James Gray M.S. Tem Fontaine M.S., P.E.
|
|
- Mercy Barber
- 5 years ago
- Views:
Transcription
1 2012 FSBPA Annual Conference September 28, 2012 Indian River County - Sector 3 Beach and Dune Restoration Project Summary and Perspectives Using an Upland Sand Source James Gray M.S. Tem Fontaine M.S., P.E.
2 Indian River County Beach Preservation Plan Developed in 1998 (Updated 2008) Wabasso Beach Park Shoreline = 22.4 miles Eight (8) planning sectors 15.4 miles designated critically eroded by FDEP 2
3 Completed Projects Ambersand (Sectors 1&2) 2003, (Offshore) South Beach (Sector 7) 2007 (Offshore) Wabasso Beach (Sector 3) (Upland) Phase 1 April 2010 Phase 2 April 2011 Phase 2b March
4 Sector 3 Beach & Dune Restoration Project 6.6 miles (R-20 to R-55) ~565,000 cubic yards ~16 cubic yards/foot fill density No Impact design Phase 2b Phase 2 Phase 1 3 Phases ( )
5 Funding Currently 100% locally funding Funding Sources Indian River County Sebastian Inlet District $4,680,000 cost share Project is eligible for 50% State cost share Status: Applied for grants; funding undetermined 5
6 Project Purpose The purpose of the project is to: Offset historical sediment deficits attributable to Sebastian Inlet, Restore/maintain the recreational beach, Restore/maintain potential habitat for marine turtles, marine life and shorebirds, and Provide storm protection for upland property and infrastructure.
7 Design Criteria Maximize fill quantities without adversely affecting nearshore hardbottom or sea turtles
8 Natural Resources Nearshore Hardbottom Photograph by Rick Herren Photograph by CSA
9 Design Process Hardbottom Equilibrium Profile given by h = Ay 2/3 h = still-water depth y = horizontal distance offshore A = sediment scale parameter
10 Fill Area Vero Beach Borrow Area
11 Indian River County Offshore Borrow Area Native Sand vs. Borrow Area Grain Size Distribution
12 Native Beach R-44 mid berm Native Beach R-32-3 Offshore Borrow Area IRS Offshore Borrow Area IRS Native Beach & Offshore Borrow Area
13 Appeal by Local Upland Sand Suppliers April and May Local sand suppliers send letters directly to County Commission 14% Adapted From: Indian River County Community Development Report, July 2012
14 Directive to Bid Project May 14, 2009 To provide economic stimulus to the local economy, Board of County Commissioners directed County staff to solicit bids for construction of the Project via use of the offshore sand source or via use of an upland sand source.
15 Bid Results $8.9 Million Contractor Location Base Bid Construction Winter 2010 Alternate Bid Construction Winter 2011 Stormwater & Underground, LLC Titusville Florida Upland Sand Sources Ranger Construction Industries, Inc. Ft. Pierce, Florida CKA, LLC St. Cloud, Florida Giannetti Contracting Corp. Sterling Heights, Offshore Borrow Area Great Lakes Dredge & Dock Company, LLC Oakbrook, Illinois Manson Construction Co. Jacksonville, Florida Weeks Marine, Inc. Covington, Louisianna $7,068,022 $7,270,807 $8,020,214 $10,242,260 $8,938,566 $17,949,332 $24,536,880 $8,548,746 $7,649,054 $8,020,214 $10,442,160 $9,089,561 $18,918,048 No Bid $7.3 Million Photo Source Sam Wolf
16 Economic Stimulus to the Local Economy Engineering Survey 3 Local Firms 1 Local Firm Construction Monitoring 1 Local Prime Contractor 2 Local Firms 2 Local Mine Subcontractors 3 Local Trucking Subcontractors 2 Local Granularmetric Testing Lab 16
17 From: Vero Beach Press Journal July 12, 2009
18 Indian River County Beach & Shore Preservation Advisory Committee February 16, 2009 Upland Sand Source in situ Evaluation Native Beach Upland Borrow Source - 1 Offshore Borrow Source Upland Borrow Source - 2 Color
19 Proposed Fill Density Reduction From 471,900 cy Down to 347,800 cy (-26.3%), 124,100 cy Orchid Island Beach and Golf Club 19
20 Upland Sand Design Issue Resolution Technical Specifications evolved to require Upland Sand Suppliers to provide updated sand characteristics equivalent to the offshore sand: Median Grain Size Overfill factor Color
21 Natural Resources Archie Carr NWR
22 Processing Upland Sand Dredge Discharge Pipe Wet-Dredged Sand not yet screened 3/8 Screen Rock Processed Sand
