1 Pipe Express - Ideal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. Dr. Gerhard Lang Business Development Manager UT Division

2 Founded in 1977 Conversion to Herrenknecht AG in 1998 Today around 4,600 employees worldwide, 2,000 in Schwanau, around 200 young people in training

3 Herrenknecht worldwide. Headquarter Schwanau, Germany Subsidiaries Representativess

4 Liaoning Shaanxi Province Changsha Fuzhou

5 All Around Tunnelling Solutions. Our core products for Traffic Tunnelling. APPLICATIONS. Road Railway Metro MACHINE RANGE. Gripper TBM Single Shield TBM Double Shield TBM Mixshield EPB Shield

6 New diameter world record. Hong Kong: Tuen Mun Chek Lap Kok Link (TM-CLKL). Mixshield, shield-ø 17.6m (57.8 ft) 2 parallel road tunnels with two road levels each

7 Vertical drilling rigs for the exploration of new energy deposits

8 Geothermal energy. Potential for a clean and stable energy supply. Deep geothermal energy Near-surface geothermal energy 3,000 5,000m deep m deep ft deep ,405ft deep

9 Innovative tunnelling technology for infrastructures in mining

10 Herrenknecht Mining. Product portfolio. Shaft Drilling Jumbo Raise Boring Rig Shaft Sinking Machines Boxhole Boring Machine Multi-service vehicles Gripper TBM

11 HERRENKNECHT GROUP UTILITY TUNNELLING. BUSINESS SEGMENTS. Utility Tunnels & Shafts Pipeline Energy MACHINE RANGE. AVN & AVND EPB Shield Gripper TBM Single Shield Double Shield Partial-face Excavation Machine Auger Boring Machine HDD Rig Direct Pipe Pipe Express VSM

12 UTILITY TUNNELLING PIPELINE. RANGE OF MAXI AND MEGA HDD RIGS. Trailer Rigs, e.g. HK250T (550,000lbs) Crawler Rigs, e.g. HK150C (330,000lbs) Frame Rigs, e.g. HK250F (550,000lbs) Modular Rigs, e.g. HK400M (880,000lbs)

13 AMU DARJA RIVER CROSSING TURKMENISTAN LARGEST HDD EVER REALIZED WITH HK TECHNOLOGY 56 GAS PIPELINE LENGTH: 1,705m (5,594 ft).

14 UTILITY TUNNELLING PIPELINE. SLANTED DRILLING HK250C-SDD ENTRY ANGLE: Application fields: oil & gas exploration Oil-Sands Coal-Seam-Gas Shale Gas Shallow Oil Gas Cavern Storage.

15 Slant Directional Drilling. SDD-Rig HK250C-SDD up to 45 drilling angle.

16 Herrenknecht New Fullface Hole-Opener Technology. From Pilotebore to final diameter in one step.

17 PIPE THRUSTER TECHNOLOGY as key innovation: POWERFUL TOOL FOR 5 DIFFERENT APPLICATIONS. 1. PIPE ASSIST TOOL FOR HDD DURING PIPE PULL-IN. 2. RECOVERY OF STUCK OR DAMAGED PIPELINE. 3. INSERTION OF PRODUCT PIPELINE IN EXISTING TUNNEL. 4. THE DIRECT PIPE -METHOD. 5. PIPE EXPRESS

18 PIPE THRUSTER as Pipe Assist Tool. Long or difficult HDD CROSSINGS. HDD-RIG ON RIG-SIDE PIPE THRUSTER ON PIPE-SIDE

19 Amudarja River Crossing in Turkmenistan. The ultimate pipeline crossing. Pipeline length 1,705m (5,594ft); pipeline diameter 56 and 8 2 x HDD Rig + Pipe Thruster

20 DIRECT PIPE Technology.

21 HDD vs. DIRECT PIPE Downhole pressure with HDD.

22 THE DIRECT PIPE METHOD - Advantages Applicable in almost all geological conditions. High alignment accuracy compared to HDD. Borehole is supported at all times. Minimum frac-out risk. One pass installation from one side. Slurry discharge through the pipeline.

23 REFERENCE LIST OF DIRECT PIPE PROJECTS. 42 Projects to date.

24 PROJECT DETAILS. 42 Direct Pipe Crossings in the USA Project: Aquashicola Creek Crossing, Northeast Supply Link Project Location: Palmerton, Pennsylvania, USA Constr. Company: Laney Directional Drilling co. Client: Williams Pipeline Machine: AVN1000XB Direct Pipe Geology: Clay with Stones, Gravel, Shale Pipeline length: 410m (1,345 feet) Pipeline-: 42 (1,067mm) Coating: FBE Purpose: Gas Pipeline Breakthrough: June 21, 2013

25 410m (1,345ft) LONG ALIGNMENT UNDER A CREEK & A STREET. 410m 1,345ft

26 THE LAUNCH SITUATION. Casing with inner coating

27 Crossing Rio Grand into Mexico with Direct Pipe. Michels Directional Crossings July 2014.

28 Crossing Rio Grand into Mexico with Direct Pipe. Michels Directional Crossings July 2014.

29 Crossing Rio Grand into Mexico with Direct Pipe. Power Modul System for longer crossing distances.

30 Pipe Express Technology. Equipment components. Operator vehicle Launch pit with Pipe Thruster Excavation unit

31 Pipe Express technology. Excavation process dry excavation

32 Pipe Express Technology. Installation methods.

33 Pipe Express Technology. Benefits - Minimum right of way. conventional 100% Pipe Express ~30%

34 Pipe Express Technology. Further Benefits Application in wetlands Environmentally sensitive areas Swampy areas with high groundwater level Areas with unstable ground conditions Areas with water-bearing layers Page 36

35 Pipe Express Technology. Components of equipment operator vehicle. Power pack, Lubrication bentonite tank Crane for supply lines Operator cabin

