1 WATER AND SANITARY SEWER STUDY Plaza Mexico Residences 3000 E Imperial Highway Lynwood, CA KPFF Job # October 16, 2017 PREPARED BY: KPFF Consulting Engineers 700 S Flower Street, Suite 2100 Los Angeles, California T (213)

2 TABLE OF CONTENTS I. INTRODUCTION... 1 II. III. IV. EXISTING CONDITION... 2 SEWER CAPACITY CALCULATIONS...2 WATER CAPACITY CALCULATIONS...5 EXHIBITS Exhibit 1 Site Plan APPENDICES Appendix A Appendix B Appendix C Bentley FlowMaster Hydraulic Calculations Sewer Flow Gauging Data Fire Flow Test Water and Sanitary Sewer Study KPFF Consulting Engineers Plaza Mexico Residences Job # Lynwood, CA October 16,

3 I. INTRODUCTION The purpose of this study is to analyze the capacity of existing water and sanitary sewer infrastructures adjacent to the proposed Plaza Mexico Residences project site. The project consists of a mixed-use residential development with 4 stories of residential units over a twostory concrete parking structure on grade. The first floor includes 26,200 square feet of restaurant and retail spaces. The scope of the new construction is approximately 156,816 square feet or 3.6 acres. An aerial photograph of the project site is shown below. Imagery from Google Earth Water and Sanitary Sewer Study Plaza Mexico Residences Lynwood, CA KPFF Consulting Engineers Job # October 16,

4 II. EXISTING CONDITION The existing water and sanitary sewer services to and from the project site are mainly owned and operated by the City of Lynwood. Exhibit 1 shows the size of the existing water and sewer lines and the direction of flow within the vicinity of Plaza Mexico Residences project. The existing water mains are 6 in Imperial Highway, 12 in State Street, and 12 in Beechwood Avenue. The existing sanitary sewer system serving the proposed Plaza Mexico Residences is made up of a combination of 8-inch diameter vitrified clay pipe branch lines in Beechwood Avenue and Imperial Highway lines and a 24-inch diameter Los Angeles County trunk line located in State Street. The general direction of sewer conveyance from the project site is shown in Exhibit 1. III. SEWER CAPACITY CALCULATIONS US3 conducted sewer gauging studies at four manholes located in Imperial Highway, State Street and Beechwood Avenue (see Exhibit 1) during an eight day period from 9/28/2017 to 10/4/2017. The summary of the sewer gauging results is shown on Table 1 below. See Appendix B for the complete sewer gauging data. Table 1 - Sewer Gauging Study Results Pipe Location US3 ID Diameter (in) Pipe Slope Flow Direction Maximum Measured Flow (gpm) Minimum Measured Flow (gpm) Beechwood Site % West State & Beechwood State & Imperial Hwy Site % South Site % South Imperial Hwy Site % East The capacity of existing sanitary sewer pipes was calculated using Bentley FlowMaster hydraulic modeling software. For the sewer pipes equal to or less than 15 in diameter, the hydraulic capacity was calculated based on them maximum d/d (flow depth versus diameter) ratio of 0.5. For the sewer pipes greater than 15 in diameter, the hydraulic capacity was calculated based on them maximum d/d (flow depth versus diameter) ratio of The summary of the sewer capacity calculation is shown on Table 2. See Appendix A for software output. The total available sewer capacity at the project site is estimated to be gallons per minute. Water and Sanitary Sewer Study KPFF Consulting Engineers Plaza Mexico Residences Job # Lynwood, CA October 16,

5 Table 2 Sanitary Sewer Hydraulic Calculation Summary Diameter (in) Design Capacity (gpm) Existing Max Flow (gpm) Existing Max Depth (in) Existing % Full Available Capacity (gpm) Site 1: Beechwood % Site 2: State & Beechwood Site 3: State & Imperial Highway Site 4: Imperial Highway 1 Hydraulic Capacity based on d/d ratio of Hydraulic capacity based on d/d ratio of US3 identified 2 of sediments in the sewer line % % % 41.3 TOTAL GPM Using Los Angeles Bureau of Engineering sewer generation factors, the average daily sanitary sewer of the proposed development is estimated to be 77,726 gallons. The breakdown of sewer generation calculation is shown in Table 2. With peaking factor of 2.64, the peak flow is estimated to be 205,196 gallons per day (or 142 gallons per minute), and it is approximately 15% of the available sewer capacity in the adjacent sewer infrastructures. Table 3 - Sewer Generation Calculations Usage Area / Units Total Flow Peak Flow Sewer Generation (gallons per (gallons per Factor day) day) Retail 13,886 SF 300 GPD / 1000 SF 4,166 GPD 10,998 GPD Restaurant 12,314 SF or 30 GPD / seat 24,600 GPD 820 seats 1 64,944 GPD Residential Studio 3 units 80 GPD / unit 240 GPD 993 GPD Residential 1 bed 170 units 120 GPD / unit 20,400 GPD 53,856 GPD Residential 2 bed 167 units 160 GPD / unit 26,720 GPD 70,712 GPD Residential 3 bed 8 units 200 GPD / unit 1,600 GPD 4,224 GPD TOTAL ,726 GPD 205,196 GPD 54 GPM 142 GPM 1 15 sq. ft per seat used to estimate seat count 2 =2.64. Water and Sanitary Sewer Study KPFF Consulting Engineers Plaza Mexico Residences Job # Lynwood, CA October 16,

6 IV. WATER CAPACITY CALCULATIONS Two public fire hydrants were tested by City of Lynwood for fire flow availability. Please refer to Appendix C. Although both hydrants are located on Imperial Highway, the first hydrant is connected to the 6 main, and the second hydrant is connected to the 12 main. The static pressures were measured at 54 psi and 57 psi. The maximum available flows at 20 psi were estimated to be 2,270 gallons per minute and 2,678 gallons per minute, respectively. Based on the preliminary plumbing design, the total water demand for the Plaza Mexico Residences project is 800 gallons per minute. Using the available flow-pressure data of the 6 main as the basis, the available pressure at 800 gallons per minute is calculated to be 49 psi. Please refer to the graph below. Fire Flow Graph for 6 Water Main in Imperial Highway Water and Sanitary Sewer Study KPFF Consulting Engineers Plaza Mexico Residences Job # Lynwood, CA October 16,

