Annual Environmental Report for Glennon Bros. Cork Ltd.

Size: px
Start display at page:

Download "Annual Environmental Report for Glennon Bros. Cork Ltd."

Transcription

1 Annual Environmental Report for Glennon Bros. Cork Ltd. Period: January 2009 to December 2009 To: The Environmental Protection Agency From: Glennon Bros. Cork Ltd. License no. P Date: 31/03/2010 Prepared by: Damien Cross BScWST

2 Annual Environmental Report for Glennon Bros. Cork Ltd. 1.0 Introduction. As a requirement of their IPPC License (No. P ) Glennon Bros. Cork Ltd. is required to prepare an annual environmental report for their site in Farran South, Fermoy, Co. Cork. This is to include, among other things, summaries of their environmental performance over the past year.

3 Table of Contents 1.0! INTRODUCTION. 2! TABLE OF CONTENTS 3! 2.0! SITE DESCRIPTION 4! 2.1! SITE DESCRIPTION. 4! 3.0! DATA 5! 3.1! SUMMARY. 5! 3.2! SURFACE WATER EMISSIONS SUMMARY 5! 3.3! WASTE MANAGEMENT REPORT 5! 3.4! RESOURCE CONSUMPTION SUMMARY 5! 3.5! ENVIRONMENTAL INCIDENTS AND COMPLAINTS SUMMARY 5! 4.0! ENVIRONMENTAL MANAGEMENT 6! 4.1! ENVIRONMENTAL POLICY, STRUCTURE AND RESPONSIBILITY. 6! 4.2! ENVIRONMENTAL STRUCTURE 6! 4.3! ENVIRONMENTAL OBJECTIVES AND TARGETS 6! 4.4! ENVIRONMENTAL MANAGEMENT PROGRAMME: REPORT ! 4.5! ENVIRONMENTAL MANAGEMENT PROGRAMME: ! 5.0! OTHER REPORTS 8! 5.1! SUMMARY 8! 5.2! BOILER COMBUSTION EFFICIENCY 8! 5.3! BUND INTEGRITY ASSESSMENT. 8! 5.4! REPORTED INCIDENTS & COMPLAINTS SUMMARY. 8! 5.5! ANNUAL GROUNDWATER TEST RESULTS. 8! 6.0 CONCLUSIONS AND FUTURE PERFORMANCE. 9! APPENDICES 10! PRTR REPORTING ! RESOURCE CONSUMPTION SUMMARY 17! ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT 19! BOILER COMBUSTION EFFICIENCY RESULTS 35! ENVIRONMENTAL COMPLAINTS & INCIDENTS REPORT 46! ANNUAL GROUNDWATER ANALYSIS 48! BUND INTEGRITY REPORT 50! Glennon Bros. Cork Ltd. 3

4 2.0 Site Description 2.1 Site Description. Glennon Bros. Cork Ltd. was purchased from Woodfab Ltd. in The company currently employs over 90 people and has a wide range of facilities such as kiln drying, planing and moulding and stress grading. As a sawmill, its main purpose is to convert round logs in to sawn timber. This is a process in which 100% of the incoming raw material, logs usually supplied by Coillte, is rendered into a useable product. The mill takes in approximately 400,000 m 3 of round logs per annum and from this produces 200,000 m 3 of sawn timber, 48,000 m 3 chips, 40,000 m 3 bark and 54,000 m 3 of sawdust. The mill is open from 7:00 am to 12:00am on Monday to Friday, during which primary sawing occurs as well as finishing processes. Some second handling processes (stacking and sorting timber) may occur on Saturdays. In brief the overall process is as follows: Incoming logs are weighed, documented and off loaded in the Logyard. They are then debarked, measured and graded into top diameter size classes at the Log Grader. The logs are then processed into sawn timber in the Main Saw Line. Sawn timber is sorted and stacked ready for kiln drying at the Drop Sorter. After drying in the Kilns, the sawn timber is either graded for constructional use, or further processed by machining at the planer shed. Glennon Bros. Cork Ltd. 4

5 3.0 Data 3.1 Summary. This section contains summary reports for the following: Surface water emissions, Waste management, Resource consumption and Complaints. Where detailed reports are required, these will be contained in the appendix. 3.2 Surface Water Emissions Summary As part of the IPPC license emissions to water have to be monitored. There are two emission points: SW1 and SW2. Both points have to be visually inspected daily. Analysis of Suspended solids, Total Ammonia, Total Phosphates and C.O.D. has to be carried out bi-annually for each emission point. Environmental Efficiency, an independent environmental firm based in Bray, Co.Wicklow performed the bulk of this analysis. In the period being reported on there have been no exceedences. A summary of this data is included in the appendix in the form of the new AER electronic reporting system. 3.3 Waste Management Report In the reporting period (January 09 to December 09) approx 63.2 tonne of waste was produced. This constituted primarily of mixed municipal waste, broken wood & scrap metal. The majority of the waste was recycled where possible. Veoila Environmental Services Ltd took 3.46 tonne of hazardous waste off site. This constituted of fluorescent bulbs, wastewater containing coolant oil and capacitors. A detailed breakdown is contained in the new web reporting format contained in the appendix. The relevant hazardous documentation is also attached in the appendix. 3.4 Resource Consumption Summary In the period from January 09 to December 09, 90% of round logs were FSC certified and was sourced from managed, renewable forests. Over 99.5% of the logs were converted into saleable product. The site had an electricity expenditure of just less than 7269 MWh over the 12- month period recorded. This constituted an increase on the previous year s reduced consumption. Approximately 264,841 litres of diesel were consumed in the period. This constituted an increase on the previous year s consumption. Volvo front loaders, fork trucks, etc; accounted for the major portion of diesel consumed. The kilns are supplied with heat from a wood residue-burning boiler. No diesel or oil is consumed in this process. Water was supplied onsite by the local water scheme for domestic use. None of the processes in the site require water. Full details of the energy consumption are contained in the appendix. 3.5 Environmental Incidents and Complaints Summary There have been no Environmental incidents in the reporting period. Glennon Bros. Cork Ltd. 5

6 4.0 Environmental Management 4.1 Environmental Policy, Structure and Responsibility. It is the policy of Glennon Bros.Cork Ltd. to conduct its operations in harmony with the environment. Environmental management is a top corporate priority. Glennon Bros.Cork Ltd. undertakes to comply with all applicable environmental standards and legislation, in all current and future processes and operations. Compliance is seen as a minimum requirement. The company will train and motivate its employees to carry out their tasks in an environmentally responsible manner. The company encourages openness and dialogue with both employees and the public on environmental performance. The company is committed to the prevention of pollution, the reduction of wastes and encourages recovery and recycling of wastes as opposed to disposal where feasible. The environmental performance of the company will be managed through the setting and meeting of specific objectives. The management of Glennon Bros. Cork Ltd. accepts full responsibility for the implementation of its corporate objectives and the maintenance of its EMP. Specifically, Mr. Damien Cross will be the management representative who will be responsible for all aspects of the EMS and of the EMP as an aspect of the EMS. The management structure is as follows: 4.2 Environmental Structure Joint Managing Directors Sales Manager Environmental Manager Production Manager Foremen /Supervisors Dispatch/Delivery Personnel Maintenance Personnel Operatives 4.3 Environmental Objectives and Targets The environmental management programme for Glennon Bros.Cork Ltd. is based largely around the setting and meeting of objective and targets. Details of these for the present and coming year are to be found in the following two reports. Glennon Bros. Cork Ltd. 6

