Environmental Division NEPA Programs Categorical Exclusion (CE)
|
|
- Philomena Conley
- 5 years ago
- Views:
Transcription
1 Environmental Division NEPA Programs Categorical Exclusion (CE) Project Information Project Name: RTE 7 INTERCHANGE AT BATTLEFIELD PKWY Federal Project#: STP-5A01(704) Project Number: , B601, C501, P101, R201 Project Type: Construction UPC: Charge Number: Route Number: 7 Route Type: Primary Project Limit--From: Approx Miles West of Battlefield Parkway To: Approx Miles East of Battlefield Parkway Additional Project Description: Purpose And Need: The project includes construction of a grade-separated interchange at Route 7 (East Market Street) and Battlefield Pkwy to replace the current signalized intersection; modification of the signalized intersection at Route 7 and Cardinal Park Drive; construction of an eastbound auxiliary lane from Cardinal Park Drive to the proposed Route 7/Battlefield Pkwy interchange and an eastbound auxiliary lane from the proposed Route 7/Battlefield Pkwy interchange to the Crosstrail Blvd/River Creek Pkwy intersection; and the addition of cyclist/pedestrian accommodations along Battlefield Parkway. The project is intended to relieve congestion; improve traffic operations, safety, and pedestrian/vehicle flow; and allow Route 7 to function as a limited-access freeway through the Town of Leesburg in accordance with the Leesburg Town Plan, adopted June 26, 2012, as amended through July District: City/County: Residency: Northern Virginia Leesburg Leesburg Date CE level document approved by VA Division FHWA: 09/27/2017 FHWA Contact: Simkins, John A. Project in STIP: Yes In Long Range Plan? Yes CE Category 23 CFR : d Description of Category: Additional actions which meet the criteria for a CE in the CEQ regulations (40 CFR ) and paragraph (a) of this section may be designated as CEs only after Administration approval unless otherwise authorized under an executed agreement pursuant to paragraph (g) of this section. The applicant shall submit documentation which demonstrates that the specific conditions or criteria for these CEs are satisfied and that significant environmental effects will not result. Logical Termini and Independent Utility: Yes Next Phase of Funding Available? Yes Comments: The project is included in a State Transportation Improvement Program (STIP) and Constrained Long Range Plan (CLRP) grouping for Safety/ITS/Operational Improvements. The improvements are justifiable and are a reasonable expenditure of funds, even if no additional transportation improvements are made. Therefore, the project has independent utility. The project termini are rational endpoints for environmental review and are logical. Typical Section: The project proposes to construct a new grade separated interchange at the existing signalized intersection of Battlefield Parkway and Route 7. The improvements include multiple roadway typical sections as follows: 1.The Route 7 typical section includes three 12-foot through lanes and one 12-foot auxiliary lane in the eastbound direction; a 12-foot additional auxiliary lane in the eastbound direction between Cardinal Park Drive and the ramp to Battlefield Parkway; three 12-foot through lanes and one 12-foot auxiliary lane in the westbound direction; a 12-foot right turn lane in the westbound direction at the Clarion Hotel; and a 12-foot right turn lane in the eastbound direction at Cardinal Park Drive. The inside graded shoulder widths will be 14-foot and the outside graded shoulder widths will be 14-foot in areas where there is no curb and gutter. 2.The Battlefield Parkway typical section includes three 12-foot through lanes in the northbound direction; a 12-foot right turn lane at Russell Branch Parkway and the Potomac Station Shopping center in the northbound direction; two 12-foot left turn lanes to the Route 7 westbound ramps; three 12-foot through lanes in the southbound direction; a 12-foot right turn lane at the Russell Branch Parkway extension; and two 12- foot left turn lanes to the Route 7 eastbound ramps. Curb and gutter is utilized along both northbound and southbound sides along Battlefield Parkway with a 5-foot sidewalk along the southbound side and a 10-foot shared use path along the northbound side Page 1 of 6
2 3.The interchange ramps include pavement widths between 16 to 36 feet, with paved shoulders ranging from 4 to 12 feet. 4.The Keystone Drive typical section is curb and gutter with 30 feet of pavement and a 5-foot sidewalk along the northbound side. 5.The west driveway includes 22 feet of pavement with 8-foot graded shoulders. Structures: The new bridge structure will be 177 feet wide and 200 feet long. The bridge length allows for the possible future widening of Route 7 and of Battlefield Parkway. Mechanically stabilized earth (MSE) walls will be located along Route 7 in both directions at the bridge abutments. MSE walls will also be located along Ramps A and D to avoid impacting the power transmission poles. The project will require a new drainage system including curb inlets, pipes, drop inlets, and culverts. The existing drainage structures will be utilized to the greatest extent feasible; this will include extending existing culverts and existing structure adjustments. Excavation will be required for any structures and foundation requirements, as well as roadside ditches and pipe bedding. SOCIO-ECONOMIC Minority/Low Income Populations: Present with no impact Disproportionate Impacts to Minority/Low Income Populations: No Source: U.S. Census Bureau, American Fact Finder, VDOT Project Manager, Public Hearing Plans Existing or Planned Public Recreational Facilities: Present with no impact Community Services: Not Present Consistent with Local Land Use: Yes Source: Leesburg Town Plan, VDOT Integrator, Leesburg Department of Public Works and Capital Projects Existing or Planned Bicycle/Pedestrian Facilities Not Present Source: Leesburg Town Plan Socio-Economic Comments: Minority populations are present