7 EXHIBIT 1: SITE PLAN

8 38 x 26 NADEL RESIDENTIAL & COMMERCIAL INC 1990 S. BUNDY DRIVE SUITE 400 LOS ANGELES, CA T F LOS ANGELES LAS VEGAS PROFESSIONAL STAMP(S): NOT FOR CONSTRUCTION CONSULTANT: 700 South Flower Street Suite 2100 Los Angeles, CA O: F: CLIENT: 3000 E. IMPERIAL, LLC 6940 BEACH BLVD., SUITE D-501 BUENA PARK, CA x x 24 NO PARKING 60 x x 24 PROJECT: PLAZA MEXICO RESIDENCES VAN NO PARKING VAN NO PARKING VAN NO PARKING PROJECT ADDRESS: 3000 E. IMPERIAL HIGHWAY LYNWOOD, CA NO HC PARKING HC PUBLIC AGENCY SUBMITTAL: ISSUED FOR BIDDING: - N/A F. DRAIN F. DRAIN F. DRAIN F. DRAIN F. DRAIN ISSUED FOR CONSTRUCTION: N/A F. DRAIN F. DRAIN F. DRAIN F. DRAIN 62 x 26 F. DRAIN 62 x x x x 23 REVISIONS: ISSUE DESCRIPTION: NO.: ISSUE DATE: 10/03/ % DESIGN DEV. NADEL PROJECT : PROJECT DATE: ISSUE: UTILITY PLAN DRAWING TITLE: C1.50 ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND THE SAME MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. Copyright 2017, NADEL RESIDENTIAL & COMMERCIAL INC. ALL RIGHTS RESERVED. Oct 03, :12pm

9 APPENDIX A: HYDRAULIC CALCULATIONS A.1. Beechwood 8 Sanitary Sewer Capacity

10 A.2. State Street 24 Sanitary Sewer Capacity

11 A.3. State & Imperial Highway 8 Sanitary Sewer Capacity

12 A.4. Imperial Highway 8 Sanitary Sewer Capacity

13 APPENDIX B: SEWER FLOW GAUGING DATA

14 Site Report Confidential Proprietary Information M+D Properties ~2940 Beechwood Av Site 1 Beechwood MH Manhole No. 1 Access: Manhole is located in the center of the street. System Type: Sanitary X Storm Install Date: 9/27/2017 Map Flow Meter Meter Depth: 67" Map Coordinates: , Slow open channel hydraulics Avg Velocity Avg Measured Level Multiplier 0.4 fps 0.125" 1 Gas O2 H2S CO LEL Technology Notes Settlement of normal system solids noted in MH trough. Traffic Safety Used cones & signs in accordance with approved traffic control plan. Land Use Residential Commercial Industrial Trunk X Traffic Plan Manhole Depth Monitored Pipe Size Inner Pipe Size (In/Out) Pipe Shape Pipe Condition Manhole Material Silt Velocity Profile Data Velocity Profile Taken Sensor Offset Sensor Dist. to Crown Sensor Direction Flow Heading 82" 8" 8"/8" Round Good Brick, painted 0 * D 14.52" 6.52" Upstream West

15 Meter Site Document M+D Properties Site 1 Beechwood MH ~2940 Beechwood Av Site Manhole During Install Installation Process Installed MH Condition

16 Velocity (fps) Level (in) Flow (gpm) Average RainFall Inches Maximum Minimum /5/2017 5:02:04 PM

17 Velocity (fps) Level (in) Flow (gpm) Average RainFall Inches Maximum Minimum /5/2017 5:02:04 PM

18 9/27/2017 thru 10/5/ /5/2017 5:02:04 PM

19 Site Report Confidential Proprietary Information M+D Properties ~11201 State St Site 2 State & Beechwood MH Access: Manhole is located in the southbound lanes within the intersection of State St & Beechwood Av. System Type: Sanitary X Storm Manhole No. 2 Install Date: 9/27/2017 Map Flow Meter Meter Depth: 102" Map Coordinates: , Moderate open channel hydraulics Avg Velocity Avg Measured Level Multiplier 3.33 fps 6.75" 1 Gas O2 H2S CO LEL Technology Notes Laterals entering MH from east & west; no flow was noted from either during install or removal. Traffic Safety Used arrow board, barricades, cones & signs in accordance with approved traffic control plan. Land Use Residential Commercial Industrial Trunk X Traffic Plan Manhole Depth Monitored Pipe Size Inner Pipe Size (In/Out) Pipe Shape Pipe Condition Manhole Material Silt Velocity Profile Data Velocity Profile Taken Sensor Offset Sensor Dist. to Crown Sensor Direction Flow Heading 133" 24" 24"/24" Round Good Brick 0 * D 31.08" 7.08" Downstream South

20 Meter Site Document M+D Properties Site 2 State & Beechwood MH ~11201 State St Site Manhole Before Install Installation Process Installed

