1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Updated) Report No: AC125 Section 1 - Basic Information Date Prepared/Updated: 08/13/2003 A. Basic Project Data (fron PDS) I.A.1. Project Statistics Country: SERBIA AND MONTENEGRO Project ID: P Project: Montenegro Environmentally Sensitive Tourist Task Team Leader: Manuel G. Marino Areas Project Authorized to Appraise Date: July 1, 2003 EBRD Amount ($m): Bank Approval: September 11, 2003 IDA Amount ($m): 7.00 Managing Unit: ECSIE Sector: Solid waste management (100%) Lending Instrument: Sector Investment & Maintenance Theme: Pollution management and environmental Loan (SIM) health (P); Environmental policies and institutions Status: Lending (S) I.A.2. Project Objectives (From PDS): The main objective of the Project is to create ecological and commercially sustainable solid waste collection and disposal services in Montenegro coastal municipalities, needed to maintain a clean, environmentally attractive coastal area. This will be achieved through: (i) developing the sector's institutional, policy and regulatory framework; (ii) rehabilitating two current municipal disposal sites, that operate without sanitary conditions, to function as properly designed regional sanitary landfills; (iii) closing current disposal sites in an environmentally acceptable manner; (iv) provision of modern collection equipment; (v) initiating a pilot recycling campaign; and (vi) strengthening multi-municipal joint companies (MJC) that will be created to operate the two regional solid waste disposal systems. Additional to the environmental benefits the project seeks to achieve, the Project aims at bolstering tourism prospects by eliminating the important obstacle that represents the current solid waste collection and disposal problems, that are gravely affecting enviromnentally sensitive tourist areas in the coast. I.A.3. Project Description (From PDS): The total project costs of US$9.5 million, of which SDR 5.0 million (equivalent to US$7.0 million), will be Association financed through an IDA credit. The project will be organized in the three components summarized below. Component I. Environmental Infrastructure * Regional Landfills. The Project will finance the improvement of environmental infrastructure in the coastal municipalities, rehabilitating two of the current municipal landfills that operate without sanitary conditions, to develop in the same areas properly designed Regional Landfills. The Project will finance landfills in Kotor, for Kotor and Budva, and in Bar, for Bar and Ulcinj, including the equipment needed for operation. * Collection Equiipment. In addition to the development of the two regional landfills, the component will finance equipment for collection and transport of solid wastes to the landfills (containers, underground facilities in sensitive areas, compactors, collection trucks, support vehicles and mobile equipment for the cleaning of containers).

2 2 Component II. Environmental Rehabilitation * Closing of Uncontrolled Disposal Sites. The project will finance equipment and civil works needed to permanently close five current municipal unsanitary disposal sites in an environmentally sound manner, and institute long-tern environmental monitoring. * Pilot Recycling Campaign. The project will finance works for the rehabilitation of solid waste management facilities, recycling equipment and technical assistance to support a pilot program of recycling, that includes: (i) the execution of a public dissemination campaign, with particular attention to local schools; (ii) the introduction of separation of wastes at the source in selected locations; (iii) an study on recycling options, demand, and markets; and (iv) the improvement of current infonnal recycling practices in Kotor's landfill. Component Ill. Technical Assistance * Project Management. The project will finance equipment and consultant services for project management, including auditing and follow-up social monitoring, and for the supervision of the proposed regional landfills. * Sector Institutional Development. The project will also finance consultant services and training to support the GoM to strengthen the newly created MJCs and further develop the regulatory framework for the sector. Project costs by component and percentages financed by the Association are shown below. Components: I. Environmental Infrastructure a. Regional Landfill Construction b Collection Equipment II. Environmental Rehabilitation III. Technical Assistance Unallocated (contingencies) I.A.4. Project Location: (Geographic location, information about the key environmental and social characteristics of the area and population likely to be affected, and proximity to any protected areas, or sites or critical natural habitats, or any other cultlrally or socially sensitive areas.) The Montenegro Coastal Area represents a unique and valuable location. It is characterized by specific biotic and biotic-environmental resources with a majestic geographical setting and very high cultural and historical values, ruins of past glories, such as old palaces, cathedrals and little churches, cowers and bell towers. The shore area also offers a great number of small ports and picturesque villages. The landscape is typified by the Mediterranean vegetation, with olive-trees, pomegranate-trees, oleanders and chestnut-trees. Some sites deserve to be mentioned, for instance the sandy beaches of Budva and the Boka Kotorska Bay, on which Kotor and Tivat are located. In particular, this area, ingress of the Adriatic Sea, via narrow channels, making wide bays extending 36 Km inland, is included in the UNESCO list of World's natural and cultural heritage (Committee for World Heritage, Cairo and Luxor October 1979) because of its exceptional environmental, cultural and historical values. B. Check Environtental (Classificationt: B (Partial Assessment) Comments.: An Environmental Impact Assessment, in parallel with a Social Assessment, has been carried

