1 PM2.5 Implementation Rule RACT/RACM Tim Smith, EPA/OAQPS Presentation to Chicago PM2.5 Workshop June 20,

2 Overview Will discuss Overall approach to RACM/RACT in the final PM2.5 implementation rule Steps in RACM/RACT process Take your questions 2

3 RACT and RACM For PM2.5 nonattainment areas: in FR based on 172(c)(1) of the CAA (a) SIP must include demonstration that State has adopted all RACM (including RACT) necessary to demonstrate attainment as expeditiously as practicable and to meet any RFP requirements. SIP shall include list of measures considered and information sufficient to support that has adopted all RACM, including RACT. (b) In determining RACM, cumulative analysis. Must adopt technically and economically feasible measures if collectively would advance attainment date by 1 year 3

4 Approach to RACM and RACT in final rule (preamble II.F.2) For PM2.5 (unlike O3) RACT is part of RACM (not an independent requirement) Greater flexibility to tailor solutions to unique problems of given nonattainment area Responsibility to conduct analysis to show that all RACT and RACM have been adopted (As discussed with flowcharts earlier, needed documentation will vary, depending on attainment date, likely more streamlined for pre-2009 measures) 4

5 Steps to RACM and RACT in final rule Identify technically and economically feasible measures and associated emissions reductions Conduct air quality modeling and related analysis Select RACT/RACM 5

6 Technical Feasibility (preamble II.F.4) Is there a measure that works (in reducing emissions of PM2.5 and/or precursors)? Consider factors such as: Process and operating conditions Raw materials Physical Plant layout Non-air quality and energy impacts (Time needed to install and operate controls) 6

7 Economic Feasibility (preamble II.F.5) Is the cost of the potential measure reasonable for the regulated entity to bear? Consider costs, $/ton, economic effects on plant and local economy $/ton for previous measures is an indicator of reasonableness but ability to absorb may differ across categories For some (particularly mobile source) measures, feasibility depends on availability of public funding and resources 7

8 Economic feasibility (cont) No fixed $/ton for reasonableness Reasonable $/ton likely higher for direct PM2.5, because very likely to have higher ug/ton References for cost include EPA cost manual, others 8

9 Economic Feasibility (cont) If source contends can t afford technology that appears to be RACT/RACM for others, thorough economic support needed If severe impacts on local economy (shutdown, severe curtailment) need economic analysis to support 9

10 Measures to Consider (Preamble II.F.6) Preamble includes examples of measures that States should consider as a starting point for RACT/RACM assessment We ll discuss candidate control measures in more detail tomorrow Need to address measures identified in public comments EPA wants to promote information sharing, particularly among States with similar air quality and source characteristics 10

11 Identifying measures additional points No tonnage threshold for RACT Screening assessments likely can inform choice of sources/measures to evaluate Areas with more severe problem likely will need to evaluate smaller sources Need to evaluate sources throughout the nonattainment area for available controls Guiding principle for analysis: show that selected RACT/RACM does not exclude any group of reasonable controls (including controls on smaller sources) that together could advance the attainment date 11

12 Consideration of intrastate sources outside the nonattainment area In defining attainment date as expeditiously as practicable take into account intrastate sources as well as RACT/RACM (Preamble pages and 20601; attainment date discussion on 20613) SIPs must address this issue Basic question: could transport from reasonably controllable intrastate sources contribute to advancement of the attainment date? 12

13 Air Quality and Related Analyses (covered by Rich and more detail upcoming by Brian) 13

14 Selection of RACT and RACM End point of analysis: Decisions on RACM, RACT, intrastate measures and the expeditiously as practicable attainment date Must include reasonable, technically and economically feasible measures if necessary for attainment as expeditiously as practicable May exclude measures if collectively would not advance attainment date 14

15 CAIR vs RACT (Preamble II.F.7) SO2 presumption in States fulfilling CAIR reduction entirely through EGU reductions: compliance by EGUs with approved CAIR SIP or FIP would satisfy RACT States may rely on this presumption without further analysis Must respond to any public comments A State may impose additional requirements on a specific plant if State determines it is reasonable means to attain expeditiously However, several factors should be considered re: potential disbenefits of beyond-cair controls Addressed case-by-case through SIP development process 15

16 CAIR vs RACT (cont) NOx presumption: In States subject to annual CAIR reduction entirely through EGU reductions Compliance by EGUs with approve CAIR SIP or FIP would satisfy RACT provided that source with existing SCR operate year-round Year round-scr For existing SCR (in place by November 1, 2005) Year round operation must be required by SIP 16

17 CAIR vs RACT (cont) No presumption for direct PM2.5 emissions 17

18 Deadlines for submission and implementation of RACT/RACM (II.F.8) Submission: With SIP in April 2008 Implementation: No later than beginning of year before the attainment date Provisions for demonstration that more time is needed for implementation consistent with expeditious schedule 18

19 Pollutants for RACT/RACM (II.F.9) Direct PM.25 SO2 Other pollutants considered precursors consistent with earlier discussion NOx: presumptively in VOC, Ammonia: presumptively out 19

20 RACT for Sources subject to previous RACT/BACT/LAER/MACT (II.F.10) State must assure that RACT is met, either through: New RACT determinations OR Certification that previously required RACT controls represent RACT New RACT required if: previously concluded RACT = no control previous determination didn t address the pollutant 20

21 Previous determinations (cont) BACT/LAER (and MSW under 111d, etc) Not automatically RACT Must present reasoning why represents RACT MACT: Further VOC controls unlikely and expect streamlined determination PM2.5. Not automatic. Issues: fine fraction, emissions capture NOx: Should consider year-round if not required by previous determination 21

22 Questions??????????????? 22

PM2.5 Designations: Evaluating Contribution of Multiple Pollutants Using the Weighted Emissions Score

PM2.5 Designations: Evaluating Contribution of Multiple Pollutants Using the Weighted Emissions Score PM2.5 Designations: Evaluating Contribution of Multiple Pollutants Using the Weighted Emissions Score Discussion with STAPPA/ALAPCO May 5, 2004 Timeline for PM2.5 Implementation Program Action Date States/Tribes