21 Velocity (fps) Level (in) Flow (gpm) Average RainFall Inches Maximum Minimum /5/2017 5:03:10 PM

22 Velocity (fps) Level (in) Flow (gpm) Average RainFall Inches Maximum Minimum /5/2017 5:03:10 PM

23 9/27/2017 thru 10/5/ /5/2017 5:03:10 PM

24 Site Report Confidential Proprietary Information M+D Properties ~2991 E. Imperial Hwy Site 3 State & Imperial MH Manhole No. 3 Access: Manhole is located in front of the eastbound left turn lane within the intersection of State St & Imperial Hwy. System Type: Sanitary X Storm Install Date: 9/27/2017 Map Flow Meter Meter Depth: 71" Map Coordinates: , Slow open channel hydraulics Avg Velocity Avg Measured Level Multiplier 0.5 fps 5.20" 1 Gas O2 H2S CO LEL Technology Notes Bend within MH; the larger pieces of brick were removed from the trough prior to monitoring. Traffic Safety Used arrow board, barricades, cones & signs in accordance with approved traffic control plan. Land Use Residential Commercial Industrial Trunk X Traffic Plan Manhole Depth Monitored Pipe Size Inner Pipe Size (In/Out) Pipe Shape Pipe Condition Manhole Material Silt Velocity Profile Data Velocity Profile Taken Sensor Offset Sensor Dist. to Crown Sensor Direction Flow Heading 86" 8" 8"/8" Round Poor Brick, painted but crumbling 2" * D 15.16" 7.16" Downstream South

25 Meter Site Document M+D Properties Site 3 State & Imperial MH ~2991 E. Imperial Hwy Site Manhole Before Install Debris Removal Sensor Installed Installed MH Condition

26 Velocity (fps) Level (in) Flow (gpm) Average RainFall Inches Maximum Minimum /5/2017 5:03:36 PM

27 Velocity (fps) Level (in) Flow (gpm) Average RainFall Inches Maximum Minimum /5/2017 5:03:36 PM

28 9/27/2017 thru 10/5/ /5/2017 5:03:36 PM

29 Site Report Confidential Proprietary Information M+D Properties ~2934 E. Imperial Hwy Site 4 Imperial MH Manhole No. 4 Access: Manhole is located in the center median lane. System Type: Sanitary X Storm Install Date: 9/27/2017 Map Flow Meter Meter Depth: 65" Map Coordinates: , Slow open channel hydraulics Avg Velocity Avg Measured Level Multiplier 0.33 fps 1.125" 1 Gas O2 H2S CO LEL Technology Notes Settlement of normal system solids noted in MH trough. Traffic Safety Used barricade, cones & signs in accordance with approved traffic control plan. Land Use Residential Commercial Industrial Trunk X Traffic Plan Manhole Depth Monitored Pipe Size Inner Pipe Size (In/Out) Pipe Shape Pipe Condition Manhole Material Silt Velocity Profile Data Velocity Profile Taken Sensor Offset Sensor Dist. to Crown Sensor Direction Flow Heading 80" 8" 8"/8" Round Fair Brick, painted but crumbling 0 * D 14.83" 6.83" Upstream East

30 Meter Site Document M+D Properties Site 4 Imperial MH ~2934 E. Imperial Hwy Site Manhole Before Install Installation Process Installed MH Condition

31 Velocity (fps) Level (in) Flow (gpm) Average RainFall Inches Maximum Minimum /5/2017 5:04:21 PM

32 Velocity (fps) Level (in) Flow (gpm) Average RainFall Inches Maximum Minimum /5/2017 5:04:21 PM

33 9/27/2017 thru 10/5/ /5/2017 5:04:21 PM

34 APPENDIX C: FIRE FLOW TEST

35 *... PART Il-A %/aen.c2 C I& P r INFORMATION ON FlRE FLOW AVAILABILITY (To be completed by Water Purveyor) Location Hydrant Number Distance from Size of 47" Nearest Property Line Size of Hydrant C X Y % ~ ~ ~ main ~ 6" Static PSI 5" Residual PSI ys Orifice size lh pitot ZS? Fire Flow at 20 PSI?--! 2fl Duration 2 #s Flow Test Date I Time?d?//k ~ ' Location -me - - LVY PQ C 6 L 'a & a Llh Hydrant Number Distance from Size of Nearest Property Line # Size of main 1 " Static PSI 57 Residual PSI * Orifice size 2 '/z Pitot 7% Fire Flow at 20 PSI 2; bt8 Duration Flow Test Date I Time ~!9 Location //* /.Iw* a Hydrant Number Distance from Size of Nearest Property Line Size of Hydrant Water main Static PSI Residual PSI Orifice size Pitot Fire Flow at 20 PSI Duration Flow Test Date I Time PART Il-B SPRINKLERED BUILDINGSIPRIVATE FIRE HYDRANTS ONLY Detector Location (check one) Above Grade Below Grade Either Backflow Protection Required (Fire S~rinklerslPrivate Hvdrant) (check one) yes No Minimum Type of Protection Required (check one) U Single Check Detector Assembly Double Check Detector Assembly Reduced Pressure Principle Detector Assembly 8'11 s 117 Date ' This Information is Considered Valid for Twelve Months Fire Department approval of building plans shall be required prior to the issuance of a Buildinq Permit by the jurisdictional Building Department. Any deficiencies in water systems will need to be resolved by the Fire Prevention Division & prior to this department's approval of building plans.

Woodbury - Aurora Metro Station

Woodbury - Aurora Metro Station Woodbury - Aurora Metro Station Master Utility Report Aurora, Colorado E. Centrepoint Dr. and E. Alameda Dr. Prepared By: Galloway 6162 S. Willow Drive, Suite 32 Greenwood Village, CO 8111 33.77.8884 POC:

More information

Wastewater Flow Monitoring Services

Wastewater Flow Monitoring Services Wastewater Flow Monitoring Services For San Gabriel, CA July 13, 2015 through July 21, 2015 Revised October 9, 2015 Leaders in Sewer Flow Monitoring Services 601 N. Parkcenter Dr., Suite 209 Santa Ana,

More information

I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices

I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendices Appendix J Utility Systems Data August 2017 I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO

More information

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES 3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES All sanitary sewers shall be designed in accordance with these Design Standards, LBWD Rules and Regulations, and to accepted engineering principles. In

More information

KUM & GO 300 SUBDIVISION THORNTON, COLORADO

KUM & GO 300 SUBDIVISION THORNTON, COLORADO FINAL UTILITY STUDY KUM & GO 300 SUBDIVISION THORNTON, COLORADO PREPARED FOR: KUM & GO, L.C. 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 PH: (515) 457-6232 CONTACT: RYAN J. HALDER PREPARED BY: OLSSON

More information

Appendix G. Utility Technical Report

Appendix G. Utility Technical Report Appendix G : Water and Energy PREPARED BY: KPFF Consulting Engineers 6080 Center Drive, Suite 750 Los Angeles, CA 90045 (310) 665-2800 Table of Contents 1. INTRODUCTION... 1 1.1. PROJECT DESCRIPTION...

