1 Annual Environmental Report 2008 IPPC Reg. No. P Dynea Ireland Ltd. Marino Point, Cobh, Co. Cork Submission Date: March 2009 March

2 IPPC Reg. No. P AER Dynea Ireland Ltd Table of Contents 1 Introduction Site Details Description of Activities Environmental Policy Environmental Organisation Chart 5 2 Summary Information 2.1 Self-Monitoring Data Emissions to Waters / Sewer Emissions to Atmosphere Waste Arisings 2.2 Energy and Water Consumption Energy Consumption Water Consumption Environmental Incidents and Complaints PRTR Agency Monitoring and Enforcement 12 3 Management of the Activity 3.1 Schedule of Objectives and Targets Environmental Management Programme Report Environmental Management Programme Proposal 16 4 Licence Specific Reports Appendix 1 Environmental Policy 19 Appendix 2 PRTR 22 Appendix 3 Noise Survey Report Appendix 4 Results of Groundwater Monitoring March

3 1 Introduction 1.1 Site Details: IPPC Licence Reg. No. P Name: Location: National Grid Reference: Dynea Ireland Ltd. Marino Point, Cobh, Co. Cork E N69788 Class number: 5.12 Class description: The production of basic organic chemicals 1.2 Description of site activities The production site of Dynea Ireland Ltd. is located at Marino Point, Cobh, Co. Cork. A number of products are manufactured at the Marino Point site in the following categories: Formalin solution 50% Urea Formaldehyde Panelboard Resins for the domestic market Melamine Urea Formaldehyde Panelboard Resins for the domestic market Urea solution for the domestic market Urea Formaldehyde Industrial Resins for the domestic market Melamine Formaldehyde Impregnating Resin for the UK market Urea Formaldehyde Impregnating Resin for the UK market The raw materials for the process are methanol, urea and melamine. The plant has the capacity to produce approximately 100,000 Tonnes per annum of liquid resin. An Integrated Pollution Control Licence (No. 34) was granted to the company by the Environmental Protection Agency on the 14 th of March An Integrated Pollution Prevention and Control Licence (No. P ) was granted to the company by the Environmental Protection Agency on the 27 th of October The production site of Dynea Ireland Ltd. is located at Marino Point, Cobh, Co. Cork. Dynea Ireland (then operating as Dynochem Ireland Ltd.) commenced resin and formalin production in mid 1997 and 1998 was the first full year of production. Dynea is a multinational company with its headquarters in Helsinki. The company was formed by the merger of two multinational companies, Dyno Industrie, a Norwegian chemical company and Neste Chemicals, a Finnish state owned chemical company, in The Dynea group of companies is now owned by the Finnish company Dynea Oy. March

4 IPPC Reg. No. P AER Dynea Ireland Ltd Dynea is a global leader in creating high value adhesion and surfacing solutions for the wood working industry and industrial applications and, in 2003, had combined revenues of approximately 1.0 billion. With 54 production units in 24 countries in Europe, the Americas and Asia Pacific, Dynea employs some 3,200 persons. This document details the performance of the company with regard to the controls sets out in the Integrated Pollution Prevention and Control Licence. 1.3 Environmental Policy Is attached as appendix 1 March

5 IPPC Reg. No. P AER Dynea Ireland Ltd. 1.4 Environmental Organisation Chart Organisation Chart Dynea Ireland Ltd. Joe Giltinan Site Manager James O Callaghan Health & Safety Engineer Roy Woods Fitter Darren Devlin HSE & Prod. Support Assistant Gary Smith Maintenance Supervisor Jerry O Keeffe Electrician Joe Terry Assistant Production Manager Shift Leaders Operators Toni Connery Accounts & Logistics Support Shift Leaders Finbarr O Sullivan Willie Barry Joe O Donovan Michael Treacy Stephen Meaney Operators Donncha Spriggs Eddie Walsh Stuart Meredith Andy Mulqueen Paddy Young Charles Geary Eric Field Eimear O Driscoll Accounts Assistant Theresa O Sullivan HR / Reception Mary Kerrigan Site Accountant Mark O Riordan Quality Manager Rose Quinlan Laboratory Analyst Derry Twomey Laboratory Analyst Liam Moynihan Commercial Manager Ireland & UK Key Black font = Permanent employee x 28 Green Font = Temporary Contracts x 1 Peter O Regan Tech. Services Mgr Ireland & UK Margaret O Leary Sales Manager, Ireland March

6 IPPC Reg. No. P AER Dynea Ireland Ltd. 2 Summary Information 2.1 Self-Monitoring Data Emissions to Water / Sewer There is one licensed discharge emission point to water from this site and no licensed discharge emission point to sewer. Emissions to Water The emission point reference number for the one discharge emission point to water is: o SW1 This discharge is sampled, monitored and analysed as per schedule C Monitoring of Emissions to Water of IPPC Licence No. P A summary of these results for the year 2008 is detailed in Table 1. This emission is described as contaminated storm water in the IPPC licence and thus by its nature it is a non- continuous emission. It should be noted that this is a new emission point specific to this site, in the previous licence (P ) there was an emission point to the IFI sewer, with different emission limit values. Therefore year on year comparisons are not accurate, however year on year data has been included to ensure fullness in reporting. Table 1: Summary Table for Emissions to Water (Ref. Point SW 1) Parameter Mass Emissions-Kg Licensed Mass Emissions (2007) Kg Volume (m 3 ) ,000 m 3 BOD ,010 COD 10,762 2,569 2,088 4, ,562.5 Suspended Solids ,517.5 Total Nitrogen ,507.5 Total Ammonia , ,005 Formaldehyde Mineral Oil ,010 Figure 1: Trend Analysis (Ref. Point SW-1) Kg BOD COD Suspended Solids Total Ammonia Formaldehyde March

7 IPPC Reg. No. P AER Dynea Ireland Ltd. Table 2: Summary of Non-compliances (Emissions to Water) Date Non-compliance Cause Corrective Action N/A In 2008 there were no non- compliances for emissions to water Emissions to Atmosphere There are three licensed discharge emission points to air from this site. The emission point reference numbers for these discharge points are o A2-1 o A2-2 o A2-3 These discharges are sampled, monitored and analysed as per schedule C Monitoring of Emissions to Air of IPPC Licence No. P A summary of these results for the year 2008 are detailed in Tables 3, 4 & 5. Table 3: Summary Table for Emissions to Atmosphere: Emission point A2-1 (Catalytic Converter Exhaust) Licensed Parameter Mass Emission (2007) (kg) TOC CO Formaldehyde Methanol Dimethyl Ether Figure 2: Trend Analysis (Ref. Point A2-1) Mass Emissions Data - Year on Year Comparison Kg TOC CO Formaldehyde Methanol Dimethyl Ether Parameter March

8 IPPC Reg. No. P AER Dynea Ireland Ltd. Table 4: Summary Table for Emissions to Atmosphere: Emission Point A2-2, A2-3 (Bag Filters at Melamine Hoppers) Parameter Volume Flow (Nm 3 /Hr) Particulates (mg/nm 3 ) A2-2 A2-3 A2-2 A < Emission Limit Value Table 5: Summary of Non-compliances (Air Emissions) Date Noncompliance N/A Cause Corrective Action In 2008 there were no non- compliances for emissions to Air Waste Arisings Information on waste arisings for the year 2008 are summarised below. There are also reported as part of the PRTR electronic reporting summary. Table 6: Waste generated on site and disposed of offsite (2008) Description Weight (Tonnes) EWC Code Cured Resin Recyclable material Wastewater Timber Paper Glass WEEE * Plastic Scrap Metal Mixed Waste to Landfill TOTAL March

9 IPPC Reg. No. P AER Dynea Ireland Ltd. Figure 3: Waste types generated on site 2008 Plastic 2% Waste 2008 Scrap M etal 2% M ixed Waste to Landfill 1% Timber 5% Cured Resin 21% WEEE 0% Glass 0% Paper 0% Recyclable material 0% Wastewater 69% Table 7: Waste year on year comparison Total Quantity of waste generated on site Total Quantity of Waste Recovered off-site Total Quantity of Waste Disposed off-site March

