1 Project Environmental Review UPDATE November 23, 2017 Northshore Waterfront Liaison Committee Teck
2 Agenda Project Objectives Project Description Project Discussion VFPA PER process Project Review Status
3 Project Objectives Create free-flowing traffic access into the Neptune Terminal for trucks and construction equipment from Low Level Road off existing Overpass Access for upgrade works terminal coal updates (Allison project: new rail dumper, new conveyors, replacement shiploader, new track 0) Mitigate reduced access for emergency and large vehicles related to G3 Terminal construction and changes Enhance firetruck access Eliminate the use for the existing height restricted underpass Create an opportunity for track straightening at dumper area and reducing risk of train derailment
4 Project Description Components Construction from the existing two-span steel bridge using a new curved steel 66 m bridge length (824 m 2 ) above grade over the eastern terminal rail lines (Track 0 through Track 8) Curved bridge components, supported by 2 abutments and 1 pier on pile foundation over the span over the tracks Approach ramp will be 230 m in length (2,197 m 2 ), 6% grade from eastern coal stockpile area up to new bridge span Ramp will be constructed using light weight fill Overpass extension connected to existing surface drainage and stormwater pollution prevention and capacity Low impact construction on the existing facility operations, allow for consistent turning traffic movement Security Gate off Low Level Overpass
5 Location North Vancouver Existing Neptune Terminal VFPA lands
6 Location Connection to existing low-level road overpass Access into existing terminal developed site Create free flowing traffic access to Neptune site Mitigate reduced access
7 Existing Neptune Cargill Overpass
8 Visualization of Overpass Extension
9 Overpass Extension Seismic and geotechnical studies Archaeological assessment, and monitoring Pile supported bridge deck design consistent with existing overpass Light weight fill for ramp No preload Limited surface soil disturbance
10 Overpass Extension Construction Environmental Management Plan Traffic dust control - wheel wash Erosion and sediment control, air, noise, light management Traffic management
11 Project Schedule Project Environmental Review submission - Aug 30, 2017 Requested revisions Oct 2, 2017 Information Requests Oct, Nov 2017 Stormwater / Drainage, Security Gate, Construction Traffic Management Geotechnical investigative studies and Archaeological monitoring completed July 2017 Detailed design end of November 2017 VFPA PER Permit anticipated Dec Jan 2018 Construction January 2018 to September 2018.
12 Project Construction and Operations Effects / Issues Construction related air emissions, traffic, light and noise Water collected through existing water treatment system Geotechnical investigations monitored through environmental management plan and chance find protocol during drilling Construction environmental management plan to mitigate construction issues related to air, soils, noise, light and traffic Archaeological Overview Assessment conducted across entire Neptune terminal
13 Next Steps PER information requests and responses Detailed designs VFPA project permit, including conditions Retain Construction Contractor Ongoing communication with VFPA / NSWLC
14 Questions?
Vancouver Wharves Diesel Handling Facility Expansion Project
Vancouver Wharves Diesel Handling Facility Expansion Project March 2018 1 Project Information 1. Vancouver Wharves Today 2. Project Rationale 3. Project Overview New Tanks, Railcar and Vessels 4. Project
More informationTeck s Coal Export Ports. Brad Johnston General Manager, Marketing & Logistics, Coal
Teck s Coal Export Ports Brad Johnston General Manager, Marketing & Logistics, Coal September 27 29, 2011 Forward-looking Information Both these slides and the accompanying oral presentation contain certain
More informationKIEWIT LEDCOR TMEP PARTNERSHIP 2115 Commissioner Street Site 1 - PER Application, Category C. August 17, Vancouver Fraser Port Authority
August 17, 2017 Vancouver Fraser Port Authority 100 The Pointe, 999 Canada Place Vancouver, BC, Canada V6C 3T4 Attention: Jessica Mehigan Subject: Overview Kiewit Ledcor TMEP Partnership ( KLTP ) has been
More informationRt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016
Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Feb
More informationPattullo Bridge Replacement Project. Cost Report
Pattullo Bridge Replacement Project Cost Report January 2018 Cost Report Page i TABLE OF CONTENTS 1 PURPOSE... 1 2 BASIS FOR THE ESTIMATE... 2 2.1 Scope of the Works... 2 2.2 Scope of Capital Costs...
