1 Gilbert, Arizona Neely Solar Facility 2015 Wastewater Treatment Committee Annual Seminar Optimizing Wastewater Treatment for the New Normal

2 Solar Project Location Neely Recharge Facility Western Canal Neely WRP

3 Project Design Details Public/Private Partnership Located at Gilbert s Neely Recharge Facility System Size: 2 mega-watts (2,257.92kW DC) 8000 solar panels - single axis tracker system Arrays are constructed over 5 recharge basins Solar panels are mounted on beams installed 20 feet underground and having a height clearance of 6½ feet above ground 5 inverters mounted on concrete pads - the inverters convert solar energy to electricity Solar system will help supply power to the Neely Wastewater Reclamation Plant

4

5

6 Project Evolution Initial concept discussions about the solar project began with Severn Trent Services, Gilbert staff and SPG Solar in June, 2010 Gilbert applied for a renewable energy incentive (Credit Purchase Agreement) through APS in August, 2010 for the proposed project Gilbert was notified by APS that the project had been selected to receive a renewable energy incentive in September, 2010 The APS CPA (incentive) provides a 60% contribution towards project construction in exchange for renewable energy credits A Land License Agreement and Power Purchase Agreement (PPA) were negotiated and approved by the Gilbert Council in November, 2010 Project design began in December, 2010 followed by construction activity beginning in February through October, 2011 The system Interconnection and Operating Agreements with APS were approved in August, 2011 The system began producing power at the end of September, 2011

7

8

9 Power Purchase Agreement Sun-Edison (Formally SPG Solar) Was required to perform project design and construction, also responsible for system operation and maintenance throughout agreement term Sun-Edison (formally Integrys Energy) is the solar system owner (Investor) while Gilbert is considered the system host PPA has a 20 year term with options at the end for either agreement renewal, ending the agreement with system removal (at owner s cost), or Gilbert can purchase the system at a depreciated value PPA requires Gilbert to purchase all of the power generated by the solar system at a fixed rate structure The solar power rate is anticipated to be at or less than the electrical power rate Gilbert would otherwise pay APS Forecasted savings for Gilbert is estimated to be approximately $2 million over the agreement term (20 years)

10 Gilbert - Neely Solar Project Forecasted Savings & Cash Flow Summary PPA Forecast Inputs: Starting Solar Rate of $0.075/kWh with 2.5% Annual Escalator Estimated Average Annual Utility Power Inflation Rate of 4% Year Utility Bill Without Solar Energy Annual Solar kwhs PPA Rate Forecasted PPA Annual Bill Remaining Annual Utility Bill with Solar Total Annual PPA Bill + Utility Bill Annual Projected Savings 1 $1,031,903 4,837, $362,816 $667,706 $1,030,522 $1,381 2 $1,073,179 4,813, $370,027 $694,414 $1,064,442 $8,738 3 $1,116,106 4,789, $377,382 $722,191 $1,099,572 $16,534 4 $1,160,751 4,765, $384,882 $751,078 $1,135,961 $24,790 5 $1,207,181 4,741, $392,532 $781,122 $1,173,653 $33,527 6 $1,255,468 4,717, $400,333 $812,366 $1,212,700 $42,768 7 $1,305,686 4,694, $408,290 $844,861 $1,253,151 $52,536 8 $1,357,914 4,670, $416,405 $878,656 $1,295,060 $62,854 9 $1,412,231 4,647, $424,681 $913,802 $1,338,482 $73, $1,468,720 4,624, $433,121 $950,354 $1,383,475 $85, $1,527,469 4,601, $441,729 $988,368 $1,430,097 $97, $1,588,567 4,578, $450,509 $1,027,903 $1,478,412 $110, $1,652,110 4,555, $459,463 $1,069,019 $1,528,482 $123, $1,718,194 4,532, $468,595 $1,111,780 $1,580,374 $137, $1,786,922 4,509, $477,908 $1,156,251 $1,634,159 $152, $1,858,399 4,487, $487,406 $1,202,501 $1,689,907 $168, $1,932,735 4,464, $497,093 $1,250,601 $1,747,694 $185, $2,010,044 4,442, $506,973 $1,300,625 $1,807,598 $202, $2,090,446 4,420, $517,049 $1,352,650 $1,869,699 $220, $2,174,064 4,398, $527,326 $1,406,756 $1,934,081 $239,983 Total $30,728,089 92,290, $8,804,520 $19,883,002 $28,687,522 $2,040,567

11

12 Solar Integration

13

14 Project Benefits - Gilbert Gilbert did not have to pay for any of the project s capital costs (~ $10.4 million) Gilbert is not required to operate or maintain the solar system during the agreement term The System is off-setting 44% of the Neely Plant s power needs with clean renewable energy Gilbert s forecasted savings (~$2 million over 20 years) Water recharge operations and wildlife habitat not impacted Public/private partnership economic development Community marketability promotes sustainability Gilbert will be contributing to the betterment of the environment by off-setting an estimated 86 million pounds of carbon dioxide over the life of the system Fits Gilbert s Strategic Initiatives Clean, Safe, Vibrant

15 Featured in The Water Environment Federation s WE&T Magazine - April, 2012

16 QUESTIONS? Aerial Photos Courtesy of SPG Solar Presentation Templates by Mark Horn Gilbert, Arizona Wastewater Manager (480)

How a Wastewater District is Saving Money with Solar Power

How a Wastewater District is Saving Money with Solar Power Sustainability in Public Works How a Wastewater District is Saving Money with Solar Power APWA Sustainability Conference May 15, 2013 How a Wastewater District is Saving Money with Solar Power Adam Ross,

More information

Roof mounted solar panels on Bldg L, Verde Valley Campus. 1. One developed Acre can produce approx 100 KW of peak solar power.