36 Pipe Express Technology. Components of equipment excavation unit. Trenching unit Conveyor Belt Trench cutter Cutterhead Buggy TBM Screw conveyor Articulation joint

37 Pipe Express Technology. Components of equipment lubrication. Reduction of friction between borehole and pipeline Protection of pipeline coating Bentonite lubrication ring

38 PIPE EXPRESS TECHNOLOGY. Components of Equipment EXCAVATION UNIT. Trench cutter hydraulically adjustable -> variable overburden MAX 2.50m (8.2 ft) STANDARD 1.50m (4.9 ft) MIN 0.50m (1.6 ft)

39 Pipe Express Technology. Components of equipment navigation. Optical guidance system (Total station) Fuzzy logic control for automatic steering (Autopilot)

40 Pipe Express Technology. Trench Compacting unit.

41 Pipe Express Technology. Trench Compacting unit. Requirements: Soil compaction simultaneous to advance Overburden of min. 0,5 m (1.6ft) Compaction on machine section. Reutilization of the excavated ground

42 Pipe Express Technology. Application range. Drive length: up to 2,000m (6,562ft) Pipeline diameter: Overburden: m ( ft) Advance rates of up to: 1.2m/min (5ft/min.) 500 1,000m/day (1, ft/day) Page 44

43 Pipe Express Technology. Summary of benefits. Working under groundwater, no lowering of ground water table Simultaneous trenching and pipe laying Minimum impact on flora and fauna No components & cutting transport inside the pipeline No drilling fluid for transport of cuttings -> no separation plant necessary Less pipe-laying equipment needed on jobsite

44 Pipe Express Technology. History overview. Start of development Concept & testing 1 Testing 2 First presentation to public Redesign & 1 st project Bauma, Innovation Award Feasibility study Concept Design and Operation of test Modifications and Presentation of the Patent application Apply for funding Pipe friction test at university Design and construction of test facility 1 First tests construction of test facility 2 prototype 36 facility m Innovation Day with clients & contractors redesign Reference project 48 gas pipeline with Gasunie on North- South Route in The technology in Munich, Bauma 2013 Winner of the innovation award for Pipe Express Netherlands technology Winner of the IPLOCA New Technology Award 2013

45 Pipe Express pilot project. 48 gas pipeline in the Netherlands. Project: North-South Gas Pipeline Location: Odiliapeel-Melick, The Netherlands Client: Gasunie Customer: Visser & Smit Hanab Pipeline length: 500m (1,640ft) Pipeline diameter: 48 Pipeline coating: PE Geology: fine sand, sand Advance rate: 1.2m/min (5ft/min)

46 Pipe Express pilot project. 48 gas pipeline in the Netherlands.

47 Pipe Express. 42 gas pipeline in Thailand Nov Project: Fourth Transmission Pipeline KP112-KP111 Location: Chon Buri, Thailand Client: PTT Customer: Punj Lloyd Pipeline length: 703m (2,306ft) Pipeline diameter: 42 Pipeline coating: PE Geology: clay, landfill, road Advance rate: 0.8m/min (3ft/min)

48 Pipe Express. 42 gas pipeline in Thailand Nov Buggy with chain conveyor Refilling of the trench

49 Pipe Express - next project in Sweden 48 water pipeline in Stockholm. Project: Albysjön 48 water pipeline Location: Stockholm, Sweden Client: Stockholm Water Contractor: Züblin Scandinavia Pipeline Length: 1.036m (3,400ft) (4 pipe sections à ~250m/820ft) Pipeline Ø: 48 Pipeline coating: PP Geology: sand with clay, sand with gravel Groundwater: up to 2m (6ft) above invert Launch: planned for end 2014, beginning 2015

50 PeX Demo Movie.

51 Top 5 nominée for the HERMES AWARD 2008 at Hannover Fair. Thank You! Winner of the ISTT NO DIG AWARD 2008 at the NO DIG 2008 in Moscow. WINNER OF THE TECHNOLOGIE AWARD AT THE IPLOCA CONVENTION 2009 IN SAN FRANCISCO. Winner of the NSTT NO DIG AWARD 2010 in the Netherlands.

Herrenknecht Pioneering Underground Technologies

Herrenknecht Pioneering Underground Technologies Herrenknecht Pioneering Underground Technologies Ing.Francisco Avila, CEO, HK Panamá, HK Mexico, HK Colombia. Lima - Perú, 10. noviembre 2014 Founded in 1977 Conversion to Herrenknecht AG in 1998 Today

More information

The new HDD Tooling from Herrenknecht Full Face Hole Opener / Down Hole Jet Pump

The new HDD Tooling from Herrenknecht Full Face Hole Opener / Down Hole Jet Pump The new HDD Tooling from Herrenknecht Full Face Hole Opener / Down Hole Jet Pump Simon Herrenknecht, Product Manager Pipeline, Herrenknecht AG Herrenknecht Introduction Herrenknecht AG, Germany Founded

More information

rapid tunnelling thanks to efficient SePArAtion. Low-impact mechanized tunnelling: Integrated solutions.

rapid tunnelling thanks to efficient SePArAtion. Low-impact mechanized tunnelling: Integrated solutions. herrenknecht AG utility tunnelling Traffic tunnelling SEPARATION PLANTS HERRENKNECHT SEPARATION PLANTS KEEP IT FLOWING. RAPID TUNNELLING THANKS TO EFFICIENT SEPARATION. Low-impact mechanized tunnelling:

More information

IPC Company & DPI Presentation. February 2017

IPC Company & DPI Presentation. February 2017 IPC Company & DPI Presentation February 2017 WHO WE ARE OVERVIEW Innovative Pipeline Crossings Inc. (IPC) Founded in 2013, in Calgary Private Company Since July 2016 under new Management Supervisory Board

More information

E-Power Pipe : A new trenchless method for underground cable installation

E-Power Pipe : A new trenchless method for underground cable installation E-Power Pipe : A new trenchless method for underground cable installation Dr. Gerhard Lang Jan 31, 2018 - UCT 2018, Track XI High Voltage Power Grid in Germany. Intention to replace nuclear power plants

More information

5/16/2018. New Jet Pump Technology for HDD & Long-distance Pipe Jacking in small diameters. Dr. Marc Peters, Herrenknecht AG. Highlights.

