1 Anglo American Platinum; Mogalakwena Mine: Explosive Depot Expansion Consultation with the council of Induna Chaba and Mapela T/A 19 January 2016, 14:30
2 AGENDA Welcome and introduction. Meeting protocol. Purpose of the meeting. Project background. Project location. Project description. 2
3 AGENDA CONTINUED Storage capacity. Summary of environmental impacts. Alternatives. Regulatory process followed. Regulatory process going forward. Questions / Comments. 3
4 WELCOME AND INTRODUCTION Introduction of parties involved in the project. Anglo American Platinum: Mogalakwena Mine Shangoni Management Services 4
5 MEETING PROTOCOL Please sign the attendance register. Please feel free to ask questions. Please ask questions that are specific to the expansion of explosives depot project. 5
6 PURPOSE OF THE MEETING To present background information on the project to Mapela T/A and to provide an opportunity for questions and comments relating to the project. This meeting forms part of the public participation process, and will be structured in the format of a Public Participation / Consultation Meeting. All concerns/comments will be recorded and included within a Public Participation Report that will be submitted to the DMR along with the project s Basic Assessment Report 6
7 PROJECT BACKGROUND Applicant: Anglo American Platinum Mogalakwena Mine Project Name Explosives Depot Expansion Project Location Farm Overysel 815 LR, Limpopo Province 7
8 PROJECT LOCALITY MAP 8
9 PROJECT LOCALITY CONTINUED 9
10 PROJECT DESCRIPTION Mogalakwena Mine is relocating its existing Explosives Magazine Storage will be kept below 80m 3 in total until further authorisation is obtained. The newly constructed Explosives Depot (which will consist of the Explosives Magazine (bunker area) as well as an Emulsion (BME and AEL) and ANPP Storage and Handling area will be expanded on the existing Waste Rock Dump (WRD) No.2, which is located within the existing mine boundary area for which Mogalakwena Mine has a Mining Right and approved EMP 10
11 PROJECT DESCRIPTION Activity applied for: Listing Notice 1: GNR 983 of 2014 Activity 51: The expansion of facilities for the storage, or storage and handling of a dangerous good, where the capacity of such storage facility will be expanded by more than 80 cubic meres 11
12 PROJECT DESCRIPTION The Expansion of the Explosives Depot will include the following: 4x 200 tons (in total m 3 ) of BME emulsion silo s; BME bunded areas around BME silo s. Bunded area capacity of m 3 each (551.44m 3 in total for four BME bunded areas); 6x 40 tons (in total 99.73m 3 ) of AEL emulsion silo s; AEL bunded areas around AEL silo s. Bunded area capacity of 44.51m 3 each (267.06m 3 in total for six AEL bunded areas); 2x 50 tons (in total 41.55m 3 ) of Ammonium Nitrate Porous Prills (ANPP) emulsion silo s; 12
13 PROJECT DESCRIPTION CONTINUED ANPP bunded areas around ANPP silo s. Bunded area capacity of 55.86m 3 each (total m 3 in total for two ANPP bunded areas); Storage of explosives and accessories of more than 80 m 3 in the existing four Explosives Magazine containers. Accessory and equipment stores; Guard (security) houses and accompanying stores; and Water management measures, including pipelines, a L water tank for spills and cleaning purposes, a pump base and a pit collection sump. 13
14 SITE PLAN 14
15 SITE PLAN: 15
16 STORAGE CAPACITY The total capacity for the storage of explosives and emulsion is m 3 for the Emulsion Storage and Handling Section, and 228m 3 for the Magazine Section. Therefore the total combined capacity of the Explosives Depot storage areas will be m 3. 16
17 SUMMARY OF ENVIRONMENTAL IMPACTS No significant impacts were identified during the environmental impact assessment process. Medium rated environmental impacts identified however relate to the following: Potential for fire and/or explosion due to explosive material and substances being exposed to sparks or open flames. Water or wind erosion of topsoil during and after rehabilitation. Compaction of topsoil, affecting growth of vegetation during rehabilitation. 17
18 SUMMARY OF ENVIRONMENTAL IMPACTS Potential unsuccessful re-vegetation during rehabilitation due to shortage of nutrients, compaction and slope failure. Potential establishment of alien invasive plants. Potential light pollution and nuisance due to lighting at the Explosive Depot Potential wash down of sediments resulting in sedimentation or siltation 18
19 ALTERNATIVES ASSESSMENT Expansion of the site versus No-project Option 19
20 ALTERNATIVES ASSESSMENT 20
21 ALTERNATIVES ASSESSMENT 21
22 Basic Assessment process (90 days (excluding 15 Dec 05 Jan)) REGULATORY PROCESS FOLLOWED Application form Application date: October 2015 Draft BAR and EMPr Public review 20 Oct 20 Nov 2015 The I&APs were provided with the opportunity to review the draft BAR for 30 days. Meeting: Consultation with the council of Induna Chaba and Mapela T/A Viewing stations Mogalakwena Library Shangoni website ( za). Minutes: Compile and distribute minutes of the meeting. Notifications: 20 Oct 15 Registered post: 16 Oct 15 Newspaper advert: October 15 in Bosveld Newspaper.
