1 WELCOME Insitu Stabilization of soils with High Density resins under and existing culvert URETEK ICR Mid Atlantic APWA-NC Storm water Management Conference Chris Gibby

2 URETEK HDPF History 1975 URETEK Finland develops high-density polymers TM 1979 The URETEK Method patented 1988 URETEK USA, Inc. granted exclusive rights to United States and Mexico 2000 ICR Dealer Network Set Up TM 2003 Deep Injection Process patented

3 Introduction to Expanding Polyurethane Three Broad Categories Hydrophilic, Hydrophobic and Hydroinsensitive (URETEK 486 Star) Two Component Polymerization Process Injected as a liquid, chemical reaction expands and changes the liquid into a solid

4 Advantages to Using URETEK Polymers Minimal Disruption No Digging / 5/8 diameter holes Develops 90% strength in 15 minutes Fully cured in 24 hours Return to service in 1 hour Excellent Chemical Resistance Longterm Structural and Dimensional Stability 10 year material warranty Environmentally Benign

5 The introduction to the West Knox Street Project Insitu Stabilization of soils with High Density resins under and existing culvert 1) Designation of the problem and identifying the most cost effective repair 2) Design of the repair, based on the environment and the degraded condition of the culvert 3) Planning, and protecting the environment, Home and population in a historic district 4) Implementation of the repair 5) Effects on the environment 6) Clean Up and restoration of the site

6

7 Step # 1 - Designation of the problem and identifying the most cost effective repair NCDOT Inspection report found a 2.5 Void found under the culvert!!!

8 Step # 1 - Designation of the problem and identifying the most cost effective repair Sink Holes on Street level 2.5 Void under culvert

9 Step # 1 - Designation of the problem and identifying the most cost effective repair NCDOT Inspection report also showed failures in the aging concrete of the culvert

10 Step # 2 - Design of the repair, based on the environment and the degraded condition of the culvert Uretek Completed DCP test on the site to help determine the extent of the soil problems under the culvert Weight of Hammer Soils

11 Step # 2 - Design of the repair, based on the environment and the degraded condition of the culvert Existing culvert building the 40 s-50 s 24 to 30 void under culvert W.O.H. Soils under culvert

12 Step # 2 - Design of the repair, based on the environment and the degraded condition of the culvert

13 Step # 3 - Planning, and protecting the environment, Home and population in a historic district (20 ) wide road with existing neighborhood and pedestrian walkway Culvert Site: West Knox St. Durham, NC

14 Step # 4 - Implementation of the repair Installation of temporary coffer dam Installation of sheet Pile wall

15 Step # 4 - Implementation of the repair URETEK Patented Deep Injection TM

16 Step # 4 - Implementation of the repair URETEK Patented Deep Injection TM

17 URETEK Patented Deep Injections Rehabilitation Diagram

18 Laser levels are used to monitor so that no unwanted movement occurs

19 Step # 4 - Implementation of the repair After Before Before

20 Step # 4 - Implementation of the repair Epoxy Crack Injection

21 Step # 4 - Implementation of the repair Joint Sealant flexible joint Finished Permanent coffer dam, up steam and down stream of the culvert

22 Step # 5 - Effects on the environment Uretek 486 is NSF 61 certified and has minimal impact on any environment, Uretek returned the site to its original condition

23 Step # 6 - Clean Up and restoration of the site

24 What was the Cost? - The estimated cost to rip out the existing culvert and replace it was approximately $3,000, Dollars! This will have closed the road for 8 to 10 weeks and disrupted all of the local residence. -Uretek completed this repair, including the sheet pile coffer dam, epoxy crack inject and stabilization of the soils under the culvert for a cost of less then $500, we never closed the walking trails or the road above. This work was completed in less then 30 days!

25 Less than 30 days, from start to finish

26 Thank you from Uretek to the APWA-NC Stormwater Management Conference Chris Gibby North Carolina (336)

WELCOME Insitu Stabilization of soils with High Density resins under and existing culvert

WELCOME Insitu Stabilization of soils with High Density resins under and existing culvert WELCOME Insitu Stabilization of soils with High Density resins under and existing culvert URETEK ICR Mid Atlantic APWA-NC Hickory 2015 Joe Church, PE jchurch@uretekma.com 803.509.4439 GEOTECHICAL CONTRACTOR

More information

High Density Polyurethane for

High Density Polyurethane for Mark Hurley Project Manager High Density Polyurethane for Soil Stabilization and Pavement Preservation Why is it important? 2 How is Soil Stabilization Part of Pavement Preservation? Extend the Life of

More information

Stabilization Techniques For Asphalt Pavements

Stabilization Techniques For Asphalt Pavements Dave Crowley Eastern Regional Manager High Density Polyurethane Stabilization Techniques For Asphalt Pavements Why is it important? 2 How is Soil Stabilization Part of Pavement Preservation? Extend the

More information

Lessons Learned from a 60 CIPP Storm Sewer Liner Installation. Robert Stolt, PE Christopher Beranek, PE

Lessons Learned from a 60 CIPP Storm Sewer Liner Installation. Robert Stolt, PE Christopher Beranek, PE Lessons Learned from a 60 CIPP Storm Sewer Liner Installation Robert Stolt, PE Christopher Beranek, PE Presentation Outline 1. CIPP Project Scope 2. CIPP Liner Installation 3. Defects Identified 4. Warranty

More information

Protective Coatings for Underground Utility Concrete Structures. By: John E. Davis Inside Sales & Marketing Specialist: Sauereisen, Inc.

