The World Bank Pernambuco Rural Economic Inclusion (P120139)
|
|
- Noah Charles
- 6 years ago
- Views:
Transcription
1 Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF PERNAMBUCO RURAL ECONOMIC INCLUSION APPROVED ON MARCH 6, 2012 TO STATE OF PERNAMBUCO REPORT NO.: RES29994 Public Disclosure Authorized AGRICULTURE LATIN AMERICA AND CARIBBEAN Public Disclosure Authorized Regional Vice President: Country Director: Senior Global Practice Director: Practice Manager/Manager: Task Team Leader: Jorge Familiar Calderon Martin Raiser Juergen Voegele Preeti S. Ahuja Maria de Fatima de Sousa Amazonas
2 ABBREVIATIONS AND ACRONYMS IFR FM PAD PDO PMU Implementation Financial Report Financial Management Project Evaluation Document Project Development Objective Project Management Unit ProRural State Program for Assistance to Small-Scale Producers/ Programa do Estado de Apoio ao Pequeno Produtor Rural RPO SARA Rural Producer Organization State Secretary of Agriculture and Agrarian Reform
3 Note to Task Teams: The following sections are system generated and can only be edited online in the Portal. BASIC DATA Product Information Project ID P Original EA Category Partial Assessment (B) Approval Date 06-Mar-2012 Financing Instrument Investment Project Financing Current EA Category Partial Assessment (B) Current Closing Date 31-Jan-2019 Organizations Borrower State of Pernambuco Responsible Agency SEDAR Project Development Objective (PDO) Original PDO The objective of the Project is to promote rural business initiatives and expansion of rural access to water and other complementary infrastructure by supporting the Borrower s Results Management Framework. Summary Status of Financing Ln/Cr/Tf Approval Signing Effectiveness Closing Net Commitment Disbursed Undisbursed IBRD Mar Jun Jul Jan Policy Waiver(s) Does this restructuring trigger the need for any policy waiver(s)? No
4 Note to Task Teams: End of system generated content, document is editable from here. I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING A. Status B. This 2 nd Restructuring Paper seeks the approval of the Brazil Country Director to the proposal from the State of Pernambuco, Brazil, for the restructuring of the Pernambuco Rural Economic Inclusion Project ProRural (P120139; Loan 8135-BR). The main objective of this second restructuring is to (i) partially cancel the original amount of the loan in USD 20 million dollars and (ii) to reallocate funds between disbursement categories. C. The Pernambuco Rural Economic Inclusion project (ProRural) was signed in June 2012, in the amount of US $ 100 million to be implemented in a period of six years. The project was signed in June 18, 2012 and was effective in July 31, The project closing date is January 31, The last disbursement requested was in October 2017, in the amount of amount of US $12,921, million. D. The original Project Development Objective (PDO) is to promote rural business initiatives and expansion of rural access to water and other complimentary infrastructure, by supporting the Borrower s Results Management Framework. This PDO will remain the same. E. Aiming to achieve the PDO, the project was divided into three components: Component I - Economic Inclusion (US $32,800,000.00); Component II - Complementary Infrastructure in the Rural Area (US $47,444,000.00); and Component III - Project Management, Supervision, Monitoring and Evaluation (US $19,506, ). F. IMPLEMENTATION PROGRESS: a. Component I - Economic Inclusion and Component II - Complementary Infrastructure in the Rural Area (i) Since November 2016, the implementation agency - SARA (State Secretary of Agriculture and Agrarian Reform) - has been committed to improve the execution speed of the components and the quality of the Business Plans. After reviewing 160 Proposals for Consultancy (components 1 and 2) sent to ProRural, and considering the eligibility criteria of the proposals, 60 consultative letters (components 1 and 2) were considered eligible for financing. These proposals selected corresponds to expenses around R$ 28 million. The release of these expenses depends on the feasibility analysis, preparation and approval of the projects and business plans and signing of the agreements with the Rural Producer Organizations (RPOs). (ii) On this note, the project decided to prioritize the support to recover the rural area of the municipalities at Mata Sul region. Mata Sul was severely affected by the most recent floods that occurred in June (iii) The process to hire a company to elaborate the subprojects and business plans (component 1) and the executive projects (component 2), including the priority investments list related to access roads /small roads and bridges destroyed by floods, was finalized. (iv) In addition, two seminars were held by Synergia, the company responsible for training the RPOs (on equipment management, environmental issues, correct use and good practices for the maintenance of water supply systems). The purpose was to present the situation diagnosis, the before and after the intervention, the progress achieved, and contributions for the future. (v) The environmental liability is undergoing and every month an update in the system is done to report the actual status of the regularization process. A company was hired to assess the environmental impact and mitigation needed to regularize the subprojects financed by ProRural.
