Anglo American Platinum; Mogalakwena Mine: Explosive Depot Expansion

Size: px
Start display at page:

Download "Anglo American Platinum; Mogalakwena Mine: Explosive Depot Expansion"

Transcription

1 Anglo American Platinum; Mogalakwena Mine: Explosive Depot Expansion Consultation with the council of Induna Chaba and Mapela T/A 19 January 2016, 14:30

2 AGENDA Welcome and introduction. Meeting protocol. Purpose of the meeting. Project background. Project location. Project description. 2

3 AGENDA CONTINUED Storage capacity. Summary of environmental impacts. Alternatives. Regulatory process followed. Regulatory process going forward. Questions / Comments. 3

4 WELCOME AND INTRODUCTION Introduction of parties involved in the project. Anglo American Platinum: Mogalakwena Mine Shangoni Management Services 4

5 MEETING PROTOCOL Please sign the attendance register. Please feel free to ask questions. Please ask questions that are specific to the expansion of explosives depot project. 5

6 PURPOSE OF THE MEETING To present background information on the project to Mapela T/A and to provide an opportunity for questions and comments relating to the project. This meeting forms part of the public participation process, and will be structured in the format of a Public Participation / Consultation Meeting. All concerns/comments will be recorded and included within a Public Participation Report that will be submitted to the DMR along with the project s Basic Assessment Report 6

7 PROJECT BACKGROUND Applicant: Anglo American Platinum Mogalakwena Mine Project Name Explosives Depot Expansion Project Location Farm Overysel 815 LR, Limpopo Province 7

8 PROJECT LOCALITY MAP 8

9 PROJECT LOCALITY CONTINUED 9

10 PROJECT DESCRIPTION Mogalakwena Mine is relocating its existing Explosives Magazine Storage will be kept below 80m 3 in total until further authorisation is obtained. The newly constructed Explosives Depot (which will consist of the Explosives Magazine (bunker area) as well as an Emulsion (BME and AEL) and ANPP Storage and Handling area will be expanded on the existing Waste Rock Dump (WRD) No.2, which is located within the existing mine boundary area for which Mogalakwena Mine has a Mining Right and approved EMP 10

11 PROJECT DESCRIPTION Activity applied for: Listing Notice 1: GNR 983 of 2014 Activity 51: The expansion of facilities for the storage, or storage and handling of a dangerous good, where the capacity of such storage facility will be expanded by more than 80 cubic meres 11

12 PROJECT DESCRIPTION The Expansion of the Explosives Depot will include the following: 4x 200 tons (in total m 3 ) of BME emulsion silo s; BME bunded areas around BME silo s. Bunded area capacity of m 3 each (551.44m 3 in total for four BME bunded areas); 6x 40 tons (in total 99.73m 3 ) of AEL emulsion silo s; AEL bunded areas around AEL silo s. Bunded area capacity of 44.51m 3 each (267.06m 3 in total for six AEL bunded areas); 2x 50 tons (in total 41.55m 3 ) of Ammonium Nitrate Porous Prills (ANPP) emulsion silo s; 12

13 PROJECT DESCRIPTION CONTINUED ANPP bunded areas around ANPP silo s. Bunded area capacity of 55.86m 3 each (total m 3 in total for two ANPP bunded areas); Storage of explosives and accessories of more than 80 m 3 in the existing four Explosives Magazine containers. Accessory and equipment stores; Guard (security) houses and accompanying stores; and Water management measures, including pipelines, a L water tank for spills and cleaning purposes, a pump base and a pit collection sump. 13

14 SITE PLAN 14

15 SITE PLAN: 15

16 STORAGE CAPACITY The total capacity for the storage of explosives and emulsion is m 3 for the Emulsion Storage and Handling Section, and 228m 3 for the Magazine Section. Therefore the total combined capacity of the Explosives Depot storage areas will be m 3. 16

17 SUMMARY OF ENVIRONMENTAL IMPACTS No significant impacts were identified during the environmental impact assessment process. Medium rated environmental impacts identified however relate to the following: Potential for fire and/or explosion due to explosive material and substances being exposed to sparks or open flames. Water or wind erosion of topsoil during and after rehabilitation. Compaction of topsoil, affecting growth of vegetation during rehabilitation. 17

18 SUMMARY OF ENVIRONMENTAL IMPACTS Potential unsuccessful re-vegetation during rehabilitation due to shortage of nutrients, compaction and slope failure. Potential establishment of alien invasive plants. Potential light pollution and nuisance due to lighting at the Explosive Depot Potential wash down of sediments resulting in sedimentation or siltation 18

19 ALTERNATIVES ASSESSMENT Expansion of the site versus No-project Option 19

20 ALTERNATIVES ASSESSMENT 20

21 ALTERNATIVES ASSESSMENT 21

22 Basic Assessment process (90 days (excluding 15 Dec 05 Jan)) REGULATORY PROCESS FOLLOWED Application form Application date: October 2015 Draft BAR and EMPr Public review 20 Oct 20 Nov 2015 The I&APs were provided with the opportunity to review the draft BAR for 30 days. Meeting: Consultation with the council of Induna Chaba and Mapela T/A Viewing stations Mogalakwena Library Shangoni website ( za). Minutes: Compile and distribute minutes of the meeting. Notifications: 20 Oct 15 Registered post: 16 Oct 15 Newspaper advert: October 15 in Bosveld Newspaper.