More information

Clean Air Fine Particle Implementation Rule for the 1997 PM2.5 Standards. Paul T Wentworth, P.E. EPA Region 3 October 31, 2007

Clean Air Fine Particle Implementation Rule for the 1997 PM2.5 Standards. Paul T Wentworth, P.E. EPA Region 3 October 31, 2007 Clean Air Fine Particle Implementation Rule for the 1997 PM2.5 Standards Paul T Wentworth, P.E. EPA Region 3 October 31, 2007 PM2.5 Implementation Rule Issues Particle Matter: What is it? EPA s PM 2.5

More information

Final Updates to National Ambient Air Quality Standards (NAAQS) for Ozone. October 2015

Final Updates to National Ambient Air Quality Standards (NAAQS) for Ozone. October 2015 Final Updates to National Ambient Air Quality Standards (NAAQS) for Ozone October 2015 What we ll cover 2015 Final 8-hour Ozone Standards Primary: 70 ppb Secondary: 70 ppb Areas will meet the standards

More information

Draft 10/28/13. Guidance for 1-Hour SO 2 Nonattainment Area SIP Submissions October 2013

Draft 10/28/13. Guidance for 1-Hour SO 2 Nonattainment Area SIP Submissions October 2013 Guidance for 1-Hour SO 2 Nonattainment Area SIP Submissions October 2013 i TABLE OF CONTENTS Preface... Page iii I. Purpose... Page 1 II. Background.... Page 1 A. Roles of the EPA and Air Agencies B. How

More information

United States Environmental Protection Agency, Region 9. Air Division. Technical Support Document. for. EPA s Notice of Proposed Rulemaking.

United States Environmental Protection Agency, Region 9. Air Division. Technical Support Document. for. EPA s Notice of Proposed Rulemaking. United States Environmental Protection Agency, Region 9 Air Division Technical Support Document for EPA s Notice of Proposed Rulemaking for the California State Implementation Plan San Joaquin Valley Unified

More information

Implementation Issues for the PM 2.5 National Ambient Air Quality Standards PM 2.5 NAAQS

Implementation Issues for the PM 2.5 National Ambient Air Quality Standards PM 2.5 NAAQS Implementation Issues for the PM 2.5 National Ambient Air Quality Standards Update for MARAMA CEMS Webinar October 6, 2011 Rich Damberg US EPA Office of Air Quality Planning and Standards 1 PM 2.5 NAAQS

More information

D.C. Circuit Request for Briefs

D.C. Circuit Request for Briefs CAIR and SIPs Bill Harnett USEPA NACAA Membership Meeting October 21, 2008 CAIR Court Decision The Court upheld several aspects of the CAIR rule relating to EPA s methodology in determining which states

More information

AIR DISPERSION MODELING

AIR DISPERSION MODELING Click to edit Master title style AIR DISPERSION MODELING Use of AERMOD for NAAQS Area Designations and State Implementation Plan Submittals SPEAKER Stewart McCollam DATE February 10, 2016 USE OF AERMOD

More information

Long-Term Strategy for Regional Haze

Long-Term Strategy for Regional Haze Long-Term Strategy for Regional Haze Presented to : MANE-VU Science & Policy Meeting, November 10, 2005 By: Ray Papalski, NJDEP 1 The Goal: The Long-term strategy must include enforceable emission limitations,

More information

NAAQS and Other Implementation Updates

NAAQS and Other Implementation Updates NAAQS and Other Implementation Updates M E G A N V. B R A C H T L, R H E A J O N E S A N D V E R A KO R N Y L A K E PA - O A Q P S, A I R Q U A L I T Y P O L I C Y D I V I S I O N A A P C A FA L L M E

More information

Pima Association of Government s Air Quality Forum June 23, 2015

Pima Association of Government s Air Quality Forum June 23, 2015 Pima Association of Government s Air Quality Forum June 23, 2015 Proposed new 8-hour ozone standard Background Proposed NAAQS Final NAAQS National and Regional Maps Planning or Implementation Requirements

More information

Policies for Addressing PM2.5 Precursor Emissions. Rich Damberg EPA Office of Air Quality Planning and Standards June 20, 2007

Policies for Addressing PM2.5 Precursor Emissions. Rich Damberg EPA Office of Air Quality Planning and Standards June 20, 2007 Policies for Addressing PM2.5 Precursor Emissions Rich Damberg EPA Office of Air Quality Planning and Standards June 20, 2007 1 Overview Sources of direct PM2.5 and SO2 must be evaluated for control measures

More information

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE COLUMBUS, OHIO HOUR OZONE NONATTAINMENT AREA

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE COLUMBUS, OHIO HOUR OZONE NONATTAINMENT AREA REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE COLUMBUS, OHIO 2015 8-HOUR OZONE NONATTAINMENT AREA Delaware, Fairfield, Franklin, and Licking Counties, Ohio Prepared by: Ohio Environmental Protection

More information

NSR Program for PM-2.5 NAAQS. Overview of Potential Proposal

NSR Program for PM-2.5 NAAQS. Overview of Potential Proposal NSR Program for PM-2.5 NAAQS Overview of Potential Proposal PM 2.5 Precursors The CAA defines air pollutant to include any pollutant that enters the air and any precursor to the formation of such pollutant

More information

Implementation of the National Ambient Air Quality Standards (NAAQS): Opportunities for Public Participation

Implementation of the National Ambient Air Quality Standards (NAAQS): Opportunities for Public Participation Implementation of the National Ambient Air Quality Standards (NAAQS): Opportunities for Public Participation EPA Environmental Justice Training Research Triangle Park, NC March 18, 2014 Rich Damberg U.S.