23 Construction - Upland Sand Beach Staging Area
24 Construction - Upland Sand Beach Grading 24
25 Sediment QA/QC Plan - Sampling & Testing at mine every 3,000 cubic yards ( once per week) at the beach every 500 feet
26 Dry 3-4 days Dredge ~3,000 cubic yards per day Screen ~1,500 cubic yards per day Truck ~5,000 cubic yards per day Test processed sand within a 24 hour period
27 Construction Challenges Phasing of Project Turbidity issues Shutdown the project and modified construction methods Processed Sand Rain delays the trucking and screening process Isolation of processed sand for stockpiling and testing Trucks haul the sand faster than mine could process Construction Access Closing of County Beach Parks for several months High Surf Pinch points around seawalls and pre-construction narrow beaches 27
28 Policy & Political Challenges Non-utilization of proven offshore Borrow Area Independent political effort by upland sand suppliers State & Federal Agency acceptance of processed sand from upland sources Local Taxpayers acceptance of the project
29 Project Performance Sea Turtle Monitoring Sea Turtle Test Plan 2010 Was upland sand an adequate medium to support incubation of sea turtle nests to term, i.e. reproductive success? Yes! Sea Turtle Monitoring Results 2011 Reproductive success for both loggerhead and green turtles was similar to, and in several cases greater than, values obtained for the natural beach. Sea Turtle Monitoring Results 2012 Preliminary results indicate similar reproductive success for both loggerhead and green turtles.
30 Native Sand vs. Upland Borrow Area R-41 Mid Berm Grain Size Distribution
31 Lessons Learned Using Upland Sand Sub-Committee formed following Phase 1 Construction Key Discussion Points Sequencing of profile surveys to determine: Project pre construction volumes (Bid volumes) Pay profile volumes Contractor s ability to provide sand 31
32 Why this project was successful! The Location of the upland mines The relatively low fill densities The County s flexibility with the Contractors performing the work The relatively low population density in the area The number of construction access areas owned by the County The upland sand sources had good in situ sand 32
33 Thank You!
MEETING AGENDA ALTERNATIVE SAND SOURCE INVESTIGATION DADE COUNTY, FLORIDA BEACH EROSION CONTROL & HURRICANE PROTECTION PROJECT
ALTERNATIVE SAND SOURCE INVESTIGATION DADE COUNTY, FLORIDA BEACH EROSION CONTROL & HURRICANE PROTECTION PROJECT MEETING AGENDA Draft Environmental Assessment Poster Session: 6:30 6:45 Presentation 6:45
More informationImpact of Hurricane Matthew on the Atlantic Coast of Florida
Impact of Hurricane Matthew on the Atlantic Coast of Florida Ralph Clark February 8, 2017 Hurricane Matthew, Oct. 6-7, 2016 2/8/2017 National Conference on Beach Preservation Technology 2 Track of Hurricane
More informationTown of Duck North Carolina
Town of Duck North Carolina Town of Duck Shore Protection Project Photograph obtained by. (July 7, 2017). Beach Maintenance Plan August 2017 Updated September 2018 Prepared By:. 4038 Masonboro Loop Road
More informationTown of Duck North Carolina
Town of Duck North Carolina Town of Duck Shore Protection Project Photograph obtained by. (July 7. 2017). Beach Maintenance Plan August 2017 Prepared By:. 4038 Masonboro Loop Road Wilmington, NC 28409
More informationMARTIN COUNTY, FLORIDA INTER-OFFICE MEMORANDUM To the Honorable Board of County DATE: August 14, 2015
TO: MARTIN COUNTY, FLORIDA INTER-OFFICE MEMORANDUM To the Honorable Board of County DATE: August 14, 2015 Commissioners VIA: Taryn Kryzda, County Administrator FROM: SUBJECT: Don Donaldson, P.E. Engineering
More informationATTACHMENT 2 PROJECT NEED AND JUSTIFICATION
ATTACHMENT 2 PROJECT NEED AND JUSTIFICATION INTRODUCTION The Project includes providing erosion control and shoreline stabilization measures including beach nourishment, maintenance dredging and bypassing,
More informationConceptual Engineering Report Collier County Beaches, Florida