23 Basic Assessment process (90 days (excluding 15 Dec 05 Jan)) REGULATORY PROCESS GOING FORWARD Public/community Consultation meeting Notifications to be done as per EIA regulations: . Registered post. Newspaper advert. Minutes: Compile and distribute minutes of the meeting. Draft BAR and EMPr Public Participation Report: Compilation of Public Participation report for inclusion as an annexure to the final BAR report. Final BAR and EMPr Submission due date: Due date: 05 February

24 QUESTIONS / COMMENTS 24

Annesley Andalusite Mine: Section 24G Rectification Process. Consultation with community members 15 June 2017

Annesley Andalusite Mine: Section 24G Rectification Process. Consultation with community members 15 June 2017 Annesley Andalusite Mine: Section 24G Rectification Process Consultation with community members 15 June 2017 AGENDA Welcome and introduction Meeting protocol Purpose of the meeting Project background Project

More information

GP 30/5/1/3/2/10242 MP

GP 30/5/1/3/2/10242 MP ! Before Dawn Property Developers (Pty) Ltd GP 30/5/1/3/2/10242 MP Background Information Document For the proposed mining permit On the farm Malony s Eye 169 IQ. Report Ref: 2017/BDPD0001 Prepared by:

More information

PROPOSED VOLSPRUIT MINE, MOKOPANE DISTRICT, LIMPOPO PROVINCE. Background Information Document (BID) ESCIENCE ASSOCIATES (PTY) LTD.

PROPOSED VOLSPRUIT MINE, MOKOPANE DISTRICT, LIMPOPO PROVINCE. Background Information Document (BID) ESCIENCE ASSOCIATES (PTY) LTD. ENVIRONMENTAL IMPACT ASSESSMENT (EIA), MINING RIGHT APPLICATION AND OTHER ANCILLARY LICENSING PROCESSES: PROPOSED PLATINUM GROUP METALS MINE & ASSOCIATED INFRASTRUCTURE PROPOSED VOLSPRUIT MINE, MOKOPANE

More information

NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE.

NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE. ENVIRONMENTAL AUTHORISATION AMENDMENT APPLICATION NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE. BACKGROUND

More information

BACKGROUND INFORMATION DOCUMENT:

BACKGROUND INFORMATION DOCUMENT: BACKGROUND INFORMATION DOCUMENT: APPLICATION FOR A MINING RIGHT MMAKAU COAL (PTY) LTD SCHURVEKOP 227 IS, BETHAL, MPUMALANGA 1. INTRODUCTION Mmakau Coal (Pty) Ltd intends to submit an application for a

More information

BASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION

BASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION BASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION DEDEA Ref: EC04/C/LN1/M/53-2014 BACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT: Return address for comments:

More information

ERM conducted the public participation process (PPP) as part of the EIA and EMPr Amendment for MP 30/5/1/2/2/133MR to include:

ERM conducted the public participation process (PPP) as part of the EIA and EMPr Amendment for MP 30/5/1/2/2/133MR to include: 6 PUBLIC PARTICIPATION PROCESS ERM conducted the public participation process (PPP) as part of the EIA and EMPr Amendment for MP 30/5/1/2/2/133MR to include: a new Central Discard Dump at the Maquasa East

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT Kingfisher Farms (Pty) Ltd SAND MINING APPLICATION Manor Grange Farm, Hibberdene (KwaZulu-Natal) BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION An application has been submitted to the Department

More information

BACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT

BACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT BACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT WASTE MANAGEMENT LICENCE APPLICATION FOR THE MANAGEMENT OF ALL WASTE STREAMS FOR THE OPEN PIT AND UNDERGROUND OPERATIONS AT VENETIA MINE, LIMPOPO

More information

Petra Diamonds (Finsch) Storm Water Management Plan Update. Project No: PET-FIN Shangoni Management Services (Pty) Ltd

Petra Diamonds (Finsch) Storm Water Management Plan Update. Project No: PET-FIN Shangoni Management Services (Pty) Ltd Petra Diamonds (Finsch) Storm Water Management Plan Update Project No: PET-FIN-13-08-06 STORM WATER MANAGEMENT PLAN UPDATE Petra Diamonds (Finsch) Storm Water Management Plan Update Project No: PET-FIN-13-08-06

More information

The PPP has been designed to achieve the following objectives: To ensure that stakeholders are well informed about the proposed development;

The PPP has been designed to achieve the following objectives: To ensure that stakeholders are well informed about the proposed development; 7 PUBLIC PARTICIPATION PROCESS 7.1 INTRODUCTION Consultation with Interested and Affected Parties (I&APs) forms an integral component of an ESIA process. It enables inter alia directly affected and neighbouring

More information

Annexure E.3. Comment Response Report. Proposed Expansion of Ash Disposal Facility at the Kriel PowerStation, Mpumalanga: Scoping Report

Annexure E.3. Comment Response Report. Proposed Expansion of Ash Disposal Facility at the Kriel PowerStation, Mpumalanga: Scoping Report Proposed Expansion of Ash Disposal Facility at the Kriel PowerStation, Mpumalanga: Scoping Report Annexure E.3 Comment Response Report Project 113084 / 11081File Kriel Ash Disposal Facility Scoping_2017