Protective Coatings for Underground Utility Concrete Structures. By: John E. Davis Inside Sales & Marketing Specialist: Sauereisen, Inc. Protective Coatings for Underground Utility Concrete Structures By: John E. Davis Inside Sales & Marketing Specialist: Sauereisen, Inc. As our cities and municipalities grow older, the utility and wastewater

More information

Chemical Grouts & Polyurethanes. Industrial Strength Repair for Leaking Concrete & Masonry Structures

Chemical Grouts & Polyurethanes. Industrial Strength Repair for Leaking Concrete & Masonry Structures Chemical Grouts & Polyurethanes Industrial Strength Repair for Leaking Concrete & Masonry Structures Which Type Should You Choose? POLYURETHANE GROUTS For our purposes, there are many options for repairing

More information

ADA Detectable Warning Surfaces.

ADA Detectable Warning Surfaces. ADA Detectable Warning Surfaces www.fibrecretept.com About Us (FPT) manufactures and distributes premium construction materials that are specifically designed for the repair, restoration, and maintenance

More information

SEWER TELEVISING & REPAIRS. Adam Tierney Business Development Manager Northern Pipe, Inc.

SEWER TELEVISING & REPAIRS. Adam Tierney Business Development Manager Northern Pipe, Inc. SEWER TELEVISING & REPAIRS Adam Tierney Business Development Manager Northern Pipe, Inc. AGENDA Purpose of CCTV Inspections Equipment NASSCO (National Association of Sewer Service Companies) Inspection

More information

Engine Bay Floors Floor Resurfacing 4000

Engine Bay Floors Floor Resurfacing 4000 Engine Bay Floors Floor Resurfacing 4000 P.O. Box 341 Macungie, PA 18062 610.530.7710 800.573.9198 www.enginebayfloors.com 1.1 SUBMITTALS Flooring Specification SECTION 1 GENERAL A. Product Data: Submit

More information

Made in U.S.A. Moai Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks: 2 Bikes

Made in U.S.A. Moai Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks: 2 Bikes Submittal Sheet Materials: 1. 5 Schedule 40 Steel Pipe (1.90 OD) Finishes: Galvanized An after fabrication hot dipped galvanized finish is available. Powder Coat Our powder coat finish assures a high level

More information

Pipeline Rehabilitation amidst Environmentally Sensitive Location

Pipeline Rehabilitation amidst Environmentally Sensitive Location 523 Pipeline Rehabilitation amidst Environmentally Sensitive Location Steve Bian, P.E. 1, Anna Pridmore, Ph.D. 2, Rudy Loera, M.S., P.E. 3, John Marshall, P.E. 4 1 DC Water, Supervisor, Civil & Structural

More information

Made in U.S.A. Wave Style Bike Rack Submittal Sheet. Materials: 1.5 Schedule 40 Steel Pipe (1.

Made in U.S.A. Wave Style Bike Rack Submittal Sheet. Materials: 1.5 Schedule 40 Steel Pipe (1. Submittal Sheet Materials: 1.5 Schedule 40 Steel Pipe (1.9 OD) Finishes: Powder Coat Our powder coat finish assures a high level of adhesion and durability by following these steps: 1. Sanded down 2. Washed

More information

Made in U.S.A. Sunrise Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks:

Made in U.S.A. Sunrise Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks: Submittal Sheet Materials: 1.5 Schedule 40 Steel Pipe (1.9 OD) Finishes: Galvanized An after fabrication hot dipped galvanized finish is available Powder Coat Our powder coat finish assures a high level

More information

Maintenance & Repair Solutions

Maintenance & Repair Solutions Maintenance & Repair Solutions PILEMEDIC THE PERMANENT SOLUTION FOR PILE RESTORATION PileMedic is a patent-pending recently developed innovative product by QuakeWrap, Inc. president, Professor Mo Ehsani

More information

The URETEK Deep Injection Process (UDI) For Roadways and Building Structures

The URETEK Deep Injection Process (UDI) For Roadways and Building Structures The URETEK Deep Injection Process (UDI) For Roadways and Building Structures A URETEK USA/ICR White Paper www.uretekicr.com 800-240-7868 Introduction Since the early days of modern civilization, road builders

