1 DIVISION OF FINANCE AND OPERATIONS OFFICE OF THE UNIVERSITY ARCHITECT Lilia Gonzales University Architect COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT Project Name: Issue Date: Solar Panels on Langford Building Roof 12/4/2017 Project Requestor: Individual/College or Division/Department or Unit Date Request Received: Jorge Vanegas, College of Architecture 3/7/2017 CBE Sub-Councils Reviewed (reports attached): X DRsc X TRsc FUPsc X Msc Other Report copies provided to: CBE Co-Chairs, CBE Coordinator, CBE Sub-Council Chairs Mehdi Azizkhari, Juan-Carlos Baltazar Status: Not Approved Approved X Approved with Caveats Caveats: For full details see the attached Sub-Council Reports X DRsc X TRsc FUPsc X Msc Summary of Caveats: Design Review sub-council recommends approval - If grant funding is sufficient, display monitors will be installed on both the fourth floor and the lobby area of Langford A with the intent to maximize student and staff exposure to educational information. Technical Review sub-council recommends approval - EH&S: Safety concerns are adequately addressed except for fall protection. While the switch to the Langford C roof and limitation of student access is positive, I request that architecture contact EHS and review the roof of Langford C for fall protection issues before installation of solar panels. I believe that adequate precautions can be implemented that will remove this concern as it relates to installation and maintenance personnel. - Facilities Services: Project team should consult with a structural engineer to ensure that panel installation is compatible with the roof structure and that the panel installation complies with building codes, especially those concerning wind loads. The project team should coordinate with the holder of the roof warranty to ensure the panel installation does not void the warranty. - UES: Looks forward to working closely with the project and design team to ensure that all campus requirements are met and that the project is successful. Applicable UES Design Standards will need to be followed. Selected UES staff should be included throughout the design and installation process and be given the opportunity to review all modifications. (see attached for contact information for Chris Dieckert, Richard Hubacek, and Keith Bornmann) Maintenance sub-council recommends approval - This project will be routed through SSC for project management to ensure all TAMU rules and regulations are followed. - College of Architecture agrees to fund any future required maintenance. - College of Architecture will develop a plan for removal of all the equipment and any repairs/damage caused if the project is abandoned in the future. - Students will not access the roof. - Coordinate with SSC regarding roof warranty concerns. Comments from the University Architect: Approved to proceed with caveats as noted. Prior to installation, the project team must contact the University Architect to confirm that all caveats have been met, especially those related to technical and safety concerns. General Services Complex, Suite TAMU College Station, TX Tel lilia.gonzales@tamu.edu

2 Reusing the Roof Space: From Solar Panels to Reduced EUI Mehdi Azizkhani Dr. Juan-Carlos Baltazar College of Architecture

3 Scope of the Project Appropriate site/face selection Simulation/selection of the required materials for the 480V 3-phase electricity service for 15.7 kva PV system 48 panels with 20% efficiency will result in kwh/yr electricity production Installing roof-mounted PV panels on the top of Langford Architecture Building A through 1-2 months on-site work: solar panels controllers inverters monitoring systems Post-Installation Evaluation (12 months)

4 Goals of the Project A Response to the broader initiative of the Sustainability Master Plan for Texas A&M University Achieving 2% reduction in the building s electricity consumption by using renewable energy From EUI=138 to kbtu/ft2/yr $41,473 to $21203 savings over the life of the system with 4.8% to 2.7% IRR The vast amount of existing roof space on campus has remained idle with no functional contribution to its buildings. This project provides an example of reusing the roof space. Providing an opportunity of educational outreach for students, staff, and faculty: Energy Awareness and Engagement Sustainability (Environmental Benefit) and GHG Reduction Building Energy Efficiency Upgrades and Optimization

5 System Specifications

6 Specs

7 Specs

8 Benefits Resource Estimate Resource Estimate CO 2 conserved (tons/month) 1.56 Equivalent recycled waste (tons/month) 4.91 Electricity conserved (kw/month) 1892 Coal avoided to be burned (lbs./month) Water conserved (gal/month) Other: reduced auto miles per month 3111 Gasoline saved (gal/month) Other: trees saved/month 36

9 Data Collection/Monitoring

10 Concern: Safety and fall protection Suggestion: Installation of the System on the ground Suggestion for the installation of the system on the ground: Provides easier visibility/access but also increase the cost of installation (almost twice) The chance of any unwanted damage due to vandalism will increase. The separate electrical room for installation of the electrical equipment would be hard to find on the ground level. To address this concern: Move the location to Langford C from Langford A Restrict access to the roof for maintenance purposes Provide the educational aspects of the system through the installed monitors inside the building and a camera near the PV system on the roof.

11 Location

12 Location and Solar Energy A C B Solar energy from January to June Solar energy from July to December

13 Yearly Cumulative

14 Location Maximum sun exposure (4.5kWh/m2 daily) Required roof area: 900 ft2 for about 48 PV panels New Alternative (Langford C) Previous Alternative (Langford A)

15 Concern: Fall Prevention/Protection No access to the raised platform for anyone other than the installers or maintenance staff for occasional access to the system (once or twice a year) Area is located at the center of the roof, there is no concern for safety issues related to any probability of falling from the roof to the ground level. There is also a small roof parapet around the raised central platform This raised area is large enough to have a 4-feet clear area on its perimeter in addition to an extra 4- feet clear area around the set of panels. Therefore, there will be always more than the required minimum 3-feet safety distance to the edge of the raised platform. The platform is only about 5 tall, which is less than half of the typical floor heights. The roof has been repaired/replaced before. Therefore, no conflict seems to exist compared with the roof replacement in Langford A scheduled for FY18.

16 Concern: Fall Prevention/Protection Ease and safety of access for maintenance

17 Concern: Electrical infrastructure should be housed in electrical rooms Existence of enough space in building C for the installation of the electrical equipment of the system in an electrical room (and not in a mechanical room)

18 Concern: consideration for isolation of solar arrays in emergencies The system is a grid-tied Surplus electricity will be provided to the grid There s a disconnection box to isolate the system whenever needed The installer team has a PE electrical engineer that will stamp the system s design before installation of the project

19 Concern: Use of ballast to secure the solar panel systems to the roof needs careful examination, despite manufacturer claims of testing.

