1 Afghanistan Third Party Monitoring THE WORLD BANK February
2 The Afghanistan Program The Context: The Afghanistan program consists of both IDA and trust fund resources; Total active portfolio: $3.2 bn The Afghanistan Reconstruction Trust Fund (ARTF) started in 2002 to provide recurrent cost financing for the Afghan Government s operating budget, funding non-security wage bill and O&M; ARTF: $7.9 bn paid in since 2002 by 33 donors, ARTF: $7.4 bn committed, $6.3 bn disbursed to gov for recurrent and investments; active portfolio $2.4 bn ; IDA: $2.7 bn committed, $2.3 bn disbursed; active portfolio $767m Current active portfolio: 31 projects (11 IDA, 15 ARTF and 5 co-financed). 2
3 Why TPM? Afghanistan faces several challenges, including: Low capacity environment; Difficult access; Challenging security context; Rough terrain, complex geological structure, disperse and remote project sites; A large trust fund program with high donor scrutiny and pressure for accountability. Need to strengthen supervision, access data from the field, report to donors. The ARTF Supervisory Agent key characteristics: Carries out asset verification, quality assurance, and data mapping of national infrastructure projects; Has conducted a total of 11,239 site visits since the program start in 2001; Provides the Bank with strengthened outreach to all 34 provinces of Afghanistan, including highly insecure areas; Focused on infrastructure quality and safeguards issues in education, rural roads, irrigation and community development; Monitored 4 projects worth a total of US$2.25 billion; Increasing economies of scale/program efficiencies: Cost per site visit: Year I: $4600, Year IV: $2060 Developed feedback systems to ensure deviations are rectified and construction quality is improved, resulting in increased ministry appreciation of monitoring value; Collaborative efforts with the ministries helped to improve program performance and foster a 3 mutual push for better projects.
4 To Consider before/during Preparation? Be clear on objective but ensure room for flexibility: Afghanistan SA started off with infrastructure, but now branching into other areas such as safeguards and FM. Initial focus was on reporting to donors but shifting the focus towards quality assurance during construction and beneficiary input; TPM by theme: The objective, focus and use of the reporting differs for infrastructure, financial management, livelihoods, social and env. Safeguards etc. Different objectives: TPM monitors social outcomes in Health. Audit vs??: Normally TPM refers to an audit agency focusing on fiduciary aspects. Afghanistan focuses on quality assurance, verification and access to data different skills needed, different contracts; 4
5 Continued What agency to hire?: The credibility of the third party is critical but will often depend on context. In International contractor was needed to ensure donor buy-in; Government more comfortable with local counterparts; The right set-up, sophisticated systems were needed; in Afghanistan compromise with international contractor, expat oversight and local counterparts Contracting: The Bank has very limited experience with Bank contracting directly this takes preparation; TPM ownership Gov/Donors/Bank?: Ideally we want gov and Bank to co-own to ensure oversight and buy-in and therefore sustainability of investment; Donors would like to own but sensitive - we need balance in what can be shared. 5
6 The SA - Monitoring Approach(es) The database, CMORE, is central to everything: data collection, monitoring, security tracking, and information processing; Smartphone technology allows for engineers to work in austere and dangerous areas; Risk management and mitigation is done through multiple tiers of control including GPS verification of staff locations and projects; Information is published in an online database and mapping application searchable catalogue that geospatially displays data; Detailed inspection reports, analysis of identified patterns, recommended actions shared with Bank and ministries; Actions to address deviations are agreed and correct systems to prevent similar problems from reoccuring and increase impact on the ground. Two Methodologies: Third Party Monitoring SA field engineers travel to sites and complete comprehensive reports. Pros: High level of detail, skilled engineers on site, complete coverage of the project including social and other data,; Cons: Cost to travel to site, sites are seen once or twice per year. Local Monitoring Community member selected to send daily information to SA/ministry in Kabul. Engineer provides oversight; Pros: Low cost, increases community buy-in and support, information comes in near real-time, deviations and rectifications can be seen immediately. 6 Cons: Monitoring is fairly simple as the members are not engineers, limited to projects in or near the community.
7 How it works? 7
8 The Process in Pictures 8
9 Lessons Learned Cooperation and collaboration with the GOA ministries is essential and includes monthly meetings, weekly reporting, joint field visits, and joint work plans. New to both Bank and ministries, learning curve to be expected. Key challenge to develop systems; Critical to convince ministries of program value should not be seen as policing function but rather input for collaboration. The TPM contractor key in this regard to strike right balance and communicate well. TPM allows the Bank to access data from all over the country, benefitting monitoring of both quality of infrastructure, output/outcome results and project effectiveness; Multifaceted dialogue builds awareness within ministries on issues related to program monitoring and infrastructure quality assurance; Helps build capacity within the government by raising the bar on monitoring and reporting standards; Provides donors, the Bank and the government with a credible system of data collection and verification which contributes to effective policy making and ARTF credibility; Addresses individual needs within CDD, transport, irrigation, livelihoods, education and health; Economy of Scale works, more project sites lower cost per site visit. 9
10 Challenges Challenges: Expensive investment. Cost decreasing over time though due to efficiencies. Working towards cost sustainability: introducing new component for community based monitoring; Significant potential risk if data is not used by bank and ministry teams; A flexible contractor is important to ensure we can respond to emerging needs safeguards an example in ARTF program. TPM to carry on in coming years but will continue to evolve in response to needs in the program and context will have to align with government s monitoring vision as it evolves; Management of relationship with government technical team, tendency for being defensive, sometimes misunderstood as policing.