5 b. Component III - Project Management, Supervision, Monitoring and Evaluation (i) The process to hire a company to carry out the project baseline is ongoing. The ToR was finalized and submitted to the Bank for no objection. Due to the proximity of the project completion, the baseline evaluation will be prepared together with the impact evaluation assessment. (ii) The Procurement Plan was revised and resubmitted for approval, considering the procurement implementation status and the priority for acquisitions to achieve the PDOs before its closure. (iii) The Aroeira system - The analysis team indicated the need for improvements in the system. ProRural promptly adjusted it and all information regarding the project was updated accordingly. (iv) The amount of R$ ,00 was returned to the designated account, according to the recommendation in the last Aid Memoire and following letter submitted to the Government in October (v) Regarding the monitoring of strategic actions by the implementation agency, five project management committee meetings were held, which includes the monitoring of the actions of responsibility of the managers of the project. G. The project management rating was upgraded from Unsatisfactory to Moderately Satisfactory. Two managers were designated to coordinate the productive inclusion and social infrastructure and the other for planning, budget and management. Key areas of the project are being supervised tightly by the new team; H. The progress towards the PDOs has been maintained at Moderately Satisfactory. Significant changes in the project administration at the PMU (Project Management Unit) level (operational flow, responsibilities, management, etc.) presented significant and positive results towards the PDOs. I. The FM performance rating was upgraded from Unsatisfactory to Moderately Satisfactory. The project FM team made great efforts to implement key activities related to improve the financial controls of the project. Nevertheless, the overall Project FM risk rating is still High, as there have been significant changes on Control Risk factors (budgeting, accounting, internal control, funds flow, financial reporting and auditing). J. Regarding the safeguards, there are slow advances in resolving pending legal environmental compliance issues and continuation of support to new activities before obtaining necessary permits. Therefore, the project was downgraded to Moderately Unsatisfactory on the compliance ratings. However, no significant negative environmental impact has been observed to-date and most project activities are of negligible impact by nature. On the other hand, overall compliance with social safeguards was rated as Satisfactory. Implementation of measures to improve and speed up activities with Indigenous Peoples and Quilombola communities that were previously agreed with the Client have been implemented. K. After the supervision / handover mission carried out in April 17-20, 2017 and successive monitoring missions and meetings, carried out between June and August, several actions were taken by the Borrower to rectify pending critical issues, and to improve the project's implementation and fix problems that previous management was facing. To name a few: a. three missions took place during 2017 to monitor the activities and in special, the financial management; b. all monitoring systems of financing, management and procurement were revised, as well as the procedures; c. hiring of external audit firm to evaluate the financial activities since 2012; d. update of business plans in the Aroeira system, which was also improved significantly; e. capacity building of economic and financial evaluators to help the beneficiaries; f. revision and re-submission of all IFR's, since 2012, with the adjustments requested. Prorural also presented all support documentation needed/requested; g. migration to STEP and adjustment of procurement plan was done h. Contracting of technical assistance for the productive and infrastructure projects; i. Correction of the shortcomings of the agreements with the OPF s; j. Partnerships with institutions that promote the project s efficiency.
6 L. It should be noted that in 2012, when the project was approved, the dollar was quoted at R$ 1.55, as stated in the Project Appraisal Document (PAD). Thus, the estimated amount to achieve the project development objectives and to implement the actions envisaged in the operation corresponded to R$ 155,000, The appreciation of the US dollar against the Real (R$3.08 approximately), during these recent years caused a significantly increase in the amount available in Reais, since then. M. Rationale a. The project's development objectives remain the same as before and will be achieved despite the cancellation of US$ 20 million and the reallocation between disbursement categories b. The disbursement rate is at 64% but this percentage is still low considering that the project will end in January However, the project has already received approximately 87% of the amount initially required for the activities originally planned. A cancellation of such amount will help Prorural to disburse all the funds that will