The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

Size: px
Start display at page:

Download "The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report."

Transcription

1 Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not been reported, this should not be construed to mean that there is full compliance with that condition of the licence. Instructions and actions arising from the visit shall be addressed, or where applicable noted, by the licensee in order to ensure compliance, to improve the environmental performance of the installation and to provide clarification on certain issues. The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Licensee Name of Installation Licensee Enva Ireland Limited (Naas Road) Enva Ireland Limited Licence Register No. W CRO Site Address Site Visit Reference No. John F. Kennedy Industrial Estate, John F. Kennedy Road, Naas Road, Dublin SV11053 Report Detail Issue Date 11/05/2017 Prepared By Barry O'Connor Site Visit Detail Date Of Inspection 13/04/2017 Announced No Time In 09:20 Time Out 16:55 Agency Personnel On Site Licensee Personnel and Role Rachel Griffith Barry O'Connor Tom Keogh - Site Supervisor Sarah Louise Malone - Site Administrator Richard Kennedy - Business Manager Photo Taken Yes Samples Taken No Video Taken No Site Visit Report - SV Enva Ireland Limited Page 1 of 15

2 Scope Site visit to assess compliance with Licence Reg. No. W Media The following environmental media were assessed at the time of the site visit: Waste Water Air Site Areas Inspected The following site areas were inspected at the time of the site visit: Waste storage areas including areas 1 and 2 Waste treatment area Tank farm Yard areas Maintenance shed Sampling points Documents Inspected The following documents were inspected at the time of the site visit: : Bund Register : Surface water inspection record (SW1), Effluent inspection record (SE3) and Interceptor Cleaning record (2017) : Pipeline pressure tests (2014) 5.2: Waste acceptance records (2017) and rejected loads records (2017) 8.1: Groundwater and surface water monitoring records (2017) 7.1: Nuisance Control Inspection Record (2017) 9.2: Emergency response procedure and firewater risk assessment (2012) 10.3: Fire drill records, training certificates, fire safety awareness training records (2016) : Environmental Liabilities Risk Assessment - ELRA (2014) 4.1: Closure, Restoration and Aftercare Management Plan - CRAMP Site Visit Report - SV Enva Ireland Limited Page 2 of 15

3 1. Incidents and Complaints 1.1 If discharge/emission exceedances have occurred in the preceding 12 month period, was the EPA and any other appropriate authorised authority notified as per licence requirements? Not Applicable 9.1 / 2A 1.2 If discharge/emission exceedances have occurred in the preceding 12 month period, has the Licensee taken appropriate and effective actions to mitigate a recurrence of these incidents? Not Applicable 9.1 / 2B Site Visit Report - SV Enva Ireland Limited Page 3 of 15

4 2. Incident Prevention 2.1 Are emergency shut-off valves for discharges to sewer and surface water easily accessible and clearly labelled? Yes Have staff received adequate training in relation to fire prevention and response in the event of an incident? Checked / 10.3(b) Yes The training record for Gary Cummins was incomplete for the following sections: Fire Safety Awareness Use of extinguishers Fire Protection The licensee indicated that the above training has been completed but the record is yet to be updated. Action: The licensee shall maintain up to date records of all training undertaken by facility staff. Furthermore, the licensee shall ensure that personnel performing specifically assigned tasks shall be qualified on the basis of appropriate education, training and experience, as required and shall be aware of the requirements of Licence Reg. No. W Has the site been free of discharge/emission exceedances in the preceding 12 month period? Yes 6.1 Site Visit Report - SV Enva Ireland Limited Page 4 of 15

5 3. Infrastructure Integrity & Drainage 3.1 Has the integrity of bunds, tanks, pipelines and containment structures been demonstrated to the Agency and are these fit for purpose? Checked Refer to Section Has a fire water risk assessment been undertaken for the site and all associated actions been implemented? Yes Is the current drainage infrastructure serving the waste storage and handling areas adequate to collect & divert run-off? Yes Where abatement infrastructure is installed, is it adequately maintained and operated? Checked Yes A carbon filter is located at the top of the holding tanks to reduce fugitive odour causing emissions. The carbon filter is not recorded on the site's preventative maintenance schedule. Action: The licensee shall ensure the carbon filter is being maintained in accordance with the instructions issued by the manufacture and shall include the filter on the site preventative maintenance schedule. Written records of all maintenance shall be maintained and kept on-site by the licensee. Site Visit Report - SV Enva Ireland Limited Page 5 of 15

6 4. Waste Acceptance Procedures / LoW Codes 4.1 Is documentation available to demonstrate that the waste characterisation undertaken is satisfactory? Yes 5.2.2, Is compositional analysis performed as part of the initial hazardous waste characterisation process? Yes If wastes are accepted from a known customer, are spot checks performed intermittently to verify the baseline characterisation data? Yes Site Visit Report - SV Enva Ireland Limited Page 6 of 15

7 5. Waste Handling 5.1 Is appropriate infrastructure installed, operated and maintained to mitigate the risk of an incident occurring? Checked 5.7 Yes A metal rack supporting an intermediate bund container (IBC) containing waste was damaged, photograph DSCF0019 refers. Action: The licensee shall ensure the appropriate storage of materials at all times. 5.2 Is there a documented waste acceptance procedure maintained at the facility? Yes Yes The waste acceptance procedure has not been updated. This issue was raised in a previous Agency site inspection in 2016, site visit Ref. No. SV08255 refers. Action: The licensee shall review and update the waste acceptance procedures at the facility, without delay, as was previously set out in a corrective action during an Agency site visit in Are all containers, including waste and fuel tanks and drums, labelled to clearly indicate their contents? Checked Is all waste stored in designated areas, protected as may be appropriate against spillage and contaminated run-off? Yes 5.4 Where a waste acceptance procedure is in place, is it being complied with? Yes Site Visit Report - SV Enva Ireland Limited Page 7 of 15