20 Concern for using ballast system Concern for voiding roof warranty Suggestion for using mechanical fasteners on the roof The ballast system will be a no roof penetration system to avoid voiding the roof warranty Coordination between SSC, researchers, and installers to assure that system installation will not void any warranties or have any adverse effects on the existing roof membrane Precedent: Jack E. Brown Building

21 Concern: Removal/Recycling of the equipment SunPower E-series and X-series solar panels have a cradle-tocradle certification. The principles for certification include sourcing materials safe for humans and the environment, and ensuring that these materials are recycled at the end of the products life. The program is free of charge.

22 Concern: Reflectivity of the solar panels for occupants in Eller O&M Imperceptible Degree of Glare Probability (GDP) which comes from the material of the surrounding buildings and not the panels PV panels location Glare analysis results for the viewer on the roof of the O&M building on June 21 at 9 am and September 21 at 9 am shows 24% DGP (imperceptible) PV panels location Glare analysis results for the viewer on the roof of the O&M building on June 21 at 9 am and September 21 at 9 am shows 21% DGP (imperceptible) Glare analysis results for the viewer inside a room on the last floor of the O&M building on June 21 at 9 am shows 20% DGP (imperceptible glare) Glare analysis results for the viewer inside a room on the last floor of the O&M building on December 21 at 9 am shows 5% DGP (imperceptible glare)

23 Telecommunications: Type of data that will be transported from solar array Real-time electricity production of the array modules DC/AC Monthly Output (W/m2) AC System Output(kWh) DC array Output (kwh)

24 Cost Effectiveness Publicity & Outreach Student Involvement Environmental Impact Actual Performance ** 1a. Measuring the CO2 conserved 1a tons/month 1a. Factor Objective Measure Performance Goals 1. Reducing the carbon footprint of the campus buildings 1b. Measuring the equivalent reduced auto miles 1b miles/month 1b. 1c. Measuring the equivalent water conserved 1c gal/month 1c. 1. Reducing the EUI of Langford Building from 138 to 135.5kBtu/ft2/yr 1d. Measuring the equivalent recycled waste 1d tons/month 1d. 2a. Measuring the electricity conserved by the PV system electricity generation and keep it constant through 2a kw/month 2a continuous monitoring 1. Increasing students awareness/interests on the subject of renewable energy and its design/retrofit applications 2b. Increasing the average number of arrays daily performance at above 90% capacity through double checking the system s cleanliness and achieving the right angles 3a. Increasing the number of users (the number of students participating in each tour of the system per year) 3b. Increasing the frequency of visiting the system by the number of courses and studios including projects related to this system in their syllabi 2b. 6 hours 2b. 3a. 200 people per year 3a. 3b. 7 per year 3b. 1. Increasing team members potential involvement in the project 4. Combining the project s work with student s course requirements and measuring the results as People Work hours hrs Increasing the number of students for volunteer contribution 5. Measuring and monitoring participations as people/semester and promoting the number of participants by informing the faculty and also through departmental outreach People/Semester Increasing the level of awareness of the project and 6. Measuring and promoting the level of awareness (based on survey questionnaires) 6. Score of 4.5 on a Likert Scale of 5 6. its features among students, staff, and faculty 1. Promoting the users information about the project 7a. Raising some questions through the distribution of survey questionnaires in users minds about the existence of the project and its features 7a. Increase of the users awareness in each interval of survey 7a. questionnaires by 30% increase for the correct/informative response 7b. Installation of the screen display in areas with higher frequency of space using 7b. Installation of the display on the fourth floor or in the lobby area of Langford Building 1. Increasing the sense of belonging 8a. Increasing the level of students contribution to decide and design the features of their academic environment through sustainability projects 8a. 3.5 on a Likert Scale of 5 8a. 8b. Educational impact in terms of student use of the installed system as an educational tool 8b. 4 on a Likert Scale of 5 8b. 7b. 1. Keeping the Internal Rate of Return above 2.8% 9a. Measuring the electricity savings through the monitoring system and fine-tuning the system failures/performance timely 9b. Purchasing the required materials/equipment from authorized and experienced installers at the lowest price for the highest quality 9a. IRR of 2.8% and $1841 in the first year 9b. purchasing the materials through a bid proposal among three authorized installers and possibly having SSC expertise involved in this process 9a. 9b. 9c. Measuring the environmental costs of not having the PV system installed as well as the benefits of having it based on objectives 1 and 2 10.Tracking the system electricity savings and following its conformity with the initial calculated cash flow results through time 9c. Achieving a lower cost compared to the system s benefits, when 9c. converting the carbon footprints reduction/ increase to dollars and comparing them with the initial cost of the system 10. Conformity with the calculated curve for the payback period as in 10. the middle of the life of the system over 30 years

25 COUNCIL FOR THE BUILT ENVIRONMENT DESIGN REVIEW SUB-COUNCIL MEMORANDUM TO: Dr. Jerry Strawser Co-Chair, Council for the Built Environment Dr. Karan Watson Co-Chair, Council for the Built Environment FROM: Ms. Lilia Gonzales, AIA University Architect and Chair, Design Review Sub-Council DATE: November 9, 2017 RE: Design Review Sub-Council (DRsc) Update Report Solar Panels at Langford Building On October 16, 2017, the DRsc Chair received updated information from Mr. Mehdi Azizkhani regarding the request from the College of Architecture for installation of solar panels on the roof of Langford Building. The proposed project location has moved from Langford Building A to Langford Building C due to previous concerns noted by all sub-councils. The updated information addressed the previous concerns related to safety, roof warranty, and maintenance. Previously, DRsc members recommended approval of the installation of the solar panels with caveats. Below are the responses to those caveats: A study be conducted and presented to address DRsc concerns related to safety and structural concerns. Concerns addressed within updated TRsc Report. Confirmation and assurance should be provided that the installation of the solar panels will not void any warranties or have any adverse effects on the existing roof membrane. Coordination with SSC Service Solutions may be necessary. Concerns addressed within updated TRsc Report. A long-term maintenance plan must be addressed and presented for the solar panels. Concerns addressed within updated Msc Report. Consideration of the installation of a second monitor on the second floor of Langford Building A to maximize student and staff exposure to educational information. The monitor(s) location will be either on the fourth floor or lobby area of Langford A Building. If the project's grant is sufficient, displaying monitors will be installed in both locations. Proposed project location should be studied to make sure there will be no adverse effects to other projects / installations in the area. Concern no longer an issue with new location on the roof of Langford Building C. Based on the updated information and responses, the DRsc maintains its recommendation for approval. Please contact me with any questions. cc: Jorge Vanegas DRsc Members Bettyann Zito 1

