Water System Design by Optimization: Colorado Springs Utilities Case Studies. Istvan Lippai, Ph.D., P.E. 1

Size: px
Start display at page:

Download "Water System Design by Optimization: Colorado Springs Utilities Case Studies. Istvan Lippai, Ph.D., P.E. 1"

Transcription

1 Water System Design by Optimization: Colorado Springs Utilities Case Studies Abstract Istvan Lippai, Ph.D., P.E. 1 Traditional water system master planning procedures have included designing water distribution networks to meet minimum system pressures, velocities and fire flow requirements. With the population of Colorado Springs projected to increase to nearly 520,000 by 2030, the Colorado Springs Utilities (Utility) has adopted designby-optimization to reduce costs and streamline design procedures. WinPipes is an EPANET-based water distribution system solver, optimizer, and output interpreter. It was modified for the specific requirements of the Utility. The optimization program was designed to evaluate multiple performance criteria for maximum and minimum pressure, maximum velocity, flow from a single hydrant, simultaneous flow from multiple hydrants, pump capacity and energy, and component failure based reliability. Development of the optimizer as well as the design-by- optimization approach of both a small and a large development is presented. The master planning of these developments represented unique challenges for the design and operation of the Utilities distribution system. Design-by- optimization allowed the Utility to meet specific design criteria at near minimum cost without compromising the integrity or reliability of the distribution system. Introduction The Utility currently serves a population of about 370,000 persons with the population projected to increase to about 520,000 persons by year Ground elevations within the Utility service area range from about 5,900 feet (1,800 m), USGS datum, along the southern edge of Colorado Springs to 7,800 feet (2,380 m) in the western regions of the city along the foothills. Water is supplied to the primary service levels (pressure zones) mainly by gravity through a complex system of large mains, pressure reducing valves (PRV's), and storage reservoirs. 1 Water Resources Consultant, Castle Rock, Colorado, bpgclm@yahoo.com 1

2 The Utility service area is divided into five major service levels including Briargate, Templeton, Northfield, Highline, and Lowline. Ten secondary service levels are served within each primary service level. Four water treatment plants provide a delivery capacity of 230 MGD (10,100 l/s). Water treatment plants are McCullough at 75 MGD (3,300 l/s), Pine Valley at 92 MGD (4,000 l/s), Mesa at 50 MGD (2,200 l/s), and Fountain Valley Authority (FVA) at 13 MGD (600 l/s). A future SDS water treatment plant (150 MGD) is proposed in the eastern vicinity of the City to serve future growth. Figure 1 shows the City of Colorado Springs current and future water system. FLYING HORSE RANCH McCullough WTP (75 MGD) Pine Valley WTP (92 MGD) WOLF-CORDERA RANCH WOODMEN HEIGHTS RANCH BANNING LEWIS RANCH Mesa WTP (50 MGD) SDS WTP (150 MGD) FVA (13 MGD) SDS (150 MGD) Figure 1 Colorado Springs Utilities Current and Future Water System Growth within the City is limited to the northern and eastern boundaries of the water system. Dark lines in Figure 1 represent the existing water system. Gray lines represent expected future developments. Several master planned developments within the City require system optimization to determine the best engineering solution in meeting established design criteria while at the same time minimizing capital costs. A hydraulic water model in conjunction with WinPipes was used to optimize the water system design for a small development and a large development. The area of the small development, the Wolf-Codera Ranch, is 2,400 acres (9.7 km2) with an estimated average daily demand (ADD) of 3.7 MGD (160 l/s). In contrast, the Banning Lewis development is 28,000 acres (113.3 km2) with an ADD of 60 MGD (2630 l/s). Water service to the Wolf-Codera Ranch is provided from a 10 MGD (440 l/s) pump station which pumps to a 5 MG (19,000 m3) reservoir. The Banning Lewis 2

3 development will be served from the proposed SDS water treatment plant and a series of reservoirs and pump stations. Water Model The Utility is using H2Onet for water system modeling. The model currently contains 39 storage reservoirs, 258 pressure reducing valves, over 19,000 nodes, and over 23,000 pipes. The model is expected to grow with new developments. The current ADD is 84 MGD (3,700 l/s). The projected 2030 ADD is 113 MGD (5,000 l/s). The maximum day to average day peaking factor used for system planning is 2.5. The water models for both the small and large developments optimized in this study were easily separated from the overall system model. Fire Flows H2ONet s Fireflow command is used to simulate fire flows from individual hydrants. All construction permits for new development must be approved by Colorado Springs Fire Department (Fire Department). The Fire Department requires a report by the Utility stating the available pressure and fire flow for the proposed construction meets minimum criteria. Expected post-development pressures and fire flows are computed using the Utility s water model. The method of modeling fire flows was established in close cooperation with the Fire Department to ensure their confidence in the modeled results. The headloss for a typical hydrant with 5-1/4 inch Main Valve is computed based on a 4-1/2 inch Nozzle. Hydrant nozzle headloss coefficients were computed from discharge-headloss curves supplied by hydrant manufacturers. The total headloss is computed as the sum of minor headloss and hydrant lateral friction headloss to simulate fire flows. A typical hydrant configuration and associated minor headloss coefficients are depicted in Figure /2" NOZZLE HYDRANT 6" GATE VALVE Minor Loss Coefficients Item Description K Line to Branch Tee 0.8 8"x6" Reducer 0.2 6" Gate Valve 0.2 Hydrant Nozzle 2.8 Total /4" VALVE 8" MAIN 6" HYDRANT LATERAL Figure 2 Typical New Hydrant Installation 3

4 The available hydrant discharge is simulated with a residual 20 psi (14.1 m) of pressure remaining at the hydrant and in the system. This is consistent with a Fire Department requirement as well as the method used by commercial software to model fire flows. Minor headloss, is added to the friction headloss through the 6 inch (150 mm) hydrant lateral to model fire flows. It is important to estimate the available fire flow as accurately as possible because underestimating the available fire flow would be uneconomical while overestimating the available fire flow could result in denial of occupancy permit. Alternative Method of Determining Fire Flows No service connections are allowed between the 6 inch (150 mm) gate valve and the hydrant for developments within the Colorado Springs service area. With 20 psi (14.1 m) residual pressure at the left side of the valve and everywhere else in the system, fire flow can also be computed by assuming zero pressure at the hydrant discharge nozzle. This method may be more realistic and WinPipes could be used to compute fire flows with this alternate method. It was not used for the design-byoptimization of Utility projects because commercial software (e.g. H2ONet) does not currently support this alternative. Simultaneous Fire Flows Another simulation scenario used to estimate system performance involved more than one hydrant open at the same time. Several hydrants are opened at the same time to produce large fire flows for this scenario. H2ONet s Simultaneous Fire command is not used because it does not simulate the Fire Department requirement of minimum 20 psi (14.1 m) residual at the hydrants. Instead, each fire node was replaced with a tank of water surface elevation equal to the elevation of fire node plus residual pressure of 20 psi or 46.2 feet (14.1 m). This method has worked better for modeling simultaneous fire flows under large fire flow demand. This configuration is shown in Figure 3. Figure 3 Simultaneous Flow from 3 Hydrants 4