More information

BACKGROUND INFORMATION DOCUMENT SEPTEMBER 2014 MDEDET REF NUMBER: 17/2/3N-389

BACKGROUND INFORMATION DOCUMENT SEPTEMBER 2014 MDEDET REF NUMBER: 17/2/3N-389 ENVIRONMENTAL AUTHORISATION PROCESS AND APPLICATION FOR REQUIRED LICENCES FOR THE PHOLA COAL PROCESSING PLANT, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE BACKGROUND INFORMATION DOCUMENT SEPTEMBER

More information

IMPORTANT NOTICE. Kindly note that:

IMPORTANT NOTICE. Kindly note that: 1 APPLICATION FORM FOR ENVIRONMENTAL AUTHORISATIONS IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998 AND THE NATIONAL ENVIRONMENTAL MANAGEMENT WASTE ACT, 2008 IN RESPECT OF LISTED ACTIVITIES

More information

INTRODUCTION PROJECT DESCRIPTION

INTRODUCTION PROJECT DESCRIPTION JOE GQABI DISTRICT MUNICIPALITY DROUGHT RELIEF PROGRAMME PROPOSED LADY GREY BULK WATER SUPPLY PROJECTS, LADY GREY, SENQU MUNICIPALITY, EASTERN CAPE EIA BACKGROUND INFORMATION DOCUMENT INTRODUCTION Joe

More information

Cape Environmental Assessment Practitioners(Pty) Ltd

Cape Environmental Assessment Practitioners(Pty) Ltd Cape Environmental Assessment Practitioners(Pty) Ltd Reg. No. 2008/004627/07 Telephone: (044) 874 0365 Facsimile: (044) 874 0432 17 Progress Street, George Web: www.cape-eaprac.co.za PO Box 2070, George,

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION DOCUMENT PROPOSED CONSTRUCTION OF 400/132KV MARANG B SUBSTATION AND ±2KM, 400kv POWER LINE LOOPING IN AND OUT FROM THE BIGHORN-MARANG OR MEDUPI MARANG 400KV POWERLINES WITHIN RUSTENBURG

More information

NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS 11 August 2017 Dear Stakeholder ENVIRONMENTAL IMPACT ASSESSMENT AND PUBLIC PARTICIPATION PROCESS DEVELOPMENT OF THE RICHARDS BAY COMBINED CYCLE POWER PLANT (CCPP) AND ASSOCIATED INFRASTRUCTURE ON A SITE

More information

FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Agricultural Expansion on Portion 2 of Farm 92, Tregaron, known as Sylvania, Sundays River Valley Municipality BACKGROUND INFORMATION DOCUMENT,

More information

HARDROCK PROJECT CONCEPTUAL EXPLOSIVES AND BLASTING MANAGEMENT PLAN

HARDROCK PROJECT CONCEPTUAL EXPLOSIVES AND BLASTING MANAGEMENT PLAN HARDROCK PROJECT CONCEPTUAL EXPLOSIVES AND BLASTING MANAGEMENT PLAN April 2017 Greenstone Gold Mines GP Inc. 365 Bay Street, Suite 500 Toronto, Ontario M5H 2V1 Table of Contents 1.0 Introduction and Environmental

More information

PROJECT NATURE LOCATION

PROJECT NATURE LOCATION APPLICATION FOR RECTIFICATION IN TERMS OF SECTION 24G OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT (ACT NO. 107 OF 1998) FOR THE UNLAWFUL COMMENCEMENT OF VARIOUS LISTED ACTIVITIES FOR THE UNDERGROUND COAL

More information

EnviroLeg cc NATIONAL WATER Reg p 1

EnviroLeg cc NATIONAL WATER Reg p 1 EnviroLeg cc NATIONAL WATER Reg p 1 GN. 704 GG20119 4 June 1999 NATIONAL WATER ACT, 1998 (ACT NO. 36 OF 1998) REGULATIONS ON USE OF WATER FOR MINING AND RELATED ACTIVITIES AIMED AT THE PROTECTION OF WATER

More information

BACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT JULY 2015

BACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT JULY 2015 Introduction EOH Coastal & Environmental Services has been appointed by K2014173145 (South Africa) (Pty) Ltd (Reg No. 2014/173145/07), to undertake the Public Participation Process and associated Basic

More information

ENVIRONMENT INDUCTION. Section 5

ENVIRONMENT INDUCTION. Section 5 ENVIRONMENT INDUCTION Section 5 1 Overview Environmental Legal Obligations Environment Policy Environmental Commitment InSitu Recovery (ISR) Mining Low Environmental Impact Monitoring and Reporting Environmental

More information

PROPOSED CONSTRUCTION OF A SEWAGE TREATMENT PLANT AT CAPE POINT, TABLE MOUNTAIN NATIONAL PARK

PROPOSED CONSTRUCTION OF A SEWAGE TREATMENT PLANT AT CAPE POINT, TABLE MOUNTAIN NATIONAL PARK PROPOSED CONSTRUCTION OF A SEWAGE TREATMENT PLANT AT CAPE POINT, TABLE MOUNTAIN NATIONAL PARK SCOPING REPORT EXECUTIVE SUMMARY 1 INTRODUCTION SANParks proposes, as a key element of a wider infrastructure

More information

Technical Guidance 9. Guidance on Preparing Nitrogen Management Plans for Mines using Ammonium Nitrate Fuel Oil Products for Blasting