8 6. Site Specific Issues 6.1 Bunding Checked , Yes All of the mobile bunds observed on site are not recorded on the facilities bund register, and records were not available to demonstrate their integrity to the Agency on the day. This is in non-compliance with A bund located in the Rundown Screen Building, reference number 3, was full of oil, photograph DSCF0012 refers. The tanker dig out bund, reference number 7, contained a volume of aqueous waste and was not desludged as necessary, photograph DSCF0002 refers. This is in non-compliance with Action: The licensee shall update the facilities bund register to include all bunds in use on site. Records of the integrity and water tightness of all the bunds and their resistance to penetration by water or other materials stored therein shall be kept by the licensee. All bunds shall be inspected weekly, desludged as necessary and properly maintained at all times. The licensee shall ensure that all bunds, including fixed and mobile bunds, are included in the sites inspection checklist, without delay. 6.2 DMP / ELRA Checked 4.1, Yes An ELRA dated 2014 was reviewed on the day of inspection. A Decommissioning Management Plan (DMP) was not available for review during the inspection. This issue was previously raised by the Agency in a 2016 site visit Ref. No. SV08255 refers. This is in non-compliance with 4.1 Action: The licensee shall update the facilities ELRA, and prepare a fully detailed and costed plan for the decommissioning or closure of the site as per the previous corrective action outlined in Section 1.1 of the 2016 Agency site visit Ref. No. SV08255, without delay. 6.3 Emergency Response Procedure (ERP) Checked 9.2 Yes Site Visit Report - SV Enva Ireland Limited Page 8 of 15

9 The ERP was reviewed and the following observations were made on the day of the inspection: - The document was not dated. - Site maps were illegible. - The interceptor shut off valve is referenced in the 'General evacuation roles' section only. - The ERP does not reference the EPA 'Guidance to licensee on the Preparation of Accident Prevention Procedures and Emergency Response Procedures' document. - No reference is made to how emergency scenarios occurring out of normal hours of operation will be detected and communicated. - An up to date waste storage map for the facility is not included. - The document did not contain a senior site manager or company director signature. Action: The licensee shall carry out a review the facilities ERP document and update as required. 6.4 Filter Press Interceptor Spill Checked Yes The filter press was not operating on the day of the inspection and a spillage was observed in the tank farm bund which the licensee indicated was from an overtopping of the filter press interceptor tank. The licensee indicated that more oil than normal had entered the interceptor tank through the process sludge treatment, causing a possible blockage of the sump and the licensee stated an investigation had commenced as to how this had occurred. The licensee stated that staff from another of the licensee's facilities were due on site to carry out a clean up of the bund. The licensee indicated that the filter press interceptor tank was last cleaned out on the 23/01/2017. Action: The licensee shall empty the filter press interceptor tank and carry out a clean up of the bund, without delay. The licensee shall investigate the reason for the spillage from the interceptor tank, record and retain the results of the investigation and put suitable preventative measures in place to avoid a re-occurrence. The licensee shall carry out a review of the suitability of the frequency of preventative maintenance currently scheduled for the interceptor tank. 6.5 Process Flow Diagram No Yes The licensee could not provide an up to date process flow diagram for the facility on the day of inspection. Action: The licensee shall carry out activities in accordance with the facilities process flow diagram, a copy of which shall be available for inspection at all times. 6.6 Outdoor storage covers Checked Yes Site Visit Report - SV Enva Ireland Limited Page 9 of 15

10 The waste alum sludge pile in Bund 7 in the yard area was un-covered at the time of inspection, photograph DSCF0002 refers. The licensee indicated that the metal bars used to support the bund cover were currently under repair. The hazardous filter cake from the press was stored in a partially covered skip in the yard area. Creosote coated ESB poles were observed stored in an open top trailer unit in the yard. Action: The licensee shall ensure that all wastes stored in yard areas are covered at all times. 6.7 Spillages Checked , 9.3, Yes Spillages of landfill leachate to hardstanding were observed during the tanker truck unloading process, photograph DSCF0008 refers. Action: The licensee shall prevent and/or put measures in place to capture spillages during transfers to the facilities tank farm. 6.8 Colour coded gullies Checked Yes Some surface water gullies in the yard area were not appropriately colour coded, photograph DSCF0004 refers. Action: All surface water discharge gullies, drainage grids and manhole covers shall be painted with blue triangles. These colour codes shall be maintained so as to be visible at all times during facility operation. 6.9 Environmental Objectives Checked Yes An air line hose used in the transfer of waste liquids to the tank farm was in constant operation during the site visit, despite no transfer of liquids occurring. The licensee indicated that this was not a maintenance issue, but does lead to a higher energy use at the facility. Action: The licensee shall give adequate consideration to updating the facilities Schedule of Environmental Targets and Objectives to target a specific reduction in energy use through the air line hose and/or any other energy reduction measures deemed appropriate High Level Alarm Checked Yes Site Visit Report - SV Enva Ireland Limited Page 10 of 15

