Understanding EN 10204:2004 Type 3.2 Certification. Working together for a safer world

Size: px
Start display at page:

Download "Understanding EN 10204:2004 Type 3.2 Certification. Working together for a safer world"

Transcription

1 Understanding EN 10204:2004 Type 3.2 Certification Working together for a safer world

2 EN 10204:2004 Type 3.2 Certification INTRODUCTION History and Development of the Standard Applicability; Definitions True 3.2 certification v Intent of 3.2 certification Background; Definition; Client classification Common Client Misconceptions Inspection Practicalities What, Why and How we do our Inspections

3 EN 10204:2004 Type 3.2 Certification History of the Standard Originally issued in 1991 derived from DIN Re-issued in 2004 (current version), with reduced No of certificate types seven to four. Certificate types which require independent third-party involvement were called type 3.1c in 1991 version, changed to type 3.2 in 2004 version.

4 EN 10204:2004 Type 3.2 Certification History of the Standard Applicability and definitions Scope (1.1) All metallic products e.g. plates, sheets, bars, forgings, castings. Definition (2.3) Manufacturer organization that manufactures the respective products according to the requirements of the order and to the properties specified in the referenced product specification. Definition (2.5) Product Specification complete detailed technical requirements relevant for the order, stated in written form e.g. referenced regulations, standards or other specifications. Technical Committee responsible for EN comprises mainly representatives of primary steelmakers - hence its focus on primary metallic products. Lloyd s Register (LR) often visit stockists where do they fit in with EN 10204?

5 History of the Standard Purpose of Third-Party Inspection The main purpose of Type 3.2 certification is to independently verify: Material traceability from original cast to despatch to customer. Material properties ensures material is fit for its intended purpose. The Independent Third Party s activity should add value to the material/product. The customer/end user should have assurance that the material is correct and fit for purpose.

6 True 3.2 v intent of 3.2: Background Rise in importance of stockists no longer just steel merchants. Ref:- Intermediate Material Handler LR 3.2 factsheet. Stockists now specialise in selling material into Oil & Gas supply chain Oil & Gas end-users often require third-party inspection/verification of raw materials for critical applications EN Type 3.2 certification Not always economically viable to buy 3.2 certified raw material from primary steelmaker (minimum batch quantity) Industry-driven requirement for Type 3.2 certification of material handled by stockists Can stockists be classified as manufacturers as per EN 10204? If not, how can we certify to Type 3.2 as required by Industry?

7 True 3.2 v intent of 3.2: Definition of Manufacturer LR has adopted the same definition of a manufacturer as stated in NORSOK standard M-650 Qualification of Manufacturers of Special Materials:- party, including sub-contractors, which carry out operations affecting the material properties of the finished product. Clear that Foundries, Forges, Extruders, etc. are manufacturers A stockist depending on their production route could be classed as a manufacturer If a stockist has a production route that is not classed as manufacturing, but LR Surveyors have carried out suitable inspection and witnessing of testing, then certification to the intent of EN Type 3.2 can be endorsed/issued.

8 Is this stockist a manufacturer? Saw Drill Steelmaker Stockist Customer Grind Turn No mechanical property changing operations. Stockist has not manufactured the material certification to the intent of EN

9 Is this stockist a manufacturer? Forge Heat treat Steelmaker Stockist Customer Extrude Wire draw Mechanical property changing operations have been carried out Stockist has manufactured the material certification in accordance with EN Material must be traceable through Stockist s and sub-contractor s operations.

10 Common client misconception #1 If the material has been 3.2 certified at the steelmaker there is nothing else to do. Not necessarily - complicated supply chains lead to potential traceability issues Steelmaker Stockist A Stockist B Customer How can we preserve the material s 3.2 status? Solution Independent Third Party involvement at every stage of supply chain cast transfer.

11 Common client misconception #2 The Independent Third Party can carry out a paperwork review for Type 3.2 certification. Does this verify the material s traceability or properties? Does this add value to the material? No. The Independent Third Party is just acting as an expensive spell-checker.