More information

BART Discussion. Regional/State/Local Modelers Workshop May 17, 2006 San Diego, CA

BART Discussion. Regional/State/Local Modelers Workshop May 17, 2006 San Diego, CA BART Discussion Regional/State/Local Modelers Workshop May 17, 2006 San Diego, CA EPA Office of Air Quality Planning and Standards Contacts: Todd Hawes (hawes.todd@epa.gov), Kathy Kaufman (kaufman.kathy@epa.gov)

More information

Implementing the NAAQS and Regional Haze Program

Implementing the NAAQS and Regional Haze Program Implementing the NAAQS and Regional Haze Program EPA Office of Air Quality Planning and Standards Lydia Wegman STAPPA/ALAPCO s Spring Membership Meeting May 24, 2005 Overview CAIR Ozone PM & Regional Haze

More information

Chapter 3. Demonstration of Federal Clean Air Act Requirements. PROPOSED 2016 Moderate Area Plan for the 2012 PM2.5 Standard

Chapter 3. Demonstration of Federal Clean Air Act Requirements. PROPOSED 2016 Moderate Area Plan for the 2012 PM2.5 Standard Chapter 3 Demonstration of Federal Clean Air Act Requirements This page intentionally blank. Chapter 3: Demonstration of Federal CAA Requirements PROPOSED Moderate Area Plan for the 2012 PM2.5 Standard

More information

What is the Transport Rule?

What is the Transport Rule? What is the Transport Rule? The Transport Rule will limit pollution from power plants that are located in 31 eastern, southern, and midwestern states and DC The CAA requires each state to be a good neighbor

More information

OVERVIEW of SIP for Annual PM2.5 Standard MWAQC December 12, 2007

OVERVIEW of SIP for Annual PM2.5 Standard MWAQC December 12, 2007 OVERVIEW of SIP for Annual PM2.5 Standard MWAQC December 12, 2007 Outline Fine Particle Pollution, Definition & SIP Requirements Attainment Demonstration Inventories Control Measures Mobile Vehicle Emissions

More information

Implementation Updates for 2015 Ozone NAAQS

Implementation Updates for 2015 Ozone NAAQS Implementation Updates for 2015 Ozone NAAQS Anna Marie Wood, Director, Air Quality Policy Division Richard A. Chet Wayland, Director, Air Quality Assessment Division U.S. Environmental Protection Agency

More information

Background. North Carolina RACT Rules. Attachment

Background. North Carolina RACT Rules. Attachment Clarifying Information for Group I Control Techniques Guidelines and Nitrogen Oxide and Volatile Organic Compounds Reasonably Available Control Technology for Major Sources Background On April 15, 2004,

More information

Update on USEPA Actions to address Climate Change. Colleen McKaughan Associate Director, Air Division US EPA Region IX June 10, 2010

Update on USEPA Actions to address Climate Change. Colleen McKaughan Associate Director, Air Division US EPA Region IX June 10, 2010 Update on USEPA Actions to address Climate Change Colleen McKaughan Associate Director, Air Division US EPA Region IX June 10, 2010 1 Select Federal GHG Regulations Tailoring Rule & Light Duty Vehicle

More information

ATTACHMENT A. Designations and Classifications

ATTACHMENT A. Designations and Classifications ATTACHMENT A Detailed Comments from the Northeast States for Coordinated Air Use Management (NESCAUM) on EPA s Proposed Rule for Implementing the 8-hour Ozone Standard (68 FR 32802-32870) Designations

More information

The Clean Air Act: Multi-State, Multi-National Air Issues. It s a small multi-pollutant world after all. Jed Anderson The AL Law Group

The Clean Air Act: Multi-State, Multi-National Air Issues. It s a small multi-pollutant world after all. Jed Anderson The AL Law Group The Clean Air Act: Multi-State, It s a small multi-pollutant world after all. Multi-National Air Issues Jed Anderson The AL Law Group UH LAW SCHOOL ENVIRONMENTAL LAW LAW 5390 FALL 2018 Local/State/National/Global

More information

Proposed Air Pollution Transport Rule. Reducing Air Pollution Protecting Public Health. Presentation for Endicott House

Proposed Air Pollution Transport Rule. Reducing Air Pollution Protecting Public Health. Presentation for Endicott House Environment Proposed Air Pollution Transport Rule Reducing Air Pollution Protecting Public Health Energy Presentation for Endicott House U.S. Environmental Protection Agency Office of Air and Radiation

More information

Final Rulemaking: Additional RACT Requirements for Major Sources of NO x and VOCs. Citizens Advisory Council September 15, 2015

Final Rulemaking: Additional RACT Requirements for Major Sources of NO x and VOCs. Citizens Advisory Council September 15, 2015 Final Rulemaking: Additional RACT Requirements for Major Sources of NO x and VOCs Citizens Advisory Council September 15, 2015 Tom Wolf, Governor John Quigley, Secretary 1 Headings RACT Overview : White

More information

DFW SIP Development Update and Oil & Gas Inventory Follow-Up

DFW SIP Development Update and Oil & Gas Inventory Follow-Up DFW SIP Development Update and Oil & Gas Inventory Follow-Up Air Quality Division Heather Evans, Michael Ege, Chris Kite Air Quality Technical Information Meeting Arlington, Texas April 17, 2014 Air Quality

More information

Division of Air Quality

Division of Air Quality North Carolina Department of Environment and Natural Resources Division of Air Quality Beverly Eaves Perdue Sheila C. Holman Dee Freeman Governor Director Secretary October 1, 2010 EPA Docket Center, EPA

More information

DRAFT 2015 OZONE CONFORMITY ANALYSIS FOR THE 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM AND THE 2018 REGIONAL TRANSPORTATION PLAN

DRAFT 2015 OZONE CONFORMITY ANALYSIS FOR THE 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM AND THE 2018 REGIONAL TRANSPORTATION PLAN DRAFT 2015 OZONE CONFORMITY ANALYSIS FOR THE 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM AND THE 2018 REGIONAL TRANSPORTATION PLAN JANUARY 9, 2019 KINGS COUNTY ASSOCIATION OF GOVERNMENTS This report

More information

Discussion of the Best Available Retrofit Technology (BART) Guidelines and BART Modeling

Discussion of the Best Available Retrofit Technology (BART) Guidelines and BART Modeling Discussion of the Best Available Retrofit Technology (BART) Guidelines and BART Modeling Regional/State/Local Modelers Workshop May 16, 2007 Todd Hawes, EPA OAQPS 1 2 3 4 Rate To Achieve Natural Conditions

More information

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE COLUMBUS ANNUAL PM 2.5 NONATTAINMENT AREA

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE COLUMBUS ANNUAL PM 2.5 NONATTAINMENT AREA REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE COLUMBUS ANNUAL PM 2.5 NONATTAINMENT AREA Coshocton, Delaware, Fairfield, Franklin, and Licking Counties, Ohio Prepared by: Ohio Environmental Protection

More information

We ll Discuss What are SSM Provisions? Regulatory Changes What can we do to protect ourselves?