11 The grease tank (No.7) in the tank farm does not contain a high level alarm and a manual process is in place to record levels of grease. The licensee indicated that the facility were considering the installation of a SCADA remote monitoring system for all the storage tanks at the facility. Action: The licensee shall ensure compliance with Monitoring Reports Checked 10.3(e) Yes The sewer monitoring reports reviewed did not contain a summary, discussion or conclusion and did not specify the Emission Limit Value (ELV) beside the monitoring results. Action: All monitoring reports submitted to the Agency for review shall include a licensee summary as a minimum. The licensee shall specify the ELV value on result tables, or other, to allow for a direct comparison. Site Visit Report - SV Enva Ireland Limited Page 11 of 15

12 Summary 2 non-compliances and 13 observations were recorded against Licence Reg. No. W during the site visit. The licensee shall implement each of the corrective actions outlined in this report in order to rectify the issues raised, without delay. FOLLOW-UP ACTIONS You are required to complete the instructions and actions, as outlined in this report, within the specified timeframe. Where required, you shall respond to actions specified in Investigations within the required timeframe.the licensee shall maintain documentary evidence, for review by the EPA, that the prescribed corrective actions were completed within the required timeframe. (i) Investigations You are not required to respond directly to items contained in this EPA site visit report; where an issue requires a direct response, the EPA will generate a Investigation through the EDEN system. You will receive notification when a Investigation instruction or action is generated. (ii) Publication of reports and licensee response. Please note that this Site Visit Report will be made available for public viewing via the EPA s Licence Enforcement Access Portal within one day of the issue date and will be published on the Licence Details Page of the EPA s website, that relates to your licence 60 calendar days after the issue date. You may if you choose submit, within 45 calendar days of the issue date of this Site Visit Report, a Licensee Public Response that will be published alongside the Site Visit Report. This Response, should you wish to avail of it, provides you with an opportunity to inform the public about how you are implementing the actions set out in the report, activities underway, timescales and target completion dates. Please be aware that the content of your Licensee Public Response must be factual and should not breach the EPAs stated online publication standards. If you wish to submit a Licensee Public Response to an EPA Site Visit Report, you should do this by clicking on the Make a Response link on the Site Visits page in EDEN. A.pdf document containing your response can be attached and submitted from here. (iii) Response to Site visit report Where you do wish to respond directly to a site visit report, you should do this by generating a Licensee Return of the type Site Updates/Notifications and the sub-type Response to EPA Report in EDEN. Please note that you are required to comply with the conditions of your licence at all times, and where noncompliance occurs you must restore compliance within the shortest possible time. These actions will be verified during subsequent EPA visits. Please quote the above Inspection Reference in any future correspondence in relation to this Report. Site Visit Report - SV Enva Ireland Limited Page 12 of 15

13 Photographs 13/04/2017 DSCF0019: IBC stored on damaged racking DSCF0012: Bund full of oil in Rundown Screen Building Site Visit Report - SV Enva Ireland Limited Page 13 of 15

14 DSCF0002: Bund 7 Alum sludge containing aqueous waste DSCF0008: Tanker leachate spillage Site Visit Report - SV Enva Ireland Limited Page 14 of 15

15 DSCF0004: Surface water gully not appropriately colour coded Site Visit Report - SV Enva Ireland Limited Page 15 of 15

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

INTEGRATED POLLUTION CONTROL LICENCE

INTEGRATED POLLUTION CONTROL LICENCE This licence was amended on 17 th September 2007 under Section 96(1) of the EPA Acts 1992 and 2003. The details of Amendment A must be read in conjunction with this licence. The amendment document is entitled

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION

INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION Headquarters, Johnstown Castle Estate, County Wexford, Ireland INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION Licence Register Number: Applicant: Location of Activity: 564 Arthur P. Dinan Limited

More information

EPA Application Form

EPA Application Form EPA Application Form 9.1 - Environmental Management Techniques - Attachment Organisation Name: Glanway Ltd Application I.D.: LA 001486 Page 1 of 17 Amendments to this Application Form Attachment Version

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

Guidance on the preparation and submission of Annual Environmental Reports for waste water discharge licences

Guidance on the preparation and submission of Annual Environmental Reports for waste water discharge licences Guidance on the preparation and submission of Annual Environmental Reports for waste water discharge licences Environmental Protection Agency An Ghníomhaireacht um Chaomhnú Comhshaoil P.O. Box 3000, Johnstown

More information

TRANSFER STATION WASTE LICENCE. Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland 193-1

TRANSFER STATION WASTE LICENCE. Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland 193-1 Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland WASTE LICENCE TRANSFER STATION Waste Licence Register Number: Licensee: Location of Facility: 193-1 Irish Bulk Liquid Storage Limited

More information

Environmental Management Plan

Environmental Management Plan (Operational Sites) 1 P a g e A. Introduction An is a written document with the purpose to provide mitigation measures and principles for the management of sites in order to reduce potential impacts to

More information

VIRIDOR WASTE MANAGEMENT LIMITED. Lostock Waste Treatment Plant. Accident Management Plan. November 2009

VIRIDOR WASTE MANAGEMENT LIMITED. Lostock Waste Treatment Plant. Accident Management Plan. November 2009 VIRIDOR WASTE MANAGEMENT LIMITED Lostock Waste Treatment Plant CONTENTS 1 Introduction... 1 2 Mitigation... 8 2.1 Inadequate waste acceptance procedures... 8 2.2 Waste storage... 9 2.3 Transfer of substances...