5/16/2018. New Jet Pump Technology for HDD & Long-distance Pipe Jacking in small diameters. Dr. Marc Peters, Herrenknecht AG. Highlights. Highlights. How to use a Jet Pump? Jet pump for HDD New Jet Pump Technology for HDD & Long-distance Pipe Jacking in small diameters Dr. Marc Peters, Herrenknecht AG Full-Face Hole opener & Downhole Jet

More information

DIRECT PIPE AS AN ALTERNATIVE TO HDD, METHOD AND CASE STUDIES

DIRECT PIPE AS AN ALTERNATIVE TO HDD, METHOD AND CASE STUDIES DIRECT PIPE AS AN ALTERNATIVE TO HDD, METHOD AND CASE STUDIES Authors : Presenter : Dr Gerhard Lang, Business Development Manager, Herrenknecht AG Diana Pfeff, Product Manger, Herrenknecht AG Ben Hayes,

More information

NO DIG BERLIN 2015 Symposium and Exhibition March. Paper 5-3. Increasing requirements move boundaries in Pipe Jacking

NO DIG BERLIN 2015 Symposium and Exhibition March. Paper 5-3. Increasing requirements move boundaries in Pipe Jacking NO DIG BERLIN 2015 Symposium and Exhibition 24 27 March Paper 5-3 Increasing requirements move boundaries in Pipe Jacking Dipl.-Ing. Peter Schmaeh Herrenknecht AG, Schwanau, Germany ABSTRACT Utility lines

More information

TRENCHLESS SOLUTIONS FOR SEWER NETWORKS AND SEA OUTFALLS.

TRENCHLESS SOLUTIONS FOR SEWER NETWORKS AND SEA OUTFALLS. TRENCHLESS SOLUTIONS FOR SEWER NETWORKS AND SEA OUTFALLS. Author: Frank B. Stevens Pr. Eng, BSc (Civil), HonFIMESA, FSAICE Technical Representative for Herrenknecht AG (Utility Tunnelling). stevens.frank@herrenknecht.de

More information

Experts in tunneling with Tunnel Boring Machines

Experts in tunneling with Tunnel Boring Machines www.eurohinca.com www.terratest.es Experts in tunneling with Tunnel Boring Machines info@eurohinca.com EUROHINCA Europea de Hincas Teledirigidas, S.A., EUROHINCA, was incorporated in 1996 for the execution

More information

INNOVATIVE DIRECT PIPE METHOD CASE HISTORIES

INNOVATIVE DIRECT PIPE METHOD CASE HISTORIES INNOVATIVE DIRECT PIPE METHOD CASE HISTORIES René A. von Rautenkranz, Sales & Project Manager Herrenknecht (Asia) Ltd., Bangkok, Thailand ABSTRACT The Direct Pipe -method combines the advantages of the

More information

Trenchless Pipeline Crossings

Trenchless Pipeline Crossings Trenchless Pipeline Crossings Overview Where we started Horizontal Directional Drilling 1960 s Evolution of the process Where we are today HDD Microtunneling Direct Pipe Crossing Process Where we re going

More information

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo. Pipe Jacking/Microtunnelling Dr. Mark Knight Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo 1 New Installations New Installations Non-Steering Methods Steering Methods

More information

FOR HIGHWAY TUNNEL GALLERIA SPARVO.

FOR HIGHWAY TUNNEL GALLERIA SPARVO. HERRENKNECHT EPB SHIELD S-574 FOR HIGHWAY TUNNEL GALLERIA SPARVO. PRODUCT PORTFOLIO OF HERRENKNECHT GROUP. MECHANIZED TUNNELLING TECHNOLOGY. STEEP TUNNELLING. St. Petersburg 30 downhill EPB Shield Access

More information

Offshore meets Onshore: Trenchless solutions for pipeline landfalls.

Offshore meets Onshore: Trenchless solutions for pipeline landfalls. Offshore meets Onshore: Trenchless solutions for pipeline landfalls. Michael Lubberger, Herrenknecht AG Geneva, October 2018 Introduction Tunnelling Segment Lining Pipe Jacking Direct Pipe HDD Sea Outfalls,

More information

King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal

King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TA-T1-03 King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle

More information

HDD Training. Mitigation. Mark Miller, PE Jon Robison, PE

HDD Training. Mitigation. Mark Miller, PE Jon Robison, PE HDD Training Mitigation Mark Miller, PE Jon Robison, PE Mitigating HDD Risks HDD construction risks need to be evaluated during the design process to reduce the risk of schedule delays, damage to existing

More information

Trenchless Technology

Trenchless Technology TRENCHLESS TECHNOLOGY Gene Woodbridge Earth Boring Co. Limited www.earthboring.ca Earth Boring Co. Limited 1576 Ifield Road Mississauga, ON L5H 3W1 (905) 277-9632 fax (905) 274-9040 Trenchless Technology

More information

2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January

2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January Program: Title: Author: 2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January 29-31. Successful Technology for Utility Installations

More information

Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati

Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati Steve Lamb The Robbins Company, Solon, Ohio, USA Steve Abernathy Midwest Mole, Inc., Indianapolis, Indiana, USA ABSTRACT: A Robbins

More information

Direct Pipe Installations underneath USACE Levees Keeping Permitted Minimum Hydraulic Fracture Factor of Safety

