NOTICE OF A PUBLIC PARTICIPATION PROCESS FOR AN ENVIRONMENTAL IMPACT ASSESSMENT DEA&DP Ref.: 16/3/3/6/7/1/F4/6/3072/16
|
|
- Marsha Pitts
- 5 years ago
- Views:
Transcription
1 NOTICE OF A PUBLIC PARTICIPATION PROCESS FOR AN ENVIRONMENTAL IMPACT ASSESSMENT DEA&DP Ref.: 16/3/3/6/7/1/F4/6/3072/16 Notice is hereby given of a public participation process in terms of Environmental Impact Assessment (EIA) regulations as promulgated in the National Environmental Management Act, 1998 (Act no 107 of 1998 NEMA) with reference to the listed activities identified in terms of NEMA Government Notice No. 983 and 985; Government Gazette No of 4 December LISTED ACTIVITIES: Listing Notice 1 (R983): (9) The development of infrastructure exceeding 1000 metres in length for the bulk transportation of water or storm water (i) with an internal diameter of 0.36 metres or more; or (ii) with a peak throughout of 120 litres per second or more (10) The development and related operation of infrastructure exceeding 1000 metres in length for the bulk transportation of sewage, effluent, process water, waste water, return water, industrial discharge or slimes (i) with an internal diameter of 0.36 metres or more; or (ii) with a peak throughout of 120 litres per second or more (15) The development of structures in the coastal public properties where the development footprint is bigger than 50 square metres (17) Development (v) if no development setback exists, within a distance of 100 metres inland of the high water mark of the sea or estuary, whichever is greatest in respect of (e) buildings of 50 square metres or more or (f) infrastructure with a development footprint of 50 square metres or more (19 ) The infilling or depositing of any material of more than 5 cubic metres into, or the dredging, excavation, removal or moving of soil, sand, shells, shell grit, pebbles, rock of more than 5 cubic metres from (iii) the littoral active zone, an estuary or a distance of 100 metres inland of the high waters mark of the sea or an estuary, whichever distance is the greater (34) The expansion or changes to existing facilities for any process or activity where such expansion or changes will result in the need for a permit or licence or an amended permit or licence in terms of national or provincial legislation governing the release of emissions or pollution (41) The expansion and related operation of facilities, infrastructure or structures for aquaculture of (ii) molluscs and echinoderms where the annual production output of such a facility, infrastructure or structures will be increased by kg (wet weight) or more (45) The expansion of infrastructure for the bulk transportation of water or storm water where the existing infrastructure (i) has an internal diameter of 0.36 metres or more; or (ii) has a peak throughput of 120 litres per second or more and (a) where the facility or infrastructure is expanded by more than 1000 metres in length or (b) where the throughput capacity of the facility or infrastructure will be increased by 10 % more (52) The expansion of structures in the coastal public property where the development footprint will be increased by more than 50 square metres (54) The expansion of facilities (v) if no development setback exists, within a distance of 100 metres inland of the high water mark of the sea or an estuary, whichever is greater in respect of (e) buildings where the building is expanded by 50 square metres or more or (f) infrastructure where the development footprint is expanded by 50 square metres or more
2 (67) Phased activities for all activities (i) listed in this notice, which commenced on or after the effective date of this notice or (ii) similarly listed in any of the previous NEMA notices, which commenced on or after the effective date of such previous NEMA notices Listing Notice 3 (R985): (12) The clearance of an area of 300 square metres or more of indigenous vegetation (a) in the Western Cape (iii) within the littoral active zone or 100 metres inland from the high water mark of the sea or an estuarine functional zone whichever distance is greater, excluding where such removal will occur behind the development setback line on erven in urban areas (24) The expansion and related operation of facilities of any size for any form of aquaculture (d) in Western Cape (iii) in Aquatic critical biodiversity areas Activity: Expansion of existing abalone farm, including upgrading or installation of new water pipelines Location: Farm 18/108, Farm 108/110, Farm 110, pipeline servitude, Jacobsbaai Name of Proponent: Jacobs Baai Sea Products Pty Ltd Consultant for more information: PHS CONSULTING PO Box 1752, Hermanus, 7200 Fax: mn@phsconsulting.co.za A Draft Basic Assessment Report (BAR) will be available on our website Interested and/or affected parties are welcome to lodge any comments, queries or issues to PHS CONSULTING on or before 13 th June 2016 via the above mentioned contact details.