5 The impact of large simultaneous flows on the pressure gradient is more pronounced than the impact of individual hydrants. It is very important to verify the minimum residual pressure is maintained in the system and velocities do not exceed the maximum allowable velocity during simultaneous flows. Planning and Design of New Developments Colorado Springs is experiencing rapid growth. Most of the growth is occurring on the northern and eastern side of Colorado Springs on large sections of land. During the past two years, development plans were submitted for Flying Horse Ranch (FHR), Wolf-Cordera Ranch (WCR), Woodmen Heights Ranch (WHR) and Banning Lewis Ranch (BLR). There was prior knowledge about the nature and requirements for FHR and WCR, but very little prior information was available for WHR and BLR. Design-by- optimization was used by a relatively small Utility staff to design large extensions to the existing system on short notice. WCR and BLR were selected for presentation in this paper because WCR and BLR represent the challenges of small and large systems, respectively. Wolf-Cordera Ranch Model WCR model contains1981 pipes, 372 hydrants and 5 pumps. The pipe to area ratio is pipes per acre (204 pipes per km2). The system consists mostly of 8 inch (200 mm) pipes. The system configuration is given in Figure 4 with fire flow requirements shown. CORDERA RANCH WOLF RANCH RC WOLF RANCH RESERVOIR OVERFLOW = 7315' PRESSURE ZONE OVERFLOW = 7435' RC RC FIRE DEMAND : 8000 GPM MU1: 8000 GPM MU2: 7250 GPM ES1: 5250 GPM MS1: 5250 GPM RC: 2750 GPM RW: 2500 GPM BRIARGATE RESERVOIR OVERFLOW=7135' RC ES1 RC RW MU2 MU1 RW MS1 Figure 4 Wolf-Cordera Ranch Model Utility s standards require that 8 inch (200 mm) minimum diameter pipes are used for distribution lines and 6 inch (150 mm) minimum diameter pipes be used for cul-de- 5

6 sacs. Small systems that are designed for consumptive demand with little irrigation requirements may only need minimum pipe sizes. A summary of optimized WCR pipe diameters is given in Table 1. Table 1 Wolf-Cordera Ranch Pipe Summary Diameter Length Volume in mm ft m % gallons liters % ,954 5, ,371 99, ,133 85, ,093 2,778, ,500 18, ,449 1,345, ,193 2, , , ,589 5, ,854 1,475, Total 383, , ,580,895 5,984, Based on Utility experience with construction in undisturbed soil of $8/Diameter/ft ($0.315/Diameter/mm), the optimized cost of WCR water distribution system is $28.8M or $12,000/acre ($3.0M/km2). Banning Lewis Ranch Model BLR model is a planning skeletal model of 396 pipes representing supply mains. The pipe-to-area ratio is pipes per acre (3.5 pipes per km2). The system consists of 12 inch (300 mm) and larger pipes. Large system consumptive demands combined with fire demands dictates the required pipe sizes. See Table 2 for summary of optimized BLR pipe diameters. Table 2 Banning Lewis Ranch Pipe Summary Diameter Length Volume in mm ft m % gallons liters % , , ,826,750 14,485, ,400 59, ,030,464 7,686, ,425 24, ,890,047 7,154, ,985 20, ,541,944 13,407, ,862 1, ,894 1,597, ,066 10, ,296,309 12,477, ,878 4, ,889,046 7,150, Total ####### 320, ,896,454 63,960, Based on $8/Diameter Inch/Foot, the optimized cost of BLR water mains is $144.4M or $5,200/acre ($1.3M/km2). A meaningful comparison cannot be made between WCR and BLR costs because only the larger supply mains are included in the BLR model, while all the pipes are included in the WCR model. WCR and BLR are both designed for 8,000 GPM (500 l/s) maximum fire flow demand. The differences in pipe sizes are due to differences in consumptive system demand. The relative impact of fire flow on pipe sizes depends on system demand. (Lippai and Heaney 2000). 6

7 Multi-objective Optimization with WinPipes Multi-objective optimization may be used to meet all design criteria while satisfying all physical constraints. These include, at a minimum, node pressures, fire flows and system performance with any one of the critical components out of service. The process is easy enough to allow designers to apply optimization to the design of new systems, expansion and rehabilitation of existing systems. Undergraduate students at the University of Colorado at Boulder learned to use WinPipes to optimize simple water systems after an introductory lecture followed with some phone and assistance. Combining third party optimizers with the simulator and evaluator is well suited for a variety of applications because the heuristic search engine is independent of the simulation model. The optimizer may be a genetic algorithm, a tabu search, or any suitable intelligent search engine. With the introduction of commercial optimizers, the project may be separated into several parts (e.g., simulation, evaluation and optimization). Individuals who are experienced in their specific area develop procedures for each part and the components combined in the appropriate environment. Several commercial and public domain optimizers were linked with WinPipes to determine which optimizer works best with water distribution system optimization. Evolver was found to work best with water system optimization (Lippai, Heaney and Laguna, 1999). WinPipes is linked to Evolver to design water systems by defining constants, constraints, variables and objectives, and manipulating the variables so that all the objectives are satisfied at optimal cost. See Figure 5. Evolver-WinPipes Interaction Spreadsheet Environment Initialize 1. Constants 2. Constraints 3. Objectives Evolver Updates water system variables using Genetic Algorithms WinPipes.EXE 1. Reads water system variables 2. Modifies EPANet data file 3. Solves modified EPANet data file 4. Computes Penalties Figure 5 Application of WinPipes for Optimization Constants: Constraints: Variables: Pipe and Energy Unit Cost Data, Node Demands and MD/MH Ratio. Maximum Velocity, Maximum Pressure and Rules. Pipe Diameters, Pipe Roughness Coefficients, Tank Elevations and Link Settings. 7

8 Objectives: Node Pressures, Node Pressures with Pipe Closures, Fire Flows, Simultaneous Fire Flows, Pump Station Discharge and Pumping Life Cycle Costs. Link settings, simultaneous fire flows, pump station discharge and pumping life cycle costs were implemented for WCR water system. WinPipes evaluates every component for each event and computes an objective value based on costs and penalties. Penalties are set intentionally high to drive the optimization process in the direction of a system that satisfies every design objective. Link Settings can be used to open and close pipes, valves and pumps and to change the setting of valves and pumps. Link Settings can be used to explore pressure zone boundary changes, reservoir locations and operation of pumps. Rules are used to guide the optimization process. Rules are used to modify Evolver generated variables prior to model simulation and evaluation by WinPipes. For example, rules may be used to force the diameters of a subset of pipes to a specific value or to remain within a range of values. A rule may state that diameters must always increase or remain the same. Wolf-Cordera Ranch Multi -Objective Optimization The WCR water system was evaluated for pressure at 544 nodes, fire flow at 544 hydrants, simultaneous fire flow for 33 commercial locations and 45 residential locations, pump discharge capacity and energy life cycle costs for average day and maximum day demands. The initial 625 objective evaluations were reduced to 40 objective evaluations by eliminating hydrants that were found to meet design criteria with minimum pipe sizes. Pressure for Node Pressure (psi) Time (hours) Figure 6 Pressure at Node with Maximum Day Demand, Fire Flow, Simultaneous Fire Flow and Pump Operation 8