10 IPPC Reg. No. P AER Dynea Ireland Ltd. 2.2 Energy and Water Consumption Energy Consumption Fig 4: Energy use on site Total Energy Usage MWh Year Table 8: Energy Consumption Summary Natural gas (Megawatthours) Electricity (Megawatthours) Total (Megawatt-hours) Water Consumption Table 9: Water Consumption Summary Municipal supply (m 3 ) March

11 IPPC Reg. No. P AER Dynea Ireland Ltd. Fig 5: Water consumption on site Municipal supply (m3) m Year 2.3 Environmental Incidents and Complaints Summary Reports Table 10: Incident Summary Date of Incident Brief description of incident Corrective Action 11/01/2008 While lifting IBC of antifoam to top floor the forks of the lifting hoist pierced the IBC causing a spill of approximately 600ltrs Overflow of Tank T-415 while filling. Failure of high level transmitter. Spill contained in bund and transferred to T While loading PO 78 with 11F438 from T423 the tanker overfilled 100kgs While charging raw materials to R1 it was noticed that product was coming out of the side of R1 where the viscometer had been removed. Immediately the bottom valve of R1 and R2 were opened and vacuum applied to R2. All the contents of R1 were transferred into R2. On investigation afterwards it was confirmed that 200kgs was lost onto the ground. The spill was contained appropriately using absorbent material. New Siemens transmitters installed Nov 08 The filing system did not stop when set point reached. The system was rebooted and filling retested. The filling system was monitored closely for a week with No recurrance of this problem. Erect signs to say that if viscometer is removed the flange must be blanked. March

12 IPPC Reg. No. P AER Dynea Ireland Ltd. Table 11: Complaint Summary MONTH Date Complaint Received Type of Complaint Comments February 12/02/2008 Misc. Mrs. O' Connor rang P O' Regan regarding spraying of water in harbour - we were testing jetty fire hose at the time - this was explained to her. Also complained of sticky residue on her husband's car. P O Regan explained that would not have come from this site. 2.4 PRTR Electronic Report The AER Returns Worksheet has been completed and submitted electronically to the Agency as per instructions. In addition the printed sheets are attached to this report in Appendix Agency Monitoring and Enforcement During 2008 there were a number of monitoring visits by Agency staff. Sample of emissions to water and air were taken. March

13 IPPC Reg. No. P AER Dynea Ireland Ltd. 3 Management of the Activity 3.1 Schedule of Objectives and Targets 5 Year Environmental Plan ( ) 1. Waste Management Objective: Reduction in solid waste generated on site Target(s): Reduction in year on year solid waste generation by 5% per annum Decrease in waste sent to landfill Increase in waste sent for recycling /recovery Responsibility: Environmental officer and Assistant Production Manager 2008 Report: Overall waste generated on site for 2008 has increased compared to The biggest increase is in cured resin. There has been a decrease in general waste disposal and the recycling of plastics and glass have remained the same. 2. Environmental Management Objective: Continuously improve environmental performance on site and maintain ISO Standard Target(s): Reduction in Environmental Management (procedural) issues raised at ISO and EPA Audits Improve site wide environmental management Maintain compliance with all IPPC licence conditions Responsibility: Environmental officer 2008 Report: Re certification of ISO 14001:2004 was achieved 3. Energy Use Objective: Optimise operations to ensure energy is used efficiently Target(s): Maximise output of steam generator Operate plant as efficiently as possible Responsibility: H&S Engineer 2008 Report: Steam generator was running throughout 2008 contributing to the reduction of electricity consumed 4. Water Management Objective: Manage water efficiently on site Target(s): Reduce to a minimum unnecessary contamination of storm water Install appropriate wastewater treatment unit Reuse as much water as possible on site Responsibility: H&S Engineer / Environmental officer /Assistant Production Manager 2008 Report: RO pilot plant was installed and water being treated through this was reused in production. This was still being run on a trial basis March

14 IPPC Reg. No. P AER Dynea Ireland Ltd. 5. Protection of Groundwater Objective: Investigate thoroughly groundwater contamination and remediate as appropriate Target(s): Elimination of groundwater contamination (where possible and where source is Dynea) Responsibility: Environmental officer/assistant Production Manager 2008 Report: Phase one of the remediation work of the underground drains has taken place with drains being cleaned and relined to stop any potential contamination 6. Maintenance of quality of Air Emissions Objective: Maintain low air emissions from production and eliminate odour emissions Target(s): Maintain licensed air emissions at current levels and have no other air emissions Responsibility: Environmental officer 2008 Report: There have been no odour emissions in 2008 and the licensed air emissions for TOC, CO and Dimethylether have been lower than in 2007 March

15 IPPC Reg. No. P AER Dynea Ireland Ltd. 3.2 Environmental Management Programme Report 2008 Dynea Environmental Management Programme 2008, Report on Progress 1. Waste Management Objective: Reduction in solid waste generated on site Responsibility: Environmental officer/assistant Production Manager Report: Training has taken place in 2008 making people aware of waste reduction. There are facilities available for the segregation of glass, paper, timber and dry recyclables for all at the site. There has been a reduction in general non-recyclable waste from 39.8T in 2007 to 7.7T Waste dockets are filled out for each load and tracked each month 2. Environmental Management Objective: Continuously improve environmental performance on site and maintain ISO Standard Responsibility: Environmental officer Report: o Internal audits have been carried out which has found that the maintenance programme for environmentally critical equipment was effective and there were records for internal and external calibration checks. o There are control measures in place to ensure that the site operates with in the limits set out. In an effort to continually improve results from water monitoring are compared with those tested externally. Both internal and external results have shown that the water is within limits. o Raw material efficiency on site is routinely assessed by looking at formox efficiency data and resin data on raw material addition. o Training has been carried out on environmental awareness on site. o Emergency response plan and environmental procedures will be updated as the need arises or when modifications take place that requires these to be altered o CRAMP & ELRA were reviewed with no changes required. o Tank tests have been carried out on T417, T418, T419, T405, T402, T403, T401in 2008 o Work on environmental risk audit programme software has not taken place 3. Energy Use Objective: Optimise operations to ensure energy is used efficiently Responsibility: H&S Engineer / Environmental officer Report: o Energy meters were installed during 2008, this should aid in identifying areas of higher energy consumption and where savings may be made o Installation of sensors for lights in production areas did not go ahead o A new and bigger condenser was installed to help improve operation of steam engine 4. Water Management March

16 IPPC Reg. No. P AER Dynea Ireland Ltd. Objective: Manage water efficiently on site Responsibility: H&S Engineer / Environmental officer Report: o A pilot project was started mid 2008 which was to put all storm water through an RO unit and use the water from this in production. There is also a possibility to discharge the water from the RO unit as it will be within the limits for discharge. This trial has been working since mid 2008 and it does make use of the site water more efficiently. By using more of this storm water we are using less mains water and we are reducing the amount of water that is discharged. o Phase 1 of the underground repair work has been completed. The drains around the urea store have been cleaned and lined and are now leak proof. In 2009 drains around the office building are being relined. 5. Protection of Groundwater Objective: Investigate thoroughly groundwater contamination and remediate as appropriate Responsibility: H&S Engineer / Environmental officer Report: o WYG carried out an investigation into the groundwater contamination which has been sent to the epa. Also the ground water has been monitored through the biannual monitoring tests and the groundwater shows signs of improvement. Improvements in groundwater should come about through the relining of the drains 6. Maintenance of quality of Air Emissions Objective: Maintain low air emissions from production and eliminate odour emissions Responsibility: H&S Engineer / Environmental officer Report: o There have been no odour emissions in 2008 and the air emissions in 2008 have been within the limits set out in the IPPC licence. March