3 NOTICE OF A PUBLIC PARTICIPATION PROCESS FOR AMENDMENT AND / OR GENERAL AUTHORISATION OF COASTAL WATERS DISCHARGE PERMIT (CWDP) IN TERMS OF SECTION 69 OF THE INTEGRATED COASTAL MANAGEMENT (ICM ACT), (ACT NO. 24 OF 2008) Applicant: JACOBSBAAI SEA PRODUCTS (PTY) LTD, Farm 18/108 Jacobsbaai Permit Ref. Number: 2012/009/WC/JACOBSBAAI SEA PRODUCTS WC Government EA&DP EIA Ref Number: 16/3/3/6/7/1/F4/6/3072/16 Description of Activity and Location: The discharge of approx. 700 litres per second of abalone farm effluent, into the sea, at the coastal surfzone section in close proximity to the abalone farm, coordinates S, E, currently takes place. The farm effluent is seawater which has passed through abalone tanks and thus contains some levels of dissolved and undissolved nutrients. This discharge is not a new activity and has been in place since The expansion of the abalone farm is proposed, along with a new effluent channel (Preferred Alternative 2) and therefore a new discharge point will be applicable. You are hereby notified that an amendment and / or General authorisation may be required for the existing CWDP should the preferred alternative, Alternative 2, for the proposed expansion of the abalone farm, be authorised by the Western Cape Government Environmental Affairs and Development Planning. The new discharge point will be located at approximately S; E. Consultant for more information: PHS CONSULTING PO Box 1752, Hermanus, 7200 Fax: mn@phsconsulting.co.za A Draft Basic Assessment Report (BAR) and the existing CWDP will be available on our website Interested and/or affected parties are welcome to lodge any comments, queries or issues to PHS CONSULTING on or before 13 th June 2016 via the above mentioned contact details.
4 From: Sent: To: Subject: Attachments: Thursday, 12 May :16 AM Notice of Public Participation for the proposed expansion of existing abalone farm, Jacobsbaai Notice of EIA DRAFT JSP.pdf; JSP BAR draft.pdf; Notice of CWDP.pdf; APP B1 SDP FINAL.pdf Michelle Pretorius DAFF Nitasha Pillay DEA Oceans and Coasts Mulalo Tshikotshi DEA Oceans and Coasts Tandiwe Njajula DEA (CWDP Case officer) Zayed Brown WC Gov EA&DP: Pollution Management Dear All, please see attached notice of public participation, as well as Draft Basic Assessment Report and Site plan. Please let me know if you need any further information. Kind regards, Environmental Consultant Sub-Contracted to PHS Consulting C:
5 From: Sent: To: Subject: Attachments: Thursday, 12 May :56 AM Notice of Public Participation for the proposed expansion of existing abalone farm, Jacobsbaai Notice of EIA DRAFT JSP.pdf; JSP BAR draft.pdf; Notice of CWDP.pdf; APP B1 SDP FINAL.pdf Jacobsbaai Ratepayers Assoc. M. Gregory R. Frith H. Lazarus R. Hart E. Cloete G. Hugo A. Ellmann West Coast Aboriginal Council Dear All, please see attached notice of public participation, as well as Draft Basic Assessment Report and Site plan. Please let me know if you need any further information. Kind regards, Environmental Consultant Sub-Contracted to PHS Consulting C:
6
4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION
4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION This section provides an overview of legislation, guidelines and information documents that have informed the scope and content of this report and the approach
More informationBACKGROUND INFORMATION DOCUMENT FOR A PROPOSED SEWER IN GROOT DRAKENSTEIN, WESTERN CAPE
Purpose of this Document The purpose of this Background Information Document (BID) is to provide Interested and Affected Parties (I&APs) with background information about the proposed project and to introduce
More informationPostal Private Bag X6546, GEORGE, 6530 Physical Fourth Floor York Park Building, York Street, GEORGE, Website
SCIENTIFIC SERVICES Postal Private Bag X6546, GEORGE, 6530 Physical Fourth Floor York Park Building, York Street, GEORGE, 6530 Website Enquiries www.capenature.co.za Clyde Lamberts Telephone +27 44 802
More informationNEM:WA (81) Transitional provisions in respect of permits issued in terms of Environment Conservation Act
Addendum IV: Legal considerations for the construction and operation of a constructed wetland NEM:WA (81) Transitional provisions in respect of permits issued in terms of Environment Conservation Act (1)
More informationBACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE
BACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE 1. INTRODUCTION The Saldanha Bay Industrial Development Zone (IDZ) is located
More information4 APPROACH TO EIA PROCESS AND PUBLIC PARTICIPATION LEGISLATION AND GUIDELINES PERTINENT TO THIS EIA National Legislation 4-5
4 APPROACH TO EIA PROCESS AND PUBLIC PARTICIPATION 4-1 4.1 LEGAL CONTEXT FOR THIS EIA 4-1 4.2 LEGISLATION AND GUIDELINES PERTINENT TO THIS EIA 4-5 4.2.1 National Legislation 4-5 4.3 PRINCIPLES FOR SCOPING
More informationENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA
ENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA BACKGROUND INFORMATION DOCUMENT SRK Project 364470/42G June 2007
More informationterms of sections 24(2), 24(5), 24D and 44, read with section 47A(1)(b) of the
325 National Environmental Management Act (107/1998): Amendment of the Environmental Impact Assessment Regulations Listing Notice 2 of 2014 40772 194 No. 40772 GOVERNMENT GAZETTE, 7 APRIL 2017 DEPARTMENT
More informationEIA Listed activities & Time Lines
EIA Listed activities & Time Lines UPDATED: JANUARY 2015 Background In terms of the Bill of Rights, included in the Constitution of the Republic of South Africa of 1996, everyone has the right to have
More informationCHAPTER 4: APPROACH TO EIA, LEGISLATION AND PUBLIC CONSULTATION 4-1
CHAPTER 4: APPROACH TO EIA, LEGISLATION AND PUBLIC CONSULTATION 4-1 4.1. OVERVIEW OF APPROACH TO PREPARING THE FINAL EIA REPORT AND EMPR 4-2 4.2. LEGISLATION, EIA GUIDELINES AND INTERNATIONAL CONVENTIONS
More informationCape Environmental Assessment Practitioners(Pty) Ltd
Cape Environmental Assessment Practitioners(Pty) Ltd Reg. No. 2008/004627/07 Telephone: (044) 874 0365 Facsimile: (044) 874 0432 17 Progress Street, George Web: www.cape-eaprac.co.za PO Box 2070, George,
More informationPROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL BACKGROUND INFORMATION DOCUMENT April 2014 (2 nd Edition) Project developer: South Africa Mainstream
More informationFigure 4. The proposed location of the Zalu Dam a) basin and b) wall.
