Preliminary Emission Summary and Dispersion Modelling Report for a Hot Mix Asphalt Plant P.B. Paving and Landscaping Plantagenet, Ontario

Size: px
Start display at page:

Download "Preliminary Emission Summary and Dispersion Modelling Report for a Hot Mix Asphalt Plant P.B. Paving and Landscaping Plantagenet, Ontario"

Transcription

1 Preliminary Summary and Dispersion Modelling Report for a Hot Mix Asphalt Plant P.B. Paving and Landscaping Plantagenet, Ontario prepared on behalf of: Levac Robichaud Leclerc Associates Ltd Chamberland Street Rockland, Ontario K4K 1M6 by: P.O. Box 313 Ingleside, Ontario K0C 1M0 March 29, 2012 Stirling Engineering Inc Reference # 10074

2 Executive Summary This document is a Preliminary Summary and Dispersion Modelling ( ESDM ) Report. This Preliminary ESDM Report has been prepared based on the provisions of Section 26 of Ontario Regulation 419/05 and the Ontario Ministry of the Environment document Procedure for Preparing an Summary and Dispersion Modelling Report, dated March This Preliminary ESDM Report has been prepared on behalf of Levac Robichaud Leclerc Associates Ltd ( Levac ) for P.B. Paving and Landscaping ( PB Paving ) in support of municipal approvals for a proposed asphalt plant to be located in Plantagenet, Ontario. The plant is expected to operate 12 hours per day, 5 days per week, typically 200 days per year. Operations at the plant will include: receiving storage and handling of raw materials; mixing and heating of raw materials to produce hot mix asphalt at a rate of 250 tonnes per hour; and trucking of hot mix asphalt products The PB Paving facility is subject to Section 19 of Ontario Regulation 419/05. s from the PB Paving asphalt plant may include trace quantities of particulate matter (PM); nitrogen oxides (NO x ); sulphur dioxide (SO 2 ); benzene; formaldehyde; quinine; beryllium; cadmium; and hexavalent chromium. The modelled concentrations of these contaminants at the point of impingement concentrations are below the applicable limits as established under Ontario Regulation 419/05. A noise assessment review has been prepared separately to this report. March 29, 2012 p. i

3 Table 1.1 Summary Table Contaminant Name Contaminant CAS # Total Facility Rate (g/s) Air Dispersion Model Used Max POI Concentration (µg/m 3 ) Averaging Period (hours) MOE POI Limit (µg/m 3 ) Regulation Schedule # Percentage of MOE Limit (%) PM E+00 RUN E % NO x E-01 RUN E % SO E-01 RUN E % benzene E-03 RUN E % formaldehyde E-02 RUN E % quinone E-03 RUN E % beryllium E-06 RUN E % cadmium E-05 RUN E % hexavalent chromium E-06 RUN E % March 29, 2012 p. ii

4 Table of Contents 1.0 INTRODUCTION AND BACKGROUND Proponent Contact for Technical Information Regarding the ESDM Report Project Description Summary Report Format Background of Preliminary Summary Dispersion Modelling Report ENVIRONMENTAL COMPLIANCE APPROVAL APPLICATION FORMS FACILITY DESCRIPTION North American Industry Classification System (NAICS) General Process and Operations Description Operating Envelope Description of Raw Materials and Products INITIAL IDENTIFICATION OF SOURCES AND CONTAMINANTS General Characterisation of s Natural Gas Fired Dryer s Load-Out Operation s Silo Filling s Source and Contaminant Identification ASSESSMENT OF THE SIGNIFICANCE OF CONTAMINANTS AND SOURCES Insignificant Sources Contaminants Emitted in Negligible Amounts Contaminants Emitted in Insignificant Quantities Screened Out VOC s Screened Out PAH s Additional Screened Out PAH Compounds Screened Out Non-Hazardous Air Pollutants Screened Out Metals Significant Contaminants OPERATING CONDITIONS, EMISSION ESTIMATING AND DATA QUALITY Source No. 1 Natural Gas Fired Dryer Natural Gas Fired Dryer Operating Conditions Natural Gas Fired Dryer Rates Source No. 1 s Data Quality Statement Amalgamated Source Summary SOURCE SUMMARY TABLE NOISE ASSESSMENT DISPERSION MODELLING Point of Impingement Calculations Dispersion Modelling Input and Output Files EMISSION SUMMARY TABLE Summary and Conclusions PROFESSIONAL SEAL REFERENCES Regulation, Codes and Standards Publication and Documents APPENDICES March 29, 2012 p. iii

5 Appendix A Application and Supporting Documentation (RESERVED-to be included in MOE submission only): Environmental Compliance Approval Application (RESERVED-to be included in MOE submission only): Acoustic Assessment Report for P B Paving, Hugh Williamson Associates Inc, Appendix B ESDM Supporting Documentation Township of Alfred-Plantagenet Zoning Map, showing Lot 18 Concession 2 (3083 Old Highway 17), Plantagenet, Ontario SK-001 Dispersion Modelling Site Plan SK-002 Example Process Flow Diagram SK-003 Nearest Point of Reception Appendix C Dispersion Modelling PBSTACK.doc converted from PBSTACK.stk RUN308 input file PBSTAK2.doc converted RUN308 output file List of Tables Table 1.1 Summary Table... ii Table 4.1 Source and Contaminant Identification Table... 7 Table 5.1 PM from Insignificant Sources Verification... 8 Table 5.2 Contaminants Associated with Natural Gas Combustion Emitted in Negligible Amounts... 8 Table 5.3 AP-42 Table VOC Contaminants Screened Out Using Section of the Procedure Document... 9 Table 5.4 AP-42 Table PAH Contaminants Screened Out Using Section of the Procedure Document Table 5.5 Additional AP-42 Table PAH Contaminants to be Screened Out by Section of the Procedure Document Table 5.6 AP-42 Table non-hap Organic Contaminants Screened Out Using Section of the Procedure Document Table 5.5 AP-42 Table Trace Metal s Screened Out by Section of the Procedure Document Table 5.8 Remaining Significant Contaminants Table 6.1 Source No. 1 Expected s Rates Table 7.1 Source Summary Table Table 9.1 Dispersion Modelling Input Summary Table March 29, 2012 p. iv

6 10074-SK-001 Site Plan SK-002 Example Process Flow Diagram SK-003 Nearest Point of Reception List of Drawings March 29, 2012 p. v

7 1.0 INTRODUCTION AND BACKGROUND This document is a Preliminary Summary and Dispersion Modelling ( ESDM ) Report prepared in support of municipal approvals, for a proposed asphalt plant to be operated by P.B. Paving and Landscaping ( PB Paving ). This Preliminary ESDM Report has been prepared by Stirling Engineering Inc ( Stirling Engineering ) on behalf of Levac Robichaud Leclerc Associates Ltd for PB Paving. 1.1 Proponent The mailing address and physical address for PB Paving is: P.B. Paving and Landscaping 111, County Road 19 Wendover, Ontario K0A 3K0 The management contact for PB Paving is: Contact: Mr. Sylvain Fredette Telephone: Fredwelding@bellnet.ca The technical contact for the project is: Contact: Mr. Mario Elie Company: Levac Robichaud Leclerc Associates Ltd Telephone: (613) Facsimile: (613) melie@lrl.ca 1.2 Contact for Technical Information Regarding the ESDM Report This ESDM Report has been prepared by: Stirling Engineering Inc P.O. Box 313 Ingleside, Ontario K0C 1M0 The contact for additional technical information regarding this document is: Contact: Mr. Robert S. Wilson, P.Eng Telephone: (613) Facsimile: (613) rwilson@stirlingengineering.ca March 29, 2012 p. 1 of 21

8 1.3 Project Description Summary PB Paving is an Ontario based contractor engaged in the construction industry. PB Paving is proposing to erect and operate a hot mix asphalt plant at a property in Plantagenet (Township of Alfred-Plantagenet) Ontario. The hot mix asphalt ( HMA ) plant would be used to support road construction and resurfacing projects in Eastern Ontario. 1.4 Report Format This Preliminary ESDM Report has been prepared based on Section 26 of Ontario Regulation 419/05 Air Pollution Local Air Quality ( O. Reg. 419/05 ) and the Environmental Protection Act. The Ontario Ministry of the Environment ( MOE ) document Procedure for Preparing an Summary and Dispersion Modelling Report ( Procedure document ) dated March 2009 was referenced for additional guidance. 1.5 Background of Preliminary Summary Dispersion Modelling Report To assist in the design and layout of the facility, and to obtain the necessary approvals, PB Paving retained Levac Robichaud Leclerc Associates Ltd ( Levac ), an Ontario consulting engineering and project management firm, to provide professional engineering services. Levac subcontracted portions of the environmental approval work to Stirling Engineering. This Preliminary ESDM Report has been prepared by Stirling Engineering in support of municipal approvals for the construction of the HMA plant. The Preliminary ESDM will be converted to a final ESDM and submitted to the Ontario Ministry of the Environment, with additional supporting documentation to obtain an Environmental Compliance Approval prior to operation of the HMA plant. March 29, 2012 p. 2 of 21