12 Common client misconception #3 We can ask the Test House to add EN to their Mechanical Test Report. Irrelevant Test House not the manufacturer ref: definition of Type 3.2 certificate in EN Ignores other testing that may be a requirement of product specification (e.g. NDE). Only causes confusion in the industry

13 Inspection practicalities The main purpose of 3.2 certification is to independently verify the material s: Traceability from original cast to despatch to customer Properties to ensure the material is fit for its intended purpose The Independent Third Party s activity should add value to the material/product.

14 Inspection practicalities We ll discuss a generic inspection process applicable for true and intent of 3.2 certification. Additional inspection/witnessing can be done as required by specific customer requirements (Bills of Material; ITPs, etc). All clients are different. Many scenarios can arise. LR Surveyor s experience and collaboration with the client can formulate a suitable work-around where necessary. We adopt a 3-stage inspection process:- 1: Check material s identity and stamp piece/area to be used for mechanical testing Stamp for test 2: Witness/review mechanical and metallurgical testing. 3: Review all client s documentation against product specification, endorse paperwork and inspect/stamp material for release.

15 Inspection Practicalities 1 1: Check material s identity and stamp piece/area to be used for mechanical testing Stamp for test 2: Witness/review mechanical and metallurgical testing. 3: Review all client s documentation against product specification, endorse paperwork and inspect/stamp material for release. Objective is to verify the material s identity look for original, unique identification cast/melt No, serial No, etc. Identification should be traceable within client s facility and back to the melt/cast (if a foundry), or traceable to the original steelmaker s Type 3.1 certificate (stockist, etc). If all is satisfactory, the test material is hard stamped with the Surveyor s personal stamp (initials). This identifies the material to the attending Surveyor at the Test House.

16 Inspection Practicalities 2 1: Check material s identity and stamp piece/area to be used for mechanical testing Stamp for test 2: Witness/review mechanical and metallurgical testing. 3: Review all client s documentation against product specification, endorse paperwork and inspect/stamp material for release. Witness mechanical testing usually carried out at a sub-contract, accredited (ISO 17025) testing facility. All testing equipment will be verified by the attending Surveyor as being within calibration. Testing should be carried out to the client s requirements. Failed tests will be noted on the Test Report. LR s standard policy for 3.2 certification is to witness mechanical testing tensile, impact, hardness, bend, etc. but review metallurgical testing grain size, ferrite count, corrosion test, etc. Ref: LR s 3.2 factsheet

17 Inspection Practicalities 2 1: Check material s identity and stamp piece/area to be used for mechanical testing Stamp for test 2: Witness/review mechanical and metallurgical testing. 3: Review all client s documentation against product specification, endorse paperwork and inspect/stamp material for release. Review client documentation against ALL customer s requirements Product Specification. Includes all processes that affect the material s properties and all processes required by the Product Specification (NDE, etc). Endorse client s paperwork. Inspect material to be despatched (quantity/quality, size, identification) and hard stamp ilrs + personal stamp. If required, LR can issue certification that supplements the client s certification. Includes a scope of survey and conclusion statement that material either conforms to, or is to the intent of EN Type 3.2

18 EN 10204:2004 Type 3.2 Certification Conclusions:- EN Type 3.2 certification provides assurance to the customer that:- The material is fully traceable. The material s properties meet specified requirements. Type 3.2 certified material, carried out by LR, will as a minimum have been subject to the inspection/testing/witness regime described previously. EN Type 3.2 certified material can be used in many applications not just the Oil & Gas industry where a high-level, independent assurance is required.

19 EN 10204:2004 Type 3.2 Certification Further Information:- EN 10204: 2004 Type 3.2 Inspection Certification factsheet. Explains our inspection process in more detail. LR has an extensive global network of qualified and trained Surveyors, capable of inspecting material to EN Type 3.2 and discussing technical queries. Higher concentration of Surveyors in industrial centres to meet client demand Click here to request a quote, ask a question or request a surveyor.