26

27

28

COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT. Watts Cross Country Storage Building 5/5/2017. Kevin Hurley, Athletics Department 4/24/2017

COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT. Watts Cross Country Storage Building 5/5/2017. Kevin Hurley, Athletics Department 4/24/2017 DIVISION OF FINANCE AND ADMINISTRATION OFFICE OF THE UNIVERSITY ARCHITECT Lilia Gonzales University Architect COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT Project Name: Issue Date: Watts Cross Country

More information

COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT. Turk Road Utility Corridor 10/24/2016. Jim Riley, Utilities & Energy Services 8/17/2016

COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT. Turk Road Utility Corridor 10/24/2016. Jim Riley, Utilities & Energy Services 8/17/2016 DIVISION OF FINANCE AND ADMINISTRATION OFFICE OF THE UNIVERSITY ARCHITECT Lilia Gonzales University Architect COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT Project Name: Issue Date: Turk Road Utility

More information

COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT. Emergency Generator at A.P. Beutel Health Center 4/28/2017

COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT. Emergency Generator at A.P. Beutel Health Center 4/28/2017 DIVISION OF FINANCE AND ADMINISTRATION OFFICE OF THE UNIVERSITY ARCHITECT Lilia Gonzales University Architect COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT Project Name: Issue Date: Emergency Generator

More information

COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT. Lamar Street Utility Corridor 1/5/2017. Jim Riley, Utilities & Energy Services 11/7/2016

COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT. Lamar Street Utility Corridor 1/5/2017. Jim Riley, Utilities & Energy Services 11/7/2016 DIVISION OF FINANCE AND ADMINISTRATION OFFICE OF THE UNIVERSITY ARCHITECT Lilia Gonzales University Architect COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT Project Name: Issue Date: Lamar Street Utility

More information

TEXAS A&M ENGINEERING

TEXAS A&M ENGINEERING TEXAS A&M ENGINEERING 312 Jack K. Williams Administration Building I 3126 TAMU I College Station, Texas 77843-3126 M. Katherine Banks, Ph.D., P.E. Vice Chancellor and Dean of Engineering Director, Texas

More information

COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT. Living Wall at Langford Building 4/20/2018. Jorge Vanegas, College of Architecture 3/13/2018

COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT. Living Wall at Langford Building 4/20/2018. Jorge Vanegas, College of Architecture 3/13/2018 DIVISION OF FINANCE AND OPERATIONS OFFICE OF THE UNIVERSITY ARCHITECT Lilia Gonzales University Architect Project Name: COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT Issue Date: Living Wall at Langford

More information

TEXAS A&M ENGINEERING

TEXAS A&M ENGINEERING ...I... TEXAS A&M ENGINEERING 312 Jack K. Williams Administration Building I 3126 TAMU I College Station, Texas 77843-3126 M. Katherine Banks, Ph.D., P.E. Vice Chancellor and Dean of Engineering Director,

More information

Planning and Engineering for a Large Campus Solar Installation

Planning and Engineering for a Large Campus Solar Installation Planning and Engineering for a Large Campus Solar Installation Department of Electrical and Computer Engineering March 14, 2012 APPLICANT CONTACT INFORMATION Project Lead Name: Philip T. Krein E-mail:

More information

Dubuque County West Campus Secondary Roads Shop Solar Array Bid Documents and Specifications. Notice to Bidders

Dubuque County West Campus Secondary Roads Shop Solar Array Bid Documents and Specifications. Notice to Bidders Dubuque County West Campus Secondary Roads Shop Solar Array Bid Documents and Specifications Notice to Bidders 1. Sealed proposals will be received at the Dubuque County Auditor s Office in the Courthouse,

More information

We ve cracked the code to harness the sun

We ve cracked the code to harness the sun We ve cracked the code to harness the sun FUSION 3.3 ft. 6.6 ft. Wire mesh fall protection. FUSION photovoltaic panel requires only one 0.5 diameter opening inside the sealed boot. That s smaller than

More information

We ve cracked the code to harness the sun

We ve cracked the code to harness the sun We ve cracked the code to harness the sun FUSION 3.3 ft. 6.6 ft. Wire mesh fall protection. FUSION photovoltaic panel requires only one 0.5 diameter opening inside the sealed boot. That s smaller than

More information

SOLARPVSYSTEM INFORMATIONPACK FIT PROGRAM

SOLARPVSYSTEM INFORMATIONPACK FIT PROGRAM SOLARPVSYSTEM INFORMATIONPACK FIT PROGRAM (Thailand, July 2013) The Thai government has recently introduced a generous subsidy scheme involving Feed in Tariffs. This means that you get paid a premium rate

More information

2014 ENERGY REPORT. Mark J. Ferguson, P.E. Campus Operations & Plant Manager

2014 ENERGY REPORT. Mark J. Ferguson, P.E. Campus Operations & Plant Manager 2014 ENERGY REPORT Mark J. Ferguson, P.E. Campus Operations & Plant Manager Table of Contents Executive Summary... 2 Utilities Overview... 3 Avoided Cost... 4 Our Carbon Footprint... 5 Benchmarking...

More information

Roof mounted solar panels on Bldg L, Verde Valley Campus. 1. One developed Acre can produce approx 100 KW of peak solar power.