Roof mounted solar panels on Bldg L, Verde Valley Campus. 1. One developed Acre can produce approx 100 KW of peak solar power. SOLAR OPPORTUNITIES Roof mounted solar panels on Bldg L, Verde Valley Campus There is a growing national commitment to the utilization of sustainable energy sources. Solar, wind, and bio- mass systems

More information

Solar Energy for Publicly Owned Treatment Works

Solar Energy for Publicly Owned Treatment Works Solar Energy for Publicly Owned Treatment Works Edith Makra, Metropolitan Mayors Caucus Elena Savona, Elevate Energy March 2016 The Power Bureau Mark Pruitt Consultant 1 Solar Energy for POTW CENTRAL STATES

More information

Basic technical information on solar PV

Basic technical information on solar PV Basic technical information on solar PV Agenda 1. Solar Thermal Systems 2. How Does Solar PV Work? 3. What are the Main Components of a PV System? 4. What are the Solar PV Mounting Options? Types of Solar

More information

ECE 333 GREEN ELECTRIC ENERGY 15. PV ECONOMICS

ECE 333 GREEN ELECTRIC ENERGY 15. PV ECONOMICS ECE 333 GREEN ELECTRIC ENERGY 15. PV ECONOMICS George Gross Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign ECE 333 2002 2017 George Gross, University of Illinois

More information

Environmental concerns/reduce carbon emissions Save money on electric bills General interest in new technologies Increase in building value

Environmental concerns/reduce carbon emissions Save money on electric bills General interest in new technologies Increase in building value Environmental concerns/reduce carbon emissions Save money on electric bills General interest in new technologies Increase in building value 1 Does solar work in Palestine? PV costs and benefits Other uses

More information

The CSI Site. Research Studies. Value? Depends on who you are: How to Determine the Value of a Solar Investment

The CSI Site. Research Studies. Value? Depends on who you are: How to Determine the Value of a Solar Investment How to Determine the Value of a Solar Investment The CSI Site Rob Baron Lakeland College CN Theatre, MacEwan University January 19, 2017 Research Studies Solar PV and Micro Wind Performance Verification

More information

Los Angeles Department of Water and Power. Green Energy and Good Jobs Initiative Presentation for City Council

Los Angeles Department of Water and Power. Green Energy and Good Jobs Initiative Presentation for City Council Los Angeles Department of Water and Power Green Energy and Good Jobs Initiative Presentation for City Council November 4, 2008 Introduction This presentation is in response to the Council Motion introduced

More information

Value? Depends on who you are: The CSI Site

Value? Depends on who you are: The CSI Site How to Determine the Value of a Solar Investment The CSI Site Rob Baron Lakeland College CN Theatre, MacEwan University January 19, 2017 Note: This document contains corrected information that differs

More information

Strategic Plan. Renewable Energy. July 23, 2014

Strategic Plan. Renewable Energy. July 23, 2014 Strategic Plan Renewable Energy July 23, 2014 What we re going to do Quick background Goals Strategies Feedback and comments from you Long-term renewable energy goal Accelerate the pace at which new, small

More information

Introduction to Basic Solar Issues for the Brownfield Practitioner in Florida

Introduction to Basic Solar Issues for the Brownfield Practitioner in Florida Ed Strobel & Roger Messenger Florida Alliance for Renewable Energy Sunshine Solar Services, Inc. (Ed) VB Engineering (Roger) April 1, 2010 Introduction to Basic Solar Issues for the Brownfield Practitioner

More information

Structuring the Solar Deal

Structuring the Solar Deal The 26 th Annual Energy Fair June 19, 2015 Structuring the Solar Deal Presented By: Arthur J. Harrington Godfrey & Kahn, S.C. aharrington@gklaw.com 414-287-9414 13993876 Three Important Facts About Electrical

More information

An End User Perspective on the Cost of Solar Photovoltaic Energy Systems Installed by Commercial Organizations. Kenton D. Swift May 14, 2012

An End User Perspective on the Cost of Solar Photovoltaic Energy Systems Installed by Commercial Organizations. Kenton D. Swift May 14, 2012 An End User Perspective on the Cost of Solar Photovoltaic Energy Systems Installed by Commercial Organizations Kenton D. Swift May 14, 2012 2 Do Commercial Solar PV System Installations Make Economic Sense?