9 A large number of checks were performed for each set of variables to verify that each simulation met the rules and constraints. See Figure 6 for an example time history of pressure at Node The Time (hours) represents a sequence of events occurring in response to multiple design criteria with each time period representing the response of the model to the design conditions imposed. The normal pressure at zero hour is 58 psi (40.8 m). The fire demand and pressure at 2 hours is 1,750 GPM (110 l/s) and 22 psi (15.5 m), respectively. The pump station discharge of 7,320 GPM (462 l/s) at 4 hours increases the pressure to 67 psi (47.1 m). The residential simultaneous discharge of 2,780 GPM (175 l/s) at 6 hours from two hydrants near Node reduces the pressure to 32 psi (22.5 m). The commercial simultaneous discharge of 8,590 GPM (542 l/s) at 11 hours from four hydrants reduces the pressure to 27 psi (19.0 m). Similar graphs can be generated for any node or link, and be inspected to evaluate system performance for possible inconsistencies. Optimizing WCR based on single objective of pressure alone would have been meaningless because the pipe sizes produced could not provide fire flows. Component failure based reliability is modeled with pipe closures. Utility maintenance first responds to pipe failure by isolating the broken pipe. It is done by closing the valves on both sides of the break. Developers often argue that the requirement of three valves for every tee and four valves for every cross is excessive but having adequate isolation valves play a critical role during of pipe failure. No pipe closures were included during the optimization process but a post-optimization reliability check was performed. The 8,300 GPM (524 l/s) demand distributed at 1123 nodes was converted to dynamic demand constructs (Lippai 1996) for realistic system response to pipe closures. Dynamic demand modeling replaces the fixed demand with a combination of flow control valve, a check valve and a reservoir to estimate the fraction of demand that is delivered. See Figure 7. Da y 1, 1 2 :0 0 AM Figure 7 Static Demands Replaced with Dynamic Demand Constructs 9

10 A detailed explanation of dynamic demand modeling can be found in Pipeline 2005 conference proceedings (Lippai and Wright 2005), Criticality Analysis Case Study: Zone 7 Water Distribution System. A post-optimization closure of 599 pipes revealed there was no serious degradation of service for any of the closed pipe scenarios, as seen in Figure 8. Pressure for Node Pressure (psi) Tim e (hours) Figure 8 Pressure at Node in Response to Pipe Closures Closure of the 24 inch (600 mm) pipe between the pump station and Wolf ranch reservoir requires pump activation to maintain service. Banning Lewis Ranch Multi-Objective Optimization The 28,000-acre (113 km2) BLR service area is divided into eight pressure zones. See Figure 9. Each pressure zone has its own independent supply reservoir with the following exceptions. Northfield supplies Reduced Northfield and Lowline supplies Reduced Lowline. Table 3 shows the pressure zones within the BLR, overflow or hydraulic grades for each zone and maximum day demands for ultimate build out of the BLR, which is expected by

11 Reduced Briargate Templeton Reduced Templeton Northfield Reduced Northfield Highline Lowline Reduced Lowline Figure 9 Banning Lewis Ranch Model Table 3 Banning Lewis Ranch Pressure zones Section Pressure Zone Overflow ElevationMaximum Daily Demand Number Description ft m MGD l/s % 1 Reduced Briargate Templeton Reduced Templeton a Northfield b Reduced Northfield Highline a Lowline b Reduced Lowline Total Demand Optimization of independent sections of the water system was performed in parts to control the solution space (and therefore limit run times) but the complete BLR model was used for optimization of sections to take advantage of normally closed PRV s between pressure zones for fire flows. An 8,800 GPM (555 l/s) fire demand just above the normally closed PRV separating Reduced Briargate (RBRGT) and Templeton (TMPL) zones would allow PRV flow reversal from TMPL to RBRGT to assist with the RBRGT fire demand. See Table 4 for summary of BLR variables and constraints. 11

12 Table 4 Banning Lewis Ranch Variables and Constraints Section Pressure Zone Pipe Diameter Node Pressure Fire Flow Number Description Variables Constraints Constraints 1 Reduced Briargate Templeton Reduced Templeton Northfield Highline Lowline Total Variables and Constraint The reduction of variables and constraints for large systems is not surprising. The optimization problem is greatly simplified because the model is less detailed. See Figure 10 for pressure at Reduced Briargate Node Pressure (psi) Pressure for Node Time (hours) Figure 10 - Pressure at Node with Normal Demand and Fire Flow The normal pressure at zero hour is 74 psi (52.1 m). The fire demand and pressure at 31 hours is 8,800 GPM and 37.2 psi (555 l/s and 26.2 m), respectively. The required 8,000 GPM fire flow was increased by 10% because the skeletal system has no hydrants and therefore no simultaneous flow scenarios could be modeled. Conclusions and Recommendations Significant savings were realized from the designs submitted to the Utility for WCR. The $28.8M for WCR and $144.4M for BLR is the optimized cost that meets every specified design constraint. Equally important as the savings were the finding that the original designs submitted by the developer did not meet the design constraints and would have produced unacceptable pressures in the system during large simultaneous flows. The design-by- optimization of BLR did not identify savings. Initial diameters were deliberately overstated to produce an initial design to meet all 12

13 constraints. When design by optimization becomes a routine part of the design process the optimized project cost is going to be the project cost and claims of savings will be replaced with the knowledge that the optimal design meets all design objectives at the lowest possible cost. A major advantage of in-house design-by- optimization is the invaluable input from informed engineering management and design professionals. Design objectives were re-evaluated in consultation with management and design professionals to determine if some objectives should be modified after initial optimization and results presentation. Acknowledgements Len Wright, Ph.D., P.E., Water Resources Engineer, Carollo Engineers, edited the paper. Lisa Barbato, P.E, Managing Engineer, Colorado Springs Utilities, contributed the description of Colorado Springs Utilities water system in the Introduction section and edited the paper. Lisa Hagerman, Project Engineer, and Keta Donegan, Engineering Support Specialist, Colorado Springs Utilities, developed demand estimates for Banning Lewis Ranch. References Evolver (2001). The Genetic Algorithm Solver for Microsoft Excel, Palisade Corporation, Newfield, NY. H2ONet v3.5 (2001). Graphical Water Distribution Modeling and Management Package, MW Soft, Inc., Pasadena, CA. Lippai, I and Wright, L. (2005). Criticality Analysis Case Study: Zone 7 Water Distribution System, Pipeline 2005, Houston, Texas (accepted). Lippai, I. and Heaney, J.P. (2000). Efficient and Equitable Impact Fees for Urban Water Systems, J. Water Resources Planning and Management, pp Lippai, I, (1999). Robust Urban Water Distribution System Design. Doctor of Philosophy Dissertation, University of Colorado, Boulder, CO. Lippai, I., Heaney, J.P., and Laguna, M. (1999). Robust water system design with commercial intelligent search optimizers. J. Computing in Civil Engineering, pp Lippai, I. (1996). Introduction to demand based reliability of water distribution systems. In: Conference on Municipal and rural water supply and water quality, Poznan, Poland, pp Rossman, L. A. (1994). EPANET Users Manual. Drinking Water Research Division, Risk Reduction Eng. Laboratory, U. S. Environmental. Protection Agency, Cincinnati, OH. 13