20 David Thompson Senior Surveyor T +44 (0) E david.thompson@lr.org Lloyd s Register 1 Trinity Park, Bickenhill Lane Birmingham B37 7ES Working together for a safer world Lloyd s Register, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause as the Lloyd s Register Group. The Lloyd s Register Group assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Lloyd s Register Group entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract. 2017, Lloyd s Register. No Part of this document may be reprinted or redistributed without express prior permission of Lloyd s Register.

Materials and Qualification Procedures for Ships

Materials and Qualification Procedures for Ships Materials and Qualification Procedures for Ships Approval of a Works for the Manufacture of Non-heat treated ERW Steel Pipes Revision 2, Sept 2014 Lloyd s Register Group Limited, its subsidiaries and affiliates

More information

Materials and Qualification Procedures for Ships

Materials and Qualification Procedures for Ships Materials and Qualification Procedures for Ships Approval of a Works for the Manufacture of Steel Forgings for Semi- Built and Continuous Grain Flow Crankshafts Revision 3, January 2015 Page 1 of 14 Lloyd

More information

Materials and Qualification Procedures for Ships

Materials and Qualification Procedures for Ships Materials and Qualification Procedures for Ships Approval of a Foundry for the Manufacture of Stainless Steel Castings including Propellers Revision 2, January 2015 Lloyd s Register Group Limited, its

More information

Materials and Qualification Procedures for Ships

Materials and Qualification Procedures for Ships Materials and Qualification Procedures for Ships Approval of a Foundry for the Manufacture of Steel Castings Revision 3, January 2015 Lloyd s Register Group Limited, its subsidiaries and affiliates and

More information

Materials and Qualification Procedures for Ships

Materials and Qualification Procedures for Ships Materials and Qualification Procedures for Ships Approval of a Works for the Manufacture of Chain Cable for ships Revision 2, April 2015 Page 1 of 19 Lloyd s Register Group Limited, its subsidiaries and

More information

Materials and Qualification Procedures for Ships

Materials and Qualification Procedures for Ships Materials and Qualification Procedures for Ships Approval of Works for the Manufacture of Fusion Welded Pressure Vessels Revision 4, July 2015 Page 1 of 17 Lloyd s Register Group Limited, its subsidiaries

More information

Overview of Draft API Standard 20M

Overview of Draft API Standard 20M Overview of Draft API Standard 20M Qualification of Suppliers of Machining Services for Use in the Petroleum and Natural Gas Industries API STANDARD 20M Slide 1 of 9 Overview Standard 20M provides methods

More information

Qualification of manufacturers of special materials

Qualification of manufacturers of special materials SERVICE SPECIFICATION DNVGL-SE-0079 Edition June 2016 Qualification of manufacturers of special materials The electronic pdf version of this document found through http://www.dnvgl.com is the officially

More information

Materials and Qualification Procedures for Ships

Materials and Qualification Procedures for Ships Materials and Qualification Procedures for Ships Approval Procedure for Laboratories Engaged in Testing of Coating Systems in Accordance with IACS Z17 and IMO MSC.215(82) and/or IMO MSC.288(87). Revision

More information

PROCESS CHECK REPORT

PROCESS CHECK REPORT Company: Process Title Process Check Report Ref. No: Raytheon Process Auditor(s): Date Of Process Audit: AEROSPACE FASTENER MANUFACTURERS Summary: Conclusion: Distribution: Auditor: Approved By: Approved

More information

Purchase Order Quality Requirement Clauses

Purchase Order Quality Requirement Clauses Purchase Order Quality Requirement Clauses Section I: Administrative. 1. Scope. This document lists the quality purchase requirements (QPRs) that JEM Engineering uses in business agreements such as purchase

More information

voestalpine SPECIALTY METALS UK Experts in Oil & Gas, CPI & Energy industries voestalpine High Performance Metals UK

voestalpine SPECIALTY METALS UK Experts in Oil & Gas, CPI & Energy industries voestalpine High Performance Metals UK voestalpine SPECIALTY METALS UK Experts in Oil & Gas, CPI & Energy industries voestalpine High Performance Metals UK voestalpine WORLDWIDE voestalpine AG Group is a leading global technology and capital