Technical Guidance 9. Guidance on Preparing Nitrogen Management Plans for Mines using Ammonium Nitrate Fuel Oil Products for Blasting Technical Guidance 9 Environmental Management Act Guidance on Preparing Nitrogen Management Plans for Mines using Ammonium Nitrate Fuel Oil Products for Blasting Version 1.0 Environmental Protection Division

More information

BACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE

BACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE BACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE 1. INTRODUCTION The Saldanha Bay Industrial Development Zone (IDZ) is located

More information

2010 EIA Regulations GNR 543 of 18 June 2010, effective 2 August 2010

2010 EIA Regulations GNR 543 of 18 June 2010, effective 2 August 2010 2010 EIA Regulations GNR 543 of 18 June 2010, effective 2 August 2010 CH 1 INTERPRETATION AND PURPOSE OF THESE REGULATIONS S 1 Interpretation; S 2 Purpose of Regulations CH 2 COMPETENT AUTHORITY S3 Who;

More information

APPENDIX 3.6 MINUTES OF STAKEHOLDER MEETINGS

APPENDIX 3.6 MINUTES OF STAKEHOLDER MEETINGS APPENDIX 3.6 MINUTES OF STAKEHOLDER MEETINGS I&J Focus Group Meeting: 12 January 2018 IRVIN AND JOHNSON LTD NOTES OF FOCUS GROUP MEETING Date 12 January 2018 Venue: Project: Environmental Consultants:

More information

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS ARTICLE 6 EXCAVATION OF MINERAL MATERIALS SECTION 1. PURPOSE All excavations, extraction of materials and minerals, open pits and impounding of waters hereafter established or enlarged shall conform to

More information

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani DESCRIPTION OF

More information

IAIAsa August 2014 Betty Mdala Department of Environmental Affairs

IAIAsa August 2014 Betty Mdala Department of Environmental Affairs D R A F T S TA N D A R D F O R T H E S T O R A G E O R S T O R A G E A N D H A N D L I N G O F D A N G E R O U S G O O D S A N D I D E N T I F I C AT I O N O F A C T I V I T I E S W H I C H M AY C O M

More information

Operating and Reclamation Plan

Operating and Reclamation Plan Operating and Reclamation Plan For sites in sensitive locations, additional information may be required. If more space is needed, attach additional sheets or use the blank sheet provided at the end of

More information

REASSESSMENT OF THE FINANCIAL PROVISION FOR BLOEMHOF QUARRY, PARYS, FREE STATE PROVINCE

REASSESSMENT OF THE FINANCIAL PROVISION FOR BLOEMHOF QUARRY, PARYS, FREE STATE PROVINCE REASSESSMENT OF THE FINANCIAL PROVISION FOR BLOEMHOF QUARRY, PARYS, FREE STATE PROVINCE REFERENCE NUMBER: FS 30/5/1/2/2/10045 MR JULY 2018 PREPARED FOR: Inzalo Crushing and Screening (Pty) Ltd Contact

More information

APPLICATION FOR THE ESTABLISHMENT OF A BORROW PIT ON POGELA FARM NEAR HEATONVILLE, KWAZULU-NATAL DRAFT ENVIRONMENTAL MANAGMENT PROGRAMME

APPLICATION FOR THE ESTABLISHMENT OF A BORROW PIT ON POGELA FARM NEAR HEATONVILLE, KWAZULU-NATAL DRAFT ENVIRONMENTAL MANAGMENT PROGRAMME APPLICATION FOR THE ESTABLISHMENT OF A BORROW PIT ON POGELA FARM NEAR HEATONVILLE, KWAZULU-NATAL DRAFT ENVIRONMENTAL MANAGMENT PROGRAMME Prepared for: Prepared by: John Readman ACER (Africa) Environmental

More information

NOVEMBER 2016 REVISION 0. Prepared by: JG AFRIKA (PTY) LTD

NOVEMBER 2016 REVISION 0. Prepared by: JG AFRIKA (PTY) LTD DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT & ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT: PROPOSED ESTABLISHMENT OF A STAGED MOBILE CRUSHING PLANT WITHIN THE CURRENT FOOTPRINT OF THE AMASUNDU GRAVEL CC

More information

Proposed Acetylene Gas Production Facility

Proposed Acetylene Gas Production Facility Proposed Acetylene Gas Production Facility Environmental Impact Assessment Public Meeting 24 July 2014 Agenda Introduction 5 minutes Project Description 15 minutes EIA Findings and Mitigation 10 minutes

More information

VLAKVARKFONTEIN COAL MINE

VLAKVARKFONTEIN COAL MINE VLAKVARKFONTEIN COAL MINE PURPOSE OF THIS DOCUMENT: This Background Information Document (BID) provides you, as an Interested and Affected Party (I&AP), an overview of the proposed project. The BID invites

More information

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP)

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP) Established 1907 POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP) DATE: JULY 2018 Version Date Section Modified 1 July 2018 All Reason for Modification Original Management Plan Review Team MCC Environmental,

More information

Public Participation Process for the Proposed

Public Participation Process for the Proposed Appendix I. Public Participation Process for the Proposed Tongaat Sand Mine on Portion 164 (of 6) of the Farm Lot 49 No. 862 A Report for the BA Process August 2018 Contents Appendix I.... 1 1. Evidence