More information

MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices

MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendices Appendix J Utility Systems Data February 2017 MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO

More information

CITY OF ANAHEIM SEWER DESIGN MANUAL

CITY OF ANAHEIM SEWER DESIGN MANUAL CITY OF ANAHEIM CITY OF ANAHEIM DEPARTMENT OF PUBLIC WORKS SUBDIVISION SECTION SEWER DESIGN MANUAL TABLE OF CONTENTS 1. SIZING... 2 Design flows:... 2 Roughness coefficient (n):... 2 Velocity (Average

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

M E M O R A N D U M. Date: January 31, Bjorn Schrader, Abramson Teiger Architects. Kimley-Horn and Associates, Inc.

M E M O R A N D U M. Date: January 31, Bjorn Schrader, Abramson Teiger Architects. Kimley-Horn and Associates, Inc. M E M O R A N D U M Date: January 31, 2017 To: From: Subject: Bjorn Schrader, Abramson Teiger Architects Kimley-Horn and Associates, Inc. 8888 Washington - Utility Memorandum Introduction Kimley-Horn and

More information

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS DESIGN STANDARDS SECTION 2 INDEX ITEM DESCRIPTION 2.00 GENERAL STATEMENT 2.01 WATER DISTRIBUTION

More information

TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM GENERAL SIZING LINES 115.

TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM GENERAL SIZING LINES 115. TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM SECTION TITLE PAGE 115.1 GENERAL 115.1 115.2 SIZING LINES 115.1 115.3 DISTRIBUTION SYSTEM 115.2 115.3.1 Layout

More information

PRELIMINARY WASTEWATER CAPACITY STUDY

PRELIMINARY WASTEWATER CAPACITY STUDY PRELIMINARY WASTEWATER CAPACITY STUDY Tentative Tract Map No. 18955 CITY OF HESPERIA Prepared for: HESPERIA VENTURES I, LLC 10410 Roberts Road Calimesa, CA 92320 Tel (714) 785 2381 Mr. John Ohanian Prepared

More information

APPENDIX J WATER AND SEWER UTILITIES

APPENDIX J WATER AND SEWER UTILITIES APPENDIX J WATER AND SEWER UTILITIES J.1 Water Study Domestic and Emergency Fire PROJECT SITE: 10000 W. Santa Monica Blvd Los Angeles, California 90067 APN: 4319-001-(001-002) Vesting Tentative Tract Map

More information

Introduction to Storm Sewer Design

Introduction to Storm Sewer Design A SunCam online continuing education course Introduction to Storm Sewer Design by David F. Carter Introduction Storm sewer systems are vital in collection and conveyance of stormwater from the upstream

More information

WATER MAIN EXTENSION DESIGN REQUIREMENTS

WATER MAIN EXTENSION DESIGN REQUIREMENTS This guideline provides minimum requirements for the design of new water main extensions. This guide is not to be used as a substitution for the detailed design of the water system. The Developer s Engineer

More information

WASTEWATER REVIEW CHECKLIST. Project Number: Reviewed By: Telephone:

WASTEWATER REVIEW CHECKLIST. Project Number: Reviewed By: Telephone: The City of East Point DEPARTMENT OF WATER AND SEWER 1526 East Forrest Ave. Suite 400 East Point, Georgia 30344 FAX (404) 270-7215 www.eastpointcity.org WASTEWATER REVIEW CHECKLIST Project Name: Tax ID

More information

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility: Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Sanitary Sewer

More information

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES 4.1 GENERAL REQUIREMENTS 4.1.1 Water and fire protection distribution facilities are to be provided solely for the purpose of supplying potable

More information

Ivins City Standard Specifications for Design and Construction Part 2 Engineering and Design Standards

Ivins City Standard Specifications for Design and Construction Part 2 Engineering and Design Standards 2.9. WATER SYSTEM DESIGN Ivins City Standard Specifications for Design and Construction All culinary water mains and appurtenances shall be designed to provide for adequate future service for all contiguous

More information

City of Moss Landing, CA Sanitary Sewer Flow Monitoring SFE File #C Installation Report. Submitted To:

City of Moss Landing, CA Sanitary Sewer Flow Monitoring SFE File #C Installation Report. Submitted To: City of Moss Landing, CA Sanitary Sewer Flow Monitoring SFE File #C91-01 Installation Report Submitted To: MBARI Attention: Mr. Keith Raybould 7700 Sandholdt Rd Moss Landing, CA 95039-9644 Submitted By:

More information

TxDOT Houston District Permit Requirements (Information contained herein is subject to change)

TxDOT Houston District Permit Requirements (Information contained herein is subject to change) Houston District Permit Requirements (Information contained herein is subject to change) Access Driveway for Commercial / Industrial Developments; or Street Tie-In / Drainage-Only 1) Complete the three

More information

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

ENGINEERING REVIEW CHECKLIST City of Mount Clemens (To be completed by the Developer s & Submitted with ing Plans) DATE: PROJECT NAME: Site Plan Approved: Date DESIGN ENGINEERING COMPANY: ing Company Contact Information: Name: Phone: Email: Owner Contact

More information

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

PRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS

PRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS PRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS 39 AUGUST 2005 TABLE OF CONTENTS PRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS PAGE SECTION 1 DESIGN CRITERIA 41 SECTION 2 SUBMITTAL 44 SECTION 3 STRUCTURES