7 4.4 Environmental Management Programme: Report 2009 In the period from January 2009 December 2009 most of the objectives and targets were met within their stated time scales. A detailed account of this is included in the appendix. 4.5 Environmental Management Programme: 2010 A proposal for the environmental management programme for the year 2010 is included with this report. The emphasis of the programme is to continue on from last year s objectives. These objectives form part of a longer-term strategic plan to sustain and maintain progress achieved to date. Glennon Bros. Cork Ltd. 7

8 5.0 Other Reports 5.1 Summary A number of ancillary reports are requested as part of the AER. These are as follows. 5.2 Boiler Combustion Efficiency Environmental Efficiency was commissioned to perform a report on boiler efficiency. This is included in the appendix. 5.3 Bund Integrity Assessment. A report on bund integrity is to be carried out every three years. A bund assessment was carried out in 2008 and is included in the appendix. 5.4 Reported Incidents & Complaints Summary. In the period of this report (Jan 09 to Dec 09) there were no complaints. 5.5 Annual Groundwater test results. A copy of the annual groundwater test is supplied in the appendix. Glennon Bros. Cork Ltd. 8

9 6.0 Conclusions and Future Performance. Glennon Bros Cork Ltd is committed to protecting the environment. This document, along with the following appendices, portrays the state of environmental performance for the company at the end of December This will be used as the yardstick by which future environmental performance will be measured against. The objectives and targets as set out in the EMP for 2010 aim to improve and enhance the environmental performance of the company. Glennon Bros. Cork Ltd. 9

10 Appendices AER 2009 Glennon Bros. Cork Ltd. 10

11 PRTR Reporting 2009 Glennon Bros. Cork Ltd. 11

12

13 Glennon Bros. Cork Ltd. IPPC License 13 No. P

14 Glennon Bros. Cork Ltd. IPPC License 14 No. P

15

16

17 Resource Consumption Summary AER 2009

18 Electricity Consumption: January 2009 December 2009 Total kwh Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Totals 7, Electricity Consumption: January 2003 December 2009 Period kwh Jan 03 - Dec 03 6,697,476 Jan 04 - Dec 04 7,486,336 Jan 05 - Dec 05 8,444,037 Jan 06 - Dec 06 8,741,505 Jan 07 - Dec 07 8,149,704 Jan 08 - Dec 08 6,378,769 Jan 09 Dec 09 7, Diesel Consumption Jan 09 Dec 09 Area Diesel (L) %Usage Forklifts / Volvo / other 264, %

19 Environmental Management Programme Report AER 2009 Glennon Bros. Cork Ltd. 19

20 Report on Environmental Management Programme for Glennon Bros. Cork Ltd. Period: January 2009 December 2009 To: The Environmental Protection Agency From: Glennon Bros. Cork Ltd. License no. P Date: 31/03/2010

21 Report on Environmental Management Programme of Glennon Bros. Cork Ltd. (January 2009 to December 2009). 1.0 Brief for EMP. As a requirement of their IPPC License (No. P ) Glennon Bros. Cork Ltd. is required to set up and maintain an Environmental Management System at their site in Farran South, Fermoy Co. Cork. One of the requisites of the EMS is the establishment of an Environmental Management Programme. The function of this document is to report on the results of the EMP for the above period of their IPPC license. 2.1 Components of the EMP. 2.0 Summary The EMP for the given period included a time schedule for achieving objectives and targets. This report forms part of the AER and includes the following: Designation of responsibility for achieving objectives; The means of achieving said objectives; The time frame for achieving said objectives. 2.2 Objectives: The EMP will include the following objectives: Onsite Housekeeping programme Optimization Efficiency programme 2.3 Reporting. This report on the EMP includes the success in meeting agreed targets, and is to be submitted to the EPA. An electronic version of this report shall be retained on-site for a period of not less than seven years and shall be available for inspection by authorised persons of the EPA. Glennon Bros. Cork Ltd. 21

22 Table of contents 1.0 BRIEF FOR EMP SUMMARY COMPONENTS OF THE EMP OBJECTIVES: REPORTING TABLE OF CONTENTS RESPONSIBILITY AND CORPORATE OBJECTIVES FOR EMP MANAGEMENT RESPONSIBILITY GLOBAL OBJECTIVES AND TIME FRAMES Onsite Housekeeping Program: Optimisation Efficiency Program: TARGETS AND TIME FRAMES OVERVIEW: ONSITE HOUSEKEEPING PROGRAM OPTIMISATION EFFICIENCY PROGRAM BREAKDOWN AND ANALYSIS OF ACHIEVED OBJECTIVES SUMMARY ONSITE HOUSEKEEPING PROGRAM Objective Targets Conclusion OPTIMISATION EFFICIENCY PROGRAM Objectives Targets Conclusion NEW DEVELOPMENTS CONCLUSION Glennon Bros. Cork Ltd. 22

23 3.0 Responsibility and Corporate Objectives for EMP. 3.1 Management Responsibility. The management of Glennon Bros. Cork Ltd. accepts full responsibility for the implementation of its corporate objectives and the maintenance of EMP. Mr. Damien Cross is the management representative with responsibility for all aspects of the EMS and of the EMP as an aspect of the EMS. 3.2 Global Objectives and Time Frames Onsite Housekeeping Program: Objective: Targets: Completion Date: To designate area zoned responsibility for onsite waste pollution control to ensure clean working environment is maintained Design zones within the site. Assign supervisor responsibility for each area Train staff to ensure program success. Agree details with Agency Ongoing. Frequent review required Optimisation Efficiency Program: Objective: Targets: Completion date: To continue program from last years EMP. Continuation of re-design of grading system to maximise log usage incorporating new sawing practises. Continual testing of new sawn practises should decrease required intake of raw material based on more efficient sawn program. Ongoing Glennon Bros. Cork Ltd. 23

24 4.0 Targets and Time Frames. 4.1 Overview: The global objectives in Section 3.2 each consist of a series of individual targets. These targets have their own areas of responsibility and associated time frames. 4.2 Onsite Housekeeping Program Ref. No. Target Responsibility Completion Date. Date Completed 1 Designate Area Zones Environmental Manager May 2009 May Assign Area supervisors Plant Manager June 2009 July Train Supervisors in each area Environmental Manager July 2009 August Train Staff in each area Area November August 2009 Supervisors Regular checks of current system Environmental Manager Ongoing Ongoing Table 4.2: Onsite Housekeeping Program: targets and time frames. 4.3 Optimisation Efficiency Program Ref. Target Responsibility Completion Date No. Date. Completed Assess efficacy of new sawing Production September 1 June 2009 manual Engineer 2009 Production 2 Run Simulations of new system Ongoing Ongoing Engineer Production 3 Implement trial settings March 2009 April 2009 Engineer Maintain sawn data relating to new 4 Saw Doctor Ongoing Ongoing sawn practises Run test batches comparing new Production 5 Ongoing Ongoing sawn system with old records Supervisors Assess overall reduction of Environmental 6 March 2010 Not complete Electricity usage Manager Re assess grading success and Production 7 March 2010 Not complete adjust any changes needed Engineer Table 4.3: Optimisation Efficiency Program: targets and time frames. Glennon Bros. Cork Ltd. 24

