used to construct a precipitation-based model of Plant I/I (Figure 4-4). Hourly Plant flow records were not available for the period August 2004 through December Once calibrated, the model was applied to a 50-year record of hourly precipitation to output the following risk-based I/I projections (Table 4-6). The I/I quantities listed in Table 4-6 represent the sewer system as it currently exists. As new pipes are added to the system, new sources of I/I will develop. In general, new pipes are expected to admit lower amounts of I/I than old pipes. This is due to modern building codes which prohibit connection of roof drains, and installation of leakresistant piping (PVC, HDPE). In this case, the amount of I/I per linear foot of new pipe added to the system is assumed to be one-half the amount of I/I per linear foot of existing pipe (Table 4-7). This reduction is supported by data from the nearby LOTT Clean Water Alliance collection system. Note that the average amount of pipe added per new customer is assumed to be inchdiameter-mile (IDM). This value is based upon the average IDM per person in the Plant service area calculated for the 2005 Re-Rating and Capacity Study, and based upon the pipe and customer inventories presented in the 2001 Unified Sewer Plan. Over the long term, the average I/I in the existing system is expected to improve as proportion of new pipes increases and as the County conducts preservation to repair/replace portions of the existing system. Given the I/I estimates outlined above, the Plant influent wastewater flow rate projections for different design conditions are summarized in Table November 2010

6 CHAPTER 4 Chambers Creek Regional Wastewater Treatment Plant Facilities Plan Figure 4-4. Precipitation-based I/I model: actual flow in blue, model flow in red, rainfall in green Table 4-6. Risk-Based I/I Model (all flows in mgd) Period Flow I/I Base sanitary flow Average day Average summer a Average winter b year peak summer c year peak month c year peak day c year peak hour c a. Summer is defined as June, July, and August. b. Winter is defined as December, January, and February. c. 10-year return period between flows means that in any given year, there is a 10 percent chance of a flow greater than this amount (10 percent risk). Table 4-7. I/I per IDM of New Pipe added to the System (gpd/idm) a Period gpd/idm Average day 237 Average summer b 63 Average winter c year peak summer d year peak month d year peak day d 1, year peak hour d 1,878 a. New pipe I/I per IDM is estimated by taking one-half the measured I/I per IDM of existing pipe. b. Summer is defined as June, July, and August. c. Winter is defined as December, January, and February. d. 10-year return period between flows means that in any given year, there is a 10 percent chance of a flow greater than this amount (10 percent risk). Table 4-8. Plant Total Flow Projections for Design Conditions (mgd), year peak summer c 10-year peak month c Year Base sanitary flow Average day Average summer a Average winter b 10-year peak day c 10-year peak hour c a. Summer is defined as June, July, and August. b. Winter is defined as December, January, and February. c. 10-year return period between flows means that in any given year, there is a 10 percent chance of a flow greater than this amount (10 percent risk). November

7 Chambers Creek Regional Wastewater Treatment Plant Facilities Plan CHAPTER Historical Plant Loadings The Plant capacity is a function of the influent wastewater hydraulic flowrate and mass loading of organic and inorganic material. The next sections discuss the historical and projected Plant influent loadings. The daily recorded Plant influent loadings of biochemical oxygen demand (BOD) and total suspended solids (TSS) are plotted on Figure 4-5. While both parameters demonstrate a steady increase over time, the TSS shows considerably more variation, including spikes of over 160,000 pounds per day (lb/d). Figure 4-6 shows 30-day average loadings. From this data, there does not appear to be a repeatable seasonal pattern to the Plant loadings (i.e., peak month loadings just as likely to occur during the summer and the winter.) Table 4-9 lists the recorded annual loads alongside the peak 30-day average loadings for each year since Table 4-10 summarizes the current Plant influent loadings and recommended peaking factors based upon the historical records. Figure 4-5. Daily influent loadings of BOD and TSS, Figure day average influent loadings, Table 4-9. Historical Plant Loadings and 30-day Maximum Peaking Factors Annual average 30-day maximum Peaking factor Year TSS BOD TSS BOD TSS BOD ,625 31,484 45,500 52, ,547 31,800 44,000 37, ,665 37,599 56,400 49, ,654 37,469 65,000 57, ,393 32,081 42,000 38, ,063 35,510 51,000 42, average 37,370 35,020 52,667 46, November 2010