More information

4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION

4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION 4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION This section provides an overview of legislation, guidelines and information documents that have informed the scope and content of this report and the approach

More information

Base Metal and Iron Ore Mining

Base Metal and Iron Ore Mining Multilateral Investment Guarantee Agency Environmental Guidelines for Base Metal and Iron Ore Mining Industry Description and Practices This document addresses the mining of base metal ores (copper, lead

More information

Notice of Availability of the Draft Environmental Impact Statement for the Mount

Notice of Availability of the Draft Environmental Impact Statement for the Mount This document is scheduled to be published in the Federal Register on 12/02/2011 and available online at http://federalregister.gov/a/2011-30926, and on FDsys.gov 4310-HC DEPARTMENT OF THE INTERIOR Bureau

More information

ethekwini Environment al Health Department.

ethekwini Environment al Health Department. E12.2 Response to Comments received on DRAFT BAR Licensing of existing waste facilities within the South African National Blood Service (SANBS) Pinetown Campus, Pinetown, Durban, KwaZulu-Natal Department

More information

Glass Bottle Manufacturing Plant

Glass Bottle Manufacturing Plant Glass Bottle Manufacturing Plant proposed by SAB and partners SCOPING AND EIA Public Information Sharing Meeting 20 June 2018 1 1 Agenda 1.Welcome and introductions 2. Purpose of the meeting 3.Background

More information

LIFE Project Number LIFE03 ENV/GR/ Layman s Report

LIFE Project Number LIFE03 ENV/GR/ Layman s Report LIFE Project Number LIFE03 ENV/GR/000213 LIFE PROJECT NAME Rehabilitation of abandoned bauxite surface mines using alumina red mud as filler (REFILL) Reporting Date 30-11-2006 The large open pit areas

More information

Environmental Management Plan

Environmental Management Plan (Operational Sites) 1 P a g e A. Introduction An is a written document with the purpose to provide mitigation measures and principles for the management of sites in order to reduce potential impacts to

More information

3 EIA PROCESS AND METHODOLOGY

3 EIA PROCESS AND METHODOLOGY 3 EIA PROCESS AND METHODOLOGY 3.1 Introduction The Environmental Impact Assessment (EIA) and Waste Licence Application process for the proposed Majuba Continuous Ashing project is comprised of two main

More information

The following structures will be required:

The following structures will be required: 2.3.1 Central Discard Dump Introduction The current discard dump does not have sufficient capacity to accommodate the discard produced from the proposed future operations. A new Discard Dump, called the

More information

BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE

BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE JUNE 2017 ENVIRONMENTAL IMPACT ASSESSMENT PROCESS CONSTRUCTION OF THE PROPOSED BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE NORTHERN CAPE BACKGROUND INFORMATION DOCUMENT A commercial

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION DOCUMENT ENVIRONMENTAL AUTHORISATIONS FOR THE PROPOSED KLIPSPRUIT EXTENSION: WELTEVREDEN PROJECT Project Number Prepared for BHP Billiton Energy Coal South Africa (Pty) Limited (BECSA)

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT APPLICATION FOR RECTIFICATION APPLICATION FOR RECTIFICATION IN TERMS OF SECTION 24G OF NEMA FOR THE UNLAWFUL COMMENCEMENT AND / OR CONTINUATION OF LISTED ACTIVITIES ON THE FARM EKANGALA 610JR, GAUTENG.

More information

ESKOM HOLDINGS SOC LIMITED: WATER USE LICENCE APPLICATION AT THE MEDUPI AND MATIMBA POWER STATIONS, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE

ESKOM HOLDINGS SOC LIMITED: WATER USE LICENCE APPLICATION AT THE MEDUPI AND MATIMBA POWER STATIONS, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE 11 May 2018 1791642 Interested and Affected Parties ESKOM HOLDINGS SOC LIMITED: WATER USE LICENCE APPLICATION AT THE MEDUPI AND MATIMBA POWER STATIONS, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE Dear

More information

INITIAL PUBLIC MEETING

INITIAL PUBLIC MEETING B3 INITIAL PUBLIC MEETING A public meeting were held at Hoedjiesbaai Hotel, Saldanha Bay 16 February 2016 to present the proposed Project and solicit input from stakeholders into the scoping process. B3.1

More information

PUBLIC MEETING B3.1 ATTENDANCE REGISTERS. A record of attendance from the provided in the following pages.

PUBLIC MEETING B3.1 ATTENDANCE REGISTERS. A record of attendance from the provided in the following pages. B3 PUBLIC MEETING A public meeting were held at Hoedjiesbaai Hotel, Saldanha Bay 16 February 2016 to present the proposed Project and solicit input from stakeholders into the scoping process. B3.1 ATTENDANCE

More information

Kendal /Kusile to Zeus Environmental Monitoring Report

Kendal /Kusile to Zeus Environmental Monitoring Report MONTHLY ENVIRONMENTAL MONITORING REPORT Power Lines from Kendal/Kusile to Zeus Substation Bravo Integration Project Bravo 4: Construction of two 400 kv lines DEA Ref # 12/12/20/1095 Report Prepared for:

More information

Draft Amendment Application Report, Agni Steels SA February 2011 Executive Summary EXECUTIVE SUMMARY