11 TPM in Transport Projects Projects: NERAP- US$232million, closed Dec 2013, covered 32/34 provinces, over 200/368 districts, over 500 contracts; ARAP-US$332 million, ongoing, covers 33/34 provinces, over 250/368 districts; over 600 rehab. contracts and over 500 maintenance contracts; Justifications for TPM: Dispersed and remote project sites, impossible for Bank team to monitor all project sites; Sub-projects in almost every province including in secure provinces, not cleared for Bank staff to visit; Expensive investment, ensure the right quality and scope; Complex engineering structures require special expertise to monitor; Feasible for such type of contract, economy of scale; TPM Scope: Visual quality evaluation of the roads, bridges and structures against defined technical specifications; Evaluation of the construction methodologies used by the contractor; Assessment of the contractor s resources on site; Review of the engineering designs against site and identifications of design faults for improvement; Visual check of the quality of construction material; Evaluation of contractor s performance; Other ad-hoc check and data collection as per the task team request. 11
12 TPM in Transport Continued.. Advantages: Over 1266 site visits by TPM engineers since inception, which otherwise not possible with traditional bank supervision; Significant Improvement in overall sub-projects quality; Each rehabilitation sub-project gets at least one visit ( 100% representation); Reliable and accessible data from the site; Opportunity for remedial actions before too late; Knowledge sharing between TPM-Consultant and government engineers; Better control of problem sub-projects and prospect for timely decision making; Flexibility for ad-hoc and special data collection from site; Screening contractors and identifying the frequent bad performers; Feasibility of special analysis of data and preparation of analytical reports; Weekly technical meetings to discuss deficiencies, deviation and agree on remedial actions 12
13 TPM in Transport Continued.. Challenges: Security risk still an issue; Cost of monitoring, sustainability; Availability of sites for monitoring; always need for a bunch of project to justify the cost; Sometimes communication between TPM and government engineers becomes an issue; culture of being defensive; Ownership of the government, not yet fully accepted and recognized; Quality of reports and findings highly depend on capacity of the monitoring engineers on site; counter check has been challenging; TPM services not mature in the country, limited number of qualified consultants, local consultants not yet developed as a result high cost for service Cost per sites is not a comprehensive indicator; should be linked to the size of investment; linked to performance of the project ( quality, disbursement, no. of deviations, on time completion of sub-projects), etc. 13
14 TPM in Education Sector Project: Education Quality Improvement Project (EQUIP) II is a USD 460 million basic/secondary education project. Coverage is nationwide (insecure and secure provinces). Project is implemented entirely using government systems right up to community level. School shuras are responsible for the majority of school construction. TPM Scope Three functions: implementation support; capacity building; external supervision. Works with clients to monitor progress with meeting outputs/objectives; Builds capacity within governments by working closely with government engineering departments; Provides due diligence in project implementation (compliance with technical standards/physical audit/safeguards compliance etc.) Justification for TPM: Country context : highly insecure, governance-challenged environment Bank capacity: limited ability to conduct field visits Community capacity: responsible for school construction but quality can be mixed; Government Capacity: lack of qualified engineers, weak monitoring systems, weak or non-existent technical standards (e.g., DRM) 14
15 TPM in Education continued.. Advantages: Complements Bank supervision and Government monitoring; Raises the bar by having high monitoring standards; Brings in new technology (satellite imagery, mobile phone apps) as well as innovations in monitoring (community monitoring). Captures knowledge across the country as well as across the Bank portfolio. Allows client/bank to analyze systemic deficiencies/trends and put in place mitigation measures. TPM can be contracted to conduct monitoring of physical assets (IRD) and/or social indicators (Johns Hopkins - health service delivery. Provides independent verification of government systems/findings ( ghost schools ); Direct and indirect capacity building of counterpart agencies. 15
16 TPM in Education continued.. Challenges: Linking physical/fiduciary audits would make system more effective; Payment to TPM (per site) is much higher than what government or Bank teams have for monitoring; Institutional model of TPM varies and some are more effective than others; Contractual accountability: TPM in the long term should be contracted by client and accountable to the client. TPM is an independent monitor but is dependent on government counterparts for information, access to project sites, etc. TPM is only as relevant as the quality of information/cooperation they get from government. Regulatory environment of the country can influence the effectiveness of TPM 16