8 CHAPTER 4 Chambers Creek Regional Wastewater Treatment Plant Facilities Plan Table Current Plant Loadings and Peaking Factors Average lb/d Peak month lb/d Peak month factor Peak day lb/d TSS 37,500 52, ,000 BOD 35,000 45, , Plant Loading Projections Future Plant loadings are a function of the service area population and employment similar to the BDF. Using the current loadings and peaking factors from Table 4-10, future Plant loadings are projected to increase at rates proportional to changes of the BSF. These projections are summarized in Table Table Load Projections (lb/d), Average day Peak month Year TSS BOD TSS BOD ,500 35,000 52,500 45, ,800 40,000 59,900 51, ,100 46,700 70,100 60, ,400 53,500 80,300 69, ,200 65,500 98,300 85, ,800 81, , , Build-Out Flow and Loading Projections The projections developed in this analysis span the period from By 2040, the model assumes sewers will be extended to the entire anticipated service area. However, it is unlikely every resident will be connected to the system. To estimate the maximum potential contribution from the service area, an analysis of the developable area is used. An estimate of the available buildable lands was created by subtracting the areas occupied by water bodies, wetlands, and steep slopes from the future service area. A composite zoning map was then created using the County s GIS zoning coverage of unincorporated areas, as well as paper zoning maps obtained from the incorporated municipalities within the Plant s service area (DuPont, Lakewood, Steilacoom, and University Place). The composite zoning map was clipped using the buildable lands map. Clipping is a geoprocessing tool which creates a new GIS coverage by cutting the information in an input layer using the boundaries of a clip layer. Clipping the zoning coverage using the buildable lands map produced a zoning coverage that included only buildable lands within the Plant service area. The overall procedure is illustrated on Figures 4-7 through Figures 4-7 and 4-8 show the procedure for generating the buildable lands GIS coverage using the service area, water bodies, wetlands, and steep slopes maps. Figures 4-9 and 4-10 show the clipped zoning map coverage. An estimate of the build-out population was generated by populating the buildable zoning map with information from the 2002 Pierce County Buildable Lands Report and housing density information drawn from the municipal codes of DuPont, Lakewood, Pierce County, Steilacoom, and University Place. The total area for each zoning classification was multiplied by the dwelling unit densities (in dwelling units/acre) drawn from the appropriate municipal code or the Pierce County Buildable Lands Report, giving a total number of dwelling units for each zoning classification. This was then multiplied by the average number of residents per dwelling unit, taken from the Pierce County Buildable Lands Report, giving a total number of residents for each zoning classification. The dwelling unit densities and residents per dwelling unit for each residential zoning classification are shown in Table November

9 Chambers Creek Regional Wastewater Treatment Plant Facilities Plan CHAPTER 4 Figure 4-7. Unbuildable lands in the Plant service area Figure 4-8. Buildable lands in the Plant service area 4-9 November 2010

10 CHAPTER 4 Chambers Creek Regional Wastewater Treatment Plant Facilities Plan Figure 4-9. Zoning, western Pierce County Figure Zoning, eastern Pierce County November

11 Chambers Creek Regional Wastewater Treatment Plant Facilities Plan CHAPTER 4 Table Build-Out Population Forecast Parameters Residential Zoning Jurisdiction Zone Dwelling unit density (du/acre) Residents/dwelling unit a DuPont R R R R Residential Reserve b Lakewood Air Corridor Arterial Residential Commercial c Multi Family 1 c Multi Family 2 c Multi Family 3 c Mixed Residential 1 c Mixed Residential 2 c R1 c R2 c R3 c R4 c Steilacoom Multi Family d R-7.2 d R-9.6 d University Place Multifamily High e Multifamily Low e R1 e R2 e Pierce County High Density Single Family f Moderate Density Single Family f Moderate- High Density Residential f Single Family f a. Residents per dwelling unit from Pierce County Buildable Lands Report, b. Dwelling unit density from DuPont Municipal Code. c. Dwelling unit density from Lakewood Municipal Code. d. Dwelling unit density from Steilacoom Municipal Code. e. Dwelling unit density from University Place Municipal Code. f. Dwelling unit density from Pierce County Buildable Lands R eport, For mixed-use zoning classifications, a residential fraction, representing the fraction of mixed-use acreage devoted to housing, was multiplied by the total buildable land for each zoning classification. The remainder of the analysis was completed in the same manner as for the residential zoning. The parameters used for mixed-use zoning are shown in Table An estimate of employment at build-out was generated using employment density information from the Pierce County Buildable Lands Report. The report estimates the number of employees per acre for commercial/retail, industrial, and governmental zoning classifications. These values were multiplied by the total area for each zoning classification derived from the buildable zoning map. For mixed-use zonings, a parameter defining the fraction of land devoted to residential use was included. The parameters for the build-out employment forecast are shown in Table November 2010

12 CHAPTER 4 Chambers Creek Regional Wastewater Treatment Plant Facilities Plan Jurisdiction Table Build-Out Population Forecast Parameters Mixed-Use Zoning Zone Fraction residential a Dwelling unit density (du/acre) Residents/ Dwelling unit a DuPont Mixed use b Lakewood Central business district c Neighborhood commercial 1 c Neighborhood commercial 2 c Transit oriented commercial c University Place Mixed use d Mixed use office d Pierce County Activity center e Commercial mixed use district e High density residential district e Major urban center e Mixed use district e Office: residential mixed use district e Urban village e a. Fraction residential and residents/dwelling unit from Pierce County Buildable Lands R eport, b. Dwelling unit density from DuPont Municipal Code. c. Dwelling unit density from Lakewood Municipal Code. d. Dwelling unit density from University Place Municipal Code. e. Dwelling unit density from Pierce County Buildable Lands R eport, Jurisdiction Table Build-Out Employment Forecast Parameters Zone Fraction residential Fraction nonresidential Employees/acre DuPont DuPont commercial DuPont industrial DuPont manufacturing research DuPont mixed use DuPont office Lakewood LW Air corridor LW C LW C LW Central business district LW industrial LW industrial LW industrial business park LW neighborhood commercial LW neighborhood commercial LW transit oriented commercial November