Draft Amendment Application Report, Agni Steels SA February 2011 Executive Summary EXECUTIVE SUMMARY EXECUTIVE SUMMARY PROJECT BACKGROUND AND DESCRIPTION On the 16 February 2009, Agni Steels SA (Pty) Ltd (formerly Afro Asia Steels), was issued an Environmental Authorisation for the construction and operation

More information

Annex D5. Public Meeting Minutes

Annex D5. Public Meeting Minutes Annex D5 Public Meeting Minutes Subject/Ref Venue De Beers Consolidated Mines Ltd (DCBM) Waste Management of All Waste Streams for the Existing Venetia Mine, Limpopo Province Musina Community Hall, Musina,

More information

Wellhead Protection Issues Related to Mining Activities Minnesota Rural Water Conference March 4, 2014

Wellhead Protection Issues Related to Mining Activities Minnesota Rural Water Conference March 4, 2014 Wellhead Protection Issues Related to Mining Activities Minnesota Rural Water Conference March 4, 2014 Terry Bovee Source Water Protection Unit Minnesota Department of Health Purpose Response to requests

More information

Hydrocarbon Management PROCEDURE

Hydrocarbon Management PROCEDURE Hydrocarbon Management PROCEDURE Doc No: Approved: PRO-0380 Operations Manager Table of Contents 1. PURPOSE... 3 2. SCOPE... 3 3. REFERENCES... 3 3.1 LEGISLATION/STANDARDS... 3 4. DEFINITIONS... 3 5. HYDROCARBON

More information

Appendix 8. Petroleum Hydrocarbon Products, Ammonium Nitrate and Explosives Management Plan

Appendix 8. Petroleum Hydrocarbon Products, Ammonium Nitrate and Explosives Management Plan Appendix 8 Petroleum Hydrocarbon Products, Ammonium Nitrate and Explosives Management Plan Petroleum Hydrocarbon Products, Ammonium Nitrate, and Explosives Management Plan This Petroleum Hydrocarbon Products,

More information

ANGLO AMERICAN THERMAL COAL LANDAU COLLIERY

ANGLO AMERICAN THERMAL COAL LANDAU COLLIERY Landau Colliery DWA Quarterly Report No. 5 April to June 2013 ANGLO AMERICAN THERMAL COAL LANDAU COLLIERY Department of Water Affairs (DWA) Quarterly Report No. 2 1 st April 30 th June 2013 1 Table of

More information

CHINA AFRICA SUNLIGHT ENERGY COAL & METHANE GAS MINING EIA

CHINA AFRICA SUNLIGHT ENERGY COAL & METHANE GAS MINING EIA CHINA AFRICA SUNLIGHT ENERGY COAL & METHANE GAS MINING EIA Environmental Guardians Services is a consultancy company that does the following; Environmental Impact Assessments (EIA) Safety, Health & Environmental

More information

PROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE

PROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE PROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE Background Information Document DEDEA Ref No s: EC 155/ORT/LN1&LN2/M/13 34 EC 157/ORT/LN1&LN3/M/13

More information

SECTION 24G ENVIRONMENTAL ASSESSMENT REPORT FOR THE TSHIPI BORWA MINE

SECTION 24G ENVIRONMENTAL ASSESSMENT REPORT FOR THE TSHIPI BORWA MINE Page i SECTION 24G ENVIRONMENTAL ASSESSMENT REPORT FOR THE TSHIPI BORWA MINE August 2017 SUBMITTED FOR ENVIRONMENTAL AUTHORISATION IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT (ACT 107 OF 1998)

More information

PROPOSED MOKOLO CROCODILE (WEST) WATER AUGMENTATION PROJECT PHASE 2

PROPOSED MOKOLO CROCODILE (WEST) WATER AUGMENTATION PROJECT PHASE 2 BACKGROUND INFORMATION DOCUMENT May 2016 PROPOSED MOKOLO CROCODILE (WEST) WATER AUGMENTATION PROJECT PHASE 2 Water Transfer Infrastructure & Bulk Power Supply Proponent Implementing Agent Engineering Team

More information

SISHEN IRON ORE COMPANY (PTY) LTD KOLOMELA MINE HEUNINGKRANZ PROJECT (MINING AND PROCESSING AT HEUNINGKRANZ) POSTMASBURG, NORTHERN CAPE

SISHEN IRON ORE COMPANY (PTY) LTD KOLOMELA MINE HEUNINGKRANZ PROJECT (MINING AND PROCESSING AT HEUNINGKRANZ) POSTMASBURG, NORTHERN CAPE SISHEN IRON ORE COMPANY (PTY) LTD KOLOMELA MINE HEUNINGKRANZ PROJECT (MINING AND PROCESSING AT HEUNINGKRANZ) POSTMASBURG, NORTHERN CAPE ENVIRONMENTAL IMPACT ASSESSMENT & ENVIRONMENTAL MANAGEMENT PROGRAMME

More information

Wed 2015/04/22 10:00 AM Wed 2015/04/22 12:00 PM Tentative

Wed 2015/04/22 10:00 AM Wed 2015/04/22 12:00 PM Tentative Novashni Moodley Subject: Location: Start: End: Show Time As: Recurrence: Meeting Status: Organizer: Required Attendees: Invitation to the SWWTW EIA and WML Focus Group Meeting (EIA Phase) SWWTW Boardroom

More information

Site EMP Kit- Guidance Notes

Site EMP Kit- Guidance Notes Site EMP Kit- Guidance Notes Introduction This Guide has been designed to assist applicants to understand council s requirements for Site Environmental Management Plans (Site EMP s) for subdivisions. The

More information

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents Site Description A description of construction activity. The proposed sequence for major activities. Estimates of the total

More information

Figure 4. The proposed location of the Zalu Dam a) basin and b) wall.

