Planning, Design and Estimation of a Check Dam B.H. Ramathilagam 1, S. Murugesan 2, M. Manikandan 3, A. Arumugaraja 4, Assistant professor 1 2, 3, 4

Size: px
Start display at page:

Download "Planning, Design and Estimation of a Check Dam B.H. Ramathilagam 1, S. Murugesan 2, M. Manikandan 3, A. Arumugaraja 4, Assistant professor 1 2, 3, 4"

Transcription

1 ISSN XXXX XXXX 2017 IJESC Research Article Volume 7 Issue No.4 Planning, Design and Estimation of a Check Dam B.H. Ramathilagam 1, S. Murugesan 2, M. Manikandan 3, A. Arumugaraja 4, Assistant professor 1 2, 3, 4, U. G. student Department of Civil Sethu institute of technology, Virudhunagar, India Abstract To overcome these issues on a global scale, water erosion is the most severe type of soil erosion. It occurs mostly in the form of running water. This study was to develop information from dam which check dam can be adopted for the purpose of ground water recharge. Dams are constructions built across a river or a stream and used to interrupt and store water for special purpose. Check dams are comparatively smaller and more temporary to other types of dams for the purpose of ground water recharge. The Study consisted of a site selection phase, a surveying phase, an planning phase, an design phase and estimation analysis..this Particular scheme lies in highly favourable zone for recharge as classified in the zonation map for Ground water recharge. By implementing this scheme, with in the zone of influence of about 1 km radius from the check dam site will be benefitted by way of percolation. Increase the Ground water level and increase the revenue through the ayacut. Totally Ha Ayacut is benefitted through Seventy Eight No s of wells. Moreover, all the wells (both domestic and agricultural wells) within the zone of influence will be recharged. The length of the check dam is 106m. The design and Estimation of the structure is done using the software Ms-Excel. The total estimation amount of the project is Rs Lakhs. Keywords : Ground Water-Recharge, Water Erosion Control, Check Dams, Flow Velocity. I. INTRO DUCTION A dam is a barrier that impounds water or underground streams. Reservoirs created by dams not only suppress floods but also provide water for activities such as irrigation, human consumption, industrial use, aquaculture, and navigability. Hydropower is often used in conjunction with dams to generate electricity. A dam can also be used to collect water or for storage of water which can be evenly distributed between locations. Dams generally serve the primary purpose of retaining water, while other structures such as floodgates or leaves are used to manage or prevent water flow in to specific land regions. There are several types of check dams; each type of dam is constructed with different conditions. In general, some essential considerations of check dams need to be considered. First, the site of each check dam must be carefully inspected to assess dam settling. The slope of waterway should be no more than 50% and the depth to bedrock should be over 2 feet (Department of Environmental Quality, 2005). Second, check dams materials will vary depending on conditions and locations. Logs and rock are usually utilized in permanent or semi-permanent check dams for their stability, and sandbag is for short term purpose (Mississippi Department of Environmental Quality, 2011) This type of dam project can be widely utilized in small open channels and drainage ways, including temporary and permanent swales. Check dams flattens the gradient of channels and blocks streams from fluently flowing. As a consequence, not only the velocity of flow is mitigated, but also the path can be distributed toward vegetation. On another hand, check dams also trap sediments from streams which helps to reduce water erosion. II. S ITE S URVEYING Before starting surveying work to select the area where the check dam is constructed and some procedures should be consider for selecting a site the water demand and ground water is necessity for cultivate crops and increase revenue and standard of living afterwards opinion from public and grievance should be noted. leveling should be done in the proposed site with the use of surveying instrument like autolevel, tripod, tape, plump bob, thread. Surveying work of leveling is carried out from upstream to downstream of the river up to 50 M from the site then reduced level of each points should be calculated from height of collimation method. Site should be cleared from vegetable, leaves, un bushy level after foundation should be erected at where the soil is week depth up to 3m to 5 m. Figure 1 I. Plan of check dam The planning of check dam done should be in two views A) Half plan at top & half plan at foundation. b) cross -section of check dam A. Half plan at top & half plan at foundation Half plan from top view and half plan at foundation are shown in fig 2. From top view plan shows apron & of both U/S International Journal of Engineering Science and Computing, April