More information

Single Post Anchor Part Number Spectrum Lane ~ Missoula MT ~

Single Post Anchor Part Number Spectrum Lane ~ Missoula MT ~ Single Post Anchor Part Number 21700 7100 Spectrum Lane ~ Missoula MT 59808 800.791.8056 ~ www.spectrumproducts.com 21700 Man Rev B You have purchased a Spectrum Aquatics Single Post Anchor. Providing

More information

Hydrophilic Polyurethane Grout

Hydrophilic Polyurethane Grout Product description Azo-Grout 675 is a single-component, hydrophilic polyurethane that cures when mixed with water. Depending on the amount of water in the mixture, Azo-Grout 675 will vary in consistency

More information

Homeowner s Do-It Yourself Guide for Hazardous Sidewalks

Homeowner s Do-It Yourself Guide for Hazardous Sidewalks Homeowner s Do-It Yourself Guide for Hazardous Sidewalks The City and County of Denver s Neighborhood Sidewalk Repair Program is a multi-year program addressing damaged, sloping and uneven sidewalks, citywide,

More information

Building Preservation Material Technologies

Building Preservation Material Technologies INNOVATIVE GROUTING SOLUTIONS Seminario de la Beca: Dr. Ramon Carrasquillo, PhD, Reparaciones Estructurales: Soluciones Innovadoras PREPARED BY: JOSE R GAYA, P.E., M.ENG. Building Material Technologies

More information

Bridge Asset Management City of Battle Creek Planning and Projects

Bridge Asset Management City of Battle Creek Planning and Projects Bridge Asset Management City of Battle Creek Planning and Projects Michigan Bridge Conference, March 20, 2013 Gregory B. Rickmar P.E., Public Works Department, City of Battle Creek Alan Halbeisen, P.E.

More information

INLINER LAY_InLiner Brochure_FA_ indd 1

INLINER LAY_InLiner Brochure_FA_ indd 1 INLINER LAY_InLiner Brochure_FA_010913.indd 1 Layne Inliner, LLC is the second largest cured-in-place pipe (CIPP) lining company in the United States. We began as the first U.S. licensee of the Inliner

More information

Incorporating Maintenance & Preservation Strategies into and Integrated Bridge Management System. Jim Edgerton Director of Technical Sales

Incorporating Maintenance & Preservation Strategies into and Integrated Bridge Management System. Jim Edgerton Director of Technical Sales Incorporating Maintenance & Preservation Strategies into and Integrated Bridge Management System Jim Edgerton Director of Technical Sales May 9,2013 Agenda About NCDOT Departmental Goals NCDOT s Integrated

More information

Incorporating Performance Measures into NCDOT s Bridge Management System. Rick Nelson, P.E. Jim Edgerton

Incorporating Performance Measures into NCDOT s Bridge Management System. Rick Nelson, P.E. Jim Edgerton Incorporating Performance Measures into NCDOT s Bridge Management System Rick Nelson, P.E. Jim Edgerton Agenda About NCDOT Departmental Goals NCDOT s Integrated AMS Performance Management Framework Planning

More information

REHABILITATION. Geopolymer & Hybrid Cements. > Manholes > Sewer & Storm Pipes > Other Civil Infrastructure. vortexcompanies.com

REHABILITATION. Geopolymer & Hybrid Cements. > Manholes > Sewer & Storm Pipes > Other Civil Infrastructure. vortexcompanies.com REHABILITATION P R O D U C T S Geopolymer & Hybrid Cements > Manholes > Sewer & Storm Pipes > Other Civil Infrastructure vortexcompanies.com Since 1991, QUADEX LLC has been developing and manufacturing

More information

Applications (As provided by Avanti International)

Applications (As provided by Avanti International) Applications (As provided by Avanti International) The information contained in the document is property of Avanti International. Avanti offers the following verbiage as a technical reference to assist

More information

CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE

CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 932 MARCH 1998 CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE 932.01 SCOPE 932.02 REFERENCES 932.03 DEFINITIONS TABLE OF CONTENTS 932.04 SUBMISSION

More information

EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: PLUMBING SECTION: SANITARY WASTE AND VENT PIPING

EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: PLUMBING SECTION: SANITARY WASTE AND VENT PIPING ICC-ES Report PMG-1273 Reissued 01/2018 This report is subject to renewal 01/2019 EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: 22 00 00 PLUMBING SECTION: 22 13 16

More information

Perma Construction Aids Private Limited

Perma Construction Aids Private Limited +91-8048762201 Perma Construction Aids Private Limited https://www.permaindia.in/ We are offering waterproofing systems, Tile Adhesive,Waterproofing Coating, Crystallization Based & Elastomeric Waterproofing,

More information

City of Charlotte BMP Maintenance and Inspection Check List Grassed Channels / Swales [Note: a separate form must be used for each BMP]

City of Charlotte BMP Maintenance and Inspection Check List Grassed Channels / Swales [Note: a separate form must be used for each BMP] City of Charlotte BP aintenance and Inspection Check List Grassed Channels / Swales [Note: a separate form must be used for each BP] Project Name: Project Address: Owner s Name: Owner s Address: Recorded