23 Basic Assessment process (90 days (excluding 15 Dec 05 Jan)) REGULATORY PROCESS GOING FORWARD Public/community Consultation meeting Notifications to be done as per EIA regulations: . Registered post. Newspaper advert. Minutes: Compile and distribute minutes of the meeting. Draft BAR and EMPr Public Participation Report: Compilation of Public Participation report for inclusion as an annexure to the final BAR report. Final BAR and EMPr Submission due date: Due date: 05 February
24 QUESTIONS / COMMENTS 24
Annesley Andalusite Mine: Section 24G Rectification Process. Consultation with community members 15 June 2017
Annesley Andalusite Mine: Section 24G Rectification Process Consultation with community members 15 June 2017 AGENDA Welcome and introduction Meeting protocol Purpose of the meeting Project background Project
More informationGP 30/5/1/3/2/10242 MP
! Before Dawn Property Developers (Pty) Ltd GP 30/5/1/3/2/10242 MP Background Information Document For the proposed mining permit On the farm Malony s Eye 169 IQ. Report Ref: 2017/BDPD0001 Prepared by:
More informationPROPOSED VOLSPRUIT MINE, MOKOPANE DISTRICT, LIMPOPO PROVINCE. Background Information Document (BID) ESCIENCE ASSOCIATES (PTY) LTD.
ENVIRONMENTAL IMPACT ASSESSMENT (EIA), MINING RIGHT APPLICATION AND OTHER ANCILLARY LICENSING PROCESSES: PROPOSED PLATINUM GROUP METALS MINE & ASSOCIATED INFRASTRUCTURE PROPOSED VOLSPRUIT MINE, MOKOPANE
More informationNOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE.
ENVIRONMENTAL AUTHORISATION AMENDMENT APPLICATION NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE. BACKGROUND
More informationBACKGROUND INFORMATION DOCUMENT:
BACKGROUND INFORMATION DOCUMENT: APPLICATION FOR A MINING RIGHT MMAKAU COAL (PTY) LTD SCHURVEKOP 227 IS, BETHAL, MPUMALANGA 1. INTRODUCTION Mmakau Coal (Pty) Ltd intends to submit an application for a
More informationBASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION
BASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION DEDEA Ref: EC04/C/LN1/M/53-2014 BACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT: Return address for comments:
More informationERM conducted the public participation process (PPP) as part of the EIA and EMPr Amendment for MP 30/5/1/2/2/133MR to include:
6 PUBLIC PARTICIPATION PROCESS ERM conducted the public participation process (PPP) as part of the EIA and EMPr Amendment for MP 30/5/1/2/2/133MR to include: a new Central Discard Dump at the Maquasa East
More informationBACKGROUND INFORMATION DOCUMENT
Kingfisher Farms (Pty) Ltd SAND MINING APPLICATION Manor Grange Farm, Hibberdene (KwaZulu-Natal) BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION An application has been submitted to the Department
More informationBACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT
BACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT WASTE MANAGEMENT LICENCE APPLICATION FOR THE MANAGEMENT OF ALL WASTE STREAMS FOR THE OPEN PIT AND UNDERGROUND OPERATIONS AT VENETIA MINE, LIMPOPO
More informationPetra Diamonds (Finsch) Storm Water Management Plan Update. Project No: PET-FIN Shangoni Management Services (Pty) Ltd
Petra Diamonds (Finsch) Storm Water Management Plan Update Project No: PET-FIN-13-08-06 STORM WATER MANAGEMENT PLAN UPDATE Petra Diamonds (Finsch) Storm Water Management Plan Update Project No: PET-FIN-13-08-06
More informationThe PPP has been designed to achieve the following objectives: To ensure that stakeholders are well informed about the proposed development;
7 PUBLIC PARTICIPATION PROCESS 7.1 INTRODUCTION Consultation with Interested and Affected Parties (I&APs) forms an integral component of an ESIA process. It enables inter alia directly affected and neighbouring
More informationAnnexure E.3. Comment Response Report. Proposed Expansion of Ash Disposal Facility at the Kriel PowerStation, Mpumalanga: Scoping Report
Proposed Expansion of Ash Disposal Facility at the Kriel PowerStation, Mpumalanga: Scoping Report Annexure E.3 Comment Response Report Project 113084 / 11081File Kriel Ash Disposal Facility Scoping_2017
More informationBACKGROUND INFORMATION DOCUMENT SEPTEMBER 2014 MDEDET REF NUMBER: 17/2/3N-389