Roof mounted solar panels on Bldg L, Verde Valley Campus. 1. One developed Acre can produce approx 100 KW of peak solar power. SOLAR OPPORTUNITIES Roof mounted solar panels on Bldg L, Verde Valley Campus There is a growing national commitment to the utilization of sustainable energy sources. Solar, wind, and bio- mass systems

More information

APPLICATION FOR SOLAR PERMIT

APPLICATION FOR SOLAR PERMIT APPLICATION FOR SOLAR PERMIT Permit Application Application Checklist o New York State Unified Solar Permit Application for Roof Mounted Systems 12kW or less. (Includes Electrical Permit Application) o

More information

Solar Energy 101 What You Need to Know to Go Solar

Solar Energy 101 What You Need to Know to Go Solar Solar Energy 101 What You Need to Know to Go Solar Cathy Redson Sarah Raymer SolPowerPeople, Inc. October 6, 2012 The data, analysis, views, and commentary that follow have been provided by the presenter

More information

Farm Energy IQ. Solar Energy on Farms. Farms Today Securing Our Energy Future. Ed Johnstonbaugh, Penn State Extension

Farm Energy IQ. Solar Energy on Farms. Farms Today Securing Our Energy Future. Ed Johnstonbaugh, Penn State Extension Farm Energy IQ Farms Today Securing Our Energy Future Solar Energy on Farms Ed Johnstonbaugh, Penn State Extension Farm Energy IQ Farm Energy IQ Presents: Solar Energy on Farms: Photovoltaic (PV) Electric

More information

Aurora Genmounts Install LT Installation Manual

Aurora Genmounts Install LT Installation Manual Aurora Genmounts Install LT Installation Manual TABLE OF CONTENTS 1.0 INTRODUCTION 2.0 PRODUCT OVERVIEW 3.0 TECHNICAL SPECS 4.0 INSTALLER RESPONSIBILITY 5.0 SITE SELECTION 6.0 TOOLS REQUIRED 7.0 COMPONENT

More information

Farm Energy IQ. Solar Energy on Farms. Farms Today Securing Our Energy Future. Ed Johnstonbaugh, Penn State Extension

Farm Energy IQ. Solar Energy on Farms. Farms Today Securing Our Energy Future. Ed Johnstonbaugh, Penn State Extension Farm Energy IQ Farms Today Securing Our Energy Future Solar Energy on Farms Ed Johnstonbaugh, Penn State Extension Farm Energy IQ Farm Energy IQ Presents: Solar Energy on Farms: Photovoltaic (PV) Electric

More information

REQUEST FOR PROPOSALS for

REQUEST FOR PROPOSALS for REQUEST FOR PROPOSALS for Ground Mounted & Rooftop Solar Photovoltaic System Issued by Pearlstone Conference & Retreat Center Issued: June 25, 2018 Table of Contents I. Overview... 3 Intent... 3 Proposal

More information

Environmental concerns/reduce carbon emissions Save money on electric bills General interest in new technologies Increase in building value

Environmental concerns/reduce carbon emissions Save money on electric bills General interest in new technologies Increase in building value Environmental concerns/reduce carbon emissions Save money on electric bills General interest in new technologies Increase in building value 1 Does solar work in Palestine? PV costs and benefits Other uses

More information

Power Saver TM Program

Power Saver TM Program Power Saver TM Program COMMERCIAL SOLAR PHOTOVOLTAIC PERFORMANCE-BASED INCENTIVE PROGRAM GUIDELINES These guidelines govern the procedures and qualifications for incentives under the Austin Energy Commercial

More information

Bullitt Center s Energy Performance

Bullitt Center s Energy Performance Bullitt Center s Energy Performance Introduction In 2007 Congress created a Zero Net Energy Commercial Buildings Initiative with a goal of achieving a market transition to Zero Net Energy for new commercial

More information

Student Green Energy Fund Proposal Application Form

Student Green Energy Fund Proposal Application Form Student Green Energy Fund Proposal Application Form Section 1: Summary Information Project Title: Duration (months): Marshall Student Center (MSC) Solar Panel Installation 4 months Total Budget ($): $1,435,880.95

More information

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY Page 1 of 5 REFERENCE Denver Building and Fire Code (DBC) Section 131, International Residential Code (IRC) Section M2301, the National Electrical Code (NEC) Articles 690 & 705 PROCEDURE The procedure

More information

Devin Maurizio. Spring 2007 Lighting/Electrical Option. Williams College Center for Theater & Dance

Devin Maurizio. Spring 2007 Lighting/Electrical Option. Williams College Center for Theater & Dance Devin Maurizio Spring 2007 Lighting/Electrical Option Presentation Outline: Building Overview Lighting Depth Front Lobby Dance Rehearsal Studio Depth Summary Electrical Depth Photovoltaics Depth Summary

More information

50 kw Solar Installation ICWT WET Laboratory Fresno, California

50 kw Solar Installation ICWT WET Laboratory Fresno, California Project Summary By Kaomine Vang and James Tischer The International Center for Water Technology (ICWT) California State University, Fresno 5370 N Chestnut Ave M/S OF18 Fresno, CA 93740-8021 www.icwt.net

More information

5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS

5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS To Wit: To see if the Town will vote to amend the Town of Westborough Zoning Bylaws, Article 2, District Regulations, Section 2300, Use Regulations Schedule; and to amend Article 4, Special Regulations

More information

BURBANK FIRE DEPARTMENT 311 East Orange Grove Avenue, Burbank CA Fax

BURBANK FIRE DEPARTMENT 311 East Orange Grove Avenue, Burbank CA Fax BURBANK FIRE DEPARTMENT 311 East Orange Grove Avenue, Burbank CA 91502 818 238 3473 Fax 818 238 3479 SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINES BASED ON THE CSFM PV GUIDELINES (REVISED APRIL 2017) The

More information

Solar Tompkins: Accelerating the Adoption of Solar in Tompkins County

Solar Tompkins: Accelerating the Adoption of Solar in Tompkins County Solar Tompkins: Accelerating the Adoption of Solar in Tompkins County What is Solar Tompkins? Solar Tompkins is a non profit, community solar initiative focused on facilitating a large sustained increase

More information

Metal Roo ng + Solar Arrays: The Perfect Combination. Photovoltaic Technology

Metal Roo ng + Solar Arrays: The Perfect Combination. Photovoltaic Technology Metal Roo ng + Solar Arrays: The Perfect Combination Photovoltaic Technology The Challenge: Well-known Fact: Americans are too dependent on oil and natural gas. We re also the leading consumer of energy

More information

Anchorage Alaska Solar Tour: Saturday, June 17th, 2017 Tour Starts At 10am

Anchorage Alaska Solar Tour: Saturday, June 17th, 2017 Tour Starts At 10am Please visit alaskasolartour.org for updates on this tour Anchorage Alaska Solar Tour: Saturday, June 17th, 2017 Tour Starts At 10am Sites Times Building Address Area of town Site #1 10 10:45am CIRI Office

More information

Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System

Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System Brooks Martner Lafayette, Colorado University of Toledo Spring 2013 PHYS 4400 - Principles and Varieties