Direct Pipe Installations underneath USACE Levees Keeping Permitted Minimum Hydraulic Fracture Factor of Safety North American Society for Trenchless Technology (NASTT) NASTT s 216 No-Dig Show Dallas, Texas March 2-24, 216 TA-T5-3 Direct Pipe Installations underneath USACE Levees Keeping Permitted Minimum Hydraulic

More information

Sioux City Iowa Utilizes HDD to Install Twin 36 Casings for Sanitary Sewer Siphons

Sioux City Iowa Utilizes HDD to Install Twin 36 Casings for Sanitary Sewer Siphons WATER Sioux City Iowa Utilizes HDD to Install Twin 36 Casings for Sanitary Sewer Siphons Presented by Peter Merten, PE, HR Green, Inc. and David Reuter, PE, Underground Solutions UCT Underground Construction

More information

Microtunnelling. Building infrastructures and power supply systems underground, while life above continues unaffected.

Microtunnelling. Building infrastructures and power supply systems underground, while life above continues unaffected. Microtunnelling Building infrastructures and power supply systems underground, while life above continues unaffected. 2 Comprehensive Microtunnelling Solutions A reliably functioning infrastructure which

More information

2 Support of the cavity and settlement Support of the face Natural support Mechanical support...

2 Support of the cavity and settlement Support of the face Natural support Mechanical support... Table of Contents The authors... VII Foreword to the 2nd Edition... IX 1 Introduction... 1 1.1 Basic principles and terms... 3 1.2 Types of tunnel boring machine according to DAUB... 5 1.2.1 Categories

More information

TBM rescue projects using shafts and ground freezing

TBM rescue projects using shafts and ground freezing TBM rescue projects using shafts and ground freezing Dipl.-Ing. Michael Löffler, Dipl.-Ing. Helmut Haß (CDM Consult GmbH, Germany) Dipl.-Ing. Thomas Ahlbrecht (Deilmann-Haniel Shaft Sinking GmbH, Germany)

More information

Hardrock Tunnel Boring Machines

Hardrock Tunnel Boring Machines Bernhard Maidl, Leonhard Schmid, Willy Ritz, Martin Herrenknecht Hardrock Tunnel Boring Machines In co-operation with Gerhard Wehrmeyer and Marcus Derbort -=rnst & Sohn '-A Wiley Company Contents 1 Historical

More information

WARNING DO NOT BID ON THIS PROJECT

WARNING DO NOT BID ON THIS PROJECT WARNING DO NOT BID ON THIS PROJECT Nick H. Strater, P.G., Associate, Brierley Associates, Bedford, NH Brian C. Dorwart, P.E., P.G., Sr. Consultant, Brierley Associates, Bedford, NH For projects advertised

More information

Design of pipeline installation D-GEO PIPELINE

Design of pipeline installation D-GEO PIPELINE Design of pipeline installation D-GEO PIPELINE Design of pipeline installation D-GEO PIPELINE General Pipelines are an important part of the underground infrastructure. They are the lifelines of our modern

More information

HERRENKNECHT Large-scale projects in small diameters win GSTT Award 2015.

HERRENKNECHT Large-scale projects in small diameters win GSTT Award 2015. Pioneering Underground Technologies Page1/5 Press Release HERRENKNECHT Large-scale projects in small diameters win GSTT Award 2015. April 10, 2015 Berlin / Schwanau Two projects in which microtunnelling

More information

Design of pipeline installation. D-Geo Pipeline

Design of pipeline installation. D-Geo Pipeline Design of pipeline installation D-Geo Pipeline Design of pipeline installation D-Geo Pipeline General Pipelines are an important part of the underground infrastructure. They are the lifelines of our modern

More information

PIPE JACKING & TUNNELING SYSTEMS DRIVEN FOR CUSTOMER SUCCESS

PIPE JACKING & TUNNELING SYSTEMS DRIVEN FOR CUSTOMER SUCCESS PIPE JACKING & TUNNELING SYSTEMS 6(721 6(*'( 35$+6 '1$ 6558% //$ (920(5 DRIVEN FOR CUSTOMER SUCCESS OUR EQUIPMENT SYSTEMS Since inception, Akkerman has grown with the evolution of industry demands. We

More information

Cutting-Edge Trenchless Technology Proposed for Challenging CSO Project

Cutting-Edge Trenchless Technology Proposed for Challenging CSO Project North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TM1-T2-03 Cutting-Edge Trenchless Technology Proposed for Challenging CSO Project

More information

Shieldhall Tunnel construction of the first shaft, service chamber, cut and cover and the tunnel boring machine launch chamber at Craigton

Shieldhall Tunnel construction of the first shaft, service chamber, cut and cover and the tunnel boring machine launch chamber at Craigton www.waterprojectsonline.com Shieldhall Tunnel construction of the first shaft, service chamber, cut and cover and the tunnel boring machine launch chamber at Craigton C onstruction of the Shieldhall Tunnel,

More information

Pipe Jacking. Japan Sewage Works Association

Pipe Jacking. Japan Sewage Works Association Pipe Jacking Japan Sewage Works Association June, 2013 1 Pipe Jacking Yosuke Matsumiya y.matsumiya@ngsk.or.jp Japan Sewage Works Association Suisui Bldg. 2-10-12 Uchikanda, Chiyodaku Tokyo 101-0047 Japan,

More information

Developed countries require a modern infrastructure Roads Railways Power Communications Water Wastewater

Developed countries require a modern infrastructure Roads Railways Power Communications Water Wastewater Introduction to Soft Ground Tunnelling in Urban Environment Dr. Noppadol Phienwej Geotechnical and Geo-environmental environmental Engineering School of Engineering and Technology Asian Institute of Technology