More information

Doherty Brothers Timber Company Limited

Doherty Brothers Timber Company Limited Annual Environmental Report 2008 Doherty Brothers Timber Company Limited Licence Number: P0354-01 Report Date: 14 th September 2009 Report Number: 1010-09-01 Version 0 40 Coolraine Heights, Old Cratloe

More information

Waste Water Incidents

Waste Water Incidents Waste Water Incidents Guidance for Irish Water on the types of incidents that should be reported to the EPA Definition: The following shall constitute an incident for the purpose of the licence or certificate:

More information

Waste Water Discharge Licence Audit Report

Waste Water Discharge Licence Audit Report Waste Water Discharge Licence Audit Report The audit is a random sample on a particular day of a facility s operation and environmental performance. Lack of reporting of an area or issue should not be

More information

Waste Water Discharge

Waste Water Discharge Environmental Protection Agency An Ghnfomhakacht urn Chaomhnl Comhshaoii Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland Waste Water Discharge Certificate of Authorisation Certificate

More information

"UTH d BERTENVIRONMENTAL

UTH d BERTENVIRONMENTAL "UTH d BERTENVIRONMENTAL I Objection To Proposed Decish Industrial Emissions Licepw Register No PO997-01. Prepared By Cuthbert Environmental 14 AIIendde Axenue Mdboum Bishopstown Cork Prepared For The

More information

LICENCE REG NO. W HAS BEEN TRANSFERED

LICENCE REG NO. W HAS BEEN TRANSFERED AMENDMENT UNDER S42B(1) OF THE WASTE MANAGEMENT ACTS, 1992 TO 2003 This licence was amended on 7 April 2005 under Section 42B(1) of the Waste Management Acts 1996 to 2003. The details of the amendment

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Bantry Licence Register No. D0168-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section 2.

More information

The APP and ERP should be site specific and may consist of a single document each or a series of linked documents.

The APP and ERP should be site specific and may consist of a single document each or a series of linked documents. 1. Purpose The purpose of this document is to set out the minimum requirements of the Environmental Protection Agency (EPA) for Accident Prevention Procedures (APP), Emergency Response Procedures (ERP),

More information

PROPOSED DECISION WASTE LICENCE. Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland

PROPOSED DECISION WASTE LICENCE. Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland WASTE LICENCE PROPOSED DECISION Waste Licence Application Register Number: 192-1 Applicant: Rilta Limited t/a Sita Environmental

More information

INSPECTORS REPORT ON A LICENCE APPLICATION

INSPECTORS REPORT ON A LICENCE APPLICATION OFFICE OF LICENSING & GUIDANCE INSPECTORS REPORT ON A LICENCE APPLICATION To: Directors From: Aoife Loughnane - Licensing Unit th Date: 20 July 2006 RE: Application for an IPPC Licence Review from Huntstown

More information

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P Clogrennane Lime Ltd Toonagh Lime Works AER 2010 Licence # P0 771-01 Section 1 Overview. 3 1.0 Introduction 1.1 Description of Activities 1.2 Responsibility for Environmental Management 1.3 Environmental

More information

Environmental Conditions Laboratories (for commercial use) Group

Environmental Conditions Laboratories (for commercial use) Group GBR No. 20 Environmental Conditions Laboratories (for commercial use) Group ERA regulates the environmental impact of enterprises through two key mechanisms. Smaller scale activities are regulated through

More information

Jim Bridger Plant Document Type: PLANT POLICIES & PROCEDURES Document ID Number: ENV-CCR001

Jim Bridger Plant Document Type: PLANT POLICIES & PROCEDURES Document ID Number: ENV-CCR001 Jim Bridger Plant Document Type: PLANT POLICIES & PROCEDURES Document ID Number: ENV-CCR001 Department: Environmental Review Date: 09/01/2015 SUBJECT: CCR Fugitive Dust Control Plan Reviewed By: Dale Gillespie

More information

GUIDE TO THE PREPARATION OF A WORKING PLAN WASTE TRANSFER / TREATMENT FACILITY

GUIDE TO THE PREPARATION OF A WORKING PLAN WASTE TRANSFER / TREATMENT FACILITY GUIDE TO THE PREPARATION OF A WORKING PLAN WASTE TRANSFER / TREATMENT FACILITY A working plan is an essential document and consists of a written statement accompanied by plans, drawings and specifications

More information

RILTA ENVIRONMENTAL Ltd. ENVIRONMENTAL MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL ISO 14001:2004

RILTA ENVIRONMENTAL Ltd. ENVIRONMENTAL MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL ISO 14001:2004 RILTA ENVIRONMENTAL Ltd. ENVIRONMENTAL MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL In accordance with ISO 14001:2004 Environmental Management System Manual Page 1 of 29 CONTENTS i ii iii iv

More information

Annual Environmental Report (Period 1 st January 2008 to 31 st December 2008)

Annual Environmental Report (Period 1 st January 2008 to 31 st December 2008) Ireland Town Centre House, Dublin Road, Naas, Co. Kildare, Ireland Tel: [353] (0)45 874411 Fax: [353] (0)45 874549 E-mail: info@golder.ie http://www.golder.com Annual Environmental Report (Period 1 st

More information

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV-000018-008 LNG Project Page 2 of 14 CONTENTS 1.0

More information

Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland. INDUSTRIAL EMISSIONS LICENCE Recommended Determination P

Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland. INDUSTRIAL EMISSIONS LICENCE Recommended Determination P Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland INDUSTRIAL EMISSIONS LICENCE Recommended Determination Licence Register Number: Company Register Number: Licensee: Location of

More information

Wastewater Management Procedure Environment

Wastewater Management Procedure Environment 1 Purpose and Scope This procedure specifies the operational environmental requirements relating to the management of wastewater and the operation and maintenance of Roy Hill wastewater treatment plants

More information

EPA Report on the investigation of the Lime spill incident which occurred at the Dublin Waste to Energy Facility, Poolbeg on 7 th June 2017.