About Me. Overview. Seattle Regional Water System. Seattle Regional Water System. Water System Analysis and Design at Seattle Public Utilities

About Me. Overview. Seattle Regional Water System. Seattle Regional Water System. Water System Analysis and Design at Seattle Public Utilities About Me Water System Analysis and Design at Seattle Public Utilities Jon C. Ford, P.E. CEE 481 October 1, 8 Senior Civil Engineer, Seattle Public Utilities BSCE, Seattle University MSCE, University of

More information

Table of Contents. 3.1 Source Capacity Analysis

Table of Contents. 3.1 Source Capacity Analysis Table of Contents 3.1 Source Capacity Analysis... 3-1 3.1.1. Design Criteria... 3-1 3.1.2. Source Capacity Evaluation... 3-1 3.1.2.1 Plateau Zone... 3-1 3.1.2.2 Cascade View Zone... 3-4 3.2 Storage Capacity

More information

ENGINEERING REPORT WATER SUPPLY

ENGINEERING REPORT WATER SUPPLY PROPOSED RESIDENTIAL DEVELOPMENT, CORAL SPRINGS TRELAWNY FCS #: 1124/76/C ENGINEERING REPORT WATER SUPPLY PREPARED FOR Gore Developments Limited 2c Braemar Ave, Kingston 10 FEBRUARY 2012 1 TABLE OF CONTENTS

More information

Section 5 - Planning Criteria. Section 5

Section 5 - Planning Criteria. Section 5 Section 5 - Planning Criteria Section 5 SECTION 5 PLANNING CRITERIA This section presents the design criteria and methodologies for analysis used to evaluate the existing distribution system and its facilities

More information

Section 7 Hydraulic Model Development and Evaluation Criteria

Section 7 Hydraulic Model Development and Evaluation Criteria Section 7 Hydraulic Model Development and Evaluation Criteria The hydraulic evaluation conducted to develop this master plan was performed using a computer model of the reclaimed water distribution system.

More information

CHAPTER 4 HYDRAULIC ANALYSIS

CHAPTER 4 HYDRAULIC ANALYSIS CHAPTER 4 HYDRAULIC ANALYSIS This chapter presents information on the computer hydraulic model of the City s water system and the results of hydraulic analyses. The purpose of the hydraulic analysis is

More information

2006 Water Master Plan

2006 Water Master Plan 2006 Water Master Plan Prepared for: City of Fountain 116 South Main Street Fountain, Colorado 017 Prepared by: Black & Veatch Corporation 6300 South Syracuse Way Suite 300 Centennial, Colorado 0111 Project

More information

Leveraging Hydraulic Models

Leveraging Hydraulic Models Leveraging Hydraulic Models presented by Melissa Brunger, P.E. GAWP Fall Conference November 14, 2017 Hydraulic Modeling Applications Case Studies Conclusions/Lessons Learned AGENDA System curves for pump

More information

FREELAND WATER & SEWER DISTRICT BERCOT ROAD INTERTIE STUDY

FREELAND WATER & SEWER DISTRICT BERCOT ROAD INTERTIE STUDY FREELAND WATER & SEWER DISTRICT ISLAND COUNTY WASHINGTON BERCOT ROAD INTERTIE STUDY G&O #13507 NOVEMBER 2013 FREELAND WATER & SEWER DISTRICT ISLAND COUNTY WASHINGTON BERCOT ROAD INTERTIE STUDY G&O #13507

More information

Section 9 Distribution System Analysis

Section 9 Distribution System Analysis Section 9 Distribution System Analysis This section presents the analysis of the City of Sunnyside s (City) distribution system. Hydraulic modeling was performed to evaluate the adequacy of existing facilities

More information

APPENDIX B. WSSC Design Criteria for Water Distribution Systems

APPENDIX B. WSSC Design Criteria for Water Distribution Systems a. System Requirements ) Pressure Requirements APPENDIX B WSSC Design Criteria for Water Distribution Systems a) The water distribution system shall have adequate capacity to supply domestic demand to

More information

Pumps and Pumping Stations

Pumps and Pumping Stations Pumps and Pumping Stations Pumps add energy to fluids and therefore are accounted for in the energy equation Energy required by the pump depends on: Discharge rate Resistance to flow (head that the pump

More information

Session 2 Pump Selection. Mark Markham, P.E. Gresham, Smith and Partners September 14, 2017

Session 2 Pump Selection. Mark Markham, P.E. Gresham, Smith and Partners September 14, 2017 Session 2 Pump Selection Mark Markham, P.E. Gresham, Smith and Partners September 14, 2017 Quick Refresh System Curves graphically show the relationship between flow rates and associated total dynamic

More information

SAWS WATER PROJECTS MODELING CRITERIA GUIDELINES

SAWS WATER PROJECTS MODELING CRITERIA GUIDELINES SAWS WATER PROJECTS MODELING CRITERIA GUIDELINES July 2016 2800 U.S. Highway 281 North San Antonio, Texas 78212 Modeling Criteria Guidelines, July 2016 TABLE OF CONTENTS MODELING CRITERIA GUIDELINES FOR

More information

South Coast Water District 2016 Master Plan Updates

South Coast Water District 2016 Master Plan Updates South Coast Water District 2016 Master Plan Updates SCWD Sara Mathis, PE AECOM Henry Liang, PE Greg Bradshaw, PE Kelly McEnerney, EIT November 14, 2016 2016 Master Plan Update Presentation Outline Approach

More information

South Coast Water District 2017 Master Plan Updates

South Coast Water District 2017 Master Plan Updates South Coast Water District 2017 Master Plan Updates SCWD Sara Mathis, PE AECOM Henry Liang, PE Kelly McEnerney, EIT June 22, 2017 2017 Master Plan Update Presentation Outline Approach Potable Water System

More information

EPANET. Ivan Solinas

EPANET. Ivan Solinas EPANET Ivan Solinas agronomi@gmail.com The Irrigation Questions How to irrigate How much to irrigate When to Irrigate Pressurized pipe network What is EPANET EPANET is a computer program that performs

More information

CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM

CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM 2018 TABLE OF CONTENTS Section Four Water Distribution System SECTION PAGE NUMBER 1. Objective...1 2. Submissions

More information

SYSTEM ID: New York Tunnels System

SYSTEM ID: New York Tunnels System SYSTEM ID: New York Tunnels System NARRATIVE DESCRIPTION The New York Tunnels System represents the major water supply transmission tunnels for the City of New York in 1969. The system consists of 1 reservoir

More information

Calculate the Costs of Piping System Elements

Calculate the Costs of Piping System Elements Calculate the Costs of Piping System Elements by Ray Hardee, Engineered Software, Inc. Last month s column described the process of creating an energy cost balance sheet for a piping system (see Figure