remain available. c. The PMU intends to focus its efforts to recover the Mata Sul rural area, where recent flooding has affected dramatically the local population. Therefore, an amount of US $ 10,000, will be applied in activities and investment already planned to recover the region. d. Because of the reduction in the contracted value of the project, some targets previously established in the Project Results and Monitoring Matrix were revised. The new proposed targets are in line with the amount to be invested. e. To assure the achievement of the new targets proposed, PMU hired consultancies to improve the quality of the subprojects preparations and to supervise the implementation. In addition, PMU hired an audit firm to identify issues and to provide support to define priorities and bottlenecks that need to be worked on. f. Changes are being implemented throughout the project structure, from the way it works to reviewing the roles and responsibilities of the technical team. The changes are already generating tangible results in the project. Planned actions are being implemented in accordance with the timetables agreed with the Bank and the Federal Government. g. Among the new methodologies implemented, the integrated management model used by the State Government in the Covenants for Life, Health and Education state program was adopted. This management model provides accurate and relevant information through monitoring cycles. The monitoring generates better information to support subproject evaluation and decision making. It also allows the project to evolve and execute its actions with quality and efficiency. h. The monitoring cycles happens monthly within eleven territorial offices. The status of each agreement signed with the Rural Producer Organizations and follow up actions are debated on a case by case basis. It is important to highlight that the general monitoring and monitoring of the new agreements are a priority for the technical team, to ensure that ProRural improves its evaluation and are in line with the beneficiaries needs. i. In view of the above, it is verified that the new management team is working to mitigate any risks aiming to achieve a good execution of the Project. This is being done through a detailed planning of all the activities and a rigorous monitoring of the commitments agreed. II. DESCRIPTION OF PROPOSED CHANGES (i) Cancel US $ 20,000, of the total credit operation a. As agreed at the meeting held on July 5, 2017 and in accordance to the letter sent by the Government of Pernambuco in July 26, 2017 Oficio No. 521/2017-GG/PE and in October 10, b. This cancellation still allows sufficient amount to implement the project and the activities estimated to be fully completed. (ii) Reallocation between Disbursement Categories a. The project intends to focus its support to the recovery of infrastructure (mostly bridges) on those municipalities in the rural area in Mata Sul region that were most affected / destroyed by the recent floods that occurred in June 2017 (component 2).
7 b. Even though these specific investments were not programmed when the project was approved, a preliminary survey shows that US $ 10 million is sufficient to finance these investments at Mata Sul. c. The proposed reduction of the amounts presented in each category (see Table 1 below) was prepared in line with the demands identified by each category. i. Category 1 reduce US $ 8 million ii. Category 2 reduce US $9 million iii. Category 3 reduce US $ 2,7 million iv. Category 4 reduce US US $ 0,3 million (iii) Change in Results Framework a. Due to the reduction of the loan amount and reallocation between disbursement categories, some targets will need to be adjusted. The proposed changes in the target results were based on the measurement of the performance achieved by the project, as of today, and in accordance with the execution plan until January 2019, considering the existing resources and the demands of new agreements with the beneficiaries of the Project. b. To assure the achievement of the targets, proposed changes are being implemented throughout the project structure, from the way it operates to reviewing the roles and responsibilities of the technical team. The changes are already generating tangible outcomes in the project s results. Planned actions are being implemented in accordance with the timetables agreed with the Bank and the Federal Government. c. Among the new methodologies implemented, the integrated management model used by the State Government was applied to ProRural. This management model provides intensive use of precise and relevant information through monitoring cycles. These monitoring cycles generates more accurate information that support the subproject for their evaluation and decision making. d. The new management team is working to mitigate any risks in the good execution of the Project, through a detailed planning of all the activities and a rigorous monitoring of the commitments agreed.