2 side and D/S side. from left to right half top plan shows figure 2. U/S Return wall then us bed level to crest and stilling basin is 6.40m wide afterwards cement concrete blocks in right side portion ends is apron in D/S bed level and 8.00m wide. total discharge through scour vents and over weir = cusecs Design discharge for the anicut = cusecs D. Stability calculation The stability of body wall of the anicut was checked for the following conditions: 1 Reservoir empty without eq 2. Reservoir at MWL,with tail water with uplift 3.Reservoir at FRL, no tail water with uplift 4.Upstream side fully silted up to crest, No silt/water at D/s side Figure:2 Half plan at top & half plan at foundation B. Cross-section of check dam Cross-section of check dam shows abutments, d/s wing at start,u/s wing & return, d/s wing at end, d/s wing at basin. cement concrete 1:3:6 using 40mm aggregate m15 graded aggregate with surface reinforcement details are shown in figure 3 1. Maximum stress= SV/b*(1+6e/b) = T/m 2 Minimum stress = SV/b*(1+6e/b) = T/m 2 2. Maximum stress= SV/b*(1+6e/b )=3.5442T/m 2 3. Maximum stress= SV/b*(1+6e/b) =3.5442T/m 2 4.Maximum stress= SV/b*(1+6e/b) =3.5442T/m 2 E. Surface flow Regime width Looseness factor = 4.83 sqrt ( ) =107.5m = Existing overall length /Regime width = M Figure 3 II. CROSS-SECTION DES IGN A. Design the check dam structure The check dam structure design in limit state method. Design should be followed by the rules of indian standard IS B. Rear water calculation To find out the discharge in the rear water calculation by applying manning s formula (i) area (A)= m 2 (ii) wetted perimeter (p) = m (iii)discharge=17497 cusecs. C. Front maximum water level The front maximum water level determines discharge the amount of water from anicut and back water length calculation : P/ H O 0.65 < 1.33 (velocity of approach should be taken) total discharge over the weir = m 3 /sec % of discharging passing = % Scour depth = 3.6 M Stilling basin level = m Total horizontal floor length: Length of u/s floor = 3.00m Width of the body wall = 2.50m D/s floor length = 6.80m Total floor length required =12.30 m providing stilling basin length = 6.40m Hence total floor length = 12.30m F. Downstream protection work Length of downstream protection block = 1.5 D =5.7 m Hence provide 4 rows of CC block of size 1.5x1.5x0.9 m tk of pitching (Is ) = 850mm International Journal of Engineering Science and Computing, April

3 slope of =2.00:1 Length of launching =8.560 m qty of stone reqd for tk = 0.85x 8.56 = m 3 Inner tk reqd = 7.276/8 = m Quantity of pitching provided = 10.4 m 3 Quantity of pitching required = m 3 G. Ups tream wing wall &returns earth pressure: Vertical component = KN Horizontal component = KN Maximum stress = P/A(1+6e/b) = KN/m 2 Minimum stress =P/A (1-6e/b) =5.145 KN/m 2 J. Design of downstream wingwall at end portion Earth pressure: Vertical component = KN/m 2 Horizontal component = KN/m 2 Maximum stress = P/A(1+6e/b) = KN/m 2 Minimum stress =P/A (1-6e/b) =3.728 KN/m 2 H. Design of downstream wing wall at start earth pressure: Vertical component = KN/M 2 Horizontal component = KN/M 2 Maximum.stress = P/A(1+6e/b) = KN/m 2 Minimum stress =P/A (1-6e/b) =73.277KN/m 2 K. Design of downstream wingwall at return portion earth pressure: Vertical component t= KN/M Horizontal co mponent= KN/ m2 Maximum stress = P/A(1+6e/b) = KN/m 2 Minimum stress =P/A (1-6e/b) =2.468 KN/m 2 I. Design of downstream wingwall at basin portion Earth pressure: Vertical component = KN/m 2 Horizontal component t= KN/m 2 Maximum.stress = P/A(1+6e/b) = KN/m 2 Minimum stress =P/A (1-6e/b) =7.309 KN/m 2 III.ES TIMATION The estimation of the total approximate cost of the project is calculated by the detailed estimated method are as in the below tabulation. International Journal of Engineering Science and Computing, April