13 Chambers Creek Regional Wastewater Treatment Plant Facilities Plan CHAPTER 4 Jurisdiction Table Build-Out Employment Forecast Parameters Zone Fraction residential Fraction nonresidential Employees/acre Steilacoom Steilacoom C general Steilacoom C shoreline Steilacoom industrial University Place UP commercial UP light industrial business park UP mixed use UP mixed use office UP neighborhood commercial UP town center Pierce County Activity center Commercial mixed use district Community center Community employment Employment center Employment services High density residential district Major urban center Mixed use district Neighborhood center Office: residential mixed use district Research office Residential/office: civic Urban village a. All fraction residential and employees/acre from Pierce County Buildable Lands Report, Given the areas and projected densities outlined above, and assuming a value of 80 percent zone density at build-out, the forecasted population and employment at build-out is shown in Table Table Build-Out Population and Employment Forecast Build-out Area Residents Employees DuPont 12,741 10,222 Lakewood 107,710 31,050 Steilacoom 9,432 3,434 University Place 40,660 7,719 Pierce County 168, ,776 Total 339, ,202 Employment projections for build-out were based on an overall employment-based wastewater generation rate. Currently, the average unit employee wastewater generation rate is 52.0 gpd/employee for the service area (Table 4-3). Projecting to 2040, and combining the data from Table 4-3 and Table 4-4, this figure climbs to 53.4 gpd/employee. Using this value alongside the base residential wastewater generation rate (85.6 gpd/capita) a built-out BSF of mgd is projected. The complete set of build-out flow and load projections are outlined in Table The build-out population projection is somewhat lower than the 2040 projection reported in Table 4-8, while the build-out employment projection is considerably higher November 2010

14 CHAPTER 4 Chambers Creek Regional Wastewater Treatment Plant Facilities Plan Table Build-Out Flow and Loadings Projections Point source Flow (gpd) Base sanitary flow, mgd Average day, mgd Average summer, mgd Average winter, mgd year peak summer, mgd year peak month, mgd year peak day, mgd year peak hour, mgd Average day TSS, lb/d 91,000 Average day BOD, lb/d 85,000 Peak month TSS, lb/d 127,500 Peak month BOD, lb/d 110,500 An alternate approach is to use the developable portion of the service area (approximately 59,440 acres) and apply the average build-out residential density for the Pacific northwest of eight residents per acre. This translates to a build-out population of over 475,000 and a BSF of mgd. By comparison, using the PSRC population and employment projections, the model predicts a BSF of mgd by Taken together, the build-out BSF projection is within 5 percent of the 2040 projection, and within 7 percent of the eight-resident-per-acre build-out value. The convergence of three independent build-out flow values between 36 and 40 mgd is encouraging. For the purposes of this Facilities Plan, the flow and loading projections summarized in Tables 4-8 and 4-11 are used to predict conditions from 2009 through The build-out flow projections in Table 4-16 are used to predict conditions at build-out. November

2.1 Summary of Existing and Future Population Estimates

2.1 Summary of Existing and Future Population Estimates SECTION 2 Demographics This technical memorandum identifies the uncertainties and describes potential future demographics that might affect wastewater facilities in the City of McCall, Idaho (the City).

More information

CHAPTER 9: SANITARY SEWER INTRODUCTION FORECASTS CHAPTER 9: SANITARY SEWER 9-1

CHAPTER 9: SANITARY SEWER INTRODUCTION FORECASTS CHAPTER 9: SANITARY SEWER 9-1 CHAPTER 9: SANITARY SEWER INTRODUCTION The Metropolitan Land Planning Act (amended 1995) requires local governments to prepare comprehensive plans and submit them to the Metropolitan Council to determine

More information

Handout 5: Stormwater Cost of Service

Handout 5: Stormwater Cost of Service Handout 5: Stormwater Cost of Service Introduction The purpose of this handout is to describe the current cost allocation methodology for the stormwater program. The existing Stormwater Management Service

More information

WASTEWATER FLOW FORECASTS

WASTEWATER FLOW FORECASTS The population of the 15-county Metro Water District is expected to increase by over 3 million people during the planning period: from 4.4 million in 2005 to 7.5 million in 2035. A corresponding increase

More information

Wastewater Facilities Plan Existing Conditions Demographics Flows and Loads Future Effluent Limitation Scenarios

Wastewater Facilities Plan Existing Conditions Demographics Flows and Loads Future Effluent Limitation Scenarios Agency Review Technical Memorandum Wastewater Facilities Plan Existing Conditions Demographics Flows and Loads Future Effluent Limitation Scenarios Prepared for City of McCall June 2006 322 East Front

More information

Vernon Township Municipal Build Out Report

Vernon Township Municipal Build Out Report Vernon Township Municipal Build Out Report Prepared by the State of New Jersey Highlands Water Protection and Planning Council in Support of the Highlands Regional Master Plan: Report on the Results of

More information

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL INTRODUCTION The District developed a hydraulic model of the sanitary sewer system as part the 2000 Wastewater Comprehensive Plan. The output from this model

More information

Infiltration and Inflow. Michael Sassaman Phone

Infiltration and Inflow. Michael Sassaman Phone Infiltration and Inflow Michael Sassaman msassaman@entecheng.com Phone 610-373-3345 Inflow and Infiltration PA DEP Learning Objectives Do you have Excessive I/I? Sources of Inflow and Infiltration I/I

More information

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA Technical Memorandum Farming in the Floodplain Project Prepared for May 2017 PCC Farmland Trust Photo credit: Google Earth TABLE OF CONTENTS Page

More information

COMPREHENSIVE SANITARY SEWER SYSTEM PLAN

COMPREHENSIVE SANITARY SEWER SYSTEM PLAN COMPREHENSIVE SANITARY SEWER SYSTEM PLAN Prepared for: City of Rosemount 2875 145 th Street West Rosemount, MN 55068 December 28, 2007 Prepared by: WSB & Associates, Inc. 701 Xenia Avenue South, Suite

More information

Submitted to: Mr. Jim Dunn Chesterfield County Economic Development Department 9401 Courthouse Road - Suite B Chesterfield, VA 23830