ENVIRONMENTAL AUTHORISATION PROCESS AND APPLICATION FOR REQUIRED LICENCES FOR THE PHOLA COAL PROCESSING PLANT, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE BACKGROUND INFORMATION DOCUMENT SEPTEMBER
More informationIMPORTANT NOTICE. Kindly note that:
1 APPLICATION FORM FOR ENVIRONMENTAL AUTHORISATIONS IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998 AND THE NATIONAL ENVIRONMENTAL MANAGEMENT WASTE ACT, 2008 IN RESPECT OF LISTED ACTIVITIES
More informationINTRODUCTION PROJECT DESCRIPTION
JOE GQABI DISTRICT MUNICIPALITY DROUGHT RELIEF PROGRAMME PROPOSED LADY GREY BULK WATER SUPPLY PROJECTS, LADY GREY, SENQU MUNICIPALITY, EASTERN CAPE EIA BACKGROUND INFORMATION DOCUMENT INTRODUCTION Joe
More informationCape Environmental Assessment Practitioners(Pty) Ltd
Cape Environmental Assessment Practitioners(Pty) Ltd Reg. No. 2008/004627/07 Telephone: (044) 874 0365 Facsimile: (044) 874 0432 17 Progress Street, George Web: www.cape-eaprac.co.za PO Box 2070, George,
More informationBACKGROUND INFORMATION DOCUMENT
BACKGROUND INFORMATION DOCUMENT PROPOSED CONSTRUCTION OF 400/132KV MARANG B SUBSTATION AND ±2KM, 400kv POWER LINE LOOPING IN AND OUT FROM THE BIGHORN-MARANG OR MEDUPI MARANG 400KV POWERLINES WITHIN RUSTENBURG
More informationNOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
11 August 2017 Dear Stakeholder ENVIRONMENTAL IMPACT ASSESSMENT AND PUBLIC PARTICIPATION PROCESS DEVELOPMENT OF THE RICHARDS BAY COMBINED CYCLE POWER PLANT (CCPP) AND ASSOCIATED INFRASTRUCTURE ON A SITE
More informationFULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Agricultural Expansion on Portion 2 of Farm 92, Tregaron, known as Sylvania, Sundays River Valley Municipality BACKGROUND INFORMATION DOCUMENT,
More informationHARDROCK PROJECT CONCEPTUAL EXPLOSIVES AND BLASTING MANAGEMENT PLAN
HARDROCK PROJECT CONCEPTUAL EXPLOSIVES AND BLASTING MANAGEMENT PLAN April 2017 Greenstone Gold Mines GP Inc. 365 Bay Street, Suite 500 Toronto, Ontario M5H 2V1 Table of Contents 1.0 Introduction and Environmental
More informationPROJECT NATURE LOCATION
APPLICATION FOR RECTIFICATION IN TERMS OF SECTION 24G OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT (ACT NO. 107 OF 1998) FOR THE UNLAWFUL COMMENCEMENT OF VARIOUS LISTED ACTIVITIES FOR THE UNDERGROUND COAL
More informationEnviroLeg cc NATIONAL WATER Reg p 1
EnviroLeg cc NATIONAL WATER Reg p 1 GN. 704 GG20119 4 June 1999 NATIONAL WATER ACT, 1998 (ACT NO. 36 OF 1998) REGULATIONS ON USE OF WATER FOR MINING AND RELATED ACTIVITIES AIMED AT THE PROTECTION OF WATER
More informationBACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT JULY 2015
Introduction EOH Coastal & Environmental Services has been appointed by K2014173145 (South Africa) (Pty) Ltd (Reg No. 2014/173145/07), to undertake the Public Participation Process and associated Basic
More informationENVIRONMENT INDUCTION. Section 5
ENVIRONMENT INDUCTION Section 5 1 Overview Environmental Legal Obligations Environment Policy Environmental Commitment InSitu Recovery (ISR) Mining Low Environmental Impact Monitoring and Reporting Environmental
More informationPROPOSED CONSTRUCTION OF A SEWAGE TREATMENT PLANT AT CAPE POINT, TABLE MOUNTAIN NATIONAL PARK
PROPOSED CONSTRUCTION OF A SEWAGE TREATMENT PLANT AT CAPE POINT, TABLE MOUNTAIN NATIONAL PARK SCOPING REPORT EXECUTIVE SUMMARY 1 INTRODUCTION SANParks proposes, as a key element of a wider infrastructure
More informationTechnical Guidance 9. Guidance on Preparing Nitrogen Management Plans for Mines using Ammonium Nitrate Fuel Oil Products for Blasting
Technical Guidance 9 Environmental Management Act Guidance on Preparing Nitrogen Management Plans for Mines using Ammonium Nitrate Fuel Oil Products for Blasting Version 1.0 Environmental Protection Division
More informationBACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE
BACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE 1. INTRODUCTION The Saldanha Bay Industrial Development Zone (IDZ) is located
More information2010 EIA Regulations GNR 543 of 18 June 2010, effective 2 August 2010
2010 EIA Regulations GNR 543 of 18 June 2010, effective 2 August 2010 CH 1 INTERPRETATION AND PURPOSE OF THESE REGULATIONS S 1 Interpretation; S 2 Purpose of Regulations CH 2 COMPETENT AUTHORITY S3 Who;