17 IPPC Reg. No. P AER Dynea Ireland Ltd. 3.3 Proposed Environmental Management Programme Waste Management Objective: Reduction in non-hazardous waste generated on site by 20% and Hazardous waste by 50% Responsibility: Environmental officer/assistant Production Manager Projects: o Identify areas where excessive waste is generated and develop programmes to improve these areas. o Focus on improving communication on site about the waste targets and progression made to meet these targets. 2. Environmental Management Objective: Continuously improve environmental performance on site and maintain ISO Standard Responsibility: Environmental officer Projects o Carry out internal audits on environmental management system o Continue a comparison programme of external and internal water results o Carry out training programmes for environmental issues on site o Update environmental procedures on site o Revise CRAMP & ELRA as appropriate o Continue Tank & Pipeline inspection programme, this began in 2007 and needs to be completed by October Energy Use Objective: Optimise operations to ensure energy is used efficiently Responsibility: H&S Engineer / Environmental officer Projects: o Install Gas meter at an appropriate point during 2009, this should aid in identifying higher energy consumption and where savings may be made o Install level transmitter in H101 to improve the quality of the steam going to the steam engine to improve efficiency o Install a steam drier to improve the quality of the steam going to the steam engine to improve efficiency 4. Water Management Objective: Manage water efficiently on site Responsibility: H&S Engineer / Environmental officer/site Manager Projects: o Improve the management of the water on site by installing an RO unit on site to replace the trial that had taken place in This will optimise reuse of contaminated storm water and reduce the use of mains water. o Carry out Phase 2 of the underground drains repair March

18 IPPC Reg. No. P AER Dynea Ireland Ltd. 5. Protection of Groundwater Objective: Investigate thoroughly groundwater contamination Responsibility: H&S Engineer / Environmental officer/site Manager Projects: o Continue to carry out investigations into ground water contamination o Continue to monitor groundwater for improvement. o Carry out Phase 2 of the underground drains repair 6. Maintenance of quality of Air Emissions Objective: Maintain low air emissions from production Responsibility: H&S Engineer / Environmental officer Projects: o Monitor and analyse air emissions. March

19 IPPC Reg. No. P AER Dynea Ireland Ltd. 4 Licence Specific Reports 4.1 Noise Monitoring Report This report is attached in Appendix 3 it shows that the site was in compliance with limits set by the IPPC licence for noise. 4.2 Groundwater Monitoring Summary As per schedule C.6 of IPPC licence P Groundwater monitoring was carried out twice during The results of this monitoring are attached in Appendix 4. March

20 IPPC P AER APPENDIX ONE Environmental Policy March

21 IPPC Reg. No. P AER Dynea Ireland Ltd. Dynea Group Environmental Policy HEALTH, SAFETY, ENVIRONMENT AND QUALITY POLICY Dynea's long-term development is secured through the way we handle Health, Safety, Environment and Quality matters. This policy is for us the basis to build trust between Dynea and our stakeholders. We will Ensure that health and safety are our first priority; Minimise harmful environmental impacts; Base our work on openness and continual improvement; Develop products, services and operations with consistent quality, which are environmentally preferred and safe; Implement this policy according to the agreed health, safety, environment and Health, Safety, Environmental and Quality Management System based on ISO or equivalent standards. IMPLEMENTATION This Health, Safety, Environment and Quality Policy will come into force immediately. Roger Carlstedt President and CEO March

22 IPPC Reg. No. P AER Dynea Ireland Ltd. Dynea Cork Environmental Policy Dynea Ireland Ltd Health, Safety, Environment and Quality Policy The Business Principles and Objectives of Dynea apply to all the activities of Dynea Ireland, in the manufacture and supply of its products, be they resin, methanol or formalin or any other material. In respect of HSE, Dynea Ireland Ltd s policy is to ensure, that we comply with the requirements of all current legislation, thereby creating a working environment where risks to Health, Safety and the Environment are eliminated in so far as is reasonably practicable In accordance with the particulars of our above policy we recognise the following as key deliverables: As a company we strive to ensure that we fulfil all moral obligations and legal requirements to safeguard the Safety, Health, Welfare and Environmental impacts impacting on all our employees, management team, contractors, visitors to our facilities, the environment and members of the public who may be affected by our business activities. We believe that Health, Safety and Environmental Management is the responsibility of all our employees, management team, contractors and all visitors to our facilities as all of these key people have the ability to impact on Health, Safety and the Environment. HSE Management is a critical factor to the success of our business. Quite simply Good HSE Management makes good business sense. We strongly believe that through good HSE Management, Senior Management Commitment to Safety and Health, Quality Training with key Policies and Procedures in place will ultimately contribute to and increase HSE awareness within our organisation helping us to nurture and develop a Positive Proactive Health, Safety and the Environment friendly Culture. Our aim is to reduce, eliminate and control the risks associated with our business ultimately reducing if not eliminating accident/incident occurrences and potential environmental disasters occurring on site which could adversely inhibit the growth and future development of our organisation. The maintenance of continual improvement in all aspects of Health & Safety, Environmental Protection and Quality is the responsibility of all members of staff, and is maintained via internal Audit schedules and also regular Management Review Meetings. The organisation also uses clearly defined objectives and targets, reviewed regularly, as a tool to drive improved performance for the benefit of all stakeholders. The foundations of these high quality standards are well-conceived and documented design and development procedures, good logistic procedures and appropriately timed customer service. At each stage, the personnel involved are responsible for the quality of goods produced and/or service provided. Improvements in the Health and Safety, Environmental and Quality standards shall be achieved by continually identifying and solving problems in all areas of activity, ensuring appropriate systematic forums for analysis and decision making, are critical in this respect. Adequate and relevant training in all areas is a necessary addition to continual improvement. All management systems are designed to ensure, at a minimum, compliance with all legal and other requirements and to provide for continuous improvement of all aspects of HSEQ performance. March

23 IPPC Reg. No. P AER Dynea Ireland Ltd. The Dynea Ireland Business Management System is based upon full and carefully written procedures and Task Instructions, as well as standards, specifications and process mapping. The Dynea Ireland Health, Safety, Environmental and Quality Manual gives a basic description of the whole Business Management System, describing the procedures, documentation and the responsibilities delegated throughout the Management Structure. All contractors working on site shall also be subject to the strict procedures detailed in the Business Management System and will be put through a strict approval procedure before being allowed on site in order that their operations do not compromise the integrity of the Business Management System. Joe Giltinan Site Manager April 2008 March

24 IPPC P AER APPENDIX TWO PRTR Report March

25 IPPC Reg. No. P Dynea Ireland Ltd. AER PRTR# : P0034 Facility Name : Dynea Ireland Limited Filename : P0034_2008(1).xls Return Year : 2008 REFERENCE YEAR 2008 AER Returns Worksheet Version FACILITY IDENTIFICATION Parent Company Name Dynea Ireland Limited Facility Name Dynea Ireland Limited PRTR Identification Number P0034 Licence Number P Waste or IPPC Classes of Activity No. class_name The production of basic organic chemicals, such as:(a) simple hydrocarbons (linear or cyclic, saturated or unsaturated, aliphatic or aromatic),(b) oxygencontaining hydrocarbons such as alcohols, aldehydes, ketones, carboxylic acids, esters, acetates... The chemical manufacture of glues, bonding agents and adhesives, not included in paragraphs 5.12 to Address 1 Marino Point Address 2 Cobh Address 3 County Cork Address 4 Country Ireland Coordinates of Location River Basin District NACE Code 2014 Main Economic Activity Manufacture of other organic basic chemicals AER Returns Contact Name Mark O'Riordan AER Returns Contact Address mark.oriordan@dynea.com AER Returns Contact Position PlantChemist/Quality Manager & Environmental Officer AER Returns Contact Telephone Number / AER Returns Contact Mobile Phone Number AER Returns Contact Fax Number Production Volume Production Volume Units Tonnes Number of Installations 1 Number of Operating Hours in Year 8232 Number of Employees 28 User Feedback/Comments Web Address 2. PRTR CLASS ACTIVITIES Activity Number 4ai 4aii March 2009 Activity Name Simple hydrocarbons (linear or cyclic, saturated or unsaturated, aliphatic or aromatic) Oxygen-containing hydrocarbons such as alcohols, 25