3 3 out during project preparation. Environmental Management Plans have also been prepared before appraisal as part of the EAs. Based on the results of these stldies it has been confirmed that the project will have a positive environmental impact and any potential negative consequences will be properly managed and mitigated with the proposed measures. The Bank has confirmned the Environmental category B for the project. C Safeguard Policies Triggered (fromi PDS) (click on E for a detailed desciption or click on the policy number for a brief description) Policy Triggered Environmental Assessment (OP 4.01, BP 4.01, GP 4.01) 0 Yes () No Natural Habitats (OP 4.04, BP 4.04, GP 4.04) () Yes 0 No Forestry (OP 4.36, GP 4.36) Pest Management (OP 4.09) Cultural Property (OPN 11.03) Indigenous Peoples (OD 4.20) Involuntary Resettlement (OP/BP 4.12) Safety of Dams (OP 4.37, BP 4.37) Projects in International Waters (OP 7.50, BP 7.50, GP 7.50) Projects in Disputed Areas (OP 7.60, BP 7.60, GP 7.60)* C) Yes 0 No C) Yes * No U) Yes 0 No C) Yes * No ( ) Yes 0 No C) Yes 0 No U) Yes 0 No U) Yes 0 No Section II - Key Safeguard Issues and Their Management D. Sutmmary of Key Safeguard Issues. Please fill in all relevant questions. If iniformation is lnot available, describe steps to be tak-en to obtaini necessary data. T.iD. Ia. Describe any safeguard issues and impacts associated with the proposed project. Identify and describe any potential large scale, significant and/or ilteversible impacts. The project is expected to have an important and positive environmental impact in the project area. By closing current uncontrolled sited and developing two of them to function as properly controlled sanitary landfills, that include all necessary pollution control measures, the project will not only eliminate the existing degradation, but provide the basis for adequate management of solid wastes in the future, in an environmnentally and financially sustainable manner. An Environmental Assessment (EA) has been completed of the proposed regional landfills in Kotor (for the municipalities of Kotor and Budva) and Bar (for the municipalities of Bar and Ulcinj). The EAs follow the guidelines of the EU and the Government of Montenegro (Official Gazette 21/97). Public consultation meetings with local stakeholders and public in general, including NGOs, were carried out by PEW during project preparation to discuss the proposed assessment TORs and results. The conclusions of these consultation meetings have been incorporated in the Final EAs submitted to the Bank. Issues/impacts known to occur in landfill development and of most concem to stakeholders were studied during the preappraisal mission, and in the EAs, particularly: (i) social, socioeconomic and cultural issues; (ii) hydrogeology, hydrology and water quality; (iii) health and safety; (iv) air quality; (v) noise; (vi) ecology; (vii) off-site traffic; and (viii) visual/landscape. The types of likely impacts expected and the mitigation measures that will be applied are presented in the project's EAs, which conclude that since the project proposes to remedy past environmental degradation and incorporates