8 Note to Task Teams: The following sections are system generated and can only be edited online in the Portal. III. SUMMARY OF CHANGES Changed Change in Results Framework Not Changed Cancellations Proposed Reallocation between Disbursement Categories Change in Disbursement Estimates Change in Overall Risk Rating Change in Implementation Schedule Change in Implementing Agency Change in DDO Status Change in Project's Development Objectives Change in Components and Cost Change in Loan Closing Date(s) Change in Disbursements Arrangements Change in Safeguard Policies Triggered Change of EA category Change in Legal Covenants Change in Institutional Arrangements Change in Financial Management Change in Procurement Other Change(s) Change in Economic and Financial Analysis Change in Technical Analysis Change in Social Analysis Change in Environmental Analysis
9 PDO_IND_TABLE The World Bank IV. DETAILED CHANGE(S) OPS_DETAILEDCHANGES_RESULTS_TABLE RESULTS FRAMEWORK Project Development Objective Indicators Beneficiary RPOs successfully inserted into LPAs. Unit of Measure: Text Value No Change Date 25-Apr Apr Jan-2019 Increase in real gross sales value beneficiary RPOs Unit of Measure: Percentage Value Revised Date 25-Apr Oct Jan-2019 Beneficiary RPOs selling products to institutional or private markets after subproject conclusion Unit of Measure: Percentage Value No Change Date 25-Apr Apr Jan-2019 Rural households with access to Improved Water Sources, including 30% female headed and 5% belonging to vulnerable groups (IP or Quilombola) Unit of Measure: Text Value 0 families (cum) families (cum) 27,000 families (cum) Revised Date 27-Jun Oct Jan-2019 Rural households with access to Improved Sanitation Services, including 30% female headed and 5% belonging to vulnerable groups (IP or Quilombola) Unit of Measure: Text
10 Value 0 families (cum) families (cum) 3,000 families (cum) Revised Date 27-Jun Oct Jan-2019 Intermediate Indicators IO_IND_TABLE Rural households benefiting directly from project interventions, including 30% women-headed and 5% belonging to vulnerable groups (IP or Quilombola). Unit of Measure: Number Value Revised Date 25-Apr Oct Jan-2019 Beneficiary RPOs, including 30% with women in specific management positions Unit of Measure: Number Value Revised Date 27-Jun Oct Jan-2019 RPOs trained and/or using financial management instruments for their financed productive activities Unit of Measure: Percentage Value No Change Date 27-Jun Apr Jan-2019 Beneficiary RPOs with organized arrangements for the management, operation and maintenance of financed productive investments Unit of Measure: Percentage Value Revised
11 Date 27-Jun Oct Jan-2019 Beneficiary rural households using water supply investments for drinking water Unit of Measure: Number Value No Change Date 25-Apr Apr Jan-2019 RPOs charging user fees for management and maintenance of financed water supply projects. Unit of Measure: Percentage Value Revised Date 25-Apr Oct Jan-2019 Rural water and sanitation subprojects concluded, including 30% of RPOs with women in specific management positions Unit of Measure: Number Value Revised Date 27-Jun Oct Jan-2019 Processing time between first subproject profile submission and release of first disbursement to RPO Unit of Measure: Text Value Processing time of initial round of Business 0 90% reduction Revised Plans Date 30-Aug Oct Jan-2019 MIS fully functional and producing all required products Unit of Measure: Yes/No
12 OPS_DETAILEDCHANGES_CANCELLATIONS_TABLE The World Bank Value No Yes Yes No Change Date 27-Jun Apr Jan-2019 CANCELLATIONS Ln/Cr/Tf Status Currency IBRD Disburs ing USD Current Amount 100,000, Cancellation Amount Value Date of Cancellation New Amount 20,000, Jan ,000, Reason for Cancellation BORROWER' S REQUEST FOR COUNTRY REASONS OPS_DETAILEDCHANGES_REALLOCATION _TABLE REALLOCATION BETWEEN DISBURSEMENT CATEGORIES Current Allocation Actuals + Committed Proposed Allocation Financing % (Type Total) Current Proposed IBRD Currency: USD ilap Category Sequence No: 1 Current Expenditure Category: GO,CW,NCS&CS-PROD.SUBPJ PART 1(b) 32,800, ,819, ,800, ilap Category Sequence No: 2 Current Expenditure Category: GO,CW,NCS&CS-SUB P2(a),TRG P2(a)ii 47,444, ,019, ,044, ilap Category Sequence No: 3 Current Expenditure Category: GO,CW,CS,NCS&TRGN-EXCP COVERCATS1&2 14,206, ,671, ,006, ilap Category Sequence No: 4 Current Expenditure Category: OPERATING COSTS 5,300, ,901, ,900,
13 OPS_DETAILEDCHANGES_SORT_TABLE The World Bank ilap Category Sequence No: 6 Current Expenditure Category: PREMIUM FOR CAPS/COLLARS ilap Category Sequence No: 7 Current Expenditure Category: UNALLOCATED Total 99,750, ,411, ,750, OPS_DETAILEDCHANGES_DISBURSEMENT_TABLE DISBURSEMENT ESTIMATES Change in Disbursement Estimates Yes Year Current Proposed ,619, ,619, ,414, ,888, ,254, ,185, ,890, ,486, ,206, ,300, ,861, ,000, ,000, ,520, ,752, SYSTEMATIC OPERATIONS RISK-RATING TOOL (SORT) Risk Category Rating at Approval Current Rating Political and Governance Moderate Macroeconomic Moderate Sector Strategies and Policies Low Technical Design of Project or Program Moderate Institutional Capacity for Implementation and Sustainability Moderate
14 Fiduciary Moderate Environment and Social Low Stakeholders Low Other Overall Moderate Note to Task Teams: End of system generated content, document is editable from here.
Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation
More informationImplementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation
More informationImplementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation
More informationThe World Bank Ethiopia: Supporting Open Data Initiative (P156400)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ETHIOPIA: SUPPORTING OPEN DATA INITIATIVE APPROVED ON OCTOBER 15, 2015
More informationImplementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Operation Name: Ministry
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Copy AFRICA Malawi Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 13 ARCHIVED on 04-Nov-2015 ISR21002 Implementing Agencies:
More informationImplementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Operation Name: Rio de Janeiro Mass Transit
More informationImplementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Operation Name: IQ-TF EMERG. WATER, SANITATION
More informationName Previous Rating Current Rating
Public Disclosure Authorized Public Disclosure Copy MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Environment & Natural Resources Global Practice Global Environment Project Investment Project Financing
More informationImplementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046) Operation Name: Second Agricultural Technology
More informationL/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Nov ,493,000.00
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021025 Public Disclosure Authorized Public Disclosure Authorized Project ID P106703 Country Brazil Project
More informationINDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)
Public Disclosure Authorized INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU) (P159191) EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global
More informationThe World Bank AO-Market Oriented Smallholder Agriculture Project (P093699)
Public Disclosure Authorized AFRICA Angola Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 06-Nov-2015 ISR21246 Implementing Agencies: Ministry of Agriculture
More informationPublic Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Governance Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 9 ARCHIVED on 05-Jan-2016 ISR22346 Implementing Agencies: BAPPENAS,
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Transport Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 13 ARCHIVED on 17-Jun-2015 ISR19767 Implementing Agencies: Hanoi Urban
More informationImplementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715) Operation
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING INDIA - CAPACITY BUILDING FOR INDUSTRIAL POLLUTION MANAGEMENT APPROVED ON JUNE 3, 2010
Public Disclosure Authorized The World Bank REPORT NO.: RES29424 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDIA - CAPACITY BUILDING
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Copy AFRICA Malawi Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 14 ARCHIVED on 30-Jun-2016 ISR23059 Implementing Agencies:
More informationImplementation Status & Results Brazil Sustainable Cerrado Initiative (P091827)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Sustainable Cerrado Initiative (P091827) Operation Name: Sustainable Cerrado Initiative (P091827)
More informationImplementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P086341)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P86341) o C Operation
More informationImplementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Operation Name: Western
More informationImplementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046) Operation Name: Second Agricultural Technology
More informationPublic Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Public Sector Governance Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 22-May-2015 ISR18498 Implementing Agencies:
More informationImplementation Status & Results Indonesia Barefoot Engineers III (P131387)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Barefoot Engineers III (P131387) Operation
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22361 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationImplementation Status & Results Brazil Energy Sector Technical Assistance Project (P076977)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Energy Sector Technical Assistance Project (P076977) Operation Name: Energy Sector Technical
More informationImplementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Operation Name: WAPP APL 2 - OMVS
More informationL/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 50,000,
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020344 Public Disclosure Authorized Project ID P106702 Country Brazil Project Name BR Integr. Solid
More informationFOR OFFICIAL USE ONLY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:
More informationImplementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329) Operation Name: Rajasthan Rural Livelihoods
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE FOREST PROTECTION AND REFORESTATION PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT
More informationImplementation Status & Results Indonesia ID-Domestic Gas Market Development Project (P077175)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project
More informationDocument of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF BUSINESS ENVIRONMENT REFORM & INSTITUTION STRENGTHENING PROJECT
Document of The World Bank Report No: 56839-MK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF BUSINESS ENVIRONMENT REFORM & INSTITUTION STRENGTHENING PROJECT LOAN NUMBER 4793 MK JUNE 21, 2005
More informationImplementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)
More informationPublic Disclosure Copy. Public Disclosure Copy. The World Bank
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Sustainable Integrated Ecosystem
More informationL/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Sep ,000, Original Commitment 550,000,
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020046 Public Disclosure Authorized Operation ID P132768 Country Brazil Operation Name BR-Pernambuco
More informationThe World Bank Burkina Faso - Bagre Growth Pole Project (P119662)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF BURKINA FASO - BAGRE GROWTH POLE PROJECT APPROVED ON JUNE 21, 2011 TO
More informationApproach Paper. Study Proposal. Sustainability of Water and Sanitation Interventions in Rural Areas
Approach Paper Study Proposal Sustainability of Water and Sanitation Interventions in Rural Areas Inter-American Development Bank January 2014 This work is distributed under a Creative Commons license
More informationThe World Bank Sustainable Land Management Project (P133133)
Public Disclosure Authorized AFRICA Ethiopia Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 9 ARCHIVED on 04-Dec-2017 ISR28418 Implementing Agencies:
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:
More informationIMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-95978) ON A GRANT FROM THE GLOBAL ENVIRONMENT FACILITY TRUST FUND IN THE AMOUNT OF US$8.