More information

SKSC Civils (pty) LTD. Brilliance Technology Quality - Innovation

SKSC Civils (pty) LTD. Brilliance Technology Quality - Innovation SKSC Civils (pty) LTD Brilliance Technology Quality - Innovation About us SKSC Civils was inspired by numerous individuals in South Africa, ranging from the civil to the construction industry, to truly

More information

Hydrophilic Polyurethane Grout Cartridge Application

Hydrophilic Polyurethane Grout Cartridge Application Product description Azo-Grout 675 is a single-component, hydrophilic polyurethane that cures when mixed with water. Depending on the amount of water in the mixture, Azo-Grout 675 will vary in consistency

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER. April 16, 2010

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER. April 16, 2010 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER 834.01 Description 834.02 Materials 834.03 Shipment and Storage 834.04 Submittals 834.05

More information

SPECTRASHIELD. Total System for Large Wastewater Structures PART I - GENERAL

SPECTRASHIELD. Total System for Large Wastewater Structures PART I - GENERAL 1.01 DESCRIPTION SPECTRASHIELD Total System for Large Wastewater Structures PART I - GENERAL The work described within details a complete program for wet wells, treatment plants or other large wastewater

More information

SECTION IRRIGATION PIPELINE LINING (CURED-IN-PLACE PIPE)

SECTION IRRIGATION PIPELINE LINING (CURED-IN-PLACE PIPE) SECTION 02518 IRRIGATION PIPELINE LINING (CURED-IN-PLACE PIPE) PART 1 GENERAL 1.01 SECTION INCLUDES A. Irrigation pipeline lining, as herein specified, consists of installing pipe liner by trenchless methods

More information

TECHNICAL SPECIFICATION FOR CURED-IN-PLACE MANHOLE REHABILITATION LINER SYSTEM

TECHNICAL SPECIFICATION FOR CURED-IN-PLACE MANHOLE REHABILITATION LINER SYSTEM TECHNICAL SPECIFICATION FOR CURED-IN-PLACE SYSTEM PART 1 GENERAL 1.01 SCOPE OF WORK Furnish all materials, labor, equipment, tools and required incidentals for providing and installing a resin impregnated

More information

Building the City of West Palm Beach s Stormwater Infrastructure Rehab Program June 15, 2018

Building the City of West Palm Beach s Stormwater Infrastructure Rehab Program June 15, 2018 Building the City of West Palm Beach s Stormwater Infrastructure Rehab Program June 15, 2018 2018 HDR, Inc., all rights reserved. Data Evaluation and Literature Review Presentation Outline Condition Assessment

More information

6 STORMWATER IMPROVEMENTS

6 STORMWATER IMPROVEMENTS 6 STORMWATER IMPROVEMENTS 6.01 General Requirements a. In addition to the standards contained in this, the design of stormwater systems is also governed by several ordinances and regulations. (1) Projects

More information

Water New Zealand Conference September 2017 Gerard Cody Water Services Reticulation Engineer Timaru District Council #

Water New Zealand Conference September 2017 Gerard Cody Water Services Reticulation Engineer Timaru District Council # Water New Zealand Conference September 2017 Gerard Cody Water Services Reticulation Engineer Timaru District Council # 1102077 Topic Items Pleasant Point township background and sewer rehabilitation drivers

More information

Airport Surface Repair Technology

Airport Surface Repair Technology Airport Surface Repair Technology Build on our strength Fast & Permanent Repair for Airport Surfaces Making runway repairs at the speed of flight Air transportation continues to serve as one of the country

More information

CITY OF WINDSOR STANDARD SPECIFICATIONS JULY 2012 S-31 KEYHOLE EXCAVATION TABLE OF CONTENTS

CITY OF WINDSOR STANDARD SPECIFICATIONS JULY 2012 S-31 KEYHOLE EXCAVATION TABLE OF CONTENTS TABLE OF CONTENTS 31.01. SCOPE OF WORK... 1 31.02. REFERENCES... 1 31.03. DEFENITIONS... 1 31.04. MATERIALS... 2 31.05. EQUIPMENT... 3 31.06. CONSTRUCTION... 4 31.07. QUALITY ASSURANCE... 6 31.08. MEASUREMENT

More information

6 STORMWATER IMPROVEMENTS

6 STORMWATER IMPROVEMENTS 6 STORMWATER IMPROVEMENTS 6.01 General Requirements a. In addition to the standards contained in this, the design of stormwater systems is also governed by several ordinances and regulations. (1) Projects

More information

Structural Lining of Water Mains. City of St. John s, Water and Wastewater Division

Structural Lining of Water Mains. City of St. John s, Water and Wastewater Division Structural Lining of Water Mains Overview Applications Pre-lining process Installation (Aqua-Pipe Product) Post-lining process Challenges Applications Alternative to water main reconstruction. Limited

More information

The work required for this project includes, but is not limited to, the following items, not listed in order of execution.