17 TPM in Rural Development Sector Project Third National Solidarity Project: sept 2016: (US$1.5 Billion) to build, strengthen and maintain Community Development Councils (CDCs) as effective institutions for local governance and socio-economic development. Est. over 41,000 elected Community Development Councils (over 90% of rural villages) constructed over 85,000 sub-projects (US$1.5 in block grants over 10 years) TPM Scope and advantages Sample size: Total of 800 TPM sites this year (<1%) Provide assurance: 34 ARTF donors, complaints handling tool for WB team, Evolved from physical verification after completion towards enhancing quality construction during the 4 stages of construction Results: changed technical engineering designs, learning during site visits for communities and project engineers, corrections in poor construction etc.); 17
18 TPM in Rural Development continued.. Monitor the MIS High reliance on NSP s database (by WB, Donors, GoA) Serve as a means to verify the integrity and accuracy of NSPs own data collection and MIS by the FPs and NSP monitors; High risk areas (for WB, NSP monitors and FP engineers) No govt. presence in district (No District Governor & No District Police Chief, functions from other nearby village or provincial center), Located on insurgency corridor; CDC members can t disclose their identity in other villages or officials; Travel to district center is extremely risky; Travel with project documents is impossible; Permanent AGEs check posts; Regular military operations) Fiduciary monitoring A first pilot (100%); Move the focus away from communities towards the systems at the Province; FM gives greater autonomy to NSP; Contribute to greater fiduciary assurance and identify gaps for NSP IV design 18
19 TPM in Rural Development continued.. Challenges and lessons learnt: Requires full commitment from the WB Task team to manage it (provide data, context, manage relationships, regular coordination etc) Reporting needs to be backed up by local context knowledge (case of latrines, construction material, safeguards, grading for CDD type of sub-projects); Local paid monitors and the community voluntary model; Standard approach to TPM changed to suite individual project needs (Not all ministries need capacity building); Building trust and a good working relationship between the Project team and TPM agent takes time 19
20 Social Safeguards in TPM Gradual inclusion of safeguards and gender Safeguards monitoring needs: Original contract for TPM did not include safeguards and gender Development of project specific questions regarding safeguards and gender Close cooperation btw IRD and project staff to develop questions IRD s engineers were trained on social safeguards to understand issues. The key safeguards questions/output indicators: Availability and implementation status of safeguards instruments at sub-projects site, (i.e. ESMP, abbreviated RAP with strip plan) Records of consultation/training sessions with communities, including PAFs (i.e. number of consultation and training sessions to date, etc.) Functionality of grievances handling (i.e. number of grievances submitted/handled, key issues, etc.) Gender data (i.e. consultation meeting with project affected women, girls enrollment ratio, female staff, female CDC, etc.) Environmental Safeguards (i.e. safety measures, safety equipments, quarry/borrow pit management, etc. )
21 Benefits and use of data Follow up of IRD TPM findings: TPM findings Project level GRC is in place-but no grievances were recorded. No sub-project had evidence of women being consulted during planning. Land for a number of schools through community donation were not proper location. The donated land were low-lying and or flood plain areas, which are prone to flooding. Information on affected land/assets (i.e. size with number of PAFs) and land disputes information. Follow up actions Public awareness program among the affected communities regarding GRM services. (ARAP about 187 grievances submitted- Last mission findings). Recruitment of female staff to conduct consultation with project affected women. Site selection criteria developed and are being applied. Those safeguards figures, which are being reported is very helpful. In addition; Project staff will report follow up actions on TMP to WB in monthly format TPM findings help us to discuss shortcomings with project implementers during WB supervision implementation mission. The implementing partners safeguards staff are now more accountable to communities, particularly to affected people with regards to land issues.
22 Challenges & opportunities Challenges: The PMUs staff was initially a bit defensive, and hesitant to accept findings of TPM related to social safeguards. Strengthening relational btw the implementing agencies and the TMP is crucial for success. And the implementing partners shall provide response and feedback to TPM reports. Limited capacity of TPM engineers on social safeguards. Only reporting on availability of reporting data but no qualitative information on process. Opportunities: TPM has strengthened safeguards performances, and it has helped PMUs safeguards team to be more accountable to communities and WB. The TPM experiences, particularly use of smart phone has proved very useful in fragile situation.
Third Party Monitoring Programme for the Afghanistan Reconstruction Trust Fund: A Review
1 Third Party Monitoring Programme for the Afghanistan Reconstruction Trust Fund: A Review World Bank South Asia Region Operational Services and Quality Department March 2014 2 List of Acronyms ARAP.Afghanistan