More information

Basic technical information on solar PV

Basic technical information on solar PV Basic technical information on solar PV Agenda 1. Solar Thermal Systems 2. How Does Solar PV Work? 3. What are the Main Components of a PV System? 4. What are the Solar PV Mounting Options? Types of Solar

More information

Power Purchase Agreements

Power Purchase Agreements Foro de Eficiencia Energética y Energía Renovable: Herramientas de Análisis Económico para Aumentar la Competitividad Empresarial Mayaguez, PR Octubre 2012 Renewable Energy Power Purchase Agreement (PPA)

More information

Renewable Energy Plan 2011 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619

Renewable Energy Plan 2011 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619 Renewable Energy Plan 2011 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619 This Biennial Review filing by the Lansing Board of Water & Light (LBWL) complies with Public Act 295 of

More information

NABCEP PV Technical Sales Job Task Analysis

NABCEP PV Technical Sales Job Task Analysis NABCEP PV Technical Sales Job Task Analysis Introduction This document presents an in-depth Job Task Analysis for solar electric professionals who gather site specific information and analyze customer

More information

SOLAR FOR HOMES TYLER HUEBNER, RENEW WISCONSIN BETTER BUILDINGS BETTER BUSINESS CONFERENCE, WI DELLS FEBRUARY 16, 2018

SOLAR FOR HOMES TYLER HUEBNER, RENEW WISCONSIN BETTER BUILDINGS BETTER BUSINESS CONFERENCE, WI DELLS FEBRUARY 16, 2018 SOLAR FOR HOMES TYLER HUEBNER, RENEW WISCONSIN BETTER BUILDINGS BETTER BUSINESS CONFERENCE, WI DELLS FEBRUARY 16, 2018 ABOUT RENEW WISCONSIN: FOUNDED 1991 SUPPORT FOR: - SOLAR - WIND - BIOMASS & BIOGAS

More information

FY2017 SREC Registration Program (SRP) Final As-Built Technical Worksheet Instructions Page 1

FY2017 SREC Registration Program (SRP) Final As-Built Technical Worksheet Instructions Page 1 If the SRP Registration was submitted in paper form, the Final As Built Packet must be submitted in paper. If the SRP Registration was submitted via the online portal, the Final As Built documents must

More information

Look Inside To Determine Your Home s Solar Energy Needs

Look Inside To Determine Your Home s Solar Energy Needs KYOCERA MYGEN Residential System Look Inside To Determine Your Home s Solar Energy Needs THE COMPLETE MYGEN SYSTEM Kyocera s MyGen Grid-Connected Systems are convenient and comprehensive photovoltaic (PV)

More information

Monroe County s Path to Solar Energy: Western New York s Largest Municipal Solar Installation

Monroe County s Path to Solar Energy: Western New York s Largest Municipal Solar Installation Monroe County s Path to Solar Energy: Western New York s Largest Municipal Solar Installation April 24, 2018 Michelle Virts, MCDES Nathan Rizzo, Solar Liberty Monroe County 13 MW 13 MW 45,000 Solar Modules

More information

Renewable Energy Systems

Renewable Energy Systems Renewable Energy Systems Phil Brodhagen Companies El Paso Green Energies LLC Peak View Solar NABCEP Certified PV Installation Professional NABCEP Certified Sales Professional www.elpasogreenenergies.com

More information

Solar for Homeowners 1: Getting Started with Solar

Solar for Homeowners 1: Getting Started with Solar Solar for Homeowners 1: Getting Started with Solar 1 July 25, 2013 California Center for Sustainable Energy Vision: To create a sustainable energy future. Mission: To foster public policies and provide

More information

Demystifying Rooftop Solar

Demystifying Rooftop Solar Demystifying Rooftop Solar Week 4 : Economics OLLI at Illinois Study Group Fall 2017 1:30 pm Tuesdays Blue Room Proposed Session Outline 1. Overview of solar power in general. How PV works with demos.

More information

Solar Electric Investment Proposal

Solar Electric Investment Proposal Solar Electric Investment Proposal for Jack Sun Date : 8/10/12 Site Location: 117 So Mary Ave, #30 Sunnyvale, CA 94087 This PROPOSAL SUMMARY is based on the site location, estimated electric usage and

More information

Contents. Contents. Module 1 Photovoltaic panels in context of renewable technologies 1

Contents. Contents. Module 1 Photovoltaic panels in context of renewable technologies 1 BPEC Domestic Solar Photovoltaic Systems Learning Manual BPEC0018 Contents Contents Page Module 1 Photovoltaic panels in context of renewable technologies 1 Module 2 How a photovoltaic system works principles

More information

Renewable Energy Plan 2013 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619

Renewable Energy Plan 2013 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619 Renewable Energy Plan 2013 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619 This Biennial Review filing by the Lansing Board of Water & Light (LBWL) complies with State of Michigan

More information

Energy Independent Community. an evaluation for

Energy Independent Community. an evaluation for Energy Independent Community an evaluation for Energy Independent Community An evaluation for the Algona Municipal Utilities, Iowa Conducted by The Iowa Association of Municipal Utilities Wind Utility