9 2.0 ENVIRONMENTAL COMPLIANCE APPROVAL APPLICATION FORMS This section has been intentionally left blank. This ESDM report has been prepared in advance of municipal approvals and Environmental Compliance Approval Application forms are not required at this phase of the project. March 29, 2012 p. 3 of 21

10 3.0 FACILITY DESCRIPTION PB Paving is proposing the construction of an HMA plant which is to be located on part of Lot 18, Concession 2, Township of Alfred-Plantagenet (former Township of North Plantagenet) in the United Counties of Prescott Russell. The property is approximately ha in area. Based on zoning by-law information provided by the Corporation of the Township of Alfred-Plantagenet, the property is zoned A-1 or Agriculture with exception. A zoning bylaw amendment is required to convert the zoning to use supporting the asphalt plant operation. A copy of the current zoning is attached in Appendix A. The proposed asphalt paving facility and property boundaries are shown in drawings Proposed Asphalt Plant Location Existing Features- General and Proposed Asphalt Plant Location Existing Features, dated November For the purposes of dispersion modelling, the property boundaries have been set at the property line. 3.1 North American Industry Classification System (NAICS) The PB Paving facility may be given the applicable The North American Industry Classification System (NAICS) Code of Asphalt Paving Mixture and Block Manufacturing US. This NAICS code is part of the 324 Group, and does not fall under Schedule 4 or 5 of O. Reg. 419/ General Process and Operations Description The U.S. Environmental Protection Agency ( EPA ) document AP-42, Fifth Edition Compilation of Air Pollutant Factors, Volume 1: Stationary Point and Area Sources, Chapter 11 Section 1: Hot Mix Asphalt Plants ( AP-42 ) dated April 2004, was used to prepare this Preliminary ESDM. The specific model of HMA plant to be used at the Plantagenet site has not been determined. PB Paving however has confirmed that they will be constructing and operating a batch type plant. PB Paving has also confirmed that they will be fueling the plant with natural gas. The plant will be equipped with a primary collector for particulate emissions and a secondary collector costing of a filter fabric type dust collector, or an equivalent emission control device. The main activities associated with a batch type asphalt plant operation are: receiving and handling of fine and coarse aggregate, reclaimed asphalt pavement ( RAP ) and liquid asphalt cement (bitumen); aggregate size sorting; drying and mixing of sorted aggregate with recovered particulate matter, RAP and liquid asphalt cement; loading; and, possibly storage. Drawing SK-002 provides a general process flow diagram for a typical batch plant, based on AP-42. March 29, 2012 p. 4 of 21

11 3.3 Operating Envelope PB Paving is expected to operate the HMA plant twelve (12) hours per day, five (5) days per week and up to 200 days per year. Using a maximum production rate of 250 tons/hr, an annual asphalt throughput of 5.4x10 8 kg (0.54 MMT) can be estimated for the PB Paving facility. 3.4 Description of Raw Materials and Products The raw material used at the proposed PB Paving facility is fine and coarse aggregate, RAP and liquid asphalt cement. A typical weight distribution of HMA is 92% aggregate and RAP, and 8% liquid asphalt cement and water. March 29, 2012 p. 5 of 21

12 4.0 INITIAL IDENTIFICATION OF SOURCES AND CONTAMINANTS This section provides an initial identification of the sources and corresponding contaminants emitted from the proposed PB Paving facility. 4.1 General Characterisation of s Contaminant emissions from the asphalt plant operation have been identified through the AP-42 document. The contaminants can be considered in several groups: particulate matter (PM) emissions from the dust collector, transportation and fugitive emissions; products of combustion from the natural gas fired dryer; volatile organic compounds (VOC) from combustion and the heated asphalt; polyaromatic hydrocarbon compounds (PAH) from the heated asphalt semi-volatile and heavy organic compounds from the heated asphalt; and trace metals from the heated asphalt. The PB Paving facility will be a batch plant will have three (3) main sources of contaminant emissions: Source 1, the natural gas fired dryer, is further described in section 4.1.1; Source 2 is the combined fugitive emissions from several load-out locations of the HMA plant, is further described in section 4.1.2; and Source 3, the silo filling process, is further described in section Natural Gas Fired Dryer s The most significant source of emissions at the PB Paving facility will be a natural gas fired dryer. Contaminants from the rotary dryer will be directed to a primary collector then to a common dust collector where the contaminants will be filtered, with trace contaminants emitted directly to atmosphere through a stack Load-Out Operation s Fugitive load-out emissions will be generated by several activities throughout the HMA plant. These activities will emit particulate material ( PM ) directly to atmosphere Silo Filling s A separate point source of PM emissions is the silo filling operation. This activity will also emit PM directly to atmosphere. 4.2 Source and Contaminant Identification The sources of emissions from the PB Paving facility are tabulated in Table 4.1, the Source and Contaminant Identification Table. March 29, 2012 p. 6 of 21

13 For the purposes of this report, the emissions from the natural gas fired dryer are referred to as Source No. 1, the emissions from the load-out operations are referred to as Source No. 2 and the emissions from the silo filling procedure are referred to as Source No. 3. Table 4.1 Source and Contaminant Identification Table Source Information Source No. Source Description 1 natural gas fired dryer Expected Contaminants PM, NO x, SO 2, benzene, formaldehyde, quinine, beryllium, cadmium, hexavalent chromium 2 load-out operations PM 3 silo filling operations PM March 29, 2012 p. 7 of 21

14 5.0 ASSESSMENT OF THE SIGNIFICANCE OF CONTAMINANTS AND SOURCES This section provides an assessment of the significance of sources and contaminants emitted from the proposed PB Paving facility. 5.1 Insignificant Sources In accordance with subsection of the Procedure document, individual sources that emit contaminants at a rate less than 5% of total property-wide emissions of a contaminant can be considered insignificant sources. PM is the only common contaminant to be emitted from multiple sources. PM emissions from the natural gas fired dryer, load-out and silo filling procedures are estimated in the following table, based on the AP-42 document. Table 5.1 PM from Insignificant Sources Verification Source No. Rate (g/s) Percent of Total s (%) Total: As shown in Table 5.1, PM emissions from Sources No. 2 and 3 can be considered insignificant, as these sources are expected to emit below the 5% property-wide emission threshold for PM. 5.2 Contaminants Emitted in Negligible Amounts None of the identified emission sources are listed in Appendix B.2 of the Procedure document and therefore the contaminants from the specified sources cannot be categorized as emitted in negligible amounts. Several of the contaminants identified in the AP-42 document are associated exclusively with the combustion of natural gas for the dryer. As stated in Section of the Procedure document the only significant contaminant from the combustion of natural gas is NOx. Since the asphalt plant will have only moderately sized heaters, the combustion contaminants listed in Table 5.2 have been further excluded from the ESDM. Table 5.2 Contaminants Associated with Natural Gas Combustion Emitted in Negligible Amounts Source No. Contaminant AP-42 Reference Table CAS # 1 methane carbon monoxide carbon dioxide sulphur dioxide March 29, 2012 p. 8 of 21