More information

CS-13 TRENCHLESS TECHNOLOGY TABLE OF CONTENTS

CS-13 TRENCHLESS TECHNOLOGY TABLE OF CONTENTS TABLE OF CONTENTS CS-13.0 Trenchless Technology... 1 CS-13.1 Location of Existing Services... 1 CS-13.2 Alignment... 1 CS-13.3 Directional Drilling... 1 CS-13.4 Pipe Thrusting... 2 CS-13.5 Guided Boring/Auger

More information

Pipe Jacking Association: Introduction Presentation. Lecture notes. Slide 1. Slide 2

Pipe Jacking Association: Introduction Presentation. Lecture notes. Slide 1. Slide 2 Slide 1 PIPE JACKING An introduction to pipe jacking prepared by the Pipe Jacking Association This introduction to pipe jacking has been prepared by the Pipe Jacking Association as an aid to engineers

More information

TBM Selection and Specification

TBM Selection and Specification By Bradford F. Townsend and Paul E. Jenkins Date: 13 June 2009 TBM Selection - Challenges to be met TBM Technology Auxiliary Measures and Backup New Developments Summary of Selection Process Procurements

More information

Pipe Jacking. Progress is built on ideas.

Pipe Jacking. Progress is built on ideas. Pipe Jacking Progress is built on ideas. Frankfurt airport, enlargement of hydrant-fuelling system elongation of southeast-sewer, Nuremberg U 55 subway station, Brandenburger Tor, Berlin subway station

More information

Principles for Tunnel Design. 20th to 21st April 2017 Kuala Lumpur

Principles for Tunnel Design. 20th to 21st April 2017 Kuala Lumpur 20th to 21st April 2017 Kuala Lumpur Mechanized Tunneling (TBM and Support Systems) Thorsten Tatzki Herrenknecht Asia Headquarters Pte. Ltd. Introduction: General Overview Shield Machines and Tunnel Boring

More information

Venice Pumping Plant Dual Force Main Project Draft EIR

Venice Pumping Plant Dual Force Main Project Draft EIR City of Los Angeles Venice Pumping Plant Dual Force Main Project Draft EIR 4.0 ALTERATIVES UDER COSIDERATIO Alternatives under consideration for this Project are defined by the alignment and construction

More information

D&B versus TBM some case stories

D&B versus TBM some case stories D&B versus TBM some case stories TBM Applications II Bergen, June 6 th and 7 th Project Manager Anne Kathrine Kalager Case stories Two different Projects Considerations regarding excavation method: New

More information

No-Dig Technology is the art and science of pipes, ducts and cables using techniques that minimizes / eliminates the need for excavation, i.e.

No-Dig Technology is the art and science of pipes, ducts and cables using techniques that minimizes / eliminates the need for excavation, i.e. No Dig Technology Introduction: No-Dig Technology is the art and science of installing, repairing or renewing underground pipes, ducts and cables using techniques that minimizes / eliminates the need for

More information

Seattle, WA SHORING * GROUNDWATER CONTROL * ENVIRONMENTAL

Seattle, WA   SHORING * GROUNDWATER CONTROL * ENVIRONMENTAL Seattle, WA www.soilfreeze.com SHORING * GROUNDWATER CONTROL * ENVIRONMENTAL Haiku is one of the most important forms of traditional Japanese poetry. Haiku is: a 17-syllable verse form consisting of three

More information

PIPE JACKING. An introduction to pipe jacking prepared by the Pipe Jacking Association

PIPE JACKING. An introduction to pipe jacking prepared by the Pipe Jacking Association PIPE JACKING An introduction to pipe jacking prepared by the Pipe Jacking Association Pipe Jacking Pipe Jacking Microtunnelling Pipe Jacking - General Arrangement Pipe Jacking is an integrated system linking:

More information

Diaphragm wall Construction

Diaphragm wall Construction Diaphragm wall Construction Diaphragm wall is a continuous wall constructed in ground in to facilitate certain construction activities, such as: a) As a retaining wall b) As a cut-off provision to support

More information

Fifty Feet of Peat: Design Challenges of Three Long HDD Crossings of the Sacramento River

Fifty Feet of Peat: Design Challenges of Three Long HDD Crossings of the Sacramento River Fifty Feet of Peat: Design Challenges of Three Long HDD Crossings of the Sacramento River 3 rd Annual Rocky Mountain Regional No Dig Conference & Exhibition Westminster, CO November 8, 2012 David Bennett,

More information

Pipe Ramming with HDD. Presentation Outline

Pipe Ramming with HDD. Presentation Outline EXAMINING PIPE RAMMING DESIGN- A FORENSIC ANALYSIS OF A HIGH RISK PROJECT Kimberlie Staheli, Ph.D., P.E. Staheli Trenchless Consultants Seattle, WA, USA Presentation Outline Pipe Ramming State of the Art

More information

USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA. Miranda Roman D. *, LaFaso Edward

USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA. Miranda Roman D. *, LaFaso Edward USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA Miranda Roman D. *, LaFaso Edward Iseki, Inc. 7518 Carroll Road, San Diego, Calif. 92121-2402 USA This paper will discuss the

More information

Dahlia Ponds Tunnel Project. Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless

Dahlia Ponds Tunnel Project. Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless DAHLIA PONDS TUNNEL PROJECT CASE HISTORY Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless Outline Owner s Approach Design & Engineering Construction

More information

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV NORTH SHORE CONNECTOR TUNNELS AND STATION SHELL LIGHT RAIL PROJECT PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV North Shore Connector Alignment 7300 lf Extension to existing 25 mile system 18 Contracts $435

More information

Slurry MTBM in Alluvial Soils and 25k Rock Chris L. Windley, P.E. McKim & Creed Inc. Stephen D. Leitch, P.E. Hazen and Sawyer, P.C. Joshua P.