More informationAPPENDIX 3.6 MINUTES OF STAKEHOLDER MEETINGS
APPENDIX 3.6 MINUTES OF STAKEHOLDER MEETINGS I&J Focus Group Meeting: 12 January 2018 IRVIN AND JOHNSON LTD NOTES OF FOCUS GROUP MEETING Date 12 January 2018 Venue: Project: Environmental Consultants:
More informationARTICLE 6 EXCAVATION OF MINERAL MATERIALS
ARTICLE 6 EXCAVATION OF MINERAL MATERIALS SECTION 1. PURPOSE All excavations, extraction of materials and minerals, open pits and impounding of waters hereafter established or enlarged shall conform to
More informationLivezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani DESCRIPTION OF
More informationIAIAsa August 2014 Betty Mdala Department of Environmental Affairs
D R A F T S TA N D A R D F O R T H E S T O R A G E O R S T O R A G E A N D H A N D L I N G O F D A N G E R O U S G O O D S A N D I D E N T I F I C AT I O N O F A C T I V I T I E S W H I C H M AY C O M
More informationOperating and Reclamation Plan
Operating and Reclamation Plan For sites in sensitive locations, additional information may be required. If more space is needed, attach additional sheets or use the blank sheet provided at the end of
More informationREASSESSMENT OF THE FINANCIAL PROVISION FOR BLOEMHOF QUARRY, PARYS, FREE STATE PROVINCE
REASSESSMENT OF THE FINANCIAL PROVISION FOR BLOEMHOF QUARRY, PARYS, FREE STATE PROVINCE REFERENCE NUMBER: FS 30/5/1/2/2/10045 MR JULY 2018 PREPARED FOR: Inzalo Crushing and Screening (Pty) Ltd Contact
More informationAPPLICATION FOR THE ESTABLISHMENT OF A BORROW PIT ON POGELA FARM NEAR HEATONVILLE, KWAZULU-NATAL DRAFT ENVIRONMENTAL MANAGMENT PROGRAMME
APPLICATION FOR THE ESTABLISHMENT OF A BORROW PIT ON POGELA FARM NEAR HEATONVILLE, KWAZULU-NATAL DRAFT ENVIRONMENTAL MANAGMENT PROGRAMME Prepared for: Prepared by: John Readman ACER (Africa) Environmental
More informationNOVEMBER 2016 REVISION 0. Prepared by: JG AFRIKA (PTY) LTD
DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT & ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT: PROPOSED ESTABLISHMENT OF A STAGED MOBILE CRUSHING PLANT WITHIN THE CURRENT FOOTPRINT OF THE AMASUNDU GRAVEL CC
More informationProposed Acetylene Gas Production Facility
Proposed Acetylene Gas Production Facility Environmental Impact Assessment Public Meeting 24 July 2014 Agenda Introduction 5 minutes Project Description 15 minutes EIA Findings and Mitigation 10 minutes
More informationVLAKVARKFONTEIN COAL MINE
VLAKVARKFONTEIN COAL MINE PURPOSE OF THIS DOCUMENT: This Background Information Document (BID) provides you, as an Interested and Affected Party (I&AP), an overview of the proposed project. The BID invites
More informationPOLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP)
Established 1907 POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP) DATE: JULY 2018 Version Date Section Modified 1 July 2018 All Reason for Modification Original Management Plan Review Team MCC Environmental,
More informationPublic Participation Process for the Proposed
Appendix I. Public Participation Process for the Proposed Tongaat Sand Mine on Portion 164 (of 6) of the Farm Lot 49 No. 862 A Report for the BA Process August 2018 Contents Appendix I.... 1 1. Evidence
More information4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION
4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION This section provides an overview of legislation, guidelines and information documents that have informed the scope and content of this report and the approach
More informationBase Metal and Iron Ore Mining
Multilateral Investment Guarantee Agency Environmental Guidelines for Base Metal and Iron Ore Mining Industry Description and Practices This document addresses the mining of base metal ores (copper, lead
More informationNotice of Availability of the Draft Environmental Impact Statement for the Mount
This document is scheduled to be published in the Federal Register on 12/02/2011 and available online at http://federalregister.gov/a/2011-30926, and on FDsys.gov 4310-HC DEPARTMENT OF THE INTERIOR Bureau
More informationethekwini Environment al Health Department.