We ll Discuss What are SSM Provisions? Regulatory Changes What can we do to protect ourselves? We ll Discuss What are SSM Provisions? Regulatory Changes SSM SIP Call SSM Guidance to States Title V Affirmative Defense What can we do to protect ourselves? A Few Definitions SSM: Startup, Shutdown,

More information

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE COLUMBUS ANNUAL PM 2.5 NONATTAINMENT AREA

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE COLUMBUS ANNUAL PM 2.5 NONATTAINMENT AREA REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE COLUMBUS ANNUAL PM 2.5 NONATTAINMENT AREA Coshocton, Delaware, Fairfield, Franklin, and Licking Counties, Ohio Prepared by: Ohio Environmental Protection

More information

Allegheny County Health Department

Allegheny County Health Department Allegheny County Health Department Roger Westman,, Ph.D Manager, Air Quality Program April 29, 2005 PM 2.5 Nonattainment Areas Western PA LAWRENCE BEAVER BUTLER ARMSTRONG Pittsburgh Beaver Valley Area

More information

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52 [EPA-R05-OAR ; FRL ] Approval and Promulgation of Air Quality Implementation Plans;

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52 [EPA-R05-OAR ; FRL ] Approval and Promulgation of Air Quality Implementation Plans; This document is scheduled to be published in the Federal Register on 10/22/2012 and available online at http://federalregister.gov/a/2012-25819, and on FDsys.gov 6560-50-P ENVIRONMENTAL PROTECTION AGENCY

More information

FINAL TRANSPORTATION CONFORMITY RULE Comparison Table for Provisions for Conformity under the New Ozone and PM 2.5 Standards June 2004

FINAL TRANSPORTATION CONFORMITY RULE Comparison Table for Provisions for Conformity under the New Ozone and PM 2.5 Standards June 2004 Timing of conformity under the new standards Timing of conformity under the 1-hour ozone standard General changes in interim emissions tests Note: These tests are generally used for conformity determinations

More information

PROPOSED ADOPTION OF RULE 3.25, FEDERAL NEW SOURCE REVIEW FOR NEW AND MODIFIED MAJOR PM2.5 SOURCES FINAL STAFF REPORT

PROPOSED ADOPTION OF RULE 3.25, FEDERAL NEW SOURCE REVIEW FOR NEW AND MODIFIED MAJOR PM2.5 SOURCES FINAL STAFF REPORT Yolo-Solano Air Quality Management District 1947 Galileo Court, Suite 103 Davis, CA 95618 (530)757-3650 www.ysaqmd.org PROPOSED ADOPTION OF RULE 3.25, FEDERAL NEW SOURCE REVIEW FOR NEW AND MODIFIED MAJOR

More information

from Portland Cement Manufacturing

from Portland Cement Manufacturing Department of the Environment COMAR 26.11.30 Control of Emissions from Portland Cement Manufacturing Plants Air Quality Control Advisory Council December 8, 2014 Background Proposed regulation presented

More information

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE CANTON-MASSILLON, OH ANNUAL AND 24-HOUR PM 2.5 NONATTAINMENT AREA

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE CANTON-MASSILLON, OH ANNUAL AND 24-HOUR PM 2.5 NONATTAINMENT AREA REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE CANTON-MASSILLON, OH ANNUAL AND 24-HOUR PM 2.5 NONATTAINMENT AREA Stark County, Ohio Prepared by: Ohio Environmental Protection Agency Division of Air

More information

o62. Honeywell m Additional RACT Requirements for June 27, 2014

o62. Honeywell m Additional RACT Requirements for June 27, 2014 o62. Honeywell Honeywell 101 Columbia Rd. Morristown, NJ 07962 June 27, 2014 Via Electronic and Overnight Mail Environmental Quality Board Rachel Carson State Office Building 16th Floor 400 Market Street

More information

Clean Air Act Emission Limits

Clean Air Act Emission Limits 1 Clean Air Act Emission Limits CAA Emission Limits Authority for and Origin of Limits Federally promulgated regulations (e.g. NSPS, NESHAP, or MACT) SIP requirements PSD and N/A NSR permits 2 NSPS 3 New

More information

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE OHIO PORTION OF THE STEUBENVILLE-WEIRTON OH-WV 24-HOUR PM 2.5 NONATTAINMENT AREA

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE OHIO PORTION OF THE STEUBENVILLE-WEIRTON OH-WV 24-HOUR PM 2.5 NONATTAINMENT AREA REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE OHIO PORTION OF THE STEUBENVILLE-WEIRTON OH-WV 24-HOUR PM 2.5 NONATTAINMENT AREA Jefferson County, Ohio Prepared by: Ohio Environmental Protection Agency

More information

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE OHIO PORTION OF THE HUNTINGTON-ASHLAND, OH-KY-WV ANNUAL PM 2.5 NONATTAINMENT AREA

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE OHIO PORTION OF THE HUNTINGTON-ASHLAND, OH-KY-WV ANNUAL PM 2.5 NONATTAINMENT AREA REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE OHIO PORTION OF THE HUNTINGTON-ASHLAND, OH-KY-WV ANNUAL PM 2.5 NONATTAINMENT AREA Adams, Gallia, Lawrence and Scioto Counties, Ohio Prepared by: Ohio

More information

NAAQS AND OTHER IMPLEMENTATION UPDATES. Anna Marie Wood Director, Air Quality Policy Division, U.S. EPA Spring Business Meetings May 2016