15 Additionally the AP-42 document identifies total organic carbon and volatile organic carbon as general, non-speciated emissions. This ESDM addresses only the individual speciated emissions. 5.3 Contaminants Emitted in Insignificant Quantities Contaminants emitted in insignificant quantities can be identified by developing emission thresholds. Contaminants emitted at a rate below the threshold may be considered negligible in accordance with the following equation used to calculate the emission threshold from subsection of the Procedure document: The Dispersion Factor is selected from Appendix B.1, Table B-1 of the Procedure document based on the distance from the emission source to the closest Point of Reception ( POR ). The distance from the point source of the main asphalt plant stack to the nearest POR is approximately 45 metres. Using Table B-1 of the Procedure document, a more conservative distance from the main plant point source of 40 metres was used to obtain a rural dispersion factor of 8,100 µg/m 3 per g/s emission Screened Out VOC s Several of the speciated VOC compound identified in Table of the AP-42 document can be screened out using the Threshold procedure specified in subsection of the Procedure Document. The screened out VOCs are listed in Table 5.3. Table 5.3 AP-42 Table VOC Contaminants Screened Out Using Section of the Procedure Document Contaminant CAS # Factor (lb/ton of HMA produced) Threshold (g/s) Rate (g/s) Factor Rating acetaldehyde E ethylbenzene D toluene D xylene D Screened Out PAH s Similarly, Table identifies several PAH compounds that can be screened out using the Threshold. The screened out PAH compounds are listed in Table 5.4 Of the PAH compounds listed in Table of AP-42 with a corresponding MOE published POI limit, only 2-methylnaphthalene (CAS ) was emitted at a rate above the threshold. The calculated Point of Impingement ( POI ) concentration for 2-methylnaphthalene however is less than 1 % of the allowable published limit, even though it is the PAH emitted in the greatest amount. March 29, 2012 p. 9 of 21

16 Also noteworthy is that benzo(a)pyrene, the PAH with the lowest allowable POI of micrograms per cubic meter (3.3 nanograms per cubic meter) was screened out using Section Table 5.4 AP-42 Table PAH Contaminants Screened Out Using Section of the Procedure Document Contaminant CAS # Factor (lb/ton of HMA produced) Threshold (g/s) Rate (g/s) Factor Rating acenaphthene E E E-05 D acenephtyelene E E E-05 D benzo(a)pyrene E E E-09 E naphthalene E E E-03 D Additional Screened Out PAH Compounds The remaining PAH compounds identified in Table of AP-42 do not have published POI limits. If a POI limit of 1.0 micrograms per cubic meter (the next lowest published POI to benzo(a)pyrene), all but phenanthrene (CAS ) could be screened out using the Thresholds. Even using a POI of micrograms per cubic meter, all listed PAH compounds not screened out would still have a modelled POI concentration below micrograms per cubic meter, except fluorene (CAS ) which would be slightly above at micrograms per cubic meter. Based on the above evaluation, all other PAH compounds identified in Table of AP-42 can also be screened out. The additional PAH compounds to be screened out are listed in Table 5.5, with a conservative POI limit of 1 microgram per cubic meter used as the screening POI, except 2-methylnaphthalene (CAS ) which has a published POI of 30 micrograms per cubic meter. March 29, 2012 p. 10 of 21

17 Table 5.5 Additional AP-42 Table PAH Contaminants to be Screened Out by Section of the Procedure Document Contaminant CAS # Factor (lb/ton of HMA produced) Threshold (g/s) based on 1 µg/m3 POI Rate (g/s) Factor Rating 2-methylnaphthalene E E E-03 D anthracene E E E-06 D benzo(a)anthracene E E E-07 E benzo(b)fluoranthene E E E-07 D benzo(h,g,i)perylene E E E-08 E benzo(k)fluoranthene E E E-07 E chrysene E E E-07 E dibenz(a,h)anthracene E E E-09 E fluoranthene E E E-06 D fluorene E E E-05 D indeno(1,2,3-ed)pyrene E E E-09 E phenanthrene E E E-05 D pyrene E E E-06 D Screened Out Non-Hazardous Air Pollutants Table of AP-42 identifies only four non-hazardous air pollutants (non-hap) organic compounds emitted from batch asphalt plants. Although these four non-hap organic compounds do not have published POI limits, they can also be reasonably screened out as non-hazardous emissions, using a conservative POI limit 1 microgram per cubic meter. The non-haps that can also be screened out are listed in Table 5.6. Table 5.6 AP-42 Table non-hap Organic Contaminants Screened Out Using Section of the Procedure Document Contaminant CAS # Factor (lb/ton of HMA produced) Threshold (g/s) Rate (g/s) Factor Rating benzaldehyde E E E-03 E butraldehude/ E E E-04 E isobutraldehyde crotonaldehyde E E E-04 E hexanal E E E-04 E Screened Out Metals The last group of contaminants to be considered are the trace metal emissions from the asphalt plant. All of the metals identified in Table of AP-42 can be screened out using Thresholds from section of the Procedure document except beryllium (CAS ), cadmium (CAS ), and hexavalent chromium (CAS ). The metals that can be screened out are listed in March 29, 2012 p. 11 of 21

18 Table 5.7 AP-42 Table Trace Metal s Screened Out by Section of the Procedure Document Contaminant CAS # Factor (lb/ton of HMA produced) Threshold (g/s) based on 1 µg/m3 POI Rate (g/s) Factor Rating arsenic E E E-05 D barium E E E-05 E chromium E E E-05 D copper E E E-05 D lead E E E-05 D manganese E E E-04 D mercury E E E-05 E nickel E E E-05 D selenium E E E-05 E zinc E E E-04 D 5.4 Significant Contaminants The remaining contaminants that are emitted in significant quantities are listed in Table 5.8. Table 5.8 Remaining Significant Contaminants Source No. Contaminant CAS # MOE POI Limit (µg/m 3 ) 1 PM NOx SOx benzene formaldehyde quinone beryllium cadmium hexavalent chromium March 29, 2012 p. 12 of 21

19 6.0 OPERATING CONDITIONS, EMISSION ESTIMATING AND DATA QUALITY This section provides a description of the operating conditions used in the calculation of the emission estimates. The emissions estimates for contaminants determined to be insignificant in Section 5.0 have been included to demonstrate the estimating technique used. 6.1 Source No. 1 Natural Gas Fired Dryer An exhaust fan is attached to the proposed secondary collector used in the hot mix asphalt paving process at the PB Paving facility. The contaminants generated by the secondary collector are captured by a bag house Natural Gas Fired Dryer Operating Conditions Contaminant emissions were modelled as exhausting continuously over a half hour period from the asphalt plant operating at a peak throughput rate of 250 tons per hour Natural Gas Fired Dryer Rates Dryer emissions rates for Source No. 1 contaminants are summarized in Table 6.1. Table 6.1 Source No. 1 Expected s Rates Contaminant AP-42 Referen ce Table Factor (lb/ton of HMA produced) Rate (g/s) Factor Rating PM E+00 B NO x E-01 D SO x E-01 E benzene E-03 D formaldehyde E-02 D quinone E-03 E beryllium E E-06 E cadmium E E-05 D hexavalent chromium E E-06 E Source No. 1 s Data Quality Statement Based on subsection of the Procedure document, the data quality for the benzene, formaldehyde and PM emissions can be considered above-average data quality as the emission rate estimates that are developed from tests on a moderate to large number of sources where the source category population is sufficiently specific to minimize variability. Based on subsection of the Procedure document, the data quality for the nitrogen oxide emissions can be considered average data quality as the emission rate estimates that are March 29, 2012 p. 13 of 21

20 developed from tests on a reasonable number of facilities where the source category population is sufficiently specific to minimize variability. Based on subsection of the Procedure document, the data quality for berylium, cadmium, and hexavalent chromium, emissions can be considered marginal or uncertain data quality as the emission rate estimates that are developed from tests on a reasonable number of facilities where the source category population is sufficiently specific to minimize variability. 6.2 Amalgamated Source Summary For a HMA maximum production rate of 250 ton/hr, the estimated emissions of significant contaminants have been included in Table 7.1. March 29, 2012 p. 14 of 21

21 7.0 SOURCE SUMMARY TABLE s of sources with significant contaminants are summarized in Table 7.1, the Source Summary Table. Table 7.1 Source Summary Table Source No. 1 Source Description Natural Gas Fired Dryer Stack No. Stack Volumetric Flow Rate [m 3 /s] (est) Source Data Stack Inner Diameter [m] 0.5 (est) Stack Height Above Grade [m] 20.0 Stack Height Above Roof [m] 0.0 Contaminant CAS # Maximum Rate [g/s] Data Averaging Period [hrs] PM E NOx E SO E benzene E formaldehyde E quinone E beryllium E cadmium E hexavalent chromium E Estimating Technique emission factor emission factor emission factor emission factor emission factor emission factor emission factor emission factor emission factor Data Quality B Percentage of Overall s [%] 93.4% D 11.1% E 1.5% D 8.9% D 2.5% E 1.3% E 1.1% D 1.8% E 5.3% March 29, 2012 p. 15 of 19

22 8.0 NOISE ASSESSMENT A noise assessment report is being submitted separately. March 29, 2012 p. 16 of 21