within the study area, but are not anticipated to be disproportionately impacted as the project does not involve relocations or changes in access (see Appendix A: Environmental Justice Analysis). New access to the Leesburg FC Complex will be provided but the soccer fields will not be impacted. The ballfields at John W. Tolbert Elementary School will not be impacted or have access changes. No community services have been identified within the project area. Current land uses surrounding the proposed project area include a mixture of vacant land and commercial/retail uses. The Town of Leesburg is currently developing a Small Area Plan that reconsiders future land use in the area and designates the property in the northwest quadrant of the project area for mixed-use development. There are no existing bicycle/pedestrian facilities along Battlefield Parkway between Russell Branch Parkway and the entrance to the Marketplace at Potomac Station shopping center. Leesburg's Comprehensive Plan calls for bicycle/pedestrian facilities in this location. The project will provide a new sidewalk and shared-use path, completing the link in the Town's bicycle/pedestrian network. Use of 4(f) Property: No Source: VDOT Integrator, Loudoun County WebLogis GIS Review 6(f) Conversion: Acres of Conversion: SECTION 4(f) and SECTION 6(f) 4(f) Comments: There are no 4(f) resources in the vicinity of the project. 6(f) Comments: There are no 6(f) resources in the vicinity of the project. Section 106 Effect Determination: NO EFFECT CULTURAL RESOURCES Name of Historic Property: N/A DHR Concurrence date: 02/22/2018 MOA/PA Execution Date: None Cultural Resource Comments: The Virginia Department of Historic Resources (VDHR) has concurred with VDOT s findings: (1) that archaeological sites 44LD1752, 44LD1753, and 44LD1786 are not eligible for listing on the National Register of Historic Places (NRHP); (2) that previously recorded architectural resources # and # are now demolished, and that # was previously determined not individually eligible by the VDHR in 2008; (3) that architectural resources # , # , # , and # are not individually eligible for the NRHP; (4) that the Ball s Bluff Battlefield, architectural resource # , is partially within the area of potential effect (APE); however the project s APE is located outside of any American Battlefield Protection Program potential National Register or expanded National Historic Landmarks battlefield limits; (5) that no potential historic districts are present in the APE; and (6)that the project will have No Effect upon historic properties Page 2 of 6
3 Are Waters of the U.S. present? Yes Linear Feet of Impact: Approximately 1311 NATURAL RESOURCES Federal Threatened or Endangered Species: Northern Long-Eared Bat (Myotis septentrionalis)-federal:ft-present with no impact Tri-colored Bat (Perimyotis subflavus )-Federal:SOC-Present with no impact Little Brown Bat (Myotis lucifugus lucifugus )-Federal:SOC-Present with no impact 100 Year Floodplain: Present with no impact Regulatory Floodway Zone: Not Present Public Water Supplies: Not Present Are any tidal waters/wetlands present? No Wetlands: Present with impacts Tidal Acres of Impact: 0 Tidal Wetland Type: None Are any Non-Tidal Wetlands Present? Yes Non Tidal Acres of Impact: 1.3 Non Tidal Wetland Type: Emergent Are water quality permits required? Yes Total Wetland Acres of Impacts: 1.3 Natural Resource Comments: A search of VDOT's GIS Integrator database indicates Department of Natural Heritage (DNH) sites, Brook Floater Mussel (State Endangered), Green Floater Mussel (State Threatened), and habitat for the Green Floater Mussel are all found within two (2) miles of the proposed project. This project is within the Tuscarora Creek watershed. Due to distance, concerns to potential mussel habitat in Goose Creek and the Potomac River are not anticipated. VDOT s GIS Integrator also identified the Northern Long-eared Bat (Federal Threatened), Tri-Color Bat (State Endangered), and Little Brown Bat (State Endangered) within the search area; however, no known roost trees and no hibernacula for this species are located near the proposed project. A search of the U.S. Fish and Wildlife Service (USFWS) Information for Planning and Coordination (IPaC) database identified the Northern Long-eared Bat (NLEB) as the only protected federal species within two (2) miles of the proposed project. A project review package and self-certification letter with a May Effect determination relying on the finding of the January 2016 Programmatic Biological Opinion for Final 4(d) Rule for the NLEB and Activities Excepted from Take Prohibitions was submitted to USFWS for review; USFWS did not respond with comments within 30 days signifying concurrence with the determination. The project has the potential to impact several intermittent and perennial stream systems that flow into Tuscarora Creek. Wetlands, primarily palustrine emergent (PEM), are associated with these streams. Unavoidable impacts to Waters of the U.S., including streams and wetlands, will require water quality permits in support of 401 and 404 of the Clean Water Act. The Virginia Department of Health Office of Drinking Water (VDH ODW) identified one (1) public groundwater well within a one (1)-mile search radius from the project. Based on the proximity of well location to the project, no impact is anticipated. The project is not within the watershed of any public surface water intakes. Open Space Easements: Not Present Agricultural/Forestal Districts: Not Present Source: Project Definition Form AGRICULTURAL/OPEN SPACE Agricultural/Open Space Comments: A search of VDOT's GIS Integrator database indicated that no agricultural/forestal districts, nor Virginia Outdoors Foundation (VOF) open space easements, are present within the project area. Coordination with VOF, dated 12/04/2017, confirmed that there are no existing nor proposed open space easements within the immediate vicinity of the project. NRCS Form CPA-106 Attached? No NRCS Form CPA-106 not attached because: Land already in Urban use. Alternatives Analysis Required? No FARMLAND Source: Natural Resources Conservation Service (NRCS) coordination, dated 04/02/2018. Farmland Comments: Per coordination with the NRCS, the project area is committed to urban use and no prime or unique farmland will be affected. The project is required to develop and follow an erosion and sediment control plan Page 3 of 6