E12.2 Response to Comments received on DRAFT BAR Licensing of existing waste facilities within the South African National Blood Service (SANBS) Pinetown Campus, Pinetown, Durban, KwaZulu-Natal Department
More informationGlass Bottle Manufacturing Plant
Glass Bottle Manufacturing Plant proposed by SAB and partners SCOPING AND EIA Public Information Sharing Meeting 20 June 2018 1 1 Agenda 1.Welcome and introductions 2. Purpose of the meeting 3.Background
More informationLIFE Project Number LIFE03 ENV/GR/ Layman s Report
LIFE Project Number LIFE03 ENV/GR/000213 LIFE PROJECT NAME Rehabilitation of abandoned bauxite surface mines using alumina red mud as filler (REFILL) Reporting Date 30-11-2006 The large open pit areas
More informationEnvironmental Management Plan
(Operational Sites) 1 P a g e A. Introduction An is a written document with the purpose to provide mitigation measures and principles for the management of sites in order to reduce potential impacts to
More information3 EIA PROCESS AND METHODOLOGY
3 EIA PROCESS AND METHODOLOGY 3.1 Introduction The Environmental Impact Assessment (EIA) and Waste Licence Application process for the proposed Majuba Continuous Ashing project is comprised of two main
More informationThe following structures will be required:
2.3.1 Central Discard Dump Introduction The current discard dump does not have sufficient capacity to accommodate the discard produced from the proposed future operations. A new Discard Dump, called the
More informationBRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE
JUNE 2017 ENVIRONMENTAL IMPACT ASSESSMENT PROCESS CONSTRUCTION OF THE PROPOSED BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE NORTHERN CAPE BACKGROUND INFORMATION DOCUMENT A commercial
More informationBACKGROUND INFORMATION DOCUMENT
BACKGROUND INFORMATION DOCUMENT ENVIRONMENTAL AUTHORISATIONS FOR THE PROPOSED KLIPSPRUIT EXTENSION: WELTEVREDEN PROJECT Project Number Prepared for BHP Billiton Energy Coal South Africa (Pty) Limited (BECSA)
More informationBACKGROUND INFORMATION DOCUMENT
APPLICATION FOR RECTIFICATION APPLICATION FOR RECTIFICATION IN TERMS OF SECTION 24G OF NEMA FOR THE UNLAWFUL COMMENCEMENT AND / OR CONTINUATION OF LISTED ACTIVITIES ON THE FARM EKANGALA 610JR, GAUTENG.
More informationESKOM HOLDINGS SOC LIMITED: WATER USE LICENCE APPLICATION AT THE MEDUPI AND MATIMBA POWER STATIONS, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE
11 May 2018 1791642 Interested and Affected Parties ESKOM HOLDINGS SOC LIMITED: WATER USE LICENCE APPLICATION AT THE MEDUPI AND MATIMBA POWER STATIONS, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE Dear
More informationINITIAL PUBLIC MEETING
B3 INITIAL PUBLIC MEETING A public meeting were held at Hoedjiesbaai Hotel, Saldanha Bay 16 February 2016 to present the proposed Project and solicit input from stakeholders into the scoping process. B3.1
More informationPUBLIC MEETING B3.1 ATTENDANCE REGISTERS. A record of attendance from the provided in the following pages.