23 9.0 DISPERSION MODELLING s from the property were modeled using MOE RUN308 modelling software. The property was modeled as an irregular shaped polygon, based on Drawing SK-001 Site Plan. Modelling was completed for a generic 1 g/s emission from a point source. A description of the application of an approved dispersion model is tabulated in Table 9.1 below. Table 9.1 Dispersion Modelling Input Summary Table Relevant Section of the Regulation Section Title Summary of How the Approved Dispersion Modelling was Used 8 Negligible Sources of Contaminant See ESDM Section Same Structure Contamination n/a 10 Operating Conditions See ESDM Section Source of Contaminant Rates Combined Effect of Assumptions for Operating Conditions and Rates Meteorological Conditions See ESDM Section 6 as per RUN 308 as per RUN Area of Modelling Coverage(receptor locations) Stack Height for Certain New Sources of Contaminant n/a 14 m 16 Terrain Data as per RUN Averaging Periods Half hour averaging periods were used as required for use with RUN308. March 29, 2012 p. 17 of 21

24 9.1 Point of Impingement Calculations The ESDM will be submitted in accordance with Section 19 of O. Reg. 419/05. Modelling for the ESDM has been completed using the RUN308 modelling software as specified in the Appendix to Regulation 346. The contaminant emissions from the proposed PB Paving facility have been modeled as emissions from a point source, based on an extended stack height of 20 m above grade, which is more than two (2) times the height of the proposed noise attenuation barrier. The stack will be located approximately 45 m from the west property boundary. The generic 1 g/s emission from the point source resulted in a maximum ground level POI concentration of µg/m 3 at the property line. Maximum POI concentrations for all significant contaminants were calculated by multiplying the generic 1 g/s maximum POI concentration by the ratio of the actual contaminant emission rate relative to the generic 1 g/s emission rate. 9.2 Dispersion Modelling Input and Output Files A copy of the model input data for the file PBPOIN20.stk, converted to PBPOIN20.doc is provided in Appendix C. The RUN308 output file for the maximum ground level concentration, converted to file PBMAXGLC.doc is also provided in Appendix C. March 29, 2012 p. 18 of 21

25 10.0 EMISSION SUMMARY TABLE The POI concentration of all significant expected contaminants calculated in subsection 9.1 has been summarized in Table 1.1, the Summary Table. The calculated POI concentrations were compared against the criteria listed in the MOE document Summary of Standards and Guidelines to Support Ontario Regulation 419: Air Pollution Local Air Quality ( Guideline ). All expected contaminant emissions in the Summary Table are below their respective limits. Particulate matter is expected to have the highest POI concentration, relative to the MOE criteria listed in the Guideline, at 93 % Summary and Conclusions There are expected to be nine (9) contaminants with significant emissions from the processes at the PB Paving facility. The nine significant contaminants are: PM; NO x ; SO 2 ; benzene; formaldehyde; quinine; beryllium; cadmium; and hexavalent chromium These contaminants will be emitted from Source No. 1, the natural gas fired dryer. The contaminants emitted from the PB Paving facility are in compliance with the corresponding standards published in O. Reg. 419/05, based on the emission estimates and dispersion modelling. March 29, 2012 p. 19 of 21

26

27 12.0 REFERENCES 12.1 Regulation, Codes and Standards Environmental Protection Act Ontario Regulation 419/05 Air Pollution-Local Air Quality 12.2 Publication and Documents Ontario s Ambient Air Quality Criteria, Standards Development Branch, Ontario Ministry of the Environment, February 2008 Jurisdictional Screening Level (JSL) List Procedure for Preparing an Summary and Dispersion Modelling Report, Ontario Ministry of the Environment, March 2009 AP-42, Fifth Edition Compilation of Air Pollutant Factors, Volume 1: Stationary Point and Area Sources, Chapter 11 Section 1: Hot Mix Asphalt Plants, U.S. Environmental Protection Agency, April 2004 Drawing Proposed Asphalt Plant Location Existing Features- General, Levac Robichaud Leclerc Associates Ltd, November 2011 Drawing Proposed Asphalt Plant Location Existing Features, Levac Robichaud Leclerc Associates Ltd March 29, 2012 p. 21 of 21

28 13.0 APPENDICES March 29, 2012 p. 22 of 21

29 Appendix A ESDM Supporting Documentation (RESERVED-to be included in MOE submission only): Environmental Compliance Approval Application (RESERVED-to be included in MOE submission only): Acoustic Assessment Report for P B Paving, Hugh Williamson Associates Inc, March 29, 2012

30 Appendix B ESDM Supporting Documentation SK-001 Site Plan SK-002 Example Process Flow Diagram SK-003 Nearest Point of Reception Township of Alfred-Plantagenet Zoning By-Law for PB Paving Site March 29, 2012

31 (0, 385) (840, 385) (820, 310) (985,270) stack (500,70) 45 m (720, 50) County Road 17 (770,50) (0, 0) (165,0) berm PRELIMINARY EMISSION SUMMARY AND DISPERSION MODELING REPORT FOR P.B. PAVING AND LANDSCAPING FACILITY, PLANTAGENET, ONTARIO DISPERSION MODELLING SITE PLAN AAH 1 1 MAR 29, 2012 NTS SK-001

32 Note: A reproduction of Figure General process flow diagram for batch drum mix asphalt plants (source classification codes in parentheses), taken from The U.S. Environmental Protection Agency document AP 42, Fifth Edition Compilation of Air Pollutant Factors, Volume 1: Stationary Point and Area Sources, Chapter 11 Section 1: Hot Mix Asphalt Plants dated April PRELMINARY EMISSION SUMMARY AND DISPERSION MODELING REPORT FOR P.B. PAVING AND LANDSCAPING FACILITY, PLANTAGENET, ONTARIO MAR 29, NTS TYPICAL HOT MIX ASPHALT PLANT PROCESS FLOW DIAGRAM AAH SK

33 Maximum ground level concentration 460 m County Road 17 PRELIMINARY EMISSION SUMMARY AND DISPERSION MODELING REPORT FOR P.B. PAVING AND LANDSCAPING FACILITY, PLANTAGENET, ONTARIO MAXIMUM GROUND LEVEL CONCENTRATION COUNTOUR AAH 1 1 MAR 29, 2012 NTS SK-003

34

35 Appendix C Dispersion Modelling PBSTACK.doc converted from PBSTACK.stk RUN308 input file PBSTAK2.doc converted RUN308 output file March 29, 2012

36 This is the updated property description for the PB Paving facility in Plantag Property line co-ordinates # 1=( 0. 0.) # 2=( ) # 3=( ) # 4=( ) # 5=( ) # 6=( ) # 7=( ) # 8=( ) # 9=( 0. 0.) #10=( 0. 0.) #11=( 0. 0.) Point Sources y m Number Height Exit Diameter Temp x Rate Velocity m gm/s m/s m C m This is the point source for the PB Paving stack.

37 MAXIMUM GROUND LEVEL CONCENTRATION VERSION 2.00 Date: March 28, 2012 Application No: Reviewer: RSW Title: RSW This is the maxglc for a 1 g/s emission from the main asphalt plant source at P B Paving. Data from file: pbstack.stk Point Sources Y m Number Height Exit Diameter Temp X Rate Velocity m gm/s m/s m C m Single Source Maximum Ground Level Concentrations Source Stability Maximum Distance Wind Speed Conc (ug/m3) (m) (m/sec) 1 C D Maximum off-property ground level concentration ug/m3 Stability D Wind direction deg Wind speed m/s Coordinates (m) Maximum Concentration along the property line ug/m3 Stability D Wind direction deg Wind speed m/s Coordinates (m)

SNAP CODE: NOSE CODE: NFR CODE: 2 A 6

SNAP CODE: NOSE CODE: NFR CODE: 2 A 6 pr040611 Activity 040611 SNAP CODE: 040611 SOURCE ACTIVITY TITLE: PROCESSES IN WOOD, PAPER PULP, FOOD, DRINK AND OTHER INDUSTRIES Road Paving with Asphalt NOSE CODE: 105.16.31 NFR CODE: 2 A 6 1 ACTIVITIES

More information

January 12, 2016 Mr. Stephen Barlow, P.E. Regional Air Pollution Control Engineer NYSDEC Region 5 232 Golf Course Road Warrensburg, New York 12885 Re: DEC Application # 5-4120-00266/00001 (Air State Facility)