A B Figure 4. The proposed location of the Zalu Dam a) basin and b) wall. Figure 5. Detailed layout of the proposed Zalu Dam (Source: Feasibility Study for the Augmentation of the Lusikisiki Regional Water
More informationFULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Agricultural Expansion on Portion 2 of Farm 92, Tregaron, known as Sylvania, Sundays River Valley Municipality BACKGROUND INFORMATION DOCUMENT,
More informationProposed Wolseley Wind Energy Facility: Motivation for Amendment of Environmental Authorisation
SAGIT Energy Ventures (Pty) Ltd The Oval, Newlands P.O. Box 44721, Claremont Western Cape, South Africa Proposed Wolseley Wind Energy Facility: Motivation for Amendment of Environmental Authorisation Submitted
More informationBASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION
BASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION DEDEA Ref: EC04/C/LN1/M/53-2014 BACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT: Return address for comments:
More informationBACKGROUND INFORMATION DOCUMENT SEPTEMBER 2014 MDEDET REF NUMBER: 17/2/3N-389
ENVIRONMENTAL AUTHORISATION PROCESS AND APPLICATION FOR REQUIRED LICENCES FOR THE PHOLA COAL PROCESSING PLANT, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE BACKGROUND INFORMATION DOCUMENT SEPTEMBER
More informationProposed Wolseley Wind Energy Facility: Motivation for Amendment of Environmental Authorisation
SAGIT Energy Ventures (Pty) Ltd The Oval, Newlands P.O. Box 44721, Claremont Western Cape, South Africa Proposed Wolseley Wind Energy Facility: Motivation for Amendment of Environmental Authorisation Submitted
More informationPROJECT NATURE LOCATION
APPLICATION FOR RECTIFICATION IN TERMS OF SECTION 24G OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT (ACT NO. 107 OF 1998) FOR THE UNLAWFUL COMMENCEMENT OF VARIOUS LISTED ACTIVITIES FOR THE UNDERGROUND COAL
More informationBOLAND ENVIRONMENTAL CONSULTANTS CC
BOLAND ENVIRONMENTAL CONSULTANTS CC y ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Proposed Photo-Voltaic Solar Power Plant On Farm Nuwerus, No. 450 Portion 6, Worcester DEA REF. NO: 12/12/20/2019 BACKGROUND
More informationINTRODUCTION PROJECT DESCRIPTION
JOE GQABI DISTRICT MUNICIPALITY DROUGHT RELIEF PROGRAMME PROPOSED LADY GREY BULK WATER SUPPLY PROJECTS, LADY GREY, SENQU MUNICIPALITY, EASTERN CAPE EIA BACKGROUND INFORMATION DOCUMENT INTRODUCTION Joe
More informationENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED REVERSE OSMOSIS PLANT AT HENDRINA POWER STATION, MPUMALANGA EXECUTIVE SUMMARY: FINAL BASIC ASSESSMENT REPORT
1 ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED REVERSE OSMOSIS PLANT AT HENDRINA POWER STATION, MPUMALANGA DEA REF. NO. 12/12/20/2273 AUGUST 2011 EXECUTIVE SUMMARY: FINAL BASIC ASSESSMENT REPORT Eskom Holdings
More informationBACK GROUND INFORMATION DOCUMENT
PROJECT: Basic Environmental Assessment for the Replacement of a Causeway Crossing of the Klaserie River, Klaserie Game Reserve BACK GROUND INFORMATION DOCUMENT CONSULTANT: P.O. Box 507 White River 1240
More informationPROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE
PROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE Background Information Document DEDEA Ref No s: EC 155/ORT/LN1&LN2/M/13 34 EC 157/ORT/LN1&LN3/M/13
More informationTo license or not to license? Listed or Unlisted? Presented by: Stuart Gower-Jackson
To license or not to license? Listed or Unlisted? Presented by: Stuart Gower-Jackson Order of proceedings 1. Classification of activities and an easy explanation on how to determine which activities qualify
More informationDEA Reference Number: To be announced
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR THE PROPOSED DEVELOPMENT AND INCLUSION OF THE METAL CONCENTRATORS (METCON) REFINERY FACILITY IN THE JEWELLERY MANUFACTURING PRECINT (JMP) WITHIN THE OR TAMBO INTERNATIONAL
More informationAPPENDIX 3.6 MINUTES OF STAKEHOLDER MEETINGS
APPENDIX 3.6 MINUTES OF STAKEHOLDER MEETINGS I&J Focus Group Meeting: 12 January 2018 IRVIN AND JOHNSON LTD NOTES OF FOCUS GROUP MEETING Date 12 January 2018 Venue: Project: Environmental Consultants:
More informationBACK GROUND INFORMATION DOCUMENT
PROJECT: Basic Environmental Assessment for the Construction of a lodge and additional staff accommodation, Lion Sands, Sabi Sand Game Reserve BACK GROUND INFORMATION DOCUMENT CONSULTANT: EMROSS Consulting
More informationFreshwater Consulting cc Unit 23, Imhoff Farm Kommetjie Road Kommetjie 7975
Freshwater Consulting cc Unit 23, Imhoff Farm Kommetjie Road Kommetjie 7975 Cell: 072 377 7006 E-mail: dean.ollis@gmail.com 22 June 2018 Chantel Muller Sillito Environmental Consulting By email: chantel@environmentalconsultants.co.za
More informationBACKGROUND INFORMATION DOCUMENT
BACKGROUND INFORMATION DOCUMENT ENVIRONMENTAL AUTHORISATIONS FOR THE PROPOSED KLIPSPRUIT EXTENSION: WELTEVREDEN PROJECT Project Number Prepared for BHP Billiton Energy Coal South Africa (Pty) Limited (BECSA)
More informationDRAFT SCOPING REPORT
DRAFT SCOPING REPORT DIEPSLOOT MIXED USE TOWNSHIP THE REMAINING EXTENT OF PORTIONS 1 AND 6 OF THE FARM DIEPSLOOT 388 JR CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY Prepared for: NOVEMBER 2015 TABLE
More informationEXECUTIVE SUMMARY 1. INTRODUCTION
I 1. INTRODUCTION EXECUTIVE SUMMARY Mulilo Renewable Energy (Pty) Ltd (later referred to as Mulilo) has identified two alternative sites for the establishment of a 10MW photovoltaic (PV) power generation
More informationTongaat WWTW Water Use Licence Application. Draft Report Meeting 1 October 2015
Tongaat WWTW Water Use Licence Application Draft Report Meeting 1 October 2015 Agenda Welcome and purpose Public Participation Process Introduction ethekwini W&S Tongaat Waste Water Treatment Works A Water
More informationProposed Langhoogte Wind Energy Facility: Motivation for Amendment of Environmental Authorisation
SAGIT Energy Ventures (Pty) Ltd The Oval, Newlands P.O. Box 44721, Claremont Western Cape, South Africa Proposed Langhoogte Wind Energy Facility: Motivation for Amendment of Environmental Authorisation
More informationPROPOSED CONSTRUCTION OF A SEWAGE TREATMENT PLANT AT CAPE POINT, TABLE MOUNTAIN NATIONAL PARK
PROPOSED CONSTRUCTION OF A SEWAGE TREATMENT PLANT AT CAPE POINT, TABLE MOUNTAIN NATIONAL PARK SCOPING REPORT EXECUTIVE SUMMARY 1 INTRODUCTION SANParks proposes, as a key element of a wider infrastructure
More informationAnnesley Andalusite Mine: Section 24G Rectification Process. Consultation with community members 15 June 2017
Annesley Andalusite Mine: Section 24G Rectification Process Consultation with community members 15 June 2017 AGENDA Welcome and introduction Meeting protocol Purpose of the meeting Project background Project
More informationEnvironmental Planning and Assessment Act 1979
New South Wales State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries) Amendment 2010 under the Environmental Planning and Assessment Act 1979 Her Excellency the Governor,
More information(24 July 2015 to date) NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT 59 OF 2008
(24 July 2015 to date) NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT 59 OF 2008 (Gazette No. 32000, Notice No. 278. Commencement date: 1 July 2009 save for sections 28(7)(a), sections 35 to 41 and section
More informationNATIONAL POLICY ON COASTAL EFFLUENT DISCHARGES FROM LAND-BASED SOURCES
i TABLE OF CONTENTS TABLE OF CONTENTS... ii EXECUTIVE SUMMARY... iv ACKNOWLEDGEMENTS...x LIST OF FIGURES... xi ACRONYMS... xii GLOSSARY OF TERMS... xiv SECTION 1:... 1 INTRODUCTION... 1 1.1 Historical
More informationBACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT
BACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT WASTE MANAGEMENT LICENCE APPLICATION FOR THE MANAGEMENT OF ALL WASTE STREAMS FOR THE OPEN PIT AND UNDERGROUND OPERATIONS AT VENETIA MINE, LIMPOPO
More informationENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE
ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE 1 MAY 2012 DEA REF. NO. 12/12/20/2501 NEAS REF. NO. DEAT/EIA/0000611/2011 EXECUTIVE
More informationTHE PROPOSED HOUSING DEVELOPMENT ON FARM UITKOMS NO. 463, PORTION 1, KURUMAN RD, KATHU, NORTHERN CAPE