More informationIronton Russell Bridge Project
Construction Update January 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails
More informationTHIS IS NOT A BUILDING PERMIT
PROJECT PERMIT NUMBER 2012-066 DATE OF APPROVAL January 23, 2013 APPLICANT ADDRESS OF APPLICANT PROJECT LOCATION PROJECT TITLE Neptune Bulk Terminals Ltd. 1001 Low Level Road, PO Box 86367 North Vancouver
More informationConstructability Guidelines
Constructability Guidelines The Constructability Guidelines offer a list of items that should be considered by Constructability function personnel during the Concept Development Phase through the Final
More informationDIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS
OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006
More informationIronton Russell Bridge Project
Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014
More informationIronton Russell Bridge Project
Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014
More information12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway
in association with Design 151.66 Km (Existing Road Apr. 180 km) 2 OBJECTIVE: The Government of Timor Lestewishes to Engage Consultant to carry out the Preliminary, Detailed Engineering Design and Environment
More information407 TRANSITWAY. Planning & Preliminary Design
FROM EAST OF HIGHWAY 400 TO KENNEDY ROAD GWP #252-96-00 Public Information Centre #2 June 24 th and 29 th, 2010 Purpose of Public Information Centre #2 The first Public Information Centre (PIC #1) was
More informationHUDSON TUNNEL PROJECT
HUDSON TUNNEL PROJECT NORTH BERGEN COMMUNITY MEETING Lido Restaurant 2600 Tonnelle Avenue North Bergen, NJ January 30, 2018 6:00-8:00 PM Agenda Project Overview Construction Activities in North Bergen
More informationUpdate on the S11D project
Update on the S11D project Analyst Tour Pará, November 2015 isclaimer This presentation may include forward-looking statements, including statements that present Vale's plans, strategies and expectations
More informationBaseline Document Change Announcement
BDC16D-01 Page 1 of 7 New Jersey Department of Transportation 1035 Parkway Avenue, PO Box 600, Trenton, New Jersey 08625-0600 Baseline Document Change Announcement ANNOUNCEMENT: BDC16D-01 DATE: September
More informationCapital Rail Constructors: Quarterly Update to MWAA Board of Directors
Dulles Corridor Metrorail Project Phase 2, Package A Capital Rail Constructors: Quarterly Update to MWAA Board of Directors Keith Couch Capital Rail Constructors January 2018 Agenda 1. Safety 2. Schedule
More informationSOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY
SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY Ryers Station Improvement Project Robert L. Lund, Jr., PE Assistant General Manager Engineering, Maintenance and Construction Division David J. Sands,
More informationScott Hockly. Environmental Management of an Inner City Roading Project
Scott Hockly Environmental Management of an Inner City Roading Project Overview National War Memorial Park (Pukeahu) The big picture The Alliance Constraints Memorial Park Empowering Act Approach Reality
More informationGrowing Our Business. Potash Handling Facility. Input Consideration Memo
Growing Our Business Potash Handling Facility Input Consideration Memo October 2014 Purpose This Input Consideration Memorandum p o ides Pa ifi Coast Te i al s espo se to uestio s a d concerns received
More informationDESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION
DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION Vireak Hinh, P.Eng. R.V. Anderson Associates Ltd., Toronto, Canada Jennifer Trimble Region of Halton, Oakville, Canada
More informationChapter 4 Bridge Program Drawings
Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles
More informationIronton Russell Bridge Project
Construction Update October 1, 2013 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails
More informationCode of Construction Practice Part B: Site Specific Requirements
Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Code of Construction Practice Part B: Site Specific Requirements Blackfriars
More informationImprovements to Florida s Rail Network. CSX Transportation, Inc. AMEC Environment & Infrastructure, Inc.