NAAQS AND OTHER IMPLEMENTATION UPDATES. Anna Marie Wood Director, Air Quality Policy Division, U.S. EPA Spring Business Meetings May 2016 NAAQS AND OTHER IMPLEMENTATION UPDATES Anna Marie Wood Director, Air Quality Policy Division, U.S. EPA Spring Business Meetings May 2016 2 OVERVIEW NAAQS Implementation Updates Ozone Exceptional Events

More information

THE WHITE HOUSE Office of the Press Secretary. April 12, 2018

THE WHITE HOUSE Office of the Press Secretary. April 12, 2018 FOR IMMEDIATE RELEASE April 12, 2018 THE WHITE HOUSE Office of the Press Secretary April 12, 2018 MEMORANDUM FOR THE ADMINISTRATOR OF THE ENVIRONMENTAL PROTECTION AGENCY SUBJECT: Promoting Domestic Manufacturing

More information

NAAQS Update. Amy Marshall March 22, 2016

NAAQS Update. Amy Marshall March 22, 2016 NAAQS Update Amy Marshall March 22, 2016 Presentation Topics Current NAAQS Review Schedule and Status Ozone NAAQS Update SO 2 1-hr NAAQS Update NAAQS Modeling Update Other NAAQS related news/activities

More information

Chapter 6. Attainment Demonstration, RACM, RFP, and Contingency 2016 PLAN FOR THE HOUR OZONE STANDARD

Chapter 6. Attainment Demonstration, RACM, RFP, and Contingency 2016 PLAN FOR THE HOUR OZONE STANDARD Chapter 6 Attainment Demonstration, RACM, RFP, and Contingency 2016 PLAN FOR THE 2008 8-HOUR OZONE STANDARD This page intentionally blank. Chapter 6: Attainment Demonstration, RACM, RFP, and Contingency

More information

OZONE TRANSPORT COMMISSION Ali Mirzakhalili, P.E. Stationary and Area Sources Committee OZONE TRANSPORT COMMISSION

OZONE TRANSPORT COMMISSION Ali Mirzakhalili, P.E. Stationary and Area Sources Committee OZONE TRANSPORT COMMISSION OTC /MANE-VU Committees Meeting April 11, 2017 Washington, DC OZONE TRANSPORT COMMISSION Ali Mirzakhalili, P.E. Stationary and Area Sources Committee OZONE TRANSPORT COMMISSION 1 Stationary and Area Sources

More information

APPENDIX E EMISSIONS ESTIMATE FOR GENERAL CONFORMITY

APPENDIX E EMISSIONS ESTIMATE FOR GENERAL CONFORMITY APPENDIX E EMISSIONS ESTIMATE FOR GENERAL CONFORMITY Environmental and Planning Consultants 440 Park Avenue South, 7th Floor New York, New York 10016 tel: 212-696-0670 fax: 212-213-3191 www.akrf.com Memorandum

More information

Air Quality Program Update. SWEP Regulatory Update Meeting Harrisburg, PA November 5, 2015

Air Quality Program Update. SWEP Regulatory Update Meeting Harrisburg, PA November 5, 2015 Air Quality Program Update SWEP Regulatory Update Meeting Harrisburg, PA November 5, 2015 1 National Ambient Air Quality Standards Under Section 109 of the Clean Air Act (CAA), the U.S. Environmental Protection

More information

RULES AND REGULATIONS Title 25 ENVIRONMENTAL PROTECTION

RULES AND REGULATIONS Title 25 ENVIRONMENTAL PROTECTION 2036 RULES AND REGULATIONS Title 25 ENVIRONMENTAL PROTECTION ENVIRONMENTAL QUALITY BOARD [ 25 PA. CODE CHS. 121 AND 129 ] Additional RACT Requirements for Major Sources of NO x and VOCs The Environmental

More information

Eight-Hour Ozone SIP Development Issues in DFW Air Quality Planning Section

Eight-Hour Ozone SIP Development Issues in DFW Air Quality Planning Section Eight-Hour Ozone SIP Development Issues in DFW Air Quality Planning Section 9 Pages March 18, 2005 Erik Gribbin Air Quality Planning and Implementation Division Texas Nonattainment Areas AQP&I Division

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT Proposed Revision to State Implementation Plan (SIP) to Address Federal Clean Air Act Requirements for Reasonably Available

More information

NESCAUM Permit Modeling Committee Quarterly Call December 1, 2005

NESCAUM Permit Modeling Committee Quarterly Call December 1, 2005 NESCAUM Permit Modeling Committee Quarterly Call December 1, 2005 NESCAUM s Permit Modeling Committee (PMC) held a conference call on December 1, 2005 at 10:00 AM. These notes provide a summary of the

More information

Air Quality Rules Update: CAIR CAMR

Air Quality Rules Update: CAIR CAMR Air Quality Rules Update: CAIR CAMR Cindy L. Phillips, P.E. Cindy.Phillips@dep.state.fl.us FDEP Bureau of Air Regulation Environmental Partnering Workshop September 8, 2006 1 CAIR Federal Clean Air Interstate

More information

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE DAYTON-SPRINGFIELD ANNUAL PM 2.5 NONATTAINMENT AREA

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE DAYTON-SPRINGFIELD ANNUAL PM 2.5 NONATTAINMENT AREA REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE DAYTON-SPRINGFIELD ANNUAL PM 2.5 NONATTAINMENT AREA Clark, Greene, and Montgomery Counties, Ohio Prepared by: Ohio Environmental Protection Agency Division

More information

APPENDIX VIII AIR QUALITY CONFORMITY ANALYSIS

APPENDIX VIII AIR QUALITY CONFORMITY ANALYSIS 2018 Kings County Regional Transportation Plan APPENDIX VIII AIR QUALITY CONFORMITY ANALYSIS H:\RTPA\2018 RTP Update\Final RTP\APPENDIX VIII - Air Quality Conformity Title Page.docx Appendix VIII CONFORMITY

More information

Comments on ADEQ s NAAQS SIP/Minor NSR Permitting Guidance Document

Comments on ADEQ s NAAQS SIP/Minor NSR Permitting Guidance Document July 2, 2015 Comments on ADEQ s NAAQS SIP/Minor NSR Permitting Guidance Document AEF submits the following comments on the ADEQ document entitled Developing the NAAQS SIP: A Look at Minor Stationary Source