More information

Agua Consulting Inc. Engineered Water Solutions

Agua Consulting Inc. Engineered Water Solutions Agua file: 023-01.340 District of Summerland 9215 Cedar Avenue Box 159 Summerland, BC V0H 1Z0 Attention: Mr. Devon van der Meulen, Manager of Utilities Dear Devon: RE: Banks Crescent Proposed 346 Unit

More information

SYSTEM ID: KY 10 NARRATIVE DESCRIPTION

SYSTEM ID: KY 10 NARRATIVE DESCRIPTION SYSTEM ID: KY 10 NARRATIVE DESCRIPTION KY 10 is primarily a branched system in Kentucky with the following assets: 13 Tanks, 13 Pumps, 1 Water Treatment Plant, and approximately 1353879 feet of pipe. KY

More information

SYSTEM ID: KY 3 NARRATIVE DESCRIPTION

SYSTEM ID: KY 3 NARRATIVE DESCRIPTION SYSTEM ID: KY 3 NARRATIVE DESCRIPTION KY 3 is primarily a grid system in Kentucky with the following assets: 3 Tanks, 5 Pumps, 1 Water Treatment Plant, and approximately 277,022 feet of pipe. KY 3 provides

More information

Task 5. Christopher Mack Zack Kaldy MET 330 Fluid Mechanics November 8, Purpose

Task 5. Christopher Mack Zack Kaldy MET 330 Fluid Mechanics November 8, Purpose Purpose Task 5 Christopher Mack Zack Kaldy MET 330 Fluid Mechanics November 8, 2015 For the fifth task of this project we are asked to specify the layout of the piping system, the material type and sizes

More information

STUDY OF WATER DISTRIBUTION NETWORK USING EPANET

STUDY OF WATER DISTRIBUTION NETWORK USING EPANET STUDY OF WATER DISTRIBUTION NETWORK USING EPANET Darshan Mehta 1, Krunal Lakhani 2, Divy Patel 3, Govind Patel 4 Assistant Professor, Civil Engg. Dept., S.S.A.S.I.T, Surat, Gujarat, India 1 UG Student,

More information

Utilities are constantly striving to

Utilities are constantly striving to Comprehensive Approach to Increase Effectiveness & Efficiency of Flushing Programs Using Latest Hydraulic & Water Quality Monitoring Tools Kelcia D. Mazana, Edward H. Talton Jr., and C. Robert Reiss Utilities

More information

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,

More information

Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge. Presentation to Board April 21, 2011

Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge. Presentation to Board April 21, 2011 Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge Presentation to Board April 21, 2011 PRESENTATION OUTLINE Master Plan Overview Purpose and Approach Supply and Demand

More information

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN. (HAL Project No.: )

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN. (HAL Project No.: ) PRESSURIZED IRRIGATION SYSTEM MASTER PLAN (HAL Project No.: 348.09.200) May 2012 TABLE OF CONTENTS TABLE OF CONTENTS... i LIST OF TABLES... ii LIST OF FIGURES... ii ACKNOWLEDGEMENTS... iii GLOSSARY OF

More information

Hydraulic Modeling and System Optimization

Hydraulic Modeling and System Optimization DRINKING WATER ENERGY MANAGEMENT WORKSHOP SERIES TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: Hydraulic Modeling and System Optimization Steven Jones, M.S., P.E. September 4, 2013 What is a Water System

More information

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS DESIGN STANDARDS SECTION 2 INDEX ITEM DESCRIPTION 2.00 GENERAL STATEMENT 2.01 WATER DISTRIBUTION

More information

MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices

MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendices Appendix J Utility Systems Data February 2017 MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO

More information

ScienceDirect. Numerical model of a district water distribution system in Bucharest. A.-M. Georgescu a, *, S. Perju a, S.-C. Georgescu b, A.

ScienceDirect. Numerical model of a district water distribution system in Bucharest. A.-M. Georgescu a, *, S. Perju a, S.-C. Georgescu b, A. Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 70 ( 2014 ) 707 714 12th International Conference on Computing and Control for the Water Industry, CCWI2013 Numerical model

More information

QC Analytical Water Treatment/Distribution Conference

QC Analytical Water Treatment/Distribution Conference QC Analytical Water Treatment/Distribution Conference May 23, 2016 QC Analytical Training Facility LeClaire, IA by Brian Roth, P.E. Principal Civil Engineer Stanley Consultants, Inc. Muscatine, IA Alice:

More information

COLLECTION AND DISTRIBUTION OF WATER

COLLECTION AND DISTRIBUTION OF WATER COLLECTION AND DISTRIUTION OF WATER Addis Ababa University Addis Ababa Institute of Technology Department of Civil Engineering Collection and Distribution of Water Deals with the transport of water from

More information

El Margarita Development Analysis

El Margarita Development Analysis 303 Second Street, Suite 300 South San Francisco, California 94107 415-243-2150 FAX: 415-896-0999 El Margarita Development Analysis 28 January 2015 Prepared for City of Yuba City 1201 Civic Center Boulevard

More information

North and South Plan ALBERT JUNE 2. G:\2013\ \Reports\N and S Water AFC\Cover Page North and South AFC Water Master Plan.docx.

North and South Plan ALBERT JUNE 2. G:\2013\ \Reports\N and S Water AFC\Cover Page North and South AFC Water Master Plan.docx. North and South Plan AFC Water Master Prepared for: WESTERN MUNICIPAL WATER DISTRICT 14205 Meridian Parkway. Riverside, CA 92518 (951) 571-7100 Prepared by: ALBERT A. WEBBB ASSOCIATES 3788 MCCRAY STREET

More information

West Bountiful City. Water System Capital Facilities Plan

West Bountiful City. Water System Capital Facilities Plan Water System Capital Facilities Plan August 2008 TABLE OF CONTENTS 1.0 Executive Summary... 1 2.0 Definition of Terms and Abbreviations... 2 3.0 Introduction... 3 3.1 Background...3 3.2 Scope of Investigation...3

More information

Volume 1 Executive Summary

Volume 1 Executive Summary 2013 Cheyenne Water and Wastewater Master Plans Final November 27, 2013 Prepared for: City of Cheyenne Board of Public Utilities 2416 Snyder Ave. Cheyenne, WY 82001 Prepared by: HDR Engineering AMEC Earth

More information

Domestic Water Use and Piped Water Supply (PWS)

Domestic Water Use and Piped Water Supply (PWS) Domestic Water Use and Piped Water Supply (PWS) Om Damani (Adapting from the slides of Milind Sohoni, Pooja Prasad, and Puru Kulkarni) 2 3 4 5 6 7 8 9 10 11 Agenda Introduction to Piped water schemes (PWS)

More information

EL PASO COUNTY WATER REPORT

EL PASO COUNTY WATER REPORT EL PASO COUNTY WATER AUTHORITY EL PASO COUNTY WATER REPORT DRAFT Executive Summary The El Paso County Water Authority (EPCWA) has prepared this Water Report to assist in evaluating how water demands of

More information

Irrigation network design and reconstruction and its analysis by simulation model