Conceptual Engineering Report Collier County Beaches, Florida Presented to Collier County Coastal Advisory Committee October 13, 2011 Steve Keehn, PE, CPE Topics Goals Monitoring & Performance Summary
More informationAsharoken Coastal Storm Damage Risk Reduction Feasibility Study
Asharoken Coastal Storm Damage Risk Reduction Feasibility Study Megan Jadrosich Project Manager U.S. Army Corps of Engineers Project Progress New York District Public Update April 23, 2009 Outline Summary
More informationAPPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT RENOURISHMENT
APPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT 2014-2015 RENOURISHMENT U.S. ARMY CORPS OF ENGINEERS SAVANNAH DISTRICT JUNE 2014 This page intentionally blank. SECTION
More information02 APRIL PUBLIC NOTICE U.S. Army Corps of Engineers, Savannah District
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 Planning Branch TO WHOM IT MAY CONCERN: 02 APRIL 2019 PUBLIC NOTICE U.S. Army
More informationFlorida Inland Navigation District: Permitting and Construction of the M 5 Island Offloading & Crossroads Maintenance Dredging and the NA 1 Upland
Florida Inland Navigation District: Permitting and Construction of the M 5 Island Offloading & Crossroads Maintenance Dredging and the NA 1 Upland DMMA Facility Authored by Lori Brownell, P.E. and John
More informationCity of Naples Beach Restoration & Water Quality Improvement Project
City of Naples Beach Restoration & Water Quality Improvement Project Presented By: Erickson Consulting Engineers, Inc. Karyn Erickson, ME, PE, D CE, Project Director Christin Perkinson, PhD, PE, D CE,
More informationPINELLAS COUNTY RESTORE ACT DIRECT COMPONENT PROJECTS IDEAS SUBMITTED TO PINELLAS COUNTY
RESTORE ACT DIRECT COMPONENT S DATE RECEIVED: 7/7/14 NAME: : Tides Golf Course Acquisition & Restoration Purchase ~90 acre property, retrofit stormwater systems, restore habitat, create trials and boardwalks.
More informationThe State of New Jersey s Shore Protection Program
Oakwood Beach Storm Damage Reduction Project NJDEP-Bureau of Coastal Engineering Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs Branch Dwight Pakan, Project Manager, Philadelphia District
More informationBEACH AND INLET PROJECTS UPDATE
BEACH AND INLET PROJECTS UPDATE Topics Post-Matthew FEMA Emergency Dune Restoration Project Revised Permit Based on Updated Survey Adjust Design Due to Post-Storm Recovery/Erosion USACE Delta Project Expected
More informationSand Relocation Project
Sand Relocation Project (Contract E ) Dade County BEC & HP Project Tom R. Martin, P.E. Senior Coastal Engineer USACE, Jacksonville District February 15, 2013 US Army Corps of Engineers JACKSONVILLE DISTRICT
More informationTHIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R
THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. CENAP-OP-R-2015-167-24 Application No. In Reply Refer
More informationSANDY HOOK CHANNEL, NEW YORK HARBOR FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING
Public Notice In replying refer to: Public Notice No. Sandy Hook Channel, NY Harbor FY17 Published: 14 February 2017 Expires: 14 March 2017 New York District 26 Federal Plaza New York, N.Y. 10278 ATTN:
More informationNOTICE DATE: December 20, U.S. Army Corps of Engineers
US Army Corps of Engineers Memphis District Public Notice FILE NUMBER: MVM-2018-224 NOTICE DATE: December 20, 2018 Attn: Postmaster, Please Post Until EXPIRATION DATE: January 18, 2019 U.S. Army Corps
More informationFinal General Reevaluation Report and Final Environmental Impact Statement. Hurricane Protection and Beach Erosion Control
Final General Reevaluation Report and Final Environmental Impact Statement on Hurricane Protection and Beach Erosion Control WEST ONSLOW BEACH AND NEW RIVER INLET (TOPSAIL BEACH), NORTH CAROLINA Appendix
More informationPublic Information Meeting 7 MARCH 2017
Public Information Meeting 7 MARCH 2017 Outline of the Presentation Overview of the project Key dates and milestones Anticipated construction Timetable & Activities Required sea turtle monitoring during
More informationLEE COUNTY, FLORIDA GASPARILLA ISLAND SEGMENT SHORE PROTECTION PROJECT 2013 BEACH RENOURISHMENT POST CONSTRUCTION MONITORING REPORT.