B3 PUBLIC MEETING A public meeting were held at Hoedjiesbaai Hotel, Saldanha Bay 16 February 2016 to present the proposed Project and solicit input from stakeholders into the scoping process. B3.1 ATTENDANCE
More informationKendal /Kusile to Zeus Environmental Monitoring Report
MONTHLY ENVIRONMENTAL MONITORING REPORT Power Lines from Kendal/Kusile to Zeus Substation Bravo Integration Project Bravo 4: Construction of two 400 kv lines DEA Ref # 12/12/20/1095 Report Prepared for:
More informationDraft Amendment Application Report, Agni Steels SA February 2011 Executive Summary EXECUTIVE SUMMARY
EXECUTIVE SUMMARY PROJECT BACKGROUND AND DESCRIPTION On the 16 February 2009, Agni Steels SA (Pty) Ltd (formerly Afro Asia Steels), was issued an Environmental Authorisation for the construction and operation
More informationAnnex D5. Public Meeting Minutes
Annex D5 Public Meeting Minutes Subject/Ref Venue De Beers Consolidated Mines Ltd (DCBM) Waste Management of All Waste Streams for the Existing Venetia Mine, Limpopo Province Musina Community Hall, Musina,
More informationWellhead Protection Issues Related to Mining Activities Minnesota Rural Water Conference March 4, 2014
Wellhead Protection Issues Related to Mining Activities Minnesota Rural Water Conference March 4, 2014 Terry Bovee Source Water Protection Unit Minnesota Department of Health Purpose Response to requests
More informationHydrocarbon Management PROCEDURE
Hydrocarbon Management PROCEDURE Doc No: Approved: PRO-0380 Operations Manager Table of Contents 1. PURPOSE... 3 2. SCOPE... 3 3. REFERENCES... 3 3.1 LEGISLATION/STANDARDS... 3 4. DEFINITIONS... 3 5. HYDROCARBON
More informationAppendix 8. Petroleum Hydrocarbon Products, Ammonium Nitrate and Explosives Management Plan
Appendix 8 Petroleum Hydrocarbon Products, Ammonium Nitrate and Explosives Management Plan Petroleum Hydrocarbon Products, Ammonium Nitrate, and Explosives Management Plan This Petroleum Hydrocarbon Products,
More informationANGLO AMERICAN THERMAL COAL LANDAU COLLIERY
Landau Colliery DWA Quarterly Report No. 5 April to June 2013 ANGLO AMERICAN THERMAL COAL LANDAU COLLIERY Department of Water Affairs (DWA) Quarterly Report No. 2 1 st April 30 th June 2013 1 Table of
More informationCHINA AFRICA SUNLIGHT ENERGY COAL & METHANE GAS MINING EIA
CHINA AFRICA SUNLIGHT ENERGY COAL & METHANE GAS MINING EIA Environmental Guardians Services is a consultancy company that does the following; Environmental Impact Assessments (EIA) Safety, Health & Environmental
More informationPROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE
PROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE Background Information Document DEDEA Ref No s: EC 155/ORT/LN1&LN2/M/13 34 EC 157/ORT/LN1&LN3/M/13
More informationSECTION 24G ENVIRONMENTAL ASSESSMENT REPORT FOR THE TSHIPI BORWA MINE
Page i SECTION 24G ENVIRONMENTAL ASSESSMENT REPORT FOR THE TSHIPI BORWA MINE August 2017 SUBMITTED FOR ENVIRONMENTAL AUTHORISATION IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT (ACT 107 OF 1998)
More informationPROPOSED MOKOLO CROCODILE (WEST) WATER AUGMENTATION PROJECT PHASE 2
BACKGROUND INFORMATION DOCUMENT May 2016 PROPOSED MOKOLO CROCODILE (WEST) WATER AUGMENTATION PROJECT PHASE 2 Water Transfer Infrastructure & Bulk Power Supply Proponent Implementing Agent Engineering Team
More informationSISHEN IRON ORE COMPANY (PTY) LTD KOLOMELA MINE HEUNINGKRANZ PROJECT (MINING AND PROCESSING AT HEUNINGKRANZ) POSTMASBURG, NORTHERN CAPE
SISHEN IRON ORE COMPANY (PTY) LTD KOLOMELA MINE HEUNINGKRANZ PROJECT (MINING AND PROCESSING AT HEUNINGKRANZ) POSTMASBURG, NORTHERN CAPE ENVIRONMENTAL IMPACT ASSESSMENT & ENVIRONMENTAL MANAGEMENT PROGRAMME
More informationWed 2015/04/22 10:00 AM Wed 2015/04/22 12:00 PM Tentative
Novashni Moodley Subject: Location: Start: End: Show Time As: Recurrence: Meeting Status: Organizer: Required Attendees: Invitation to the SWWTW EIA and WML Focus Group Meeting (EIA Phase) SWWTW Boardroom
More informationSite EMP Kit- Guidance Notes
Site EMP Kit- Guidance Notes Introduction This Guide has been designed to assist applicants to understand council s requirements for Site Environmental Management Plans (Site EMP s) for subdivisions. The
More informationSTORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No
STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents Site Description A description of construction activity. The proposed sequence for major activities. Estimates of the total
More informationFigure 4. The proposed location of the Zalu Dam a) basin and b) wall.