The work required for this project includes, but is not limited to, the following items, not listed in order of execution. ESTIMATE OF QUANTITIES SPECIFICATIONS Construction Specifications: South Dakota Standard Specifications for Roads and Bridges, 2004 Edition and Required Provisions, Supplemental Specifications and/or Special

More information

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles

More information

Public Open House. Proposed Liberty Village Natural Gas Pipeline Project. Please sign-in at the registration table upon arrival

Public Open House. Proposed Liberty Village Natural Gas Pipeline Project. Please sign-in at the registration table upon arrival Proposed Liberty Village Natural Gas Pipeline Project Public Open House Please sign-in at the registration table upon arrival Feel free to approach any team member to discuss the project Share your thoughts

More information

Keyhole Technology. Logo here

Keyhole Technology. Logo here Keyhole Technology A M I N I M A L L Y I N V A S I V E & C O S T E F F E C T I V E M E T H O D F O R T H E M A I N T E N A N C E, R E P A I R A N D M A P P I N G O F U N D E R G R O U N D U T I L I T I

More information

The first option is a concrete wall that could be covered with a brick veneer.

The first option is a concrete wall that could be covered with a brick veneer. ITEM R2 OFFICE OF THE CITY MANAGER (910) 341-7810 FAX(910)341-5839 TDD (910)341-7873 8/19/2014 City Council City Hall Wilmington, North Carolina 28401 Dear Mayor and Councilmembers: Attached for your consideration

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Recording and Tracking Bridge Maintenance Work SPECIFIC SUBJECT: DIVISION

More information

CONCRETE REPAIR IN ACTION: USING THE MANUAL AS A GUIDE. Christen Longoria, P.E. San Antonio District Project Engineer

CONCRETE REPAIR IN ACTION: USING THE MANUAL AS A GUIDE. Christen Longoria, P.E. San Antonio District Project Engineer CONCRETE REPAIR IN ACTION: USING THE MANUAL AS A GUIDE Christen Longoria, P.E. San Antonio District Project Engineer TxDOT CONCRETE REPAIR MANUAL Step-by-Step repair procedures for use on new and existing

More information

Inspection Procedure Handout

Inspection Procedure Handout Contact Information Currituck County Planning and Community Development Central Permitting Division Mainland Office 153 Courthouse Road, Suite G107 Mainland Phone: 252.232.3378 Currituck, NC 27929 Mainland

More information

SIKA EGYPT. Injection Systems. Scope: Highly expansion solvent free water-reactive two part Polyurethane foam injection system

SIKA EGYPT. Injection Systems. Scope: Highly expansion solvent free water-reactive two part Polyurethane foam injection system Method Statement for Application of Sika Injection 20 SIKA EGYPT Injection Systems Scope: Highly expansion solvent free water-reactive two part Polyurethane foam injection system INTRODUCTION: The water

More information

Active Landscapes: Making Green spaces work for us. Water and WW management. The current situation and trends: Eli Cohen AYALA-Water & Ecology

Active Landscapes: Making Green spaces work for us. Water and WW management. The current situation and trends: Eli Cohen AYALA-Water & Ecology Active Landscapes: Making Green spaces work for us Eli Cohen AYALA-Water & Ecology www.ayala-aqua.com Water and WW management The current situation and trends: Growing water consumption, globally Source:

More information

+91-8048762201 Perma Construction Aids Private Limited http://www.permaindia.in/ We are offering waterproofing systems, Tile Adhesive,Waterproofing Coating, Crystallization Based & Elastomeric Waterproofing,

More information

We Raise Sunken CONCRETe! How you can save your sinking concrete slab and WHY...

We Raise Sunken CONCRETe! How you can save your sinking concrete slab and WHY... We Raise Sunken CONCRETe! How you can save your sinking concrete slab and WHY... 1 1 Who We Are We know that your home is your most valuable asset. Where you raise your family. Create memories. Cherish

More information

Recommended Qualification Structure for Sub-structure Work Occupations (Construction) Level 2

Recommended Qualification Structure for Sub-structure Work Occupations (Construction) Level 2 Recommended Qualification Structure for Sub-structure Work Occupations (Construction) Level 2 This structure has been recommended by employers and stakeholders from the above occupational area for organisations

More information

Appendix A SURVEY QUESTIONNAIRE

Appendix A SURVEY QUESTIONNAIRE Appendix A SURVEY QUESTIONNAIRE Highway stakeholders recognize the overwhelming need for effective technologies in both the structural and functional stormwater facility renewal while minimizing negative

More information

Work to install fibre cables for ultrafast broadband

Work to install fibre cables for ultrafast broadband Work to install fibre cables for ultrafast broadband Work is currently being carried out to install fibre cabinets and cables in your area to provide ultrafast broadband direct to the boundary of your

More information

Dusit Roongsang, P.E. Presented at. PNWS AWWA Conference Bellevue, WA May 1, 2015