THE PROPOSED HOUSING DEVELOPMENT ON FARM UITKOMS NO. 463, PORTION 1, KURUMAN RD, KATHU, NORTHERN CAPE DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY D:E&NC reference number: NC/EIA/09/JTG/GAM/KAT1/2014
More informationFINAL Basic Assessment Report:
CEN INTEGRATED ENVIRONMENTAL MANAGEMENT UNIT Environmental and Rural Development Specialist FINAL Basic Assessment Report: Proposed Upgrades to and Expansion of the Nelson Mandela University s Internal
More informationEXECUTIVE SUMMARY: SCOPING REPORT ENVIRONMENTAL IMPACT ASSESSMENT (EIA) PROCESS FOR VISSERSHOK NORTH LANDFILL WASTE MANAGEMENT LICENCE
EXECUTIVE SUMMARY: SCOPING REPORT ENVIRONMENTAL IMPACT ASSESSMENT (EIA) PROCESS FOR VISSERSHOK NORTH LANDFILL WASTE MANAGEMENT LICENCE SRK Project Number 508446 1 INTRODUCTION The City of Cape Town (CoCT)
More informationGOURITSMOND ABALONE FARM DRAFT BASIC ASSESSMENT REPORT (FOR COMMENT)
GOURITSMOND ABALONE FARM DRAFT BASIC ASSESSMENT REPORT (FOR COMMENT) PROPOSED ESTABLISHMENT OF AN ABALONE FARM TO BE LOCATED ON THE FARM LANGE FONTEYN 6/453, RIVERSDALE, WESTERN CAPE APPLICANT: AQUNION
More informationThe following comment in the Scoping report for the marine component is quoted out of context and/or misinterpreted: Appendix 2A page 12 of 37:
Namibian Marine Phosphate (Pty) Ltd Page 1 of 8 Comments and Response Trail All the comments made on the Marine Scoping Report, are presented in the table below, along with responses indicating where and
More informationProposed Sea-Based Aquaculture Development Zone in Saldanha Bay. TNPA Port of Saldanha Planning Workshop
Proposed Sea-Based Aquaculture Development Zone in Saldanha Bay TNPA Port of Saldanha Planning Workshop Introduction DAFF aims to develop and facilitate aquaculture in South Africa to supply food, create
More informationEnvironmental Affairs and Development Planning ("Department") taken in terms of section 22 of the ECA.
.. fill Western Cape Government Environmental Affairs and Development Planning MINISTRY OF LOCAL GOVERNMENT, ENVIRONMENTAL AFFAIRS AND DEVELOPMENT PLANNING M 3/6/5 Mr Andrew Stuart Rogers HPF Properties
More informationProposed Expansion of the existing Natal Solvent Recovery facility on ERF 7590, Pinetown (10 Clubhouse Place, Westmead) REF: 12/9/11/L44704/4
Proposed Expansion of the existing Natal Solvent Recovery facility on ERF 7590, Pinetown (10 Clubhouse Place, Westmead) REF: 12/9/11/L44704/4 NOTICE OF APPLICATION FOR WASTE MANAGEMENT LICENCE, SUBJECT
More informationBIOMASS POWER PLANT NEAR MKUZE, KWAZULU-NATAL
BIOMASS POWER PLANT NEAR MKUZE, KWAZULU-NATAL DEA ref: 14/12/16/3/3/1/619 MOTIVATION FOR AMENDMENT OF ENVIRONMENTAL AUTHORISATION March 2014 Prepared for: Navosync (Pty) Ltd Suite 103 Dixon Street, Cape
More informationNOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE.
ENVIRONMENTAL AUTHORISATION AMENDMENT APPLICATION NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE. BACKGROUND
More informationManagement Plan for the Koeberg Nature Reserve
Management Plan for the Koeberg Nature Reserve Western Cape South Africa Prepared by: Eskom Holdings SOC Limited Citation Koeberg Nature Reserve Management Plan. Revision 1, (November 2015), Koeberg Management
More information1 INTRODUCTION. Figure 1.1: Steve Tshwete Local Municipality
1 INTRODUCTION Hendrina Power Station is located at Pullenshope (near Hendrina) in the Mpumalanga Province and falls within the Steve Tshwete Local Municipality (Figure 1.1) which falls within the Nkangala
More informationThe aim of the public participation process undertaken as part of this Scoping phase is to:
SECTION 5: PUBLIC PARTICIPATION PROCESS 5.1 PUBLIC PARTICIPATION PROCESS Public participation is an integral aspect of any EIA process and should aim to meaningfully engage stakeholders at all levels throughout
More informationDRAFT SCOPING REPORT
PROPOSED DE KEUR DAM AND CULTIVATED LANDS (ON REMAINDER OF FARM LEEURIVIER 406 AND PORTION 3 OF FARM LANGLEEGTE 114, KOUE BOKKEVELD) DRAFT SCOPING REPORT In terms of EIA Regulations 2014, as amended, and
More informationDEPARTMENT OF ENVIRONMENTAL AFFAIRS. No November 2013 NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT, 2008 (ACT NO.