EPA Report on the investigation of the Lime spill incident which occurred at the Dublin Waste to Energy Facility, Poolbeg on 7 th June 2017. EPA Report on the investigation of the Lime spill incident which occurred at the Dublin Waste to Energy Facility, Poolbeg on 7 th June 2017. Summary Dublin Waste to Energy Limited (hereafter referred to

More information

Attachment C Management of the Installation

Attachment C Management of the Installation Table of Contents Attachment C Management of the Installation C1.1 Organisational Chart C1.2 Quality, Safety and Environmental (QSE) Policy Statement C1.3 Roles & Responsibilities of Key Environmental

More information

ATTACHMENT J ACCIDENT PREVENTION & EMERGENCY RESPONSE

ATTACHMENT J ACCIDENT PREVENTION & EMERGENCY RESPONSE ATTACHMENT J ACCIDENT PREVENTION & EMERGENCY RESPONSE Attachment J Industrial Emissions Licence Application J.1 Accident Prevention This Accident Prevention information sets out the various measures at

More information

EPA WASTE WORKSHOP. Hodson Bay Hotel, Athlone, Co.Westmeath. Thursday 24 th October 2013

EPA WASTE WORKSHOP. Hodson Bay Hotel, Athlone, Co.Westmeath. Thursday 24 th October 2013 EPA WASTE WORKSHOP Hodson Bay Hotel, Athlone, Co.Westmeath. Thursday 24 th October 2013 Enforcement in the Waste Sector in 2013 Jim Moriarty Manager, Environmental Enforcement (Waste) Damien Masterson

More information

WASTE LICENCE. Headquarters, P.O. Box 3000, Johnstown Castle Estate County Wexford, Ireland 158-1

WASTE LICENCE. Headquarters, P.O. Box 3000, Johnstown Castle Estate County Wexford, Ireland 158-1 Headquarters, P.O. Box 3000, Johnstown Castle Estate County Wexford, Ireland WASTE LICENCE Waste Licence Register Number: Licensee: Location of Facility: 158-1 Ray Whelan Limited Waste Services, Cappanaboe,

More information

WESTPORT, CO. MAYO, IRELAND.

WESTPORT, CO. MAYO, IRELAND. - c. ALLERCAN GEE PHARMACEUTICALS IRELAND TELEPHONE: +353-98-25222 TELEFAX: +353-98-25791 WEB SITE: www.allergan.com WESTPORT, CO. MAYO, IRELAND. Office of Climate, Licensing & Resource Use, EPA Headquarters,

More information

Rhode Peaking Power Plant. Annual Environmental Report 2008

Rhode Peaking Power Plant. Annual Environmental Report 2008 Rhode Peaking Power Plant Annual Environmental Report 2008 Table of Contents Subject Page Introduction 1 Summary Information Plant Operation Data 1 Emissions to Air 1 Emissions to Water 2 Waste 2 Energy

More information

Drinking Water Audit Report

Drinking Water Audit Report Drinking Water Audit Report County: Limerick Date of Audit: 20/02/2017 Plant(s) visited: Newcastlewest PWS Date of issue of Audit Report: File Reference: Auditors: 30/03/2017 DW2014/283 Ms. Cliona Ní Eidhin

More information

Table 4.7.2(II) BREF Document on Best Available Techniques on Emissions from Storage, July 2006

Table 4.7.2(II) BREF Document on Best Available Techniques on Emissions from Storage, July 2006 Table 4.7.2(II) BREF Document on Best Available Techniques on Emissions from Storage, July 2006 With respect to the Conclusions on BAT for this horizontal BREF, the details of applicability and status

More information

ACCIDENT PREVENTION & EMERGENCY RESPONSE

ACCIDENT PREVENTION & EMERGENCY RESPONSE Attachment J ACCIDENT PREVENTION & EMERGENCY RESPONSE Cadbury Ireland Limited Project Ref: OES1061_01 Cadbury Ireland Limited February 2007 Attachment J J.1 Accidental Emissions Control Accidental emissions

More information

Annual Environmental Report 2015

Annual Environmental Report 2015 Annual Environmental Report 2015 Agglomeration Name: Licence Register. D0063-01 Blessington Table of Contents Section 1. Executive Summary and Introduction to the 2015 AER 1 1.1 Summary report on 1 Section

More information

DREHID MECHANICAL BIOLOGICAL TREATMENT FACILITY WASTE LICENCE APPLICATION ATTACHMENTS JUNE 2012

DREHID MECHANICAL BIOLOGICAL TREATMENT FACILITY WASTE LICENCE APPLICATION ATTACHMENTS JUNE 2012 DREHID MECHANICAL BIOLOGICAL TREATMENT FACILITY WASTE LICENCE APPLICATION ATTACHMENTS JUNE 2012 TOBIN CONSULTING ENGINEERS ATTACHMENTS TO WASTE LICENCE APPLICATION Prepared on behalf of: Bord na Móna Plc.