Dusit Roongsang, P.E. Presented at. PNWS AWWA Conference Bellevue, WA May 1, 2015 Dusit Roongsang, P.E. Presented at PNWS AWWA Conference Bellevue, WA May 1, 2015 Not waterproof structures Leakage rate is suitable for intended use Contain water Prevent contamination of contents Prevent

More information

Manual Road Building Option Routes:

Manual Road Building Option Routes: Recommended Qualification Structure for Road Building and Maintenance (Construction) Level 2 This structure has been recommended by employers and stakeholders from the above occupational area for organisations

More information

Manual Road Building Option Routes:

Manual Road Building Option Routes: Recommended Qualification Structure for Road Building and Maintenance (Construction) Level 2 This structure has been recommended by employers and stakeholders from the above occupational area for organisations

More information

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016 Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations

More information

profile-mix-plus, Page 1 of 8, Rev

profile-mix-plus, Page 1 of 8, Rev Strong-Seal Profile Mix for reconstructing deteriorated structures to original dimensions, eliminating infiltration and providing structural restoration, corrosion protection and a smooth surface for application

More information

Rehabilitation of Lafayette Aqueduct No. 1

Rehabilitation of Lafayette Aqueduct No. 1 Rehabilitation of Lafayette Aqueduct No. 1 Marisa Boyce, P.E. October 1, 2013 CA-NV AWWA AFC 2013 Outline EBMUD Background History of Lafayette Aqueduct No. 1 Studies Temporary Repairs Long-term Plans

More information

Stormwater Drainage Restoration and Rehabilitation at Liverpool City Council

Stormwater Drainage Restoration and Rehabilitation at Liverpool City Council John Monro Interflow Pty Limited Stormwater Drainage Restoration and Rehabilitation at Liverpool City Council Abstract Liverpool City Council has underground concrete stormwater drains that have been in

More information

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017 Engineering & Capital Improvements Shore Acres Civic Association August 21 st, 2017 40 th Avenue N Bridge 34 th Avenue NE Storm Drainage Improvements Resiliency Planning Continued Maintenance 40 th Avenue

More information

Franklin County Communique to the Planning Board

Franklin County Communique to the Planning Board Franklin County Communique to the Planning Board PETITIONER(S): Name of Petitioner: Carolina Solar Energy II, LLC Address: 400 W. Main St. Suite 503 City/State/Zip: Durham, NC 27701 LOCATION: REQUEST FOR

More information

Table of Contents. 1. Challenges of Current Systems. 2. The T-Port System Features & Benefits. 3. MTSU-CIM Test Results

Table of Contents. 1. Challenges of Current Systems. 2. The T-Port System Features & Benefits. 3. MTSU-CIM Test Results Patent No. 8043029 Table of Contents 1. Challenges of Current Systems 2. The T-Port System Features & Benefits 3. MTSU-CIM Test Results 4. Main Components & The Process 5. Comparison of Concrete Crack

More information

Transportation Category. New Location and. Green Vehicles. Reduced Parking Footprint. Bicycle Facilities. Access to Quality Transit

Transportation Category. New Location and. Green Vehicles. Reduced Parking Footprint. Bicycle Facilities. Access to Quality Transit New Location and Transportation Category LEED ND Location Sensitive Land Protection High Priority Site Surrounding Density Diverse Uses Access to Quality Transit Bicycle Facilities Reduced Parking Footprint

More information

SPECTRASHIELD. Total System for Manholes (Brick/Concrete)

SPECTRASHIELD. Total System for Manholes (Brick/Concrete) SPECTRASHIELD Total System for Manholes (Brick/Concrete) PART I GENERAL 1.01 DESCRIPTION The work described within details a complete program for manholes. This section details the methods, procedures,

More information

IMPROVING SOIL STIFFNESS BENEATH PAVEMENTS USING POLYURETHANE INJECTION

IMPROVING SOIL STIFFNESS BENEATH PAVEMENTS USING POLYURETHANE INJECTION Popik, Trout, and Brown Page 1 IMPROVING SOIL STIFFNESS BENEATH PAVEMENTS USING POLYURETHANE INJECTION Mark Popik Applied Research Associates Inc. 541 Eglinton Avenue West, Suite 15, Toronto, ON, Canada,

More information

THE SPECIALIST FOR NO DIG REHABILITATION

THE SPECIALIST FOR NO DIG REHABILITATION THE SPECIALIST FOR NO DIG REHABILITATION DN 50 to DN 250 Private and public drainage Housing management Industry HIGH DEMAND FOR PIPE REHABILITATION The total length of drainage systems on private and

More information

ARDEX GUIDE SPECIFICATION

ARDEX GUIDE SPECIFICATION ARDEX GUIDE SPECIFICATION ARDEX PC-T Part of the ARDEX Polished Concrete System (APCS) SECTION 03 01 30 MAINTENANCE OF CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings, general