More information

Severn Sun Solar Project. Invenergy LLC Public Community Meeting August 6, 2015

Severn Sun Solar Project. Invenergy LLC Public Community Meeting August 6, 2015 Severn Sun Solar Project Invenergy LLC Public Community Meeting August 6, 2015 Invenergy LLC is a Qualified Applicant Invenergy LLC qualified to participate in the IESO Large Renewable Procurement - Request

More information

Architectural Integration of Solar PV into Building Design

Architectural Integration of Solar PV into Building Design Architectural Integration of Solar PV into Building Design Agenda 1. New Construction is the Best Time for PV 2. Design Considerations to Maximize Solar Potential 3. Lousy Design Decisions 4. Architectural

More information

Grafton Solar Photovoltaics (PV) March 28, 2013

Grafton Solar Photovoltaics (PV) March 28, 2013 Grafton Solar Photovoltaics (PV) March 28, 2013 Proposed Solar Electricity in Grafton Site System Size (kw DC) System Size (kw AC) Energy (kwh/year) Grafton Campus 11,325,421 Area (Acres) Science Park

More information

GREEN INITIATIVES FOR THE SWINE SECTOR

GREEN INITIATIVES FOR THE SWINE SECTOR GREEN INITIATIVES FOR THE SWINE SECTOR Donald Hilborn Ontario Ministry of Agriculture, Food and Rural Affairs 401 Lakeview Drive, Woodstock, Ontario N4T 1W2 E-mail: don.hilborn@ontario.ca As part of the

More information

Wind Energy. Evaluating the International Renewable Energy Market for the Creation of a Longstanding and Secure Energy Policy 12/29/10

Wind Energy. Evaluating the International Renewable Energy Market for the Creation of a Longstanding and Secure Energy Policy 12/29/10 Evaluating the International Renewable Energy Market for the Creation of a Longstanding and Secure Energy Policy GCC Solar Power Meeting 13-14 Dec 2010 Doha, Qatar US Keynote Presentation Prof. Saifur

More information

Delaware Electric Cooperative Generator Interconnection Application Long Form (For Use with Generators Greater than 100 kw)

Delaware Electric Cooperative Generator Interconnection Application Long Form (For Use with Generators Greater than 100 kw) An applicant (Generator Owner) makes application to to install and operate a generating facility greater than 100 kw interconnected with the utility system. Section 1, Applicant Information Directly Interconnected

More information

DC Surface (non-submersible) pumps are most economical. Reduce pumping energy by half

DC Surface (non-submersible) pumps are most economical. Reduce pumping energy by half Solar Electric Energy for Irrigation February 19, 2008 Erik Bakke You know Solar is good for the Earth Increase Profits - Reduce operating costs Decrease Risks - Hedge against rising prices Increase Cash

More information

Local Solar PV Systems Update

Local Solar PV Systems Update Local Solar PV Systems Update Promoting Research and Education for Alaskans in Sustainable Development acat.org Getting to Net Zero Energy Step 1: Phantom Loads Step 2: Lighting Step 3: Appliances Step

More information

Solar for Homeowners. Discover solar technologies for your home

Solar for Homeowners. Discover solar technologies for your home Solar for Homeowners Discover solar technologies for your home What We Do Information Resource & Expert Implementation Partner Energy Programs Technical Assistance Training & Education Areas of Expertise

More information

Life After the ITC. Solar Focus Moderator:

Life After the ITC. Solar Focus Moderator: Life After the ITC Solar Focus 2014 Moderator: Yuri Horwitz, Sol Systems Shayle Kann, GreenTech Media Lidija Sekaric, Department of Energy Ralph Mannion, Kingspan Energy Forecasting 2017 Shayle Kann Senior

More information

Solar Projects in Indian Country. PRESENTED BY: Josh Simmons Principal Consultant / Attorney August 18, 2016

Solar Projects in Indian Country. PRESENTED BY: Josh Simmons Principal Consultant / Attorney  August 18, 2016 Solar Projects in Indian Country PRESENTED BY: Josh Simmons Principal Consultant / Attorney www.prospersustainably.com August 18, 2016 Solar Projects in Indian Country Please sign-in and provide contact

More information

Distributed Generation

Distributed Generation Distributed Generation November 2014 November 6, 2014 1 Forward-Looking Statements Leading the Way in Electricity SM Statements contained in this presentation about future performance, including, without

More information

Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System

Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System Brooks Martner Lafayette, Colorado University of Toledo Spring 2013 PHYS 4400 - Principles and Varieties

More information

DRAFT Commercial Solar Bylaw November 8, 2011

DRAFT Commercial Solar Bylaw November 8, 2011 145-28. Commercial Solar Photovoltaic Installations A. Purpose This bylaw is to encourage the use of solar energy systems and protect solar access consistent with MGL 40A 9B and with the Green Communities

More information

SCE Solar Programs Overview SOUTHERN CALIFORNIA EDISON

SCE Solar Programs Overview SOUTHERN CALIFORNIA EDISON SCE Solar Programs Overview Southern California Edison Overview An Edison International company, SCE is one of the nation s largest investor-owned electric utilities, with more than 120 years of service.