Improvements to Florida s Rail Network CSX Transportation, Inc. AMEC Environment & Infrastructure, Inc. Florida Brownfield Conference October 29, 2012 Introduction Keith A. Brinker CSX Transportation,
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0
MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes
More informationConstruction Best Management Practices Handbook BEST MANAGEMENT PRACTICES
Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN
More informationI-91 Viaduct Public Information Briefing
I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:
More informationUPCOMING DESIGN & CONSTRUCTION PROJECTS 2 nd Quarter 2018 (Project & Construction Management)
UPCOMING DESIGN & CONSTRUCTION PROJECTS 2 nd Quarter 2018 (Project & Construction Management) DESIGN PHASE PROJECTS Manchester - Rehabilitation and Repair of Wharf 2 Structural concrete repair, fender
More informationStructural - Engineering Review Checklist
Structural - Engineering Review Checklist Project: List Corridor Criteria ID Review Priority (H,M,L) TOPICS S-_-## Structural Design Codes, Manuals and Specifications 6.1.0 REFERENCES DESIRED Criteria
More informationRESOLUTION NO
RESOLUTION NO. 2012-22 A RESOLUTION REQUESTING THAT CERTAIN POTENTIAL ON AND OFF-SITE IMPACTS ASSOCIATED WITH THE GATEWAY PACIFIC TERMINAL BE ANALYZED AS PART OF THE SEPA AND NEPA PROCESSES WHEREAS, Pacific
More informationAgenda. PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014
Agenda Welcome FTA Full Funding Grant Agreement Update GLX Phase 1 Construction Update GLX Phases 2/2A, 3 & 4 Construction Contracts Upcoming Early Construction Work Construction Mitigation Night & Weekend
More informationREINFORCED EARTH. Risk Mitigation
REINFORCED EARTH Risk Mitigation The Value of Experience Reinforced Earth technology has a wide scope of applications that extend well beyond roads and bridges. The advantages of the Reinforced Earth system
More informationI-91 Viaduct Public Information Briefing
I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 9 September 13, 2017 Agenda Welcome and Presenter Introductions Update on Construction and Demolition
More informationProposed G3 Terminal Vancouver Project Update. Presented to North Shore Waterfront Liaison Committee January 14, 2016
Proposed G3 Terminal Vancouver Project Update Presented to North Shore Waterfront Liaison Committee January 14, 2016 G3 & G3 Terminal Vancouver G3 formed to invest in Canada s grain sector by establishing
More informationEXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE
EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.
More informationDeveloping Tools for Hydromodification Management and Assessment
Developing Tools for Hydromodification Management and Assessment Hydromodification: Channel Erosion Before Development After Development Increase in: - Imperviousness - Drainage Slope - Direct Runoff Decrease
More informationTemporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities
Development Services 1775 12 th Ave. NW P.O. Box 1307 Issaquah, WA 98027 425-837-3100 issaquahwa.gov Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction
More informationG2-0 LIST OF ACTIVE MTODs
G2-0 LIST OF ACTIVE MTODs DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200- GRADING 219.101 Light Duty Straw
More informationItem Name Description Unit of Measure Mobilization Per WSDOT Lump Sum
Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of
More informationWelcome! Contact Information
Welcome! Thank you for taking the time to participate in this information session for G3 Terminal Vancouver (G3), an export grain terminal to be built at Lynnterm West Gate in the City of North Vancouver
More informationWell Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.
Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan
More informationAppendix H Balfour Beatty Independent Surveyor s Report
Appendix H Balfour Beatty Independent Surveyor s Report 25 SEMMMS Relief Road Southern Section A6 to Airport Cost Estimate Report Assessment of construction costs Design Freeze 4 Prepared by BBMCE January
More informationLA 1 Bridge Project Status Update Feb. 12, 2007 WSA/DOTD A Partnership
New Bridge Old Bridge LA 1 Bridge Project Status Update Feb. 12, 2007 Satellite Image of Southern Louisiana Project Location Project Overview 2 1C 1B 1A Major Project work modules 1. Mapping, Location,
More informationThe Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects
The Chief Estimator Software Item Cost Summary Bridge & Overpass Projects Elevated Transit Guideways Precast Girder Elevated Guideway 10 Abutment Excavation & Backfill 1,500.00 m3 222 10,368 8,634 1,309
More informationBrighton & Sussex University Hospital
Brighton & Sussex University Hospital Regional Centre for Teaching, Trauma & Tertiary Care known as the 3Ts Programme Project Address: Eastern Road, Brighton BN2 5BE Principal Contractor: Laing O Rourke
More informationGrade-Separated Trail Crossings How Do We Get Over There?