4 Invasive Species in the project area? Unknown INVASIVE SPECIES There is potential for invasive species to become established along the limits of disturbance of the project during and following construction. Section (c) of VDOT's Road and Bridge Specifications (2016) includes provisions intended to control noxious weeds (which includes non-native and invasive species). While rights-of-ways are at risk from invasive species colonization from adjacent properties, implementing the above provisions would reduce or minimize potential for introduction, proliferation, and spread of invasive species. Additionally, the implementation of best management practices for erosion/sediment control and abatement of pollutant loading would minimize indirect impacts to adjoining communities and habitat by reducing excess nutrient loads that could encourage invasive species proliferation. Invasive Species Comments: The Virginia Department of Conservation and Recreation (DCR) has only general information about the distribution of invasives. Many invasive plant species are adapted to take advantage of soil disturbances and poor soil conditions. Non-native invasive plants are found throughout Virginia. Therefore, the potential exists for some VDOT projects to further the establishment of invasive species. Minimizing soil disturbance will help to inhibit the establishment of invasive species. Air Quality Status and Regional Conformity AIR QUALITY Jurisdiction Description: This project is located within a Marginal 8-hour Ozone Nonattainment area, and a volatile organic compounds (VOC) and nitrogen oxides (NOx) Emissions Control Area. As such, all reasonable precautions should be taken to limit the emissions of VOC and NOx. In addition, the following VDEQ air pollution regulations must be adhered to during the construction of this project: 9 VAC 5-130, Open Burning restrictions; 9 VAC 5-45, Article 7, Cutback Asphalt restrictions; and 9 VAC 5-50, Article 1, Fugitive Dust precautions. Exempt Status The project is of the type that would be exempt from conformity, as outlined in section of the transportation conformity regulation. Therefore, CO, PM, and MSAT analyses are not required for either conformity purposes (per EPA regulation) or NEPA (per FHWA guidance, and VDOT programmatic agreements with FHWA and corresponding protocols specified in the VDOT Resource Document.) Exempt under 40 CFR , Table 2, Safety - "Projects that correct, improve, or eliminate a hazardous location or feature". The project purpose and need statement ( from District staff 9/1/2017) cites safety as its first point, as follows: "Improve safety and pedestrian/vehicle flow, and allow Route 7 to function as a limited-access freeway..." According to District staff ( 9/7/2017), "In regard to proposed safety mitigation, generally grade separated interchange increase safety over an at grade intersection that exist now". A link was also provided to a ranking of worst-intersections in 2014, which had this intersection at the top of the list. See: Noise Scoping Decision: Type I - Noise study required Barriers Under Consideration? No NOISE Noise Comments: A Preliminary Noise Analysis was completed for this project. Noise modeling was completed for Existing (2015), No- Build (2040), and predicted Design Year (2040) Build conditions. Under Design Year (2040) Build conditions, a total of one receptor representing a basketball court is anticipated to experience noise impacts. A barrier was evaluated in an attempt to mitigate Design Year (2040) Build noise impacts at this location. The results of the Preliminary Noise Analysis concluded that the noise barrier was feasible, but not reasonable under VDOT s State Noise Abatement Policy. Therefore, noise abatement is not currently recommended for this project. No considerable, long-term construction related noise impacts are anticipated. Any noise impacts that do occur as a result of roadway construction measures are anticipated to be temporary in nature and would cease upon completion of the project s construction phase. Further study may be completed in Final Design to refine the abatement options Page 4 of 6
5 Residential Relocations: No Commercial Relocations No Non-Profit Relocations: No Right of Way required? Yes RIGHT OF WAY AND RELOCATIONS Fee Simple: 14.4 Temporary Easement: 10.1 Permanent Easement: 0.1 Utility Easement: 0 Amount of Right of Way Acreage: 24.6 Septic Systems or Wells: Present with impacts Hazardous Materials: Present with impacts Source: Public Hearing Plans, Loudoun County Health Department, VDOT Integrator, American Society for Testing Materials (ASTM) Phase I Environmental Site Assessment (ESA) ROW and Relocations Comments: A total of approximately 24.6 acres of right of way are anticipated to be required for the project, of which 14.4 acres are fee simple, 0.1 acres are permanent easements, and 10.1 acres are temporary easements. No families, persons, businesses, farms, or non-profit organizations will be displaced as a result of this project. A Phase I ESA, completed for the project in December 2017, identified six (6) recognized environmental conditions (RECs) with the potential to impact soil and/or groundwater resources in the project area. The Phase I ESA recommends that a Phase II ESA be completed at selected locations. If any solid or hazardous waste is generated/encountered during construction, all applicable federal, state, and county regulations for their disposal will be followed. A number of private wells and septic systems were located near