25 5.1 Summary. 5.0 Breakdown and Analysis of Achieved Objectives. This section analyses the way in which the individual targets for each objective were met. 5.2 Onsite Housekeeping Program Objective To designate area zoned responsibility for onsite waste pollution control to ensure clean working environment is maintained Targets Design zones within the site. Assign supervisor responsibility for each area Train staff to ensure program success Conclusion While some improvement was made in the overall reduction of waste, the area zones 5.3 Optimisation Efficiency Program Objectives To continue program from last years EMP Targets Contination of re-design of grading system to maximise log usage incorporating new sawing practises. Continual testing of new sawn practises to decrease required intake of raw material based on more efficient sawn program Conclusion The Electronic sawn pattern system is updated on a regular basis and has proven great success. Some areas of the new grading system have had a negative effect. These areas will be focused on in Glennon Bros. Cork Ltd. 25

26 6.0 New Developments In the event of new developments, the substantial modification of existing processes or the introduction of new processes at Glennon Bros. Cork Ltd. separate Environmental Management Programmes will be established for each case. Such programmes will: Identify and evaluate the potential impacts of such new developments and develop appropriate project environmental objectives; Establish mechanisms to achieve these objectives; Address the environmental aspects of changes as these projects proceed; Take corrective action and assess its effectiveness if these changes prove to be detrimental to the environment. Glennon Bros. Cork Ltd. 26

27 7.0 Conclusion. This document is a report for the Environmental Management Programme at year-end 2009, which constitutes a part of the overall Environmental Management System at Glennon Bros. Cork Ltd. Glennon Bros. Cork Ltd. 27

28 Proposed Environmental Management Programme for Glennon Bros. Cork Ltd Period: January 2010 December 2010 To: The Environmental Protection Agency From: Glennon Bros. Cork Ltd. License no. P Date: 31/03/2010 Glennon Bros. Cork Ltd. 28

29 Proposed Environmental Management Programme for Glennon Bros. Cork Ltd. 1.0 Brief for EMP. As a requirement of their IPPC License (No. P ) Glennon Bros. Cork Ltd. is required to set up and maintain an Environmental Management System at their site in Farran South, Fermoy. One of the requisites of the EMS is the maintenance of an Environmental Management Programme. The function of this document is to lay out a proposal for said EMP, for agreement with the Environmental Protection Agency 2.1 Components of the EMP. 2.0 Summary The EMP shall include a time schedule for achieving objectives and targets. It shall form part of AER and should include the following: Designation of responsibility for achieving objectives; The means of achieving said objectives; The time frame for achieving said objectives. 2.2 Objectives: The EMP will include the following objectives: Onsite Housekeeping programme Optimization Efficiency programme 2.3 Reporting. As part of the AER a report on the EMP, including the success in meeting agreed targets, shall be submitted to the EPA. These reports shall be retained on-site, in electronic form, for a period of not less than seven years and shall be available for inspection by authorised persons of the EPA. Glennon Bros. Cork Ltd. 29

30 Table of contents 1.0 BRIEF FOR EMP SUMMARY COMPONENTS OF THE EMP OBJECTIVES: REPORTING TABLE OF CONTENTS RESPONSIBILITY AND CORPORATE OBJECTIVES FOR EMP MANAGEMENT RESPONSIBILITY GLOBAL OBJECTIVES AND TIME FRAMES Onsite Housekeeping Programme: Optimisation Efficiency Programme: TARGETS AND TIME FRAMES OVERVIEW: ONSITE HOUSEKEEPING PROGRAMME OPTIMISATION EFFICIENCY PROGRAM NEW DEVELOPMENTS CONCLUSION Glennon Bros. Cork Ltd. 30

31 3.0 Responsibility and Corporate Objectives for EMP. 3.1 Management Responsibility. The management of Glennon Bros. Cork Ltd. accepts full responsibility for the implementation of its corporate objectives and the maintenance of EMP. Specifically the environmental manager, Mr. Damien Cross, will be the management representative who will be responsible for all aspects of the EMS and of the EMP as an aspect of the EMS. 3.2 Global Objectives and Time Frames Onsite Housekeeping Programme: Objective: Targets: Completion Date: To design a new plan to manage areas zoned for onsite waste pollution control. To maintain reduced levels of waste output. Discuss various aspects of zoned area plan Identify areas needing more improvement Re-design plan to incorporate identified improvement areas Ongoing. Frequent review required Optimisation Efficiency Programme: Objective: Targets: To continue program from last years EMP. Identify key problematic areas Re-design grading/sawing program Setup Iterative process of testing Completion date: Ongoing Glennon Bros. Cork Ltd. 31

32 4.0 Targets and Time Frames. 4.1 Overview: The global objectives in Section 3.2 each consist of a series of individual targets. These targets have their own areas of responsibility and associated time frames. 4.2 Onsite Housekeeping Programme Ref. No. 1 Target Responsibility Completion Date. Discuss plan for managing zoned areas 2 Identify key improvement areas Group 3 Design plan for managing zoned areas addressing key improvement areas Group August 2010 Environmental Manager September 2010 October 2010 Area November 4 Train Staff in each area Supervisors 2010 Environmental 5 Regular checks of current system Ongoing Manager Table 4.3: Onsite Housekeeping Programme: Targets and Timeframes. Date Completed 4.3 Optimisation Efficiency Program Ref. No. Target Responsibility Completion Date. 1 Identify key problematic areas Group August Design new grading/sawing system Production September to match Engineer Implement trial settings Production September Engineer & 2010 Supervisors 4 Design Iterative program of testing Production Engineer October Run test batches comparing new Production sawn system with old records Supervisors Ongoing 6 Assess overall reduction of Environmental Electricity usage Manager March Assess success of program to date Group March 2011 Table 4.4: Optimisation Efficiency Program: targets and time frames. Date Completed Glennon Bros. Cork Ltd. 32

33 5.0 New Developments In the event of new developments, the substantial modification of existing processes or the introduction of new processes at Glennon Bros. Cork Ltd. separate Environmental Management Programmes will be established for each case. Such programmes will: Identify and evaluate the potential impacts of such new developments and develop appropriate project environmental objectives; Establish mechanisms to achieve these objectives; Address the environmental aspects of changes as these projects proceed; Take corrective action and assess its effectiveness if these changes prove to be detrimental to the environment. Glennon Bros. Cork Ltd. 33

34 6.0 Conclusion. This document is a proposal for the Environmental Management Programme, which will constitute a part of the overall Environmental Management System at Glennon Bros. Cork Ltd. It is subject to agreement with the Environmental Protection Agency. Upon agreement this proposal will be fully incorporated into Glennon Bros. EMS. Glennon Bros. Cork Ltd. 34

35 Boiler Combustion Efficiency Results AER 2009 Glennon Bros. Cork Ltd. 35

36 Glennon Bros. Cork Ltd. 36

37 Glennon Bros. Cork Ltd. 37

38 Glennon Bros. Cork Ltd. 38

39 Glennon Bros. Cork Ltd. 39

40

41 Glennon Bros. Cork Ltd. IPPC License 41 No. P

42

43 Glennon Bros. Cork Ltd. 43

44 Glennon Bros. Cork Ltd. 44

45 Glennon Bros. Cork Ltd. 45

46 Environmental Complaints & Incidents Report AER 2009 Glennon Bros. Cork Ltd. 46

47 Complaints Report In the period January 2009 to December 2009, there were no incidents or complaints of an environmental nature in Glennon Bros. Cork Ltd. Glennon Bros. Cork Ltd. 47

48 Annual Groundwater Analysis AER 2009 Glennon Bros. Cork Ltd. 48

49 Glennon Bros. Cork Ltd. 49

50 Bund Integrity Report AER 2009 Glennon Bros. Cork Ltd. 50

51 Glennon Bros. Cork Ltd. 51

52 Glennon Bros. Cork Ltd. 52

53 Glennon Bros. Cork Ltd. 53

54 Glennon Bros. Cork Ltd. 54

55 Glennon Bros. Cork Ltd. 55

56 Glennon Bros. Cork Ltd. 56

57 Glennon Bros. Cork Ltd. 57

Annual Environmental Report for Glennon Bros. Timber Ltd.