4 SI.NO Qty Description of work Rate Per Amount 1 L.S Clearing the site L.S m 3 Earth work excavation for m foundation m 3 Earth work excavation in all m soils except medium rock m 3 Extra for every additional 6.90 m lead of 10m m 3 Extra for every additional lift of 1m 5.50 m C.C 1:4:8 using 40 mm Hard broken stone jelly A) 100 m 3 Up to 1.50 m depth below m C.C 1:3:6 using 40 mm hard broken stone jelly a) 1580 m 3 Upto 1.50 m 4.50 m depth below m Cement concrete 1:2:4 using 20mm metal a) 266 m 3 Up to 1.5 m depth below m b) 266 m 3 From 1.5 m depth -4.5 m below m Cement concrete 1:2:4 (Graded mix ) 60% of 40mm & 40% of 20mm a) 1580 m 3 Upto 1.5 m depth below m b) 266 m 3 Upto 1.00m height above m c) 49 m 3 From 1.00m height -4..5m m height above m 3 Cement concrete 1:1, 5:3 using 20 mm metal with minimum Reinforcement m m 3 Supplying and erecting centering for soffits steel M sheets of size 90 x60 cm and 10 BG stiffened Qtl Steel fabricating Qtl m 3 Forming sand filter of m course sand and fine sand m 3 Graded filter using broken m stone 10 to 80mm m 3 Gravel filling for protection m blocks m 3 Rough stone dry packing for m revetment m 3 Jeddy stone dry packing for m launching apron 18 L.S Provision for expansion joints on every 20m interval L.S L.S L.S Provision for bailing out of L.S L.S water fixing hydrology board, gaugeplates.marking stones etc. 20 L.S Provision for bank connection L.S L.S Total IV. CO NCLUSION From this study, by observing the results the following conclusions were made the purpose of the project is increase the Ground Water recharge through the increase a yield of Crops. The site of check dam is surveyed in the area of Kadamalaikundu village of Andipatti thaluk in Theni District. In this study consist of Surveying, Planning, Designing and Estimation. The Surveying work carried with the instrument of Auto-Level. The designing and estimation work are done in Ms - excel software. All the Results of design and estimated are found to be safe The IS code of Design is followed International Journal of Engineering Science and Computing, April

5 This method of design is considered to be better than the other methods available for design particularly for check dams From the design result it has been concluded that this design can be adopted for any check dams. The estimated cost of the check dam is found to be Total Rs Lakhs. This amount implies the material cost, labour cost and all other miscellaneous charges. REFERENCE [1] Hangxi Fan The Function of check dams and the effect of Check Dams on Water Erosion department of resource analysis, saint Marry s university of Minnesota, winona, MN [2] IS criteria for structural design of barriages and weirs. International Journal of Engineering Science and Computing, April

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

Inflow pipe. Drain. Drain

Inflow pipe. Drain. Drain Inflow pipe Screened overflow Drain Foul flush diverter Screened intake Manhole cover Maximum water level Seal Inspection cover Possible local drainage through screen Drain Bottom sloped Screened outlet

More information

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08 (b) Discuss in brief shaft spillway with neat sketches. Marks 04 OR Q (2) Explain in brief USBR stilling basin. Marks 08 Stilling Basins The basins are usually provided with special appurtenances including

More information

PART B. Irrigation Design Drawing

PART B. Irrigation Design Drawing PART B Irrigation Design Drawing Design of surplus weir. Estimation of Flood discharge entering the tank Combined catchment area of group of tanks= 25.89sq.kms Intercepted catchment area of he upper tanks=

More information

10(a) Bridge and culvert design information

10(a) Bridge and culvert design information 10(a) Bridge and culvert design information The following information is required to accompany resource consent applications for bridges or culverts on waterways. Please answer all questions if possible.

More information

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) SMP-11 PLANNING CONSIDERATIONS: Design Life: 1 yr Acreage

More information

Figure Inlet protection (Source: Minnesota DOT)

Figure Inlet protection (Source: Minnesota DOT) 3.9 INLET PROTECTION Figure 3.14. Inlet protection (Source: Minnesota DOT) Overview Description: A manufactured protective device or barrier used to trap sediment at a storm drain surface or curb inlet.

More information

Narora Weir A Historical Perspective of Piping Theory

Narora Weir A Historical Perspective of Piping Theory Narora Weir A Historical Perspective of Piping Theory Kevin S. Richards, Ph.D., L.P.G. Senior Advisor USACE - Risk Management Center September 23, 2015 US Army Corps of Engineers BUILDING STRONG Outline

More information

STREAM CONDITION & EROSION CONCERNS IN CITY OF FORT WORTH. Ranjan S. Muttiah Stormwater Management City of Fort Worth

STREAM CONDITION & EROSION CONCERNS IN CITY OF FORT WORTH. Ranjan S. Muttiah Stormwater Management City of Fort Worth STREAM CONDITION & EROSION CONCERNS IN CITY OF FORT WORTH Ranjan S. Muttiah Stormwater Management City of Fort Worth Contrast in Practices AG LAND URBAN LAND - Soil is the livelihood - Soil for building

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

Fabric Drop Inlet Protection

Fabric Drop Inlet Protection Fabric Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Block