the project area. Any septic or well that has not been abandoned could collapse under the weight of heavy machinery and will require a permit for abandonment if the systems are no longer in use or have been determined to be demolished. CUMULATIVE AND INDIRECT IMPACTS Present or reasonably foreseeable future projects (highway and non-highway) in the area: Yes Impact same resources as the proposed highway project (i.e. cumulative impacts): Yes Indirect (Secondary) impacts: Yes Source: VDOT Project Manager, NoVA District Transportation Planning Section, VDOT Six Year Improvement Program, Constrained Long Range Plan Cumulative and Indirect Impacts Comments: Reasonably foreseeable actions within or in close proximity to the project study area include: Battlefield Parkway Shared Use Path at Route 15; Route 15 Interchange at Edwards Ferry Road and Fort Evans Road; Battlefield Parkway Route 15 to Dulles Greenway; and Belmont Ridge Road Widening from Hay Road to Gloucester Parkway, among others. Indirect impacts of the project include increased economic growth due to improved traffic circulation and urbanization. The intensity of the incremental impacts of the project are considered small when viewed in the context of impacts from other past, present, and reasonably foreseeable future actions, and would not rise to a level that would cause substantial cumulative and indirect impacts. Substantial Controversy on Environmental Grounds: No Source: Agency Scoping Comments, Public Hearing Comments Public Hearing: Yes Type of Hearing: Design Public Hearing Other Public Involvement Activities: Yes PUBLIC INVOLVEMENT Type of Public Involvement: Public Information Meeting (PIM), Notice of Public Availability Public Involvement Comments: A PIM was held for the project on Tuesday, May 16, 2017 at John W. Tolbert Elementary School in Leesburg, VA. The PIM was followed by a comment period ending May 31, 2017 that resulted in 11 public comments. A Design Public Hearing (DPH) was held on Wednesday, March 7, 2018, also at John W. Tolbert Elementary School in Leesburg, VA. The comment period for the DPH ended March 17, Of the 38 public comments received, one comment was about noise levels from cars and trucks. VDOT will post a 15-day notice of document availability for the CE following completion of the NEPA document Page 5 of 6
6 State Agencies: Department of Environmental Quality DEQ - Air Division DEQ - Waste Division DEQ - Water Division Department of Conservation and Recreation Department of Forestry Department of Game and Inland Fisheries Department of Health Department of Historic Resources Department of Mines, Minerals and Energy Virginia Marine Resources Commission Virginia Outdoors Foundation Local Entity: Loudoun County Board Of Supervisors Loudoun County Health Department Loudoun County Administrator Leesburg County/City Planner Loudoun County/City Planner Loudoun Economic Development Office Leesburg Economic Development Office Leesburg County Administrator Loudoun Fire and Rescue Loudoun Housing Director Leesburg Mayor Loudoun Office of Transportation Leesburg Parks and Recreation Loudoun Parks and Recreation Leesburg Planning District Loudoun Planning District Leesburg Public Works Loudoun Public Works Loudoun School Leesburg Town/City Manager Other Coordination Entities: Virginia State Police Department Church of the Holy Spirit Harper Park Middle School John W. Tolbert Elementary School Loudoun County Department of Fire and Rescue Loudoun County Sheriff's Office Loudoun Water Potomac Hills Presbyterian Church COORDINATION Federal Agencies: Natural Resources Conservation Service U.S. Fish and Wildlife Service U.S. Army Corps of Engineers This project meets the criteria for a Categorical Exclusion pursuant to 40 CFR and 23 CFR and will not result in significant impacts to the human or natural environment Page 6 of 6
Categorical Exclusion (CE)
Categorical Exclusion (CE) Project Information Project Name: I-66 ITB West Falls Church Metro Garage Access Federal Project#: NHPP-066-1(356) Project Number: 0066-96A-493, B686, C501, P101 Project Type:
More informationCategorical Exclusion (CE)
Categorical Exclusion (CE) Project Information Project Name: Federal Project#: Project Number: 0029-002-135, D624, P101 Project Type: Construction UPC: 77383 Charge Number: Route Number: 29 Route Type:
More informationCategorical Exclusion (CE)
Categorical Exclusion (CE) Project Information Project Name: Rte 130 Bridge Replacement over Pedlar River Federal Project#: BR-005-3(116) Project Number: 0130-005-643, B650, C501, P101, R201 Project Type:
More informationCategorical Exclusion (CE)
Categorical Exclusion (CE) Project Information Project Name: Widen E Elden St from Van Buren St to Fairfax County Parkway Federal Project#: HPT-5401( ) Project Number: U000-235-110, C501, P101, R201 Project
More informationCategorical Exclusion (CE)
Categorical Exclusion (CE) Project Information Project Name: Design/Build: RTE 15 &I66 HAYMARKET P&R LOT Federal Project#: STP-5A01(767) Project Number: PR15-076-236, C501, D665, P101, R201 Project Type:
More informationCategorical Exclusion (CE)
Categorical Exclusion (CE) Project Information Project Name: ROUTE 17 I95 BRIDGE TO HOSPITAL BLVD Federal Project#: NHPP-5111(298) Project Number: 0017-088-R72, B616, C501, P101, R201 Project Type: Construction
More informationCategorical Exclusion (CE)
Categorical Exclusion (CE) Project Information Project Name: Rte. 9 - Town of Hillsboro - Pedestrian Study & Improvements Federal Project#: STP-5401(608) Project Number: 0009-053-111, P101 Project Type:
More informationCATEGORICAL EXCLUSION DOCUMENTATION
Form EQ-104 (Revised 3/18/04) TO: Mr. Roberto Fonseca-Martinez FROM: John Muse DATE: 01/24/2005 CATEGORICAL EXCLUSION DOCUMENTATION Date CE level document approved by VA Division FHWA: 08/05/03 FHWA Contact:
More informationPreliminary Environmental Inventory
Preliminary Environmental Inventory Project Information PPMS ID #: 19036 Date: 02/23/2005 District SERP Coordinator: Project Name: Forest Hill Avenue Field Review Date: 02/04/2005 Field Review Conducted