Annual Environmental Report for Glennon Bros. Timber Ltd. Annual Environmental Report for Glennon Bros. Timber Ltd. Period: January 2009 to December 2009 To: The Environmental Protection Agency From: Glennon Bros. Timber Ltd. License no. P0327-01 Date: 31/03/2010.

More information

IPC Licence P AER Report Waterford Crystal Springmount Dungarvan Co. Waterford

IPC Licence P AER Report Waterford Crystal Springmount Dungarvan Co. Waterford IPC Licence P0156-01 AER Report 2008 Waterford Crystal Springmount Dungarvan Co. Waterford 31 st March 2009-1 - Table of Contents Page No. 1.0 Introduction 3 1.1 Brief Description of Site Activities 1.2

More information

Heiton Buckley. Builders Merchants. Annual Environmental report for Licence No. PO340-01

Heiton Buckley. Builders Merchants. Annual Environmental report for Licence No. PO340-01 Heiton Buckley Builders Merchants Annual Environmental report for 2010 Licence No. PO340-01 1 The following is a summary of the contents of the 2010 AER. Further details are available in the full report

More information

ANNUAL ENVIRONMENTAL REPORT

ANNUAL ENVIRONMENTAL REPORT ANNUAL ENVIRONMENTAL REPORT JANUARY 2017 TO DECEMBER 2017 Licence Registration Number: PO357-01 Licensee: Cross Vetpharm Group Ltd Location of Activity: Attention: Airton Close, Tallaght Dublin 24. Office

More information

Doherty Brothers Timber Company Limited

Doherty Brothers Timber Company Limited Annual Environmental Report 2008 Doherty Brothers Timber Company Limited Licence Number: P0354-01 Report Date: 14 th September 2009 Report Number: 1010-09-01 Version 0 40 Coolraine Heights, Old Cratloe

More information

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P Clogrennane Lime Ltd Toonagh Lime Works AER 2010 Licence # P0 771-01 Section 1 Overview. 3 1.0 Introduction 1.1 Description of Activities 1.2 Responsibility for Environmental Management 1.3 Environmental

More information

Annual Environmental Report 2013

Annual Environmental Report 2013 Annual Environmental Report 2013 For Woodland Products Ltd., Drumully, Emyvale, Co. Monaghan IPPC Reg. No. P0198-01 By QED Engineering Ltd., M-TEK Building 1 Armagh Road Monaghan July 2014 Table of Contents

More information

IPC Licence P AER Report Waterford Crystal Kilbarry Cork Road Waterford

IPC Licence P AER Report Waterford Crystal Kilbarry Cork Road Waterford IPC Licence P0157-02 AER Report 2008 Waterford Crystal Kilbarry Cork Road Waterford 31 st March 2009-1 - Table of Contents Page No. 1.0 Introduction 4 1.1 Brief Description of Site Activities 1.2 Environmental

More information

Irish Country Meats Navan

Irish Country Meats Navan Irish Country Meats Navan Annual Environmental Report 2008 Index 1 Introduction 2 Environmental Policy 3 Site Description 4 Summary Information 4.1 Emission to Sewer 4.2 Emissions to Water 4.3 Waste Management

More information

Woking. q business confidence report

Woking. q business confidence report Woking q1 business confidence report Woking q1 report headlines saw a new record in company registrations in Woking when compared to any previous. was a record quarter for company registrations in Woking

More information

Carton Bros. Darkley Shercock Co. Cavan ANNUAL ENVIRONMENTAL REPORT Compiled 31 st March IPPC LICENCE No. P

Carton Bros. Darkley Shercock Co. Cavan ANNUAL ENVIRONMENTAL REPORT Compiled 31 st March IPPC LICENCE No. P Darkley Shercock Co. Cavan ANNUAL ENVIRONMENTAL REPORT 2009 Compiled 31 st March 2010 IPPC LICENCE No. P0024-02 1 TABLE OF CONTENTS Page No. List of Tables 3 List of Graphs 4 List of Appendices 5 1.0 Introduction

More information

Facility Information Summary AER Reporting Year

Facility Information Summary AER Reporting Year 1 Facility Information Summary AER Reporting Year 2016 Licence Register Number P0690-02 Name of site C&F Automotive Ltd T/A Iralco Site Location Collinstown, Mullingar, Co Westmeath NACE Code 2561 Class/Classes

More information

Irish Country Meats Camolin

Irish Country Meats Camolin Irish Country Meats Camolin Annual Environmental Report 2009 Index 1 Introduction 2 Environmental Policy 3 Site Description 4 Summary Information 4.1 Emission to Water 4.2 Surface Water 4.3 Boiler Emissions

More information

SAWMILL SURVEY Report on the survey of sawmill consumption and production in Great Britain in 2000.

SAWMILL SURVEY Report on the survey of sawmill consumption and production in Great Britain in 2000. SAWMILL SURVEY 2000 Report on the survey of sawmill consumption and production in Great Britain in 2000. Prepared by Economics & Statistics Unit of the Forestry Commission in association with the Forestry

More information

Result data last updated. 10 July Map of Norske Skog Albury Paper Mills Environmental Protection Licence compliance monitoring sites

Result data last updated. 10 July Map of Norske Skog Albury Paper Mills Environmental Protection Licence compliance monitoring sites A full copy of our license can be found on the EPA website under the following address http://www.epa.nsw.gov.au/prpoeoapp/viewpoeolicence.aspx?docid=32757&sysuid=1&licid=1272 Result data last updated

More information

University of Michigan Eco-Driving Index (EDI) Latest data: August 2017

University of Michigan Eco-Driving Index (EDI)   Latest data: August 2017 University of Michigan Eco-Driving Index () http://www.ecodrivingindex.org Latest data: August 2017 Developed and issued monthly by Michael Sivak and Brandon Schoettle Sustainable Worldwide Transportation

More information

ANNUAL ENVIRONMENTAL REPORT. Dingle Civic Amenity Site. Licence ref. No W

ANNUAL ENVIRONMENTAL REPORT. Dingle Civic Amenity Site. Licence ref. No W ANNUAL ENVIRONMENTAL REPORT. Dingle Civic Amenity Site. Licence ref. No W00225 1. 2009 March 2010 1) Reporting Period 01/01/09-31/12/09 2) Details of Activity The principal activities include recycling

More information

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Administration Division Public Works Department Anchorage: Performance. Value. Results. Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,

More information

FORT FRANCES DRINKING WATER SYSTEM

FORT FRANCES DRINKING WATER SYSTEM FORT FRANCES DRINKING WATER SYSTEM Large Municipal Residential Drinking Water System (O. Reg. 170/03 - SCHEDULE 22) ANNUAL SUMMARY REPORT For the period of JANUARY 01, 2015 TO DECEMBER 31, 2015 DRINKING