More information

PROCEDURE. GTT (GAZ TRANSPORT & TECHNIGAZ) Mk III, Mk V & NO96 MEMBRANE CONTAINMENT SYSTEMS GENERAL APPROVAL AND SUPPLY OF MATERIALS AND COMPONENTS

PROCEDURE. GTT (GAZ TRANSPORT & TECHNIGAZ) Mk III, Mk V & NO96 MEMBRANE CONTAINMENT SYSTEMS GENERAL APPROVAL AND SUPPLY OF MATERIALS AND COMPONENTS PROCEDURE GTT (GAZ TRANSPORT & TECHNIGAZ) & MEMBRANE CONTAINMENT SYSTEMS GENERAL APPROVAL AND SUPPLY OF MATERIALS AND COMPONENTS 1. It is necessary for materials and component parts of the containment

More information

TITLE: SQR-001 Supplier Quality Requirements

TITLE: SQR-001 Supplier Quality Requirements Page: Page 1 of 8 TITLE: SQR-001 Supplier Quality Requirements Page: Page 2 of 8 Contents REVISION HISTORY... 3 REFERENCED QUALITY DOCUMENTS... 3 DOCUMENT DETAILS... 3 1. PURPOSE OF DOCUMENT... 4 2. DOCUMENT

More information

D.P.E.LTD QUALITY CONTROL PROCEDURE NO 9 QUALITY CONTROL REQUIREMENTS FOR SUPPLIERS MASTER COPY

D.P.E.LTD QUALITY CONTROL PROCEDURE NO 9 QUALITY CONTROL REQUIREMENTS FOR SUPPLIERS MASTER COPY Page 1 of 8 D.P.E.LTD QUALITY CONTROL PROCEDURE NO 9 QUALITY CONTROL REQUIREMENTS FOR SUPPLIERS MASTER COPY REF: DPE/Q.C.P.9 Dated: 19/10/2010 Approved By: P Knight Title: Quality Manager Signed: Page

More information

EC TYPE EXAMINATION (MODULE B) CERTIFICATE

EC TYPE EXAMINATION (MODULE B) CERTIFICATE EC TYPE EXAMINATION (MODULE B) CERTIFICATE This is to certify that: LLOYD'S REGISTER VERIFICATION LIMITED (LRV), designated as a notified body under the terms of the Merchant Shipping (Marine Equipment)

More information

Purchase Order and Quality Clauses

Purchase Order and Quality Clauses Purchase Order Clauses P01) DELIVERY PAPERWORK - shipments are to include all material traceability, packing sheets, certifications and test reports when the shipment arrives on our dock. Tech Manufacturing

More information

CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS

CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS 1. Introduction 1.1 Scheme for type approval of products of Indian Register of Shipping (IRS) is an impartial certification system based on a design review

More information

Rules for the Manufacture, Testing and Certification of Materials

Rules for the Manufacture, Testing and Certification of Materials Rules for the Manufacture, Testing and Certification of Materials July 2013 A guide to the Rules and published requirements Rules for the Manufacture, Testing and Certification of Materials Introduction

More information

Helical Products Company

Helical Products Company Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance

More information

Supplier Quality Requirements Manual AEC-300

Supplier Quality Requirements Manual AEC-300 Page 1 of 12 Supplier Quality Requirements Manual AEC-300 Page 2 of 12 Revision History Rev. Level Section Description DCN Date NC ALL Initial Release DCN-0094 2010-02-24 A 1 Paragraph 16: Software Control

More information

Requirements for Suppliers

Requirements for Suppliers 1.0 INTRODUCTION This document establishes requirements designed to ensure Park Engineering & Manufacturing Inc. (PEM) suppliers produce product that meets PEM s quality expectations and terms. Only suppliers

More information

ShipRight Notice for. Linked Supporting Services Anti-Corrosion System Notation, July Issue date: September 2014

ShipRight Notice for. Linked Supporting Services Anti-Corrosion System Notation, July Issue date: September 2014 ShipRight Notice for Linked Supporting Services Anti-Corrosion System Notation, July 2012 The status of this Rule set is amended as shown and is now to be read in conjunction with this and prior Notices.