26 IPPC Reg. No. P Dynea Ireland Ltd. 4aiii 4aiv 4aix 4av 4avi 4avii 4aviii 4ax 4axi AER aldehydes, ketones, carboxylic acids, esters, acetates, ethers, peroxides, epoxy resins Sulphurous hydrocarbons Nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates Synthetic rubbers Phosphorus-containing hydrocarbons Halogenic hydrocarbons Organometallic compounds Basic plastic materials (polymers, synthetic fibres and cellulose-based fibres) Dyes and pigments Surface-active agents and surfactants 3. SOLVENTS REGULATIONS (S.I. No. 543 of 2002) Is it applicable? No Have you been granted an exemption? No If applicable which activity class applies (as per Schedule 2 of the regulations)? Is the reduction scheme compliance route being used? March

27 IPPC Reg. No. P AER Dynea Ireland Ltd. 4.1 RELEASES TO AIR PRTR# : P0034 Facility Name : Dynea Ireland Limited Filename : AER returns worksheet 2008.xls Return Year : /03/ : SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS RELEASES TO AIR POLLUTANT METHOD QUANTITY Method Used A2 1 No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year 02 Carbon monoxide (CO) M CRM On-line IR analyser * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button SECTION B : REMAINING PRTR POLLUTANTS RELEASES TO AIR POLLUTANT METHOD QUANTITY Method Used No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button SECTION C : REMAINING POLLUTANT EMISSIONS (As required in your Licence) RELEASES TO AIR POLLUTANT METHOD Method Used A2 1 A2 2 A2 3 Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 Emission Point 3 T (Total) KG/Year QUANTITY A (Accidental) KG/Year F (Fugitive) KG/Year 212 Formaldehyde M CRM Internally validated method Methanol M CRM Internally validated method Total Organic Carbon (as C) M CRM On-line IR analyser Total Particulates M CRM Gravimetric Additional Data Requested from Landfill operators Landfill: Please enter summary data on the quantities of methane flared and / or utilised * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button landfill gas (Methane) flared or utilised on their facilities to accompany the figures for total methane generated. Operators should Dynea Ireland Limited Method Used Designation or Description Facility Total Capacity m3 per hour additional_pollutant_no T (Total) kg/year M/C/E Method Code Total estimated methane generation (as per site model) 0.0 N/A Methane flared (Total Flaring Capacity) Methane utilised in engine/s (Total Utilising Capacity) Net methane emission (as reported in Section A above) 0.0 N/A March

28 IPPC Reg. No. P AER Dynea Ireland Ltd. 4.2 RELEASES TO WATERS PRTR# : P0034 Facility Name : Dynea Ireland Limited Filename : P0034_2008(1).xls Return Year : /03/ : SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS Data on ambient monitoring of storm/surface water or groundwater, conducted as part of your licence requirements, should NOT be submitted under AER / PRTR Reporting as this onl RELEASES TO WATERS POLLUTANT QUANTITY Method Used SW1 No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year 12 Total nitrogen M CRM Persulfate digestion * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button SECTION B : REMAINING PRTR POLLUTANTS RELEASES TO WATERS POLLUTANT QUANTITY Method Used No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button SECTION C : REMAINING POLLUTANT EMISSIONS (as required in your Licence) RELEASES TO WATERS POLLUTANT QUANTITY Method Used SW 1 Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year 238 Ammonia (as N) M CRM salicylate BOD M Internally Validated Method Internally Validated Methaod COD M CRM Digestion method Formaldehyde M CRM Internally Validated Method Mineral oils M CRM Internally validated method Suspended Solids M CRM Internally validated method March

29 IPPC Reg. No. P AER Dynea Ireland Ltd. 5. ONSITE TREATMENT & OFFSITE TRANSFERS OF WASTE PRTR# : P0034 Facility Name : Dynea Ireland Limited Filename : P0034_2008(1).xls Return Year : /03/ : Method Used Name and Address of Final Licence / Permit No. of Final Transfer Destination European Waste Code Hazardous Quantity T/Year Description of Waste Waste Treatment Operation M/C/E Method Used Location of Treatment Name and Licence / Permit No. of Recoverer / Disposer / Broker Address of Recoverer / Disposer / Broker Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY) Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY) Cork miniskips/ck WMC John F Connolly Rd Within the Country No Cured resin D1 M Weighed Offsite in Ireland 234/04 Churchfield, Cork Greenstar recycling/ck WMC Sarsfield court industrial Within the Country No 0.68 Recyclable waste R3 M Weighed Offsite in Ireland 323/05 estate, Glanmire, Co. Cork Smithstown industrial estate, Within the Country No Waste water D9 M Weighed Offsite in Ireland Enva Ireland Ltd/ 41-1 shannon, Co. Clare Cork miniskips/ck WMC John F Connolly Rd Within the Country No timber R3 M Weighed Offsite in Ireland 234/04 Churchfield, Cork Within the Country No 0.13 paper R3 M Weighed Offsite in Ireland Rehab recycling/ck WMC 146/03 Monahan Rd, Cork Within the Country No 0.41 glass R3 M Weighed Offsite in Ireland Rehab recycling/ck WMC 146/03 Monahan Rd, Cork Within the Country No plastics R3 M Weighed Offsite in Ireland Cork miniskips/ck WMC 234/04 John F Connolly Rd Churchfield, Cork Greenstar recycling/ck WMC Sarsfield court industrial Within the Country No mixed waste to landfill D1 M Weighed Offsite in Ireland 323/05 estate, Glanmire, Co. Cork Within the Country No 9.78 metal R4 M Weighed Offsite in Ireland Cork metal/ck WMC 26/01 Dublin Hill, Cork Within the Country Yes WEE R13 M Weighed Offsite in Ireland Rehab recycling/ck WMC 146/03 unit 77, broomhill Rd, Tallaght ind. Est. Dublin24 unit 77, broomhill Rd, Tallaght ind. Est. Dublin24 WP RO March

30 IPPC P AER APPENDIX THREE 2008 Noise Report March

31 March

32 March

33 Page 33

34 Page 34

35 Page 35

36 Page 36

37 Page 37

38 Page 38

39 Page 39

40 March

41 Page 41

42 Page 42

43 IPPC P AER APPENDIX FOUR 2008 Groundwater Monitoring Results March

44 44

45 45

46 46

47 47

48 48

49 49

50 50

51 51

52 52

53 53

4.1 RELEASES TO AIR Link to previous years emissions data PRTR# : P0297 Facility Name : Procter & Gamble (Manufacturing) Ireland Limited Filename : P0297_2010.xls Return Year : 2010 08/08/2011 13:20 8

More information

Novartis Animal Health Ireland Limited

Novartis Animal Health Ireland Limited ANNUAL ENVIRONMENTAL REPORT 2008 For Novartis Animal Health Ireland Limited IPC Licence No. P0085-01 Document Number: 1046-01 v1.00 Tel: 353 1 276 1428 Fax: 353 1 276 1561 Email: energy@iol.ie www.enviro-consult.com

More information

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P Clogrennane Lime Ltd Toonagh Lime Works AER 2010 Licence # P0 771-01 Section 1 Overview. 3 1.0 Introduction 1.1 Description of Activities 1.2 Responsibility for Environmental Management 1.3 Environmental

More information

Soltec (Ireland) Ltd Waste Licence No W /12/12

Soltec (Ireland) Ltd Waste Licence No W /12/12 1 Soltec (Ireland) Ltd EPA License W0115-01 Report Type: AER Reporting Period: 1 st Jan 2012-31 st Dec 2012 Document Name Function Date Signature Written by Mary Lynam - Dunne Accounts Manager 7-1-13 Edited

More information

Kildare Chilling Company. Annual Environmental Report 2011

Kildare Chilling Company. Annual Environmental Report 2011 Kildare Chilling Company Annual Environmental Report 2011 Issued By Michael Maguire Environmental Officer Kildare Chilling Company - 1 - Table of Contents 1. Introduction.. 3 2. Site Description... 4 3.