Public Disclosure Authorized Document of The World Bank Report No.: ICR00003829 IMPLEMENTATION COMPLETION AND RESULTS REPORT Public Disclosure Authorized Public Disclosure Authorized (TF-95978) ON A GRANT
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 14-Apr-2014
More informationL/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Jun ,000,000.00
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020618 Public Disclosure Authorized Public Disclosure Authorized Project ID P113402 Country Sri Lanka
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014
More informationImplementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)
More informationDistribution: Restricted EB 99/68/R November 1999 Original: English Agenda Item 9(c) English
Distribution: Restricted EB 99/68/R.32 10 November 1999 Original: English Agenda Item 9(c) English IFAD Executive Board Sixty-Eighth Session Rome, 8-9 December 1999 REPORT AND RECOMMENDATION OF THE PRESIDENT
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: June 10, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project Name: Brasilia Environmentally Sustainable Pro
More informationPresident s report. Proposed loan to the State of Paraíba of the Federative Republic of Brazil for the
Document: EB 2009/98/R.36/Rev.1 Agenda: 17(d)(i) Date: 17 December 2009 Distribution: Public Original: English E President s report Proposed loan to the State of Paraíba of the Federative Republic of Brazil
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/27/2011 1. Basic Project Data Original
More informationA New Model for Delivering Cash Relief FINDINGS FROM THE IRC S CASH RESEARCH & DEVELOPMENT PROGRAM
A New Model for Delivering Cash Relief FINDINGS FROM THE IRC S CASH RESEARCH & DEVELOPMENT PROGRAM PAKISTAN 2015-2016 Summary The IRC s cash research priorities aim to understand how best cash can be delivered
More informationIMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-77820) ON A LOAN IN THE AMOUNT OF US$ 24.3 MILLION TO THE FOR A
Public Disclosure Authorized Document of The World Bank Report No: ICR00003924 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-77820) ON A LOAN IN THE AMOUNT OF US$ 24.3
More informationLearnings from Bihar, India An evolutionary process and the impact of a market development program to create a functioning sanitation market
Learnings from Bihar, India An evolutionary process and the impact of a market development program to create a functioning sanitation market Shankar Narayanan PSI India UNC Water & Health Conference 2015
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA14823 Project Name
More informationPUBLIC DISCLOSURE AUTHORISED
PUBLIC DISCLOSURE AUTHORISED CARIBBEAN DEVELOPMENT BANK EXECUTIVE SUMMARY WITH MANAGEMENT RESPONSE PROJECT COMPLETION VALIDATION REPORT EXPANSION OF THE GRANTLEY ADAMS INTERNATIONAL AIRPORT - BARBADOS
More informationDocument of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED SOCIAL PROTECTION TECHNICAL ASSISTANCE LOAN
I_--- Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 27247 - CL Public Disclosure Authorized PROJECT APPRAISAL DOCUMENT ON A PROPOSED SOCIAL PROTECTION TECHNICAL
More informationIMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA TF-56730) ON A CREDIT IN THE AMOUNT OF SDR 20.1 MILLION (US$29.2 MILLION EQUIVALENT)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-42070 IDA-42080
More informationREPORT 2014/103 INTERNAL AUDIT DIVISION. Audit of the recruitment process at the United Nations Conference on Trade and Development
INTERNAL AUDIT DIVISION REPORT 2014/103 Audit of the recruitment process at the United Nations Conference on Trade and Development Overall results relating to the management of the recruitment process
More informationLiberia Development Forestry Sector Management Project
Questions & Answers Q1: What has been the World Bank s role in the Liberia forestry sector and what has been the impact of the Liberia Development Forestry Sector Management Project? Since 2004, the Bank
More informationEnhancing Results-Based Management through Quality Assurance of Supervision Missions
Enhancing Results-Based Management through Quality Assurance of Supervision Missions Supervision in the context of Management for Development Results The concepts of Management for Development Results
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared/ Updated
More informationTerms of Reference (TOR) Provision of consultancy services for payroll verification exercise
Terms of Reference (TOR) Annex 2 A. Brief Introduction Provision of consultancy services for payroll verification exercise UNDP ELECT II Project has been providing support to the Independent Election Commission
More informationREPORT 2015/024 INTERNAL AUDIT DIVISION. Audit of the Office of the United Nations High Commissioner for Human Rights Country Office in Guatemala
INTERNAL AUDIT DIVISION REPORT 2015/024 Audit of the Office of the United Nations High Commissioner for Human Rights Country Office in Guatemala Overall results relating to the management of operations
More informationEx Post-Evaluation Brief Morocco: Rural Water Supply I and II
Ex Post-Evaluation Brief Morocco: Rural Water Supply I and II Rural Water Supply I, Programme/Client BMZ no. 1997 65 611 (inv.) / 1997 70 215 (AM) Rural Water Supply II, BMZ no. 2002 65 306* (inv.) / 2002
More informationInternational Bank for Reconstruction and Development International Development Association