A B Figure 4. The proposed location of the Zalu Dam a) basin and b) wall. Figure 5. Detailed layout of the proposed Zalu Dam (Source: Feasibility Study for the Augmentation of the Lusikisiki Regional Water
More informationAT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017.
Cairns Shipping Development Project Revised Draft Environmental Impact Statement Fact Sheet July 2017 AT A GLANCE > An additional 70 cruise ships into Port of Cairns each year by 2031 > Project design
More information1 INTRODUCTION 1.1 PROJECT BACKGROUND
1 INTRODUCTION 1.1 PROJECT BACKGROUND The International Power Consortium South Africa (IPCSA) has developed a solution to Saldanha Steel s requirement for stable, economical electricity over the long term.
More informationleft over, or an unwanted by-product, from an industrial, commercial, domestic or other activity; or
14. Waste Management 14.1. Waste Management Regulations The regulatory requirements governing waste management are provided within the EP Act, the EPR and associated Environmental Protection (Waste Management)
More informationEnvironmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review
Environmental Management Plan Introduction This Environmental Management Plan (EMP) has been prepared for SEF Energy Co. Ltd. for the purpose of providing a stand-alone plan for managing the potential
More informationENVIRONMENTAL IMPACT ASSESSMENT FOR THE
OSHO Cement (Pty) Ltd ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF A CEMENT GRINDING FACILITY ON A SITE LOCATED WITHIN THE COEGA INDUSTRIAL DEVELOPMENT ZONE, PORT ELIZABETH Environmental
More informationAssessing the nitrogen losses from late season application of liquid dairy manure
R&TT College d'alfred ONTARIO FEDERATION OF AGRICULTURE Assessing the nitrogen losses from late season application of liquid dairy manure INTERIM REPORT January 1997 ONTARIO MINISTRY OF AGRICULTURE, FOOD
More informationAn introduction to and overview of Shangoni s Approach By Nico Brits
Water Conservation and Demand Management Strategy An introduction to and overview of Shangoni s Approach By Nico Brits Overview Background Introduction to WC/WDM Guidelines Advantages of WC/WDM Plan WC/WDM
More informationAM-PR-003 Construction Environmental Management Plan (C-EMP)
OMS Procedure AM-PR-003 Construction Environmental Management Plan (C-EMP) Revision: 1 Prepared by: Shannon Holroyd Authorised by: Marcus Manning Authorisation Date: 18th May 2015 This document has been
More informationAPRIL 2015 CONTINGENCY PLANS
APRIL 2015 CONTINGENCY PLANS Prepared by: TERRATEST (PTY) LTD PO Box 794 HILTON Postal code 3245 Telephone:0333436789 Email:terratest@terratest.co.za Project director: Simon Johnson TABLE OF CONTENTS 1
More informationDuvha Power Station. Fugitive Emission Management Plan. March 2015
Duvha Power Station Fugitive Emission Management Plan March 2015 1 INTRODUCTION Most releases into the atmosphere from power stations are from tall stacks. These stacks aid in the dispersion of pollutants
More informationBACKGROUND INFORMATION DOCUMENT FOR A PROPOSED SEWER IN GROOT DRAKENSTEIN, WESTERN CAPE
Purpose of this Document The purpose of this Background Information Document (BID) is to provide Interested and Affected Parties (I&APs) with background information about the proposed project and to introduce
More informationBy Paul Robinson Research Director Southwest Research and Information Center PO Box 4524 Albuquerque, NM
Fact Sheet Concerning Sources of Groundwater Contamination at the Technical Area Five (TA-V), the Tijeras Arroyo Groundwater (TAG) and the Burn Site Areas of Concern at Sandia National Laboratories By
More informationEnvironmental Working Group. Monthly Report
Monthly Report July 2012 ENVIRONMENTAL WORKING GROUP Relationship Organizational Chart Weekly (EWG) and EWG/Kiewit Alarie, a Partnership (KAP) meetings. The EWG review its Action Items that include priority
More informationMAPPING & SOLUTIONS GUIDE. RIIENV201D Identify and assess environmental and heritage concerns