More information

Certificate of Conformity of Factory Production Control

Certificate of Conformity of Factory Production Control Certificate of Conformity of Factory Production Control This certificate is issued to: Weldon Road, Corby, Northants, NN17 5UE Cleveland, TS25 2EG In compliance with Regulation 305/2011/EU of the European

More information

Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Compliance Verification Engineer for TWI Certification Ltd.

Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Compliance Verification Engineer for TWI Certification Ltd. Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Compliance Verification Engineer for TWI Certification Ltd. How can I become a Responsible Welding Coordinator (RWC) to comply with ISO 3834 and ISO 14731-1?

More information

QUALITY CONTROL MANUAL

QUALITY CONTROL MANUAL QUALITY CONTROL MANUAL Page 1 of 10 TABLE OF CONTENTS CONTENTS PAGE General Information 3 Statement of Policy and Authority 3 Control of the QC Manual (Section I) 4 Responsibility of Key Personnel (Section

More information

(A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION,

(A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION, (A) GENERAL: (A.1) GENERAL ELECTRIC (GE) IS THE END USER. (A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION, ANALYSIS, AND

More information

Special Purchase Order Clauses

Special Purchase Order Clauses SC-1 Quality System: The Supplier shall have a quality management system that conforms to: a) SAE AS9100 Quality Management Systems Aerospace Requirements b) SAE AS9110 Quality Management Systems Aerospace

More information

W-09 ANCHOR CHAIN CABLES AND ACCESSORIES FOR SHIPS

W-09 ANCHOR CHAIN CABLES AND ACCESSORIES FOR SHIPS Guideline No.: W-09(201510) W-09 ANCHOR CHAIN CABLES AND ACCESSORIES FOR SHIPS Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical

More information

Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries

Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries API SPECIFICATION 20F FIRST EDITION, XXX 201X 1 1. Scope 1.1 Purpose This API specification specifies requirements for the

More information

CERTIFICATE OF FIRE APPROVAL

CERTIFICATE OF FIRE APPROVAL LR427.203.2 CERTIFICATE OF FIRE APPROVAL This is to certify that The product detailed below will be accepted for compliance with the applicable Lloyd s Register Rules and Regulations and with the International

More information

Supplier Quality Clauses

Supplier Quality Clauses Page: 1 of 9 Supplier 425 Strempel St. Seguin, TX 78155 Page: 2 of 9 1.0 PURPOSE 1.1 The purpose of this this Quality Clause Document is to specify requirements by which Quality/Production activities shall

More information

EXPERTS IN OIL & GAS. voestalpine Specialty Metals voestalpine.com/specialtymetals

EXPERTS IN OIL & GAS. voestalpine Specialty Metals voestalpine.com/specialtymetals EXPERTS IN OIL & GAS voestalpine Specialty Metals voestalpine.com/specialtymetals voestalpine WORLDWIDE voestalpine AG Group is a leading global technology and capital goods group with a unique combination

More information

Total 70 files quick download in editable form by e delivery

Total 70 files quick download in editable form by e delivery Chapter-1.0 CONTENTS OF EN 1090-2 & ISO 3834-2 DOCUMENT KIT FOR CE Mark on EXC3 for Steel Structure (More than 70 document files) The Total Editable Document kit has 7 main directories as below. DIN EN

More information

ISO 9001:2008 and AS9100 Rev. C. Supplier Quality Manual

ISO 9001:2008 and AS9100 Rev. C. Supplier Quality Manual ISO 9001:2008 and AS9100 Rev. C Supplier Quality Manual ffective Date: Section I Supplier (same as xternal Provider) xpectations 1.0 Introduction 2 of 7 This Supplier Quality Manual (SQM) has been created