More information

Blue Ridge Environmental Defense League PO Box 88 Glendale Springs, North Carolina

Blue Ridge Environmental Defense League  PO Box 88 Glendale Springs, North Carolina Blue Ridge Environmental Defense League www.bredl.org PO Box 88 Glendale Springs, North Carolina 28629 BREDL@skybest.com (336) 982-2691 Testimony of Louis A. Zeller Science Director, Blue Ridge Environmental

More information

AIR AND ODOUR EMISSIONS ASSESSMENT OF OPERATIONAL SHUTDOWN STACK RELEASE

AIR AND ODOUR EMISSIONS ASSESSMENT OF OPERATIONAL SHUTDOWN STACK RELEASE AIR AND ODOUR EMISSIONS ASSESSMENT OF OPERATIONAL SHUTDOWN STACK RELEASE CLEAN HARBORS CANADA INC. CORUNNA, ONTARIO DISCLAIMER: SOME FORMATTING CHANGES MAY HAVE OCCURRED WHEN THE ORIGINAL DOCUMENT WAS

More information

Phase II Environmental Site Assessment (ESA) Update. Bernard Benoit Project Management (BBPM) 2212 Gladwin Crescent, Unit B4 Ottawa, Ontario K1B 5N1

Phase II Environmental Site Assessment (ESA) Update. Bernard Benoit Project Management (BBPM) 2212 Gladwin Crescent, Unit B4 Ottawa, Ontario K1B 5N1 Phase II Environmental Site Assessment (ESA) Update 2720 Richmond Road Bernard Benoit Project Management (BBPM) 2212 Gladwin Crescent, Unit B4 K1B 5N1 Centre Multiservices Francophone de l Ouest d Ottawa

More information

Cockburn Cement Limited. Summary of stack emission and ground level concentration data. September 2010

Cockburn Cement Limited. Summary of stack emission and ground level concentration data. September 2010 Cockburn Cement Limited Summary of stack emission and ground level concentration data September 2010 THIS REPORT CONTAINS INFORMATION EXTRACTED FROM THE KATESTONE ENVIRONMENTAL AIR QUALITY IMPACT ASSESSMENT

More information

Hamilton Works 2017 Annual Toxic Substances Reduction Report (O. Reg. 455/09)

Hamilton Works 2017 Annual Toxic Substances Reduction Report (O. Reg. 455/09) Hamilton Works 2017 Annual Toxic Substances Reduction Report (O. Reg. 455/09) Issued June 1, 2018 Basic Facility Information Section 1 Facility Information Owner Stelco Inc. Facility name Hamilton Works

More information

Lake Erie Works 2012 Annual Toxics Reduction Report (O. Reg. 455/09)

Lake Erie Works 2012 Annual Toxics Reduction Report (O. Reg. 455/09) Lake Erie Works 2012 Annual Toxics Reduction Report (O. Reg. 455/09) Issued May 24, 2013 Basic Facility Information Section 1 Facility Information Owner US Steel Canada Facility name Lake Erie Works Address

More information

Hamilton Works 2016 Annual Toxic Substances Reduction Report (O. Reg. 455/09)

Hamilton Works 2016 Annual Toxic Substances Reduction Report (O. Reg. 455/09) Hamilton Works 2016 Annual Toxic Substances Reduction Report (O. Reg. 455/09) Issued June 1, 2017 Basic Facility Information Section 1 Facility Information Owner U. S. Steel Canada Inc. Facility name Hamilton

More information

COLACEM CANADA INC. L'ORIGNAL, ONTARIO. Version 1.0. This report documents the compliance status of the Facility as of May 3, 2016.

COLACEM CANADA INC. L'ORIGNAL, ONTARIO. Version 1.0. This report documents the compliance status of the Facility as of May 3, 2016. May 2016 COLACEM CANADA INC. L'ORIGNAL, ONTARIO Emission Summary and Dispersion Modelling Report Version 1.0 This report documents the compliance status of the Facility as of May 3, 2016. Submitted to:

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Miller Paving Limited Post Office Box, No. 4080 Markham,

More information

Miller Paving Limited Braeside Quarry Expansion

Miller Paving Limited Braeside Quarry Expansion Miller Paving Limited Braeside Quarry Expansion Prepared for: Miller Paving Limited A Division of Miller Group Inc. 505 Miller Avenue Markham, Ontario L3R 9R8 Prepared by: Church & Trought Inc. 106 885

More information

Brandon Generating Station Licence Review Air Quality Impact Assessment

Brandon Generating Station Licence Review Air Quality Impact Assessment Figure 5.1 Locations of Maximum Predicted Point of Impingement (POI) Pollutant Concentrations Due to Unit #5 and Fugitive Dust Emissions 38106-20 June 2006 68 SENES Consultants Limited Predicted incremental

More information

one (1) hot mix asphalt silo, operating at a maximum temperature of 163 degrees celsius;

one (1) hot mix asphalt silo, operating at a maximum temperature of 163 degrees celsius; Site Location:Mobile Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Aecon Construction and Materials

More information

The following table summarizes the average test results for the three tests conducted by ORTECH and the corresponding emission criteria:

The following table summarizes the average test results for the three tests conducted by ORTECH and the corresponding emission criteria: EXECUTIVE SUMMARY ORTECH Environmental (ORTECH) was requested by Clean Harbors to conduct a comprehensive emission testing program at the incineration facility located at 4090 Telfer Road in Corunna, Ontario.

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Site Location: Mobile Facility Ministry of the Environment Ministère de l Environnement AMENDED ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 7962-9E8TPG Issue Date: December 30, 2013

More information

Prepared for: Toronto Hydro Energy Services Inc. 14 Carlton Street Toronto, Ontario M5B 1K5. Prepared by:

Prepared for: Toronto Hydro Energy Services Inc. 14 Carlton Street Toronto, Ontario M5B 1K5. Prepared by: EMISSION SUMMARY AND DISPERSION MODELLING REPORT GREEN LANE LANDFILL GAS COGENERATION PLANT TORONTO HYDRO ENERGY SERVICES INC. 38024 JOHN WISE LINE, TOWNSHIP OF SOUTHWOLD, ONTARIO Prepared for: Toronto

More information

HOT MIX ASPHALT PLANTS

HOT MIX ASPHALT PLANTS United States Office Of Air Quality EPA-454/R-00-019 Environmental Protection Planning And Standards December 2000 Agency Research Triangle Park, NC 27711 Air HOT MIX ASPHALT PLANTS EMISSION ASSESSMENT

More information

Updates on Proposed Guidance/Technical Bulletins and Technical Standards

Updates on Proposed Guidance/Technical Bulletins and Technical Standards Updates on Proposed Guidance/Technical Bulletins and Technical Standards September 2015 Presentation for AWMA Breakfast Series by Cathy Grant (cathy.grant@ontario.ca) 416-327-6600 1 Standards Development

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY

DEPARTMENT OF ENVIRONMENTAL QUALITY DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION 246 OREGON STATE AIR TOXICS PROGRAM 340-246-0090 Ambient Benchmarks for Air Toxics (1) Purpose. Ambient benchmarks are concentrations of air toxics that serve

More information

New Source MACT and Residual Risk at an Iron Foundry

New Source MACT and Residual Risk at an Iron Foundry New Source MACT and Residual Risk at an Iron Foundry Paper #70148 Steven Klafka, P.E., DEE Wingra Engineering, S.C., 303 South Paterson Street, Madison, WI 53703 ABSTRACT Expansion of three Wisconsin grey

More information

Evaluation of Cumulative Risk from an Iron Foundry

Evaluation of Cumulative Risk from an Iron Foundry Evaluation of Cumulative Risk from an Iron Foundry Control #58 Prepared by Steven J. Klafka, P.E., DEE Wingra Engineering, S.C., 303 South Paterson Street, Madison, WI 53703 Prepared for the Annual Meeting

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment Ministère de l Environnement ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 4495-9FUQDY Issue Date: February 5, 2014 Holcim (Canada) Inc. 2300 Steeles Ave

More information

Table A1 Summary statistics for hourly NO 2 concentrations in Ireland in 2016

Table A1 Summary statistics for hourly NO 2 concentrations in Ireland in 2016 Table A1 Summary statistics for hourly NO 2 concentrations in Ireland in 2016 Kilkitt Castlebar Enniscorthy Emo Court Portlaoise Kilkenny Seville Lodge South Link Road Swords Blanchardstown Ballyfermot