More information

Sump Pumps Office procedures for the Drainage & Grading section

Sump Pumps Office procedures for the Drainage & Grading section County of Los Angeles Department of Public Works Building and Safety Division Grading and Drainage Section Sump Pumps Office procedures for the Drainage & Grading section Introduction This manual provides

More information

**RESPONSES TO COMMENTS MUST BE RETURNED WITH REVISED PLANS FOR FINAL PLAN APPROVAL.** Approved as submitted X Needs attention N/A Non-Applicable

**RESPONSES TO COMMENTS MUST BE RETURNED WITH REVISED PLANS FOR FINAL PLAN APPROVAL.** Approved as submitted X Needs attention N/A Non-Applicable PLAN REVIEW CHECKLIST FOR WATER MAINS AND SANITARY SEWERS CITY OF ANDERSON / ELECTRIC CITY UTILITIES ************************************************************************************* Project Name:

More information

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES A. GENERAL 1. The following water system design guidelines are based on Federal, State and local health requirements and the Hilton Head No. 1 Public

More information

DESIGN STANDARDS SECTION DS 6 SANITARY SEWER SYSTEM

DESIGN STANDARDS SECTION DS 6 SANITARY SEWER SYSTEM DESIGN STANDARDS SECTION DS 6 SANITARY SEWER SYSTEM DS 6-01 GENERAL: A. INTENT: The intent of these Design Standards is to provide minimum standards for the design of a wastewater system that will dependably

More information

appendix c Sewer area Study

appendix c Sewer area Study Appendix C Sewer Area Study SEWER AREA STUDY FOR 8150 Sunset Boulevard 8150 Sunset Boulevard Los Angeles, CA 90046 Prepared for: PCR Services Corporation 201 Santa Monica Boulevard, Suite 500 Santa Monica,

More information

Utilities December 9, Utilities

Utilities December 9, Utilities 3.3 3.3.1 Existing Conditions The project site and nearby properties on Buena Vista Avenue are served by municipal water and sewer service, and by gas, electrical, telephone and cable service. Utility

More information

FREELAND WATER & SEWER DISTRICT BERCOT ROAD INTERTIE STUDY

FREELAND WATER & SEWER DISTRICT BERCOT ROAD INTERTIE STUDY FREELAND WATER & SEWER DISTRICT ISLAND COUNTY WASHINGTON BERCOT ROAD INTERTIE STUDY G&O #13507 NOVEMBER 2013 FREELAND WATER & SEWER DISTRICT ISLAND COUNTY WASHINGTON BERCOT ROAD INTERTIE STUDY G&O #13507

More information

EXHIBIT A FEE SCHEDULE

EXHIBIT A FEE SCHEDULE EXHIBIT A FEE SCHEDULE PERMIT FEE WORKSHEET INSTRUCTIONS: Each application for a new permit or change in status shall be accompanied by the appropriate fee as indicated below. NO PERMIT APPLICATION WILL

More information

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT BUILDING DEPARTMENT

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT BUILDING DEPARTMENT REQUIREMENTS FOR COMMERCIAL PERMITS 1. Submit a digital Drainage Impact Study per the current Drainage Impact Study Policy as referenced in the Ascension Parish Drainage Ordinance to Jamaica Banker JBanker@apgov.us

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

In general, the City will not approve a development which cannot be served by extensions to the City s wastewater collection system.

In general, the City will not approve a development which cannot be served by extensions to the City s wastewater collection system. 6. WASTEWATER SYSTEM 6.1 General: The design and construction of the wastewater collection system to serve the development shall be in accordance with good engineering principles, these Standards of Design,

More information

Site Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177

Site Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177 WEST BRICKELL CENTRE Major Use Special Permit 290 SW 10 th Street, 245 SW 11 th Street,240-270 SW 10 th Street, 251-253 SW 11 th Street, 255 SW 11 th Street, and 267 SW 11 th Street Site Utility Study

More information

CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413

CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413 Page: 1 of 5 CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413 COMMERCIAL/RESIDENTIAL UTILITY PLAN COMPLETENESS CHECK LIST Updated

More information

December 6, Nate Hatleback Project Manager City of Thornton 9500 Civic Center Drive Thornton, CO 80229

December 6, Nate Hatleback Project Manager City of Thornton 9500 Civic Center Drive Thornton, CO 80229 December 6, 2016 Nate Hatleback Project Manager City of Thornton 9500 Civic Center Drive Thornton, CO 80229 RE: Drainage Conformance Letter Hilton Garden Inn @ The Grove The Grove Filing No 1, lot 5E Thornton,

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s C i t y o f G l a d s t o n e P u b l i c W o r k s D e s i g n S t a n d a r d s T a b l e o f C o n t e n t s SECTION THREE SANITARY SEWER REQUIREMENTS... 1 3.0000 SANITARY SEWERS... 1 3.0010 General

More information

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT BUILDING DEPARTMENT

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT BUILDING DEPARTMENT REQUIREMENTS FOR COMMERCIAL PERMITS 1. Submit a digital Drainage Impact Study per the current Drainage Impact Study Policy as referenced in the Ascension Parish Drainage Ordinance to Patrice Johnson pjohnson@apgov.us

More information

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY FOR CITY OF OTTAWA PROJECT NO.: 11-532 FOR TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Existing Conditions... 2 1.2 Required Permits / Approvals...