4 4 necessary pollution prevention measures, these impacts are positive in tenns of the local environmlent and any effect on the environient would be limited and teclnically and institutionally manageable. During project preparation the Bank obtained from the relevant authorities confirmation of the compatibility of the proposed landfill with activities carried out in its surroundings. In particular, consultants reviewed during appraisal any potential attraction to birds associated to the proposed landfill, the problems and risks this might cause in the nearby Tivat's airport operation, and proposed measures to prevent them. The consultants concluded that the current status is unacceptable and represents a high risk, that further recommends the urgent implementation of the project. The consultants also recommended locating the landfill further away for the ninway for added security, and full coverage of the wastes. With these measures, the Federal Ministry of Transport and Telecommunications approved the location of the proposed landfill on January 28, This issue was also reviewed in the EA, which concluded that the landfill was, with the proposed control measures and in the proposed location, fully compatible with the airport and a fundamental improvement of the current situation. The control measures have also been incorporated in the EMP and will be a credit covenant. The EA and EMP were approved by the government and the municipality, that issued the required construction pennit. As part of the preparation of the EAs, an Environmental Management Plan for each landfill was also prepared. These were published, together with the EAs summary, in the official gazette and made available to the public at the beneficiary's offices and local libraries. The obligation to implement the EMPs will also be adopted by the MJCs under the Sub-credit and Project Implementation Agreement. These EMPs are binding documents and the commnitment for their implementation by the Project beneficiaries is part of the project legal agreements. Local NGOs and community representatives will have an opportunity to be involved in the monitoring and control of the proposed activities, to ensure that the EMP requirements are followed. II.D. lb. Describe any potential cumulative impacts due to application of more than one safeguard policy or due to multiple project component. N/A Il.D. Ic Describe any potential long term impacts due to anticipated future activities in the project area. N/A II.D.2. In light of 1, describe the proposed treatmiient of alternatives (if required) I[.D.3. Describe arrangement for the boirower to address safeguard issues Environmental Assessment: An environmental impact assessment has been carried out by PEW under tenns of reference acceptable to the Association. This assessment has been complemented by a social assessment and an environmental management plan. Involuntary Resettlement: The project does not involve any resettlement, land acquisition or involuntary changes in land use. Both landfill sites are municipal property. This was confirmed by the Bank's team as part of the preappraisal mission. Thus OP/BP 4.12 is not triggered. International Waters: During preparation and appraisal the team verified that the project does not involve works or actions on intemational waterways or discharges into surface or groundwaters. This OP is not triggered. II.D.4. Identify the key stakeholders and describe the mechanisms for consultation and disclosure on

5 5 safeguard policies, with an emphasis on potentially affected people. The Social Assessment included focus groups with key stakeholders to discuss the project components, approach and investments and to identify both areas of concem and means to address them. As part of project preparation, the project team also conducted meetings with relevant stakeholders and local NGOs to review the results of the Enviromnental and Social Assessments. These were followed by additional public consultations in each city prior to appraisal to discuss the Environmental Assessment and disseminate information about project objectives and components. E. Safeguiards Classification (select in SAP). Category is detenrined by the highest impact in any policy. Or on basis of cumulative impacts from multiple safeguards. Whenever an individual safeguard policy is triggered the provisions of that policy apply. SI. - Significant, cumulative and/or irreversible impacts; or significant technical and institutional risks in management of one or more safeguard areas [X] S2. - One or more safeguard policies are triggered, but effects are limited in their impact and are technically and institutionally manageable [ ] S3. -No safeguard issues [ ] SF. - Financial intermediaiy projects, social development funds, community driven development or similar projects which require a safeguard framework or programmatic approach to address safeguard issues. F. Disclosure Requiremiienits Environmental Assessment/Analvsisv/Management Plan: Expected Actual 4/1/2003 6/4/2003 6/16/2003 5/27/2003 4/1/2003 7/16/2003 Date of distributing the Exec. Summary of the EA to the Executive Directors (For category A projects) Resettlement Action Plan/Franmework: Expected Actual Indigenous Peoples Development Plan/Framework: Expected Actual Pest Management Plan: Expected Actual Dam Safety Management Plan: Expected Actual

6 6 If in-country disclosure of any of the above documents is not expected, please explain why. Signed and submitted bv Name Date Task Team Leader: Manuel G. Marino 6/18/03 Project Safeguards Specialists 1: Stan Peabody/Person/World Bank 6/18/03 Project Safeguards Specialists 2: Rita Klees/Person/World Bank 6/18/03 Project Safeguards Specialists 3: Approved by: Namie Date Regional Safeguards Coordinator: Jane Holt 07/17/03 Motoo Konishi 03/24/03 Sector Manager

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Initial) Report No: AC124 Section I - Basic Information

More information

Integrated Safeguards Data Sheet (Updated)

Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Updated) Section I - Basic Information Date Prepared/Updated:

More information

AC431. Integrated Safeguards Data Sheet (Updated)

AC431. Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Updated) Section I - Basic Information Date Prepared/Updated:

More information

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Initial) Report No: AC100 Section I - Basic Information

More information

Integrated Safeguards Data Sheet (Updated)

Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE WORLD BANK GROUP InfoShop Date Prepared/Updated: 02/10/2003 Section I - Basic Information

More information

InfoShop. Integrated Safeguards Data Sheet (Initial) Date ISDS Prepared/Updated: 10/21/2002. Section I - Basic Information

InfoShop. Integrated Safeguards Data Sheet (Initial) Date ISDS Prepared/Updated: 10/21/2002. Section I - Basic Information Public Disclosure Authorized THE WORLD BANK GROUP InfoShop Integrated Safeguards Data Sheet (Initial) 25030 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date Prepared/Updated:

More information

Ac i 11. Public Disclosure Authorized. Project ID: P Task Team Leader: Allan Rotman. Public Disclosure Authorized.

Ac i 11. Public Disclosure Authorized. Project ID: P Task Team Leader: Allan Rotman. Public Disclosure Authorized. Ac i 11 Integrated Safeguards Data Sheet (Updated) Section I - Basic Information Date Prepared/Updated: 06/10/2003 A. Basic ProjectData (from PDS) I.A. 1. Project Statistics Country: TUNISIA Project: Tunisia:

More information

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) THE WORLD BANK GROUP U---- _ InfoShop Date Prepared/Updated: 02/24/2003 Section I - Basic Information A. Basic Project Data Country: BRAZIL Project: RF Support of Scientific Research for the Amazon II

More information

Integrated Safeguards Data Sheet (Updated)

Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Section I - Basic Information Date Prepared/Updated: 08/01/2003 A. Basic Project Data

More information

Ac iowi. Managing Unit: ECSIE Lending Instrument: Specific Investment Loan (SIL) Status: Appraisal

Ac iowi. Managing Unit: ECSIE Lending Instrument: Specific Investment Loan (SIL) Status: Appraisal Ac iowi Integrated Safeguards Data Sheet (Updated) Section I - Basic Information Date Prepared/Updated: 6/5/23 A. Basic Project Data (from PDS) I.A. 1. Project Statistics Country: LITHUANIA Project: Vilnius

More information

InfoShop. Integrated Safeguards Data Sheet (Initial) Report No: AC85. Section I - Basic Information. A. Basic Project Data Country: INDIA

InfoShop. Integrated Safeguards Data Sheet (Initial) Report No: AC85. Section I - Basic Information. A. Basic Project Data Country: INDIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THfE WORLD BANK GROUP InfoShop Date Prepared/Updated: 05/22/2003 Section I - Basic Information

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) Section I Basic Information Date ISDS Prepared/Updated:

More information

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) THE WORLD BANK GROUP,.,.,. InfoShop Integrated Safeguards Data Sheet (Initial) AWorld Frcs7 ol Poverty Date Prepared/Updated: 12/19/2002 25318 Section I - Basic Information December 19, 2002 A. Basic Project

More information

Integrated Safeguards Data Sheet (Updated)

Integrated Safeguards Data Sheet (Updated) THE WORLD BANK GROUP AWorld Free of Poverty ilnfoshop 24623 Date Prepared/Updated: 07/31/2002 Section I - Basic Information Integrated Safeguards Data Sheet (Updated) A. Basic Project Data Country: UGANDA

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized o Date ISDS Prepared/Updated: 19-Jan-2016 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

Project ID: P Global Supplemental ID: P Project: HAZARD RISK MITIGATION AND

Project ID: P Global Supplemental ID: P Project: HAZARD RISK MITIGATION AND Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Updated) Report No: AC561 Section I - Basic Information

More information

Financing (In USD Million) Financing Source

Financing (In USD Million) Financing Source Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 05-Aug-2012 I. BASIC INFORMATION 1. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014

More information

Integrated Safeguards Data Sheet (Updated)

Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Section I - Basic Information Date Prepared/Updated: 06/14/2006 A. Basic Project Data

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 04/13/2006 INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Report No.: AC2194 1. Basic Project Data Country: Burkina Faso Project ID: P098956 Project Name: Post-Primary