More information

Prepared for: Toronto Hydro Energy Services Inc. 14 Carlton Street Toronto, Ontario M5B 1K5. Prepared by:

Prepared for: Toronto Hydro Energy Services Inc. 14 Carlton Street Toronto, Ontario M5B 1K5. Prepared by: EMISSION SUMMARY AND DISPERSION MODELLING REPORT IN SUPPORT OF A RENEWABLE ENERGY APPROVAL APPLICATION TORONTO HYDRO ENERGY SERVICES INC. LESLIE ST., TORONTO, ONTARIO Prepared for: Toronto Hydro Energy

More information

PROCEDURE FOR PREPARING AN EMISSION SUMMARY AND DISPERSION MODELLING REPORT [GUIDELINE A-10]

PROCEDURE FOR PREPARING AN EMISSION SUMMARY AND DISPERSION MODELLING REPORT [GUIDELINE A-10] February 2017 PROCEDURE FOR PREPARING AN EMISSION SUMMARY AND DISPERSION MODELLING REPORT [GUIDELINE A-10] Version 4.0 Guidance for Emission Summary and Dispersion Modelling Reports under Ontario Regulation

More information

Prepared for: Toronto Hydro Energy Services Inc. 14 Carlton Street Toronto, Ontario M5B 1K5. Prepared by:

Prepared for: Toronto Hydro Energy Services Inc. 14 Carlton Street Toronto, Ontario M5B 1K5. Prepared by: EMISSION SUMMARY AND DISPERSION MODELLING REPORT IN SUPPORT OF A RENEWABLE ENERGY APPROVAL APPLICATION TORONTO HYDRO ENERGY SERVICES INC. LESLIE ST., TORONTO, ONTARIO Prepared for: Toronto Hydro Energy

More information

California Regional Water Quality Control Board San Francisco Bay Region

California Regional Water Quality Control Board San Francisco Bay Region California Regional Water Quality Control Board San Francisco Bay Region Linda S. Adams Secretary for Environmental Protection 1515 Clay Street, Suite 1400, Oakland, California 94612 (510) 622-2300 Fax

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Miller Paving Limited 505 Miller Avenue Post Office

More information

15.7 Mines And Smoke Pots

15.7 Mines And Smoke Pots 15.7 Mines And Smoke Pots Munitions listed in this section begin with the Department of Defense Identification Code (DODIC) letter K. Almost all munitions included in this category are mines or smoke pots.

More information

ENVIRONMENTAL ASSESSMENT FINDINGS AND CONCLUSIONS WEBER SIGN SERVICE, INC. th 730 EAST 8 STREET MICHIGAN CITY, INDIANA 46360

ENVIRONMENTAL ASSESSMENT FINDINGS AND CONCLUSIONS WEBER SIGN SERVICE, INC. th 730 EAST 8 STREET MICHIGAN CITY, INDIANA 46360 ENVIRONMENTAL ASSESSMENT FINDINGS AND CONCLUSIONS WEBER SIGN SERVICE, INC. th 730 EAST 8 STREET MICHIGAN CITY, INDIANA 46360 Prepared for: THE MICHIGAN CITY REDEVELOPMENT COMMISSION 100 EAST MICHIGAN BOULEVARD

More information

F3. Final Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

F3. Final Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report F3. Final Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Air Quality & Odour Net Effects Analysis

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique D. Crupi & Sons Limited 85 Passmore Avenue Post Office

More information

F3. Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

F3. Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report F3. Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Draft Air Quality & Odour Net Effects Analysis

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 7108-AA3KY8

More information

8 AIR QUALITY ASSESSMENT

8 AIR QUALITY ASSESSMENT Environmental Impact Statement Dairygold Mallow Redevelopment Chapter 8 AIR QUALITY 8 AIR QUALITY ASSESSMENT 8.1 INTRODUCTION This chapter describes the potential impacts to the ambient air quality from

More information

In 2016, Sarnia chemical plant prepared a new plan for the following substance:

In 2016, Sarnia chemical plant prepared a new plan for the following substance: D. Luecke Sarnia Chemical Plant Manager 519.339.2757 December 2016 Sarnia Chemical Plant Reduction plan summary (OR 455/09) Provincial regulations set out requirements for business owners to inform Ontarians

More information

Appendix Q Canadian Air Quality Study

Appendix Q Canadian Air Quality Study Appendix Q Canadian Air Quality Study NOTICE The information contained in this Appendix was developed strictly for the purpose of evaluating the environmental impacts associated with the Ambassador Bridge

More information

ACOUSTIC ASSESSMENT OF THE PROPOSED PLANTAGENET ASPHALT PLANT

ACOUSTIC ASSESSMENT OF THE PROPOSED PLANTAGENET ASPHALT PLANT Ottawa, Ontario, Canada ACOUSTIC ASSESSMENT OF THE PROPOSED PLANTAGENET ASPHALT PLANT Township of Alfred & Plantagenet County of Prescott & Russell Prepared for P. B. Paving and Landscaping 3083, Old Highway

More information

Scope of Work for Water Sampling

Scope of Work for Water Sampling Scope of Work for Water Sampling From: Meghan Betcher, Environmental Scientist Downstream Strategies, LLC 100 Railroad Ave. 304-445-7200 mbetcher@downstreamstrategies.com Date: June 26, 2017 Downstream

More information

EXPORT SOIL-MATERIAL QUALITY REQUIREMENTS

EXPORT SOIL-MATERIAL QUALITY REQUIREMENTS EXPORT SOIL-MATERIAL QUALITY REQUIREMENTS GENERAL Industrial operations have been conducted on Port of Long Beach property since the 1930s. Though it is unlikely that hazardous substances will be encountered

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique S & C Electric Canada Ltd. 90 Belfield Road Toronto,

More information

APPENDIX B. Soil Sample Certificate of Analysis

APPENDIX B. Soil Sample Certificate of Analysis APPENDIX B Soil Sample Certificate of Analysis 5 SHOREHAM DR DOWNSVIEW, ON M3N1S4 SOIL ANALYSIS REVIEWED BY: Mike Muneswar, BSc (Chem), Senior Inorganic Analyst TRACE ORGANICS REVIEWED BY: Jacky Takeuchi,

More information

OREGON Environmental Laboratory Accreditation Program ORELAP Fields of Accreditation

OREGON Environmental Laboratory Accreditation Program ORELAP Fields of Accreditation MATRIX Reference Code Analyte Code Description STAT Analysis Corporation 40 CFR Part 50 Appendix J Environmental Laboratory Program 3950 Particulates

More information

WASTE ACCEPTANCE CRITERIA AND DEVELOPMENT OF SOIL TRIGGER VALUES FOR EPA-LICENSED SOIL RECOVERY FACILITIES

WASTE ACCEPTANCE CRITERIA AND DEVELOPMENT OF SOIL TRIGGER VALUES FOR EPA-LICENSED SOIL RECOVERY FACILITIES WASTE ACCEPTANCE CRITERIA AND DEVELOPMENT OF SOIL TRIGGER VALUES FOR EPA-LICENSED SOIL RECOVERY FACILITIES 1. Introduction This guidance document applies to soil recovery facilities which exceed the operational

More information

Urban Area Polycyclic Aromatic Hydrocarbons Study Tiered Approach to Corrective Action Objectives

Urban Area Polycyclic Aromatic Hydrocarbons Study Tiered Approach to Corrective Action Objectives Urban Area Polycyclic Aromatic Hydrocarbons Study Tiered Approach to Corrective Action Objectives Two background studies were recently completed investigating certain polycyclic aromatic hydrocarbon (PAHs)

More information

Table B1: Analytical Results for Nutrients in Surface Water

Table B1: Analytical Results for Nutrients in Surface Water Table B1: Analytical Results for Nutrients in Surface Water Sample ID 1 2 Physical Tests Colour, True (Colour Units) 15 (4) units absolute, or 5 units above background (30-day average)

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique CRH Canada Group Inc. 2391 Lakeshore Road West Mississauga,

More information

Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Draft Air Quality & Odour Net Effects Analysis & Prepared By: JANUARY, 2014 Executive Summary Two expansion alternatives were

More information

R E P O R T E P O R T

R E P O R T E P O R T R E P O R T E P O R T EMISSION SUMMARY AND DISPERSION MODELLING REPORT GENERAL MOTORS OF CANADA COMPANY ST. CATHARINES CET CASTING, ENGINE AND TRANSMISSION Company Address: GENERAL MOTORS OF CANADA COMPANY