More information

26 th October 2016 IPPC Licence No: W Company. Re: Request for Technical Amendment

26 th October 2016 IPPC Licence No: W Company. Re: Request for Technical Amendment RILTA Environmental Ref: ENV3716.epa E-Mail: conor_wall@clearcircle.com 26 th October 2016 IPPC Licence No: W0192-03 Company RILTA Environmental Limited Subject Re: Request for Technical Amendment Dear

More information

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21 CONTENTS PAGE 1 INTRODUCTION 3 2. GENERAL OVERVIEW OF THE ACTIVITY 4 3 DATA 3.1 Emissions to Atmosphere 4 3.2 Surface Water Emissions 5 3.3 Ground Water Sampling 8 3.4 Noise 8 3.5 Inspection of Valves

More information

Annual Environmental Report ANNUAL ENVIRONMENTAL REPORT 2012

Annual Environmental Report ANNUAL ENVIRONMENTAL REPORT 2012 ANNUAL ENVIRONMENTAL REPORT 2012 Contents 1.0 Introduction...3 1.1 Site Activities... 3 1.2 Company Environmental Policy... 3 1.3 Organisation chart for Environmental Management... 3 2.0 Summary Information...4

More information

BEVERAGE CANS REVESBY

BEVERAGE CANS REVESBY BEVERAGE CANS REVESBY POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Environment Protection Authority License 643 Item ID: 8409 Version: 1.2 Page 1 of 16 1.0 OVERVIEW AND LEGAL REQUIREMENTS This Pollution

More information

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21 CONTENTS PAGE 1 INTRODUCTION 3 2. GENERAL OVERVIEW OF THE ACTIVITY 4 3 DATA 3.1 Emissions to Atmosphere 5 3.2 Surface Water Emissions 6 3.3 Ground Water Sampling 8 3.4 Noise 10 3.5 Inspection of Valves

More information

Trade Effluent. 19 th October 2017

Trade Effluent. 19 th October 2017 Trade Effluent 19 th October 2017 Trade Effluent for Open Market Why The wholesale Trade Effluent standard is an integral part of Severn Trent wholesale operations and provides further clarification in

More information

WINGECARRIBEE SHIRE COUNCIL Southern Regional Livestock Exchange POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

WINGECARRIBEE SHIRE COUNCIL Southern Regional Livestock Exchange POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN WINGECARRIBEE SHIRE COUNCIL Southern Regional Livestock Exchange POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to

More information

Annual Environmental Report 2013

Annual Environmental Report 2013 Annual Environmental Report 2013 For Woodland Products Ltd., Drumully, Emyvale, Co. Monaghan IPPC Reg. No. P0198-01 By QED Engineering Ltd., M-TEK Building 1 Armagh Road Monaghan July 2014 Table of Contents

More information

Annual Environmental Report 2015

Annual Environmental Report 2015 Annual Environmental Report 2015 For Woodland Products Ltd., Drumully, Emyvale, Co. Monaghan IPPC Reg. No. P0198-01 By QED Engineering Ltd., M-TEK Building 1 Armagh Road Monaghan March 2016 Table of Contents

More information

GUIDE TO THE PREPARATION OF A WORKING PLAN SCRAPYARD / ELV FACILITY

GUIDE TO THE PREPARATION OF A WORKING PLAN SCRAPYARD / ELV FACILITY GUIDE TO THE PREPARATION OF A WORKING PLAN SCRAPYARD / ELV FACILITY A working plan is an essential document and consists of a written statement accompanied by plans, drawings and specifications detailing

More information

HAZARDOUS WASTE STORAGE, LESS THAN 90 DAY SITE LEACHATE SUMP AT RUSSELL ROAD LANDFILL

HAZARDOUS WASTE STORAGE, LESS THAN 90 DAY SITE LEACHATE SUMP AT RUSSELL ROAD LANDFILL ENVIRONMENTAL STANDARD OPERATING PROCEDURE 2 HAZARDOUS WASTE STORAGE, LESS THAN 90 DAY SITE LEACHATE SUMP AT RUSSELL ROAD LANDFILL 1. Version, Date. 3, 05 March 2014 (EMS) 2. Purpose. This Environmental

More information

Pollution Prevention and New Industrial Estates

Pollution Prevention and New Industrial Estates Pollution Prevention and New Industrial Estates Chris Pittner Associate Director WSP 21 May 2012 POLLUTION PREVENTION AND NEW INDUSTRIAL ESTATES Pollution within Industrial Estates Legal Framework and

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan Gunnedah Quarry Products Pty Ltd Prepared by Tim MacKellar, Gunnedah Quarry Products Document created 13.10.13 Reviewed 10.10.14 Reviewed 12.10.15 Reviewed 02.02.18

More information

Standard rules SR2012 No13 Treatment of Incinerator Bottom Ash (IBA)

Standard rules SR2012 No13 Treatment of Incinerator Bottom Ash (IBA) Standard rules Chapter 4, The Environmental Permitting (England and Wales) Regulations 2016 Standard rules SR2012 No13 Treatment of Incinerator Bottom Ash (IBA) Part A Installation - treatment capacity