More information

Solar Photovoltaic Electricity Generation for Dairy Farms

Solar Photovoltaic Electricity Generation for Dairy Farms Improving the Welsh Dairy Supply Chain Solar Photovoltaic Electricity Generation for Dairy Farms www.ddc-wales.co.uk Dairy Development Centre Gelli Aur Carmarthen Carmarthenshire SA32 8NJ Telephone: 01554

More information

ALBERTA ROOFING CONTRACTORS ASSOCIATION. This old roof ain t what she used to be

ALBERTA ROOFING CONTRACTORS ASSOCIATION. This old roof ain t what she used to be ALBERTA ROOFING CONTRACTORS ASSOCIATION This old roof ain t what she used to be Roofing Basics 1 ARCA s History, Mission, Role, & Services 2 Commercial Roofing 101 3 Roof Maintenance 4 ARCA s Warranty

More information

Case Study: Golisano Institute for Sustainability

Case Study: Golisano Institute for Sustainability Case Study: Golisano Institute for Sustainability Rochester Institute of Technology - Golisano Institute for Sustainability Sustainability Hall at Rochester Institute of Technology A001.01 (RIT) is a LEED-Platinum

More information

Addition to Section 4 - Special Use Regulations

Addition to Section 4 - Special Use Regulations Large-Scale Ground-Mounted Solar Photovoltaic Installations Addition to Section 4 - Special Use Regulations 4.4 Large Scale Ground-Mounted Solar Photovoltaic Installations 4.4.1 Purpose The purpose of

More information

Model Curriculum. Solar PV Project Manager (E&C) SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL:

Model Curriculum. Solar PV Project Manager (E&C) SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: Model Curriculum SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: GREEN JOBS RENEWABLE ENERGY Project Management SGJ/Q0114, V1.0 7 TABLE OF CONTENTS 1. Curriculum 01 2. Trainer Prerequisites 06 3.

More information

NORTH COUNTRY LIBRARY SYSTEM County Route 190 Watertown, NY 13601

NORTH COUNTRY LIBRARY SYSTEM County Route 190 Watertown, NY 13601 22072 County Route 190 Watertown, NY 13601 REQUEST FOR PROPOSAL DESIGN/BUILD OF SOLAR PHOTOVOLTAIC ARRAY Solicitation The North Country Library System (NCLS), Watertown NY is soliciting proposals from

More information

Architectural Integration of Solar PV into Building Design

Architectural Integration of Solar PV into Building Design Architectural Integration of Solar PV into Building Design 1 Agenda 1. New Construction is the Best Time for PV 2. Design Considerations to Maximize Solar Potential 3. Lousy Design Decisions 4. Architectural

More information

Introduction to Photovoltaic (PV) Facilities

Introduction to Photovoltaic (PV) Facilities Introduction to Photovoltaic (PV) Facilities Hunterdon County Planning Board TYPES OF SOLAR PANEL DEVELOPMENTS Fixed Tilt Ground Mount Arrays Usually: Ground based PV facilities Typically utilize open

More information

College of Lake County Sustainability Center

College of Lake County Sustainability Center ~ 1 ~ Climate Action Plan College of Lake County College of Lake County Sustainability Center ~ 2 ~ Table of Contents I. Introduction...3 A. CLC s Climate Commitment... 3 B. Executive Summary... 4 C. CLC

More information

SuCCeSSful rooftop PhotovoltaiCS

SuCCeSSful rooftop PhotovoltaiCS SuCCeSSful rooftop PhotovoltaiCS How to AcHieve A HigH - QuAlity, well- MAintAined, compatible Rooftop pv SySteM. Center for environmental innovation in roofing 816 Connecticut Ave, NW Fifth Floor Washington,

More information

NABCEP PV Technical Sales Job Task Analysis

NABCEP PV Technical Sales Job Task Analysis NABCEP PV Technical Sales Job Task Analysis Introduction This document presents an in-depth Job Task Analysis for solar electric professionals who gather site specific information and analyze customer

More information

AN EFFECTIVE STUDY ON PERFORMANCE ANALYSIS OF GRID CONNECTED PV SYSTEM

AN EFFECTIVE STUDY ON PERFORMANCE ANALYSIS OF GRID CONNECTED PV SYSTEM AN EFFECTIVE STUDY ON PERFORMANCE ANALYSIS OF GRID CONNECTED PV SYSTEM Jignesh L. Rohit 1, Prof. K.D. Panchal 2 1 P.G. Student, M. E. (Energy Engineering), Government Engineering College, Valsad, Gujarat

More information

Solar Electric Investment Proposal

Solar Electric Investment Proposal Solar Electric Investment Proposal for Jack Sun Date : 8/10/12 Site Location: 117 So Mary Ave, #30 Sunnyvale, CA 94087 This PROPOSAL SUMMARY is based on the site location, estimated electric usage and

More information

Santa Monica Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS

Santa Monica Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS Santa Monica Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 City of Santa Monica TABLE OF CONTENTS GENERAL INFORMATION ABOUT SOLAR PHOTOVOLTAIC SYSTEMS... 2 RESOURCES... 3 GENERAL 3 1.0

More information

Beverly Hills Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS

Beverly Hills Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS Beverly Hills Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS GENERAL INFORMATION ABOUT SOLAR PHOTOVOLTAIC SYSTEMS...2 RESOURCES...3 GENERAL 3 1.0 MARKING...5 1.1 MAIN

More information

Benefits of Green Buildings. Government Finance Officers Association of Texas April 2014

Benefits of Green Buildings. Government Finance Officers Association of Texas April 2014 Benefits of Green Buildings Government Finance Officers Association of Texas April 2014 Overview LEED History and information General Purpose & Examples LEED Scoring & Benefits City of Irving Projects

More information

Request for Proposals for Photovoltaic System Installation

Request for Proposals for Photovoltaic System Installation Request for Proposals for Photovoltaic System Installation Presented by: Mason County Public Utility District No. 1 Prepared by: Locations: Contact: Bonneville Environmental Foundation, Renewable Energy

More information

Walk-Don t Run. Steps to Change Sustainable Designs into. "Net Zero Buildings Designs"