Slurry MTBM in Alluvial Soils and 25k Rock Chris L. Windley, P.E. McKim & Creed Inc. Stephen D. Leitch, P.E. Hazen and Sawyer, P.C. Joshua P. Slurry MTBM in Alluvial Soils and 25k Rock Chris L. Windley, P.E. McKim & Creed Inc. Stephen D. Leitch, P.E. Hazen and Sawyer, P.C. Joshua P. Farmer, P.E. Hazen and Sawyer, P.C. Project Background City

More information

Modeling Microtunnelling Construction Operations with WebCYCLONE

Modeling Microtunnelling Construction Operations with WebCYCLONE Journal of Geological Resource and Engineering 4 (2017) 188-196 doi:10.17265/2328-2193/2017.04.005 D DAVID PUBLISHING Modeling Microtunnelling Construction Operations with WebCYCLONE Dang Trung Thanh Department

More information

A number of abbreviations and technical terms have been used in this guideline:

A number of abbreviations and technical terms have been used in this guideline: Page No: i CONTENTS 1.0 BACKGROUND 2 2.0 DEFINITIONS 2 3.0 INTRODUCTION 2 4.0 HORIZONTIAL DIRECTIONAL DRILLING GUIDELINE 2 4.1 HDD Process 2 4.2 HDD Methods 2 4.2.1 Pilot Bore 2 4.2.2 Reaming 2 4.2.3 Pullback

More information

Tel: Neil: Tony: Website:

Tel: Neil: Tony: Website: Australian Tunnelling Services are a consortium that has been formed to offer specialist underground services to both clients and contractors in the Civil Engineering, Mining & Building Industries. The

More information

Pipejacking Tunnel Boring Machines TBMs. Michael Frenke, LOVAT Inc.

Pipejacking Tunnel Boring Machines TBMs. Michael Frenke, LOVAT Inc. Pipejacking Tunnel Boring Machines TBMs Michael Frenke, LOVAT Inc. Pipejacking Tunnel Boring Machines (TBMs( TBMs) Introduction Pipejacking Sequence TBM Design Features Types of Jacking Pipe Pipejacking

More information

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer APPENDIX I Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer THE CITY OF BARRIE PROJECT NO. 15M-00594-01 CONCEPTUAL DESIGN SALEM ROAD AND MCKAY ROAD TRUNK WATERMAIN AND SANITARY

More information

#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA)

#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA) #47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA) by Michael J. Carey Michael J. Fisher Steven R. Day Presented at: International Containment Technology

More information

Design and Implementation of the South Hartford CSO Tunnel

Design and Implementation of the South Hartford CSO Tunnel Design and Implementation of the South Hartford CSO Tunnel Brian Canterbury, P.E., AECOM James Sullivan, P.E., AECOM Andrew Perham, The Metropolitan District The Metropolitan District NEWEA January 22,

More information

1.0 Micro Tunnelling An overview

1.0 Micro Tunnelling An overview 1.0 Micro Tunnelling An overview Micro tunnelling (also known as slurry pipejacking) is not a new method. It is preformed extensively across the world with rapid expansion every year. Herrenknecht, manufactured

More information

Short Drive Microtunnelling (MTBM) TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention Centre, Niagara Falls, ON

Short Drive Microtunnelling (MTBM) TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention Centre, Niagara Falls, ON Short Drive Microtunnelling (MTBM) TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention Centre, Niagara Falls, ON Earth Boring Co. Limited Trenchless Since 1947 Founded in Streetsville

More information

Agenda for Today s Workshop

Agenda for Today s Workshop Agenda for Today s Workshop 10:00 to 10:45: Introduction Dr. Mo Najafi 10:45 to 11:15: Research and Testing Mr. Jwala Sharma 11:15 to 11:45: Cost Comparison Ms. Trupti Kulkarni 11:45 to 12:00: Lab Tour

More information

2 Technology of closed-face tunnelling machines

2 Technology of closed-face tunnelling machines 2 Technology of closed-face tunnelling machines 2.1 Machine types There are two basic types of pressurised closed-face tunnelling systems slurry tunnelling machines (STMs) and earth pressure balance machines

More information

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe. MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction

More information

A Sigh of Relief: Completion of the San Mateo El Cerrito Relief Line. Kourosh Iranpour, PE

A Sigh of Relief: Completion of the San Mateo El Cerrito Relief Line. Kourosh Iranpour, PE A Sigh of Relief: Completion of the San Mateo El Cerrito Relief Line Kourosh Iranpour, PE Presentation Outline Background information Selection of preferred alignment Primary project challenges Selection

More information

SHAFT CONSTRUCTION SECANT PILE

SHAFT CONSTRUCTION SECANT PILE by Rob jameson and eric lindquist feature story SECANT PILE SHAFT CONSTRUCTION Modern Tools and Techniques Allow Excavation to Depths Previously Considered Infeasible By Rob Jameson and Eric Lindquist

More information

PMSA Regional Conference The role of innovative technology and PM in delivery of the Durban Harbour Tunnel.

PMSA Regional Conference The role of innovative technology and PM in delivery of the Durban Harbour Tunnel. PMSA Regional Conference 2016 The role of innovative technology and PM in delivery of the Durban Harbour Tunnel. Frank B. Stevens Pr Eng, B SC (Civil), HonFIMESA, FSAICE Shark Protection Nagal Dam Opening

More information

Challenges on HDD Pipeline Shore Approach

Challenges on HDD Pipeline Shore Approach OIL & GAS Challenges on HDD Pipeline Shore Approach DNV GL New Recommended Practice Luis D'Angelo - Danilo Machado 02 November 2016 1 SAFER, SMARTER, GREENER Agenda Objectives Why to use HDD in Shore Approach?