More information

Green Isle Foods IDA Industrial Estate Monread Road Naas Co Kildare

Green Isle Foods IDA Industrial Estate Monread Road Naas Co Kildare Green Isle Foods IDA Industrial Estate Monread Road Naas Co Kildare IPPC Licence Reg No. P0805-01 Annual Environmental Report 2008-1 - Contents Section Title Page No. 1.0 Introduction 1.1 Introduction

More information

The year 2005 was one of significant change for

The year 2005 was one of significant change for In This Report Letter from the CEO About SUMCO Long-term EHS Goals EHS Policies EHS and Safety Environmental Stewardship / Natural Resource Use Environmental Performance Analysis The year 2005 was one

More information

FPI30311 Certificate III in Sawmilling and Processing

FPI30311 Certificate III in Sawmilling and Processing FPI30311 Certificate III in Sawmilling and Processing Release: 1 FPI30311 Certificate III in Sawmilling and Processing Modification History Qualification code updated to FPI10111 to reflect Training Package

More information

Quality Manual. For Firewood Supply

Quality Manual. For Firewood Supply WOOD FUEL QUALITY ASSURANCE SCHEME Quality Manual For Firewood Supply Suppliers Name Document Date Introduction: - It is a requirement of the Wood Fuel Quality Assurance (WFQA) Scheme that suppliers have

More information

A Long Term Perspective

A Long Term Perspective 40 Sustainability Iggesund Paperboard follows the environmental policy of the Holmen Group quoted here: It is in Holmen s interest to contribute to the positive and sustainable development of society in

More information

PERFORMANCE CRITERIA

PERFORMANCE CRITERIA FPIC2030A Unit Descriptor Pre-requisite Unit(s) Application of the Unit Competency Field Sector Debark logs This unit specifies the outcomes required to debark logs to a set diameter and length. The unit

More information

The operation of combustion installations with a rated thermal input greater than 50MW at Whitegate (Corkbeg and Glanagow Townlands), County Cork

The operation of combustion installations with a rated thermal input greater than 50MW at Whitegate (Corkbeg and Glanagow Townlands), County Cork WHITEGATE POWER STATION ANNUAL ENVIRONMENTAL REPORT 2011 1 Contents 1 INTRODUCTION... 3 1.1 Name and Location of the Site... 3 1.2 IPPC Licence Registration Number... 3 1.3 Brief Description of Activities

More information

CASTLETOWNBERE WASTE TRANSFER STATION AND CIVIC AMENITY SITE

CASTLETOWNBERE WASTE TRANSFER STATION AND CIVIC AMENITY SITE 31/03/2011 Castletownbere WTS and CA Site Annual Environmental Report 2010 CASTLETOWNBERE WASTE TRANSFER STATION AND CIVIC AMENITY SITE WASTE LICENCE W0160-01 ANNUAL ENVIRONMENTAL REPORT 2010 31 st December

More information

Kurnell Refinery Conversion Project

Kurnell Refinery Conversion Project Kurnell Refinery Conversion Project Waste Management Plan CALTEX REFINERIES (NSW) PTY LTD January 2014 Page 1 1 INTRODUCTION Caltex propose to convert the petroleum refinery in Kurnell (the Site ) to a

More information

Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero

Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories Learning Objectives At the end of the class the student will be able to: 1. Describe the production budget process

More information

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action ISO 14001 4.5.1 Monitoring and Measurement 4.5.2 Nonconformance and Corrective and Preventative Action 4.5.1 Monitoring and Measurement The organization shall establish and maintain documented procedures

More information

INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION

INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION Headquarters, Johnstown Castle Estate, County Wexford, Ireland INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION Licence Register Number: Applicant: Location of Activity: 564 Arthur P. Dinan Limited

More information

ENVIRONMENTAL POLICY DOCUMENT

ENVIRONMENTAL POLICY DOCUMENT ENVIRONMENTAL POLICY DOCUMENT Issue Date Revision By Next review due Amendment Page 1 Table of Contents 1. Scope 2. Definitions 3. Environmental Management System Requirements 4. Environmental Policy Statement

More information

Legal Description: Lot 2 DPS contained in CT SA 43C/267 Lot 2 DP contained in CFR SA

Legal Description: Lot 2 DPS contained in CT SA 43C/267 Lot 2 DP contained in CFR SA Application for Existing Use Certificate under Section 139A of the Resource Management Act 1991 To: Applicant: Site Location: The Chief Executive Rotorua District Council Private Bag 3029 Rotorua 3046

More information

Traffic Division Public Works Department Anchorage: Performance. Value. Results.

Traffic Division Public Works Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements. Direct Services Design, operate and maintain the

More information

Wastewater Discharge Permit Renewal Application

Wastewater Discharge Permit Renewal Application Wastewater Discharge Permit Renewal Application PLEASE COMPLETE ALL PAGES OF THIS DOCUMENT. Information provided in this application will be used for renewal of a Wastewater Discharge Permit, required

More information

This Report has been cleared for submission to the Board by

This Report has been cleared for submission to the Board by 7 This Report has been cleared for submission to the Board by.- Article 1 1 (2)(b)(ii) response rec Site notice inspected: Fees) regulations 1994 to 2004. The installation is located in a rural area of

More information

Southside Wastewater Treatment Plant Renewable Energy Leasing Project

Southside Wastewater Treatment Plant Renewable Energy Leasing Project City of Dallas Water Utilities Department Southside Wastewater Treatment Plant Renewable Energy Leasing Project Presented to the TEC September 8, 2008 Southside Wastewater Treatment Plant Renewable Energy

More information

Chain of custody of forest-based products Guidance for use

Chain of custody of forest-based products Guidance for use PEFC GUIDE PEFC GD 2001:2011 Issue 1 2011-06-22 Chain of custody of forest-based products Guidance for use PEFC Council World Trade Center 1, 10, route de l Aéroport CH-1215 Geneva, Switzerland Tel: +41

More information

ENVIRONMENTAL PERFORMANCE 2011 UPM Caledonian

ENVIRONMENTAL PERFORMANCE 2011 UPM Caledonian ENVIRONMENTAL PERFORMANCE 211 UPM Caledonian UPM CORPORATE ENVIRONMENTAL STATEMENT 211 UPM paper and pulp mills UPM Caledonian, Environmental Performance in 211 is a supplement to the Corporate Environmental

More information

Annual Environmental Report 2015

Annual Environmental Report 2015 Annual Environmental Report 2015 For Woodland Products Ltd., Drumully, Emyvale, Co. Monaghan IPPC Reg. No. P0198-01 By QED Engineering Ltd., M-TEK Building 1 Armagh Road Monaghan March 2016 Table of Contents

More information

ENERGY AUDIT. 123 Main Street Mississauga, Ontario. January 1, Report To: Mr. John Smith Smith Printing Company.

ENERGY AUDIT. 123 Main Street Mississauga, Ontario. January 1, Report To: Mr. John Smith Smith Printing Company. Report To: Mr. John Smith Smith Printing Company ENERGY AUDIT 123 Main Street Mississauga, Ontario January 1, 2009 120 Carlton Street, Suite 212 Toronto, Ontario M5A 4K2 Tel 416-964-3246 Toll Free 1-866-964-3246

More information

Communication on Progress May, 2017

Communication on Progress May, 2017 Communication on Progress May, 2017 Introduction Tvilum is Europe s leading supplier of practical, environmentally friendly furniture, designed for you and your home. Tvilum is a Danish company that produces

More information

Development Services Department Anchorage: Performance. Value. Results.