More informationInnovations for Sustainable Infrastructure Experience from Azerbaijan Rural Investment Project (AZRIP)
Public Disclosure Authorized No. 126/ April 2010 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Innovations for Sustainable Infrastructure Experience from Azerbaijan
More information1. Introduction and Country Overview
CASE STUDY NATURAL DISASTER AND CRISES RESPONSE BY THE TANZANIA SOCIAL ACTION FUND 1 1. Introduction and Country Overview 2. The Tanzania Social Action Fund: Program Overview 3. Response to Crises and
More informationQuarterly Report. Afghanistan Reconstruction Trust Fund FEBRUARY 2017 APRIL SUPERVISORY AGENT: Management Systems International
Quarterly Report FEBRUARY 2017 APRIL 2017 Afghanistan Reconstruction Trust Fund SUPERVISORY AGENT: Management Systems International Date: 11 July 2017 Management Systems International (MSI), a Tetra Tech
More informationAga Khan Foundation, Afghanistan Job Opportunities : Labour market assessment of vocational training and employment pathways for adolescent girls
Aga Khan Foundation, Afghanistan Job Opportunities Position Title : Labour market assessment of vocational training and employment pathways for adolescent girls Duty Station : Kabul Announcing Date : March
More informationAGRICULTURE AND RURAL DEVELOPMENT CLUSTER
AGRICULTURE AND RURAL DEVELOPMENT CLUSTER Islamic Republic of Afghanistan Ministry of Public Works Ministry of Rural Rehabilitation and Development Ministry of Finance NATIONAL RURAL ACCESS PROGRAM (NRAP)
More informationSummary Education in Emergencies Project Manager, Kabul, (Afghanistan)
War Child Job Description & Person Specification Summary Job title: Education in Emergencies Project Manager, Kabul, (Afghanistan) Contract Type: 12 months fixed term contract ( ends August 2018) International
More informationVACANCY ANNOUNCEMENT
United Nations Human Settlements Programme P.O. Box 30030, Nairobi 00100, KENYA Tel: +254-20 7623120, Fax: +254-20 7624266/7 infohabitat@unhabitat.org, www.unhabitat.org VACANCY ANNOUNCEMENT Issued on:
More informationTerms of Reference (TOR) Provision of consultancy services for payroll verification exercise
Terms of Reference (TOR) Annex 2 A. Brief Introduction Provision of consultancy services for payroll verification exercise UNDP ELECT II Project has been providing support to the Independent Election Commission
More informationGlobal Infrastructure Facility
Global Infrastructure Facility ------------------------------------------------------------------------------------------------------------------- Partnership Framework As Adopted by the Governing Council
More informationPAC Consulting Agriculture and Markets Team Leader Recruitment Pack
PAC Consulting Agriculture and Markets Team Leader Recruitment Pack 1 Our Vision Our vision is for a world where all people have access to the technologies that enable them to meet their basic needs and
More informationREPORT 2015/024 INTERNAL AUDIT DIVISION. Audit of the Office of the United Nations High Commissioner for Human Rights Country Office in Guatemala
INTERNAL AUDIT DIVISION REPORT 2015/024 Audit of the Office of the United Nations High Commissioner for Human Rights Country Office in Guatemala Overall results relating to the management of operations
More informationStandards for Excellence Program Organizational Self-Assessment Checklist
Standards for Excellence Program Organizational Self-Assessment Checklist Instructions for using the checklist: if the organization has met the standard, X if the organization has not met the standard,
More informationThe Jordanian National Policy Framework for Microfinance Sector: Towards Inclusive Finance
The Jordanian National Policy Framework for Microfinance Sector: Towards Inclusive Finance Majdoulin Abu-Dalhoum Head of Civil Society Institutions & Microfinance Section Presentation submitted for: Iraq
More informationDeveloping a Feedback and Grievance Redress Mechanism (FGRM) for the Fiji National REDD+ Programme TERMS OF REFERENCE
FIJI REDD+ Readiness Program supported by FCPF/World Bank Developing a Feedback and Grievance Redress Mechanism (FGRM) for the Fiji National REDD+ Programme TERMS OF REFERENCE 1. INTRODUCTION Fiji has
More informationTERMS OF REFERENCE FOR THE FINAL EVALUATION 1. BACKGROUND: ONE UN S PARTNERSHIP WITH THE GIHUNDWE HOSPITAL
ONE UN PARTNERSHIP WITH GIHUNDWE HOSPITAL TO PROVIDE HOLISTIC CARE TO SURVIVORS OF VIOLENCE AGAINST WOMEN AND GIRLS THROUGH THE ONE STOP CENTER MODEL TERMS OF REFERENCE FOR THE FINAL EVALUATION Recruitment
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4819 Project Name. Adolescent Girls Initiative - Afghanistan Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4819 Project Name Adolescent
More informationTerms of Reference. Senior Researcher / Study Consultant for the Educational Demand and Needs Assessment Study
REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE MINISTÉRIO DA EDUCAÇÃO Direção Nacional do Ensino Recorrente Rua Vila Verde Dili,Telf. 77304158 / 77012038 / 77012042 Terms of Reference Senior Researcher / for the
More informationEFCOG BEST PRACTICE: CONTRACTOR ASSURANCE SYSTEM EFFECTIVENESS VALIDATION. John A. McDonald, ,
EFCOG BEST PRACTICE: CONTRACTOR ASSURANCE SYSTEM EFFECTIVENESS VALIDATION Facility: Point of Contact: DOE laboratory partners and contractors subject to Contractor Assurance System requirements John A.