More information

Carbury Compost (W ) Drummin Carbury Co. Kildare

Carbury Compost (W ) Drummin Carbury Co. Kildare Carbury Compost (W0124-01) Drummin Carbury Co. Kildare Annual Environmental Report 2010 Prepared By: Donna Kelly BSc Hons Environmental Science CONTENTS Page No. 1.0 Reporting Period 3 2.0 Waste Activities

More information

Annual Environmental Report for Glennon Bros. Cork Ltd.

Annual Environmental Report for Glennon Bros. Cork Ltd. Annual Environmental Report for Glennon Bros. Cork Ltd. Period: January 2009 to December 2009 To: The Environmental Protection Agency From: Glennon Bros. Cork Ltd. License no. P0344-01 Date: 31/03/2010

More information

Irish Country Meats Navan

Irish Country Meats Navan Irish Country Meats Navan Annual Environmental Report 2008 Index 1 Introduction 2 Environmental Policy 3 Site Description 4 Summary Information 4.1 Emission to Sewer 4.2 Emissions to Water 4.3 Waste Management

More information

Essidev SA Trading as Organic Lens Manufacturing IPPC License P Annual Environmental Report 2008

Essidev SA Trading as Organic Lens Manufacturing IPPC License P Annual Environmental Report 2008 ESSIDEV SA T/A ORGANIC LENS MANUFACTURING IPPC Licence P-0061-03 Essidev SA Trading as Organic Lens Manufacturing IPPC License P0061-03 Annual Environmental Report 2008 2 Contents Section 1 INTRODUCTION

More information

Tel: +353 (0) Fax: +353 (0) Website: ARRAN CHEMICAL COMPANY LTD

Tel: +353 (0) Fax: +353 (0) Website:  ARRAN CHEMICAL COMPANY LTD ARRAN CHEMICAL COMPANY LTD Ireland Monksland Industrial Estate Athlone, Co Roscommon, Tel: +353 (0)90 6494807 Fax: +353 (0)90 6494809 Email: info@arranchemical.ie Website: www.arranchemical.ie ARRAN CHEMICAL

More information

KILDARE COUNTY COUNCIL Comhairle Chontae Cill Dara

KILDARE COUNTY COUNCIL Comhairle Chontae Cill Dara KILDARE COUNTY COUNCIL Comhairle Chontae Cill Dara ATHY WASTE WATER TREATMENT PLANT ANNUAL ENVIRONMENTAL REPORT 2010 WWDA Licence No. D0003-01 May 2011 Aras Cill Dara Devoy Park Naas Co. Kildare Tel: (045)

More information

Irish Country Meats Navan

Irish Country Meats Navan Irish Country Meats Navan Annual Environmental Report 2009 Index 1 Introduction 2 Environmental Policy 3 Site Description 4 Summary Information 4.1 Emission to Sewer 4.2 Emissions to Water 4.3 Waste Management

More information

MANAGEMENT OF THE INSTALLATION

MANAGEMENT OF THE INSTALLATION MANAGEMENT OF THE INSTALLATION Cadbury Ireland Limited Project Ref: OES1061_01 EPA Export 25-07-2013:21:15:11 Site Management and Control Cadbury Ireland Limited manufactures and distributes over 25 products

More information

MANAGEMENT OF THE INSTALLATION. Attachment C. Cadbury Ireland Limited, Rathmore Installation Rathmore Installation IPPC Licence Application

MANAGEMENT OF THE INSTALLATION. Attachment C. Cadbury Ireland Limited, Rathmore Installation Rathmore Installation IPPC Licence Application MANAGEMENT OF THE INSTALLATION Cadbury Ireland Limited, Project Ref: OES1061_01 EPA Export 25-07-2013:19:20:35 Cadbury Ireland Limited, July 2006 Site Management and Control Cadbury Ireland Limited manufactures

More information

Kurnell Refinery Conversion Project

Kurnell Refinery Conversion Project Kurnell Refinery Conversion Project Waste Management Plan CALTEX REFINERIES (NSW) PTY LTD January 2014 Page 1 1 INTRODUCTION Caltex propose to convert the petroleum refinery in Kurnell (the Site ) to a

More information

Annual Environmental Report. For. Bergin Waste Disposal limited. Waste Licence no. W

Annual Environmental Report. For. Bergin Waste Disposal limited. Waste Licence no. W 2010 Annual Environmental Report For Bergin Waste Disposal limited Waste Licence no. W0163-01 Prepared by: ANN CLARKE FACILITY MANAGER BERGIN WASTE DISPOSAL LTD. 1.0 Reporting Period 4 2.0 Waste Activities

More information

Irish Country Meats Camolin

Irish Country Meats Camolin Irish Country Meats Camolin Annual Environmental Report 2009 Index 1 Introduction 2 Environmental Policy 3 Site Description 4 Summary Information 4.1 Emission to Water 4.2 Surface Water 4.3 Boiler Emissions

More information

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY S1014-0340-0008MPW NTS Rev1.doc Print Date 19 February 2009 ISSUE NUMBER 1 DATE 19/02/09 AUTHOR CHECKED MPW SMO Title Page

More information

Environment Protection Licence

Environment Protection Licence Licence Details Number: Anniversary Date: 20076 12-June Licensee CLEANWAY ENVIRONMENTAL SERVICES PTY LTD PO BOX 5179 MINTO NSW 2566 Premises 12 SHAW ROAD 12 SHAW ROAD INGLEBURN NSW 2565 Scheduled Activity

More information

Astellas Ireland Co, Ltd (AICL (KP)) Annual Environmental Report (AER) 2011 IPC Licence Reg. No: P

Astellas Ireland Co, Ltd (AICL (KP)) Annual Environmental Report (AER) 2011 IPC Licence Reg. No: P Astellas Ireland Co, Ltd (AICL (KP)) Annual Environmental Report (AER) 211 IPC Licence Reg. No: P18-1 March 212 OES Consulting FBD House, Fels Point, Tralee, Co. Kerry p: 66 7128321 w: www.oes.ie AICL

More information

Irish Distillers Ltd. Midleton Distilleries

Irish Distillers Ltd. Midleton Distilleries Irish Distillers Ltd. Midleton Distilleries Midleton Co. Cork Reg.No. P0442-01 Annual Environmental Report Date of Issue: March 2009 1.0 Introduction Licence Register Number Name and Location of Site Brief

More information

Loy Yang B Environment Improvement Plan

Loy Yang B Environment Improvement Plan Loy Yang B Environment Improvement Plan 2017 Table of Contents 1 Endorsement 1 2 Environment Policy 2 3 Operating Arrangements 3 4 Site Management and Business Systems 4 5 Environmental Impacts and Risks

More information

GLOBAL SUPPLY. Dundalk Brewery. Dundalk Brewery. IPPC Licence Register No.: P ANNUAL ENVIRONMENTAL REPORT

GLOBAL SUPPLY. Dundalk Brewery. Dundalk Brewery. IPPC Licence Register No.: P ANNUAL ENVIRONMENTAL REPORT GLOBAL SUPPLY Dundalk Brewery Dundalk Brewery IPPC Licence Register No.: P0440-01 ANNUAL ENVIRONMENTAL REPORT 2008 Table of Contents 1. Introduction... 1 1.1 GENERAL... 1 1.2 DUNDALK BREWERY ENVIRONMENTAL

More information

Waste Management Plan

Waste Management Plan Boral Cement Limited Berrima Works Waste Management Plan Document Filename: Document Owner: Approved By: CMT-ENV-006 Berrima Waste Management Plan HSE Advisor, Berrima Works Operations Manager, Berrima