STAATSKOERANT, 29 NOVEMBER 2013 No. 37083 3 GOVERNMENT NOTICE DEPARTMENT OF ENVIRONMENTAL AFFAIRS No. 921 29 November 2013 NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT, 2008 (ACT NO. 59 OF 2008) LIST OF
More informationSandveld Environmental Management Framework: Overview & Lessons Learned Genevieve Pence & Paul Hardcastle
Sandveld Environmental Management Framework: Overview & Lessons Learned Genevieve Pence & Paul Hardcastle Biodiversity Planning Forum Wilderness, 7-10 June 2016 Background & Need for EMF Issues raised
More informationCOMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM STORAGE FACILITY AND A PETROLEUM PIPELINE
Licence Number: PPL.sf.p.F1/164/2013 COMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM STORAGE FACILITY AND A PETROLEUM PIPELINE This licence is issued by the National Energy Regulator, hereinafter
More informationStrategic Environmental Assessments (SEAs) for large scale infrastructure projects
Strategic Environmental Assessments (SEAs) for large scale infrastructure projects 1 Presented by: Lydia Cape (Pr. Sci. Nat. Environmental Sciences) Council for Scientific and Industrial Research, South
More informationCEFANI MOUTH HOLIDAY RESORT EXPANSION CHINTSA BACKGROUND INFORMATION DOCUMENT DEDEAT Ref: EC/12/A/LN1/M/13 03 INTRODUCTION
CEFANI MOUTH HOLIDAY RESORT EXPANSION CHINTSA BACKGROUND INFORMATION DOCUMENT DEDEAT Ref: EC/12/A/LN1/M/13 03 INTRODUCTION Indwe Environmental Consulting has been appointed as an independent Environmental
More informationIAIAsa August 2014 Betty Mdala Department of Environmental Affairs
D R A F T S TA N D A R D F O R T H E S T O R A G E O R S T O R A G E A N D H A N D L I N G O F D A N G E R O U S G O O D S A N D I D E N T I F I C AT I O N O F A C T I V I T I E S W H I C H M AY C O M
More informationPROPOSED VOLSPRUIT MINE, MOKOPANE DISTRICT, LIMPOPO PROVINCE. Background Information Document (BID) ESCIENCE ASSOCIATES (PTY) LTD.
ENVIRONMENTAL IMPACT ASSESSMENT (EIA), MINING RIGHT APPLICATION AND OTHER ANCILLARY LICENSING PROCESSES: PROPOSED PLATINUM GROUP METALS MINE & ASSOCIATED INFRASTRUCTURE PROPOSED VOLSPRUIT MINE, MOKOPANE
More informationNMBM Seaview Low Income Housing Development Final Scoping Report
NMBM Seaview Low Income Housing Development Final Scoping Report Report Prepared for Nelson Mandela Bay Municipality Report Number 373512/4 DEDEAT Reference Number: ECm1/C/LN2/M/01-2014 Report Prepared
More informationTHE INTEGRATED COASTAL MANAGEMENT BILL A brief guide to assist the public participation process
THE INTEGRATED COASTAL MANAGEMENT BILL A brief guide to assist the public participation process environment & tourism Department: Environmental Affairs and Tourism REPUBLIC OF SOUTH AFRICA INTRODUCTION
More informationCape Environmental Assessment Practitioners (Pty) Ltd
Cape Environmental Assessment Practitioners (Pty) Ltd Reg. No. 2008/004627/07 Telephone: (044) 874 0365 1 st Floor Eagles View Building Facsimile: (044) 874 0432 5 Progress Street, George Web: www.cape-eaprac.co.za
More informationTHE PROPOSED UPGRADING AND CONSTRUCTION OF MOUNT AYLIFF GRAVEL ACCESS ROADS AND CONCRETE CAUSEWAYS
UMZIMVUBU LOCAL MUNICIPALITY THE PROPOSED UPGRADING AND CONSTRUCTION OF MOUNT AYLIFF GRAVEL ACCESS ROADS AND CONCRETE CAUSEWAYS DRAFT BASIC ASSESSMENT REPORT AUGUST 2017 Prepared for Prepared by Umzimvubu
More informationNOTICE OF INTENT. 2. This notification should be submitted not less than 14 days prior to initiating the basic assessment process.