More information5th European Microfinance Award Microfinance and the Environment Application form
Inclusive Finance Network Luxembourg 5th European Microfinance Award Microfinance and the Environment Application form The selection process consists of two primary components: - Component : Institutional
More informationMonitoring and Evaluating Social Protection Programs Efforts to Respond to Natural Disasters and Climate Change-Related Shocks
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Why Is It Important to Monitor and Evaluate Disaster- and Climate Shock-sensitive Components
More informationCAPRA National Accreditation Standards
Category 1.0 Agency, Authority, Role and Responsibility 1.1 Source of Authority 1.1.1 Public Authority/Policy Body 1.1.2 Citizen Advisory Boards/Committees 1.1.3 Responsibilities of Approving Authority,
More informationIn Control: Getting Familiar with the New COSO Guidelines. CSMFO Monterey, California February 18, 2015
In Control: Getting Familiar with the New COSO Guidelines CSMFO Monterey, California February 18, 2015 1 Background on COSO Part 1 2 Development of a comprehensive framework of internal control Internal
More informationSocial and Environmental Investment Overview
Table of contents 1. Introduction 3 2. SEI Governance Hierarchy 3 3. SEI Programme 4 3.1 Goal and Objectives 4 3.2 SEI Programme Framework 5 3.3 Project Funding Types 6 4. SEI Management System 7 4.1 SEI
More informationAudit of Weighing Services. Audit and Evaluation Services Final Report Canadian Grain Commission
Audit and Evaluation Services Final Report Canadian Grain Commission November 2016 Table of Contents 1. EXECUTIVE SUMMARY... 2 Conclusion... 2 Statement of Assurance... 2 2. INTRODUCTION... 3 Authority
More informationEMPLOYMENT POLICY BRIEF
EMPLOYMENT POLICY BRIEF INVESTMENT IN INFRASTRUCTURE ASSESSMENT OF EMPLOYMENT OUTCOMES USING PROJECT- LEVEL ANALYSIS: APPROACH AND INDICATORS This policy paper presents an overview of the approach and
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:
More informationICT for Community Sanitation in Zambia
ICT for Community Sanitation in Zambia Moving from Pilot to Sustained National Program ICT4D Conference Hyderabad, India May 2017 Akros establishes data-driven systems to improve the health and well-being
More informationSuccess Factors for the Implementation of Mini Grids. Michael Franz, Project Manager, GIZ
Success Factors for the Implementation of Mini Grids Michael Franz, Project Manager, GIZ Berlin, 26 February 2013 Page 1 giz Service Portfolio for the Energy Sector Capacity development Technical and management
More informationActions Taken to Assist Customers and Strengthen Operations and Governance
Actions Taken to Assist Customers and Strengthen Operations and Governance September 2017 2017 Wells Fargo Bank, N.A. All rights reserved. For public use. Changes in our retail bank Changed leadership
More informationKREDIT Microfinance Institution Plc. - Cambodia
MICROFINANCE INSTITUTIONAL RATING EXECUTIVE SUMMARY KREDIT Microfinance Institution Plc. Cambodia FINAL RATING OUTLOOK BBB Stable Mission date: October 2015 Date Rating Committee : January 2016 Validity:
More informationDURATION : 30 working days over the period 20 September November 2016
Terms of Reference for the recruitment of a national consultant for the formulation of a Project Document on Inclusive Development and Public Sector Efficiency under the Pillar 1 of the UNDP Country Programme
More informationJOB DESCRIPTION. Job title: Country Director Location: South Sudan. Department: Management Length of contract: 2 years. Role type: Global Grade: 12
JOB DESCRIPTION Job title: Country Director Location: South Sudan Department: Management Length of contract: 2 years Role type: Global Grade: 12 Travel involved: Up to 30% within South Sudan, with periodic
More informationThe PSM Consultant will work in close collaboration with UNDP Country Office staff, governments, UN agencies in the areas of their expertise.
The United Nations Development Programme (UNDP) is the UN s global development network, advocating for change and connecting countries to knowledge, experience and resources to help people build a better
More informationUttarakhand Rural Water Supply and Sanitation Sector Program. Arun Dobhal Swajal, Uttarakhand
Uttarakhand Rural Water Supply and Sanitation Sector Program Arun Dobhal Swajal, Uttarakhand Past Scenario in the WATSAN Sector in Uttarakhand Build-forget-rebuild syndrome in WATSAN sector. Inadequate
More informationDexia Group Audit Charter
January 2013 Dexia Group Audit Charter The present Charter states the fundamental principles governing the internal audit function in the Dexia Group, describing its objectives, its role, responsibilities
More information1. Programme, Policy and Strategy
1. Programme, Policy and Strategy 1 1.1 Programme Goal The overall goal in Urban Management Sector is to invest in a balanced urban development programme across the country to create cities that are economically
More informationTransport and ICT (GTIDR), Southeast Asia and the Pacific (SEAP - GTI02)
TOR No: 2017-042 Title: Junior Professional Officer Grade: UC Division/VPU: Transport and ICT (GTIDR), Southeast Asia and the Pacific (SEAP - GTI02) Duty Location: Sydney, Australia Appointment Type Two-year
More informationFacilities Management Service Review of External Cleaning Contracts
GM23.18 REPORT FOR ACTION Facilities Management Service Review of External Cleaning Contracts Date: October 26, 2017 To: Government Management Committee From: Deputy City Manager, Internal Corporate Services
More informationCanadian Forces Grievance Board