More information

REHABILITATION. PRODUCTS & MATERIALS Geopolymers Hybrid Cements Polymerics Ancillary Products. vortexcompanies.com

REHABILITATION. PRODUCTS & MATERIALS Geopolymers Hybrid Cements Polymerics Ancillary Products. vortexcompanies.com REHABILITATION PRODUCTS & MATERIALS Geopolymers Hybrid Cements Polymerics Ancillary Products vortexcompanies.com TABLE OF C O N T E N T S Polymeric Materials... 1-4 Geopolymer & Hybrid Cements... 5-9 REHABILITATION

More information

Natura Series White Matte Undermount Bathroom Sink

Natura Series White Matte Undermount Bathroom Sink INSTALLATION MANUAL Natura Series White Matte Undermount Bathroom Sink KSU-7MW www.kraususa.com I Toll Free: 1.800.775.0703 I 2017 Kraus USA Inc. I REV. September 29, 2017 Thank you for purchasing Kraus

More information

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH) City of St. Catharines Standard Drawings SEPTEMBER 2018 Revised September 6, 2018 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 2 Monolithic Curb-Faced Sidewalk 110-2002 3 Sidewalk

More information

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017 VT 14 East Montpelier Bridge Project Informational Meeting February 22, 2017 Welcome & Introductions VTrans Mark Sargent, Project Manager Wayne Symonds, Structures Program Manager Chris Barker, Resident

More information

Specialty Expansion Joint Systems

Specialty Expansion Joint Systems www.dsbrown.com Specialty Expansion Joint Systems Bridges Expansion Joint Systems for Architectural, Parking Garage and Bridge Applications Bridge the World with Leading Infrastructure Solutions Corporate

More information

Elavo White Ceramic Small Rectangular Undermount Bathroom Sink w/ Overflow

Elavo White Ceramic Small Rectangular Undermount Bathroom Sink w/ Overflow INSTALLATION MANUAL Elavo White Ceramic Small Rectangular Undermount Bathroom Sink w/ Overflow KCU-241 www.kraususa.com I toll free: 1.800.775.0703 I 2014-2015 Kraus USA Inc. I REV. August 13, 2015 Thank

More information

Specifying Trenchless Sewer Rehabilitation Projects. Presented by: Todd Stelmacher Visu-Sewer, Inc.

Specifying Trenchless Sewer Rehabilitation Projects. Presented by: Todd Stelmacher Visu-Sewer, Inc. Specifying Trenchless Sewer Rehabilitation Projects Presented by: Todd Stelmacher Visu-Sewer, Inc. Todd Stelmacher Bio Visu-Sewer Sales Engineer MN, ND, SD, WI 30+ years public utilities experience Municipal

More information

Section Fluid Applied Waterproofing

Section Fluid Applied Waterproofing Section 07920 - Fluid Applied Waterproofing Part 1 - General 1.01 Summary A. This specification describes the injection of a crack or joint with infiltrating water with a low viscosity hydrophobic polyurethane

More information

Fargo, ND HEI No. 8675_001 October 31, 2017 PELICAN RIVER DAM CONCRETE SPILLWAY ASSESSMENT REPORT. Pelican Rapids, Minnesota

Fargo, ND HEI No. 8675_001 October 31, 2017 PELICAN RIVER DAM CONCRETE SPILLWAY ASSESSMENT REPORT. Pelican Rapids, Minnesota Fargo, ND HEI No. 8675_001 October 31, 2017 PELICAN RIVER DAM CONCRETE SPILLWAY ASSESSMENT REPORT Pelican Rapids, Minnesota PELICAN RIVER DAM CONCRETE SPILLWAY ASSESSMENT REPORT Pelican Rapids, Minnesota

More information

SECTION MAINTENANCE OF STONE ASSEMBLIES

SECTION MAINTENANCE OF STONE ASSEMBLIES SECTION 04 01 40 - MAINTENANCE OF STONE ASSEMBLIES PART 1 GENERAL 1.1 SUMMARY OF WORK A. Submit the following items in time to prevent delay of the work and to allow adequate time for review, do not order

More information

Joint Sealants.

Joint Sealants. Joint Sealants www.fibrecretept.com About Us (FPT) manufactures and distributes premium construction materials that are specifically designed for the repair, restoration, and maintenance of parking garages,

More information

CHAPTER B TABLE OF CONTENTS

CHAPTER B TABLE OF CONTENTS July 2006 Page B-1 CHAPTER B TABLE OF CONTENTS B.00 Introduction B.01 Definitions B.02 Maintenance Levels B.03 Definition of Traveled Way B.04 Policy for Performing Roadbed Maintenance Work B.05 Surface

More information

WATERSTOP INJECTION SYSTEMS

WATERSTOP INJECTION SYSTEMS WATERSTOP INJECTION SYSTEMS Introduction Thank you for choosing the SealBoss Concrete Repair System for your chemical injection application. You are now well on your way to a successful and permanent concrete

More information

No-Dig Technology is the art and science of pipes, ducts and cables using techniques that minimizes / eliminates the need for excavation, i.e.