Walk-Don t Run. Steps to Change Sustainable Designs into. Net Zero Buildings Designs Walk-Don t Run Steps to Change Sustainable Designs into "Net Zero Buildings Designs" Curtis Wade C.E.M., PMP, B.E.P., LEED AP BD+C, LEED AP O&M Director, Department of Utilities and Energy Services Matthew

More information

Texas Tech University Energy Savings Program October 2011 Update

Texas Tech University Energy Savings Program October 2011 Update Texas Tech University Energy Savings Program October 2011 Update The Texas Tech Energy Savings Update is being submitted in accordance with Governor s Executive Order RP 49, Electric Conservation by State

More information

Reducing the Carbon Footprint of the Hyannis WPCF:

Reducing the Carbon Footprint of the Hyannis WPCF: Reducing the Carbon Footprint of the Hyannis WPCF: Through Renewable Energy Production and Energy Efficiency Measures Rip Copithorn PE, BCEE Water Technology Leader Marc Drainville PE, BCEE, LEED AP Senior

More information

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD . EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD STANDARD #H-005 EFFECTIVE 08-20-2009 About the Guideline This guideline was developed with safety as the principal objective. The solar photovoltaic

More information

Board of Directors Des Moines Area Community College. Telephonic Board Meeting December 18, :00 p.m.

Board of Directors Des Moines Area Community College. Telephonic Board Meeting December 18, :00 p.m. Board of Directors Telephonic Board Meeting December 18, 2018 4:00 p.m. Building 22 Conference Room; DMACC Ankeny Campus 2006 South Ankeny Boulevard; Ankeny, Iowa AGENDA 1. Call to order. 2. Roll call.

More information

SOLAR ENERGY CHRIS PRICE TECHNICAL SERVICES OFFICER BIMOSE TRIBAL COUNCIL

SOLAR ENERGY CHRIS PRICE TECHNICAL SERVICES OFFICER BIMOSE TRIBAL COUNCIL SOLAR ENERGY CHRIS PRICE TECHNICAL SERVICES OFFICER BIMOSE TRIBAL COUNCIL SOLAR ENERGY 1. Photovoltaics - What are they and how do they work? 2. The Solar Resource - Understanding, measuring and using

More information

Renewable Energy Feasibility Study for Ione Band of Miwok Indians

Renewable Energy Feasibility Study for Ione Band of Miwok Indians Renewable Energy Feasibility Study for Ione Band of Miwok Indians By: Community Assessment of Renewable Energy and Sustainability & The Renewable and Appropriate Energy Laboratory Contents i. About CARES

More information

Look Inside To Determine Your Home s Solar Energy Needs

Look Inside To Determine Your Home s Solar Energy Needs KYOCERA MYGEN Residential System Look Inside To Determine Your Home s Solar Energy Needs THE COMPLETE MYGEN SYSTEM Kyocera s MyGen Grid-Connected Systems are convenient and comprehensive photovoltaic (PV)

More information

IX. ADDITION OF SOLYNDRA SOLAR PANELS (ELECTRICAL BREADTH)

IX. ADDITION OF SOLYNDRA SOLAR PANELS (ELECTRICAL BREADTH) IX. ADDITION OF SOLYNDRA SOLAR PANELS (ELECTRICAL BREADTH) BACKGROUND Carderock Springs Elementary is striving to achieve a LEED Silver rating from the USGBC. The school s design is part of the Montgomery

More information

UNIVERSITY OF TORONTO, Department of Civil Engineering

UNIVERSITY OF TORONTO, Department of Civil Engineering Name: Student #: UNIVERSITY OF TORONTO, Department of Civil Engineering CIV 380 Sustainable Energy Systems Midterm: Wednesday, March 6 th, 2012 3:10 PM. The test is one hour and 50 minutes (110 minutes).

More information

The IMERYS PHOTOVOLTAIC INTEGRATED PV SYSTEM. The flexible renewable energy system L74216 (61.7) R. Uniclass.

The IMERYS PHOTOVOLTAIC INTEGRATED PV SYSTEM. The flexible renewable energy system L74216 (61.7) R.  Uniclass. The IMERYS PHOTOVOLTAIC INTEGRATED PV SYSTEM The flexible renewable energy system Uniclass Cl/SfB L74216 (61.7) R www.imerys-rooftiles.com The IMERYS Integrated Photovoltaic System Designed by Europe s

More information

MARBLEHEAD FIRE DEPARTMENT Standard Operating Guideline Draft for Photovoltaic/Solar Installations

MARBLEHEAD FIRE DEPARTMENT Standard Operating Guideline Draft for Photovoltaic/Solar Installations TOWN OF MARBLEHEAD FIRE DEPARTMENT Marblehead Fire Department Installation Guidelines for Photovoltaic/Solar installations July 1, 2015 Updated December 2015 MARBLEHEAD FIRE DEPARTMENT Standard Operating

More information

SOLAR ENERGY SYSTEMS APPLICATION

SOLAR ENERGY SYSTEMS APPLICATION For reasonable accommodations or alternative formats please contact 311 at 612-673-3000. People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000. TTY users call 612-673-2157

More information

Contents. Contents. Module 1 Photovoltaic panels in context of renewable technologies 1

Contents. Contents. Module 1 Photovoltaic panels in context of renewable technologies 1 BPEC Domestic Solar Photovoltaic Systems Learning Manual BPEC0018 Contents Contents Page Module 1 Photovoltaic panels in context of renewable technologies 1 Module 2 How a photovoltaic system works principles

More information

Building Solar Friendly Roofs

Building Solar Friendly Roofs Building Solar Friendly Roofs Presented by John Maissan Leading Edge Projects Inc. Yukon Housing Corporation Contractor Breakfast April 15, 2015 Presentation Outline Why solar Sun angles by time of day

More information

Presentation Outline. Project Background

Presentation Outline. Project Background Presentation Outline Analysis 2: Building Information Modeling Virtual Structural Breadth (Will Not Be Discussed) Analysis 4: Solar Photovoltaic (PV) Panels Project Background Project Background Location

More information

CITY OF LA MESA FIRE DEPARTMENT SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE

CITY OF LA MESA FIRE DEPARTMENT SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE CITY OF LA MESA FIRE DEPARTMENT SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE April 22, 2008 SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE April 22, 2008 TABLE OF CONTENTS 1.0 MARKING...3 1.1 MAIN SERVICE DISCONNECT...3