Submitted to: Mr. Jim Dunn Chesterfield County Economic Development Department 9401 Courthouse Road - Suite B Chesterfield, VA 23830 THE TIMMONS REPORT Draft Executive Summary of Preliminary Engineering, Environmental and Master Planning Report for Meadowville Technology Park Chesterfield County, Virginia Submitted to: Mr. Jim Dunn

More information

TOWN OF LONDONDERRY, NEW HAMPSHIRE WASTEWATER FACILITIES PLAN UPDATE TABLE OF CONTENTS

TOWN OF LONDONDERRY, NEW HAMPSHIRE WASTEWATER FACILITIES PLAN UPDATE TABLE OF CONTENTS 6%34(6%4(2 )%&+-+4+(3 1-%/ 51 %4( :=>?;9 406/ 0) -0/ 0/ (227! /(6 *%.13*+2(,8A #""$ TOWN OF LONDONDERRY, NEW HAMPSHIRE WASTEWATER FACILITIES PLAN UPDATE TABLE OF CONTENTS SECTION DESCRIPTION PAGE ES

More information

Chapter 8 Addressing I/I Issues and High Flows

Chapter 8 Addressing I/I Issues and High Flows Chapter Outline Chapter 8 Addressing I/I Issues and High Flows This chapter is organized into the following sections: Introduction Background Estimation of Infiltration Volume Conveyance Costs Effect of

More information

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan 2 Population and Land Use Population and land use information was utilized to analyze existing wastewater flows and to estimate future flows. The population and land use data were obtained from the following:

More information

BIG ROCHE A CRI LAKE CHARACTERISTICS

BIG ROCHE A CRI LAKE CHARACTERISTICS BIG ROCHE A CRI LAKE CHARACTERISTICS Lake Description Big Roche Cri Lake is located in north central Adams County and has a surface area of 205 acres, a shoreline length of 6.1 mile, a volume of 6,993

More information

City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012

City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012 City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and

More information

Element 06 Utilities. Utilities Element Page

Element 06 Utilities. Utilities Element Page Element 06 Utilities Table of Contents 1. Introduction 2. Major Issues, Concerns, and Citizen Input 3. Utilities Goals & Policies 4. Analysis Water Electricity Stormwater Sewer Natural Gas Telecommunications

More information

What is a stormwater utility fee?

What is a stormwater utility fee? What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville

More information

APPENDIX 5: SAMPLE MODEL RESULTS

APPENDIX 5: SAMPLE MODEL RESULTS APPENDIX 5: SAMPLE MODEL RESULTS A. Evaluation of Groundwater Sustainability in the Ramsey Area B. Evaluation of Groundwater Sustainability in the Woodbury Area C. Evaluation of Future Drawdown Conditions

More information

City of Anacortes Utility Rates & Information January 2016

City of Anacortes Utility Rates & Information January 2016 The City of Anacortes provides water, storm drain, sewer, and solid waste services. City of Anacortes Utility rates are established by ordinance. The City of Anacortes bills monthly minimum charges (base

More information

Brighton Township Additional Flow at WWTP Monthly Operating Data Expanded and Updated Analysis

Brighton Township Additional Flow at WWTP Monthly Operating Data Expanded and Updated Analysis ARCHITECTS. ENGINEERS. PLANNERS. OHM 14 Advancing Communities' memorandum : June 23, 216 To: Brian Vick, Township Manager cc: Jacob Rushlow, PE, OHM Tom High, IA From: Ken Arnold, PE and Sherri Wright,

More information

City of Tacoma Regional Stormwater Facility Plan: ATTACHMENT 1: FLETT CREEK WATERSHED

City of Tacoma Regional Stormwater Facility Plan: ATTACHMENT 1: FLETT CREEK WATERSHED City of Tacoma Regional Stormwater Facility Plan: ATTACHMENT 1: FLETT CREEK WATERSHED Aerial Photo of Flett Holding Ponds and Flett Wetlands Gravel Pit Stormwater Regional Facility and Outlet Structure

More information

Wastewater Treatment & Water Supply Alternatives Analysis

Wastewater Treatment & Water Supply Alternatives Analysis Wastewater Treatment & Water Supply Alternatives Analysis Lake Sallie & Lake Melissa Chain of Lakes Prepared for Pelican River Watershed District February 2008 Table of Contents 1.0 EXECUTIVE SUMMARY...

More information

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE PLAN SUMMARY AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE The Pennsylvania Sewage Facilities Act (Act 537) was enacted by the Pennsylvania

More information

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and Impact

More information

NOTICE OF BOARD ACTION BOARD OF DIRECTORS TOWN OF MANCHESTER, CONNECTICUT

NOTICE OF BOARD ACTION BOARD OF DIRECTORS TOWN OF MANCHESTER, CONNECTICUT NOTICE OF BOARD ACTION BOARD OF DIRECTORS TOWN OF MANCHESTER, CONNECTICUT On June 7, 2016, the Board of Directors of the Town of Manchester, in its capacity as the Water Pollution Control Authority, revised

More information

Hillsborough County Future Land Use 160

Hillsborough County Future Land Use 160 RURAL-AGRICULTURE LAND USE CLASSIFICATION Agricultural/Mining -1/20 (AM-1/20) RESIDENTIAL GROSS DENSITY TYPICAL USES MAXIMUM FLOOR AREA RATIO OR Up to 1 dwelling unit per 20 gross acres. Alternative methods