Irrigation network design and reconstruction and its analysis by simulation model SSP - JOURNAL OF CIVIL ENGINEERING Vol. 9, Issue 1, 2014 DOI: 10.2478/sspjce-2014-0001 Irrigation network design and reconstruction and its analysis by simulation model Milan Čistý, Zbynek Bajtek, Anna

More information

Research on pressure optimization effect of high level water tank by drinking water network hydraulic model

Research on pressure optimization effect of high level water tank by drinking water network hydraulic model Available online at www.sciencedirect.com Procedia Engineering 31 (2012) 958 966 International Conference on Advances in Computational Modeling and Simulation Research on pressure optimization effect of

More information

A Balancing Act: Complex Distribution System Planning in the Western North Carolina Foothills Tina Whitfield - HDR

A Balancing Act: Complex Distribution System Planning in the Western North Carolina Foothills Tina Whitfield - HDR A Balancing Act: Complex Distribution System Planning in the Western North Carolina Foothills Tina Whitfield - HDR 2017 HDR, Inc., all rights reserved. Agenda 01 Overview 02 Approach 03 Findings 04 Alternatives

More information

Chapter 6 STEP System Force Main Velocity Evaluation

Chapter 6 STEP System Force Main Velocity Evaluation Chapter 6 STEP System Force Main Velocity Evaluation \\7348101\TOC.doc CHAPTER 6 STEP System Force Main Velocity Evaluation 6.1 INTRODUCTION The City s existing STEP (septic tank effluent pump) pumps currently

More information

To assess the prevailing Water Distribution Network using EPANET

To assess the prevailing Water Distribution Network using EPANET To assess the prevailing Water Distribution Network using EPANET Vipinkumar G Yadav 1, Darshan Mehta 2 Sahita I Waikhom 3 1 Assistant Professor, Civil Engineering Department, G.E.C, Rajkot, Gujarat, India

More information

DRAFT TECHNICAL MEMORANDUM

DRAFT TECHNICAL MEMORANDUM Stetson Engineers, Inc. Technical Memorandum - New City of Solvang Well Field, May 14, 2010 DRAFT TECHNICAL MEMORANDUM 2171 E. Francisco Blvd., Suite K San Rafael, California 94901 TEL: (415) 457-0701

More information

CVEN 339 Summer 2009 Final Exam. 120 minutes allowed. 36 Students. No curve applied to grades. Median 70.6 Mean 68.7 Std. Dev High 88 Low 24.

CVEN 339 Summer 2009 Final Exam. 120 minutes allowed. 36 Students. No curve applied to grades. Median 70.6 Mean 68.7 Std. Dev High 88 Low 24. CVEN 339 Final Exam 120 minutes allowed 36 Students No curve applied to grades Median 70.6 Mean 68.7 Std. Dev. 13.7 High 88 Low 24.5 Name: CVEN 339 Water Resources Engineering Summer Semester 2009 Dr.

More information

Appendix 13. Haymeadow Raw Water irrigation System Basis of Design

Appendix 13. Haymeadow Raw Water irrigation System Basis of Design Appendix 13 Haymeadow Raw Water irrigation System Basis of Design 28 MEMORANDUM TO: FROM: Brandon Cohen, Scott Schlosser Brendon Langenhuizen, PE & David M. Kotz, PE DATE: September 13, 2018 RE: Haymeadow

More information

DRINKING WATER CONSTRUCTION PERMIT APPLICATON

DRINKING WATER CONSTRUCTION PERMIT APPLICATON DRINKING WATER CONSTRUCTION PERMIT APPLICATON Addition to existing water system New drinking water system Facilities to be added Surface Plant (new or expansion) New Well or Spring Source Booster Pump

More information

Before 1990, roughly 116 wastewater

Before 1990, roughly 116 wastewater F W R J Going Beyond Steady-State Wastewater System Modeling in Sarasota County: A Case for Extended-Period Simulation Christopher C. Baggett, Fatih Gordu, Roberto A. Rosario, and Christopher B. Cole Before

More information

Section 1 - Introduction...7. Section 2 - Raw Water Supply Section 3 - Water Treatment Section 4 - Water Distribution System...

Section 1 - Introduction...7. Section 2 - Raw Water Supply Section 3 - Water Treatment Section 4 - Water Distribution System... Table of Contents Section 1 - Introduction...7 1.1 Population Growth...7 1.1.1 Service Area...7 1.1.2 Past Population...7 1.1.3 Projected Population Growth...9 1.2 Water Demands...9 1.2.1 Past Water Demands...9

More information

Environmental Engineering-I

Environmental Engineering-I Environmental Engineering-I Prof. Dr. Muhammad Zulfiqar Ali Khan Engr. Muhammad Aboubakar Farooq Water Distribution Systems & Analysis 1 Water Distribution Systems & Analysis References Water Supply &

More information

Storage and pumping capacity analysis using hydraulic modeling

Storage and pumping capacity analysis using hydraulic modeling Storage and pumping capacity analysis using hydraulic modeling G. MacPherson City of Chilliwack, B.C., Canada W. de Schaetzen & S. Cripps GeoAdvice Inc., Vancouver, B.C., Canada ABSTRACT: This paper summarizes

More information

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES A. GENERAL 1. The following water system design guidelines are based on Federal, State and local health requirements and the Hilton Head No. 1 Public

More information

Appendix J Effluent Pump Station

Appendix J Effluent Pump Station Appendix J Effluent Pump Station TECHNICAL MEMORANDUM Salmon Creek Treatment Plant Effluent Pump Station Hydraulics and Phasing Analysis for the Phase 5A Project Columbia River Outfall and Effluent Pipeline

More information

ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT

ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT H A E S T A D M E T H O D S ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT F i r s t E d i t i o n Table of Contents Preface Continuing Education Units About the Software xv xix xxi Chapter 1 Introduction

More information

SITING AN ELEVATED TANK: NOT IN MY BACKYARD

SITING AN ELEVATED TANK: NOT IN MY BACKYARD SITING AN ELEVATED TANK: NOT IN MY BACKYARD Scott Huneycutt, P.E., Union County Public Works Benjamin Cownie, E.I.T., Black & Veatch Jeff Coggins, P.E., Black & Veatch Kevin T. Laptos, P.E., Black & Veatch*

More information

FLEMING HILL WTP FINISHED WATER PUMP STATION ELECTRIFICATION PROJECT TECHNICAL MEMORANDUM NO. 1 HYDRAULIC ANALYSIS AND PUMP SELECTION

FLEMING HILL WTP FINISHED WATER PUMP STATION ELECTRIFICATION PROJECT TECHNICAL MEMORANDUM NO. 1 HYDRAULIC ANALYSIS AND PUMP SELECTION CITY OF VALLEJO This document is released for the purpose of information exchange review and planning only under the authority of George C. Chin, October 15, 2015, State of California, PE No. 82654. FLEMING

More information

Ivins City Standard Specifications for Design and Construction Part 2 Engineering and Design Standards

Ivins City Standard Specifications for Design and Construction Part 2 Engineering and Design Standards 2.9. WATER SYSTEM DESIGN Ivins City Standard Specifications for Design and Construction All culinary water mains and appurtenances shall be designed to provide for adequate future service for all contiguous