More information

PURCHASING QUALITY CLAUSES

PURCHASING QUALITY CLAUSES Page 1 of 5 These requirements apply to all suppliers A. Right of Entry Tri Models, Tri Model s customer and their customers or applicable regulatory agencies shall have right of access to all facilities,

More information

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR STRUCTURAL STEEL APPROVED FABRICATOR INSPECTION PROGRAMS 1.0 PURPOSE EC 020-2014 (Adopted

More information

(A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION,

(A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION, (A) GENERAL: (A.1) PRATT & WHITNEY IS THE END USER. (A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION, ANALYSIS, AND APPROVAL

More information

SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS

SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS 1 INTERPRETATION... 1 1.1 Definitions... 1 2 QUALITY MANAGEMENT SYSTEM... 2 2.1 Quality Management

More information

Materials and Qualification Procedures for Ships

Materials and Qualification Procedures for Ships Materials and Qualification Procedures for Ships Approval of Fibre Reinforcements Revision 1, December 2013 Material and Qualification Procedures for Ships Lloyd s Register Group Limited, its subsidiaries

More information

W-19 Steel Forgings for Continuous Grain-Flow Semi-Built Crankshafts

W-19 Steel Forgings for Continuous Grain-Flow Semi-Built Crankshafts Guideline No. W-19 (201705) W-19 Steel Forgings for Continuous Grain-Flow Semi-Built Crankshafts Issued date: May 9, 2017 China Classification Society Foreword This Guideline is a part of CCS Rules, which

More information

OPW Engineered Systems

OPW Engineered Systems 1 of 5 1.0 Purpose 1.1 The purpose of this manual is to promote a clear understanding of OPW Engineered Systems (OPW-ES) expectations and requirements for suppliers. This manual explains the process OPW-

More information

These requirements apply to all suppliers:

These requirements apply to all suppliers: Page 1 of 5 These requirements apply to all suppliers: A. Right of Entry Tri Models, Tri Model s customer and their customers or applicable regulatory agencies shall have right of access to all facilities,

More information

Contents. 1. Certification of Materials 2. Supply of Materials

Contents. 1. Certification of Materials 2. Supply of Materials September 2013 1 Contents 1. Certification of Materials 2. Supply of Materials 2 1. CERTIFICATION OF MATERIALS The European standard which specifies the different types of inspection documents supplied

More information

(A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION,

(A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION, (A) GENERAL: (A.1) PRATT & WHITNEY IS THE END USER. (A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION, ANALYSIS, AND APPROVAL

More information

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 PPE-R/00.018 Version 1 RECOMMENDATION FOR USE Number of pages: 5 Approval stage : Approved on : Origin : Horizontal Committee, C2D Ad hoc group

More information

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers A. PURPOSE To define the Orbel quality assurance provisions for inventory materials received from strategic suppliers. This document is intended for use by Orbel strategic suppliers to aid in the quality

More information

Purchase Order Quality Requirement Clauses

Purchase Order Quality Requirement Clauses Purchase Order Quality Requirement Clauses Section I: Administrative. 1. Scope. This document lists the quality purchase requirements (QPRs) that JEM Engineering uses in business agreements such as purchase

More information

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE Page 1 of 8 1.0 PURPOSE 1.1 The purpose of this manual is to have a single document which conveys the minimum quality requirements and manufacturing practices expected of suppliers for value added products

More information

HFI Fluid Power Products Quality Manual Revision # 5 dated 02/07/10. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc.