More information

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Parts 52 and 81. [EPA-R05-OAR ; FRL Region 5]

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Parts 52 and 81. [EPA-R05-OAR ; FRL Region 5] This document is scheduled to be published in the Federal Register on 09/09/2016 and available online at http://federalregister.gov/a/2016-21457, and on FDsys.gov 6560-50-P ENVIRONMENTAL PROTECTION AGENCY

More information

Boiler MACT, NAAQS Revisions and Other Clean Air Act Developments. September 20, 2012 H. Carl Horneman

Boiler MACT, NAAQS Revisions and Other Clean Air Act Developments. September 20, 2012 H. Carl Horneman Boiler MACT, NAAQS Revisions and Other Clean Air Act Developments September 20, 2012 H. Carl Horneman Industrial, Commercial & Institutional Boilers, Process Heaters and Waste Incinerator Rules Final rules

More information

ABSTRACT LEGISLATIVE AND REGULATORY BACKGROUND

ABSTRACT LEGISLATIVE AND REGULATORY BACKGROUND Title: Summary of Determinations for Coal-Fired Authors: Carl V. Weilert, Katherine Zack and Novi Leigh, Burns & McDonnell Engineering Presented at: Power-Gen Renewable Energy & Fuels Conference Date:

More information

8-Hour Ozone. Implementing Current 2008 Standard Proposed New 2015 Standards. Denver Regional Council of Governments Board Meeting July 15, 2015

8-Hour Ozone. Implementing Current 2008 Standard Proposed New 2015 Standards. Denver Regional Council of Governments Board Meeting July 15, 2015 8-Hour Ozone Implementing Current 2008 Standard Proposed New 2015 Standards Denver Regional Council of Governments Board Meeting July 15, 2015 Ken Lloyd Executive Director How Ozone Is Formed Source: www.montgomerycountymd.gov/dep/resources/images/outreach/air/ozoneformation.jpg

More information

Dick Sch u t tt EPA Region June 25, 2008

Dick Sch u t tt EPA Region June 25, 2008 New Ozone NAAQS Dick Sch tt EPA Region 4 Dick Schutt EPA Region 4 June 25, 2008 Topics to Cover National Ambient Air Quality Standards (NAAQS) 2008 8-Hour Ozone Standard EAC Status Measures for reducing

More information

Consultation Process: The MANE-VU Asks and State Haze SIPs. NESCAUM & MARAMA Regional Haze SIP Training April 22, 2015 Paul J.

Consultation Process: The MANE-VU Asks and State Haze SIPs. NESCAUM & MARAMA Regional Haze SIP Training April 22, 2015 Paul J. Consultation Process: The MANE-VU Asks and State Haze SIPs NESCAUM & MARAMA Regional Haze SIP Training April 22, 2015 Paul J. Miller, NESCAUM Consultation Overview 1. Consultation requirements 2. Past

More information

Please Note: Suggested citation of this presentation is:

Please Note: Suggested citation of this presentation is: 1 Please Note: Suggested citation of this presentation is: Bielawa, R. Mid-Atlantic States Section Annual Workshop, Ozone: Challenges, Trends, Strategies, and New Developments. New Brunswick, NJ, October

More information

REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) STATE IMPLEMENTATION PLAN (SIP) REVISION WESTERN NEVADA COUNTY 8-HOUR OZONE NONATTAINMENT AREA

REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) STATE IMPLEMENTATION PLAN (SIP) REVISION WESTERN NEVADA COUNTY 8-HOUR OZONE NONATTAINMENT AREA NORTHERN SIERRA AIR QUALITY MANAGEMENT DISTRICT Gretchen Bennitt, Executive Director DISTRICT HEADQUARTERS NORTHERN FIELD OFFICE 200 Litton Drive, Suite 320 257 E. Sierra, Unit E Grass Valley, CA 95945

More information

FINAL CONFORMITY DETERMINATION for the Cloverdale Rancheria Fee-to-Trust and Resort Casino Project, Sonoma County, California.

FINAL CONFORMITY DETERMINATION for the Cloverdale Rancheria Fee-to-Trust and Resort Casino Project, Sonoma County, California. BUREAU OF INDIAN AFFAIRS FINAL CONFORMITY DETERMINATION for the Cloverdale Rancheria Fee-to-Trust and Resort Casino Project, Sonoma County, California. AGENCY: Bureau of Indian Affairs, Department of the

More information

OZONE IN NORTH TEXAS AND THE CLEAN AIR ACT

OZONE IN NORTH TEXAS AND THE CLEAN AIR ACT OZONE IN NORTH TEXAS AND THE CLEAN AIR ACT North Texas Commission Topics: North Texas Webinar Series June 25, 2014 Chris Klaus, Senior Program Manager Mindy Mize, Program Manager Air Quality Planning &

More information

APPENDIX B General Conformity Analysis

APPENDIX B General Conformity Analysis APPENDIX B General Conformity Analysis GENERAL CONFORMITY ANALYSIS Under Section 176(c)(1) of the federal Clean Air Act (CAA), federal agencies that engage in, support in any way or provide financial assistance

More information

AIR QUALITY CONFORMITY ANALYSIS: VISUALIZE 2045 SCOPE OF WORK

AIR QUALITY CONFORMITY ANALYSIS: VISUALIZE 2045 SCOPE OF WORK December 14, 2017 AIR QUALITY CONFORMITY ANALYSIS: VISUALIZE 2045 SCOPE OF WORK I. INTRODUCTION Projects solicited for the quadrennial update of the region s transportation plan, Visualize 2045, and the

More information

[Including Revisions to Affected Portions of the Interstate Transport SIP for the hour Ozone and 1997 PM 2.5 NAAQS]

[Including Revisions to Affected Portions of the Interstate Transport SIP for the hour Ozone and 1997 PM 2.5 NAAQS] [Including Revisions to Affected Portions of the Interstate Transport SIP for the 1997 8-hour Ozone and 1997 PM 2.5 NAAQS] Department of Environmental Quality March 20, 2013 Table of Contents List of Tables...