MAPPING & SOLUTIONS GUIDE RIIENV201D Identify and assess environmental and heritage concerns RIIENV201D - Identify and assess environmental and heritage concerns Mapping This Learning Guide covers the
More informationEnvironmental Working Group. Monthly Report
Monthly Report June 2012 ENVIRONMENTAL WORKING GROUP Relationship Organizational Chart Weekly (EWG) and EWG/Kiewit Alarie, a Partnership (KAP) meetings. The EWG review its Action Items that include priority
More informationMINUTES OF PUBLIC MEETING: EIA/EMP PHASE
MINUTES OF PUBLIC MEETING: EIA/EMP PHASE APPLICANT: Mmakau Mining (Pty) Ltd PROJECT: Schurvekop Coal Mine PROJECT AREA: Farm Schurvekop 227 IS, Bethal, Mpumalanga REF. #: MP30/5/1/2/2/10160MR 7 September
More informationMagino Project Environmental Impact Statement. Technical Support Document Water Management Plan
EIS Techni cal Support Document 20-12 Magino Project Environmental Impact Statement Technical Support Document 20-12 Rev. No. Revision Date Approved 0 Document issued for EIS Table of Contents SECTION
More informationBASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT
BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT SUBMITTED FOR ENVIRONMENTAL AUTHOIZATIONS IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998 AND THE NATIONAL ENVIRONMENTAL
More informationBasic Assessment and Environmental Management Programme Helam Mining Page 1
BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT NAME OF APPLICANT: Helam Mining (Pty) Ltd TEL NO: +27 11 702 6922 FAX NO: + 27 11 706 3071 POSTAL ADDRESS: Post Office Box 71007, Bryanston,
More informationENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA DEA Reference Number: 12/12/20/2175 BACKGROUND INFORMATION
More informationCOMMENT AND RESPONSE REPORT (CRR) VERSION 2
APPLICATION FOR ENVIRONMENTAL AUTHORISATION, AN AMENDMENT OF AN ENVIRONMENTAL MANAGEMENT PROGRAMME AND AN INTEGRATED WATER USE LICENCE APPLICATION ON BEHALF OF BHP BILLITON ENERGY COAL SOUTH AFRICA (PTY)
More informationLodestone Namibia (Pty) Ltd. Magnetite Mining Prospect near Dordabis: EPL 3112 PLAN OF STUDY FOR ENVIRONMENTAL IMPACT ASSESSMENT CONTENTS
Colin Christian & Associates CC Environmental Consultant 3 Gordon Day St PO Box 81182 Olympia Windhoek Namibia Lodestone Namibia (Pty) Ltd Tel: 061 302296 Fax: 061-302297 Cellphone: 081 1490037 Email:
More informationNeptune Cargill Overpass Extension
Project Environmental Review UPDATE November 23, 2017 Northshore Waterfront Liaison Committee Teck Agenda Project Objectives Project Description Project Discussion VFPA PER process Project Review Status
More informationCity of Guelph Transfer of Review Procedures 7 March, 2017
Step 1-Determine where the project is located on the City of Guelph Vulnerability Map If the project is found not to be located in a vulnerability area with a vulnerability score of 8 or higher (See Attachment
More informationInformation Session 31 May 2014, 10:00, Graceland Church, Thabazimbi
Aquila Steel (S Africa) (Pty) Ltd Information Session 31 May 2014, 10:00, Graceland Church, Thabazimbi AGENDA Welcome and introduction Purpose of this information session Information session protocol Environmental
More informationWellhead Protection Issues Related to Mining Activities Minnesota Department of Health August 2009
SN' source water protection Wellhead Protection Issues Related to Mining Activities Minnesota Department of Health August 2009 Purpose - This document has been drafted in response to requests from local
More informationWesizwe Platinum Limited
Facts about the Bakubung Mine Project The Bakubung Platinum Mine is located on the Western Limb of the Bushveld Igneous Complex, north of the City of Rustenburg and near to the community of Ledig. The
More informationCIRCULAR NO. DG-1. Instructions for the Safe Handling of Cars Loaded with Dangerous Goods Delayed in Transit on Railway Property
CIRCULAR NO. DG-1 Instructions for the Safe Handling of Cars Loaded with Dangerous Goods Delayed in Transit on Railway Property Effective: June 30, 2005 Note: This update of the RAC Circular DG-1 is based
More informationEnvironmental Management Plan (EMP)
SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit
More information