More information

BWSE-PA10 (08/18) Page 1 of 5 Project No. WCP

BWSE-PA10 (08/18) Page 1 of 5 Project No. WCP BWSE-PA10 (08/18) Page 1 of 5 Project No. WCP NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER SYSTEM ENGINEERING TECHNICAL REVIEW FORM DISTRIBUTION SYSTEMS (N.J.A.C. 7:10-11.10) Water

More information

CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL (850)

CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL (850) CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL 32447 (850) 482-2786 TRANSPORTATION CONCURRENCY ANALYSIS CITY OF MARIANNA CONCURRENCY MANAGEMENT SYSTEM (CMS) This form

More information

GENERAL INFORMATION AND REQUIREMENTS

GENERAL INFORMATION AND REQUIREMENTS GENERAL INFORMATION AND REQUIREMENTS 1.0 BOARD S STANDARD SPECIFICATIONS: Copies of these Standard Specifications for Water Mains, Sanitary Sewers and Sewage Pumping Stations may be purchased from the

More information

CHAPTER 5 WATER SYSTEM DESIGN STANDARDS

CHAPTER 5 WATER SYSTEM DESIGN STANDARDS CHAPTER 5 WATER SYSTEM DESIGN STANDARDS TABLE OF CONTENTS CHAPTER 5 WATER SYSTEM DESIGN STANDARDS 5.00 Objective Page 1 5.01 Additional Referenced Standards Page 1 5.02 Special Design Problems Page 2 5.03

More information

APPENDIX J WATER SUPPLY AND SEWER CAPACITY STUDY

APPENDIX J WATER SUPPLY AND SEWER CAPACITY STUDY I NITIAL S TUDY/MITIGATED NEGATIVE D ECLARATION NO. 1844 15 M ARCH 2018 K ILLEFER SQUARE A PARTMENTS C ITY OF ORANGE, COUNTY OF ORANGE, CALIFORNIA APPENDIX J WATER SUPPLY AND SEWER CAPACITY STUDY P:\WSH1601\March

More information

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan 4 Capacity Analysis The capacity analysis used the calibrated dry weather and wet weather wastewater collection system model to evaluate

More information

APPENDIX B. WSSC Design Criteria for Water Distribution Systems

APPENDIX B. WSSC Design Criteria for Water Distribution Systems a. System Requirements ) Pressure Requirements APPENDIX B WSSC Design Criteria for Water Distribution Systems a) The water distribution system shall have adequate capacity to supply domestic demand to

More information

City of Logan Sanitary Sewer Design Standards

City of Logan Sanitary Sewer Design Standards City of Logan Sanitary Sewer Design Standards 2011 http://www.loganutah.org/public_works/engineering/stdsspecsdesign.cfm Table of Contents PART 1. CITY OF LOGAN SANITARY SEWER SYSTEM DESIGN STANDARDS FOR

More information

PRELIMINARY DRAINAGE REPORT FOR THE EDI MASTER PLAN

PRELIMINARY DRAINAGE REPORT FOR THE EDI MASTER PLAN PRELIMINARY DRAINAGE REPORT FOR THE EDI MASTER PLAN April 5, 2015 Wayne W. Chang, MS, PE 46548 Chang Civil Engineering Hydrology Hydraulics Sedimentation P.O. Box 9496 Rancho Santa Fe, CA 92067 (858) 692-0760

More information

3.9 times the average 3.8 times the average 3.6 times the average

3.9 times the average 3.8 times the average 3.6 times the average ARTICLE VI DESIGN OF SANITARY SEWERS M'RSMIN. VOL.281 JA 2 4 2001 IMAGE; Section 601 Determination of the Amount of Sewage for Sanitary Sewers A. MSD Design Standards for estimating sanitary sewage flow

More information

CITY OF MELISSA MANUAL FOR THE DESIGN OF WATER AND SANITARY SEWER LINES

CITY OF MELISSA MANUAL FOR THE DESIGN OF WATER AND SANITARY SEWER LINES CITY OF MELISSA MANUAL FOR THE DESIGN OF WATER AND SANITARY SEWER LINES SECTION A NOTES TO ENGINEERS This manual is intended to aid and assist private engineers in the layout and design of sanitary sewers

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

D. SITE UTILITY STUDY

D. SITE UTILITY STUDY D. SITE UTILITY STUDY MIADOCS 838506 1 5220 BISCAYNE BOULEVARD MAJOR USE SPECIAL PERMlT!$ITE UTILJTY STUDY z"lmpamm Societe L &t -pation Fimm, Inc. Site Utility Study Introduction 5220 Biscayne Boulevard

More information

Appendix L. Drainage Report

Appendix L. Drainage Report Appendix L Drainage Report 2nd Street and Pacific Coast Highway Retail Project City of Long Beach County of Los Angeles, CA DRAINAGE REPORT April 5, 2017 DRAINAGE REPORT For: 2nd Street and Pacific Coast

More information

Utility Investigation Analysis Report

Utility Investigation Analysis Report Utility Investigation Analysis Report New Jersey Schools Development Authority New A. C. Redshaw Elementary School New Brunswick, New Jersey NJDOE Project #3530 060 03 1032 May 2012 Prepared for: New Jersey

More information

PLAN CHECK CORRECTION SHEET FOR METHANE MITIGATION SYSTEMS 2017 LAPC

PLAN CHECK CORRECTION SHEET FOR METHANE MITIGATION SYSTEMS 2017 LAPC PLAN CHECK CORRECTION SHEET FOR METHANE MITIGATION SYSTEMS 2017 LAPC This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

More information

The following information is required when submitting a building permit application:

The following information is required when submitting a building permit application: Dept. of Planning and Zoning Town of Greensboro PO Box 340 Greensboro, MD 21639 410-482-6222 The following information is required when submitting a building permit application: 1. A Completed building

More information

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System INSTRUCTIONS: This form shall be completed and submitted (in duplicate)

More information

SECTION 13 WATER SYSTEMS

SECTION 13 WATER SYSTEMS TABLE OF CONTENTS SECTION 13 WATER SYSTEMS 13.1 PURPOSE AND DEFINITIONS... 1 13.1.1 Purpose... 1 13.1.2 DOU Water System... 1 13.1.3 Definitions... 1 13.2 GENERAL REQUIREMENTS... 6 13.2.1 Authority and

More information

ADDENDUM # 3 DATE: February 16, 2018

ADDENDUM # 3 DATE: February 16, 2018 ADDENDUM # 3 DATE: February 16, 2018 REFERENCE: Invitation for Bid No.: S-LB-18607 IFB Issue Date: January 25, 2018 Title: Stonewall Middle School Addition and Renovations Architect/Engineer: Architecture