More information3 ENVIRONMENTAL CONSEQUENCES
TABLE OF CONTENTS Section 1 PURPOSE AND NEED Page 1.1 Study Area 1 1.2 History 2 1.3 Need 3 1.3.1 Existing Conditions 3 1.3.1.a. Safety 3 1.3.1.b. Capacity 4 1.3.1.c. Access Management 5 1.3.2 Future Conditions
More informationNEPA and Design Public Hearings
NEPA and Design Public Hearings Monday, December 5, 2016 Washington-Lee High School 1301 N. Stafford Street Arlington, VA 22201 Thursday, December 8, 2016 Mary Ellen Henderson Middle School 7130 Leesburg
More informationAir Report. Project Information PPTA/LAP. Traffic Data I-495 NORTHERN SECTION SHOULDER USE. Project Number: , C501, P101 UPC:
Air Report Project Information Project Name: I-495 NORTHERN SECTION SHOULDER USE Project Number: 0495-029-123, C501, P101 UPC: 105130 Route Number: 495 Project Limit - From: South of Old Dominion Drive
More informationEnvironme ntal Assessment Addendum
FI Improved Interchange at I-71 and Routes 36/37 and Proposed Sunbury Parkway Environme ntal Assessment Addendum DEL-71-7.91 PID 90200 September 20, 2017 The environmental review, consultation, and other
More informationOklahoma Department of Transportation Environmental Programs Division Office Fax
Oklahoma Department of Transportation Environmental Programs Division Office 521-3050 Fax 522-5193 Documented Categorical Exclusion (DCE) for I-40: Pavement Reconstruction and Added Lanes from the Douglas
More informationBackground. FHWA Decisions
The Federal Highway Administration (FHWA) has reviewed the Virginia Department of Transportation s (VDOT) March 30, 2017 letter requesting a Finding of No Significant Impact, the Revised Environmental
More information5.0 PRELIMINARY ENVIRONMENTAL REVIEW
5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors
More informationFEDERAL HIGHWAY ADMINISTRATION FINDI NG OFNO SIGN IFICANT IMPACT FOR STP-5AOI (165)
FEDERAL HIGHWAY ADMINISTRATION FINDI NG OFNO SIGN IFICANT IMPACT FOR ROUTE: 'LOCATION: STATE PROJECT: FEDERAL PROJECT: Route 606 Reconstruction Project Loudoun County, Virginia 0606-053-983, PI 0 I ; UPC
More informationTHIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R October 26, 2018
THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2018-822 October 26, 2018 Application
More informationDRAFT AIR QUALITY TECHNICAL MEMORANDUM
AIR QUALITY TECHNICAL MEMORANDUM PROJECT DEVELOPMENT AND ENVIRONMENT STUDY STATE ROAD 60 GRADE SEPARATION OVER CSX RAILROAD Polk County, Florida Financial Project ID: 436559-1-22-01 Prepared for: Florida
More informationGet Involved Design Public Hearing
Get Involved Design Public Hearing VDOT representatives will review and evaluate Mail comments to Mr. Vicente Valeza at the address John G. Lewis Memorial Bridge any information received as a result of
More informationREEVALUATION FORM. Page 1. Code:
Page 1 COLORADO DEPARTMENT OF TRANSPORTATION Original NEPA Reevaluation Project Approval Date: Date: Code: REEVALUATION FORM FONSI 9/2004 August 31, 2012 17354 Project Name and Location: Interstate 25,
More informationPUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.
US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: June 17, 2014 Comment Deadline: July 17, 2014 Corps Action ID#: SAW-2009-00655 NC DOT TIP: R-4903 The Wilmington District, Corps
More informationPUBLIC HEARING LOOP 9
PUBLIC HEARING LOOP 9 From Interstate (I)-35E to I-45 Dallas and Ellis Counties, Texas CSJ: Loop 2964-10-005 9: I-35E to I-45 Tuesday, June 20, 20, 2017 2017 Public Hearing Introductions ELECTED & PUBLIC
More informationJOINT PUBLIC NOTICE Savannah District/State of Georgia
DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA 30260-1777 Regulatory Branch SAS-2016-00412 JOINT PUBLIC NOTICE Savannah District/State of Georgia
More informationInterstate 66 Tier 1 Environmental Impact Statement Public Hearing
Interstate 66 Tier 1 Environmental Impact Statement Public Hearing 1 Project Corridor Study Process / Tiering Approach Tier 1 EIS focuses on broad issues - Purpose and need - Mode / Technology choice -
More informationWork Breakdown Structure Element Dictionary Preliminary Engineering
Element Name Initiation PE 3.1 Initiation includes the implementation of the project s funding and notification of the consultant or in-house design staff to commence work, the Kickoff Meeting with the
More informationCategorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation
Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation Introduction The Indiana Department of Transportation (INDOT) and the
More informationJohn Simkins, FHWA Mack Frost, FHWA Jim Utterback, VDOT Jim Long, VDOT Janet Hedrick, VDOT Scott Smizik, VDOT
Ms. Irene Rico Federal Highway Administration May 8, 2015 Page 3 cc: John Simkins, FHWA Mack Frost, FHWA Jim Utterback, VDOT Jim Long, VDOT Janet Hedrick, VDOT Scott Smizik, VDOT Attachments 1) Description
More informationPROGRAMMATIC AGREEMENT
PROGRAMMATIC AGREEMENT CATEGORICAL EXCLUSION APPROVALS NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION & FEDERAL HIGHWAY ADMINISTRATION FEBRUARY 2000 PREAMBLE This Agreement establishes the procedures of the
More informationAPPENDIX A. NEPA Assessment Checklist
APPENDI A NEPA Assessment Checklist NEPA CHECKLIST DATE: January 12, 2009 PREPARER: Frederick Wells, RLA PIN and Project Title: Surplus Property Request Wilder Balter Partners Marketplace Town of Newburgh,
More informationARKANSAS DEPARTMENT OF TRANSPORTATION INTER OFFICE MEMORANDUM
ARKANSAS DEPARTMENT OF TRANSPORTATION INTER OFFICE MEMORANDUM September 15, 2017 TO: Master Files FROM: John Fleming, Division Head, Environmental Division SUBJECT: Job Number 110643 FAP Number NHPP-0054(23)
More informationState Route 8 Bridge Replacement Project
OPEN HOUSE PUBLIC INVOLVEMENT MEETING Celebration Church 688 Dan Street, Akron, Ohio Tuesday, July 14, 2015 5:00 PM to 7:00 PM State Route 8 Bridge Replacement Project Existing Bridge Future Bridges: Steel