Development Services Department Anchorage: Performance. Value. Results. Anchorage: Performance. Value. Results. Purpose Development Services works to facilitate development in accordance with municipal codes, municipal design criteria, and municipal construction standards.

More information

CASE STUDY. Combined Heat and Power System Installation at Atrium II Condominium, 65 Spring Garden Avenue, Toronto

CASE STUDY. Combined Heat and Power System Installation at Atrium II Condominium, 65 Spring Garden Avenue, Toronto CASE STUDY Combined Heat and Power System Installation at Atrium II Condominium, 65 Spring Garden Avenue, Toronto 2 ATRIUM II COMBINED HEAT & POWER- CASE STUDY Contents 1. Executive Summary...4 2. Project

More information

Traffic Department Anchorage: Performance. Value. Results.

Traffic Department Anchorage: Performance. Value. Results. Traffic Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements.

More information

Development Services Department Anchorage: Performance. Value. Results.

Development Services Department Anchorage: Performance. Value. Results. Development Services Department Anchorage: Performance. Value. Results. Purpose Development Services works to facilitate development in accordance with municipal codes, municipal design criteria, and municipal

More information

MANAGEMENT OF THE INSTALLATION. Attachment C. Cadbury Ireland Limited, Rathmore Installation Rathmore Installation IPPC Licence Application

MANAGEMENT OF THE INSTALLATION. Attachment C. Cadbury Ireland Limited, Rathmore Installation Rathmore Installation IPPC Licence Application MANAGEMENT OF THE INSTALLATION Cadbury Ireland Limited, Project Ref: OES1061_01 EPA Export 25-07-2013:19:20:35 Cadbury Ireland Limited, July 2006 Site Management and Control Cadbury Ireland Limited manufactures

More information

MANAGEMENT OF THE INSTALLATION

MANAGEMENT OF THE INSTALLATION MANAGEMENT OF THE INSTALLATION Cadbury Ireland Limited Project Ref: OES1061_01 EPA Export 25-07-2013:21:15:11 Site Management and Control Cadbury Ireland Limited manufactures and distributes over 25 products

More information

ANNUAL ENVIRONMENTAL REPORT 2008

ANNUAL ENVIRONMENTAL REPORT 2008 ANNUAL ENVIRONMENTAL REPORT 2008 License Register Number P0826 01 License COOLEY DISTILLERY PLC Location CASTLETOWN COOLEY RIVERSTOWN DUNDALK COUNTY LOUTH Report (for year) 2008 AER 2008 Cooley Distillery

More information

Welcome Waste Water Quality Breakout

Welcome Waste Water Quality Breakout Welcome Waste Water Quality Breakout 07 November 2016 Lawrence Gosden Managing Director, Wastewater Environmental protection 07 November 2016 Anthony Crawford, Matthew Hart and Andrew Hagger Pollution

More information

Grown in Britain Standard

Grown in Britain Standard Grown in Britain Standard This standard is published by Grown in Britain Grown in Britain Contents GROWN IN BRITAIN STANDARD... 1 A. Introduction... 2 Application process... 2 B. Scope... 3 C. Grown in

More information

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY DULLES TOLL ROAD STATEMENT OF WORK REFUSE AND RECYCLING REMOVAL SERVICES

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY DULLES TOLL ROAD STATEMENT OF WORK REFUSE AND RECYCLING REMOVAL SERVICES METROPOLITAN WASHINGTON AIRPORTS AUTHORITY DULLES TOLL ROAD STATEMENT OF WORK REFUSE AND RECYCLING REMOVAL SERVICES June 2011 Attachment 02 Statement of Work Dulles Toll Road Page 1 TABLE OF CONTENTS 1.0

More information

Peterborough City Council Energy from Waste Facility Fengate, Peterborough. Phase 1 Energy Stury

Peterborough City Council Energy from Waste Facility Fengate, Peterborough. Phase 1 Energy Stury Peterborough City Council Energy from Waste Facility Fengate, Peterborough Phase 1 Energy Stury Peterborough City Council Phase 1 Energy Study Peterborough City Council Phase 1 Energy Study Jan 2009 Notice

More information

CI User Engagement Activities and Schedule Nov Apr 2013

CI User Engagement Activities and Schedule Nov Apr 2013 OCEAN OBSERVATORIES INITIATIVE Activities and Schedule Nov 2012 - Apr 2013 Julie Thomas, Operations Director Susanne Jul, User Experience Lead 1 Overview Review engagement points in the iterative release

More information

WELCOME TO THE PARTICIPANTS OF THE FOREST DIALOG

WELCOME TO THE PARTICIPANTS OF THE FOREST DIALOG WELCOME TO THE PARTICIPANTS OF THE FOREST DIALOG Your partner in community forest management www.dipantara.net Yogyakarta : Jl.Ringin Raya 14, Condongcatur,Yogyakarta. Gunungkidul : Jalan Raya Nglipar-Ngawen

More information

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21 CONTENTS PAGE 1 INTRODUCTION 3 2. GENERAL OVERVIEW OF THE ACTIVITY 4 3 DATA 3.1 Emissions to Atmosphere 4 3.2 Surface Water Emissions 5 3.3 Ground Water Sampling 8 3.4 Noise 8 3.5 Inspection of Valves

More information

DUDLEY ENERGY FROM WASTE PLANT. PERMIT No AP3435SD WASTE INCINERATION DIRECTIVE ANNUAL REPORT

DUDLEY ENERGY FROM WASTE PLANT. PERMIT No AP3435SD WASTE INCINERATION DIRECTIVE ANNUAL REPORT DUDLEY ENERGY FROM WASTE PLANT PERMIT No AP3435SD WASTE INCINERATION DIRECTIVE ANNUAL REPORT 2011 1 CONTENTS Page Introduction 3 Non technical plant description 4 Plant operation 5 Annual waste throughputs

More information

WOLVERHAMPTON ENERGY FROM WASTE PLANT. PERMIT No AP3835SM WASTE INCINERATION DIRECTIVE ANNUAL REPORT

WOLVERHAMPTON ENERGY FROM WASTE PLANT. PERMIT No AP3835SM WASTE INCINERATION DIRECTIVE ANNUAL REPORT WOLVERHAMPTON ENERGY FROM WASTE PLANT PERMIT No AP3835SM WASTE INCINERATION DIRECTIVE ANNUAL REPORT 2008 1 CONTENTS Page Introduction 3 Non technical plant description 4 Plant operation 5 Annual waste

More information

Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities

Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities This report is a summary of water quality information for Finch s Drinking Water System, published in accordance

More information

Best Practices for Biomass Feedstock Handling and Management Wood Waste to Energy Facility for Tomslake/Kelly Lake

Best Practices for Biomass Feedstock Handling and Management Wood Waste to Energy Facility for Tomslake/Kelly Lake Best Practices for Biomass Feedstock Handling and Management Wood Waste to Energy Facility for Tomslake/Kelly Lake Prepared for: Kelly Lake Metis Settlement Society & Waste to Energy Canada July 23, 2012