More information

ATTACHMENT-1 BACKGROUND:

ATTACHMENT-1 BACKGROUND: ATTACHMENT-1 A Comparison of s current N.J.A.C. 7:27-18 (Emission Offset Rule) with the 40 CFR 51.165, 52.24 and Appendix S to 40 CFR 51 (NSR reform rules) demonstrating that the existing Emission Offset

More information

Federal Environmental Issues Driving the Electricity and Gas Industries

Federal Environmental Issues Driving the Electricity and Gas Industries Federal Environmental Issues Driving the Electricity and Gas Industries Seth D. Jaffe September 9, 2014 Carbon Emissions: Overview of Obama Administration Initiatives and Resulting Court Challenges 1 It

More information

SJVUAPCD Governing Board. Seyed Sadredin, Executive Director/APCO Project Coordinator: Sheraz Gill

SJVUAPCD Governing Board. Seyed Sadredin, Executive Director/APCO Project Coordinator: Sheraz Gill GOVERNING BOARD Hub Walsh, Chair Supervisor, Merced County Tom Wheeler, Vice Chair Supervisor, Madera County Oliver L. Baines III Councilmember, City of Fresno Tony Barba Supervisor, Kings County Skip

More information

2006 National Ambient Air Quality Standards (NAAQS) for Fine Particulate Matter (PM2.5): Designating Nonattainment Areas

2006 National Ambient Air Quality Standards (NAAQS) for Fine Particulate Matter (PM2.5): Designating Nonattainment Areas 2006 National Ambient Air Quality s (NAAQS) for Fine Particulate Matter (PM2.5): Designating Nonattainment Areas Robert Esworthy Specialist in Environmental Policy October 25, 2012 CRS Report for Congress

More information

COMPONENTS OF A SUCCESSFUL EXCEPTIONAL EVENTS DEMONSTRATION. Beth Palma Air Quality Policy Division OAQPS, U.S. EPA NACAA Spring Meeting May 2, 2017

COMPONENTS OF A SUCCESSFUL EXCEPTIONAL EVENTS DEMONSTRATION. Beth Palma Air Quality Policy Division OAQPS, U.S. EPA NACAA Spring Meeting May 2, 2017 COMPONENTS OF A SUCCESSFUL EXCEPTIONAL EVENTS DEMONSTRATION Beth Palma Air Quality Policy Division OAQPS, U.S. EPA NACAA Spring Meeting May 2, 2017 2 Exceptional Events On September 16, 2016, the EPA finalized

More information

PM2.5 NAAQS Implementation & Permitting in Georgia

PM2.5 NAAQS Implementation & Permitting in Georgia PM2.5 NAAQS Implementation & Permitting in Georgia Georgia Environmental Conference Jekyll Island, Georgia August 25, 2016 Brad James, P.E. Overview Current UFP Regulation (as PM 2.5 ) PM 2.5 NAAQS SIP

More information

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE CINCINNATI-HAMILTON, OH-KY-IN 8- HOUR OZONE NONATTAINMENT AREA

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE CINCINNATI-HAMILTON, OH-KY-IN 8- HOUR OZONE NONATTAINMENT AREA REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE CINCINNATI-HAMILTON, OH-KY-IN 8- HOUR OZONE NONATTAINMENT AREA Butler, Clermont, Clinton, Hamilton, and Warren Counties, Ohio Prepared by: Ohio Environmental

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Appendix A: Comments and Responses August 20, 2000 APPENDIX A

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Appendix A: Comments and Responses August 20, 2000 APPENDIX A APPENDIX A COMMENTS AND RESPONSES FOR PROPOSED AMENDMENTS TO RULE 4603 AND RULE 4684 August 20, 2009 A - 1 Final Draft Staff Report with Appendices for This page intentionally blank. A - 2 Final Draft

More information

a%i3 BEFORE THE DEPARTMENT OF ENVIRONMENTAL PROTECTION ENVIRONMENTAL QUALITY BOARD *********

a%i3 BEFORE THE DEPARTMENT OF ENVIRONMENTAL PROTECTION ENVIRONMENTAL QUALITY BOARD ********* a%i3 BEFORE THE DEPARTMENT OF ENVIRONMENTAL PROTECTION ENVIRONMENTAL QUALITY BOARD ********* IN RE: LARGE APPLIANCE AND METAL FURNITURE SURFACE COATING PROCESSES ********* BEFORE: HEARING: ARLEEN SHULMAN,

More information

SECTION.2300 BANKING EMISSION REDUCTION CREDITS

SECTION.2300 BANKING EMISSION REDUCTION CREDITS SECTION.00 BANKING EMISSION REDUCTION CREDITS 1A NCAC 0D.01 is proposed for adoption as follows: 1A NCAC 0D.01 PURPOSE This Section provides for the creation, banking, transfer, and use of emission reduction

More information

Clean Air Agencies Spring Membership Meeting 2008

Clean Air Agencies Spring Membership Meeting 2008 National Association of Clean Air Agencies Spring Membership Meeting 2008 Steve Page, Director Office of Air Quality Planning and Standards (OAQPS) Office of Air and Radiation USEPA 1 OAQPS Highlights

More information

MPCA Citizens Board. Michael Sandusky Director Environment Analysis and Outcomes Division

MPCA Citizens Board. Michael Sandusky Director Environment Analysis and Outcomes Division DEPARTMENT : POLLUTION CONTROL AGENCY DATE : September 17, 2010 SF-00006-05(4/86) STATE OF MINNESOTA Office Memorandum TO : FROM : MPCA Citizens Board Michael Sandusky Director Environment Analysis and

More information

2008 EIGHT-HOUR OZONE ATTAINMENT PLAN FOR SAN DIEGO COUNTY FINAL - DECEMBER 2016

2008 EIGHT-HOUR OZONE ATTAINMENT PLAN FOR SAN DIEGO COUNTY FINAL - DECEMBER 2016 2008 EIGHT-HOUR OZONE ATTAINMENT PLAN FOR SAN DIEGO COUNTY FINAL - DECEMBER 2016 SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT 10124 OLD GROVE ROAD SAN DIEGO, CA 92131 1.0 Introduction and Overview 2008