Canadian Forces Grievance Board For the period 2009-2010 to 2011-2012 Report on Plans and Priorities The Honourable Peter G. MacKay Minister of National Defence Table of Contents Chairperson s Message...3
More informationIncreasing External Auditor Reliance
Increasing External Auditor Reliance Guiding Internal Auditors to realize the benefits of raising the bar on External Auditor Reliance. SOX Software Made Simple Table of Contents 1 Introduction 3 Factors
More informationSPTF Universal Standards for. Social Performance. Management. Version 2.0, Published August 2016
SPTF Universal Standards for Social Performance Version 2.0, Published August 2016 Management Pathway to Improved Practice REPORT 5 1 LEARN Responsible Inclusive Finance 2 ASSESS IMPLEMENT 4 PLAN 3 The
More informationEvaluation, Evaluators, and the American Evaluation Association
Evaluation, Evaluators, and the American Evaluation Association What is evaluation? Evaluation is a field that applies systematic inquiry to help improve programs, products, and personnel, as well as the
More informationAudit quality a director s guide
Audit quality a director s guide November 2017 This handbook offers guidance for directors and shareholders of New Zealand FMC reporting entities about how to improve audit quality Contents About this
More informationTerms of Reference. Projects Outputs Evaluation
Terms of Reference Projects Outputs Evaluation Strengthening Participatory and Accountable Governance and Protection of Human Rights. Empowering Civil Society in A. BACKGROUND UNDP s corporate policy is
More informationJob Description JOB PURPOSE KEY JOB FUNCTIONS. Quality Assurance Worker. DATE APPROVED: May 27, 2014
Job Description POSITION: Quality Assurance Worker ACCOUNTABILITY: Director of Human Resources CLASSIFICATION: Full-time DATE APPROVED: May 27, 2014 JOB PURPOSE Reporting to the Director of Human Resources,
More informationDESCRIPTION OF ASSIGNMENT
DESCRIPTION OF ASSIGNMENT Preamble: The United Nations Volunteers (UNV) programme is the UN organization that promotes volunteerism to support peace and development worldwide. Volunteerism can transform
More informationTERMS OF REFERENCE. 1. Background: 2. Purpose and Objective of review:
TERMS OF REFERENCE Prepare an assessment report based on the review of ACTED Afghanistan's current operations and processes applied in relation to the implementation of the Girls Education Challenge for
More informationEvaluation Policy for GEF Funded Projects
Evaluation Policy for GEF Funded Projects Context Conservation International helps society adopt the conservation of nature as the foundation of development. We do this to measurably improve and sustain
More informationOPPORTUNITY PROFILE DIRECTOR, HEALTH PROMOTION & STAKEHOLDER RELATIONS HEART & STROKE FOUNDATION SASKATCHEWAN
OPPORTUNITY PROFILE DIRECTOR, HEALTH PROMOTION & STAKEHOLDER RELATIONS HEART & STROKE FOUNDATION SASKATCHEWAN ABOUT HEART AND STROKE For more than 60 years, Heart & Stroke has been dedicated to fighting
More informationSuccessful Implementation of Hairatan to Mazar-e-Sharif Railway Project in Afghanistan
Successful Implementation of Hairatan to Mazar-e-Sharif Railway Project in Afghanistan Mr. David Hill Senior Transport Specialist Asian Development Bank 12th CAREC Transport Sector Coordinating Committee
More informationDESCRIPTION OF ASSIGNMENT
Preamble: DESCRIPTION OF ASSIGNMENT The United Nations Volunteers (UNV) programme is the UN organization that promotes volunteerism to support peace and development worldwide. Volunteerism can transform
More informationSOME PERSPECTIVES. A Presentation Prepared for the CORDAID hosted Expert Meeting on Community Development Agreements. (Amsterdam, June )
MINING COMMUNITIES & COMMUNITY DEVELOPMENT AGREEMENTS SOME PERSPECTIVES A Presentation Prepared for the CORDAID hosted Expert Meeting on Community Development Agreements (Amsterdam, June 10 2011) By Benjamin
More informationParticipatory rural planning processes
Rural Transport Training Materials Module 2: Planning, Design, Appraisal and Implementation Participatory rural planning processes Session 2.1 Part 1 Presentation 2.1a The Training Modules Module1. Policies
More informationDimension 1: Define and Monitor Social Goals
Dimension 1: Define and Monitor Social Goals The Universal Standards Implementation Series Today s speakers: Margaret Namazzi, Opportunity Bank, Uganda (OBUL) Anton Simanowitz, Director, The Business of
More informationGoverning Body Geneva, March 2008 TC FOR DECISION. Public private partnerships. A. The issue INTERNATIONAL LABOUR OFFICE FIRST ITEM ON THE AGENDA
INTERNATIONAL LABOUR OFFICE GB.301/TC/1 301st Session Governing Body Geneva, March 2008 Committee on Technical Cooperation TC FOR DECISION FIRST ITEM ON THE AGENDA Public private partnerships A. The issue
More informationAUDIT UNDP COUNTRY OFFICE INDONESIA. Report No Issue Date: 10 October 2014
UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP COUNTRY OFFICE IN INDONESIA Report No. 1332 Issue Date: 10 October 2014 Table of Contents Executive Summary i I. About the Office 1 II. Good practices
More informationESCAP/RFSD/2018/INF/2
Distr.: General 1 March 2018 English only Economic and Social Commission for Asia and the Pacific Fifth Asia-Pacific Forum on Sustainable Development Bangkok, 28 30 March 2018 Item 2 of the provisional
More informationCOMMUNITY WATER SUPPLY & SANITATION PROJECT SRI LANKA
COMMUNITY WATER SUPPLY & SANITATION PROJECT SRI LANKA Sri Lanka PROFILE OF SRI LANKA Sri Lanka : An island nation Land Area : 64,740 sq km Total population : 20.9 million Rural population : 16.4 million
More informationExecutive Summary. xiii
Executive Summary Growth is good for the poor, but the impact of growth on poverty reduction depends on both the pace and the pattern of growth. A pattern of growth that enhances the ability of poor women