More information

Functional Servicing and Stormwater Management Report Appleby Mall Residential Burlington ON

Functional Servicing and Stormwater Management Report Appleby Mall Residential Burlington ON Functional Servicing and Stormwater Management Report Appleby Mall Residential Burlington ON Prepared By: R.J. Burnside & Associates Limited 1465 Pickering Parkway, Suite 200 Pickering ON L1V 7G7 Prepared

More information

Appendix D Irrigation Standards

Appendix D Irrigation Standards I. Irrigation Design Standards Appendix D Irrigation Standards (a) Purpose. To conserve water resources and promote the efficient use of water resources by establishing requirements for design, installation

More information

PLAN CHECK CORRECTION SHEET FOR METHANE MITIGATION SYSTEMS 2014 LAPC

PLAN CHECK CORRECTION SHEET FOR METHANE MITIGATION SYSTEMS 2014 LAPC PLAN CHECK CORRECTION SHEET FOR METHANE MITIGATION SYSTEMS 2014 LAPC This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

MBARI Sanitary Sewer Analysis Report

MBARI Sanitary Sewer Analysis Report Revised 9-10-08 MBARI Sanitary Sewer Analysis Report Executive Summary: This Sanitary Sewer Analysis Report has been prepared for the Monterey Bay Aquarium Research Institute (MBARI) located on Moss Landing

More information

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development City of Redwood City Stormwater Pollution Prevention Program Drainage Guidelines for Residential Development General Requirements A. Plot & Finished Grading Plan must be submitted with Building Permit

More information

Page Intentionally Left Blank

Page Intentionally Left Blank Page Intentionally Left Blank Julie Avenue and Hoeschler Drive Lift Stations Evaluation City of Sparta TABLE OF CONTENTS Page CHAPTER 1 GENERAL INFORMATION... 1 1.1 Scope of Lift Station Evaluation...

More information

Agua Consulting Inc. Engineered Water Solutions

Agua Consulting Inc. Engineered Water Solutions Agua file: 023-01.340 District of Summerland 9215 Cedar Avenue Box 159 Summerland, BC V0H 1Z0 Attention: Mr. Devon van der Meulen, Manager of Utilities Dear Devon: RE: Banks Crescent Proposed 346 Unit

More information

PRELIMINARY HYDROLOGY STUDY

PRELIMINARY HYDROLOGY STUDY PRELIMINARY HYDROLOGY STUDY FOR Tentative Tract Map West Side of Loma Alta Drive City of Oceanside, CA Prepared For: EMERALD HILLS LLC 4272 Dogwood Avenue Seal Beach, CA 90740 Contact: Mr. Jimmy Chen Ph:

More information

VISTA TECHNOLOGY CAMPUS

VISTA TECHNOLOGY CAMPUS ENGINEER S REPORT PUBLIC SEWER EXTENSION TO SERVE THE PROPOSED VISTA TECHNOLOGY CAMPUS TOWN OF BETHLEHEM & TOWN OF NEW SCOTLAND ALBANY COUNTY, NEW YORK August 22, 2007 Revised December 31, 2007 Revised

More information

Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River

Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River Sanitation District No. 1 of Northern Kentucky Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River Ohio WEA Collection Systems Workshop May 5, 2011 Sanitation District No. 1

More information

TECHNICAL SPECIFICATIONS FOR INTERCEPTOR AND SIPHON INSPECTION/CLEANING

TECHNICAL SPECIFICATIONS FOR INTERCEPTOR AND SIPHON INSPECTION/CLEANING A. GENERAL TECHNICAL SPECIFICATIONS FOR INTERCEPTOR AND SIPHON INSPECTION/CLEANING Contractor shall furnish all labor, materials, equipment, traffic control, transportation, and supervision necessary for

More information

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1 TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SECTION TITLE PAGE 105.1. SPECIFICATIONS AND SCOPE 105.1 105.2. METHODS OF ANALYSIS 105.1 105.2.1. Rational Method

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES 4.1. General Requirements 4.1.01 Water distribution and fire protection facilities are to be provided solely for the purpose of supplying

More information

Sanitary Sewer Pipe Inspection Pipe Penetrating Radar Salmon Creek and St John s Trunks Vancouver, WA

Sanitary Sewer Pipe Inspection Pipe Penetrating Radar Salmon Creek and St John s Trunks Vancouver, WA Sanitary Sewer Pipe Inspection Pipe Penetrating Radar Salmon Creek and St John s Trunks Vancouver, WA September, 1 1 Summary Clark Regional Wastewater District commissioned a condition assessment on the

More information

Chapter 5 Existing Wastewater Facilities

Chapter 5 Existing Wastewater Facilities Chapter 5 Existing Wastewater Facilities \\7348101\TOC.doc CHAPTER 5 Existing Wastewater Facilities 5.1 INTRODUCTION Lacey s wastewater utility serves over 21,000 acres (33 square miles) of residential

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 9 General Infrastructure

FLORIDA STATE UNIVERSITY MASTER PLAN 9 General Infrastructure GENERAL INFRASTRUCTURE ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee

More information

DRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J

DRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J DRAINAGE STUDY PHASE 2 REPORT FOR: HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: HORRY COUNTY STORMWATER DEPARTMENT APRIL 07, 2016 Prepared by: Savannah, GA Charleston, SC Myrtle Beach, SC Brunswick, GA

More information

INSTRUCTIONS FOR FILLING OUT APPLICATION FOR CONCURRENCY ANALYSIS, POTABLE WATER, RECLAIMED WATER AND / OR WASTEWATER SERVICE