Grade-Separated Trail Crossings How Do We Get Over There? 2008 National Trails Symposium Rory Renfro, Alta Planning + Design Scott Belonger, Loris and Associates Peter Loris, Loris and Associates PRESENTATION
More informationOperations Mine Site, Tote Road and Railway
Operations Mine Site, Tote Road and Railway 2 Panel Members Michael Anderson Richard Cook John Binns Fernand Beaulac Steve Walker Mike Lepage Michael Sheahan 3 The Panel will address: FEIS Volumes 3, 5,
More informationAsbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION
ASBESTOS AIRBORNE TOXIC CONTROL MEASURE FOR CONSTRUCTION, GRADING, QUARRYING AND SURFACE MINING OPERATIONS 93105, Title 17, California Code of Regulations Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE
More informationMASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK
MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK The professional services to be provided by the Consultant under this Agreement shall be as necessary to complete the required analyses, layouts,
More informationTEXAS PORTS STRATEGIC MISSION PLAN & PORT CAPITAL PROGRAM. November 16, 2016 November Transportation Commission Workshop November 16, 2016
TEXAS PORTS STRATEGIC MISSION PLAN & PORT CAPITAL PROGRAM November 16, 2016 Texas Ports Strategic Mission Plan Section 55.007 of the Texas Transportation Code requires the Port Authority Advisory Committee
More informationSTANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018
STANDARD CONSTRUCTION DETAILS REVISED - JANUARY 2018 TABLE OF CONTENTS STORM WATER POLLUTION PLAN NOTES - - - - - - - - - - - - - - - - - - - - - - - - - SD-EC01 SILT FENCE NOTES - - - - - - - - - - -
More informationA. INTRODUCTION OVERVIEW
Chapter 20: Construction A. INTRODUCTION OVERVIEW This chapter describes a preliminary construction and phasing plan for the proposed project, presents a description of associated construction activities
More informationRequest For Proposal (RFP) Millennium Bulk Terminals Longview, LLC Project. NEPA/SEPA Environmental Impact Statement Development
Request For Proposal (RFP) Millennium Bulk Terminals Longview, LLC Project NEPA/SEPA Environmental Impact Statement Development Date: November 21, 2012 Prepared by: Cowlitz County Department of Building
More informationMajor Capital Investments
Completed Description Wayne, Lenoir, Craven, and Carteret Counties: Upgrade track condition between Goldsboro and Morehead City Upgraded the track condition between Goldsboro and Morehead City, included
More informationOrder of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.
SEDIMENT CONTROL NOTES 1.0 GENERAL 1.1 The Developer and Contractor shall comply with the requirements of all regulatory authorities, federal, provincial and municipal government departments including
More informationProject Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce
Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,
More informationCase study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan
Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan West Rail Tsing Kwai Tunnel Location of major Tunnel Portal West Rail Tsing Kwai Tunnel Construction Features -
More informationBHPBilliton Iron Ore Port Sweating the assets. September 2003
BHPBilliton Iron Ore Port Sweating the assets September 2003 Port Hedland Ports Operations Nelson Point 240 hectares Approx 400 employees 3 car dumpers 4 reclaimers 6 stackers 2 berths Finucane Island
More informationConcrete Waste Management
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
More informationI-94/I-69 Interchange Bridge Construction
I-94/I-69 Interchange Bridge Construction General Project Information Let in August 2013 Cost of $76 million Prime Contractor Walter Toebe Construction Company Reconstruction of I-94 from Griswold to Lapeer
More informationMaine Turnpike Authority
Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson
More informationAppendix D. Stormwater Pollution Prevention Plan
Appendix D Memorandum AECOM 3292 Production Way, Floor 4 604 444 6400 tel Burnaby, BC, Canada V5A 4R4 604 294 8597 fax www.aecom.com To Joan Liu, Metro Vancouver Page 1 CC Subject Conveyance for the NSWWTP
More informationMATERIAL QUANTITIES FOR BALANCED CANTILEVER BRIDGES. FANI ANTONIOU Egnatia Odos A.E., 6th km Thessaloniki - Thermi, GREECE
MATERIAL QUANTITIES FOR BALANCED CANTILEVER BRIDGES DIMITRIOS KONSTANTINIDIS Department of Civil Infrastructure Engineering, Alexander Technical Institute of Thessaloniki, 574, GREECE FANI ANTONIOU Egnatia
More information6.0 CONSTRUCTION PROGRAMME
6.0 CONSTRUCTION PROGRAMME Introduction 6.1 This chapter of the ES describes the expected construction works programme and the key activities that will be undertaken. Detailed consideration of potential
More informationWhittier Bridge/I-95 Improvement Project. Public Information Meeting
Whittier Bridge/I-95 Improvement Project Public Information Meeting October 23, 2013 Agenda: WHITTIER BRIDGE / I-95 IMPROVEMENT PROJECT Introduce the Design-Build Team Current Project Schedule Design Project
More informationPresentation to RCCAO: Excess Soil Management: A Guide for Best Management Practices. Central Region Operations Division.