More information

PBL Environmental Management System. Staff Awareness Training. This package has been developed by the Parsons Brinckerhoff Ltd, Environment Group

PBL Environmental Management System. Staff Awareness Training. This package has been developed by the Parsons Brinckerhoff Ltd, Environment Group PBL Environmental Management System Staff Awareness Training This package has been developed by the Parsons Brinckerhoff Ltd, Environment Group Staff Awareness The aim of this package is to give you some

More information

Hazardous Waste Management

Hazardous Waste Management Objectives EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Objective

More information

Attachment C Management of the Installation

Attachment C Management of the Installation Table of Contents Attachment C Management of the Installation C1.1 Organisational Chart C1.2 Quality, Safety and Environmental (QSE) Policy Statement C1.3 Roles & Responsibilities of Key Environmental

More information

ENVIRONMENT AND SAFETY Safe company, safe tyres

ENVIRONMENT AND SAFETY Safe company, safe tyres ENVIRONMENT AND SAFETY Safe company, safe tyres Nokian Tyres follows the principles of responsible corporate citizenship and respect for the environment. In addition to fulfilling the requirements and

More information

For inspection purposes only. Company Name; Cognis (Irl) Ltd/Henkel Ireland Detergents Ltd. Reg No. P

For inspection purposes only. Company Name; Cognis (Irl) Ltd/Henkel Ireland Detergents Ltd. Reg No. P Cognis Ireland Ltd. Little Island, Co. Cork Ireland Phone (+353)21 451 71 00 Fax (+353) 21 435 35 59 www.cognis.com Noleen Roche Administration Officer Office of Licensing and Guidance Environmental Protection

More information

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities.

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities. Transit Systems NSW Environmental Management Plan GOAL 1: REDUCE THE GREENHOUSE IMPACT OF ENERGY USE To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems

More information

Emas Report 2010 Nokia plant

Emas Report 2010 Nokia plant Emas Report 2010 Nokia plant As an authorised auditor, DNV Certification Oy Ab, FI-V-0002 has, on 4 May, 2011, stated that Nokian Tyres plc s environmental system and the 2009 update of the EMAS report

More information

Toxic Substance Reduction Plan Summaries Phase 2 Substances

Toxic Substance Reduction Plan Summaries Phase 2 Substances 2012 TOXICS REDUCTION ACT Toxic Substance Reduction Plan Summaries Phase 2 Substances VERSION 1.0 Petro-Canada Lubricants Inc. 385 Southdown Road Mississauga, Ontario L5J 2Y3 December 1, 2013 Version Control

More information

Facility Information Summary AER Reporting Year

Facility Information Summary AER Reporting Year 1 Facility Information Summary AER Reporting Year 2016 Licence Register Number P0690-02 Name of site C&F Automotive Ltd T/A Iralco Site Location Collinstown, Mullingar, Co Westmeath NACE Code 2561 Class/Classes

More information

A positive, collaborative airport-wide approach is essential to minimise pollution. Heathrow Pollution Prevention Code of Practice

A positive, collaborative airport-wide approach is essential to minimise pollution. Heathrow Pollution Prevention Code of Practice A positive, collaborative airport-wide approach is essential to minimise pollution. Heathrow Pollution Prevention Code of Practice Contents EXECUTIVE SUMMARY 03 INTRODUCTION _ 1.0 04 GENERAL REQUIREMENTS

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy To ensure the effective availability of essential products and services, BCQ has raised this Business Continuity Policy in support of a comprehensive program for business continuity,

More information

THE SOLVENTS / EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (VOC) LEGISLATION

THE SOLVENTS / EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (VOC) LEGISLATION THE SOLVENTS / EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (VOC) LEGISLATION 1.0 INTRODUCTION 2 2.0 INDUSTRY SECTORS IMPACTED 2 3.0 IMPLEMENTATION 4 3.1 IPPC Licensing 4 3.2 Accredited Inspection Contractor

More information

New South Wales Concrete by-product Recycling and Disposal Industry Guidelines

New South Wales Concrete by-product Recycling and Disposal Industry Guidelines New South Wales Concrete by-product Recycling and Disposal Industry Guidelines Cement Concrete & Aggregates Australia (CCAA) is the peak industry body for the heavy construction materials industry in Australia,

More information

AIRCRAFT MAINTENANCE PTY LTD

AIRCRAFT MAINTENANCE PTY LTD AIRCRAFT MAINTENANCE PTY LTD Operational Environmental Management Plan Prepared by Chief Engineer Date: 30 th December 2008 Version 1.0 INTRODUCTION is an aircraft engineering business that has been operating

More information

ANNUAL ENVIRONMENTAL REPORT. For. McGhan Ltd. t/a Allergan Kilbride Industrial Estate, Arklow Co. Wicklow. IPPC Licence Number: P

ANNUAL ENVIRONMENTAL REPORT. For. McGhan Ltd. t/a Allergan Kilbride Industrial Estate, Arklow Co. Wicklow. IPPC Licence Number: P ANNUAL ENVIRONMENTAL REPORT 2008 For McGhan Ltd. t/a Allergan Kilbride Industrial Estate, Arklow Co. Wicklow IPPC Licence Number: P0115-04 (Document Number 1120-01 v3.00) Tel: 353 1 276 1428 Fax: 353 1

More information

Chapter 6 Objective: Protect and Enhance the Environment

Chapter 6 Objective: Protect and Enhance the Environment Chapter 6 Objective: Protect and Enhance the Environment 49 Irish Water Water Services Strategic Plan Our Strategic Aims Ensure that Irish Water services are delivered in a sustainable manner which contributes

More information

ISO14001 Training. ALPS Electric (Ireland) Ltd.. Rev 08 Updated August Consent of copyright owner required for any other use.

ISO14001 Training. ALPS Electric (Ireland) Ltd.. Rev 08 Updated August Consent of copyright owner required for any other use. ISO14001 Training Rev 08 Updated August 2007 What is ISO14001? ISO14001 is an International Standard which specifies the requirements for an Environmental Management System (EMS). It allows a company to:

More information

Kurnell Refinery Conversion Project

Kurnell Refinery Conversion Project Kurnell Refinery Conversion Project Contamination Management Plan CALTEX REFINERIES (NSW) PTY LTD January 2014 Page 1 1 INTRODUCTION Caltex propose to convert the petroleum refinery in Kurnell (the Site

More information

Emas Report 2008 Nokia plant

Emas Report 2008 Nokia plant Emas Report 28 Nokia plant As an authorised auditor, DNV Certification Oy Ab, FI-V-2 has, on 15 April, 29, stated that Nokian Tyres plc s environmental system and the 28 update of the EMAS report comply

More information

Green Stamp Certification Criteria for Printing Businesses

Green Stamp Certification Criteria for Printing Businesses Green Stamp Certification Criteria for Printing Businesses The Green Stamp program is a joint initiative of the Printing Industries Association of Western Australia and the Western Australian Department

More information

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE IRISH CEMENT PLATIN INVESTING IN OUR FUTURE INTRODUCTION Investing in our future. The next phase of investment in Platin will see further energy efficiency improvements with on site electricity generation

More information

TEXTILE INDUSTRY AND ENVIRONMENT. W.J.K.Dushyanthi Ranpatige Research Officer Industrial Technology Institute

TEXTILE INDUSTRY AND ENVIRONMENT. W.J.K.Dushyanthi Ranpatige Research Officer Industrial Technology Institute TEXTILE INDUSTRY AND ENVIRONMENT W.J.K.Dushyanthi Ranpatige Research Officer Industrial Technology Institute The textile industry One of the major contributors to many Asian economies and one of the main

More information

Guidance on the Standards for Storage and Treatment of End-of-life vehicles

Guidance on the Standards for Storage and Treatment of End-of-life vehicles Guidance on the Standards for Storage and Treatment of End-of-life vehicles Introduction This guidance has been prepared by the Environment Agency and the Scottish Environment Protection Agency (SEPA),