International Bank for Reconstruction and Development International Development Association PROGRESS REPORT TO THE BOARD OF EXECUTIVE DIRECTORS ON THE IMPLEMENTATION OF THE MANAGEMENT ACTION PLAN IN RESPONSE
More informationCountry Practice Area(Lead) Additional Financing Lao People's Democratic Republic Trade & Competitiveness P144992,P144992
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021071 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project
More informationREPORT 2015/082. Lebanon. in the United Nations Interim Force in FINAL OVERALL RATING: PARTIALLY SATISFACTORY
INTERNAL AUDIT DIVISION REPORT 2015/082 Audit of engineering support services in the United Nations Interim Force in Lebanon Overall results relating to the effective management of engineering support
More informationCountry Practice Area(Lead) Additional Financing Brazil Water P125829
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020959 Public Disclosure Authorized Public Disclosure Authorized Project ID P006553 Project Name BR
More informationPresident s report on a proposed grant under the global/regional grants window to a non- CGIAR-supported international centre
Document: Date: 13 August 2014 Distribution: Public Original: English E President s report on a proposed grant under the global/regional grants window to a non- CGIAR-supported international centre Développement
More informationREPORT 2014/148 INTERNAL AUDIT DIVISION. Audit of the recruitment process at the Office of the High Commissioner for Human Rights
INTERNAL AUDIT DIVISION REPORT 2014/148 Audit of the recruitment process at the Office of the High Commissioner for Human Rights Overall results relating to the efficient and effective management of the
More informationInternal Audit Vice Presidency (IADVP) FY12 Third Quarter Activity Report
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Internal Audit Vice Presidency (IADVP) FY12 Third Quarter Activity Report April 25, 2012
More informationMaldives: Employment Skills Training Project
Validation Report Reference Number: PVR-396 Project Number: 33217 Loan Numbers: 2028 February 2015* Maldives: Employment Skills Training Project Independent Evaluation Department *Revised May 2015. ABBREVIATIONS
More informationREPORT 2015/091 INTERNAL AUDIT DIVISION
INTERNAL AUDIT DIVISION REPORT 2015/091 Audit of the recruitment of national staff and individual contractors in the United Nations Mission in the Republic of South Sudan Overall results relating to the
More informationTECHNICAL ASSISTANCE REQUEST. MicroLoan Foundation, Malawi
TECHNICAL ASSISTANCE REQUEST FORM 2 TERMS OF REFERENCES MicroLoan Foundation, Malawi Priority 2 - MIS 1. TA BENEFICIARY DESCRIPTION... 2 2. TA NEEDS... 3 3. OBJECTIVES OF THE REQUESTED TA SUPPORT... 3
More informationMonitoring & Evaluation Framework
Jamaica Social Investment Fund Monitoring & Evaluation Framework For the REDI Project Submitted by: Sharlene B Jarrett, Ph.D., Monitoring & Evaluation Consultant 6/09/09 RURAL ECONOMIC DEVELOPMENT INITIATIVE
More informationL/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Apr ,000,000.00
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020523 Public Disclosure Authorized Public Disclosure Authorized Project ID P127105 Country Rwanda Project
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)
More information7 May 2014 GCF/B.07/ May 2014 Songdo, Republic of Korea Agenda item 6. Meeting of the Board
Guiding Framework and Procedures for Accrediting National, Regional and International Implementing Entities and Intermediaries, Including the Fund s Fiduciary Principles and Standards and Environmental
More informationFile No: PERMANENT AUDIT FILE INDEX Annual update confirmation. Business details 1. Background to client
Client: Year/Period End: PERMANENT AUDIT FILE INDEX Annual update confirmation Business details 1. Background to client 2. Financial History 3. Register of laws and regulations 4. Related parties 5. Group
More informationDocument of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT. (Grant IDA-H4840) ON A GRANT
Public Disclosure Authorized Document of The World Bank Report No.: ICR00003218 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (Grant IDA-H4840)
More information36th Board Meeting Prioritized Action Plan (PAP) to Accelerate Management for Impact For Board Information
36th Board Meeting Prioritized Action Plan (PAP) to Accelerate Management for Impact For Board Information GF/B36/27 Montreux, Switzerland 16-17 November 2016 Prioritized Action Plan Help the Secretariat
More informationReliability Improvement using Defect Elimination
Reliability Improvement using Defect Elimination A Three-Prong Approach The Keystone to Safe, Reliable, Profitable Production Michael Voigt 2006 KBC. All Rights Reserved. 1 Introduction Michael Voigt 19
More informationTerms of Reference Template
Terms of Reference Template TOR No: Title: Grade: Division/VPU: Duty Location: Appointment Type and Duration: Disaster Risk Management Specialist or Senior Disaster Risk Management Specialist (depending
More informationGUIDELINES FOR THE VALIDATION OF PROJECT COMPLETION REPORTS AND EXTENDED ANNUAL REVIEW REPORTS
GUIDELINES FOR THE VALIDATION OF PROJECT COMPLETION REPORTS AND EXTENDED ANNUAL REVIEW REPORTS A. Principles of the Validation System for Project Completion Reports and Extended Annual Review Reports 1.