LEE COUNTY, FLORIDA GASPARILLA ISLAND SEGMENT SHORE PROTECTION PROJECT 2013 BEACH RENOURISHMENT POST CONSTRUCTION MONITORING REPORT August 2014 U.S. ARMY CORPS OF ENGINEERS JACKSONVILLE DISTRICT Table
More informationU.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT
PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT APPLICATION FOR PERMIT Goat Canyon Sedimentation and Basin Maintenance Dredging Project Public Notice/Application No.: SPL-2005-02068-RRS
More informationCanaveral Harbor, Florida Federal Navigation Project -- Final Mitigation for Beach Impacts
Canaveral Harbor, Florida Federal Navigation Project -- Final Mitigation for Beach Impacts olsen associates, inc. Kevin R. Bodge, Ph.D., P.E. Olsen Associates, Inc. Jacksonville, Florida Brevard County
More informationSEDIMENT QUALITY ASSURANCE/QUALITY CONTROL PLAN DUVAL COUNTY BEACH NOURISHMENT PROJECT. FDEP Permit No JC
SEDIMENT QUALITY ASSURANCE/QUALITY CONTROL PLAN DUVAL COUNTY BEACH NOURISHMENT PROJECT FDEP Permit No. 0228528-005-JC PERMITTEE: City of Jacksonville, Florida 20 July 2015 A. INTRODUCTION The project will
More informationDEPARTMENT OF THE ARMY CORPS OF ENGINEERS, MOBILE DISTRICT P.O. BOX 2288 MOBILE, AL
DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, MOBILE DISTRICT P.O. BOX 2288 MOBILE, AL 36628-0001 CESAM RD-A April 15, 2018 PUBLIC NOTICE NO. SAM-2018-01191-DCH JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS
More informationGREAT KILLS HARBOR, STATEN ISLAND, NEW YORK FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING
Public Notice In replying refer to: Public Notice No. GREAT KILLS HARBOR FY13 Published: April 30, 2013, Expires: May 30, 2013 New York District 26 Federal Plaza New York, N.Y. 10278 ATTN: CENAN-OP-ST
More informationUpper Mississippi River Floodplain Island Restoration Details
Upper Mississippi River Floodplain Island Restoration Details Mississippi Makeover Meeting Citizens Advisory Group December 1, 2009 Hastings City Hall Community Room Scot Johnson Minnesota Department of
More informationATTN: Regulatory Office 1645 South 101 st East A venue Tulsa, OK
Public Notice U.S. Army Corps of Engineers Tulsa District Reply To: U.S. Army Corps of Engineers ATTN: Regulatory Office 1645 South 101 st East A venue Tulsa, OK 74128-4609 SWT-2013-179 Public Notice No.
More informationVILLAGE OF BALD HEAD ISLAND SHORELINE PROTECTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT
VILLAGE OF BALD HEAD ISLAND SHORELINE PROTECTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT Prepared By: U.S. Army Corps of Engineers Wilmington District and Land Management Group, Inc. (Third Party
More informationAtlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY
Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Draft Reformulation Public Information October 2016 US Army Corps of Engineers Presentation Outline Project Overview
More informationAtlantic Coast of NY, East Rockaway Inlet to Rockaway Inlet and Jamaica Bay APPENDIX N COASTAL ZONE MANAGEMENT
Atlantic Coast of NY, East Rockaway Inlet to Rockaway Inlet and Jamaica Bay APPENDIX N COASTAL ZONE MANAGEMENT Hurricane Sandy General Reevaluation Report August 2016 New York (and New York City Local
More informationEngineered and natural dunes: a comparison of abiotic characteristics and hatching success of green turtle (Chelonia mydas) nests on an eastcentral
Engineered and natural dunes: a comparison of abiotic characteristics and hatching success of green turtle (Chelonia mydas) nests on an eastcentral Florida Beach Photo by USFWS Martha Barton and Llewellyn
More informationCESAM-RD-M March 16, 2018 PUBLIC NOTICE NO. SAM RCV JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS
DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 CESAM-RD-M March 16, 2018 PUBLIC NOTICE NO. SAM-2017-00-RCV JOINT PUBLIC NOTICE U.S. ARMY CORPS
More informationCherry Creek State Park - Cherry Creek Stream 12-Mile Park Phase II Cherry Creek Basin Water Quality Authority
MEMORANDUM JRS ENGINEERING CONSULTANT, LLC TO: Chuck Reid, Manager - CCBWQA CC: Rick Goncalves, PE, TAC Chairman FROM: James R. "Jim" Swanson, PE DATE: October 21, 2014 SUBJECT: Cherry Creek Stream Reclamation
More informationPhoto on 22 October 2016 Post Matthew. Nags Head Shoreline Management Committee Public Meeting April 15, 2017
Photo on 22 October 2016 Post Matthew Nags Head Shoreline Management Committee Public Meeting April 15, 2017 Presentation Outline Nags Head Beach Nourishment Planning History Review of the 2011 Beach Nourishment
More informationU.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement
U.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement Name of Project: Maintenance Dredging AIWW Vicinity Jupiter
More informationAPPLICANT: Decatur Head Beach Association 1327 Decatur Head Drive Decatur Island Anacortes, WA Telephone: (425)
US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management
More informationAPPENDIX I DRAFT COMPENSATORY MITIGATION PLAN
APPENDIX I DRAFT COMPENSATORY MITIGATION PLAN This page intentionally left blank. SOUTHERN PALM BEACH ISLAND COMPREHENSIVE SHORELINE STABILIZATION PROJECT DRAFT COMPENSATORY MITIGATION PLAN TABLE OF CONTENTS
More informationREQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information.