More information

WOLVERHAMPTON ENERGY FROM WASTE PLANT. PERMIT No AP3835SM WASTE INCINERATION DIRECTIVE ANNUAL REPORT

WOLVERHAMPTON ENERGY FROM WASTE PLANT. PERMIT No AP3835SM WASTE INCINERATION DIRECTIVE ANNUAL REPORT WOLVERHAMPTON ENERGY FROM WASTE PLANT PERMIT No AP3835SM WASTE INCINERATION DIRECTIVE ANNUAL REPORT 2010 1 CONTENTS Page Introduction 3 Non technical plant description 4 Plant operation 5 Annual waste

More information

Organics Collection Program and Yard Material Pile Collection Update

Organics Collection Program and Yard Material Pile Collection Update STAFF REPORT DATE: August 29, 2017 TO: FROM: SUBJECT: City Council Robert A. Clarke, Public Works Director Stan Gryczko, Assistant Public Works Director Richard Tsai, Environmental Resources Manager Organics

More information

DUDLEY ENERGY FROM WASTE PLANT. PERMIT No AP3435SD WASTE INCINERATION DIRECTIVE ANNUAL REPORT

DUDLEY ENERGY FROM WASTE PLANT. PERMIT No AP3435SD WASTE INCINERATION DIRECTIVE ANNUAL REPORT DUDLEY ENERGY FROM WASTE PLANT PERMIT No AP3435SD WASTE INCINERATION DIRECTIVE ANNUAL REPORT 2008 1 CONTENTS Page Introduction 3 Non technical plant description 4 Plant operation 5 Annual waste throughputs

More information

Attachment C Management of the Installation

Attachment C Management of the Installation Table of Contents Attachment C Management of the Installation C1.1 Organisational Chart C1.2 Quality, Safety and Environmental (QSE) Policy Statement C1.3 Roles & Responsibilities of Key Environmental

More information

Annual Environmental Report 2008, PDM Ltd, Oldmilltown, Kill, Co. Kildare. 24 th March Issue No 1

Annual Environmental Report 2008, PDM Ltd, Oldmilltown, Kill, Co. Kildare. 24 th March Issue No 1 Annual Environmental Report 2008, PDM Ltd, Oldmilltown, Kill, Co. Kildare. 24 th March 2009 Issue No 1 CONTENTS Section Page No 1. INTRODUCTION... 1 1.1. General... 1 1.2. Site & Process Description...

More information

IRISH OXYGEN CO LTD. Waterfall Road, Cork Tel: (021) Fax: (021) Annual Environmental Report (AER) 2016

IRISH OXYGEN CO LTD. Waterfall Road, Cork Tel: (021) Fax: (021) Annual Environmental Report (AER) 2016 CO LTD Waterfall Road, Cork Tel: (021) 454 1821 Fax: (021) 434 3086 Annual Environmental Report () 2016 Licence No. P0070 01 P0070 01_2016 CONTENTS 1. Introduction... 3 2. Summary Information... 3 3. Environmental

More information

Fuel Switching VER Project

Fuel Switching VER Project Project Design Document: Fuel Switching VER Project for Tongaat Hulett Starch (Pty) Ltd prepared by Promethium Carbon (Pty) Ltd 5 November 2007 1 SECTION A. General description of small-scale project activity

More information

BELL BAY PULP MILL. Overview of the Bell Bay Pulp Mill Project

BELL BAY PULP MILL. Overview of the Bell Bay Pulp Mill Project BELL BAY PULP MILL BELL BAY PULP MILL Overview of the Bell Bay Pulp Mill Project Production capacity: 1.1 million ADt per annum Adjacent to existing Gunns woodchip mill Central location to access sustainable

More information

Gasification Power / Heat & Power Pure Heat. Pure power generation only up to 40% efficient.

Gasification Power / Heat & Power Pure Heat. Pure power generation only up to 40% efficient. 1.1. Uses of Biomass for Energy Gasification Power / Heat & Power Pure Heat Gasification is a process that converts organic materials into combustible gases, which can be cleaned and burnt or expanded

More information

Irish Country Meats Navan

Irish Country Meats Navan Irish Country Meats Navan Annual Environmental Report 2009 Index 1 Introduction 2 Environmental Policy 3 Site Description 4 Summary Information 4.1 Emission to Sewer 4.2 Emissions to Water 4.3 Waste Management

More information

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21 CONTENTS PAGE 1 INTRODUCTION 3 2. GENERAL OVERVIEW OF THE ACTIVITY 4 3 DATA 3.1 Emissions to Atmosphere 5 3.2 Surface Water Emissions 6 3.3 Ground Water Sampling 8 3.4 Noise 10 3.5 Inspection of Valves

More information

UTILITIES REPORT PERIOD AUGUST 2007 TO JULY University of Aberdeen

UTILITIES REPORT PERIOD AUGUST 2007 TO JULY University of Aberdeen UTILITIES REPORT PERIOD AUGUST 2007 TO JULY 2008 University of Aberdeen Contents 1 Executive Summary...3 2 Energy as Supplied Summary...3 3 Carbon Dioxide Emissions Actual for 2007/2008...4 4 Carbon Dioxide

More information

Preserving scarce resources. Cesare Spreafico Director General, COREPLA, Italy

Preserving scarce resources. Cesare Spreafico Director General, COREPLA, Italy Preserving scarce resources Cesare Spreafico Director General, COREPLA, Italy RECYCLING PLASTIC PACKAGING WASTE A CHALLENGE FOR A SUSTAINABILE GROWTH Cesare Spreafico Director General 3 KEY CHALLENGES

More information

CLONAKILTY WASTE AND RECYCLING CENTRE W

CLONAKILTY WASTE AND RECYCLING CENTRE W CLONAKILTY WASTE AND RECYCLING CENTRE W0008-01 ANNUAL ENVIRONMENTAL REPORT 2010 1 st January 2011 31 st December 2011 Prepared By: - John P O'Donovan February 2012 Clonakilty Waste and Recycling Centre

More information

Combined Heat and Power & District Heating Networks. For the East Midlands

Combined Heat and Power & District Heating Networks. For the East Midlands Combined Heat and Power & District Heating Networks For the East Midlands Introduction to Combined Heat and Power The Basics Systems produce heat & electricity Production of electricity at the point of

More information

Rainwater tank study of new homes

Rainwater tank study of new homes Rainwater tank study of new homes Helena Amaro UWSRA Science & Stakeholder Engagement Forum #4 The objectives Determine the quantity of water savings from rainwater tanks Identify opportunities to improve

More information

The Feasibility of Making Sawmill Residues into Fuel Pellets

The Feasibility of Making Sawmill Residues into Fuel Pellets Azeus Machinery Co.ltd Email: info@biopelletmachine.com Website: www.biopelletmachine.com Add: SOKEYUFA Building, NO.26 Jingliu Road,Zhengzhou,CHINA The Feasibility of Making Sawmill Residues into Fuel

More information

Schedule 2 TECHNICAL INFORMATION

Schedule 2 TECHNICAL INFORMATION Schedule 2 TECHNICAL INFORMATION This document is intended to provide context to the Haida Gwaii Request for Expressions of Interest (RFEOI) for the potential electricity supply opportunity for clean electricity

More information

ANNUAL ENVIRONMENTAL REPORT. For. McGhan Ltd. t/a Allergan Kilbride Industrial Estate, Arklow Co. Wicklow. IPPC Licence Number: P

ANNUAL ENVIRONMENTAL REPORT. For. McGhan Ltd. t/a Allergan Kilbride Industrial Estate, Arklow Co. Wicklow. IPPC Licence Number: P ANNUAL ENVIRONMENTAL REPORT 2008 For McGhan Ltd. t/a Allergan Kilbride Industrial Estate, Arklow Co. Wicklow IPPC Licence Number: P0115-04 (Document Number 1120-01 v3.00) Tel: 353 1 276 1428 Fax: 353 1

More information

Sanitation Services Bulk and Brush Program - Update. Quality of Life & Environment Committee November 14, 2016

Sanitation Services Bulk and Brush Program - Update. Quality of Life & Environment Committee November 14, 2016 Sanitation Services Bulk and Brush Program - Update Quality of Life & Environment Committee November 14, 2016 Briefing Overview Provide a recap of the current collection program Provide information related

More information

Welcome to Södra Cell Värö. One of the largest and most modern pulp mills in the world.