More information

SLIDE RAIL SHORING SYSTEMS

SLIDE RAIL SHORING SYSTEMS SLIDE RAIL SHORING SYSTEMS THE LEADING PRODUCER & DISTRIBUTOR OF TRENCH SHIELDING & SHORING EQUIPMENT SINCE 1995 Pro-Tec Equipment Slide Rail Shoring Systems What is Pro-Tec Equipment s Slide Rail? The

More information

SELECTION OF TUNNEL METHODS. By: Dr. Gary S. Brierley

SELECTION OF TUNNEL METHODS. By: Dr. Gary S. Brierley SELECTION OF TUNNEL METHODS By: Dr. Gary S. Brierley Successful Tunnel Design 2 Produce a satisfactory finished facility for no more money and in no more time than is required for the existing ground conditions.

More information

Australasian Society for Trenchless Technology Standard for Microtunnelling & Pipe Jacking

Australasian Society for Trenchless Technology Standard for Microtunnelling & Pipe Jacking Australasian Society for Trenchless Technology Standard for Microtunnelling & Pipe Jacking - 2 Minor changes JP JP JP JP 1 June 2015 1 General Revisions JC MI NH JP 03 Feb 2010 0 Issued for Use Client

More information

4.5 GEOTECHNICAL, SUBSURFACE, AND SEISMIC HAZARDS

4.5 GEOTECHNICAL, SUBSURFACE, AND SEISMIC HAZARDS 4.5 GEOTECHNICAL, SUBSURFACE, AND SEISMIC HAZARDS This section discusses the geology, soils, seismicity, hazardous materials, and subsurface obstructions along Flower Street, and evaluates their potential

More information

SPECIFICATION : BORING AND JACKING

SPECIFICATION : BORING AND JACKING SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in

More information

Tunnels. Introduction in Shield tunnelling Pipe jacking & tunnelling Slurry & hydroshield Slurry versus EPB Principles of support pressure

Tunnels. Introduction in Shield tunnelling Pipe jacking & tunnelling Slurry & hydroshield Slurry versus EPB Principles of support pressure Tunnels content of the lecture 1st Hour Tunnels Immersed tunnels Comparison Bored Tunnels (short) Land tunnels 2nd Hour Introduction in Shield tunnelling Pipe jacking & tunnelling Slurry & hydroshield

More information

herrenknecht FORMWORK utility tunnelling Traffic tunnelling Herrenknecht Formwork:

herrenknecht FORMWORK utility tunnelling Traffic tunnelling Herrenknecht Formwork: herrenknecht FORMWORK utility tunnelling Traffic tunnelling Herrenknecht Formwork: ALL AROUND THE PRODUCTION OF HIGH-PRECISION SEGMENTS. Formwork systems from Herrenknecht Formwork are used on tunnel jobsites

More information

Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective

Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective Purdue Geotechnical Society Workshop Digging Deep April 8, 2011 Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective David Chapman, P.E. Lachel & Associates, Inc. Morristown, NJ Hudson

More information

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission

More information

SECTION UTILITY HORIZONTAL DIRECTIONAL DRILLING (HDD)

SECTION UTILITY HORIZONTAL DIRECTIONAL DRILLING (HDD) SECTION 33 05 07.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING (HDD) PART 1 GENERAL 1.1 SCOPE A. Scope: 1. Design, furnish and install the proposed piping alignment by horizontal directional drilling (HDD)

More information

PUMPING STATION CONSOLIDATION AND TRENCHLESS INSTALLATION CASE STUDY

PUMPING STATION CONSOLIDATION AND TRENCHLESS INSTALLATION CASE STUDY PUMPING STATION CONSOLIDATION AND TRENCHLESS INSTALLATION CASE STUDY New River Street Pump Station - Bridgeport CT May 1, 2017 NEWEA Sustainability and Collection Systems Conference Tim McDonald, PE NEW

More information

HORIZONTAL DIRECTIONAL DRILLING: NEW ERA FOR UNDERGROUND UTILITIES

HORIZONTAL DIRECTIONAL DRILLING: NEW ERA FOR UNDERGROUND UTILITIES HORIZONTAL DIRECTIONAL DRILLING: NEW ERA FOR UNDERGROUND UTILITIES Siddharth J. Jariwala 1, Prof. Jayeshkumar Pitroda 2, Prof. J. J. Bhavsar 3 1 P. G. Student (C.E & M), B.V.M Engineering College, Vallabh

More information

DIFFICULT GROUND SOLUTIONS:

DIFFICULT GROUND SOLUTIONS: Tunnelling April/May 2016 www.tunnellingjournal.com journal The international journal for the tunnelling industry SEE PAGE 6 SEE PAGE 12 SEE PAGE 27 WORLD NEWS MONITOR PROGRESS CUTTER CARE HIGHLIGHTS FROM

More information

2016 International Petroleum Environmental Conference HORIZONTAL DIRECTIONAL DRILLING AND WELL INSTALLATION AT SMALL SITES

2016 International Petroleum Environmental Conference HORIZONTAL DIRECTIONAL DRILLING AND WELL INSTALLATION AT SMALL SITES 2016 International Petroleum Environmental Conference HORIZONTAL DIRECTIONAL DRILLING AND WELL INSTALLATION AT SMALL SITES History of Horizontal Environmental Wells Horizontal/Directional Oil Wells in

More information

Horizontal Directional Drilling

Horizontal Directional Drilling Horizontal Directional Drilling Horizontal Directional Drilling Why HDD Surface is neither broken nor damaged Restoration and repair are not required No public hazard or traffic disturbance Low social

More information

The Pilot Pipe method is a very simple method for trenchless installation of supply lines. It is done in several steps:

The Pilot Pipe method is a very simple method for trenchless installation of supply lines. It is done in several steps: Guided Auger Boring in South America Dr. Gregor Nieder, Director of Bohrtec Gesellschaft GmbH Juan Carlos Moreno Sales Manager Latin America Herrenknecht AG Introduction Bohrtec is a worldwide known manufacturer