MARTIN COUNTY EXCAVATION AND FILL PERMIT APPLICATION This application to be used only for excavating or filling activities not associated with a building permit or development review and for projects requiring
More informationApplication for Permit under Authority of Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act (33 U.S.C. 1344).
Public Notice Applicant: Carpenter, Jeffrey U.S. Army Corps of Engineers Buffalo District CELRB-TD-R Application No: 2016-01359 Section: NY Published: 6 March 2017 Expires: 5 April 2017 All written comments
More informationPublic Notice ISSUED: December 11, 2018 EXPIRES: January 10, 2019
APPLICANT: Hibbing Taconite Mine Public Notice ISSUED: December 11, 2018 EXPIRES: January 10, 2019 REFER TO: 2017-02800-DWW SECTION: 404 - Clean Water Act 1. APPLICATION FOR PERMIT TO retain fill material
More informationEngineering with Nature for Coastal Resilience
Engineering with Nature for Coastal Resilience Dr. Todd S. Bridges Senior Research Scientist, Environmental Science U.S. Army Engineer Research and Development Center, U.S. Army Corps of Engineers todd.s.bridges@usace.army.mil
More informationFountain Lake Restoration Project
NRT, AN OBG COMPANY, PRESENTS: Fountain Lake Restoration Project Andrew Millspaugh, PE WEDA Dredging Summit & Expo, June 26-29, 2017 OUTLINE Project History Lake Modeling & Dredging Plan Upland Confined
More informationJ O I N T P U B L I C N O T I C E
J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, South Carolina 29403-5107 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Ocean
More informationAMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE. Lake Superior Shoreland Lot Development Requirements.
AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE Sec. 13-1-34 is created to read as follows: Sec. 13-1-34 Lake Superior Shoreland Lot Development Requirements. Introduction. Much of Bayfield County s Lake
More informationMississippi Coastal Improvements Program A Comprehensive Plan for Coastal Resilience
Mississippi Coastal Improvements Program A Comprehensive Plan for Coastal Resilience 200 Coastal Resilience Symposium 26 May 200 US Army Corps of Engineers BUILDING STRONG Mississippi Coastal Improvements
More informationComprehensive Barrier Island Restoration Plan
Mississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan 202 National Conference on Beach Preservation Technology February 0, 202 Justin McDonald, P.E. Lead Project
More informationFINAL ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT RENOURISHMENT
FINAL ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT 2014-2015 RENOURISHMENT U.S. ARMY CORPS OF ENGINEERS SAVANNAH DISTRICT JUNE 2014 FINAL
More informationSEDIMENT QUALITY CONTROL/QUALITY ASSURANCE PLAN FOR BEACH RESTORATION OR NOURISHMENT USING AN OFFSHORE BORROW AREA. [FDEP File No.