More informationProgrammatic Categorical Exclusions
Memorandum of Agreement for Approval of Categorical Exclusions between the Federal Highway Administration and the Wyoming Department of Transportation. February 12, 2014 The Federal Highway Administration,
More informationINFORMATION REQUIRED FOR PROBABLE CATEGORICAL EXCLUSION (SECTION (d))
Grant Applicant: Proposed Project: Date: August 03, 2010 Northern Virginia Transportation Commission, Arlington County Government, and Washington Metropolitan Area Transit Authority Crystal City/Potomac
More informationRECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION CX Log #: OR-014-CX-06-06 Lease or Serial #: OR62919 Project Name: _PacifiCorp Power-line right-of-way #2 Location: Bonanza USGS
More informationRECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION CX Log #: OR-014-CX-03-02 Lease or Serial #: OR 58195 Project Name: Peetsch Mineral Material Sale Applicant: Doug Peetsch Location:
More informationJOINT PUBLIC NOTICE Savannah District/State of Georgia
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS SAVANNAH DISTRICT 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA 30260-1777 Regulatory Division December 27, 2018 SAS-2018-00428 JOINT PUBLIC NOTICE
More informationSection 1 PURPOSE AND NEED
TABLE OF CONTENTS Section 1 PURPOSE AND NEED Page 1.1 Study Area ---------------------------------------------------------------------------------- 3 1.2 History ----------------------------------------------------------------------------------------
More informationWillmar Wye Public Open House #4 and Public Hearing
Willmar Wye Public Open House #4 and Public Hearing February 23, 2017 www.dot.state.mn.us/d8/willmarwye Agenda Time Topic 5:00 pm Open House Opportunity for the public to ask questions of project staff
More informationJOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS
ISSUE DATE: February 23, 2018 EXPIRATION DATE: March 25, 2018 JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS Availability of draft Environmental Assessment, draft Finding of No Significant Impact, and
More information(1) The proposed commercial solar energy generation facility is either
(2) The design and siting of these facilities shall avoid the placement of turbines on or immediately adjacent to the upwind side of ridge crests; (3) The design may include other design features to minimize
More informationAppendix. DDOT Environmental Form II
Appendix B DDOT Environmental Form II District Department of Transportation Project Development & Environmental Evaluation CATEGORICAL EXCLUSIO CE-II FORM (Form II) Part I PROJECT DESCRIPTIO & DESIG IFORMATIO
More informationRECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION Bureau of Land Management (BLM)
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION Bureau of Land Management (BLM) CX Log #: OR-014-CX-05-30 Lease or Serial #: N/A Project Name: _Gerber Guard Station Fence Replacement
More informationI-95/Route 630 Reconstruction and Widening Initial Financial Plan
I-95/Route 630 Reconstruction and Widening Initial Financial Plan State Project Numbers: 0095-089-F09, P101, R201, R202, C501, B647, B648 0630-089-202, P101, R201, C501 UPC: 13558/4632 1 Table of Contents
More informationPublic Notice ISSUED: April 5, 2019 EXPIRES: May 6, 2019
APPLICANT: Aitkin County Highway Department Public Notice ISSUED: April 5, 2019 EXPIRES: May 6, 2019 REFER TO: MVP-2019-00387-EJI SECTION: 404 - Clean Water Act 1. APPLICATION FOR PERMIT TO discharge fill
More information4 COMMITMENTS 4.1 LAND USE AND LAND COVER
4 COMMITMENTS Each Affected Environment and Environmental Consequences Subsection contains commitments specific to the impact area being assessed. This section contains a summary of the commitments that
More informationFederal Highway Administration FINDING OF NO SIGNIFICANT IMPACT Interstate Highway 45 and Loop 197 Direct Connector Galveston County, Texas
Federal Highway Administration FINDING OF NO SIGNIFICANT IMPACT Interstate Highway 45 and Loop 197 Direct Connector Galveston County, Texas Introduction The Federal Highway Administration (FHWA) has determined,
More informationDEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA February 21, 2014
Charles A. Kilpatrick, P.E. Commissioner DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 Ms. Irene Rico Division Administrator 400 rth 8th Street, Suite 750 Richmond,
More informationCHAPTER 3 SCOPE SUMMARY
CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the
More informationRECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION CX Log #: OR-014-CX-04-24 Lease or Serial #: N/A Project Name: Surveyor Salvage CX Location: T.38S., R.5E., Sections 25,26,35,36;
More informationCESAM-RD-N May 29, 2014 PUBLIC NOTICE NO. SAM JSC
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS MOBILE DISTRICT MONTGOMERY FIELD OFFICE 605 MAPLE STREET BUILDING 1429, ROOM 105 MAXWELL AFB, AL 36112 CESAM-RD-N May 29, 2014 PUBLIC NOTICE NO. SAM-2014-00173-JSC
More informationWELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017
WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule
More informationProject Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that
US ARMY Corps Of Engineers Little Rock District JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF ARKANSAS Application Number: 2014-00083-1 Date: December 22, 2014 Comments Due: January 16, 2015 TO WHOM
More informationJ O I N T P U B L I C N O T I C E
J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, SC 29403-5107 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Water Quality Certification
More informationU.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT
PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT APPLICATION FOR PERMIT Deer Valley Road, El Mirage Road to 109 th Avenue Public Notice/Application No.: SPL-2010-00884-AP
More informationE. Other Federal Requirements and CEQA Considerations