More informationReview of Functions in Government Agencies in Afghanistan
Review of Functions in Government Agencies in Afghanistan Review of Functions in Government Agencies in Afghanistan July 2017 Dr. Axel G. Koetz and Ihsanullah Ghafoori Introduction For the past 15 years,
More informationVACANCY ANNOUCNEMNT OPEN TO INTERNAL & EXTERNAL CANDIDATES
VACANCY ANNOUCNEMNT OPEN TO INTERNAL & EXTERNAL CANDIDATES Title: Documentation Manager (Software Applications) Location: Kabul Duration: 6 months with possibility of extension Vacancy No SVN-KBL-017/18
More informationTerms of Reference for a Gender Analysis
Terms of Reference for a Gender Analysis 1. BACKGROUND The European Commission defines a gender analysis as the study of differences in the conditions, needs, participation rates, access to resources and
More informationInternal Oversight Division. Internal Audit Strategy
Internal Oversight Division Internal Audit Strategy 2018-2020 Date: January 24, 2018 page 2 TABLE OF CONTENTS LIST OF ACRONYMS 3 1. BACKGROUND 4 2. PURPOSE 4 3. WIPO STRATEGIC REALIGNMENT PROGRAM 5 (A)
More informationREQUEST FOR PROPOSALS Promoting Life-skills in Aboriginal Youth (PLAY) Program Evaluation
1.0 RIGHT TO PLAY CANADA Right To Play is an international humanitarian organization that uses sport and play to promote holistic development of children and youth in the most disadvantaged areas of the
More informationVoluntary Principles on Security and Human Rights Galp Energia 2017 Annual Report
Voluntary Principles on Security and Human Rights Galp Energia 2017 Annual Report 1. Introduction Galp is an integrated energy player that develops profitable and sustainable businesses, aiming to create
More informationJob Title Department Unit
Job Title Department Unit Head of Programme Effectiveness and Compliance Policy and Programmes Directorate Programme Effectiveness and Compliance (PEC) Grade 1 Salary Contract type Reporting to Responsible
More informationInternal Audit of the Afghanistan Country Office
Internal Audit of the Afghanistan Country Office October 2016 Office of Internal Audit and Investigations (OIAI) Report 2016/13 Sections of this report have been redacted in accordance with paragraph 9
More informationBhutan: Rural Renewable Energy Development Project (Part D Biogas Plants)
Environmental Monitoring Report Annual Report November 2016 Bhutan: Rural Renewable Energy Development Project (Part D Biogas Plants) Prepared by the Department of Renewable Energy, Royal Government of
More informationThe World Bank Pernambuco Rural Economic Inclusion (P120139)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF PERNAMBUCO RURAL ECONOMIC INCLUSION APPROVED ON MARCH 6, 2012 TO STATE
More informationEnvironmental and Social Management Framework (ESMF)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic Of Yemen Presidency of the Council of Ministers Social Fund for Development
More informationGovernance Guideline SEPTEMBER 2013 BC CREDIT UNIONS.
Governance Guideline SEPTEMBER 2013 BC CREDIT UNIONS www.fic.gov.bc.ca INTRODUCTION The Financial Institutions Commission 1 (FICOM) holds the Board of Directors 2 (board) accountable for the stewardship
More informationPETROLEUM LOGISTICS TRANSPORTATION CONSTRUCTION
PETROLEUM LOGISTICS TRANSPORTATION CONSTRUCTION Excellence. Quality. Trust. TARGE GROUP INTERNATIONAL Nationwide integrated supply chain and distribution management Targe Group International (TGI) is an
More informationAFRRCS Agency Handbook
AFRRCS Agency Handbook Governance Documents AFRRCS Agency Handbook Section: Governance Documents Version 1.0 AFRRCS Agency Handbook Governance Documents Contents 1. Vision, Mission, Values, Goals 2. Governance
More informationA New Model for Delivering Cash Relief FINDINGS FROM THE IRC S CASH RESEARCH & DEVELOPMENT PROGRAM
A New Model for Delivering Cash Relief FINDINGS FROM THE IRC S CASH RESEARCH & DEVELOPMENT PROGRAM PAKISTAN 2015-2016 Summary The IRC s cash research priorities aim to understand how best cash can be delivered
More informationInternational Bank for Reconstruction and Development International Development Association
International Bank for Reconstruction and Development International Development Association PROGRESS REPORT TO THE BOARD OF EXECUTIVE DIRECTORS ON THE IMPLEMENTATION OF THE MANAGEMENT ACTION PLAN IN RESPONSE
More informationSee your auditor clearly. Transparency report: How we perform quality audit engagements
See your auditor clearly. Transparency report: How we perform quality audit engagements February 2014 Table of contents 1) A message from the CEO and Managing Partner Assurance 2 2) Quality control policies
More informationMINISTRY OF RURAL REHABILITATION AND DEVELOPMENT (MRRD) Afghanistan Rural Enterprise Development Program (AREDP)
MINISTRY OF RURAL REHABILITATION AND DEVELOPMENT (MRRD) Afghanistan Rural Enterprise Development Program (AREDP) AREDP OVERVIEW Improve employment opportunities and income of rural men and women; and sustainability
More informationEx Post-Evaluation Brief GUATEMALA: Rural water and basic sanitation programme IV
Ex Post-Evaluation Brief GUATEMALA: Rural water and basic sanitation programme IV Sector 14030 Drinking water, sanitation and waste water Rural water supply and basic sanitation programme Programme/Client
More informationHEALTH AND POPULATION b) Water Supply and Sanitation
HEALTH AND POPULATION b) Water Supply and Sanitation Demand driven approaches Project quality and sustainability are improved by including men and women Water Supply and Sanitation projects are increasingly
More informationTargeting the rural poor. The Participatory Wealth Ranking System