SEDIMENT QUALITY CONTROL/QUALITY ASSURANCE PLAN FOR BEACH RESTORATION OR NOURISHMENT USING AN OFFSHORE BORROW AREA [FDEP File No. 0307741-002-JC] USACE DADE COUNTY BEC & HP CONTRACT G May 2012 A. INTRODUCTION
More informationPublic Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Public Notice U.S. Army Corps Permit Application No: SWG-2000-02888 Of Engineers Date Issued: 3 April 2018 Galveston District Comments Due: 3 May 2018 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND
More informationPROJECT REVIEW PLAN. Preconstruction, Engineering and Design Phase Implementation Documents
PROJECT REVIEW PLAN For Preconstruction, Engineering and Design Phase Implementation Documents For Beach Erosion Control and Hurricane Protection Project Miami-Dade County, Florida Miami Beach Hot Spots
More informationStevenson Creek Watershed Plan and Project Implementation
Stevenson Creek Watershed Plan and Project Implementation 1999-2007 Stevenson Creek Watershed Management Plan (WMP) Project Site The Watershed Management Plan was completed in 2001 with cooperative funding
More informationU.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT
PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT APPLICATION FOR PERMIT City of Oceanside Opportunistic Beach Fill Program (OBFP) Public Notice/Application No.: SPL-2014-00271-RRS
More informationThe release of the Final Environmental Impact Statement (FEIS) for the Bogue
This document is scheduled to be published in the Federal Register on 03/05/2018 and available online at https://federalregister.gov/d/2018-04408, and on FDsys.gov BILLING CODE: 3720-58 DEPARTMENT OF DEFENSE
More informationTeam Member Affiliation WEDA Member Role
Summary: Dominion Cove Point LNG, LP (DCP) owns and operates the Cove Point Liquefied Natural Gas (LNG) Terminal (terminal), an LNG import terminal in Lusby, Maryland (Figure 1). The terminal includes
More informationSEDIMENT QUALITY CONTROL/QUALITY ASSURANCE PLAN FOR BEACH RESTORATION OR NOURISHMENT USING AN OFFSHORE BORROW AREA. [FDEP Permit No.
SEDIMENT QUALITY CONTROL/QUALITY ASSURANCE PLAN FOR BEACH RESTORATION OR NOURISHMENT USING AN OFFSHORE BORROW AREA [FDEP Permit No.] Palm Beach Co Department of Environment Resources Management Jupiter/Carlin
More informationPublic Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Public Notice U.S. Army Corps Permit Application No: SWG-2007-01025 Of Engineers Date Issued: 29 March 2018 Galveston District Comments Due: 30 April 2018 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT
More informationJ O I N T P U B L I C N O T I C E
J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, South Carolina 29403-5107 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Water Quality
More informationJ O I N T P U B L I C N O T I C E
J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, SC 2943-517 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Ocean and Coastal
More informationJoint Public Notice. PURPOSE: To restore navigation depths for vessels using the facility. DREDGED MATERIAL MANAGEMENT PROGRAM (DMMP):
US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management
More informationCounty of San Mateo Planning and Building Department
County of San Mateo Planning and Building Department Coastal Development Permit EXEMPTION/EXCLUSION WORKSHEET (Categorical Exclusion Order E-81-1) (This is not a Certificate of Exemption) To be used by
More informationPUBLIC NOTICE. 696 Virginia Road Concord, MA
696 696 Virginia Road Concord, MA 01742-2751 PUBLIC NOTICE Comment Period Begins: July 28, 2015 Comment Period Ends: August 27, 2015 File Number: NAE-2014-259 In Reply Refer To: Phillip W. Nimeskern Phone:
More informationShore Protection. Atkins Team Overview. Coastal Engineering Consultant Services for Segment III. Atkins originated in Miami in 1960
Coastal Engineering Consultant Services for Segment III Shore Protection BROWARD COUNTY SOLICITATION T2112588P1 1 Atkins originated in Miami in 1960 Atkins Team Overview Leader Integrating Coastal Science
More informationDepartment of Army Permitting Process: Dredging
Department of Army Permitting Process: Dredging Brian Bader Regulatory Project Manager Regulatory Division USACE Galveston District Dredging Your Docks Seminar - 2015 Beaumont, Texas December 2, 2015 US
More informationPublic Notice. Public Notice No. CENAP-OP-R June 19, 2017
Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2017-178 June 19, 2017 Application No. In Reply Refer to: REGULATORY
More informationCESAM-RD-A October 25, 2017 PUBLIC NOTICE NO. SAM SBC