More information

Davenport Water Pollution Control Pretreatment Office Elements of a Slug/Spill Prevention, Control and Countermeasure Plan

Davenport Water Pollution Control Pretreatment Office Elements of a Slug/Spill Prevention, Control and Countermeasure Plan Davenport Water Pollution Control Pretreatment Office Elements of a Slug/Spill Prevention, Control and Countermeasure Plan 1) Introduction a) All user dischargers to the collection system discharging to

More information

SECTION 76A( 11) AMENDMENT

SECTION 76A( 11) AMENDMENT An Ghnlomhaireocht um Choomhnri Comhshaoil Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford reland SECTON 76A( 11) AMENDMENT TO NDUSTRAL EMSSONS LCENCE t Licence Register Number: Licens

More information

Crushing and Screening Management Procedure Environment

Crushing and Screening Management Procedure Environment 1 Purpose and Scope This procedure specifies the operational environmental requirements relating to crushing and screening management at the Roy Hill Project. This procedure applies to all personnel involved

More information

Pollution Prevention: Private, commercial and military airfields.

Pollution Prevention: Private, commercial and military airfields. Pollution Prevention: Private, commercial and military airfields. The following notes are intended to give broad guidance on the potential for pollution at airfields and its prevention. 1. INTRODUCTION

More information

Objection To. Proposed Decision. Industrial Emissions Licence Register No P Prepared By. O Callaghan Moran & Associates

Objection To. Proposed Decision. Industrial Emissions Licence Register No P Prepared By. O Callaghan Moran & Associates Unit 15 Melbourne Business Park Model Farm Road Cork T: 021 434 5366 E: info@ocallaghanmoran.com www.ocallaghanmoran.com Objection To Proposed Decision Industrial Emissions Licence Register No P1006-01

More information

EF10 Site Environmental Audit - 1 / 8

EF10 Site Environmental Audit - 1 / 8 EF10 Site Environmental Audit Site... Date... Internal/external audits 1. Have all corrective actions raised at previous audits been implemented (EF07)? O O O 2. Have actions taken been monitored to confirm

More information

CONTRACTOR WHS HAZARD STANDARD MOBILE POWERED PLANT EXTERNAL USE ONLY

CONTRACTOR WHS HAZARD STANDARD MOBILE POWERED PLANT EXTERNAL USE ONLY CONTRACTOR WHS HAZARD STANDARD MOBILE POWERED PLANT EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

Environmental Permitting Regulations (England & Wales) 2016

Environmental Permitting Regulations (England & Wales) 2016 Environmental Permitting Regulations (England & Wales) 2016 Regulatory Guidance Series RGN 9 Surrender Surrender version 6- August 2017 1 Document Owner: National Services/ Evidence, Policy and Permitting

More information

Notice of variation with introductory note

Notice of variation with introductory note Notice of variation with introductory note Environmental Permitting (England & Wales) Regulations 2010 Cleansing Service Group Limited CSG Sealand Treatment Plant Tamar View Industrial Estate Saltash Cornwall

More information

WORK IN THE VICINITY OF UNDERGROUND ASSETS

WORK IN THE VICINITY OF UNDERGROUND ASSETS CONTRACTOR WHS HAZARD STANDARD WORK IN THE VICINITY OF UNDERGROUND ASSETS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD

More information

IPC Licence P AER Report Waterford Crystal Springmount Dungarvan Co. Waterford

IPC Licence P AER Report Waterford Crystal Springmount Dungarvan Co. Waterford IPC Licence P0156-01 AER Report 2008 Waterford Crystal Springmount Dungarvan Co. Waterford 31 st March 2009-1 - Table of Contents Page No. 1.0 Introduction 3 1.1 Brief Description of Site Activities 1.2

More information

Modification Number: M1

Modification Number: M1 1 General considerations...1 2 Site engineering for pollution prevention and control...10 3 Site infrastructure...13 4 Site operations...14 5 Amenity management and reporting...21 6 Site records...24 7

More information

Essidev SA Trading as Organic Lens Manufacturing IPPC License P Annual Environmental Report 2008

Essidev SA Trading as Organic Lens Manufacturing IPPC License P Annual Environmental Report 2008 ESSIDEV SA T/A ORGANIC LENS MANUFACTURING IPPC Licence P-0061-03 Essidev SA Trading as Organic Lens Manufacturing IPPC License P0061-03 Annual Environmental Report 2008 2 Contents Section 1 INTRODUCTION

More information

JBS Pollution Incident Response Management Plan

JBS Pollution Incident Response Management Plan JBS Pollution Incident Response Management Plan JBS Australia Pty Limited Prime City Feedlot, NSW Document Owner Troy White, Group Environment Manager Printed copies of this document are deemed uncontrolled

More information

WPC has prepared an Environmental Liability Risk Assessment (ELRA) and Residuals management Plan for the facility and these are included below.

WPC has prepared an Environmental Liability Risk Assessment (ELRA) and Residuals management Plan for the facility and these are included below. ATTACHMENT K: REMEDIATION, DECOMMISSIONING, RESTORATION & AFTERCARE WPC has prepared an Environmental Liability Risk Assessment (ELRA) and Residuals management Plan for the facility and these are included

More information

Waste Licence W Annual Environmental Report for 2015

Waste Licence W Annual Environmental Report for 2015 Clare County Council Waste Licence W0150-01 Annual Environmental Report for 2015 Name & location of facility: Scarriff Recycling Centre & Transfer Station, Fossa Beg, Feakle Road, Scarriff, Co. Clare.