E. Other Federal Requirements and CEQA Considerations Section E.1 includes discussions of various topics required by NEPA and/or CEQA, including a description of the long-term implications of the Project,
More informationDEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection
DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION DOCUMENT NUMBER: 563-2113-660 TITLE: Coal Refuse Disposal - Site Selection EFFECTIVE DATE: February 8, 1999 AUTHORITY: The Coal Refuse
More informationSECONDARY WETLAND IMPACTS ANALYSIS
SECONDARY WETLAND IMPACTS ANALYSIS USACE File. SWG-2012-00153 During the development of the Grand Parkway (State Highway 99) Segments H and I-1 from United States Highway 59/Interstate Highway 69 N to
More informationWATER QUALITY TECHNICAL REPORT
Tri-County Parkway Location Study WATER QUALITY TECHNICAL REPORT Prepared for: The Virginia Department of Transportation Prepared by: Parsons Brinckerhoff Quade and Douglas, Inc. Wetland Studies and Solutions,
More informationAn Overview and Comparison of the Tennessee Department of Transportation s Environmental Evaluation Process
Introduction This document provides a brief overview of the policy and procedures that govern the environmental evaluation process that the Tennessee Department of Transportation (TDOT) must follow for
More informationOctober 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects
Lake Elmo Airport Environmental Assessment (EA)/ Environmental Assessment (EAW) Worksheet October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects Agenda Public Event #2
More informationNorthwest State Route 138 Corridor Improvement Project
Northwest State Route 138 Corridor Improvement Project Los Angeles County, CA DISTRICT 7- LA- 138 (PM 0.0/36.8); DISTRICT 7- LA- 05 (PM 79.5/83.1); DISTRICT 7- LA- 14 (PM 73.4/74.4) 265100/ 0700001816
More informationDEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS - MOBILE DISTRICT BIRMINGHAM FIELD OFFICE 218 SUMMIT PARKWAY, SUITE 222 HOMEWOOD, AL 35209
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS - MOBILE DISTRICT BIRMINGHAM FIELD OFFICE 218 SUMMIT PARKWAY, SUITE 222 HOMEWOOD, AL 35209 CESAM-RD-I-N December 7, 2012 PUBLIC NOTICE NO. SAM-2012-01506-LCB
More informationDecember 28, John Fleming, Division Head, Environmental Division
December 28, 2017 TO: Master Files FROM: John Fleming, Division Head, Environmental Division SUBJECT: Job Number 020582 FAP Number NHPP-0001(94) King Bayou Str. & Apprs. (S) Bridge Number M2922 Arkansas
More informationPUBLIC NOTICE. Mr. Jon Morris Beacon Partners, Inc 610 East Morehead Street Charlotte, North Carolina 28202
US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: July 31, 2013 Comment Deadline: August 30, 2013 Corps Action ID Number: SAW-2013-01263 The Wilmington District, Corps of Engineers
More informationDerry-Londonderry I-93 Exit 4A Public Officials/Information Meeting
Derry-Londonderry 13065 - I-93 Exit 4A Public Officials/Information Meeting May 24, 2018 Purpose of Meeting To present the five build alternatives To present the evaluation matrix To answer questions and
More informationDRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park
DRAFT FINDING OF NO SIGNIFICANT IMPACT for Tioga Sports Park The U.S. Fish and Wildlife Service (USFWS) prepared an Environmental Assessment (EA) to analyze the potential effects of the proposal by the
More informationWarren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description
Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description Introduction The analysis of the Warren Wagon Road Improvement Project is tiered to the 2003 Environmental
More informationEnvironmental Session Breakout Session # 1
Environmental Session Breakout Session # 1 Chip Ray Virginia Department of Transportation John Simkins Federal Highways Administration Paul Kohler Virginia Department of Transportation Leo Snead Virginia
More informationAppendix C - Highway 400 Widening and Interchange Evaluation Summary Tables
Highway 400 Improvements from 1 km South of Highway 89 to the Junction of Highway 11 Appendix C - Highway 400 Widening and Interchange Tables Prepared for: Ontario Ministry of Transportation Four General
More informationEXECUTIVE SUMMARY RIVER VALLEY INTERMODAL FACILITIES FINAL ENVIRONMENTAL IMPACT STATEMENT ES-1
ES.1 INTRODUCTION This Final Environmental Impact Statement (FEIS) for the River Valley Intermodal Facilities (RVIF) in the Arkansas River Valley (ARV) has been written in accordance with the National
More informationNEW JERSEY DEPARTMENT OF TRANSPORTATION CATEGORICAL EXCLUSION DOCUMENTATION
I. GENERAL INFORMATION NEW JERSEY DEPARTMENT OF TRANSPORTATION CATEGORICAL EXCLUSION DOCUMENTATION CED Form Updated September 18, 2007 DOT Job Code No. 1237-523 Federal Project No. Nh-29 (154) Project
More information6 Other Considerations
6 Other Considerations 6.1 Unavoidable Adverse Effects Under Alternatives 1, 2, and 3, there would be a change in the air emissions associated with replacing the Expeditionary VAQ EA-6B with the EA-18G
More informationENVIRONMENTAL ASSESSMENT for. Village of Williamsburg. SR 133 Sewer Expansion Project Loan Number CS
ENVIRONMENTAL ASSESSMENT for SR 133 Sewer Expansion Project Loan Number CS390997-0007 Applicant: Susan Ellerhorst, Village Administrator 107 West Main Street Williamsburg, Ohio 45176 Page 1 Project Summary
More informationENVIRONMENTAL ASSESSMENT
ENVIRONMENTAL ASSESSMENT Section 408 Request to Alter the Dubois Local Protection Project for the Beaver Drive sidewalk construction in Clearfield County, PA June 28, 2018 Prepared By: Environmental and
More informationFOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310
INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006
More information16.1 Significant and Unavoidable Impacts
Chapter 16 NEPA requires an EIS and CEQA requires an EIR to evaluate a number of other types of environmental impacts in addition to those already addressed in the resource chapters. The analysis required
More informationClinton Keith Road Extension Project