More information

Welcome To Our Exhibition

Welcome To Our Exhibition Welcome To Our Exhibition Welcome to the exhibition of our proposals for a Waste Recycling and Renewable Energy Facility Distributed Renewable Energy Networks Ltd (DRENL) propose to develop a 10MW Waste

More information

The following documentation was tabled:

The following documentation was tabled: Extract from the 564th meeting of the Agency held on 21 November 2008, in Headquarters, Johnstown Castle Estate, CO Wexford. 3. Report on the Oral Hearing of the Objections to a Proposed Decision on a

More information

State of the Nation Report

State of the Nation Report State of the Nation Report Landfilling Practices and Regulation in Scotland Contents 1. Summary of Solid Waste Management Sector... 2 2. Overview of Landfill Practices... 5 3. Key Stakeholders in the solid

More information

6.1 Introduction to Wastewater Issues

6.1 Introduction to Wastewater Issues Section 6: Water Pollution This Section will help you: Understand if you generate industrial wastewater; Understand where your wastewater goes; Make sure you meet requirements for floor drains; Properly

More information

INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION

INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION Headquarters, Johnstown Castle Estate Wexford, Ireland INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION Licence Register Number: 304 Applicant: Location of Activity: Mr. Anthony Fay Crocknahattin, Bailieborough,

More information

Table of Contents. 1.0 Introduction Environmental Policy Statement Environmental Management Programme... 7

Table of Contents. 1.0 Introduction Environmental Policy Statement Environmental Management Programme... 7 Table of Contents 1.0 Introduction... 3 2.0 Environmental Policy Statement... 4 3.0 Environmental Management Programme... 7 4.0 Water and Wastewater EcoMap... 8 5.0 Air, Noise, Dust EcoMap... 12 6.0 Wastes

More information

Environment Protection Licence

Environment Protection Licence Licence Details Number: Anniversary Date: 767 01-January Licensee METROPOLITAN COLLIERIES PTY. LTD. PO BOX 402 HELENSBURGH NSW 2508 Premises METROPOLITAN COLLIERY PARKES STREET HELENSBURGH NSW 2508 Scheduled

More information

Final Report. Toxic Reduction Plan. Conestoga-Rovers & Associates 651 Colby Drive Waterloo, Ontario N2V 1C2.

Final Report. Toxic Reduction Plan. Conestoga-Rovers & Associates 651 Colby Drive Waterloo, Ontario N2V 1C2. www.craworld.com Final Report Toxic Reduction Plan 10 µm Particulate Matter 2.5 µm Particulate Matter Prepared for: Firestone Textiles Co. Conestoga-Rovers & Associates 651 Colby Drive Waterloo, Ontario

More information

ENVIRONMENTAL PERFORMANCE 2011 UPM Caledonian

ENVIRONMENTAL PERFORMANCE 2011 UPM Caledonian ENVIRONMENTAL PERFORMANCE 211 UPM Caledonian UPM CORPORATE ENVIRONMENTAL STATEMENT 211 UPM paper and pulp mills UPM Caledonian, Environmental Performance in 211 is a supplement to the Corporate Environmental

More information

ACCIDENT PREVENTION & EMERGENCY RESPONSE

ACCIDENT PREVENTION & EMERGENCY RESPONSE Attachment J ACCIDENT PREVENTION & EMERGENCY RESPONSE Cadbury Ireland Limited Project Ref: OES1061_01 Cadbury Ireland Limited February 2007 Attachment J J.1 Accidental Emissions Control Accidental emissions

More information

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group Environmental Management System Integrated Pollution Control Document No. 5.2.1 Version no. 1 Origination Date 1 st February 2017 Area: The Group Approval: Group Services & Facilities Last Revision Date

More information

Definitions and Comments on 2016 Consolidated Nestlé Environmental Performance Indicators

Definitions and Comments on 2016 Consolidated Nestlé Environmental Performance Indicators Definitions and Comments on 2016 Consolidated Nestlé Environmental Performance Indicators General Comments Environmental performance indicators cover all Nestlé factories except some of the factories acquired

More information

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ACCIDENTAL SPILL PREVENTION PLAN EH-009-R03

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ACCIDENTAL SPILL PREVENTION PLAN EH-009-R03 BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ACCIDENTAL SPILL PREVENTION PLAN EH-009-R03 Department Title: Safety Department Page: 1 Department Title: Safety Department

More information

IMS (Quality, Environment, Occupational Health & Safety) Awareness Training Course As per ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007

IMS (Quality, Environment, Occupational Health & Safety) Awareness Training Course As per ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007 IMS (Quality, Environment, Occupational Health & Safety) Awareness Training Course As per ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007 SESSION 1 ST HR INTRODUCTION COURSE OBJECTIVE This course is designed

More information

LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY

LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY S1481-0320-0004IRT Levenseat Waste Management - Non-Technical Summary Page 1 LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY Document Production &

More information

Water is essential for chemistry. Water serves as a

Water is essential for chemistry. Water serves as a Völker, E., G. Zimmer & B. Elendt-Schneider (2007): Responsible water use The example of BASF AG Ludwigshafen. In: Lozán, J. L., H. Grassl, P. Hupfer, L. Menzel & C.-D. Schönwiese. Global Change: Enough

More information

WE EEN Wizard of the Environment: the Enterprise Europe Network. Eurosportello del Veneto Via delle Industrie 19/C Venezia

WE EEN Wizard of the Environment: the Enterprise Europe Network. Eurosportello del Veneto Via delle Industrie 19/C Venezia WE EEN Wizard of the Environment: the Enterprise Europe Network Eurosportello del Veneto Via delle Industrie 19/C Venezia Directive 2008/98/EC on waste (Waste Framework Directive) The Directive introduces

More information

Petroleum Refining. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Petroleum Refining. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics Multilateral Investment Guarantee Agency Environmental Guidelines for Petroleum Refining Industry Description and Practices The petroleum industry is organized into four broad sectors: exploration and

More information

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,

More information

ATTACHMENT J ACCIDENT PREVENTION & EMERGENCY RESPONSE

ATTACHMENT J ACCIDENT PREVENTION & EMERGENCY RESPONSE ATTACHMENT J ACCIDENT PREVENTION & EMERGENCY RESPONSE Attachment J Industrial Emissions Licence Application J.1 Accident Prevention This Accident Prevention information sets out the various measures at

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

THE COMPLETE GUIDE TO ISO14001

THE COMPLETE GUIDE TO ISO14001 THE COMPLETE GUIDE TO ISO14001 1. Introduction... 3 Plan Do Check Act... 5 2. Requirements... 7 Environmental Policy... 7 Environmental Aspects... 7 Legal and Other Requirements... 8 Objectives & Targets...

More information

ALPS Electric Ireland Ltd.

ALPS Electric Ireland Ltd. ALPS Electric Ireland Ltd. 2011 Annual Environmental Report for ALPS Electric Ireland Ltd. Clara Road, Millstreet, Co Cork. IPPC Licence (Reg: P0835-01) March 2012 Annual Environmental Report 2011 ALPS

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

Alucobond Today. For Many More Tomorrows. Environmental Guide

Alucobond Today. For Many More Tomorrows. Environmental Guide Alucobond Today. For Many More Tomorrows. Environmental Guide The environment is everyone s responsibility Over the last several years, the building industry has moved toward a more environmentally friendly

More information

Water 2. Compliance 5

Water 2. Compliance 5 UPS 2016 Corporate Sustainability Report Supplemental Data About This Document In 2016, UPS reported its annual Corporate Sustainability Report in accordance with the GRI Standards: Comprehensive option.