No-Dig Technology is the art and science of pipes, ducts and cables using techniques that minimizes / eliminates the need for excavation, i.e. No Dig Technology Introduction: No-Dig Technology is the art and science of installing, repairing or renewing underground pipes, ducts and cables using techniques that minimizes / eliminates the need for

More information

Rust-Oleum Industrial Brands Specification

Rust-Oleum Industrial Brands Specification Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 2 A solvent based coating system High Performance 9100/9800 System DTM Epoxy Mastic/DTM

More information

Environment. and Protects. Ordinance. Vital Information on Sanitary Service For Our Residents of The District INFILTRATION FROM BROKEN LATERALS

Environment. and Protects. Ordinance. Vital Information on Sanitary Service For Our Residents of The District INFILTRATION FROM BROKEN LATERALS New District Ordinance Saves Water and Protects Our Environment INFILTRATION OF TREE ROOTS INFILTRATION FROM BROKEN LATERALS INFLOW FROM YARD DRAINS Vital Information on Sanitary Service For Our Residents

More information

CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE

CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 932 NOVEMBER 2009 CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE TABLE OF CONTENTS 932.01 SCOPE 932.02 REFERENCES 932.03 DEFINITIONS 932.04

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

1. Before selective demolition, Owner will remove the following items:

1. Before selective demolition, Owner will remove the following items: SECTION 024119 - SELECTIVE STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Demolition and removal of selected portions of building or structure. 2. Demolition and removal of selected

More information

Index to Technical Specifications

Index to Technical Specifications Index to Technical Specifications Item Number Subject I II EXCAVATION 1.01 Trenching and Excavation Regulations 1.02 Site Grading or General Excavation 1.03 Structural Excavation 1.04 Trench Excavation

More information

PSI Crack Injection Repair Guide. Surface Preparation for Crack Injection

PSI Crack Injection Repair Guide. Surface Preparation for Crack Injection PSI Crack Injection Repair Guide Poly-Tuff Systems International 2100 Reliance Parkway Bedford, TX 76021 (817)-684-9186 www.polytuffus.com Surface Preparation for Crack Injection Clean the crack and the

More information

SIDEWALK PROBLEMS AND REPAIR

SIDEWALK PROBLEMS AND REPAIR Borough of New Hope, Pennsylvania 41 North Main Street, New Hope, Pennsylvania, 18938 (215) 862-3347 SIDEWALK PROBLEMS AND REPAIR BACKGROUND New Hope Borough Code of Ordinance Article III, section 233-3

More information

Lateral Thinking The Key To Meeting Sewer Infiltration Reduction Targets & Lowering Operating Costs

Lateral Thinking The Key To Meeting Sewer Infiltration Reduction Targets & Lowering Operating Costs Lateral Thinking The Key To Meeting Sewer Infiltration Reduction Targets & Lowering Operating Costs John Monro Interflow Pty Limited Keywords: house service line, lateral, infiltration reduction, rehabilitation,

More information

THE COMPLETE NO-DIG PIPELINE REHABILITATION SOLUTION

THE COMPLETE NO-DIG PIPELINE REHABILITATION SOLUTION TM THE COMPLETE NO-DIG PIPELINE REHABILITATION SOLUTION CLEAN ENGINEERING. Premier Pipe U.S.A. Premier Pipe is a people-driven company that prides itself on old school standards. With extensive training

More information

REPORTER INSPECTION NEWS & VIEWS FROM THE AMERICAN SOCIETY OF HOME INSPECTORS, INC.

REPORTER INSPECTION NEWS & VIEWS FROM THE AMERICAN SOCIETY OF HOME INSPECTORS, INC. ASHI 10.18 REPORTER INSPECTION NEWS & VIEWS FROM THE AMERICAN SOCIETY OF HOME INSPECTORS, INC. THE UNKNOWN UNDERGROUND The Zero Dig Solution to Failing Sewer Laterals By Morgan Trouard PG16 TECHNICAL FOCUS

More information

SECTION RESINOUS FLOORING or SECTION QUARTZ FLOORING

SECTION RESINOUS FLOORING or SECTION QUARTZ FLOORING SECTION 09 67 23 RESINOUS FLOORING or SECTION 09 67 26 QUARTZ FLOORING PART 1 - GENERAL 1.1 SUMMARY (Specification writer shall add, delete or amend, as deemed necessary) A. Provide all labor, materials,

More information

Solar Powered TS1000 Installation Pictures. (Trench and Fill Method) City of Vallejo, CA

Solar Powered TS1000 Installation Pictures. (Trench and Fill Method) City of Vallejo, CA Solar Powered TS1000 Installation Pictures (Trench and Fill Method) City of Vallejo, CA 12/04/09 Page 1 Pre-installation Phase 1. Main system components arrive on one or more pallets. 2. Optional pole

More information