Clinton Keith Road Extension Project Addendum to Supplemental Environmental Impact Report (SCH#1995062022) Clinton Keith Road Extension Project Riverside County, California Prepared for County of Riverside
More informationSection 7 Environmental Constraints
Section 7 Environmental Constraints i Yakima Valley Metropolitan and Regional Transportation Plan Public Comment DRAFT 1/27/2016 Environmental Constraints Analysis A programmatic-level review of potential
More informationSUMMARY S.1 PROJECT DESCRIPTION AND LOCATION S.2 PURPOSE AND NEED
S SUMMARY S.1 PROJECT DESCRIPTION AND LOCATION The Virginia Department of Transportation (VDOT), in cooperation with the Federal Highway Administration (FHWA), is studying alternatives to meet transportation
More informationARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT Scott E. Bennett Director Telephone (501) 569-2000 Voice/TTY 711 P.O. Bo 2261 Little Rock, Arkansas 72203-2261 Telefa (501) 569-2400 www.arkansashighways.com
More informationDecision Memo North Boundary Salvage
Map # Proposal and Need for the Proposal Decision Memo North Boundary Salvage USDA Forest Service Chequamegon-Nicolet National Forest Medford-Park Falls Ranger District The U.S. Forest Service (USFS) is
More informationCommunity Advisory Committee Meeting No. 2. June 22, 2006
Community Advisory Committee Meeting No. 2 June 22, 2006 Introductions The Study Team KDOT Wichita Partners Consultants CAC members Overview Today s Agenda Opinion Survey Study Status Starting Concept
More informationDECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT
DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT USDA Forest Service Bend/Fort Rock Ranger District, Deschutes National Forest Deschutes County, Oregon
More informationExecutive Summary. ES.1 Project Overview
ES.1 Project Overview The New Hampshire Department of Transportation (NHDOT) and the Federal Highway Administration (FHWA) have prepared this Environmental Assessment/Draft Section 4(f) Evaluation (EA/4(f))
More informationFINDINGS OF FACT And CONCLUSIONS
FINDINGS OF FACT And CONCLUSIONS SOUTHWEST RECONNECTION PROJECT Highway 61/101 Flood Mitigation State Project No. 1009-24 and State Aid Project No. 010-661-002 Prepared for: Carver County September 2013
More informationPUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.
US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: February 27, 2017 Comment Deadline: March 13, 2017 Corps Action ID Number: SAW-2009-01449 TIP No. R-2707C The Wilmington District,
More informationInterstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination
4-65 Interstate 73 FEIS: I-95 to the Myrtle Beach Region 4-66 Comment noted. The use of existing roadways was considered during alternative development (refer to Chapter 2, Section 2.1, page 2-1 and the
More informationPurpose of the Public Hearing
www.virginiadot.org Public Hearings Interstate 66 - Outside the Beltway Tier 1 Draft Environmental Impact Statement From U.S. Route 15 To I-495 Prince William and Fairfax Counties Wednesday, March 13,
More informationPublic Notice ISSUED: 20-JAN-2016 EXPIRES: 19-FEB-2016
APPLICANT: Shakopee Mdewakanton Sioux Community Public Notice ISSUED: 20-JAN-2016 EXPIRES: 19-FEB-2016 REFER TO: MVP-2015-04726-RMM SECTION: 404 - Clean Water Act 1. APPLICATION FOR PERMIT TO discharge
More informationFEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION
FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION AUGUST 2015 Table of Contents 1 Decision... 1 1.1 Project Description... 2 1.2 Basis for the FHWA Decision... 7 1.2.1
More informationARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT Dan Flowers Director Phone (501) 569-2000 Fax (501) 569-2400 P.O. Box 2261 Little Rock, Arkansas 72203-2261 WWW.ARKANSASHIGHWAYS.COM September 22, 2008
More informationTable Table 7.2 Potential Environmental Impacts and Mitigation Measures
7.2 Natural Environment/Environmental Planning Executive Summary/Key Points The Environmental Consultation and Mitigation Plan establishes: o A process for consultation with environmental resource agencies
More informationPhase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)
Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17
More informationSt. Francis Drive through the City of Santa Fe Corridor Study
VIII. ENGINEERING AND ENVIRONMENTAL EVALUATION INTERSECTION IMPROVEMENTS SOUTHERN For the southern end of the corridor, traffic volumes are expected to increase over existing levels. The Phase A Report
More informationTABLE OF CONTENTS 3.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES
TABLE OF CONTENTS 1.0 PURPOSE AND NEED -------------------------------------------------------------------------------------------- 1-1 1.1 STUDY AREA -----------------------------------------------------------------------------------------------------
More informationFINDINGS CALIFORNIA DEPARTMENT OF TRANSPORTATION FINDINGS FOR THE INTERSTATE 10 CORRIDOR PROJECT SAN BERNARDINO AND LOS ANGELES COUNTIES, CALIFORNIA
FINDINGS CALIFORNIA DEPARTMENT OF TRANSPORTATION FINDINGS FOR THE INTERSTATE 10 CORRIDOR PROJECT SAN BERNARDINO AND LOS ANGELES COUNTIES, CALIFORNIA DISTRICT 7 LA 10 (PM 44.0/48.3) DISTRICT 8 SBD 10 (PM
More informationPUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.
US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: September 19, 2013 Comment Deadline: October 19, 2013 Corps Action ID Number: SAW-2004-11082 The Wilmington District, Corps of Engineers
More informationProject: Developer/Designer: Reviewer:
City of Charlottesville, Virginia Engineering Plan Review Checklist (Site Plans, Site Plan Amendments, and Major Subdivisions) 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182;
More informationPUBLIC NOTICE US Army Corps of Engineers, Honolulu District
PUBLIC NOTICE US Army Corps of Engineers, Honolulu District Regulatory Office (CEPOH-RO) Public Notice Date: March 16, 218 Building 23 Expiration Date: March 3, 218 Fort Shafter, Hawaii 9688-44 Permit
More information