DEPARTMENT OF THE ARMY MOBILE DISTRICT, CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, AL 36628-0001 CESAM-RD-A October 25, 2017 PUBLIC NOTICE NO. SAM-2016-01643-SBC JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS
More informationThe Clean Water Act and 404/401 Process in Hawaii
The Clean Water Act and 404/401 Process in Hawaii Presented by: Robert Walker, PE Coastal Engineer Anchor QEA, LLC Clean Water Act (1972) Restore and maintain the chemical, physical, and biological integrity
More informationCHAPTER 7. San Dieguito River Flooding Adaptation
CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,
More informationTHIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R February 2, 2018
THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2015-1060-24 February 2, 2018 Application
More informationJoe Cappel Toledo-Lucas County Port Authority. Wednesday, March 14, Western Dredging Association 2018 Midwest Chapter Meeting
Joe Cappel Toledo-Lucas County Port Authority Wednesday, March 14, 2018 1 Toledo Harbor Dredging Federal Channel spans RM 7 to LM 18 (25 miles, 400-500 ft. width) Projected 1M CY Dredged Annually, includes
More informationSOUTHERN PALM BEACH ISLAND COMPREHENSIVE SHORELINE STABILIZATION PROJECT
SOUTHERN PALM BEACH ISLAND COMPREHENSIVE SHORELINE STABILIZATION PROJECT U.S. Army Corps of Engineers December 2014 Jacksonville District This page intentionally left blank. Abstract SOUTHERN PALM BEACH
More informationEnvironmental Information Worksheet
Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project
More informationFernando Camargo, Hull & Associates, Inc. On behalf of Joe Cappel Toledo-Lucas County Port Authority. Thursday, December 7, 2017
Fernando Camargo, Hull & Associates, Inc. On behalf of Joe Cappel Toledo-Lucas County Port Authority Thursday, December 7, 2017 1 Toledo Harbor Dredging Federal Channel spans RM 7 to LM 18 (25 miles, 400-500
More informationShrewsbury River Basin, Sea Bright, New Jersey Coastal Storm Risk Management Feasibility Study
Shrewsbury River Basin, Sea Bright, New Jersey Coastal Storm Risk Management Feasibility Study Draft Integrated Feasibility Report & Environmental Assessment Appendix E: Pertinent Correspondence & Environmental
More informationJOINT PUBLIC NOTICE. February 8, United States Army Corps of Engineers State of Louisiana
JOINT PUBLIC NOTICE February 8, 2016 United States Army Corps of Engineers State of Louisiana New Orleans District Department of Environmental Quality Regulatory Branch Office of Environmental Services
More informationNotice No Closing Date: May 2, 2015
Public Notice U.S. Army Corps of Engineers Pittsburgh District In Reply Refer to Notice No. below US Army Corps of Engineers, Pittsburgh District 1000 Liberty Avenue Pittsburgh, PA 15222-4186 Application
More informationPN Comment Period: April 13, 2016 to May 13, 2016
Public Notice U.S. Army Corps In Reply to Application Number of Engineers CENAB-OPR-M (Department of Natural Resources: Town of Baltimore District Ocean City/Ocean City Beach) 2015-61754 PN 16-17 Comment
More informationPUBLIC NOTICE. Maintenance dredging with upland placement of dredged material Arthur Kill Road, Staten Island, Richmond County, New York
PUBLIC NOTICE US Army Corps of Engineers New York District Jacob K. Javits Federal Building New York, N.Y. 10278-0090 ATTN: Regulatory Branch In replying refer to: Public Notice Number: NAN-2018-00809-EKN
More informationRiverine Sand Mining Scofield Island Restoration Project (BA-40)
Riverine Sand Mining Scofield Island Restoration Project (BA-40) Kenneth Bahlinger CPRA Project Manager Michael Poff CEC Project Engineer October 24, 2012 committed to our coast committed to our coast
More informationPUBLIC NOTICE LOS ANGELES DISTRICT. APPLICATION FOR PERMIT 517 & 521 Pacific Avenue Shoreline Stabilization Project
PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS LOS ANGELES DISTRICT BUILDING STRONG APPLICATION FOR PERMIT 517 & 521 Pacific Avenue Shoreline Stabilization Project Public Notice/Application No.: SPL-2016-00726-RRS
More informationSECTION 6.0 AVOIDANCE, MINIMIZATION AND MITIGATIVE MEASURES
SECTION 6.0 AVOIDANCE, MINIMIZATION AND MITIGATIVE MEASURES CEQ regulations (40 CFR 1508.20) define mitigation to include: (1) avoiding the impact altogether by not taking a certain action or parts of
More informationConstruction of Offshore Stormwater Discharges Using HDD Technologies. Karyn Erickson, D.CE., PE, President Erickson Consulting Engineers, Inc.