More information

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment

More information

Hydraulics of Jinnah Barrage; Existing Structure and Rehabilitation Alternatives

Hydraulics of Jinnah Barrage; Existing Structure and Rehabilitation Alternatives Pak. J. Engg. & Appl. Sci. Vol. 4, Jan 2009 (p. 66-73) Hydraulics of Jinnah Barrage; Existing Structure and Rehabilitation Alternatives Z. A. Chaudhry 1 1 Professor, Civil Engineering Department, University

More information

Performance Assessment of Taunsa Barrage Subsidiary Weir for Long Term Rehabilitation Planning

Performance Assessment of Taunsa Barrage Subsidiary Weir for Long Term Rehabilitation Planning Pak. J. Engg. & Appl. Sci. Vol. 7, Jul., 2010 (p. 65-70) Performance Assessment of Taunsa Barrage Subsidiary Weir for Long Term Rehabilitation Planning Zulfiqar Ali Chaudhry Civil Engineering Department,

More information

Solution for Irrigation Engineering

Solution for Irrigation Engineering Solution for Irrigation Engineering December 2015 Index Q.1) a). 2-3 b).3-5 c).5-6 d).6-8 e).9-10 Q.2) a).10-11 b). 12-14 c). 14-15 Q.3) a). 15-16 b). 17 c). 18 Q.4) a). N.A b). N.A c). N.A Q.5) a).20-22

More information

Diversion Dikes. Fe=0.95

Diversion Dikes. Fe=0.95 2.2 Diversion Dike Erosion Control Description: A diversion dike is a compacted soil mound, which redirects runoff to a desired location. The dike is typically stabilized with natural grass for low velocities

More information

Asst.Prof.Dr. Jaafar S. Maatooq. 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 1 of 26

Asst.Prof.Dr. Jaafar S. Maatooq. 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 1 of 26 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 1 of 26 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 2 of 26 Water is often more useful to people when it is properly controlled, conveyed,

More information

Types of Hydropower Facilities

Types of Hydropower Facilities Types of Hydropower Facilities 1 Impoundment Hydropower- uses a dam to store water. Water may be released either to meet changing electricity needs or to maintain a constant water level. 2 Run-of-River

More information

Inlet Protection. Fe= (Depends on soil type)

Inlet Protection. Fe= (Depends on soil type) 3.4 DESIGN CRITERIA: KEY CONSIDERATIONS Evaluate drainage patterns to ensure inlet protection will not cause flooding of roadway, property or structures Never block entire inlet opening Size according

More information

Riprap must be placed uniformly and carefully to eliminate any weak area where erosion can get a start.

Riprap must be placed uniformly and carefully to eliminate any weak area where erosion can get a start. 10.1 Riprap - General Riprap is a protective layer of material used to protect earth slopes and channels from the effects of erosion by runoff or scour by stream flow. Riprap can be a hand placed layer

More information

PART 1 GENERAL REQUIREMENTS

PART 1 GENERAL REQUIREMENTS PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...

More information

Block and gravel filters can be used where velocities are higher. Reduces the amount of sediment leaving the site.

Block and gravel filters can be used where velocities are higher. Reduces the amount of sediment leaving the site. INLET PROTECTION From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.state.ma.us/dep/brp/stormwtr/files/esfull.pdf Definition: A sediment filter or an excavated

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

[1] Level spreaders can release sheet flow down steep slopes, but the level spreader itself must be constructed across a level gradient.

[1] Level spreaders can release sheet flow down steep slopes, but the level spreader itself must be constructed across a level gradient. Level Spreaders DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Level spreaders can release

More information

Temporary Watercourse Crossing: Fords

Temporary Watercourse Crossing: Fords Temporary Watercourse Crossing: Fords DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

SE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives

SE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Materials and Waste Management - WM DESCRIPTION AND PURPOSE A gravel

More information

LINED WATERWAY OR OUTLET (Feet) Code 468

LINED WATERWAY OR OUTLET (Feet) Code 468 LINED WATERWAY OR OUTLET (Feet) Code 468 Natural Resources Conservation Service Conservation Practice Standard I. Definition A waterway or outlet having an erosion-resistant lining of concrete, stone,

More information

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01. Description. This work consists of installing and maintaining erosion and sedimentation controls to minimize soil erosion and control

More information

Irrigation Structures 2. Dr. M. R. Kabir

Irrigation Structures 2. Dr. M. R. Kabir CHAPTER 9 Irrigation Structures 2 Dr. M. R. Kabir Professor and Head, Department of Civil Engineering University of Asia Pacific (UAP), Dhaka LECTURE 22 What is Cross Drainage Works? In an irrigation project,