Welcome to Södra Cell Värö. One of the largest and most modern pulp mills in the world. Welcome to Södra Cell Värö One of the largest and most modern pulp mills in the world. 2 In Södra s world, everything starts with the forest. Södra is Sweden s largest forest-owner association, with more

More information

NZQA unit standard version 3 Page 1 of 5. Inspect export forest products for phytosanitary contamination as a site inspector

NZQA unit standard version 3 Page 1 of 5. Inspect export forest products for phytosanitary contamination as a site inspector Page 1 of 5 Title Inspect export forest products for phytosanitary contamination as a site inspector Level 5 Credits 10 Purpose This unit standard is for people working, or intending to work as a site

More information

Maximise timber recovery

Maximise timber recovery Page 1 of 6 Maximise timber recovery Level 5 Credits 25 Purpose People credited with this unit standard are able to: manage safety when maximising timber recovery; compare log supply with log specification;

More information

Presentation for the Local Government Commission and the Community Environmental Council. July 13, 2007

Presentation for the Local Government Commission and the Community Environmental Council. July 13, 2007 Community Choice Aggregation Presentation for the Local Government Commission and the Community Environmental Council July 13, 2007 1 Community Choice Aggregation (CCA) CCA Legislation (AB117) allows cities

More information

Energy demand in wood processing plants

Energy demand in wood processing plants Energy demand in wood processing plants Jingge Li, Murray McCurdy, Shusheng Pang * Abstract Computer models were developed to quantify the energy demand in a sawmill and a medium density fibreboard (MDF)

More information

Sustaining Our Buildings & Grounds

Sustaining Our Buildings & Grounds Sustaining Our Buildings & Grounds The Next 100 Years University of Alberta June 1 3 2008 Located Edmonton Alberta 3rd largest University in Canada 32,000 undergrads 6,000 grad students 13.9 million sq.

More information

Municipal Solid Waste Characteristics

Municipal Solid Waste Characteristics CITY OF LETHBRIDGE Municipal Solid Waste Characteristics Juliane Ruck, the City of Lethbridge and Xiaomei Li, Alberta Innovates Energy and Environmental Solutions SWANA Northern Lights 2015 Conference

More information

FutureMetrics LLC 8 Airport Road Bethel, ME 04217, USA

FutureMetrics LLC 8 Airport Road Bethel, ME 04217, USA Vietnam Wood Pellet Exports Rapid growth and low prices. Can it last? What is the Future? By William Strauss, PhD July 7, 2018 This brief white paper will explore the Vietnam pellet export sector. With

More information

DNV GL Business Assurance Finland Oy Ab Evaluation of Stora Enso Eesti AS Imavere Compliance with the SBP Framework: Public Summary Report

DNV GL Business Assurance Finland Oy Ab Evaluation of Stora Enso Eesti AS Imavere Compliance with the SBP Framework: Public Summary Report DNV GL Business Assurance Finland Oy Ab Evaluation of Stora Enso Eesti AS Imavere Compliance with the SBP Framework: Public Summary Report First Surveillance Audit www.sustainablebiomasspartnership.org

More information

Environmental policy. Reviewed by

Environmental policy. Reviewed by Environmental policy Date July 2016 Reviewed by Stefan Baumgartner PAPYRUS PRINCIPALS FOR ENVIRONMENTAL RESPONSIBILITY The environmental policy is there to help us minimise how our operations affect the

More information

ACORN RECYCLING LTD ANNUAL ENVIRONMENTAL REPORT 2014

ACORN RECYCLING LTD ANNUAL ENVIRONMENTAL REPORT 2014 Contents 1.0 Introduction... 2 2.0 Waste Activities carried out at the Facility... 2 3.0 Waste Management Record... 3 4.0 Resource Consumption Summary... 4 5.0 Report on the assessment of the efficiency

More information

Sustaining Our Operation in a Changing World. Michael Younis October

Sustaining Our Operation in a Changing World. Michael Younis October Sustaining Our Operation in a Changing World Michael Younis October 16 2008 Business Case Energy Consumption Cook Clean Refrigerate Cost Escalation 2 nd largest conversion cost 5.5% CAGR Environmental

More information

Refuse Collections Division Solid Waste Services Department Anchorage: Performance. Value. Results.

Refuse Collections Division Solid Waste Services Department Anchorage: Performance. Value. Results. Refuse Collections Division Solid Waste Services Department Anchorage: Performance. Value. Results. Mission Provide solid waste collection and disposal service to rate-paying customers within our defined

More information

LOGISTEC WP5 - TEST REPORT

LOGISTEC WP5 - TEST REPORT LOGISTEC WP5 - TEST REPORT Task: 5.1.3.- Demonstration of new poplar supply systems Test: Improved poplar management and harvesting machinery 2014 Crop: Short rotation poplar Location: Saucedilla (Cáceres)

More information

Soltec (Ireland) Ltd Waste Licence No W /12/12

Soltec (Ireland) Ltd Waste Licence No W /12/12 1 Soltec (Ireland) Ltd EPA License W0115-01 Report Type: AER Reporting Period: 1 st Jan 2012-31 st Dec 2012 Document Name Function Date Signature Written by Mary Lynam - Dunne Accounts Manager 7-1-13 Edited

More information

Lumber Recovery. Kenneth A. Kilborn. United States Department of Agriculture

Lumber Recovery. Kenneth A. Kilborn. United States Department of Agriculture Lumber Recovery Forest Service Pacific Northwest Studies of Alaska Research Station General Technical Report Sawmills, 1997 to 1999 United States Department of Agriculture PNW-GTR-544 April 2002 Kenneth

More information

LARNAKA SOLID WASTE MANAGEMENT

LARNAKA SOLID WASTE MANAGEMENT LIFE2015/ENV/PT/000609 LARNAKA SOLID WASTE MANAGEMENT / Acting Municipal Secretary, Solid Waste Management (1) The facility is designed to handle mixed municipal solid waste (MSW) and is located 10km from

More information

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~' 'Its ~s 71 66 CIN No. : L26943RJ1979PLC001935 Phone : 01462228101-6 Toll Free : 18001806003/6004 Fax: 01462228117/228119 E-Mail: shreebwr@shreecementltd.com (I." Website : www.shreecement.in SHREE CEMENT LTD..~..~..~

More information

Corporate Information CMP

Corporate Information CMP Corporate Information CMP Corporate Information Compliance Monitoring Program (CMP) Introduction Council s vision for information management is To provide easy access to reliable information anywhere and

More information

Environmental Statement

Environmental Statement Environmental Statement Report Environmental Protection and Occupational Safety Taicang and Anting UPDATE Status March 215 Introduction In the year 214 the environmental management at Taicang Plant 1,

More information