More information

Energy Savings through Water Conservation in Municipal Water Distribution Systems

Energy Savings through Water Conservation in Municipal Water Distribution Systems Energy Savings through Water Conservation in Municipal Water Distribution Systems Santosh Ghimire PhD Candidate Civil & Environmental Engineering Department, Michigan Tech University, Houghton, MI-49931

More information

255 NORTHFIELD DRIVE EAST

255 NORTHFIELD DRIVE EAST 255 NORTHFIELD DRIVE EAST Fire Flow/Water Demand Analysis Project Location: 255 Northfield Drive East Waterloo, Ontario Prepared for: Abbey Ridge Developments Inc. 22 King Street South, Suite 300 Waterloo,

More information

Water Utility Science Water Math and Hydraulics 050. Name: Date:

Water Utility Science Water Math and Hydraulics 050. Name: Date: Water Utility Science Water Math and Hydraulics 050 Name: Date: Note: Please show all of your calculations for each problem no matter how simple the problem may seem. Please use the accompanying pieces

More information

Report. Lake Water Supply Hydraulic Modeling. Village of. Lindenhurst, IL. April 2012

Report. Lake Water Supply Hydraulic Modeling. Village of. Lindenhurst, IL. April 2012 Lake Water Supply Hydraulic Modeling Report Village of Lindenhurst, IL April 2012 R:\MAD\Documents\Reports\Archive\2012\Lindenhurst, IL\Lake Water Supply.HM.1290.039.mjf.jan\Report\!Front Cover (Blue=Water)

More information

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN PRESSURIZED IRRIGATION SYSTEM MASTER PLAN (HAL Project No.: 314.04.100) FINAL REPORT January 2009 ACKNOWLEDGMENTS Successful completion of this study was made possible by the cooperation and assistance

More information

Water supply components

Water supply components Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution

More information

CEE 371 Fall 2009 Design Problem 1 (work in teams of 3) DESIGN OF AMHERST TRANSMISSION MAIN

CEE 371 Fall 2009 Design Problem 1 (work in teams of 3) DESIGN OF AMHERST TRANSMISSION MAIN CEE 371 Fall 2009 Design Problem 1 (work in teams of 3) DESIGN OF AMHERST TRANSMISSION MAIN Background The drinking water sources for the Town of Amherst include two surface water (reservoir) supplies

More information

RELIABILITY BASED OPTIMAL DESIGN OF A WATER DISTRIBUTION NETWORK FOR MUNICIPAL WATER SUPPLY

RELIABILITY BASED OPTIMAL DESIGN OF A WATER DISTRIBUTION NETWORK FOR MUNICIPAL WATER SUPPLY RELIABILITY BASED OPTIMAL DESIGN OF A WATER DISTRIBUTION NETWORK FOR MUNICIPAL WATER SUPPLY S.Chandramouli 1 and P.Malleswararao 2 1.Associate Professor, Department of Civil Engineering, GMRIT, Rajam,

More information

Hydraulic Analysis Comparing Efficiency of One and Two Zone Pressure Water Systems

Hydraulic Analysis Comparing Efficiency of One and Two Zone Pressure Water Systems Hydraulic Analysis Comparing Efficiency of One and Two Zone Pressure Water Systems 1 Ahmed Husain, PE MGIS Program Penn State University July 22, 2015 Energy Pressures Implementation Advisor Professor

More information

WATER SYSTEM PRESENTATION. Presenter: Mike Oemcke Company: OCWA Central New York s Water Authority Department: Water System Engineering

WATER SYSTEM PRESENTATION. Presenter: Mike Oemcke Company: OCWA Central New York s Water Authority Department: Water System Engineering WATER SYSTEM PRESENTATION 2017 Presenter: Mike Oemcke Company: OCWA Central New York s Water Authority Department: Water System Engineering OUTLINE SYSTEM OVERVIEW SOURCES OF SUPPLY MAJOR FACILITIES PRESSURE

More information

Tank Name: Cornwell 0.5MG Reservoir

Tank Name: Cornwell 0.5MG Reservoir TIDEFLEX MIXING SYSTEM (TMS) PRELIMINARY DESIGN REPORT Tank Name: Cornwell 0.5MG Reservoir Water Utility/Owner: Soquel Creek Water District, CA Consultant: CONTENTS TMS - GENERAL ARRANGEMENT DRAWING CFD

More information

Hydraulic Modeling Predicting and Resolving Water Quality Issues

Hydraulic Modeling Predicting and Resolving Water Quality Issues Alliance of Indiana Rural Water September 21, 2016 Hydraulic Modeling Predicting and Resolving Water Quality Issues Jim McNulty, P.G. Strand Associates, Inc. The content of this presentation is not to

More information

EXISTING SYSTEM ANALYSIS

EXISTING SYSTEM ANALYSIS Chapter 6 EXISTING SYSTEM ANALYSIS This chapter describes the evaluation of the existing water distribution system, using the calibrated hydraulic model and the 2006 water demands. The system evaluations

More information

SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN

SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN 3.1 GENERAL SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN 3.1.1 The following specifications cover the general design, review of plans and specifications, and acceptance of

More information

Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship

Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship Prepared by GEI Consultants/Navigant Consulting, Inc. Prepared for the California Public Utilities Commission

More information

CHAPTER 6 Evaluation of Future Water System at Buildout

CHAPTER 6 Evaluation of Future Water System at Buildout CHAPER 6 Evaluation of Future Water System at Buildout 6.1 OVERVIEW his chapter presents an evaluation of the City s future expanded water distribution system and its ability to meet recommended water

More information

Developing Mesopolis A Virtual City for Research in Water Distribution Systems and Interdependent Infrastructures

Developing Mesopolis A Virtual City for Research in Water Distribution Systems and Interdependent Infrastructures Developing Mesopolis A Virtual City for Research in Water Distribution Systems and Interdependent Infrastructures J. Garrett Johnston Mentored by Dr. Kelly Brumbelow Dwight Look College of Engineering,

More information

Simulation of Existing Water Distribution Network by using EPANET: A Case Study of Surat City

Simulation of Existing Water Distribution Network by using EPANET: A Case Study of Surat City GRD Journals Global Research and Development Journal for Engineering Recent Advances in Civil Engineering for Global Sustainability March 2016 e-issn: 2455-5703 Simulation of Existing Water Distribution

More information

Hydraulic Modeling, PUDs & Managing Water System Growth

Hydraulic Modeling, PUDs & Managing Water System Growth Hydraulic Modeling, PUDs & Managing Water System Growth American Water Resources Association Intermountain Section October 9, 2013 Utah Division of Drinking Water Ying-Ying Macauley Presentation Topics

More information

Water and wastewater treatment operations

Water and wastewater treatment operations The Search for Energy Savings: Optimization of Existing & New Pumping Stations Chris Reinbold and Vincent Hart Water and wastewater treatment operations account for 30 to 50 percent of all municipal power

More information

Examine Pump, Process & Control Elements to Solve Fluid Piping System Problems

Examine Pump, Process & Control Elements to Solve Fluid Piping System Problems Examine Pump, Process & Control Elements to Solve Fluid Piping System Problems by Ray Hardee My past Pumps & Systems columns (read them here) have dealt with using basic engineering principles to better

More information

Successfully dosing pipe networks. Kevin Sherman, Ph.D., P.E., D.WRE Vice President of Engineering Clearstream Wastewater Systems, Inc.