More information

Independent Power Production Policy

Independent Power Production Policy ENERGY STRATEGY FOR YUKON Independent Power Production Policy October 2015 BACKGROUND The Government of Yukon (YG) released the Energy Strategy for Yukon in January 2009. The strategy sets out YG s energy

More information

Conservation of Energy by Installing Solar PV System

Conservation of Energy by Installing Solar PV System Conservation of Energy by Installing Solar PV System Abhishek R 1, Dilip Kumar M 2, Vivek S 3 1Assistant Professor Department of Civil engineering, JSS Academy of Technical Education, Karnataka, India

More information

PREPARED FOR: ARIZONA PUBLIC SERVICE Updated Solar PV Value Report

PREPARED FOR: ARIZONA PUBLIC SERVICE Updated Solar PV Value Report PREPARED FOR: ARIZONA PUBLIC SERVICE 2013 Updated Solar PV Value Report MAY 2013 2013 Updated Solar PV Value Report Arizona Public Service May 10, 2013 This report has been prepared for the use of the

More information

Solar energy in the highway right of way

Solar energy in the highway right of way Solar energy in the highway right of way Allison Hamilton Oregon Solar Highway Program Manager Oregon Department of Transportation Lily Oliver Solar Photovoltaic Energy Program Manager Massachusetts Department

More information

Solar Projects in Indian Country. PRESENTED BY: Josh Simmons Principal Consultant / Attorney October 28, 2015

Solar Projects in Indian Country. PRESENTED BY: Josh Simmons Principal Consultant / Attorney   October 28, 2015 Solar Projects in Indian Country PRESENTED BY: Josh Simmons Principal Consultant / Attorney www.prospersustainably.com October 28, 2015 Solar Projects in Indian Country Please sign-in and provide contact

More information

Decentralized Commercial Systems

Decentralized Commercial Systems Decentralized Commercial Systems The Flexible Solution The challenge: Optimizing flexibility, cost, and time-to-market Cost. Energy production. ROI. When considering the design and layout of a commercial

More information

Grafton Solar. March 28, 2013

Grafton Solar. March 28, 2013 Grafton Solar Ph t lt i (PV) Photovoltaics (PV) March 28, 2013 Proposed Solar Electricity in Grafton Site System Size System Size Energy Area (kw DC) (kw AC) (kwh/year) (Acres) Grafton Campus 11,325,421

More information

ALL PARTIES MUST SIGN SECTION F.

ALL PARTIES MUST SIGN SECTION F. Please carefully read all of the following information. With the help of your installation contractor, fully complete sections A through E. ALL PARTIES MUST SIGN SECTION F. A. SITE HOST CONTACT / APPLICANT

More information

Wild Horse Solar Photovoltaic Project

Wild Horse Solar Photovoltaic Project Wild Horse Solar Photovoltaic Project Steven J. St.Clair Manager Renewable Assets Phone: 425-462-3057 Email: steven.stclair@pse.com November 19, 2009 Agenda Introduction PSE Renewable Energy Facilities

More information

The Roofing Industry Alliance for Progress

The Roofing Industry Alliance for Progress The Roofing Industry Alliance for Progress Roofing & Solar- The Future Renewable Energy World magazine estimated commercial and residential roof top photovoltaic deployment after accounting for solar shading

More information

TOWN OF NEWPORT SOLAR PROJECT A 2-MEGAWATT DC NET-METERED PV SYSTEM

TOWN OF NEWPORT SOLAR PROJECT A 2-MEGAWATT DC NET-METERED PV SYSTEM TOWN OF NEWPORT SOLAR PROJECT A 2-MEGAWATT DC NET-METERED PV SYSTEM AN HISTORIC PROJECT NH s Largest Municipal Solar Project Town & Schools Would Be Net-Zero 2 AN HISTORIC PROJECT The largest municipal

More information

Partial project funding by customers of Xcel Energy through a grant from the Renewable Development Fund.

Partial project funding by customers of Xcel Energy through a grant from the Renewable Development Fund. 1 Partial project funding by customers of Xcel Energy through a grant from the Renewable Development Fund. 2 St. Johns Solar Addition is a 182 kwdc expansion of the existing 400 kwdc St. John s Solar Farm

More information

Energy Consumption Profile

Energy Consumption Profile Presentation to BY Objectives Availability of energy on sustainable basis to achieve planned GDP targets Reliance on indigenous resources shift of energy mix towards local resources Construction of new

More information

Site Report. Report Date 6/16/2016

Site Report. Report Date 6/16/2016 Site Report Report Name John Smith Report Date 6/16/216 Declination -2d 51m Location Linden, TN 3796 Lat/Long 35.598 / -87.852 Weather Station Jackson-McKellar Sipes Rgnl AP, TN, Elevation: 433 Feet, (35.6

More information

it present one piece of that solution going forward. Solar Value Proposition Brian Baxter page 1

it present one piece of that solution going forward. Solar Value Proposition Brian Baxter page 1 Eric Develey, Session Chairman The last presentation of this session will be on Solar Value Proposition for the Cable Industry by Brian Baxter from General Electric. Brian has graduated from the Union

More information

BANKABILITY OF SOLAR PROJECTS HOW TO MAKE YOUR PV PROJECT BANKABLE? HOW TO SELECT EPC CONTRATCOR? ROLE OF TECHNLOGY SELECTION