More information

CASTLETOWNBERE WASTE TRANSFER STATION AND CIVIC AMENITY SITE

CASTLETOWNBERE WASTE TRANSFER STATION AND CIVIC AMENITY SITE 31/03/2011 Castletownbere WTS and CA Site Annual Environmental Report 2010 CASTLETOWNBERE WASTE TRANSFER STATION AND CIVIC AMENITY SITE WASTE LICENCE W0160-01 ANNUAL ENVIRONMENTAL REPORT 2010 31 st December

More information

For a complete list of all BMP categories, see Stormwater: Best Management Practices Index.

For a complete list of all BMP categories, see Stormwater: Best Management Practices Index. Stormwater: General Inspection Checklist Department: Environmental Protection Program: Stormwater This inspection checklist can be used by Stormwater Division or Environmental Services Coordinator to Conduct

More information

TABLE OF CONTENTS Attachment A. Non-Technical Summary. Attachments - Section B. General. B.1 Applicant Details

TABLE OF CONTENTS Attachment A. Non-Technical Summary. Attachments - Section B. General. B.1 Applicant Details TABLE OF CONTENTS Attachment A Non-Technical Summary B.1 Applicant Details B.1. (a). B.1. (b). B.1. (c). Attachments - Section B General A Copy of the Certificate of Incorporation Company s Registration

More information

APPLICATION REVIEW CHECKLIST LAND PROTECTION DIVISION HAZARDOUS WASTE PROGRAM OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY TECHNICALLY ADMIN.

APPLICATION REVIEW CHECKLIST LAND PROTECTION DIVISION HAZARDOUS WASTE PROGRAM OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY TECHNICALLY ADMIN. Revised 02/01 APPLICATION REVIEW CHECKLIST LAND PROTECTION DIVISION HAZARDOUS WASTE PROGRAM Facility Name: Facility ID No.: ODEQ Permit No.: Reference No.: _ Application Type: Date: (New/Modify/Renewal)

More information

RE: AFIN: PERMIT NO.: 0751-WG-SW-1 WELL NAME: Squires SWD (Jessica #1-4 SWD) COUNTY: Conway Co.

RE: AFIN: PERMIT NO.: 0751-WG-SW-1 WELL NAME: Squires SWD (Jessica #1-4 SWD) COUNTY: Conway Co. June 7, 2011 Mike Cook Terra Renewal, LLC 201 South Denver, Suite B Russellville, AR 72811 RE: AFIN: 15-00605 PERMIT NO.: 0751-WG-SW-1 WELL NAME: Squires SWD (Jessica #1-4 SWD) COUNTY: Conway Co. Mr. Cook:

More information

INSPECTORS REPORT DRAFT PD REGISTER NUMBER

INSPECTORS REPORT DRAFT PD REGISTER NUMBER INSPECTORS REPORT DRAFT PD REGISTER NUMBER 156-1 Applicant: KTK Sand and Gravel Ltd. Facility: Kimmeens, Ballymore Eustace, Co. Kildare Inspector s Recommendation: The licence be granted subject to conditions.

More information

Site condition report guidance and templates

Site condition report guidance and templates Environmental Permitting Regulations Site condition report guidance and templates Site condition report and template v5 October 2014 1 Document Owner: National Services/ Knowledge, Strategy & Planning

More information

Environmental Conditions. Mushroom Farms

Environmental Conditions. Mushroom Farms GBR No. 23 Environmental Conditions Mushroom Farms MEPA regulates the environmental impact of enterprises through two key mechanisms. Smaller scale activities are regulated through a set of General Binding

More information

Environment, Ontario Operations SUBJECT WASTE MANAGEMENT. Training Code: Document Owner: ENVIRONMENT DEPARTMENT

Environment, Ontario Operations SUBJECT WASTE MANAGEMENT. Training Code: Document Owner: ENVIRONMENT DEPARTMENT Page 1 of 10 Document Owner: ENVIRONMENT DEPARTMENT Intended Users: Operational Areas within Sudbury Operations Training Code: Approved By: SENIOR SPECIALIST, ENVIRONMENT Version Control Revision Date

More information

1. Introduction. 2. Classification of Environmental Incidents

1. Introduction. 2. Classification of Environmental Incidents EPA Guidance to Licensees/COA holders on the Notification, Management and Communication of Environmental Incidents 1 1. Introduction This guidance does not purport to be a legal interpretation of the requirements

More information

OFFICE OF LICENSING & GUIDANCE

OFFICE OF LICENSING & GUIDANCE OFFICE OF LICENSING & GUIDANCE TO: REPORT OF THE TECHNICAL COMMITTEE ON OBJECTIONS TO LICENCE CONDITIONS Directors FROM: Technical Committee - LICENSING UNIT DATE: 16/05/06 RE: Objection to Proposed Decision

More information

Green Isle Foods IDA Industrial Estate Monread Road Naas Co Kildare

Green Isle Foods IDA Industrial Estate Monread Road Naas Co Kildare Green Isle Foods IDA Industrial Estate Monread Road Naas Co Kildare IPPC Licence Reg No. P0805-01 Annual Environmental Report 2008-1 - Contents Section Title Page No. 1.0 Introduction 1.1 Introduction

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Licence Register No. D0302-01 Dromahane and Environs Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on

More information