Successfully dosing pipe networks. Kevin Sherman, Ph.D., P.E., D.WRE Vice President of Engineering Clearstream Wastewater Systems, Inc. Successfully dosing pipe networks Kevin Sherman, Ph.D., P.E., D.WRE Vice President of Engineering Clearstream Wastewater Systems, Inc. What is a successful dose? Spreads effluent throughout soil disp.

More information

Zone 40 Water System Infrastructure Plan

Zone 40 Water System Infrastructure Plan SACRAMENTO COUNTY WATER AGENCY Sacramento County Water Agency April 2006 Sacramento County Water Agency Staff: Darrell Eck, Senior Civil Engineer Dan Barry, Senior Civil Engineer Mike Crooks, Senior Civil

More information

Homework of Chapter (5)

Homework of Chapter (5) Dead Line: Wednesday (18/04/2018) The Islamic University of Gaza, Instructors: Dr. Khalil M. Al Astal Civil Engineering Department, Hydraulics -Discussion, Second semester, 2018. T.A: Eng. Mohammed AbuRahma

More information

MASTER WATER SYSTEM DESIGN REPORT DESERT TRAILS

MASTER WATER SYSTEM DESIGN REPORT DESERT TRAILS MASTER WATER SYSTEM DESIGN REPORT FOR DESERT TRAILS SURPRISE, ARIZONA Prepared for: HE Capital Fox Trails, LLC 2850 E. Camelback Road Suite 110 Phoenix, Arizona 85016 1 st Submittal February, 2009 2 ND

More information

J. PAUL GUYER, P.E., R.A.

J. PAUL GUYER, P.E., R.A. J. PAUL GUYER, P.E., R.A. Paul Guyer is a registered civil engineer, mechanical engineer, fire protection engineer and architect with over 35 years experience designing all types of buildings and related

More information

I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices

I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendices Appendix J Utility Systems Data August 2017 I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO

More information

USING DESIGN-BUILD TO MITIGATE RISK TO A MAJOR WATER DELIVERY SYSTEM ROCKY MOUNTAIN DBIA PRESENTATION MAY 20, 2016

USING DESIGN-BUILD TO MITIGATE RISK TO A MAJOR WATER DELIVERY SYSTEM ROCKY MOUNTAIN DBIA PRESENTATION MAY 20, 2016 USING DESIGN-BUILD TO MITIGATE RISK TO A MAJOR WATER DELIVERY SYSTEM ROCKY MOUNTAIN DBIA PRESENTATION MAY 20, 2016 PRESENTATION OVERVIEW Utilities / Water System Overview Project Requirements Team Selection

More information

PipelineNet: A GIS Based Water Quality Model for Distribution Systems

PipelineNet: A GIS Based Water Quality Model for Distribution Systems PipelineNet: A GIS Based Water Quality Model for Distribution Systems William B. Samuels, Ph.D Science Applications International Corporation Hazard Assessment and Simulation Division McLean, Virginia

More information

AR No. # Efficient Irrigation

AR No. # Efficient Irrigation AR No. # Efficient Irrigation Recommendation Optimize the facilities irrigation pumping system by ensuring pumps are operating at their Best Efficiency Point (BEP). We estimate the system pumping efficiency

More information

UDF is Easier in the Office: Pilot Testing a System with Wells Equipped with Variable Frequency Drives

UDF is Easier in the Office: Pilot Testing a System with Wells Equipped with Variable Frequency Drives UDF is Easier in the Office: Pilot Testing a System with Wells Equipped with Variable Frequency Drives Jeremy Cox City of Woodland Irene Suroso,P.E. West Yost Associates Flushing Program City of Woodland

More information

Woodbury - Aurora Metro Station

Woodbury - Aurora Metro Station Woodbury - Aurora Metro Station Master Utility Report Aurora, Colorado E. Centrepoint Dr. and E. Alameda Dr. Prepared By: Galloway 6162 S. Willow Drive, Suite 32 Greenwood Village, CO 8111 33.77.8884 POC:

More information

CHAPTER 4 Hydraulic Model Management and Documentation Protocols

CHAPTER 4 Hydraulic Model Management and Documentation Protocols CHAPTER 4 Hydraulic Model Management and Documentation Protocols It is important for the City s hydraulic model to be updated regularly to reflect newly installed/modified water system pipelines and facility

More information

WATER SYSTEM MASTER PLAN 10. DISTRIBUTION SYSTEM EVALUATION

WATER SYSTEM MASTER PLAN 10. DISTRIBUTION SYSTEM EVALUATION WATER SYSTEM MASTER PLAN 10. DISTRIBUTION SYSTEM EVALUATION This section provides an analysis of the current water distribution system s performance. Evaluation criteria, supply scenarios, and evaluations

More information

CHAPTER 4 SYSTEM DESIGN CRITERIA

CHAPTER 4 SYSTEM DESIGN CRITERIA INTRODUCTION CHAPTER 4 SYSTEM DESIGN CRITERIA Adequate design of the District s wastewater conveyance facilities requires the determination of the quantity of wastewater from contributing sources. The

More information

APPENDIX M VANDEN MEADOWS PROJECT WATER MODELING STUDY AND TECHNICAL MEMORANDUM

APPENDIX M VANDEN MEADOWS PROJECT WATER MODELING STUDY AND TECHNICAL MEMORANDUM APPENDIX M VANDEN MEADOWS PROJECT WATER MODELING STUDY AND TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Date: March 16, 2011 FROM: Victor M. Alaniz, P.E. Nolte Associates, Inc. 2495 Natomas Park Drive, Fourth

More information

CHAPTER SEVEN: UTILITIES

CHAPTER SEVEN: UTILITIES CHAPTER SEVEN: UTILITIES 7.1 Introduction The Water Works Board of the City of Auburn (AWWB) is the primary potable water service provider for the City of Auburn (City) and Auburn University. There are

More information

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL INTRODUCTION The District developed a hydraulic model of the sanitary sewer system as part the 2000 Wastewater Comprehensive Plan. The output from this model

More information

Presentation Summary. What, Why, and How. Building the Model. Facility Data Acquisition. Model Calibration. Real World Applications/Case Studies

Presentation Summary. What, Why, and How. Building the Model. Facility Data Acquisition. Model Calibration. Real World Applications/Case Studies Uday Khambhammettu Randolph Rostas VA AWWA Presentation Summary What, Why, and How Building the Model Facility Data Acquisition Model Calibration Real World Applications/Case Studies Model Maintenance

More information

Optimal Tank Design And Operation Strategy To Enhance Water Quality In Distribution Systems

Optimal Tank Design And Operation Strategy To Enhance Water Quality In Distribution Systems City University of New York (CUNY) CUNY Academic Works International Conference on Hydroinformatics 8-1-2014 Optimal Tank Design And Operation Strategy To Enhance Water Quality In Distribution Systems

More information