BANKABILITY OF SOLAR PROJECTS  HOW TO MAKE YOUR PV PROJECT BANKABLE? HOW TO SELECT EPC CONTRATCOR? ROLE OF TECHNLOGY SELECTION 0 HOW TO MAKE YOUR PV PROJECT BANKABLE? HOW TO SELECT EPC CONTRATCOR? ROLE OF TECHNLOGY SELECTION BANKABILITY OF SOLAR PROJECTS www.firstgreen.co IMPACT OF O&M ON BANKABILITY SOLAR RESOURCE ASSESSMENT

More information

Grafton Solar Photovoltaics (PV) March 28, 2013

Grafton Solar Photovoltaics (PV) March 28, 2013 Grafton Solar Photovoltaics (PV) March 28, 2013 Proposed Solar Electricity in Grafton Site System Size (kw DC) System Size (kw AC) Energy (kwh/year) Grafton Campus 11,325,421 Area (Acres) Science Park

More information

Company Profile COMMERCIAL SOLAR SOLUTIONS

Company Profile COMMERCIAL SOLAR SOLUTIONS Company Profile COMMERCIAL SOLAR SOLUTIONS About UGE UGE delivers immediate savings to businesses through the low cost of solar energy. We help commercial and industrial clients unlock the low cost of

More information

Wetlands Protection Act and Section 401 Permitting Process

Wetlands Protection Act and Section 401 Permitting Process Wetlands Protection Act and Section 401 Permitting Process Questions & Answers Ground-Mounted Solar Photovoltaic Systems, December 2012 can be found at: http://www.mass.gov/eea/docs/doer/renewables/solar/solar-pv-guide.pdf

More information

Imagine what we could do...

Imagine what we could do... Imagine what we could do... if the energy for Palmyra s scientific study came from the sun. PROJECT LOCATION: THE NATURE CONSERVANCY, PALMYRA ATOLL PROJECT SUMMARY The Site: The proposed project site,

More information

Jennings Heating & Cooling

Jennings Heating & Cooling Jennings Heating & Cooling Began as a coal delivery company in 1931 Currently we have over 25,000 customers Our services include: Heating & Cooling Systems Geothermal Heating & Cooling Solar Thermal Installations

More information

Farm Energy IQ. Solar Energy on Farms. Farms Today Securing Our Energy Future. Ed Johnstonbaugh, Penn State Extension

Farm Energy IQ. Solar Energy on Farms. Farms Today Securing Our Energy Future. Ed Johnstonbaugh, Penn State Extension Farm Energy IQ Farms Today Securing Our Energy Future Solar Energy on Farms Ed Johnstonbaugh, Penn State Extension Farm Energy IQ Farm Energy IQ Presents: Solar Energy on Farms: Photovoltaic (PV) Electric

More information

Impacts of Grid Regulation Policies in the United States Renewable Energy Market

Impacts of Grid Regulation Policies in the United States Renewable Energy Market Impacts of Grid Regulation Policies in the United States Renewable Energy Market Victoria Healey, Project Leader ECOWAS Renewable Energy Investment Forum 09 Oct 2013 NREL is a national laboratory of the

More information

A New Type of Hybrid Groundwater Energy System

A New Type of Hybrid Groundwater Energy System This case-history is about: A New Type of Hybrid Groundwater Energy System by Todd Giddings, Ph.D., P.G. My 10,000 square foot office building Located in State College, PA (5,600 hdd s) Constructed in

More information

EASTERN ARIZONA COLLEGE Photovoltaic Design and Application

EASTERN ARIZONA COLLEGE Photovoltaic Design and Application EASTERN ARIZONA COLLEGE Photovoltaic Design and Application Course Design 2014-2015 Course Information Division Industrial Technology Education Course Number TEC 172 Title Photovoltaic Design and Application

More information

RENEWABLE ENERGY & ENERGY EFFICIENCY INITIATIVE

RENEWABLE ENERGY & ENERGY EFFICIENCY INITIATIVE RENEWABLE ENERGY & ENERGY EFFICIENCY INITIATIVE Solar Initiatives Biofuel Utilization Streetlight Replacement Xcel Partners in Energy February 1, 2017 RENEWABLE ENERGY & EFFICIENCY INITIATIVE The City

More information

Solar Opportunities in Georgia and Tennessee. November 12, 2013

Solar Opportunities in Georgia and Tennessee. November 12, 2013 Solar Opportunities in Georgia and Tennessee November 12, 2013 Today s Panelists Anthony Coker - Senior Director, International Sales Development, Suniva, Inc. John Sibley - Senior Policy Fellow, Southface

More information

Welcome to Renewable Energy

Welcome to Renewable Energy Welcome to Renewable Energy Moderator: Mr. Chris Silkie, CardnoTEC Inc. Speakers: Mr. Kevin Prince, Sun Power Corp Mr. Vernon Hunt, NAVFAC Southwest Capt. John Hickey, USCG SMC Renewable Energy Solutions