Presentation to RCCAO: Excess Soil Management: A Guide for Best Management Practices Central Region Operations Division March 3, 2014 Outline Purpose: To provide an update on the finalized Excess Soil
More informationTECHNICAL MEMORANDUM
California High-Speed Train Project TECHNICAL MEMORANDUM 15% Design Scope Guidelines TM 0.1 Signed document on file Prepared by: 12 May 08_ Ken Jong, PE Checked by: Signed document on file 12 May 08_ John
More informationPredicting Highway Construction Impacts on a Community
Predicting Highway Construction Impacts on a Community Making the Best Decisions in the Face of Conflicting Values What does this mean? Roadway elevation Noise Berms or Noise Walls Selective clearing or
More informationOHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO
OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO 43216-0899 July 21, 2017 To: Users of the Bridge Design Manual From: Tim Keller, Administrator, Office of Structural
More informationNORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA
NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA PURPOSE AND SCOPE These criteria modify and supplement the applicable sections of the AREMA Manual of Recommended Practice in connection
More informationSITE DESIGN ENGINEER'S STATEMENT:
SITE DESIGN ENGINEER'S STATEMENT: THESE DETAILED PLANS AND SPECIFICATIONS WERE PREPARED UNDER MY DIRECTION AND SUPERVISION. SAID PLANS AND SPECIFICATIONS HAVE BEEN PREPARED ACCORDING TO THE CRITERIA ESTABLISHED
More informationKing of Prussia Rail Project Valley Forge Homes Backyard Visits. Summary of Activities
Summary of Activities Dates: Thursday, May 12, 2016 Saturday, May 14, 2016 Times: 10 a.m. 1 p.m. 10 a.m. 2 p.m. Locations: Residential homes along Powderhorn Road, Bluebuff Road and Kingwood Road Montgomery
More informationBridge pier movements induced by micropile installations
Bridge pier movements induced by micropile installations Blake Leew EllisDon Construction Inc. (formerly of Golder Associates Ltd. - Calgary) Peter Thomson and Dennis Becker Golder Associates, Calgary,
More information1. Urban Design. Current Land Uses
1. Urban Design 1.1. Overview Urban design is concerned with the arrangement, appearance and function of our suburbs, towns and cities. It is both a process and an outcome of creating localities in which
More informationMSE Walls Problems and Solutions
MSE Walls Problems and Solutions Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering ODOT Geotechnical Workshop April 11, 2006 Problems
More informationby Dr. Mark A. Ketchum, OPAC Consulting Engineers for the EERI 100 th Anniversary Earthquake Conference, April 17, 2006
Principles of Earthquake Engineering of Bridges Part 1: Principles & Approach by Dr. Mark A. Ketchum, OPAC Consulting Engineers for the EERI 100 th Anniversary Earthquake Conference, April 17, 2006 Presentation
More informationThe State of Ohio Bridges
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director ABCD NEOH Chapter The State of Ohio Bridges Tim Keller, P.E. Administrator ODOT Office of Structural Engineering Agenda 1.
More informationEnvironmental and Social Review Summary. Dakar Port, DP World Container Terminal Modernization and Operation
Environmental and Social Review Summary Dakar Port, DP World Container Terminal Modernization and Operation This Environmental and Social Review Summary (ESRS) is prepared by MIGA staff and disclosed in
More informationADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road
Financial Services Purchasing Division 215 N. Mason St. 2 nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS
More informationSR 710 North Study. Technical Advisory Committee Meeting No. 16 August 13, 2014 Stakeholder Outreach Advisory Committee Meeting No. 12 August 14, 2014
SR 710 North Study Technical Advisory Committee Meeting No. 16 August 13, 2014 Stakeholder Outreach Advisory Committee Meeting No. 12 August 14, 2014 1 1 1 Agenda Public Outreach Activities Project Report
More information3.6 Construction Methods
Exhibit 144: Birchmount Stop Layout West Don River Bridge - Girders are adequate to accommodate LRT right-of-way and required deck widening. Supplementary support or deck strengthening may be required
More informationORDER NO. An Order of the Board of Harbor Commissioners of the City of Los Angeles amending the Port of Los Angeles Tariff No. 4.
ORDER NO. An Order of the Board of Harbor Commissioners of the City of Los Angeles amending the Port of Los Angeles Tariff No. 4. FINDINGS 1. On July 12, 1989, the Board of Harbor Commissioners of the
More informationBase Metal and Iron Ore Mining
Multilateral Investment Guarantee Agency Environmental Guidelines for Base Metal and Iron Ore Mining Industry Description and Practices This document addresses the mining of base metal ores (copper, lead
More information.2 The scales and automated system for each of the three (3) scales shall be supplied from a single manufacturer.