More information

D EROSION AND SEDIMENT CONTROL. Table of Contents

D EROSION AND SEDIMENT CONTROL. Table of Contents Table of Contents D1. GENERAL... 1 D2. OBJECTIVE... 1 D3. REFERENCE MATERIAL... 1 D4. REGULATORY REQUIREMENTS... 1 D5. EROSION AND SEDIMENT CONTROL (ESC) PLANS... 2 D5.1 Goals and Objectives:... 2 D5.2

More information

Irrigation Structures 1

Irrigation Structures 1 CHAPTER 8 Irrigation Structures 1 Dr. M. R. Kabir Professor and Head, Department of Civil Engineering University of Asia Pacific (UAP), Dhaka LECTURE 20 Diversion Head Works Definition: The works, which

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent Slope Drains DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [1] Slope drains can act as outlet

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent Slope Drains DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [1] Slope drains can act as outlet

More information

Gabions. Introduction

Gabions. Introduction Gabions Introduction 1. A gabion is a wire mesh cage or basket filled with stones. Gabions are useful in construction works, for example to protect earth embankments, to line channels, to manage or divert

More information

Common Construction-Site BMPs Quick Reference Guide

Common Construction-Site BMPs Quick Reference Guide Common Construction-Site BMPs Quick Reference Guide Installation and Inspection Requirements For more information visit the Town of Truckee Clean Water Program Website: http://www.townoftruckee.com/engineering/clean-water-program

More information

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B. EROSION CONTROL GENERAL NOTES EC - 000 EROSION CONTROL GENERAL NOTES EC - 001 INSTALL TEMPORARY DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT EXISTING PAVEMENT OR APPROVED ACCESS POINT OR AS PRACTICABLE

More information

SECTION EROSION AND SEDIMENTATION CONTROLS

SECTION EROSION AND SEDIMENTATION CONTROLS SECTION 312500 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS which are hereby made

More information

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY 31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed

More information

COFFERDAM (no.) CODE 803

COFFERDAM (no.) CODE 803 ILLINOIS URBAN MANUAL PRACTICE STANDARD COFFERDAM (no.) CODE 803 Source: Kane-DuPage Soil and Water Conservation District DEFINITION A cofferdam is a temporary structure within a waterway or body of water

More information

Pond Closure - Case Study[TP1]

Pond Closure - Case Study[TP1] 2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ Pond Closure - Case Study[TP1] By Pedro J Amaya, P.E. (1) (1) Civil Engineering and Geotechnical Engineering

More information

Filter Tube Barriers (Instream)

Filter Tube Barriers (Instream) Filter Tube Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo

More information

PROJECT SCREENING MATRIX: A User s Guide

PROJECT SCREENING MATRIX: A User s Guide Version 2.0 Page 1 of 7 November 9, 2010 PROJECT SCREENING MATRIX: A User s Guide BACKGROUND The Project Screening Matrix (Screening Matrix) is one of several tools that comprise the River Restoration

More information

Sediment Basin. Fe= (Depends on soil type)

Sediment Basin. Fe= (Depends on soil type) 3.9 Sediment Control Description: A sediment basin is an embankment with a controlled outlet that detains stormwater runoff, resulting in the settling of suspended sediment. The basin provides treatment

More information

Chapter 2: Selecting Best Management Practices (BMPs)

Chapter 2: Selecting Best Management Practices (BMPs) Chapter 2: Selecting Best Management Practices (BMPs) 2.1 - Temporary versus Permanent BMPs The same level of care should be taken to select both temporary BMPs and permanent BMPs. The same level of care

More information

These potential changes and their implications are outlined in Annex 1.

These potential changes and their implications are outlined in Annex 1. Guidance Note Hydropower Guidance Note: This Guidance Note has been prepared by Natural Resources Wales (NRW) to provide applicants for abstraction and impoundment licences for hydropower schemes with

More information

Drop Height For Channel Erosion Control

Drop Height For Channel Erosion Control Drop Height For Channel Erosion Control James C.Y. Guo, Professor and Director Department of Civil Engineering, U. of Colorado at Denver, Denver, Colorado 8017 E-mail: James.Guo@cudenver.edu Introduction

More information

THE CONSTRUCTION PHASES OF THE NEW NAGA HAMMADI BARRAGE COFFERDAMS

THE CONSTRUCTION PHASES OF THE NEW NAGA HAMMADI BARRAGE COFFERDAMS Ninth International Water Technology Conference, IWTC9 2005, Sharm El-Sheikh, Egypt 355 THE CONSTRUCTION PHASES OF THE NEW NAGA HAMMADI BARRAGE COFFERDAMS Yasser Shawky ( 1), Hala Badawy ( 2) (1) Researcher,

More information

LOW WATER CROSSINGS, fords, or drifts, as they

LOW WATER CROSSINGS, fords, or drifts, as they Chapter 9 For ords and Low-Water Crossings Keep the ford profile low, armor the driving surface, and protect against scour. LOW WATER CROSSINGS, fords, or drifts, as they are commonly called, can offer

More information

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc.