INSTRUCTIONS FOR FILLING OUT APPLICATION FOR CONCURRENCY ANALYSIS, POTABLE WATER, RECLAIMED WATER AND / OR WASTEWATER SERVICE INSTRUCTIONS FOR FILLING OUT APPLICATION FOR CONCURRENCY ANALYSIS, POTABLE WATER, RECLAIMED WATER AND / OR WASTEWATER SERVICE APPLICATION MUST BE TYPED OR HAND LETTERED IN INK AND SUBMITTED WITH A REVIEW

More information

DRAFT. Technical Memorandum. Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update. Prepared For:

DRAFT. Technical Memorandum. Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update. Prepared For: DRAFT Technical Memorandum Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update Prepared For: Pinellas County Department of Environment and Infrastructure Division of Engineering and

More information

SECTION WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

SECTION WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA SECTION 6900 - WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA 6901 DESIGN CRITERIA A. General 1. The design standards presented in the City of Lee's Summit Design Criteria are the minimum standards

More information

4.21 WASTEWATER DISPOSAL

4.21 WASTEWATER DISPOSAL 4.21 WASTEWATER DISPOSAL 1. SUMMARY The proposed project includes a wastewater reclamation plant (WRP), which would be owned and operated by the City of Santa Clarita and recycle up to 395,411 gallons

More information

STEERING COMMITTEE MEETING #6

STEERING COMMITTEE MEETING #6 STEERING COMMITTEE MEETING #6 August 7 th, 2017 Topic: Infrastructure (Sewer & Water, Transportation follow up) 6:00 p.m. Transportation follow up Follow up issues map Transportation plan strategies table

More information

SITE SERVICING PRELIMINARY DESIGN BRIEF

SITE SERVICING PRELIMINARY DESIGN BRIEF 855 Carling Avenue Proposed Redevelopment SITE SERVICING PRELIMINARY DESIGN BRIEF March 2010 March 23, 2010 RVA 081785 Arnon Corporation 1801 Woodward Dr. Ottawa, ON K2C 0R3 Attention: Mike Casey Re: 855

More information

255 NORTHFIELD DRIVE EAST

255 NORTHFIELD DRIVE EAST 255 NORTHFIELD DRIVE EAST Fire Flow/Water Demand Analysis Project Location: 255 Northfield Drive East Waterloo, Ontario Prepared for: Abbey Ridge Developments Inc. 22 King Street South, Suite 300 Waterloo,

More information

CUYAHOGA COUNTY ENGINEER

CUYAHOGA COUNTY ENGINEER CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 May 28, 2010 Revisions to the July 29, 2009 edition are noted

More information

Water Utility Science Water Math and Hydraulics 050. Name: Date:

Water Utility Science Water Math and Hydraulics 050. Name: Date: Water Utility Science Water Math and Hydraulics 050 Name: Date: Note: Please show all of your calculations for each problem no matter how simple the problem may seem. Please use the accompanying pieces

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

City of Parshall, ND Municipal Infrastructure Needs Assessment August 2012

City of Parshall, ND Municipal Infrastructure Needs Assessment August 2012 City of Parshall, ND Municipal Infrastructure Needs Assessment August 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and Impact

More information

APPENDIX M VANDEN MEADOWS PROJECT WATER MODELING STUDY AND TECHNICAL MEMORANDUM

APPENDIX M VANDEN MEADOWS PROJECT WATER MODELING STUDY AND TECHNICAL MEMORANDUM APPENDIX M VANDEN MEADOWS PROJECT WATER MODELING STUDY AND TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Date: March 16, 2011 FROM: Victor M. Alaniz, P.E. Nolte Associates, Inc. 2495 Natomas Park Drive, Fourth

More information

SECTION 2 - DESIGN STANDARDS FOR GRAVITY SANITARY SEWERS

SECTION 2 - DESIGN STANDARDS FOR GRAVITY SANITARY SEWERS SECTION 2 - DESIGN STANDARDS FOR GRAVITY SANITARY SEWERS 2.1. General Requirements Sanitary sewers are to be provided solely for the removal of sanitary waste. Under no circumstances shall any roof drains,

More information

Final Drainage Report

Final Drainage Report Thornton Electric Substation Project Final Drainage Report December 14, 2016 DRAFT Prepared for: Xcel Energy, 1800 Larimer Street, Suite 400, Denver, Colorado 80202 Prepared by: 350 Indiana Street, Suite

More information

BUILDING INSPECTIONS 215 W HICKORY ST DENTON, TEXAS PHONE FAX. PERMIT AND FEE SCHEDULE (Effective October 1, 2016)

BUILDING INSPECTIONS 215 W HICKORY ST DENTON, TEXAS PHONE FAX. PERMIT AND FEE SCHEDULE (Effective October 1, 2016) Table of Contents: BUILDING INSPECTIONS 215 W HICKORY ST DENTON, TEXAS 76201 940-349-8360 PHONE 940-349-7208 FAX PERMIT AND FEE SCHEDULE (Effective October 1, 2016) * Please call Building Inspections for

More information

Table of Contents. 3.1 Source Capacity Analysis

Table of Contents. 3.1 Source Capacity Analysis Table of Contents 3.1 Source Capacity Analysis... 3-1 3.1.1. Design Criteria... 3-1 3.1.2. Source Capacity Evaluation... 3-1 3.1.2.1 Plateau Zone... 3-1 3.1.2.2 Cascade View Zone... 3-4 3.2 Storage Capacity

More information

SECTION I. (Sub-Section 3) Water Systems Design Standards. 3.1 General Plans Preparation 3-1

SECTION I. (Sub-Section 3) Water Systems Design Standards. 3.1 General Plans Preparation 3-1 SECTION I (Sub-Section 3) Water Systems Design Standards Article Page 3.1 General 3-1 3.2 Plans Preparation 3-1 3.3 Design and Construction Standards 3-1 thru 3-2 3.4 Protection of Water Supply 3-4 3.5

More information

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary APPENDIX J-3 Orcem Stormwater Management and Treatment Facilities Design Summary Stormwater Management & Treatment Facilities Design Summary INTRODUCTION KPFF Consulting Engineers has compiled this report

More information