Figure 4. The proposed location of the Zalu Dam a) basin and b) wall. A B Figure 4. The proposed location of the Zalu Dam a) basin and b) wall. Figure 5. Detailed layout of the proposed Zalu Dam (Source: Feasibility Study for the Augmentation of the Lusikisiki Regional Water

More information

AT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017.

AT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017. Cairns Shipping Development Project Revised Draft Environmental Impact Statement Fact Sheet July 2017 AT A GLANCE > An additional 70 cruise ships into Port of Cairns each year by 2031 > Project design

More information

1 INTRODUCTION 1.1 PROJECT BACKGROUND

1 INTRODUCTION 1.1 PROJECT BACKGROUND 1 INTRODUCTION 1.1 PROJECT BACKGROUND The International Power Consortium South Africa (IPCSA) has developed a solution to Saldanha Steel s requirement for stable, economical electricity over the long term.

More information

left over, or an unwanted by-product, from an industrial, commercial, domestic or other activity; or

left over, or an unwanted by-product, from an industrial, commercial, domestic or other activity; or 14. Waste Management 14.1. Waste Management Regulations The regulatory requirements governing waste management are provided within the EP Act, the EPR and associated Environmental Protection (Waste Management)

More information

Environmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review

Environmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review Environmental Management Plan Introduction This Environmental Management Plan (EMP) has been prepared for SEF Energy Co. Ltd. for the purpose of providing a stand-alone plan for managing the potential

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE OSHO Cement (Pty) Ltd ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF A CEMENT GRINDING FACILITY ON A SITE LOCATED WITHIN THE COEGA INDUSTRIAL DEVELOPMENT ZONE, PORT ELIZABETH Environmental

More information

Assessing the nitrogen losses from late season application of liquid dairy manure

Assessing the nitrogen losses from late season application of liquid dairy manure R&TT College d'alfred ONTARIO FEDERATION OF AGRICULTURE Assessing the nitrogen losses from late season application of liquid dairy manure INTERIM REPORT January 1997 ONTARIO MINISTRY OF AGRICULTURE, FOOD

More information

An introduction to and overview of Shangoni s Approach By Nico Brits

An introduction to and overview of Shangoni s Approach By Nico Brits Water Conservation and Demand Management Strategy An introduction to and overview of Shangoni s Approach By Nico Brits Overview Background Introduction to WC/WDM Guidelines Advantages of WC/WDM Plan WC/WDM

More information

AM-PR-003 Construction Environmental Management Plan (C-EMP)

AM-PR-003 Construction Environmental Management Plan (C-EMP) OMS Procedure AM-PR-003 Construction Environmental Management Plan (C-EMP) Revision: 1 Prepared by: Shannon Holroyd Authorised by: Marcus Manning Authorisation Date: 18th May 2015 This document has been

More information

APRIL 2015 CONTINGENCY PLANS

APRIL 2015 CONTINGENCY PLANS APRIL 2015 CONTINGENCY PLANS Prepared by: TERRATEST (PTY) LTD PO Box 794 HILTON Postal code 3245 Telephone:0333436789 Email:terratest@terratest.co.za Project director: Simon Johnson TABLE OF CONTENTS 1

More information

Duvha Power Station. Fugitive Emission Management Plan. March 2015

Duvha Power Station. Fugitive Emission Management Plan. March 2015 Duvha Power Station Fugitive Emission Management Plan March 2015 1 INTRODUCTION Most releases into the atmosphere from power stations are from tall stacks. These stacks aid in the dispersion of pollutants

More information

BACKGROUND INFORMATION DOCUMENT FOR A PROPOSED SEWER IN GROOT DRAKENSTEIN, WESTERN CAPE

BACKGROUND INFORMATION DOCUMENT FOR A PROPOSED SEWER IN GROOT DRAKENSTEIN, WESTERN CAPE Purpose of this Document The purpose of this Background Information Document (BID) is to provide Interested and Affected Parties (I&APs) with background information about the proposed project and to introduce

More information

By Paul Robinson Research Director Southwest Research and Information Center PO Box 4524 Albuquerque, NM

By Paul Robinson Research Director Southwest Research and Information Center PO Box 4524 Albuquerque, NM Fact Sheet Concerning Sources of Groundwater Contamination at the Technical Area Five (TA-V), the Tijeras Arroyo Groundwater (TAG) and the Burn Site Areas of Concern at Sandia National Laboratories By

More information

Environmental Working Group. Monthly Report

Environmental Working Group. Monthly Report Monthly Report July 2012 ENVIRONMENTAL WORKING GROUP Relationship Organizational Chart Weekly (EWG) and EWG/Kiewit Alarie, a Partnership (KAP) meetings. The EWG review its Action Items that include priority

More information

MAPPING & SOLUTIONS GUIDE. RIIENV201D Identify and assess environmental and heritage concerns