More information

SOLAR PANEL INSTALLATION NYC Department of Buildings

SOLAR PANEL INSTALLATION NYC Department of Buildings SOLAR PANEL INSTALLATION NYC Department of Buildings Agenda Solar Permits Processing at the DOB: Overview General Requirements Solar Approval / Permit / Sign off Property Tax Abatement Program Zoning Requirements

More information

Company Profile COMMERCIAL SOLAR SOLUTIONS

Company Profile COMMERCIAL SOLAR SOLUTIONS Company Profile COMMERCIAL SOLAR SOLUTIONS About UGE UGE delivers immediate savings to businesses through the low cost of solar energy. We help commercial and mid-scale clients become more competitive

More information

Walmart Energy. Image Area. September 2015

Walmart Energy. Image Area. September 2015 Walmart Energy Image Area September 2015 Walmart Walmart Facilities Globally Total Retail Units as of July 31 2015 11,532 Walmart U.S. 4,588 Sam s Club 651 Walmart international 6,293 Walmart employees

More information

Wild Horse Solar Photovoltaic Project

Wild Horse Solar Photovoltaic Project Wild Horse Solar Photovoltaic Project Steven J. St.Clair Manager Renewable Assets Phone: 425-462-3057 Email: steven.stclair@pse.com November 19, 2009 Agenda Introduction PSE Renewable Energy Facilities

More information

BERKELEY UNIFIED SCHOOL DISTRICT (BUSD) Chapter 3. Structural Evaluations

BERKELEY UNIFIED SCHOOL DISTRICT (BUSD) Chapter 3. Structural Evaluations BERKELEY UNIFIED SCHOOL DISTRICT (BUSD) Chapter 3 Structural Evaluations Solar Master Plan November 2011 Chapter Three Structural Evaluations Once a school district has identified the buildings that it

More information

Consumer s Guide to Solar Power

Consumer s Guide to Solar Power Consumer s Guide to Solar Power JEA Consumer s Guide to Solar Power What is Solar Energy? 3 Benefits of Solar Power 3 JEA Solar Programs 4 Types of Solar Energy Systems 6 Is Solar Right for You? 10 Installation

More information

Energy Matters The Little Green Book

Energy Matters The Little Green Book Energy Matters The Little Green Book Contents 2 Introduction 5 Making the switch 6 Home and business 8 Schools 11 Community buildings 12 Remote areas 14 Grid connect and off-grid 19 Solar panels 21 Wind

More information

Solar- Ready Roof. Op#mize the Design. The SOLAR-READY ROOF Optimize the Design Copyright All rights reserved. The

Solar- Ready Roof. Op#mize the Design. The SOLAR-READY ROOF Optimize the Design Copyright All rights reserved. The The Solar- Ready Roof Op#mize the Design Course Sponsor: Metal Roof Innova-ons Rob Haddock S- 5! /Metal Roof Innova>ons 8655 Table BuCe Road Colorado Springs, CO 80908 888-825- 3432 rob@rmhaddock.com www.s-

More information

Integrated Energy Master Plan Summary

Integrated Energy Master Plan Summary Integrated Energy Master Plan Summary January 8, 2013 Adapted from the original Board of Trustees presentation by Eric Utterson, PE, LEED AP Jerry Williams, PE, LEED AP 8760 Engineering, LLC St. Louis,

More information

CONTRACTOR S PERMIT APPLICATION for Residential PV Installation with e-inspection CA Health and Safety Code Section V p2s

CONTRACTOR S PERMIT APPLICATION for Residential PV Installation with e-inspection CA Health and Safety Code Section V p2s CONTRACTOR S PERMIT APPLICATION for Residential PV Installation with e-inspection CA Health and Safety Code Section 19825 V 11-10-12 6p2s H:\2012 Permit Masters\v 11-10-12 e-inspection Residential PV Installation

More information

How Building Owners Save by Solar PV & SPF Roofing Systems. Presented by: Daryl A. Pilon, M.E. Director of Business Development Standard Solar, Inc.

How Building Owners Save by Solar PV & SPF Roofing Systems. Presented by: Daryl A. Pilon, M.E. Director of Business Development Standard Solar, Inc. How Building Owners Save by Solar PV & SPF Roofing Systems Presented by: Daryl A. Pilon, M.E. Director of Business Development Standard Solar, Inc. ANTITRUST POLICY STATEMENT FOR SPRAY POLYURETHANE FOAM

More information

Residential Roadmap to Renewable Energy Living

Residential Roadmap to Renewable Energy Living Residential Roadmap to Renewable Energy Living Upgrading your household energy system towards a sustainable energy future ELECTRIFY HEATING & COOLING IMPROVE ENERGY EFFICIENCY 4 ACTIONS WITH IMPACT GET

More information

SCAP ENERGY MANAGEMENT COMMITTEE

SCAP ENERGY MANAGEMENT COMMITTEE SCAP ENERGY MANAGEMENT COMMITTEE Renewable Energy Sources: Wind Power PRESENTED BY: ADHAM ALMASRI, P.E., M.S. SENIOR ENGINEER-INLAND EMPIRE UTILITIES AGENCY BACKGROUND IEUA has been considering the benefits

More information

CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY MANAGEMENT 2018 TCS PEEPUL PARK, TRIVANDRUM

CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY MANAGEMENT 2018 TCS PEEPUL PARK, TRIVANDRUM CII NATIONAL AWARD FOR EXCELLENCE IN ENERGY MANAGEMENT 2018 TCS PEEPUL PARK, TRIVANDRUM Arun P S Technical Lead Unnikrishnan Nellanat Specialist ESHS Copyright 2018 Tata Consultancy Services Limited TATA

More information

Subtask 1: Economic of PV System Performance and Reliability

Subtask 1: Economic of PV System Performance and Reliability TASK 13: PERFORMANCE AND RELIABILITY OF PV SYSTEMS Subtask 1: Economic of PV System Performance and Reliability Mauricio Richter (3E), Jan Vedde (SiCon) Mike Green (M.G.Lightning Electrical Engineering)

More information

IEC Installation Guide for SERAPHIM Photovoltaic Module

IEC Installation Guide for SERAPHIM Photovoltaic Module SUSA [InstallationGuide] 2016.11_V1.0 IEC Installation Guide for SERAPHIM Photovoltaic Module Table of Contents 2 Purpose of this guide General safety Handling safety Installation safety Fire safety 5