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc. ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975 Source: Hey and Associates, Inc. DEFINITION A bridge or culvert crossing installed across a stream or watercourse for short-term

More information

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) Activity: Infiltration Systems PLANNING CONSIDERATIONS: Design Life: Short IS Acreage

More information

4. Ponds and infiltration BMPs can achieve 60 to 100% removal efficiencies for sediment.

4. Ponds and infiltration BMPs can achieve 60 to 100% removal efficiencies for sediment. Landscape BMPs For the purposes of this project, preventive measures have been categorized into two categories: landscape BMPs and source prevention BMPs. Landscape BMPs includes both vegetative practices

More information

Modular Sediment Barriers (Instream)

Modular Sediment Barriers (Instream) Modular Sediment Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo

More information

Fig: Alignment of a ridge or watershed canal (Head reach of a main canal in plains)

Fig: Alignment of a ridge or watershed canal (Head reach of a main canal in plains) SYSTEM OF IRRIGATION CANAL CHAPTER 6 Alluvial Soil and Non-Alluvial Soil The soil which is formed by transportation and deposition of silt through the agency of water, over a course of time, is called

More information

Ministry of Forests, Lands and Natural Resource Operations

Ministry of Forests, Lands and Natural Resource Operations Ministry of Forests, Lands and Natural Resource Operations Southern Engineering Group N2-38 FINDLAY CREEK FINDLAY-LAVINGTON FSR 12.6km SITE INFORMATION N SITE No. N2-38 STRUCTURE No. N2-38A FSR NAME &

More information

Feasibility of Pipe Distribution Network (PDN) over Canal Distribution Network (CDN) For Irrigation

Feasibility of Pipe Distribution Network (PDN) over Canal Distribution Network (CDN) For Irrigation Feasibility of Pipe Distribution Network (PDN) over Canal Distribution Network (CDN) For Irrigation Sandesh B. Kulavmode 1, Dr. S. S.Valunjkar 2 1,2 Department of Civil Engineering, Government College

More information

Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Page 1 of 7 Updated 12/28/2017 Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map: Parcel: Lot: Disturbed Acreage: Engineering Firm: Phone Number:

More information

Suggested Stormwater Management Practices For Individual House Lots

Suggested Stormwater Management Practices For Individual House Lots Suggested Stormwater Management Practices For Individual House Lots These practices are necessary to satisfy the water quantity and water quality criteria of the Rappahannock Stormwater Ordinance. These

More information

Dam Safety and Low Cost Spillway Designs

Dam Safety and Low Cost Spillway Designs Dam Safety and Low Cost Spillway Designs By F. Lempérière & J.P. Vigny (Hydrocoop France) THE CHALLENGE 5 th International Conference on Dam Engineering Lisbon 14-16 February 2007 Increasing dams safety

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

Irrigation Design (1) IHD302

Irrigation Design (1) IHD302 Irrigation Design (1) IHD302 Instructors : 1-Prof Dr. Kamal Abou Alhasan 2- Dr. Ashraf Saad 3- Dr. Soha Elayoty 4- Dr. Mohamed Attia 5- Dr. Hany Gomaa Topics Design of irrigation system Design of Bridge

More information

TD 603. Water Resources Milind Sohoni sohoni/ Lecture 10: Minor Structures for Ground and Surface Water. () March 23, / 31

TD 603. Water Resources Milind Sohoni   sohoni/ Lecture 10: Minor Structures for Ground and Surface Water. () March 23, / 31 TD 603 Water Resources Milind Sohoni www.cse.iitb.ac.in/ sohoni/ Lecture 10: Minor Structures for Ground and Surface Water () March 23, 2010 1 / 31 Classification by Purpose We may classify structures/procedures

More information

Rock Sock (RS) Rock Sock height.