Notice of intent to submit an application in terms of regulation 22 (b) of Government Notice No. R 385 in terms of Chapter 5 of the National Environmental Management Act, 1998 (Act 107 of 1998). July 2006
More informationENVIRONMENTAL SCOPING REPORT
MAR Tanganani X 7 high density Residential Scoping Report 2015 ENVIRONMENTAL SCOPING REPORT FOR THE PROPOSED HIGH DENSITY RESIDENTIAL TOWNSHIP TANGANANI EXTENSION 7, TO BE LOCATED ON A PART OF PORTION
More informationENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA DEA Reference Number: 12/12/20/2175 BACKGROUND INFORMATION
More informationESKOM HOLDINGS SOC LIMITED: WATER USE LICENCE APPLICATION AT THE MEDUPI AND MATIMBA POWER STATIONS, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE
11 May 2018 1791642 Interested and Affected Parties ESKOM HOLDINGS SOC LIMITED: WATER USE LICENCE APPLICATION AT THE MEDUPI AND MATIMBA POWER STATIONS, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE Dear
More informationTECHNOBURN (Pty) Ltd DRAFT SCOPING REPORT
TECHNOBURN (Pty) Ltd DRAFT SCOPING REPORT WASTE LICENCE APPLICATION, AIR EMISSIONS LICENSE APPLICATION AND SECTION 24G RECTIFICATION APPLICATION FOR A USED OIL RECYCLING FACILITY ON ERF 104904, MYMONA
More informationIMPORTANT NOTICE. Kindly note that:
1 APPLICATION FORM FOR ENVIRONMENTAL AUTHORISATIONS IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998 AND THE NATIONAL ENVIRONMENTAL MANAGEMENT WASTE ACT, 2008 IN RESPECT OF LISTED ACTIVITIES
More informationSEA FOR STRATEGIC GRID PLANNING IN SOUTH AFRICA: Enabling the efficient and effective roll out of strategic electricity transmission infrastructure
SEA FOR STRATEGIC GRID PLANNING IN SOUTH AFRICA: Enabling the efficient and effective roll out of strategic electricity transmission infrastructure Abstract ID: 409 Authors: Marshall Mabin (1), Paul Lochner
More informationINSTALLATION OF A SOLAR PHOTOVOLTAIC POWER PLANT AT ESKOM S DUVHA POWER STATION: ENVIRONMENTAL IMPACT ASSESSMENT
INSTALLATION OF A SOLAR PHOTOVOLTAIC POWER PLANT AT ESKOM S DUVHA POWER STATION: ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT REPORT APPENDIX B6: ISSUES AND RESPONSES REPORT VERSION 3 November
More informationDESCRIPTION OF PROPOSED
1 224 Kies Avenue, Reservoir Hills, Durban, 4091 Tel: +27(0)31 262 3171 Fax: +27(0)31 262 2279 Mobile: 082-875 3710 Email: enaq@vodamail.co.za - Environmental, Civil, Water & Earth Consultants PROPOSED
More informationAPPENDIX F. ENVIRONMENTAL MANAGEMENT PROGRAMME (EMPr)
APPENDIX F ENVIRONMENTAL MANAGEMENT PROGRAMME (EMPr) ENVIRONMENTAL MANAGEMENT PROGRAMME (EMPr) FOR THE PROPOSED UPGRADE AND EXPANSION OF THE EXISTING LIFEGUARD FACILITY AT UMHLANGA ROCKS, KWAZULU-NATAL.
More informationCOMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM PIPELINE AND A STORAGE FACILITY.
Licence Number: PPL.sf.p.F1/225/2015 COMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM PIPELINE AND A STORAGE FACILITY. This licence is issued by the National Energy Regulator, hereinafter referred
More informationBackground Information Document
Background Information Document Independent Power Producer Programme: EIA for a Floating Power Plant and EIA for LNG Import Facilities, Port of Saldanha: ERM Ref Number: 0320754 Purpose of this Background
More information3 PROPOSED MINING OPERATION
Page 3-1 3 PROPOSED MINING OPERATION OVERVIEW AND INTRODUCTION The main aim of the project is to establish an underground coal mine at the Commissiekraal project site. In broad terms the project includes
More informationDraft Basic Assessment Report for the Proposed Raslouw x 15 Sewer Pipeline
Draft Basic Assessment Report for the Proposed Raslouw x 15 Sewer Pipeline Reference No: Gaut: 002/13-14/E0287 September 2014 BOKAMOSO LANDSCAPE ARCHITECTS & ENVIRONMENTALCONSULTANTS P.O. BOX 11375 MAROELANA
More informationFINAL SCOPING REPORT
FINAL SCOPING REPORT The proposed Pearly Beach Waste Water Treatment Facility Prepared for: Arcus GIBB (Pty) Ltd. 14 Kloof Street Cape Town 8001 Submitted to: Department of Environmental Affairs Fedsure
More informationDevelopment Assessment Guidelines
This guide will be useful to landowners and prospec ve landowners whose land contains natural vegeta on or is included in the Durban Metropolitan Open Space System (D MOSS) Development Assessment Guidelines
More informationSCHEDULE. FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE
SCHEDULE FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE This form must be completed in triplicate for any proposed activity
More informationBASIC ASSESSMENT PROCESS