More information

Regional Ecosystem Analysis Puget Sound Metropolitan Area

Regional Ecosystem Analysis Puget Sound Metropolitan Area Final Report: 7/25/98 Regional Ecosystem Analysis Puget Sound Metropolitan Area Calculating the Value of Nature Report Contents 2 Project Overview and Major Findings 3 Regional Level Analysis 4 Neighborhood

More information

XI. Thornton Planning Area

XI. Thornton Planning Area XI. A. OVERVIEW The covers 120 square miles in the northwest corner of San Joaquin County. It consists primarily of low-lying Delta islands, sloughs, and large farms. The town of Thornton, a small agriculturally-based

More information

Notwithstanding article VII of this chapter, the following conditional uses may be permitted in the planned mixed use development (PMUD) zone:

Notwithstanding article VII of this chapter, the following conditional uses may be permitted in the planned mixed use development (PMUD) zone: DIVISION 14. - PLANNED MIXED USE DEVELOPMENT (PMUD) Sec. 78-1021. - Purpose. The town is a community with a rich tradition of mixed use neighborhoods and a paucity of land area dedicated for large commercial,

More information

Section 7 Hydraulic Model Development and Evaluation Criteria

Section 7 Hydraulic Model Development and Evaluation Criteria Section 7 Hydraulic Model Development and Evaluation Criteria The hydraulic evaluation conducted to develop this master plan was performed using a computer model of the reclaimed water distribution system.

More information

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN PRESSURIZED IRRIGATION SYSTEM MASTER PLAN (HAL Project No.: 314.04.100) FINAL REPORT January 2009 ACKNOWLEDGMENTS Successful completion of this study was made possible by the cooperation and assistance

More information

3 PROJECT DESCRIPTION

3 PROJECT DESCRIPTION 3.1 PROJECT OVERVIEW 3 PROJECT DESCRIPTION The Rocklin 60 project (proposed project) includes the subdivision of 56.9 acres of land, construction of 179 single-family, detached dwelling units, and installation

More information

Cost Recovery Procedures Manual

Cost Recovery Procedures Manual ---=---- MM SD PARTNERS FOR A CLEANER ENVIRONMENT Milwaukee Metropolitan Sewerage District Cost Recovery Procedures Manual January 2018 17-161 Section: 1 Title: Equivalent Residential Unit Reference:

More information

SEWRPC Staff Memorandum RESPONSE TO REQUESTS BY THE CITY OF NEW BERLIN TO DELINEATE THE 20-YEAR PLANNED WATER SUPPLY SERVICE AREA FOR THE UTILITY

SEWRPC Staff Memorandum RESPONSE TO REQUESTS BY THE CITY OF NEW BERLIN TO DELINEATE THE 20-YEAR PLANNED WATER SUPPLY SERVICE AREA FOR THE UTILITY SEWRPC Staff Memorandum RESPONSE TO REQUESTS BY THE CITY OF NEW BERLIN TO DELINEATE THE 20-YEAR PLANNED WATER SUPPLY SERVICE AREA FOR THE UTILITY INTRODUCTION AND BACKGROUND By letter of January 12, 2009,

More information

Madison Water Utility Pressure Zone 4 Well Siting Study

Madison Water Utility Pressure Zone 4 Well Siting Study Madison Water Utility Summary of Potential Well Sites March 24 2011 Site Status Comment 1 Dairy Center In consideration Several suitable properties in this area are available. 2 Tradewinds In consideration

More information

A GUIDE TO THE DATA AND ANALYSIS TO SUPPORT COMPREHENSIVE PLAN AMENDMENTS

A GUIDE TO THE DATA AND ANALYSIS TO SUPPORT COMPREHENSIVE PLAN AMENDMENTS A GUIDE TO THE DATA AND ANALYSIS TO SUPPORT COMPREHENSIVE PLAN AMENDMENTS Florida Department of Economic Opportunity Division of Community Development Bureau of Community Planning November 2007. Revised

More information

Background Where did CSO systems begin? Combined Sewer Overflow (CSO) Control. Background. Background. Background

Background Where did CSO systems begin? Combined Sewer Overflow (CSO) Control. Background. Background. Background Background Where did CSO systems begin? Combined Overflow (CSO) Control Eric Bergstrom HDR Engineering Background System Development Before About 196 House Background System Development After 196 Building

More information

4 PLANNING DATA AND WATER DEMAND FORECASTING

4 PLANNING DATA AND WATER DEMAND FORECASTING 4 PLANNING DATA AND WATER DEMAND FORECASTING This chapter discusses the planning data and water demand forecast information used to assess the current and future capabilities of the District s water system.

More information

City of Winter Haven Water Sustainability Program. Mike Britt, P.E., Natural Resources Division

City of Winter Haven Water Sustainability Program. Mike Britt, P.E., Natural Resources Division Florida Stormwater Association EXCELLENCE AWARD for STORMWATER PROGRAMS and PROJECTS NOMINATION FORM I. Nomination Information Nomination Category (please check only one box): Program (Department/Division)

More information

Project Name: Add a unique name that appropriately identifies the submission

Project Name: Add a unique name that appropriately identifies the submission PTAPP Online Municipal Tracking Tool Instructions Project Name: Add a unique name that appropriately identifies the submission Municipal Project: Check this box if the project is part of municipal efforts

More information

Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park

Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park Prepared for: City of Bellingham Public Works Department Environmental Resource Division 210 Lottie St.