MAPPING & SOLUTIONS GUIDE. RIIENV201D Identify and assess environmental and heritage concerns MAPPING & SOLUTIONS GUIDE RIIENV201D Identify and assess environmental and heritage concerns RIIENV201D - Identify and assess environmental and heritage concerns Mapping This Learning Guide covers the

More information

Environmental Working Group. Monthly Report

Environmental Working Group. Monthly Report Monthly Report June 2012 ENVIRONMENTAL WORKING GROUP Relationship Organizational Chart Weekly (EWG) and EWG/Kiewit Alarie, a Partnership (KAP) meetings. The EWG review its Action Items that include priority

More information

MINUTES OF PUBLIC MEETING: EIA/EMP PHASE

MINUTES OF PUBLIC MEETING: EIA/EMP PHASE MINUTES OF PUBLIC MEETING: EIA/EMP PHASE APPLICANT: Mmakau Mining (Pty) Ltd PROJECT: Schurvekop Coal Mine PROJECT AREA: Farm Schurvekop 227 IS, Bethal, Mpumalanga REF. #: MP30/5/1/2/2/10160MR 7 September

More information

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan EIS Techni cal Support Document 20-12 Magino Project Environmental Impact Statement Technical Support Document 20-12 Rev. No. Revision Date Approved 0 Document issued for EIS Table of Contents SECTION

More information

BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT

BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT SUBMITTED FOR ENVIRONMENTAL AUTHOIZATIONS IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998 AND THE NATIONAL ENVIRONMENTAL

More information

Basic Assessment and Environmental Management Programme Helam Mining Page 1

Basic Assessment and Environmental Management Programme Helam Mining Page 1 BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT NAME OF APPLICANT: Helam Mining (Pty) Ltd TEL NO: +27 11 702 6922 FAX NO: + 27 11 706 3071 POSTAL ADDRESS: Post Office Box 71007, Bryanston,

More information

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA DEA Reference Number: 12/12/20/2175 BACKGROUND INFORMATION

More information

COMMENT AND RESPONSE REPORT (CRR) VERSION 2

COMMENT AND RESPONSE REPORT (CRR) VERSION 2 APPLICATION FOR ENVIRONMENTAL AUTHORISATION, AN AMENDMENT OF AN ENVIRONMENTAL MANAGEMENT PROGRAMME AND AN INTEGRATED WATER USE LICENCE APPLICATION ON BEHALF OF BHP BILLITON ENERGY COAL SOUTH AFRICA (PTY)

More information

Lodestone Namibia (Pty) Ltd. Magnetite Mining Prospect near Dordabis: EPL 3112 PLAN OF STUDY FOR ENVIRONMENTAL IMPACT ASSESSMENT CONTENTS

Lodestone Namibia (Pty) Ltd. Magnetite Mining Prospect near Dordabis: EPL 3112 PLAN OF STUDY FOR ENVIRONMENTAL IMPACT ASSESSMENT CONTENTS Colin Christian & Associates CC Environmental Consultant 3 Gordon Day St PO Box 81182 Olympia Windhoek Namibia Lodestone Namibia (Pty) Ltd Tel: 061 302296 Fax: 061-302297 Cellphone: 081 1490037 Email:

More information

Neptune Cargill Overpass Extension

Neptune Cargill Overpass Extension Project Environmental Review UPDATE November 23, 2017 Northshore Waterfront Liaison Committee Teck Agenda Project Objectives Project Description Project Discussion VFPA PER process Project Review Status

More information

City of Guelph Transfer of Review Procedures 7 March, 2017

City of Guelph Transfer of Review Procedures 7 March, 2017 Step 1-Determine where the project is located on the City of Guelph Vulnerability Map If the project is found not to be located in a vulnerability area with a vulnerability score of 8 or higher (See Attachment

More information

Information Session 31 May 2014, 10:00, Graceland Church, Thabazimbi

Information Session 31 May 2014, 10:00, Graceland Church, Thabazimbi Aquila Steel (S Africa) (Pty) Ltd Information Session 31 May 2014, 10:00, Graceland Church, Thabazimbi AGENDA Welcome and introduction Purpose of this information session Information session protocol Environmental

More information

Wellhead Protection Issues Related to Mining Activities Minnesota Department of Health August 2009

Wellhead Protection Issues Related to Mining Activities Minnesota Department of Health August 2009 SN' source water protection Wellhead Protection Issues Related to Mining Activities Minnesota Department of Health August 2009 Purpose - This document has been drafted in response to requests from local

More information

Wesizwe Platinum Limited

Wesizwe Platinum Limited Facts about the Bakubung Mine Project The Bakubung Platinum Mine is located on the Western Limb of the Bushveld Igneous Complex, north of the City of Rustenburg and near to the community of Ledig. The

More information

CIRCULAR NO. DG-1. Instructions for the Safe Handling of Cars Loaded with Dangerous Goods Delayed in Transit on Railway Property

CIRCULAR NO. DG-1. Instructions for the Safe Handling of Cars Loaded with Dangerous Goods Delayed in Transit on Railway Property CIRCULAR NO. DG-1 Instructions for the Safe Handling of Cars Loaded with Dangerous Goods Delayed in Transit on Railway Property Effective: June 30, 2005 Note: This update of the RAC Circular DG-1 is based

More information

Environmental Management Plan (EMP)

Environmental Management Plan (EMP) SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit

More information