New Entrance and Scale Facility Page 1 of 6 1. GENERAL 1.1 Work Included.1 The intent of the work under this section is to supply and install three (3) complete low profile platform (pitless) truck scales
More informationPond Closures: Solving a Complicated Puzzle
2011 World of Coal Ash (WOCA) Conference May 9-12, 2011 in Denver, CO, USA http://www.flyash.info/ Pond Closures: Solving a Complicated Puzzle Presented by Mark Rokoff, PE URS Corporation Nick Golden,
More informationI-35W Retaining Wall Design Exhibit A - Draft Scope of Work
Background MnDOT, Metro Transit, Hennepin County, and the City of Minneapolis are in the process of developing a project for Interstate 35W between 43 rd Street in Minneapolis and 15 th Street in Minneapolis.
More informationThe safety measures against deformation of the track
The safety measures against deformation of the track 1 2 1 2 S. Chang, K. Y. Chang, R. J. T. Chen & L.-C. Wang 1 China Engineering Consultants, Inc., Taiwan 2 Technology Dept. of Civil Engineer, National
More informationCHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS
OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS APRIL 2011 APRIL 2011 Page 1 Chapter Table of Contents 12.1 Policy... 12-3 12.1.1 Table 1... 12-3
More informationMay 2004 Construction Forms A-i. Table of Contents APPENDIX A CONSTRUCTION FORMS... A-1. SCDOT Construction Form Description Table...
APPENDIX A Construction Forms SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION May 2004 May 2004 Construction Forms A-i Section Table of Contents Page APPENDIX A CONSTRUCTION FORMS... A-1 SCDOT Construction
More informationURBAN MOBILITY. Metros, Light Rail & Bus Rapid Transit systems
URBAN MOBILITY Metros, Light Rail & Bus Rapid Transit systems CONSTRUCTIVE SOLUTIONS FOR URBAN MOBILITY P R O J E C T S The value of ex of the worldw in Reinforce Reinforced Earth grade separation Reinforced
More informationMajor Capital Improvements
Major Capital ments Completed Description Wayne, Lenoir, Craven, and Carteret Counties: Upgrade track condition between Goldsboro and Morehead City Upgraded the track condition between Goldsboro and Morehead
More informationEnvironmental Management System
ILLAWARRA COAL Environmental Management System DENDROBIUM MINE LIGHTING MANAGEMENT PLAN Review History Revision Description of Changes Date Approved 1.0 Nov 04 Bryan Quinn 2.0 Three yearly review as required
More informationReason for Acceptance or Rejection
Value Engineering Approval Form Project: 25th Avenue & Union Pacific Grade Separation #6 VE Study Date: January 28 through February 1, 2013 Form updated: 5/7/2013 (Final) FHWA Functional ENV 1 ROW 1 The
More informationBAGGAGE HANDLING SYSTEM RECAPITALIZATION & OPTIMIZATION
BAGGAGE HANDLING SYSTEM RECAPITALIZATION & OPTIMIZATION ACI North America Technical & Operations Committee Vancouver, British Columbia March 24, 2015 Emily Underhill, P.E., A.A.E. Division Director Development
More informationWharf structures and Quay Deck landing areas, will be built in stages to accommodate the following transport fleet:
8C Noise Design Assumptions and Source Data 8C.1 Construction Predicted noise levels at the nearest noise sensitive receptors from construction activities have been modelled and presented as noise contours,
More informationAPPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval
APPENDIX 2 Nova Scotia Department of Environment and Labour Terms and Conditions for Approval Approval Approval Date: March 14, 2007 Keltic Petrochemicals Inc. LNG and Petrochemical Plant Facilities Keltic
More informationEnvironment Protection (Water Quality) Policy 2015, stormwater pollution prevention & dewatering guidance
South Australia s Environment Protection Authority Environment Protection (Water Quality) Policy 2015, stormwater pollution prevention & dewatering guidance Clive Jenkins, Ruth Ward and Lara Settimio Outline
More informationEnvironment Protection Licence
Licence Details Number: Anniversary Date: 767 01-January Licensee METROPOLITAN COLLIERIES PTY. LTD. PO BOX 402 HELENSBURGH NSW 2508 Premises METROPOLITAN COLLIERY PARKES STREET HELENSBURGH NSW 2508 Scheduled
More informationDistrict of North Vancouver Construction Traffic Management Plan Guidelines
District of North Vancouver Construction Traffic Management Plan Guidelines The District of North Vancouver is committed to ensuring that the disruptions to the community and traffic associated with construction