More information

SolFocus Concentrator Photovoltaics An Introduction

SolFocus Concentrator Photovoltaics An Introduction SolFocus Concentrator Photovoltaics An Introduction Phil Metz, Director of Business Development July 21, 2010 SolFocus, Inc. 2010 Patents Pending Today s Discussion What it is and How it Works SolFocus

More information

Case Study: Roza Canal

Case Study: Roza Canal Case Study: Roza Canal Introduction Until now, hydropower as a distributed generation energy source hasn t made sense: dams are both too expensive and environmentally destructive, paddlewheels are inefficient,

More information

MUNICIPALTY OF HURON EAST ENERGY CONSERVATION AND DEMAND MANAGEMENT PLAN

MUNICIPALTY OF HURON EAST ENERGY CONSERVATION AND DEMAND MANAGEMENT PLAN MUNICIPALTY OF HURON EAST ENERGY CONSERVATION AND DEMAND MANAGEMENT PLAN 2014 2019 1 Municipality of Huron East Energy Consumption and Demand Management Plan July 2014 Background Green Energy Act and Ontario

More information

Case Study: Roza Canal

Case Study: Roza Canal Case Study: Roza Canal Introduction Until now, hydropower as a distributed generation energy source hasn t made sense: dams are both too expensive and environmentally destructive, paddlewheels are inefficient,

More information

Metal Roo ng + Solar Arrays: The Perfect Combination. Photovoltaic Technology

Metal Roo ng + Solar Arrays: The Perfect Combination. Photovoltaic Technology Metal Roo ng + Solar Arrays: The Perfect Combination Photovoltaic Technology The Challenge: Well-known Fact: Americans are too dependent on oil and natural gas. We re also the leading consumer of energy

More information

Solar Energy Today s Clean Energy Choice

Solar Energy Today s Clean Energy Choice Renewable Ready Solar Energy Today s Clean Energy Choice Presented to: Better Buildings by Design Conference 2008 Leigh Seddon Solar Works, Inc. End of an Energy Era 100 years of exponential growth in

More information

Solar Solutions for Schools. Solar Power Solutions for Schools

Solar Solutions for Schools. Solar Power Solutions for Schools Solar Power Solutions for Schools Introducing Your Presenters Matt Shannon Arizona Service Territory Manager SOLON Corporation matt.shannon@solon.com Ken Carter Director of Purchasing Paradise Valley Unified

More information

Eagle Mountain Pumped Storage Project Draft License Application Exhibit D Project Costs and Financing

Eagle Mountain Pumped Storage Project Draft License Application Exhibit D Project Costs and Financing Eagle Mountain Pumped Storage Project Draft License Application Exhibit D Project Costs and Financing Palm Desert, California Submitted to: Federal Energy Regulatory Commission Submitted by: Eagle Crest

More information

Introduction to Photovoltaic (PV) Facilities

Introduction to Photovoltaic (PV) Facilities Introduction to Photovoltaic (PV) Facilities Hunterdon County Planning Board TYPES OF SOLAR PANEL DEVELOPMENTS Fixed Tilt Ground Mount Arrays Usually: Ground based PV facilities Typically utilize open

More information

ENERGY SOLUTIONS and DISTRIBUTED POWER GENERATION. g Energy Solutions - DG WMEA Tucson Conference

ENERGY SOLUTIONS and DISTRIBUTED POWER GENERATION. g Energy Solutions - DG WMEA Tucson Conference ENERGY SOLUTIONS and DISTRIBUTED POWER GENERATION An Electrical Supply Option for The Mining Industry Western Mining Electrical Association Fall Meeting - 2001 Tucson, Arizona Presented by: Tom Mc Gibbon

More information

Company Profile COMMERCIAL SOLAR SOLUTIONS

Company Profile COMMERCIAL SOLAR SOLUTIONS Company Profile COMMERCIAL SOLAR SOLUTIONS About UGE UGE delivers immediate savings to businesses through the low cost of solar energy. We help commercial and mid-scale clients become more competitive

More information

SWIFT W I N D T U R B I N E. Harness the power of the wind

SWIFT W I N D T U R B I N E. Harness the power of the wind SWIFT W I N D T U R B I N E Harness the power of the wind Generate your own clean energy. SWIFT Highlights Quiet, innovative design suitable for urban and suburban areas Flexible mounting options - rooftop,

More information

IX. ADDITION OF SOLYNDRA SOLAR PANELS (ELECTRICAL BREADTH)

IX. ADDITION OF SOLYNDRA SOLAR PANELS (ELECTRICAL BREADTH) IX. ADDITION OF SOLYNDRA SOLAR PANELS (ELECTRICAL BREADTH) BACKGROUND Carderock Springs Elementary is striving to achieve a LEED Silver rating from the USGBC. The school s design is part of the Montgomery

More information

2017 Campus PV Roadmap

2017 Campus PV Roadmap 2017 Campus PV Roadmap Table of Contents Overview 1 Section 1: Campus PV Development Team 1 1.1 Key Points of Contact 1 1.2 University Business Relationships 1-2 1.3 Student Engagement, Retention, and