Rock Sock (RS) Rock Sock height. Rock Sock (RS) SC-5 Description A rock sock is constructed of gravel that has been wrapped by wire mesh or a geotextile to form an elongated cylindrical filter. Rock socks are typically used either as

More information

R I Freshwater Wetlands Buffer Zones

R I Freshwater Wetlands Buffer Zones R I Freshwater Wetlands Buffer Zones November 21, 2013 Chuck Horbert RIDEM Freshwater Wetlands Buffer Zone Defined Means an area of undeveloped vegetated land retained in its natural undisturbed condition,

More information

Methods of Streamflow Analysis

Methods of Streamflow Analysis 4 Methods of Streamflow Analysis CHAPTER 4 Streamflow Measurements Danielle M. Andrews Department of Crop and Soil Sciences, The Pennsylvania State University I. INTRODUCTION Perennial carries water all

More information

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions) Adams Co. Conservation District 670 Old Harrisburg Road, Suite 201 Gettysburg, PA 17325 Telephone: 334-0636 Fax: 337-0730 www.adamscounty.us Erosion and Sediment Pollution Control Guidelines for Residential

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

Table Storm Drain Inlet Protection. Applicable for Paved/ Earthen Surfaces

Table Storm Drain Inlet Protection. Applicable for Paved/ Earthen Surfaces BMP C220: Storm Drain Inlet Protection Purpose Conditions of Use Storm drain inlet protection prevents coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area.

More information

Afon Claerwen Hydropower Project. Flood Risk Assessment. February 2018

Afon Claerwen Hydropower Project. Flood Risk Assessment. February 2018 Afon Claerwen Hydropower Project Flood Risk Assessment February 2018 Hydropower Consultancy & Development Document Control Scheme Name: Client Name: Client Address: Afon Claerwen Hydropower Project Elan

More information

A CASE STUDY ON RAIN WATER HARVESTING TECHNOLOGIES FOR TRIBAL AREA OF MADHYA PRADESH, INDIA

A CASE STUDY ON RAIN WATER HARVESTING TECHNOLOGIES FOR TRIBAL AREA OF MADHYA PRADESH, INDIA Plant Archives Vol. 16 No. 1, 2016 pp. 151-156 ISSN 0972-5210 A CASE STUDY ON RAIN WATER HARVESTING TECHNOLOGIES FOR TRIBAL AREA OF MADHYA PRADESH, INDIA Ghanshyam Deshmukh*, M. K. Hardaha 1 and S. K.

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm

More information

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.) Module 2: Selection of Controls and Site Planning for Construction Site Erosion Prevention Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa,

More information

GRASS-LINED CHANNEL (acre) CODE 840

GRASS-LINED CHANNEL (acre) CODE 840 NATURAL RESOURCES CONSERVATION SERVICE ILLINOIS URBAN MANUAL PRACTICE STANDARD GRASS-LINED CHANNEL (acre) CODE 840 (Source: NC Erosion and Sediment Control Field Manual) DEFINITION A natural or constructed

More information

Index. outlet protection Rev. 12/93

Index. outlet protection Rev. 12/93 6 Index outlet protection level spreader outlet stabilization structure 6.40.1 6.41.1 Rev. 12/93 Practice Standards and Specifications 6.40 level spreader Definition Purpose Conditions Where Practice Applies

More information

IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY WATER MANAGEMENT OF CONSTRUCTION SITE Patil V.A*, Gawade S.

IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY WATER MANAGEMENT OF CONSTRUCTION SITE Patil V.A*, Gawade S. IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY WATER MANAGEMENT OF CONSTRUCTION SITE Patil V.A*, Gawade S.L * Asst.prof. sant gajanan maharaj college of engineering, mahagon

More information

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES (TOTAL 10 SHEETS EXCLUDING ABSTRACT & COVER PAGE) 1 OF 7 SCHEDULE-A BOQ FOR EARTHEN DYKES

More information

Flow Diversion Banks: On grassed slopes

Flow Diversion Banks: On grassed slopes Flow Diversion Banks: On grassed slopes DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION 1.1 General The Lower Erkhuwa hydropower Project is located in Kulung and Chauki Danda VDCs of Bhojpur District, in East Nepal. It is located

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

WQ-08 ENHANCED DRY SWALE

WQ-08 ENHANCED DRY SWALE Greenville County Technical Specification for: WQ-08 ENHANCED DRY SWALE 1.0 Enhanced Dry Swale 1.1 Description An Enhanced Dry Swale is a shallow open-channel drainage way stabilized with turf grass or

More information

Our reference BGS-0003-c. Direct line +31(0)

Our reference BGS-0003-c. Direct line +31(0) Deltares Enabling Delta Life,J Alberta Environment and Parks Resilience and Mitigation Attn. Mr. A. Wilson 4th Floor, 9920-108 Street EDMONTON, AB T5K 2M4 Canada 7 October 2015 From Hans van Duijne Our