More information

INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION

INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION Headquarters, Ardcavan Wexford, Ireland INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION Licence Register Number: Applicant: Location of Activity: 269 Basta Hardware Ltd Tubbercurry, Co. Sligo. Table

More information

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Manager Environment Approved: Executive General Manager Asset Strategy DOCUMENT HISTORY Date

More information

Spill Response Procedures

Spill Response Procedures Spill Response Procedures [your municipality] Purpose: The purpose of this Standard Operating Procedure (SOP) is to provide guidance for the proper response and corrective actions to be followed in the

More information

National Lead for Health and Safety Division / Function : Centre for Autism Reports to : Job summary: Why

National Lead for Health and Safety Division / Function : Centre for Autism Reports to : Job summary: Why Why National Lead for Health and Safety Division / Function : Centre for Autism Reports to : Nominated Individual and Safeguarding lead Job summary: Responsible for providing general and specialist health,

More information

New PRTR-data 2015 in thru.de

New PRTR-data 2015 in thru.de New PRTR-data 2015 in thru.de Summary report Since 28.03.2017 data has been made available at www.thru.de. This concerns data of the reporting year 2015 and corrected data covering the period 2007 2014

More information

BENCHMARKING WASTE IN PLASTICS PROCESSING

BENCHMARKING WASTE IN PLASTICS PROCESSING ENVIRONMENTAL TECHNOLOGY BEST PRACTICE PROGRAMME BENCHMARKING WASTE IN PLASTICS PROCESSING Polymer purchase, utilities and packaging are significant costs for any plastics business. Most companies are

More information

ES Cleaning/Washing - Aircraft, Vehicles and Equipment Document Identification Number Date: March 15, 2018

ES Cleaning/Washing - Aircraft, Vehicles and Equipment Document Identification Number Date: March 15, 2018 ES-301-1.02 Cleaning/Washing - Aircraft, Vehicles and Equipment Document Identification Number ES-301-1.02 Date: March 15, 2018 Document Owner: Keith Pass 1) Activity Description: The following guideline

More information

2013 UPS Corporate Sustainability Report: Supplemental Data

2013 UPS Corporate Sustainability Report: Supplemental Data 2013 UPS Corporate Sustainability Report: Supplemental Data Table of Contents Water.... 2 Effluents and Waste.... 3 Compliance... 5 Key Performance.... 7 Indicators About this document In 2013, UPS migrated

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-80b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED REG ALBERT LEA, LLC PROJECT FREEBORN COUNTY

More information

Environmental Conditions Laboratories (for commercial use) Group

Environmental Conditions Laboratories (for commercial use) Group GBR No. 20 Environmental Conditions Laboratories (for commercial use) Group ERA regulates the environmental impact of enterprises through two key mechanisms. Smaller scale activities are regulated through

More information

Our ref: XLET7 Confirmation of Registration. Your ref: Date: 07/05/2014

Our ref: XLET7 Confirmation of Registration. Your ref: Date: 07/05/2014 Mr Lionel Griffin Vetspeed ltd, THE CAMBRIDGE PET CREMATORIUM A505 MAIN ROAD, THRIPLOW HEATH, ROYSTON, HERTFORDSHIRE, SG8 7RR, England Our ref: XLET7 Confirmation of Registration Your ref: Reg. Customer

More information

Carton Bros Ltd Darkely, Shercock, Co Cavan. For inspection purposes only.

Carton Bros Ltd Darkely, Shercock, Co Cavan. For inspection purposes only. emion Bro$. Lilllilccl, Shcrcock. Co, Ctv,lII, Ild,lnd. 'fi:i: 042 %6 'J171 0-12%91100 Ell(: u12 'J{lll 9698 12.01OTE 31" July 2012 Ms Sonja Smith Administration Officer Office of Climate, Licensing &

More information

Public Notice. Issuance of Industrial Waste Discharge Permit

Public Notice. Issuance of Industrial Waste Discharge Permit Public Notice Issuance of Industrial Waste Discharge Permit LASA s regulations [ 60-16 (I)(1)] require public notification of the issuance of Industrial Waste Discharge Permits. LASA publishes this notice

More information

Waste Management Policy

Waste Management Policy Waste Management Policy Contents 1. Introduction 2. Policy Statement 3. Policy Objectives 4. Application 5. Organisation and Management 6. Glossary of Terms Document Control Information: Last updated on:

More information

Sustainability Social,Economic and Environmental Responsibility Policy

Sustainability Social,Economic and Environmental Responsibility Policy Sustainability Social,Economic and Environmental Responsibility Policy PURPOSE Autism Initiatives recognises that our work may have a direct or indirect effect on the local, regional and global environment.

More information

Princes Square Shopping Centre Sustainability Policy. June 2014

Princes Square Shopping Centre Sustainability Policy. June 2014 Princes Square Shopping Centre Sustainability Policy June 2014 Contents 2 Sustainability Policy Princes Square s Environmental Management System (EMS) describes our strategy for managing our environmental

More information

Construction Environment Management Plan

Construction Environment Management Plan Construction Environment Management Plan Guidance Material July 2013 ABSTRACT This CEMP guidance material has been prepared by MAC to assist the identification and management of environmental risks associated

More information

Spotlight on Animal Health Business Operations: A Legal Update Husch Blackwell LLP. March 5, 2015

Spotlight on Animal Health Business Operations: A Legal Update Husch Blackwell LLP. March 5, 2015 Spotlight on Animal Health Business Operations: A Legal Update Husch Blackwell LLP March 5, 2015 Environmental Compliance, Planning and Management Systems I. Introduction A. Manufacturers and distributors,

More information

Hazardous Waste Management Policy

Hazardous Waste Management Policy Level 3 - H&S Policy Structure Hazardous Waste Management Policy BACKGROUND The University produces hazardous waste from all areas, not just laboratories and workshops, which means that this policy potentially

More information

12 WASTE. Introduction. Review of proposed development

12 WASTE. Introduction. Review of proposed development 12 WASTE Introduction 12.1 This chapter provides a qualitative assessment of the likely significant environmental effects of solid waste generation, associated with the construction and operation of the

More information

IMPORTER ASSESSMENT PROGRAM FOR FOREIGN VENDORS

IMPORTER ASSESSMENT PROGRAM FOR FOREIGN VENDORS PURPOSE: CONTENTS: IMPORTER ASSESSMENT PROGRAM FOR FOREIGN VENDORS The purpose of the XYZ Corporation Foreign Vendor Assessment Program is to objectively evaluate overseas suppliers, identifying areas

More information

Quinn Cement Ltd. January December 2011

Quinn Cement Ltd. January December 2011 Quinn Cement Ltd. January December 2011 Annual Environmental Report IPPC Licence No. P0378-01 1 Contents Contents...2 1.0 Introduction...4 1.1 Raw Material Processing...4 1.2 Clinker Production...5 1.3

More information

Photographic Processing Facility Sector Control Policy

Photographic Processing Facility Sector Control Policy Photographic Processing Facility Sector Control Policy Persigo Wastewater Treatment Plant Industrial Pretreatment Division 2145 River Road Grand Junction, CO 81505 970-256-4180 I. INTRODUCTION The United

More information

final report Water quality improvement strategy for a processing site

final report Water quality improvement strategy for a processing site final report Project title: Water Quality Improvement Strategy Project code: P.PSH.0449 Prepared by: GHD Date published: July 2010 PUBLISHED BY Meat & Livestock Australia Limited Locked Bag 991 NORTH SYDNEY

More information

Consumerism. Emissions to air. Environmental Management System. Enjoyed by some at the expense of others Earths resources endangered

Consumerism. Emissions to air. Environmental Management System. Enjoyed by some at the expense of others Earths resources endangered Environmental Management System Consumerism Enjoyed by some at the expense of others Earths resources endangered Emissions to air Acid rain Movement of pollution Ozon depletion Global warming Local air

More information

CSR CSR. Statement of Environmental Impacts. Allstate NI Environmental Strategy. Green Transport Policy. Energy Policy

CSR CSR. Statement of Environmental Impacts. Allstate NI Environmental Strategy. Green Transport Policy. Energy Policy Environmental Strategy 2013 Contents Allstate NI Environmental Strategy Statement of Environmental Impacts Introduction The following document contains the Allstate NI Strategy for the management of the

More information