More information

Michigan State University Consumers Energy Company Project Phase 1

Michigan State University Consumers Energy Company Project Phase 1 Michigan State University Consumers Energy Company Project Phase 1 2013 Forum Overview The role of AD-P in Consumers Energy Co. in meeting renewable energy portfolio standards. MSU biomass-sourced research

More information

SRP s s Sustainability Initiatives and Programs

SRP s s Sustainability Initiatives and Programs SRP s s Sustainability Initiatives and Programs Chico Hunter Sr. Engineer, Renewable Energy and Technologies February 26, 2010 Who is SRP? Established in 1903 105 year steward of the environment Largest

More information

BIZ Solar Fort Collins ClimateWise Biz Ed Program Series

BIZ Solar Fort Collins ClimateWise Biz Ed Program Series BIZ Solar Fort Collins ClimateWise Biz Ed Program Series Norm Weaver Fort Collins Utilities May 15, 2013 Commercial Solar in Fort Collins Outline: Solar Trends Cost Trends (Grid Power vs. Solar Power)

More information

Solar Pathways to Lower Cost

Solar Pathways to Lower Cost Solar Pathways to Lower Cost June, 2006 Herb Hayden Pinnacle West Capital Corporation Parent company to Arizona Public Service 1 Carol Spring Mountain Telecom Remote Solar Electric Service Home APS Experience

More information

PASADENA WATER AND POWER MEMORANDUM. August 9, 2016

PASADENA WATER AND POWER MEMORANDUM. August 9, 2016 PASADENA WATER AND POWER MEMORANDUM August 9, 2016 To: Environmental Advisory Committee From: Gurcharan Bawa Interim General Manager Subject: Pasadena Solar Program Updates This report is for information

More information

Urban Solar Rooftop Utility Feasibility Study for City of Vancouver

Urban Solar Rooftop Utility Feasibility Study for City of Vancouver Urban Solar Rooftop Utility Feasibility Study for City of Vancouver Prepared by: M.K. Anand, UBC Greenest City Scholar, 2018 Prepared for: Nicole Chan, Junior Engineer, Neighborhood Energy Utility, Engineering

More information

Net Energy Metering 2.0 Solar PV Interconnection Handbook. Effective December 1, 2017

Net Energy Metering 2.0 Solar PV Interconnection Handbook. Effective December 1, 2017 Net Energy Metering 2.0 Solar PV Interconnection Handbook Effective December 1, 2017 Important Information The NEM 1.0 solar PV rate is closed. The NEM 2.0 is the current PV rate option available for solar

More information

Seventh Plan Midterm Assessment: Draft Resource Capital Cost Estimates for Wind and Solar. Reminder: How the Council develops capital cost estimates

Seventh Plan Midterm Assessment: Draft Resource Capital Cost Estimates for Wind and Solar. Reminder: How the Council develops capital cost estimates Seventh Plan Midterm Assessment: Draft Resource Capital Cost Estimates for Wind and Solar Gillian Charles & Mike Starrett Power Committee May 8, 2018 Reminder: How the Council develops capital cost estimates

More information

Farm Energy IQ. Solar Energy on Farms. Farms Today Securing Our Energy Future. Ed Johnstonbaugh, Penn State Extension

Farm Energy IQ. Solar Energy on Farms. Farms Today Securing Our Energy Future. Ed Johnstonbaugh, Penn State Extension Farm Energy IQ Farms Today Securing Our Energy Future Solar Energy on Farms Ed Johnstonbaugh, Penn State Extension Farm Energy IQ Farm Energy IQ Presents: Solar Energy on Farms: Photovoltaic (PV) Electric

More information

UW-Rock County Solar Project

UW-Rock County Solar Project UW-Rock County Solar Project UW-Rock County in Janesville, Wisconsin, has a solar photovoltaic system aimed at education, promotion of sustainable energy, and research. We welcome your ideas, questions,

More information

Addendum 3: Additional Site Info plus continuation of Q&A November 11, 2016

Addendum 3: Additional Site Info plus continuation of Q&A November 11, 2016 Addendum 3: Additional Site Info plus continuation of Q&A November 11, 2016 RFP Modification New Info for Minetto The amperage of the service entrance was not previously available for the Minetto Water

More information

SOLAR IN ACTION. There are three basic types of solar voltaic systems:

SOLAR IN ACTION. There are three basic types of solar voltaic systems: SOLAR POWER BASICS The most common solar technologies used on buildings in the United States are solar photovoltaic (PV) panels, which generate electricity. An individual PV cell is usually small, typically

More information

Net Energy Metering 2.0 Solar PV Interconnection Handbook. Effective January 1, 2017

Net Energy Metering 2.0 Solar PV Interconnection Handbook. Effective January 1, 2017 Net Energy Metering 2.0 Solar PV Interconnection Handbook Effective January 1, 2017 Overview This Handbook illustrates the steps, processes, and requirements to apply for a Solar Photovoltaic (PV) interconnection

More information

Energy Conservation Renewable Energy The Future Rutgers

Energy Conservation Renewable Energy The Future Rutgers Renewable Energy The Future Rutgers Operations & Services Utilities Operations 6 Berrue Circle Piscataway, NJ 08854 Strategic Planning for Energy Conservation Created a Sustainable Model One area of the

More information