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: April 12, 2006 1. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

Report No.: ISDSA1037

Report No.: ISDSA1037 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Date ISDS Prepared/Updated: 07-May-2015

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 23-Mar-2014 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A Report No: 54874-ME

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: August 2, 2003 I. BASIC INFORMATION A. Basic Project Data Country: Peru Project ID: P082625 Project Name: Vilcanota Valley Task

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 01/21/2011 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 09/26/2008 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5832. Date ISDS Prepared/Updated: 12/22/2010 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5832. Date ISDS Prepared/Updated: 12/22/2010 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 12/22/2010 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5832 Country: Uruguay Project ID: P110965 Project Name: Sustainable

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized b Date ISDS Prepared/Updated: 13-Feb-212 1. BASIC INFORMATION INTEGRATED SAFEGUARDS DATA

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No.: 89787 Date prepared/updated: July 28, 2014 I. Basic Information 1. Basic

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

Integrated Safeguards Data Sheet (Updated)

Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Updated) Report No: AC113 Section I - Basic Information

More information

Integrated Safeguards Data Sheet (Updated)

Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE WORLD BANK GROUP U.- '-InfoShop Integrated Safeguards Data Sheet (Updated) AWorld

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA3140

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA3140 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET Date ISDS Prepared/Updated: July 30, 2013 I. BASIC INFORMATION

More information

INTEGRATED SAFEGUARDS DATA SHEET. Costa Rica FCPF READINESS PREPARATION GRANT CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET. Costa Rica FCPF READINESS PREPARATION GRANT CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET Costa Rica FCPF READINESS PREPARATION GRANT CONCEPT

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: June 10, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project Name: Brasilia Environmentally Sustainable Pro

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 08-Jul-2013

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02-Nov-2011 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

Integrated Safeguards Data Sheet Appraisal Stage

Integrated Safeguards Data Sheet Appraisal Stage Public Disclosure Authorized The World Bank Public Disclosure Authorized Integrated Safeguards Data Sheet Appraisal Stage Public Disclosure Authorized Appraisal Stage Date ISDS Prepared/Updated: 26-Feb-2018

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 06/03/2008 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/18/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/03/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: October 21, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Western Africa Project Name: Africa Emergency Locust Project

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2668. Date ISDS Prepared/Updated: 02/09/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2668. Date ISDS Prepared/Updated: 02/09/2007 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02/09/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No: I069892

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No: I057903

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/24/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 16-October-2012 I. BASIC INFORMATION 1. Basic Project Data

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 13-Dec-2012

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/09/2011 1. Basic Project Data Original

More information

Large Marine Ecosystem Management Activities (US$5.62)

Large Marine Ecosystem Management Activities (US$5.62) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No: I048795

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: September 13, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Mali Project Name: Second Transport Sector Project Estimated

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. 10-Oct-2014

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. 10-Oct-2014 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: I BASIC INFORMATION A Basic Project Data INTEGRATED SAFEGUARDS

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Mar-2015 Report No.: ISDSC 12226 Date ISDS Approved/Disclosed: 06-Apr-2015 Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/14/2011 1. Basic Project Data Original

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/29/2008 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: ISDSC13230 Date ISDS Prepared/Updated: 13-Jul-2015 Date ISDS Approved/Disclosed: 14-Jul-2015 I. BASIC INFORMATION A. Basic Project Data Country:

More information

Safeguard Requirements And the Framework Process

Safeguard Requirements And the Framework Process Safeguard Requirements And the Framework Process The World Bank Europe & Central Asia Region Biskek,Tblisi March/April 2008 1 Role of Bank and Borrower Bank Screens and Sets EA Category Advises Borrower

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/27/2011 1. Basic Project Data Original

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE,2 Date ISDS Prepared/Updated: 22-Jul-2015 Report.: ISDSC13452 Date ISDS Approved/Disclosed: 06-Aug-2015 Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 04/15/2010 Report No.: AC4961 1. Basic Project Data Country: Morocco Project ID: P098459 Project Name: Morocco

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 14-Apr-2014

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE . Date ISDSPrepared/Updated: 11-Jul-2017 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Report.:ISDSA21485 I. BASIC INFORMATION 1. Basic Project Data Country: Africa Project ID: P161265 Project Name:

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 06/05/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date prepared/updated: 10/09/12 I. Basic Information INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 11/15/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 19-Feb-2014

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 07/13/2009 Report No.: 49497

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 07/13/2009 Report No.: 49497 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

1.2 BIODIVERSITY IN EA AT THE WORLD BANK Mainstreaming Biodiversity in Development

1.2 BIODIVERSITY IN EA AT THE WORLD BANK Mainstreaming Biodiversity in Development 1.2 BIODIVERSITY IN EA AT THE WORLD BANK 1.2.1 Mainstreaming Biodiversity in Development The World Bank s Mainstreaming Biodiversity in Development (1995) sets out how the Bank can best direct efforts

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE,2 Date ISDS Prepared/Updated: 03-Sep-2015 Report No.: ISDSC14552 Date ISDS Approved/Disclosed: 04-Sep-2015 Public Disclosure

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/06/2011 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 11/14/2009 Report.: AC4826 1. Basic Project Data Country: Sudan Project ID: P111061 Project Name: Southern Sudan

More information

Project ID: P Sector: Construction, Other Lending Instruments: NA Is this project processed under OP 8.50 (Emergency recovery)?

Project ID: P Sector: Construction, Other Lending Instruments: NA Is this project processed under OP 8.50 (Emergency recovery)? Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) 36933 Section I Basic Information Date ISDS Prepared/Updated:

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974. Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974. Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974 Country: Africa Project ID: P094916 Project Name: WAPP

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/15/2015 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 12-Nov-2014 Report No.: ISDSC9631 Date ISDS Approved/Disclosed: 06-Dec-2014 Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/14/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

fflt EGRAT ED SAFEGUARDS DATA SHEET CONCEPT STAGE

fflt EGRAT ED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Date SDS Prepared/Updated: fflt EGRAT ED SAFEGUARDS DATA SHEET CONCEPT STAGE. BASC NFORMATON Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3947. Date ISDS Prepared/Updated: 04/20/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3947. Date ISDS Prepared/Updated: 04/20/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 04/20/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 10-Feb-2015 Report No.: ISDSC 141 Date ISDS Approved/Disclosed: 18-Feb-2015 Public Disclosure Authorized

More information

Europe and Central Asia Region Capacity Development Trust Fund

Europe and Central Asia Region Capacity Development Trust Fund Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Europe and Central Asia Region Capacity Development Trust Fund RP1439 Draft Terms of

More information

Guidance on Environmental Assessment

Guidance on Environmental Assessment Guidance on Environmental Assessment 1. Environmental assessments (EAs) of Bank1 projects are carried out in a broad range of sectoral, geographical, cultural, and socio-economic contexts. Projects assessed

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 30-May-2013

More information

5. EIA Program for Developmental Assistance

5. EIA Program for Developmental Assistance 5. EIA Program for Developmental Assistance 5.1 EIA Process in World Bank In May 1987, a series of structural changes were introduced to strengthen the Bank's environmental policies, procedures and resources.

More information

C. Project Description [from section 3 of PCN] The proposed project would comprise of the following three components:

C. Project Description [from section 3 of PCN] The proposed project would comprise of the following three components: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02/17/2012 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 26-Mar-2014

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3763. Date ISDS Prepared/Updated: 07/11/2008 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3763. Date ISDS Prepared/Updated: 07/11/2008 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 07/11/2008 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE . Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4437. Date ISDS Prepared/Updated: 08/18/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4437. Date ISDS Prepared/Updated: 08/18/2009 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 08/18/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4437 Country: Papua New Guinea Project ID: P116521 Project

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE CG - FCPF

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5229. Date ISDS Prepared/Updated: 04/15/2010 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5229. Date ISDS Prepared/Updated: 04/15/2010 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 04/15/2010 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Istanbul Municipal Infrastructure Project Report No.: AB2946 Region EUROPE AND CENTRAL ASIA Sector Solid waste management (50%); Disaster

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 03/08/2007 INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Report No.: AC2566 1. Basic Project Data Country: Lesotho Project ID: P088544 Project Name: Private

More information

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5623. Date ISDS Prepared/Updated: 09/22/2010 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5623. Date ISDS Prepared/Updated: 09/22/2010 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 09/22/2010 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 12-Feb-2014

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291 Project Name