More information

TAHOE TRUCKEE SANITATION AGENCY WASTEWATER TREATMENT INQUIRY

TAHOE TRUCKEE SANITATION AGENCY WASTEWATER TREATMENT INQUIRY TAHOE TRUCKEE SANITATION AGENCY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year,

More information

Northfield Township WWTP Capacity Evaluation Report

Northfield Township WWTP Capacity Evaluation Report Northfield Township WWTP Capacity Evaluation Report March 18, 2015 PRESENTED TO PRESENTED BY Northfield Township 8350 Main Street Suite A Whitmore Lake, Michigan 48189 Tetra Tech 710 Avis Drive Suite 100

More information

Population Projections:

Population Projections: Two West 2nd Street, Suite 800 Tulsa, OK 74103 PHONE: 918.584.7526 FAX: 918.583.1024 EMAIL: transportation@incog.org The methodology for projecting and allocating, 2005 to 2035 Introduction In order to

More information

Section 2: Watershed Characteristics and Runoff

Section 2: Watershed Characteristics and Runoff Section 2: Watershed Characteristics and Runoff The hydrology of the Wissahickon Creek and its tributaries varies greatly from place to place within the larger watershed. Stormwater management planning

More information

COMPREHENSIVE WASTEWATER MASTER PLAN

COMPREHENSIVE WASTEWATER MASTER PLAN COMPREHENSIVE WASTEWATER MASTER PLAN for BRUNSWICK COUNTY, NORTH CAROLINA February 2006 Prepared by: HDR Engineering, Inc. of the Carolinas 9970-14 Beach Drive Calabash, NC 28467 (910) 575-5880 T a b l

More information

Section 3 - Land Use, Population, and Water Demands. Section 3

Section 3 - Land Use, Population, and Water Demands. Section 3 Section 3 - Land Use, Population, and Water Demands Section 3 SECTION 3 DEMANDS LAND USE, POPULATION, AND WATER This section describes the existing water demands, the population projections, and the projected

More information

6. Pollutant Sources in

6. Pollutant Sources in 6. Pollutant Sources in 45 6. Pollutant Sources in the Plum Creek Watershed The LDC analysis for Plum Creek indicates that both point and nonpoint sources contribute pollutants in the watershed. Identifying

More information

GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS

GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS Florida Department of Environmental Regulation July 1992 TABLE OF CONTENTS PURPOSE AND APPLICABILITY................... 1 Purpose............................

More information

West Hernando County Sewer Master Plan SECTION 7.0 RECLAIMED WATER

West Hernando County Sewer Master Plan SECTION 7.0 RECLAIMED WATER SECTION 7.0 RECLAIMED WATER 7.1 Introduction The use of highly treated wastewater effluent, or reclaimed water, has expanded greatly in Florida over the past several decades. In particular, the use of

More information

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit) CHESAPEAKE BAY TMDL ACTION PLAN (2013 2018 MS4 General Permit) Piedmont Virginia Community College A Plan for Achieving a 5% Reduction of Existing Loads June 30, 2015 Main Campus This plan satisfies the

More information

COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA DEVELOPMENT POLICIES

COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA DEVELOPMENT POLICIES COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA DEVELOPMENT POLICIES TABLE OF CONTENTS DEFINITIONS WATER POLICIES Water System Extensions.... W88001 Water System Activation / Service

More information

Regulatory Setbacks and Buffers RIDEM OWTS

Regulatory Setbacks and Buffers RIDEM OWTS Regulatory Setbacks and Buffers RIDEM OWTS Brian Moore Supervising Sanitary Engineer RIDEM Onsite Program Definitions - Watercourse Any of the following: pond brook river marsh stream lake wet meadow swamp

More information

Water, Wastewater and Irrigation Impact Fee Study

Water, Wastewater and Irrigation Impact Fee Study Water, Wastewater and Irrigation Impact Fee Study City of Cape Coral, Florida Prepared by duncan associates October 2006 Table of Contents EXECUTIVE SUMMARY... 1 INTRODUCTION... 4 Background... 4 Legal

More information

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT SUBMITTED BY: TREATMENT FACILITY: NPDES #: MUNICIPALITY: COUNTY: CONTACT PERSON: Responsible Official Title Telephone #: Fax #: Email Address:

More information

Evaluation of Collection System Design Standards

Evaluation of Collection System Design Standards Wastewater Master Plan DWSD Project No. CS-1314 Evaluation of Collection System Design Standards Technical Memorandum Original Date: August 9, 2001 Revision Date: September 2003 Author: CDM Table of Contents

More information

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS: FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:

More information

Clark County Water Reclamation District January 1, 2017

Clark County Water Reclamation District January 1, 2017 Clark County Water Reclamation District January 1, 2017 DEFINITIONS Unless specifically indicated otherwise, the meaning of terms in these Service Rules shall be as follows. 1. Accidental Discharge Accidental

More information

Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship

Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship Prepared by GEI Consultants/Navigant Consulting, Inc. Prepared for the California Public Utilities Commission

More information

The City of Cocoa (City) is located in east

The City of Cocoa (City) is located in east FWRJ Reclaimed Water and Stormwater: A Perfect Pair to Meet Total Maximum Daily Load Wasteload Allocations? Danielle Honour, James Wittig, John A. Walsh, and Don Stevens Danielle Honour, P.E., D.WRE, and

More information

TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN

TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources

More information

Runoff Volume: The Importance of Land Cover

Runoff Volume: The Importance of Land Cover Runoff Volume: The Importance of Land Cover Grade Level: 9-12 Time: 1-2 class periods Learning Objectives: - Quantify the volume of water that runs off different land uses in a watershed. - Analyze the

More information

MEMORANDUM. DATE: December 12, Steve Joseph, P.E. J. Philip Cooke, P.E. Monique Durand, P.E. Wastewater Flow Projections

MEMORANDUM. DATE: December 12, Steve Joseph, P.E. J. Philip Cooke, P.E. Monique Durand, P.E. Wastewater Flow Projections 4000 Hollywood Boulevard Seventh Floor, North Tower Hollywood, Florida 33021 (954) 987-0066 Fax: (954) 987-2949 MEMORANDUM DATE: December 12, 2012 TO: FROM: PROJECT: Steve Joseph, P.E. J. Philip Cooke,

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

Table 5-1: Availability of Public Sanitary Sewer. Are plans underway to provide Public Sewer?