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Sulco Chemicals Limited 60 First Street Extension

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Alvin Martin 712776 Southgate Side Road 71 Southgate,

More information

Brandon Generating Station Unit 5 Environmental Impact Statement

Brandon Generating Station Unit 5 Environmental Impact Statement 0.3 µg/m 3 respectively are negligible, and less than 0.2 µg/m 3 at the nearest residence east of Unit 5. Therefore, fugitive dust emissions from the Brandon G.S. alone would not be sufficient to account

More information

1 ST QUARTER (SEPTEMBER THROUGH NOVEMBER 2010) MONITORING REPORT MASSPORT AIR QUALITY MONITORING STUDY, YEAR 2 LOGAN INTERNATIONAL AIRPORT

1 ST QUARTER (SEPTEMBER THROUGH NOVEMBER 2010) MONITORING REPORT MASSPORT AIR QUALITY MONITORING STUDY, YEAR 2 LOGAN INTERNATIONAL AIRPORT 1 ST QUARTER (SEPTEMBER THROUGH NOVEMBER 2010) MONITORING REPORT MASSPORT AIR QUALITY MONITORING STUDY, YEAR 2 LOGAN INTERNATIONAL AIRPORT Prepared for Massport Capital Programs and Environmental Management

More information

Flare Emissions. September 15, 2017 BY U.S. MAIL AND

Flare Emissions. September 15, 2017 BY U.S. MAIL AND BY U.S. MAIL AND EMAIL Reviewing Engineer Puget Sound Clean Air Agency 1904 rd Avenue, Suite 105 Seattle, WA 98101-17 Re: Supplemental Information for Tacoma LNG Notice of Construction Application Dear

More information

City of Sarnia. 255 Christina Street South Sarnia, Ontario N7T 7N2. Attention.: Mr. Pratt Rawat, Manager of Design and Infrastructure

City of Sarnia. 255 Christina Street South Sarnia, Ontario N7T 7N2. Attention.: Mr. Pratt Rawat, Manager of Design and Infrastructure City of Sarnia 255 Christina Street South Sarnia, Ontario N7T 7N2 Attention.: Mr. Pratt Rawat, Manager of Design and Infrastructure Environmental Subsurface Investigation Project Name 1541 Blackwell Road,

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Watch Tower Bible and Tract Society of Canada 13893

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique 1883244 Ontario Inc. 655 Huff Road, Rural Route #

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Northern Sun Mining Corp. Post Office Box, No. 5114

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment Ministère de l Environnement AMENDED ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 8288-973HSE Issue Date: September 23, 2013 Oakrun Farm Bakery Ltd. 58

More information

TABLE OF CONTENTS. Figure 5: Modelled Concentrations of Suspended Particulate Worst-Case 24-Hour Average

TABLE OF CONTENTS. Figure 5: Modelled Concentrations of Suspended Particulate Worst-Case 24-Hour Average TABLE OF CONTENTS Page No. 1. INTRODUCTION... 1 1.1 Acton Quarry Extension... 1 1.1.1 Aggregate Resources Act... 1 1.1.2 Niagara Escarpment Planning & Development Act... 1 1.1.3 Planning Act... 1 1.2 Overview

More information

NB: Unofficial translation, legally binding texts are those in Finnish and Swedish Ministry of the Environment, Finland. Government Decree 591/2006

NB: Unofficial translation, legally binding texts are those in Finnish and Swedish Ministry of the Environment, Finland. Government Decree 591/2006 NB: Unofficial translation, legally binding texts are those in Finnish and Swedish Ministry of the Environment, Finland Government Decree 591/2006 concerning the recovery of certain wastes in earth construction

More information

SURPLUS SOIL-MATERIAL REUSE REQUIREMENTS

SURPLUS SOIL-MATERIAL REUSE REQUIREMENTS SURPLUS SOIL-MATERIAL REUSE REQUIREMENTS GENERAL Surplus soil-materials generated from most, if not all, Long Beach Harbor Department projects are unlikely to meet established Port Export Soil-material

More information

Project Summary Evaluation of Emissions From Paving Asphalts

Project Summary Evaluation of Emissions From Paving Asphalts EPA United States Air and Energy Engineering Environmental Protection Research Laboratory Agency Research Triangle Park, NC 27711 Research and Development EPA/600/SR-94/135 November 1994 Project Summary

More information

An underground gold ore mining facility, consisting of the following processes and support units:

An underground gold ore mining facility, consisting of the following processes and support units: Content Copy Of Original Ministry of the Environment, Conservation and Parks Ministère de l Environnement, de la Protection de la nature et des Parcs St Andrew Goldfields Ltd. 200 Bay St ( Royal Bank Plaza,

More information

Lake Erie Works 2010 Annual Toxics Reduction Report (O. Reg. 455/09)

Lake Erie Works 2010 Annual Toxics Reduction Report (O. Reg. 455/09) Lake Erie Works 2010 Annual Toxics Reduction Report (O. Reg. 455/09) Issued June 14, 2011 Basic Facility Information Section 1 Facility Information Owner US Steel Canada Facility name Lake Erie Works Address

More information

1.0 CONTINUOUS PARAMETERS

1.0 CONTINUOUS PARAMETERS Stantec Consulting Ltd. 3W-675 Cochrane Drive, Markham ON L3R B8 October 2, 218 File: 1695528 Attention: Ms. Emilee O Leary, Regional Environmental Assessment Coordinator Ministry of the Environment, Conservation

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Lafarge Canada Inc. 6509 Airport Road Mississauga, Ontario L4V 1S7 Site Location: 4191 Highway 3, Cayuga Haldimand County N0A 1E0 Ministry of the Environment and Climate Change

More information

Guide to calculations for ChemTRAC reporting: Poultry processing and rendering. Version 1.1

Guide to calculations for ChemTRAC reporting: Poultry processing and rendering. Version 1.1 Guide to calculations for ChemTRAC reporting: Poultry processing and rendering Version 1.1 February 2013 Contents How do I use this guide? Part 1 of this guide will help you understand the ChemTRAC program,

More information

ON MOE Reg. 127/01 - Ontario Ministry of the Environment for the Airborne Contaminant Discharge Monitoring and Reporting Regulation

ON MOE Reg. 127/01 - Ontario Ministry of the Environment for the Airborne Contaminant Discharge Monitoring and Reporting Regulation Page 1 of 34 Single Window NPRI and Partners Report Preview Company Details Name: Corporation of the City of London Address: 300 Dufferin Avenue, London (Ontario) Report Details Report Status: Ready to

More information

Brunswick Layover Environmental Assessment (EA) Appendix D: Air Quality Assessment. September 2013

Brunswick Layover Environmental Assessment (EA) Appendix D: Air Quality Assessment. September 2013 Brunswick Layover Environmental Assessment (EA) Appendix D: Air Quality Assessment September 2013 BRUNSWICK RAIL MAINTENANCE FACILITY POTENTIAL AIR QUALITY IMPACTS OF PROPOSED FACILITY ON NEARBY SENSITIVE

More information

Air Quality Assessment

Air Quality Assessment Air Quality Assessment Greg Crooks, P.Eng. Joint Waste Management Group (JWMG) - May 26, 2009 AIR QUALITY ASSESSMENT Methodology The Air Quality Assessment completed as part of the Environmental Assessment

More information

15.10 Fuses and Primers

15.10 Fuses and Primers 15.10 Fuses and Primers Munitions listed in this section begin with the Department of Defense Identification Code (DODIC) letters N. This category of munitions includes fuses and primers, which are devices

More information

33101 TAMPERE.

33101 TAMPERE. Measurement of odours and hazardous gaseous emissions from steel foundry 16.-17..5.2013 Project 10745Y12A 15.10.2013 Kuokkamaantie 4 P.O. BOX 428 33101 TAMPERE Tel +358 3 2680 111 Fax +358 3 2110 106 www.ax.fi

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Brigus Gold Corp. 5300 Highway 101 E Black River-Matheson, Ontario P0K 1N0 Site Location: Black Fox Mill 5300 Highway 101 E Black River-Matheson Township, District of Cochrane

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment Ministère de l Environnement AMENDED ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 6254-9LVQ3V Issue Date: October 15, 2015 Imperial Oil Limited 602 Christina

More information

Gap Filling HAPs. For Point Sources in the 2008 National Emissions Inventory

Gap Filling HAPs. For Point Sources in the 2008 National Emissions Inventory Gap Filling HAPs and other HAP additions by EPA For Point Sources in the 2008 National Emissions Inventory 1 Pollutants Included in the NEI Criteria Pollutants/Precursors (CAPs) Required To Be Reported