More information

ITEM 750 ROCK FILTER DAMS

ITEM 750 ROCK FILTER DAMS AFTER MARCH 1, 2012 ITEM 750 ROCK FILTER DAMS 750.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control rock filter dams utilized during construction

More information

4.2 Discharge measurement by Velocity Area Method (Chitale, 1974)

4.2 Discharge measurement by Velocity Area Method (Chitale, 1974) 4.2 Discharge measurement by Velocity Area Method (Chitale, 1974) This method comprises measuring the mean velocity V and the flow area 'A' and computing the discharge Q from the continuity equation. The

More information

Conceptual-Level Cost Estimates Arkansas River Corridor Dam Improvement and River Bank Stabilization Projects

Conceptual-Level Cost Estimates Arkansas River Corridor Dam Improvement and River Bank Stabilization Projects TECHNICAL MEMORANDUM Conceptual-Level Cost Estimates Arkansas River Corridor Dam Improvement and River Bank Stabilization Projects TO: COPIES: PREPARED BY: Tulsa County File CH2M HILL DATE: September 2,

More information

Flow Diversion Banks: General

Flow Diversion Banks: General Flow Diversion Banks: General DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Flow diversion

More information

footings are provided with a concrete grade of M20. The maximum axial load 1600 KN as arrived from design is taken for the design of the footing.

footings are provided with a concrete grade of M20. The maximum axial load 1600 KN as arrived from design is taken for the design of the footing. ISSN XXXX XXXX 2017 IJESC Research Article Volume 7 Issue No.8 Planning, Designing and Estimation of a Bank Building D.Gangasekhar 1, B.Ramakrishna 2 M.Tech, (Structural Engineering) 1, Assistant Professor

More information

SC-01 Surface Outlet and Baffle Sediment Basin

SC-01 Surface Outlet and Baffle Sediment Basin Greenville County Technical Specification for: SC-01 Surface Outlet and Baffle Sediment Basin 1.0 Surface Outlet and Baffle Sediment Basin This Specification contains requirements for the design and construction

More information

WQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description

WQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description Greenville County Technical Specification for: WQ-06 SAND FILTER 1.0 Sand Filter 1.1 Description Sand Filters remove pollutants through sedimentation and filtration within the sand. The primary components

More information

Temporary Stream Crossing

Temporary Stream Crossing Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Temporary Stream Crossing

Temporary Stream Crossing Temporary Stream Crossing NS-4 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution

More information

STREAMBANK RESTORATION DESIGN

STREAMBANK RESTORATION DESIGN STREAMBANK RESTORATION DESIGN WITH VINYL SHEET PILE GRADE CONTROL STRUCTURES BRUCE M. PHILLIPS, M.S., P.E. ABSTRACT Grade control structures are an effective channel stabilization measure which can eliminate

More information

404(b)(1) EVALUATION

404(b)(1) EVALUATION 404(b)(1) EVALUATION SECTION 404(b)(1) EVALUATION DETAILED PROJECT REPORT AND ENVIRONMENTAL ASSESSMENT POMEROY SECTION 14 EMERGENCY STREAMBANK PROTECTION PROJECT POMEROY, OH I. INTRODUCTION As required

More information

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS 2. Section 2 TW O SECTIONTWO 2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS Unless specifically exempted, all Development Construction Projects will be required

More information

Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No.

Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No. Bill 1: Site Preparatory Works Page No. 1/7 Bill 1 Page 1/1 1.1 Construction of access roads to quarry sites LS 1 including their maintenance throughout the working period 1.2 Construction of deviations

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

Buffer Zones. November 29, RIDEM Freshwater Wetlands

Buffer Zones. November 29, RIDEM Freshwater Wetlands R I Freshwater Wetlands Buffer Zones November 29, 2012 Chuck Horbert RIDEM Freshwater Wetlands Buffer Zone Defined Means an area of undeveloped vegetated land retained in its natural undisturbed condition,

More information

Water Resources. Associate Prof. Ahmed Moustafa Moussa Lecture -1 Lecture 4

Water Resources. Associate Prof. Ahmed Moustafa Moussa Lecture -1 Lecture 4 Water Resources By Associate Prof. Ahmed Moustafa Moussa Lecture -1 Lecture 4 High Aswan Dam Project 1. Location The High Aswan Dam (HAD) location was determined to fit the topographical features of the

More information

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION CHAPTER 23.105 GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION Sections 23.105.101 General... 1 23.105.102 Definitions... 1 23.105.103 Permits required... 3 23.105.104 Hazards.... 4 23.105.105 Permit

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information