Targeting the rural poor The Participatory Wealth Ranking System IFAD Cambodia Country Programme: Lessons Learned and Emerging Best Practices Year 2010 Targeting the rural poor IFAD in Cambodia Since 1996,
More informationCOLLEGE OF PHYSICIANS AND SURGEONS OF ONTARIO GOVERNANCE PROCESS MANUAL
COLLEGE OF PHYSICIANS AND SURGEONS OF ONTARIO GOVERNANCE PROCESS MANUAL December 2016 Table of Contents Governance Roles and Responsibilities Table of Contents OVERVIEW OF GOVERNANCE... 3 GOVERNANCE ROLES
More informationServices in Cambodia (March 2013)
This is not an ADB material. The views expressed in this document are the views of the author/s and/or their organizations and do not necessarily reflect the views or policies of the Asian Development
More informationFinancial Management (FM) Harmonization Report and Guidance Note: Executive Summary. December 2012
Financial Management (FM) Harmonization Report and Guidance Note: Executive Summary December 2012 1 Financial Management Harmonization Report and Guidance Note: Executive Summary 1 Purpose of Report The
More informationTerms of Reference Template
Terms of Reference Template TOR No: Title: Grade: Division/VPU: Duty Location: Appointment Type and Duration: Disaster Risk Management Specialist or Senior Disaster Risk Management Specialist (depending
More informationDECISION 10/2014/GB OF THE GOVERNING BOARD OF THE EUROPEAN POLICE COLLEGE ADOPTING THE EUROPEAN POLICE COLLEGE S INTERNAL CONTROL STANDARDS AND
DECISION 10/2014/GB OF THE GOVERNING BOARD OF THE EUROPEAN POLICE COLLEGE ADOPTING THE EUROPEAN POLICE COLLEGE S INTERNAL CONTROL STANDARDS AND AMENDING THE DECISION 08/2011/GB Adopted by the Governing
More informationFinancial Management Harmonization & Alignment Frequently Asked Questions (FAQ) & Guidance
Financial Management Harmonization & Alignment Frequently Asked Questions (FAQ) & Guidance Introduction The harmonization of Financial Management (FM) arrangements by Development Partners (DPs) can assist
More informationCORPORATE GOVERNANCE CODE OF STOPANSKA BANKA AD - SKOPJE
S T O P A N S K A B A N K A AD S K O P J E CORPORATE GOVERNANCE CODE OF STOPANSKA BANKA AD - SKOPJE Skopje, April 2013 Page 1 of 12 1 On the basis of Article 26 of the Statute of Stopanska Banka AD Skopje
More informationWorld Bank Group Recruitment Drive (TOR for Future Vacancies)
World Bank Group Recruitment Drive (TOR for Future Vacancies) The World Bank Group is launching a recruitment drive aimed at attracting qualified candidates to fill positions in selected areas. Employment
More information9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction
9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE 9.1.1 Introduction This chapter is the provisional Environmental Management Plan (EMP) for the Jubilee Phase 1 Development project. The elements of
More informationOperational Service and Operational Enterprise Agencies Core Competencies
Chair Operational Service and Operational Enterprise Agencies Core Competencies COMPETENCY - STRATEGIC LEADERSHIP Strategic leadership involves approaching initiatives from a strategic perspective, championing
More informationImplementation Guides
Implementation Guides Implementation Guides assist internal auditors in applying the Definition of Internal Auditing, the Code of Ethics, and the Standards and promoting good practices. Implementation
More informationBusiness Intelligence Service. We provide accurate intelligence that supports decisions and demonstrates impact.
Business Intelligence Service 2017 We provide accurate intelligence that supports decisions and demonstrates impact. IMPROVING SERVICES STATUTORY DATA AND INSPECTIONS By working in partnership with you
More informationProposed Attestation Requirements for FR Y-14A/Q/M reports. Overview and Implications for Banking Institutions
Proposed Attestation Requirements for FR Y-14A/Q/M reports Overview and Implications for Banking Institutions O Background n September 16, 2015, the Board of Governors of the Federal Reserve System ( Federal
More informationYear II Annual Report
Year II Annual Report NOVEMBER 2016 OCTOBER 2017 Afghanistan Reconstruction Trust Fund SUPERVISORY AGENT: Management Systems International Date: 20 December 2017 Management Systems International (MSI),
More informationPublic Safety Canada Evaluation of the Workers Compensation Program. Final Report
2010-2011 Evaluation of the Workers Compensation Program 2011-03-17 Table of Contents Executive Summary... i 1. Introduction... 1 2. Profile... 1 2.1 Background... 1 2.2 Program Objective... 3 2.3 Stakeholders
More informationAudit & Risk Committee Charter
Audit & Risk Committee Charter Status: Approved Custodian: Executive Office Date approved: 2014-03-14 Implementation date: 2014-03-17 Decision number: SAQA 04103/14 Due for review: 2015-03-13 File Number:
More informationSMS Elements Veriforce, LLC. All rights reserved.
1. Leadership and Management Commitment 2. Stakeholder Engagement 3. Risk Management 4. Operational Controls 5. Incident Investigation, Evaluation, and Lessons Learned 6. Safety Assurance 7. Management
More informationPresident s report on a proposed grant under the global/regional grants window to a non- CGIAR-supported international centre
Document: Date: 13 August 2014 Distribution: Public Original: English E President s report on a proposed grant under the global/regional grants window to a non- CGIAR-supported international centre Développement
More informationAgro-dealers in Zimbabwe: Scaling input provision as key for successful small farmer engagement
Agro-dealers in Zimbabwe: Scaling input provision as key for successful small farmer engagement Author: Sithembile Maunze Organisation: SNV Zimbabwe This case is one of a series specifically prepared by
More information