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL Submission for Hulme Prize 2017 LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL F. Saffiyah BADURDEEN 1, G. T. SENTHILNATH 2, 1 Ed. Zublin AG Singapore 2 Geoconsult Asia Singapore

More information

Moncton Watermain Relocation Moncton, New Brunswick. TRS 2010 Dr Mark Knight University of Waterloo

Moncton Watermain Relocation Moncton, New Brunswick. TRS 2010 Dr Mark Knight University of Waterloo Moncton Watermain Relocation Moncton, New Brunswick TRS 2010 Dr Mark Knight University of Waterloo Presentation Outline Overview of the project Design and construction Issues Trenchless construction Lessons

More information

Presented by: Frank Guyamier

Presented by: Frank Guyamier FTBA Orlando Tuesday, March 20, 2012 Presented by: Frank Guyamier Project Engineer P3 PROJECT PARTNERS Public Sponsors 90% Equity Partner Design/Build Contractor 10% Equity Partner VMS Operator Federal

More information

Technology. Trenchless. Planning, Equipment, and Methods. Mohammad Najafi. Mc Gravu Hill

Technology. Trenchless. Planning, Equipment, and Methods. Mohammad Najafi. Mc Gravu Hill Trenchless Technology Planning, Equipment, and Methods Mohammad Najafi Mc Gravu Hill New York Chicago San Francisco Lisbon London Madrid Mexico City Milan New Delhi San Juan Seoul Singapore Sydney Toronto

More information

Nowadays, horizontal directional drilling rigs are. Complex crossings made easy

Nowadays, horizontal directional drilling rigs are. Complex crossings made easy Dr. Hans Joachim Bayer, TRACTO TECHNIK GmbH & Co. KG, Germany, discusses the benefits of horizontal directional drilling, in particular the use of mega rigs. Complex crossings made easy Nowadays, horizontal

More information

Total Automatic Excavation System for TBMs Takayoshi Nakayama, Satoshi Inoue, Yasuhide Seno Kansai Branch, Okumura Corporation ABSTRACT

Total Automatic Excavation System for TBMs Takayoshi Nakayama, Satoshi Inoue, Yasuhide Seno Kansai Branch, Okumura Corporation ABSTRACT Total Automatic Excavation System for TBMs Takayoshi Nakayama, Satoshi Inoue, Yasuhide Seno Kansai Branch, Okumura Corporation ABSTRACT A fuzzy logic excavation system for tunnel boring machines, which

More information

Long-Term Relations Between Joint Venture Partners A Supplier s Perspective.

Long-Term Relations Between Joint Venture Partners A Supplier s Perspective. Long-Term Relations Between Joint Venture Partners A Supplier s Perspective. Dipl.-Ing. (FH) Gebhard Lehmann, Vice Chairman of the Board of Management, Herrenknecht AG Rotterdam, 2015-10-09 Herrenknecht

More information

What do you mean we can t do HDD?

What do you mean we can t do HDD? Clark Public Utilities Salmon Creek Crossing What do you mean we can t do HDD? Presented by Matt Hickey, PE Murray, Smith & Associates, Inc. and Russ Knutson, PE Clark Public Utilities Project Team Clark

More information

THE TRENCHLESS TREND. Traditionally, pipeline shore crossings have integrated the by shallow waters, which are typically subject

THE TRENCHLESS TREND. Traditionally, pipeline shore crossings have integrated the by shallow waters, which are typically subject 56 THE TRENCHLESS TREND Pipeline shore crossings are often one of the most Costs and risks involved will change with every site, and every complex and technically challenging elements of any project. subsea

More information

Concrete Pipe Jacking

Concrete Pipe Jacking Concrete Pipe Jacking Technical Brief CPAA Introduction Concrete pipe jacking is a method of installing pipelines without disrupting existing surface facilities or activities. Pipe jacking has been used

More information

8Re: Northern Access 2016 Project. Ischua Creek Crossing (MP 62.4) Analysis of Feasibility and Risks of Direct Pipe Installation

8Re: Northern Access 2016 Project. Ischua Creek Crossing (MP 62.4) Analysis of Feasibility and Risks of Direct Pipe Installation 8Re: Northern Access 2016 Project Ischua Creek Crossing (MP 62.4) Analysis of Feasibility and Risks of Direct Pipe Installation Dear Mr. Horey and Mr. Hoover, Mr. Bradden Horey Mr. Brent Hoover P.E. Project

More information

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig Roger E. Renner, MGWC MUD ROTARY TECHNIQUES Presenter: Roger E. Renner Master Groundwater Contractor President of E.H. RENNER & SONS, INC. Past President of NGWA 2001 Past President of Minnesota Water

More information

MTR Shatin to Central Link Contract 1103 Hin Keng to Diamond Hill Tunnels Hong Kong, China

MTR Shatin to Central Link Contract 1103 Hin Keng to Diamond Hill Tunnels Hong Kong, China MTR Shatin to Central Link Contract 1103 Hin Keng to Diamond Hill Tunnels Hong Kong, China Project Director, VINCI Construction Grands Projets Shatin to Central Link Phases 1 & 2 SCL 1103 Shatin to Central

More information

H. Underground Transmission System Design

H. Underground Transmission System Design H. Underground Transmission System Design In addition to analyzing potential routes, the Company considered several different design technologies for the proposed underground transmission supply lines,

More information

Design Data 4. Jacking Concrete Pipe

Design Data 4. Jacking Concrete Pipe Design Data 4 Jacking Concrete Pipe FOREWORD Jacking or tunneling concrete pipe is an increasingly important construction method for installing concrete pipelines without interrupting commerce, or disturbing

More information