Table 5-1: Availability of Public Sanitary Sewer. Are plans underway to provide Public Sewer? CHAPTER 5: PUBLIC SANITARY SEWER AND PRIVATE WASTEWATER DISPOSAL; PUBLIC WATER SERVICE AND PRIVATE WELLS Public Sanitary Sewer The presence or absence of public sanitary sewer service is a major factor

More information

Water Recycling Facility Project

Water Recycling Facility Project Water Recycling Facility May 15, 2006 How did we get here? December 2002 City facing $8,000,000 fines from the Regional Water Quality Control Board (RWQCB) for Wastewater Discharge Violations. Existing

More information

Acres 32% 35% Not Suitable. Impervious. Possible UTC. Vegetation. Existing UTC

Acres 32% 35% Not Suitable. Impervious. Possible UTC. Vegetation. Existing UTC Acres A Report on Washington, D.C. s Urban Tree Canopy Why is Tree Canopy Important? Urban tree canopy (UTC) is the layer of leaves, branches, and stems of trees that cover the ground when viewed from

More information

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1

More information

Chapter 3 Dispersion BMPs

Chapter 3 Dispersion BMPs Chapter 3 Dispersion BMPs 3.1 BMP L611 Concentrated Flow Dispersion 3.1.1 Purpose and Definition Dispersion of concentrated flows from driveways or other pavement through a vegetated pervious area attenuates

More information

Review Zone Application for D&R Canal Commission Decision

Review Zone Application for D&R Canal Commission Decision Review Zone Application for D&R Canal Commission Decision MEETING DATE: June 15, 2016 DRCC #: 15-4748 Phase I and II Latest Submission Received: May 4, 2016 Applicant: Kevin Hayes Country Club Meadows,

More information

Background (cont.) Measuring Pollutant Loads. Nonpoint source Nitrogen is discrete and generated by a vast array of sources, including:

Background (cont.) Measuring Pollutant Loads. Nonpoint source Nitrogen is discrete and generated by a vast array of sources, including: Suffolk County North Shore Embayments Watershed Management Plan EEA PUBLIC SUMMARY DOCUMENT Inc. December 2007 Purpose Background The Suffolk County North Shore Embayments Watershed Management Plan (herein

More information

Aquaculture Effluents and the Environment. CS Tucker, Mississippi State University

Aquaculture Effluents and the Environment. CS Tucker, Mississippi State University Aquaculture Effluents and the Environment CS Tucker, Mississippi State University Characteristics of catfish pond effluents Impacts of catfish pond effluents Ways to reduce impacts of effluents What is

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

Municipal and Industrial Water and Wastewater Demand Forecasting Methodology.

Municipal and Industrial Water and Wastewater Demand Forecasting Methodology. Municipal and Industrial Water and Wastewater Demand Forecasting Methodology www.georgiawaterplanning.org Water Demand Forecasting Water Use Categories Agricultural Forecasted by UGA Energy Needs forecasting

More information

SECTION 5.0 CROCKETT COMMUNITY SERVICES DISTRICT WASTEWATER SERVICE

SECTION 5.0 CROCKETT COMMUNITY SERVICES DISTRICT WASTEWATER SERVICE 5.1 Overview SECTION 5.0 CROCKETT COMMUNITY SERVICES DISTRICT WASTEWATER SERVICE The Crockett Community Services District (CCSD) was formed in 2006 through the reorganization of three agencies: Crockett-Valona

More information

The Wetland Biofilter System:

The Wetland Biofilter System: The Wetland Biofilter System: A vertical flow constructed wetland for treatment of manure compost pile leachate water What is the Wetland Biofilter System? Vertical flow constructed wetland Consists of

More information

Raw water sources, facilities, and infrastructure

Raw water sources, facilities, and infrastructure WATER AND WASTEWATER SERVICES IN STEAMBOAT SPRINGS Prepared by Jay Gallagher, General Manager Mt. Werner Water and Sanitation District (February, 2015) Raw water sources, facilities, and infrastructure

More information

Agenda. Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques

Agenda. Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques MWEA Collections System Seminar September 2012 Presented by: Elaine Venema, PE Rich Grant, PE Agenda Discussion of the problems

More information

Appendix 12. Pollutant Load Estimates and Reductions

Appendix 12. Pollutant Load Estimates and Reductions Appendix 12. Pollutant Load Estimates and Reductions A pollutant loading is a quantifiable amount of pollution that is being delivered to a water body. Pollutant load reductions can be calculated based

More information

WESTMORELAND COUNTY A SUCCESSFUL MASTER SEWER SYSTEM PLAN FOLLOWED TO COMPLETION

WESTMORELAND COUNTY A SUCCESSFUL MASTER SEWER SYSTEM PLAN FOLLOWED TO COMPLETION WESTMORELAND COUNTY A SUCCESSFUL MASTER SEWER SYSTEM PLAN FOLLOWED TO COMPLETION Written by Charles Riedlinger, P.E. and Norm Risavi, County Administrator INTRODUCTION In 1995, Resource International,