More information

SACRAMENTO METROPOLITAN AIR QUALITY MANAGEMENT DISTRICT

SACRAMENTO METROPOLITAN AIR QUALITY MANAGEMENT DISTRICT SACRAMENTO METROPOLITAN AIR QUALITY MANAGEMENT DISTRICT STAFF REPORT RULE 413 STATIONARY GAS TURBINES PROPOSED AMENDMENTS Prepared by: Kevin J. Williams, Ph.D. Associate Air Quality Engineer Reviewed by:

More information

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION IX

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION IX UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION IX Technical Support Document for EPA s Notice of Proposed Rulemaking for the California State Implementation Plan Eastern Kern Air Pollution Control

More information

Maryland VOC Standards for Roof Coatings

Maryland VOC Standards for Roof Coatings Department of the Environment Maryland VOC Standards for Roof Coatings International Roof Coatings Conference July 17, 2014 Topics Covered Air Quality Overview OTC Process Existing MD VOC Regulations OTC

More information

Environmental Regulatory Developments Affecting Electric Power Generation and Industrial, Institutional and Commercial Boilers

Environmental Regulatory Developments Affecting Electric Power Generation and Industrial, Institutional and Commercial Boilers Environmental Client Service Group To: Our Clients and Friends February 19, 2013 Environmental Regulatory Developments Affecting Electric Power Generation and Industrial, Institutional and Commercial Boilers

More information

DRAFT DO NOT QUOTE OR CITE. Oklahoma s State Implementation Plan (SIP) Submittal Infrastructure Checklist

DRAFT DO NOT QUOTE OR CITE. Oklahoma s State Implementation Plan (SIP) Submittal Infrastructure Checklist DRAFT DO NOT QUOTE OR CITE Oklahoma s State Implementation Plan (SIP) Submittal Infrastructure Checklist CAA 110(a)(2)(A)-(M) Requirements in the Current SIP or Pending SIP Revisions Updated for the 2008

More information

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE CINCINNATI-HAMILTON, OH-KY-IN 8- HOUR OZONE NONATTAINMENT AREA

REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE CINCINNATI-HAMILTON, OH-KY-IN 8- HOUR OZONE NONATTAINMENT AREA REDESIGNATION REQUEST AND MAINTENANCE PLAN FOR THE CINCINNATI-HAMILTON, OH-KY-IN 8- HOUR OZONE NONATTAINMENT AREA Butler, Clermont, Clinton, Hamilton, and Warren Counties, Ohio Prepared by: Ohio Environmental

More information

2012 Air Quality Management Plan

2012 Air Quality Management Plan 2012 Air Quality Management Plan DR. ELAINE CHANG DEPUTY EXECUTIVE OFFICER LOS ANGELES CHAMBER OF COMMERCE ENERGY, WATER & ENVIRONMENTAL SUSTAINABILITY & TRANSPORTATION & GOODS MOVEMENT COUNCILS LOS ANGELES,

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. APPENDIX D: Technical Support Document August 18, 2011 APPENDIX D

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. APPENDIX D: Technical Support Document August 18, 2011 APPENDIX D APPENDIX D: Technical Support Document APPENDIX D EPA Technical Support Document (TSD) D-1 Final Draft Staff Report with Appendices APPENDIX D: Technical Support Document This page intentionally blank.

More information

Summary of the November 5, 2003, Published Proposed Rulemaking

Summary of the November 5, 2003, Published Proposed Rulemaking EPA420-F-03-041 November 2003 Transportation Conformity Rule Amendments for the New 8-hour Ozone and PM 2.5 National Ambient Air Quality Standards and Miscellaneous Revisions for Existing Areas Summary

More information

NAAQS and Other CAA Implementation Updates. Anna Marie Wood Director, Air Quality Policy Division NACAA Spring Meeting April 2015

NAAQS and Other CAA Implementation Updates. Anna Marie Wood Director, Air Quality Policy Division NACAA Spring Meeting April 2015 NAAQS and Other CAA Implementation Updates Anna Marie Wood Director, Air Quality Policy Division NACAA Spring Meeting April 2015 1 Overview Schedules for NAAQS Reviews and Implementation Ozone Sulfur Dioxide

More information

OZONE TRANSPORT COMMISSION Ali Mirzakhalili, P.E. Stationary and Area Sources Committee OZONE TRANSPORT COMMISSION

OZONE TRANSPORT COMMISSION Ali Mirzakhalili, P.E. Stationary and Area Sources Committee OZONE TRANSPORT COMMISSION OTC /MANE-VU Spring Meeting June 6, 2017 Saratoga Springs, NY OZONE TRANSPORT COMMISSION Ali Mirzakhalili, P.E. Stationary and Area Sources Committee OZONE TRANSPORT COMMISSION 1 Stationary and Area Sources

More information

Proposed Implementation of the 2015 Ozone Standard and Related Impacts to Transportation Conformity

Proposed Implementation of the 2015 Ozone Standard and Related Impacts to Transportation Conformity Proposed Implementation of the 2015 Ozone Standard and Related Impacts to Transportation Conformity Lauren DeVore DNREC Division of Air Quality Some Basics Behind the Standard Section 109 (d) of the Clean

More information

PM2.5 Implementation Rule- Modeling Summary. Brian Timin EPA/OAQPS June 20, 2007

PM2.5 Implementation Rule- Modeling Summary. Brian Timin EPA/OAQPS June 20, 2007 PM2.5 Implementation Rule- Modeling Summary Brian Timin EPA/OAQPS Timin.brian@epa.gov June 20, 2007 Attainment Demonstrations CAA Section 172(c) requires States with a nonattainment area to submit an attainment

More information

The Supreme Court and EPA Carbon Rules. Michael B. Gerrard Environmental and Energy Study Institute briefing March 6, 2014

The Supreme Court and EPA Carbon Rules. Michael B. Gerrard Environmental and Energy Study Institute briefing March 6, 2014 The Supreme Court and EPA Carbon Rules Michael B. Gerrard Environmental and Energy Study Institute briefing March 6, 2014 Clean Air Act Title II Mobile Sources CAA Section 202 Emission standards for new

More information