More informationThe IEG report How Effective Have Poverty and Social Impact Analyses Been? was discussed by CODE on June 3, 2009
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FAST TRACK BRIEF June 3, 2009 The IEG report How Effective Have Poverty and Social Impact
More informationFY17-FY18 Audit Plan. Office of Internal Auditing
FY17-FY18 Audit Plan Office of Internal Auditing -Page Intentionally Blank- TABLE OF CONTENTS Executive Summary... 4 Audit Plan Details... 6 Budgeted Hours... 7 Risk Assessment... 8 Allocation of Resources...
More informationPapua New Guinea: Coastal Fisheries Management and Development Project
Validation Report Reference Number: PCV PNG 2010-14 Project Number: 32189 Loan Number: 1925(SF) April 2010 Papua New Guinea: Coastal Fisheries Management and Development Project Independent Evaluation
More informationBusiness Practice Manual for The Transmission Planning Process
Business Practice Manual for The Transmission Planning Process Posted: June 2, 2015 Intentionally left blank TABLE OF CONTENTS 1. Introduction... 9 1.1. Purpose of California ISO Business Practice Manuals...
More informationSri Lanka: Skills Development Project
Validation Report Reference Number: PCV: SRI 2008-32 Project Number: 31283 Loan Number: 1707(SF) August 2008 Sri Lanka: Skills Development Project Operations Evaluation Department ABBREVIATIONS ADB Asian
More informationPhilippines: Northern Mindanao Community Initiatives and Resource Management Project
Philippines: Northern Mindanao Community Initiatives and Resource Management Project Loan No. 77-PH Project Id. 1137 Board Date Dec 2001 Effectiveness Date 1 Apr 2002 Original Closing Date 31 Dec 2009
More informationPrivate Public Partnerships: Sample Standard Bidding Documents for Design-Build-Operate (DBO) for Solid Waste Management
Partnerships: Sample Standard Bidding Documents for Design-Build-Operate (DBO) for Solid Waste Management Presented by Allan Rotman Sr. Environmental Specialist Context for DBO for SWM in MNA Initiated
More informationIMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD and IBRD-80330) ON A LOAN IN THE AMOUNT OF EURO MILLION (US$ MILLION EQUIVALENT)
Public Disclosure Authorized Document of The World Bank Report No: ICR00003698 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47840 and IBRD-80330)
More informationOverview of CDM Strategy, Action Plan and Monitoring, Evaluation and Reporting System for the CDM Strategy
Overview of CDM Strategy, Action Plan and Monitoring, Evaluation and Reporting System for the CDM Strategy 2014-2024 Presentation Outline CDM Strategy 2014-2024 CDM Strategy Performance Monitoring Framework
More informationReport and Recommendation of the President to the Board of Directors. Proposed Grant Nepal: Water Resources Project Preparatory Facility
Report and Recommendation of the President to the Board of Directors Project Number: 45206 June 2012 Proposed Grant Nepal: Water Resources Project Preparatory Facility CURRENCY EQUIVALENTS (as of 30 May
More informationRisk Analysis (Project Impact Analysis)
Chapter 2 Risk Analysis (Project Impact Analysis) 2.1 Overview Risk management is a process that provides management with the balance of meeting business objectives or missions and the need to protect
More informationDocument of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-72850) ON A LOAN IN THE AMOUNT OF US$25.00 MILLION EQUIVALENT TO THE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00001961 IMPLEMENTATION COMPLETION AND RESULTS
More informationCALL FOR PROPOSALS ACCESS TO AND USE OF ICT FOR WOMEN AND GIRLS
CALL FOR PROPOSALS ACCESS TO AND USE OF ICT FOR WOMEN AND GIRLS Guidelines for grant applicants Information and Communication Technology (ICT) for Development NOTICE This is an Open Call for Proposals.
More informationCOMPANY PROFILE 2016
COMPANY PROFILE 2016 takasolutions upgrades buildings to reduce the energy, water and costs at no expense to the owner while sharing the savings. TARGET CLIENTS THE CONCEPT Clients and buildings that are
More informationPT INDONESIA INFRASTRUCTURE FINANCE (SEMS) Printed from llf website on 16 November 2016.
Public Disclosure Authorized PT INDONESIA SFG2649 SOCIAL AND ENVIRONMENTAL MANAGEMENT SYSTEM Public Disclosure Authorized (SEMS) Public Disclosure Authorized Printed from llf website on 16 November 2016.
More informationTajikistan Asian Development Bank (ADB)
Water Resources Management in the Pyanj River Basin (Additional Financing) - Institutional Development of the State Agency for Hydrometeorology of Tajikistan Tajikistan Asian Development Bank (ADB) 07
More informationAdministration Division Public Works Department Anchorage: Performance. Value. Results.
Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,
More information