More information

Water Utility Science Water Math and Hydraulics 050. Name: Date:

Water Utility Science Water Math and Hydraulics 050. Name: Date: Water Utility Science Water Math and Hydraulics 050 Name: Date: Note: Please show all of your calculations for each problem no matter how simple the problem may seem. Please use the accompanying pieces

More information

Stormwater Control and Treatment

Stormwater Control and Treatment Stormwater Control and Treatment EXISTING CONDITIONS The topography of Pinellas County is mostly flat to gently sloping, characterized by sandy soils and high groundwater levels. Elevations range from

More information

POLLUTANT REMOVAL EFFICIENCIES FOR TYPICAL STORMWATER MANAGEMENT SYSTEMS IN FLORIDA

POLLUTANT REMOVAL EFFICIENCIES FOR TYPICAL STORMWATER MANAGEMENT SYSTEMS IN FLORIDA POLLUTANT REMOVAL EFFICIENCIES FOR TYPICAL STORMWATER MANAGEMENT SYSTEMS IN FLORIDA Presented at the Fourth Biennial Stormwater Research Conference Clearwater, FL October 18-20, 1995 Sponsored By: The

More information

Springfield Utility Board, Oregon Rainbow Water District, Oregon

Springfield Utility Board, Oregon Rainbow Water District, Oregon WATER MANAGEMENT AND CONSERVATION PLAN Springfield Utility Board, Oregon Rainbow Water District, Oregon August 2012 WATER MANAGEMENT AND CONSERVATION PLAN FOR SPRINGFIELD UTILITY BOARD AND RAINBOW WATER

More information

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit) CHESAPEAKE BAY TMDL ACTION PLAN (2013 2018 MS4 General Permit) Central Virginia Community College A Plan for Achieving a 5% Reduction of Existing Loads June 30, 2015 Main Campus This plan satisfies the

More information

The surface water hydrology of the site has been logically divided into six phases of monitoring, analyses, and investigation as outlined below:

The surface water hydrology of the site has been logically divided into six phases of monitoring, analyses, and investigation as outlined below: SURFACE WATER HYDROLOGY The surface water hydrology of the site has been logically divided into six phases of monitoring, analyses, and investigation as outlined below: Sample Station Locations and Descriptions

More information

OAKLAND COUNTY HEALTH DIVISION SANITARY CODE ARTICLE II - GROUNDWATER PROTECTION

OAKLAND COUNTY HEALTH DIVISION SANITARY CODE ARTICLE II - GROUNDWATER PROTECTION OAKLAND COUNTY HEALTH DIVISION SANITARY CODE ARTICLE II - GROUNDWATER PROTECTION INDEX OF CODE SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 DEFINITIONS RESIDENTIAL BUILDING SITES COMMERCIAL

More information

TAUSSIG. & Associates, Inc. DAVID. Public Finance Facilities Planning Urban Economics CAPACITY FEE STUDY FOR SAN GORGONIO PASS WATER AGENCY

TAUSSIG. & Associates, Inc. DAVID. Public Finance Facilities Planning Urban Economics CAPACITY FEE STUDY FOR SAN GORGONIO PASS WATER AGENCY DAVID TAUSSIG & Associates, Inc. CAPACITY FEE STUDY FOR SAN GORGONIO PASS WATER AGENCY JULY 21, 2015 Public Finance Facilities Planning Urban Economics Newport Beach Riverside San Francisco Chicago CAPACITY

More information

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy

More information

Water supply components

Water supply components Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution

More information

SPRINGBANK Phase 1 Background Report

SPRINGBANK Phase 1 Background Report Phase 1 Background Report Table of Contents 1.0 CONTEXT... 4 CENTRAL ASP... 4 NORTH ASP... 4 MODDLE ASP... 5 2.0 PROJECT SCOPE... 5 3.0 PLANNING POLICY FRAMEWORK... 6 COUNTY PLAN (BYLAW C-7280-2013)...

More information

Potable Water Supply, Wastewater & Reuse Element

Potable Water Supply, Wastewater & Reuse Element Potable Water Supply, Wastewater & Reuse Element GOAL ONE: HIGH QUALITY AND AFFORDABLE POTABLE WATER WILL BE AVAILABLE TO MEET THE EXISTING AND PROJECTED DEMANDS OF PINELLAS COUNTY UTILITY CUSTOMERS. 1.1.

More information

Wetland Permit Application

Wetland Permit Application DAVID J. KLOTZLE WETLAND INSPECTOR, PHILIPSTOWN, NY 238 Main Street Cold Spring, NY 10516 (914) 736-7132 Wetland Permit Application MEMO TO APPLICANT 1. Use this form to apply for a Wetlands Permit as

More information

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan 4 Capacity Analysis The capacity analysis used the calibrated dry weather and wet weather wastewater collection system model to evaluate

More information

Water Resources Element Appendix

Water Resources Element Appendix Appendix Housing Unit Projection Methodology The following assumptions were used to develop the housing unit projections for each Water Resources Element. All projections described in the and this Appendix

More information

City Council Public Input Session Water / Sewer Rate Study. March 19, 2014

City Council Public Input Session Water / Sewer Rate Study. March 19, 2014 City Council Public Input Session Water / Sewer Rate Study March 19, 2014 Overview of Meeting Introduction of the Study Overview of Water and Sewer Systems FY14 Rate Study Work Accomplished and Presentations

More information

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013 PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC JANUARY 2013 PARR Relicensing Project PARR AND FAIRFIELD LOCATIONS FFPS PARR

More information

VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN

VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information