More information

Air Quality Assessment Report Paris Grand Development County of Brant, Ontario

Air Quality Assessment Report Paris Grand Development County of Brant, Ontario Air Quality Assessment Report Paris Grand Development County of Brant, Ontario Novus Reference No. 16-0214 NOVUS TEAM: Technical Coordinator: Air Quality Engineer: Project Director: Laura Clark, B.Eng.,

More information

Internet Publication Plan. For the proposed public website for Metro Vancouver s Waste-to- Energy Facility

Internet Publication Plan. For the proposed public website for Metro Vancouver s Waste-to- Energy Facility Internet Publication Plan For the proposed public website for Metro Vancouver s Waste-to- Energy Facility June 15, 2017 1.0 Project Description This Internet Publication Plan describes the proposed public

More information

STATEMENT OF BASIS. For the issuance ofdraft Air Permit # 1140-AOP-R4 AFIN: PERMITTING AUTHORITY:

STATEMENT OF BASIS. For the issuance ofdraft Air Permit # 1140-AOP-R4 AFIN: PERMITTING AUTHORITY: STATEMENT OF BASIS For the issuance ofdraft Air Permit # 1140-AOP-R4 1. PERMITTING AUTHORITY: Arkansas Department ofenvironmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118-5317 2.

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Site Location: Mobile Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique R.W. Tomlinson ed 5597 Power

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original ModulR TS Inc. 21 Scott Avenue Paris, Ontario N3L 3R1 Site Location: 21 Scott Avenue Brant County Ministry of the Environment and Climate Change Ministère de l Environnement et

More information

ON MOE TRA - Ontario Ministry of the Environment for the Toxic Reductions Act

ON MOE TRA - Ontario Ministry of the Environment for the Toxic Reductions Act Report Preview Company Details Name Liberty Mines Inc Address Stringers Road, South Porcupine (Ontario) Report Details Report Status Submitted 2014 Report Type Inventory Facility Name Redstone Mine Facility

More information

Swedish Code of Statutes

Swedish Code of Statutes Swedish Code of Statutes Air Quality Ordinance; SFS 2010:477 Published 8 June 2010 issued 27 May 2010. The Government prescribes 1 as follows. Section 1 This Ordinance is issued 1. pursuant to Chapter

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Bombardier Transportation Canada Inc. 1001 Montreal St P.O. Box 67 Thunder Bay, Ontario P7C 4V6 Site Location: Bombardier Transportation 1001 Montreal St Thunder Bay City, District

More information

Emissions Testing Report

Emissions Testing Report National Ceramic Industries Australia 05-May-2014 60305580 Commercial-in-Confidence Emissions Testing Report 2013-14 National Ceramic Industries Australia NATA ACCREDITATION No. 2778 (14391) Accredited

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ingram Asphalt Inc. 103 Ingram Dr Toronto, Ontario M6M 2L7 Site Location: 103 Ingram Drive 103 Ingram Dr Toronto Ontario Toronto City, Ministry of the Environment and Climate Change

More information

TRAFALGAR ENVIRONMENTAL CONSULTANTS

TRAFALGAR ENVIRONMENTAL CONSULTANTS TRAFALGAR ENVIRONMENTAL CONSULTANTS March 28, 2018 MacEwen Petroleum Inc. 18 Adelaide Street, P.O. Box 100 Maxville, Ontario K0C 1T0 Attention: Mr. Larry Duchscher Dear Sir: RE: Sampling Analytical Summary

More information

Sampling Results: Chalmette and Meraux

Sampling Results: Chalmette and Meraux Page 1 of 5 Environment & Health: Health Effects of Pollution: In Depth: Analysis New Orleans Environmental Quality Test Results Contents page Sampling Results: Chalmette and Meraux Results for: Mold Endotoxin

More information

Submittal Guidelines for Imported Soil. Soil Review & Acceptance Process

Submittal Guidelines for Imported Soil. Soil Review & Acceptance Process The following guidelines are provided as a prescriptive step process to ensure the contractual and regulatory requirements for Baylands Soil Processing are met and the appropriate quality control documentation

More information

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT. Final Methodology to Calculate Particulate Matter (PM) 2.5 and PM 2.5 Significance Thresholds

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT. Final Methodology to Calculate Particulate Matter (PM) 2.5 and PM 2.5 Significance Thresholds SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT Final Methodology to Calculate Particulate Matter (PM) 2.5 and PM 2.5 Significance Thresholds October 2006 Executive Officer Barry R. Wallerstein, D. Env. Deputy

More information

Brent D. Mawdsley, B.Sc. ASL Analytical Service Laboratories Ltd Triumph St., Vancouver, BC V5L 1K5

Brent D. Mawdsley, B.Sc. ASL Analytical Service Laboratories Ltd Triumph St., Vancouver, BC V5L 1K5 SPECIALIZED TESTING REQUIREMENTS TO MEET THE BC CONTAMINATED SITES REGULATION Brent D. Mawdsley, B.Sc. ASL Analytical Service Laboratories Ltd. 1988 Triumph St., Vancouver, BC V5L 1K5 ABSTRACT British

More information

Waste Classification Assessment Report for Soils. C Spencer Ltd. Energy Works Dalton Street Hull

Waste Classification Assessment Report for Soils. C Spencer Ltd. Energy Works Dalton Street Hull 1 Waste Classification Assessment Report for Soils C Spencer Ltd Energy Works Dalton Street Hull 2 Report Reference: 65445 Date of Report: 23.06.2017 Client: Site Address: C Spencer Ltd Energy Works Dalton

More information

OVERVIEW OF SUBSTATION FACILITY AND CIRCUIT BREAKER EMISSIONS

OVERVIEW OF SUBSTATION FACILITY AND CIRCUIT BREAKER EMISSIONS Stantec Consulting Ltd. Suite 1-70 Southgate Drive Guelph ON N1G 4P5 Tel: (519) 836-6050 Fax: (519) 836-2493 January 4, 2012 Stantec File: 160960584 Ministry of the Environment Environmental Assessment

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique St. Marys Cement Inc. (Canada) 55 Industrial Street

More information

SUBJECT: Background Ambient Air Quality for Gardiner Expressway and Lakeshore Boulevard Reconfiguration

SUBJECT: Background Ambient Air Quality for Gardiner Expressway and Lakeshore Boulevard Reconfiguration MEMO TO: FROM: Jeffrey Dea Project Manager, City of Toronto Hong Liu, Ravi Mahabir CC: n/a DATE: August 22 nd, 2013 SUBJECT: Background Ambient Air Quality for Gardiner Expressway and Lakeshore Boulevard

More information

APPENDIX I-3 Air and Fugitive Dust Monitoring and Mitigation

APPENDIX I-3 Air and Fugitive Dust Monitoring and Mitigation APPENDIX I-3 Air and Fugitive Dust Monitoring and Mitigation (Tetra Tech 2014) MEMO To: Cc: From: Jason Han, New Urban West, Inc. Keith Walker, Cox, Castle & Nicholson, LLP Carl Lenker, Senior Project

More information

Re: Amendment to Certificate of Property Use No JWJJC (CPU) West Don Lands Group 1, Toronto (Property) for Property Specific Standards (PSS)

Re: Amendment to Certificate of Property Use No JWJJC (CPU) West Don Lands Group 1, Toronto (Property) for Property Specific Standards (PSS) Ministry of the Environment and Climate Change Central Region Office 5775 Yonge Street 8 th Floor North York ON M2M 4J1 Tel.: 416 326-6700 Fax: 416-325-6346 Ministère de l Environnement et de l Action

More information

Description Section. 52,100 tonnes of steel tube processed per year; 26,900 tonnes of steel coil processed per year;

Description Section. 52,100 tonnes of steel tube processed per year; 26,900 tonnes of steel coil processed per year; Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Magna Structural Systems Inc. 337 Magna Drive Aurora,

More information

Compilation and Assessment of Lab Samples from EGCS Washwater Discharge on Carnival ships. February 2019

Compilation and Assessment of Lab Samples from EGCS Washwater Discharge on Carnival ships. February 2019 Compilation and Assessment of Lab Samples from EGCS Washwater Discharge on Carnival ships February 2019 2 EXECUTIVE SUMMARY Background to the work In 2016 Carnival Corporation collected an initial set

More information