BASIC ASSESSMENT PROCESS DRAFT BASIC ASSESSMENT REPORT PROPOSED INGWAZI TRADING (PTY) LTD CHICKEN BROILER FACILITY, 74 DAHLIA ROAD, WELGEDACHT A.H. SPRINGS, GAUTENG. DRAFT BASIC ASSESSMENT REPORT April
More informationRIVER MANAGEMENT PROGRAM
RIVER MANAGEMENT PROGRAM FOR THE MAINTENANCE OF THE BANKS OF THE SMALBLAAR RIVER ON FARM 417/2, RAWSONVILLE, WORCESTER Prepared for: Deetlefs Family Trust FEBRUARY 2011 Prepared by: Boland Environmental
More informationFigure 1.1: Location of Majuba Power Station within the Pixley Ka Seme Local Municipality
1 INTRODUCTION Majuba Power Station is located near Amersfoort in the Mpumalanga Province and falls within the Pixley Ka Seme Local Municipality (Figure 1.1) which falls within the Gert Sibande District
More informationAPPENDIX H ENVIRONMENTAL MANAGEMENT PROGRAMME
APPENDIX H ENVIRONMENTAL MANAGEMENT PROGRAMME Draft PROPOSED ROADS AND STORMWATER INFRASTRUCTURE FOR SOSHANGUVE BLOCK L, CITY OF TSHWANE METROPOLITAN MUNICIPALITY ENVIRONMENTAL MANAGEMENT PROGRAMME (EMPR)
More information1 INTRODUCTION 1.1 PROJECT APPLICANT
1 INTRODUCTION 1.1 PROJECT APPLICANT Transnet State Owned Company (SOC) Limited (Transnet) is a wholly state owned company in South Africa, which strives to enable competitiveness, growth and development
More informationA brief on Fisheries and Aquaculture
A brief on Fisheries and Aquaculture Select Committee on Land and Environment 01 September 2009 Fisheries Sector of South Africa South Africa has well established fishery sector & is currently net exporter
More informationDRAFT BASIC ASSESSMENT REPORT. Prepared by:
IMPROVEMENT OF NATIONAL ROUTE N2 SECTION 14 & 15 FROM GREEN RIVER (KM 60.0) TO ZWELITSHA INTERSECTION (KM 6.00) & THE NEW BREIDBACH INTERCHANGE (KM 9.8). DRAFT Prepared for: On behalf of: GIBB Engineering
More informationethekwini Environment al Health Department.
E12.2 Response to Comments received on DRAFT BAR Licensing of existing waste facilities within the South African National Blood Service (SANBS) Pinetown Campus, Pinetown, Durban, KwaZulu-Natal Department
More informationSUMMARY OF COMMENTS/RECOMMENDATIONS
SUMMARY OF COMMENTS/RECOMMENDATIONS PROPONENT: PROPOSAL NAME: Wastewater Stabilization Pond Expansion CLASS OF DEVELOPMENT: 2 TYPE OF DEVELOPMENT: Wastewater Treatment Lagoon CLIENT FILE NO.: 2709.20 OVERVIEW:
More informationAppendix A: Project Characteristics
Gorgon Fourth Train Expansion Proposal Appendix A: Project Characteristics Appendices Project Characteristics A Key Characteristics table has been prepared to describe the elements of the Foundation Project
More informationBACKGROUND INFORMATION DOCUMENT
Kingfisher Farms (Pty) Ltd SAND MINING APPLICATION Manor Grange Farm, Hibberdene (KwaZulu-Natal) BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION An application has been submitted to the Department
More informationMeeting conduct ESKOM HOLDINGS LIMITED
ESKOM HOLDINGS LIMITED ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR A PROPOSED NUCLEAR POWER STATION AND ASSOCIATED INFRASTRUCTURE DEA REF. No.:12/12/20/944 Public Meeting: Oyster Bay Hall Revised Draft Environmental
More informationNOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
11 August 2017 Dear Stakeholder ENVIRONMENTAL IMPACT ASSESSMENT AND PUBLIC PARTICIPATION PROCESS DEVELOPMENT OF THE RICHARDS BAY COMBINED CYCLE POWER PLANT (CCPP) AND ASSOCIATED INFRASTRUCTURE ON A SITE
More informationBASIC ASSESSMENT PROCESS
BASIC ASSESSMENT PROCESS BASIC ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF A CHICKEN LAYER FACILITY FOR NEW AGE CHICKEN SUPPLY PRIMARY CO-OPERATIVE ON HOLDING 75 ENDICOTT NEAR SPRINGS IN GAUTENG. DRAFT
More informationDraft Environmental Impact Assessment Report for the Cornubia Retail Park
Draft Environmental Impact Assessment Report for the Cornubia Retail Park A Report for Tongaat Hulett Developments 20 May 2013 DM/0034/2012 KZN/EIA/0000802/2012 DOCUMENT DESCRIPTION Client: Tongaat Hulett
More informationCape Environmental Assessment Practitioners (Pty) Ltd
Cape Environmental Assessment Practitioners (Pty) Ltd Reg. No. 2008/004627/07 Telephone: (044) 874 0365 1 st Floor Eagles View Building Facsimile: (044) 874 0432 5 Progress Street, George Web: www.cape-eaprac.co.za
More informationTechnical Report: KRANSKLOOF SCOPING/0916. November 2016
Technical Report: KRANSKLOOF SCOPING/0916 FINAL SCOPING REPORT FOR THE PROPOSED CONSTRUCTION OF AN AGRICULTURAL IRRIGATION DAM AND THE PREPARATION OF LAND FOR CULTIVATION ON PORTION 1 OF THE FARM KRANSKLOOF
More information