More information

Wetlands Protection Act and Section 401 Permitting Process

Wetlands Protection Act and Section 401 Permitting Process Wetlands Protection Act and Section 401 Permitting Process Questions & Answers Ground-Mounted Solar Photovoltaic Systems, December 2012 can be found at: http://www.mass.gov/eea/docs/doer/renewables/solar/solar-pv-guide.pdf

More information

Monitoring of 20 kwp photovoltaic system

Monitoring of 20 kwp photovoltaic system Monitoring of 20 kwp photovoltaic system Milan Belik ABSTRACT The document describes influence of basic meteorological value to proposition of photovoltaic arrays. Results from 3 years long measurements

More information

Specification Lightning Protection Systems

Specification Lightning Protection Systems Specification Lightning Protection Systems General: Summary A) This Section specifies the lightning protection system for the building(s) or structure(s). This system provides safety for the building and

More information

Model Curriculum. Solar PV Designer SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: GREEN JOBS RENEWABLE ENERGY Designer SGJ/Q0110, V1.

Model Curriculum. Solar PV Designer SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: GREEN JOBS RENEWABLE ENERGY Designer SGJ/Q0110, V1. Model Curriculum Solar PV Designer SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: GREEN JOBS RENEWABLE ENERGY Designer SGJ/Q0110, V1.0 7 Solar PV Designer Solar PV Designer 2 TABLE OF CONTENTS 1.

More information

Photovoltaic Systems II. EE 446/646 Fall 2013

Photovoltaic Systems II. EE 446/646 Fall 2013 Photovoltaic Systems II EE 446/646 Fall 2013 Components of a grid-connected residential PV system (net meter) The inverter contains: Ground Fault Circuit Interrupter (GFCI) MPPT and Circuitry to disconnect

More information

Minnesota Department of Natural Resources 500 Lafayette Road, St Paul, MN 55155

Minnesota Department of Natural Resources 500 Lafayette Road, St Paul, MN 55155 Minnesota Department of Natural Resources 500 Lafayette Road, St Paul, MN 55155 Project Title: Development of Renewable Energy Strategies Contract Number: EP3-13 Milestone Number: 7 Report Date: 1.24.2013

More information

A MARRIAGE OF HELIO AND GEO ENERGY SOURCES

A MARRIAGE OF HELIO AND GEO ENERGY SOURCES A MARRIAGE OF HELIO AND GEO ENERGY SOURCES Merrick, Inc. Vadnais Heights, MN September 2008 Merrick, Inc. A nonprofit agency founded in 1964, working to meet the employment, personal development, and transportation

More information

Putting it all together

Putting it all together Putting it all together 1 Agenda 1. Solar case studies 2. Design exercises 2 Solar case studies 3 Case Study J. Craig Venter Institute Architect: ZGF Architects LLP Project Owner: J. Craig Venter Institute

More information

REQUEST FOR BID (TURNKEY SOLUTION) 1MW GRID TIE SOLAR PV POWER PLANT. Location:

REQUEST FOR BID (TURNKEY SOLUTION) 1MW GRID TIE SOLAR PV POWER PLANT. Location: REQUEST FOR BID (TURNKEY SOLUTION) 1MW GRID TIE SOLAR PV POWER PLANT Location: Dist.: Jodhpur Rajasthan, INDIA Latitude 27.32 & Longitude 71.54 Elevation: 151 meter GENERAL INFORMATION AND TECHNICAL SPECIFICATION

More information

Jenny Tenbush Information Design I. GE Energy Brand Book

Jenny Tenbush Information Design I. GE Energy Brand Book Jenny Tenbush Information Design I Energy 5.7.08 Brand Book Nuclear Steam Signature Signature 1 2 Energy out of thin air. Energy out of thin air. Billboard Billboard 3 4 Simply Our solar module product

More information

Solar Energy Services, Inc. Commercial Solar Photovoltaic Project Summaries

Solar Energy Services, Inc. Commercial Solar Photovoltaic Project Summaries Solar Energy Services, Inc. Commercial Solar Photovoltaic Project Summaries Brookings Institution (Completed December 2016) Location: Washington DC Customer: Brookings Interconnect Utility: Pepco Solar

More information

Solar Energy Case Study Webinar

Solar Energy Case Study Webinar Solar Energy Case Study 2010 Webinar JOE FICALORA FICALORA & ASSOCIATES & ASSOCIATES 1 What is this? The 7 Keys to DFSS Success 1. Active NPD Phase Gate Process 2. Linkage to Growth Strategy 3. Mind-Meld

More information

Company Profile COMMERCIAL SOLAR SOLUTIONS

Company Profile COMMERCIAL SOLAR SOLUTIONS Company Profile COMMERCIAL SOLAR SOLUTIONS About UGE UGE delivers immediate savings to businesses through the low cost of solar energy. We help commercial and industrial clients unlock the low cost of

More information

Power Ready Integrated Mounting Environment

Power Ready Integrated Mounting Environment Power Ready Integrated Mounting Environment A modular fixed tilt mounting system for large commercial solar projects THE CHORD ASSEMBLY DIFFERENT ATTACHMENTS FOR ROOF OR GROUND ATTACHMENTS THE NOTION OF

More information

Solar in a nutshell. Harness the power of the sun. Product series September 2018

Solar in a nutshell. Harness the power of the sun. Product series September 2018 Solar in a nutshell Harness the power of the sun Product series September 2018 The Power of Solar Powering Performance Solar will help you cut your costs in a truly sustainable way by providing you with

More information

Loyalty One 163 kw PV Installation. Final Report January Technology. Monitoring. SolarCity Partnership. Best Practices.

Loyalty One 163 kw PV Installation. Final Report January Technology. Monitoring. SolarCity Partnership. Best Practices. Loyalty One 163 kw PV Installation Final Report January 2012 Technology Monitoring Best Practices SolarCity Partnership Loyalty One 1 PROJECT SNAPSHOT Address: 6696 Financial Drive, Mississauga, ON Building

More information

ALTERNATIVE ENERGY RESOURCES ORDINANCE

ALTERNATIVE ENERGY RESOURCES ORDINANCE ALTERNATIVE ENERGY RESOURCES ORDINANCE Intent The Town of Seven Devils recognizes the progressive and changing needs for alternative energy sources and wishes to illustrate a desire to be proactive in

More information