Construction of Offshore Stormwater Discharges Using HDD Technologies Karyn Erickson, D.CE., PE, President Erickson Consulting Engineers, Inc. 1 Presentation Overview Introduction Project Need and Purpose
More informationNags Head Beach Nourishment Project
Proposed Plan Up to 4.6 million CY Construction in Spring- Summer 2011 Via Hopper Dredge & Other Feasible Equipment All Previous NC Beach Nourishment Projects Oct 2006 Wilmington District Washington Regulatory
More informationDepartment of Army Permitting Process: Dredging
Department of Army Permitting Process: Dredging Elizabeth Shelton Regulatory Specialist Regulatory Division USACE Galveston District Dredging Your Docks Seminar - 2015 Corpus Christi, Texas October 8,
More informationTeacher s Guide. Southern Coastal Watershed Excursion. View excursions at: WaterMatters.org/Watersheds
Teacher s Guide View excursions at: WaterMatters.org/Watersheds Lesson Time: One block or class period (approximately 50 minutes) Grades: 9 12 Objective: Using context clues and relevant facts in the excursion,
More informationSHORELINE STABILIZATION AND MARINE FACILITIES PUBLIC WORKSHOP. Town of Jupiter Community Center February 12, :30 PM
SHORELINE STABILIZATION AND MARINE FACILITIES PUBLIC WORKSHOP Town of Jupiter Community Center February 12, 2015 5:30 PM We are here to Discuss new options and flexibility with regard to marine facilities
More informationPhase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)
Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17
More informationPublic Notice ISSUED: July 13, 2018 EXPIRES: August 13, 2018
APPLICANT: Sargento Foods Inc. Public Notice ISSUED: July 13, 2018 EXPIRES: August 13, 2018 REFER TO: 2010-2909-RJH SECTION: 404 - Clean Water Act 1. APPLICATION FOR PERMIT TO discharge dredged and fill
More informationAPPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN
APPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN SUMMARY The construction team of Environmental Restoration,
More informationDepartment of the Army Permit Application
Department of the Army Permit Application DA File Number U.S. Army Corps of Engineers Honolulu District Date Received by CEPOH-RO Send Completed Application to: Honolulu District, U.S. Army Corps of Engineers
More informationCESAM-RD-A December 4, 2017 PUBLIC NOTICE NO. SAM SBC
DEPARTMENT OF THE ARMY MOBILE DISTRICT, CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, AL 36628-0001 PUBLIC NOTICE NO. SAM-2017-01123-SBC JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS AND STATE OF ALABAMA
More informationHabitat Grant Projects Clinton River Watershed
Habitat Grant Projects Clinton River Watershed L Y N N E S E Y M O U R E N V I R O N M E N T A L E N G I N E E R O F F I C E O F T H E M A C O M B C O U N T Y P U B L I C W O R K S C O M M I S S I O N
More informationPUBLIC NOTICE Application for Permit
PUBLIC NOTICE Application for Permit Issue Date: March 4, 2016 Expiration Date: April 4, 2016 US Army Corps of Engineers No: NWP-2015-432 30-Day Notice Oregon Department of State Lands No: 58511 Interested
More informationPublic Notice: Application for Permit
US Army Corps Of Engineers Walla Walla District 201 North Third Avenue Walla Walla, WA 99362-1876 Public Notice: Application for Permit APPLICATION NO.: NWW-2012-127-I02 WATERWAY: Big Wood River APPLICANT:
More informationU.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Public Notice U.S. Army Corps Permit Application No: SWG-2013-00247 Of Engineers Date Issued: 4 February 2014 Galveston District Comments Due: 7 March 2014 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT
More informationFinal General Reevaluation Report and Final Environmental Impact Statement. Hurricane Protection and Beach Erosion Control
Final General Reevaluation Report and Final Environmental Impact Statement on Hurricane Protection and Beach Erosion Control WEST ONSLOW BEACH AND NEW RIVER INLET (TOPSAIL BEACH), NORTH CAROLINA Appendix
More informationPA-03. Honorable Mike Kelly. Pennsylvania 114th Congress. 3rd Congressional District. Miles
PA-03 Honorable Mike Kelly Pennsylvania 114th Congress 3rd Congressional District 2 3 & 1&& / 0 1, O&M, Erie Harbor 2, CG-CAP 204, Presque Isle Regional Sediment Management 3, CG, Presque Isle Shoreline
More informationPublic Notice ISSUED: April 5, 2019 EXPIRES: May 6, 2019
APPLICANT: Aitkin County Highway Department Public Notice ISSUED: April 5, 2019 EXPIRES: May 6, 2019 REFER TO: MVP-2019-00387-EJI SECTION: 404 - Clean Water Act 1. APPLICATION FOR PERMIT TO discharge fill
More information