HFI Fluid Power Products Quality Manual Revision # 5 dated 02/07/10. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc. ISO9001-2008 QUALITY MANUAL SCOPE HFI Fluid Power Products is a full line stocking distributor/manufacturer for both hydraulic and pneumatic

More information

QUALITY CONTROL INSTRUCTION

QUALITY CONTROL INSTRUCTION QUALITY CONTROL INSTRUCTION NUMBER QCI 103 REVISION N TITLE: Servotronics Inc. Quality Clauses PURPOSE: To establish a system to implement Servotronics & Customer flow down Quality Requirements to Servotronics

More information

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM 1 QA.101 rev. 3-2012 PURPOSE OF THIS STANDARD Fairfield is committed to continuous product quality improvement. Our management team is convinced that only with

More information

HOW TO CONSTRUCT ASME BOILER BY THAI ASSOCIATION OF BOILOER AND PRESSURE VESSEL

HOW TO CONSTRUCT ASME BOILER BY THAI ASSOCIATION OF BOILOER AND PRESSURE VESSEL HOW TO CONSTRUCT ASME BOILER BY THAI ASSOCIATION OF BOILOER AND PRESSURE VESSEL WHAT IS ASME The American Society of Mechanical Engineers set up a committee in 1911 for the purpose of formulating standard

More information

Supplier Quality Requirements Revision B Dated November 21, 2017

Supplier Quality Requirements Revision B Dated November 21, 2017 Page 1 of 12 1. APPLICABILITY The Supplemental Quality Requirements in this document pertain to ETE designed product purchase orders. Suppliers shall ensure that their employees are aware of: Their contribution

More information

Rules for accreditation of providers of proficiency testing/interlaboratory

Rules for accreditation of providers of proficiency testing/interlaboratory Rules for accreditation of providers of proficiency testing/interlaboratory tests Scope: With this regulation the requirements for accreditations of providers of proficiency testing/interlaboratory tests/ring

More information

Trident Precision Manufacturing

Trident Precision Manufacturing Trident Precision Manufacturing QASQC Rev. A 6/7/06 Title: Supplier Quality Clauses Author: April V. Lusk Director of Quality General Suppliers are responsible for compliance to all stated Quality Clauses

More information

W-18 Steel Forgings for Continuous Grain-Flow Integrated Crankshafts

W-18 Steel Forgings for Continuous Grain-Flow Integrated Crankshafts Guideline No. W-18 (201705) W-18 Steel Forgings for Continuous Grain-Flow Integrated Crankshafts Issued date: May 9, 2017 China Classification Society Foreword This Guideline is a part of CCS Rules, which

More information

Service Suppliers Engaged in Renewal Survey Examination of Mooring Chain Intended for Mobile Offshore Units

Service Suppliers Engaged in Renewal Survey Examination of Mooring Chain Intended for Mobile Offshore Units pproval of rvc upplrsno. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Approval of Service Suppliers No. 413 Service Suppliers Engaged in Renewal Survey Examination of Mooring Chain Intended for Mobile

More information

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015 Clause A - Quality System Requirements All references to the term Government in any of the documents referenced below shall be replaced with the term Curtiss-Wright and/or the Government. All references

More information

(A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION,

(A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION, (A) GENERAL: (A.1) PRATT & WHITNEY (P&W) IS THE END USER. (A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION, ANALYSIS, AND

More information

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 1.0 SCOPE This document establishes the quality program requirements for an organization providing engineering

More information

CARES Technical Approval Report TA

CARES Technical Approval Report TA CARES Technical Approval Report TA13 5037 ROLDAN SA ROLDAN SA Lean Duplex Stainless Steel ACX 903 Assessment of the Lean Duplex Stainless Steel ACX 903 Reinforcing Bar Product and Quality System for Production

More information

Thermowells Beware of Imitations

Thermowells Beware of Imitations Technical Description TD/TP 001 Issue 1 Thermowells Beware of Imitations Pressure Vessel Codes and Thermowells When specifying and buying thermowells for the process industries there are some points that

More information

Originally presented at ASM International, Materials Solutions, Columbus, Ohio in October 2004 Richard Bolton MEng, AMIChemE, Area 42 Consulting

Originally presented at ASM International, Materials Solutions, Columbus, Ohio in October 2004 Richard Bolton MEng, AMIChemE, Area 42 Consulting A User s Perspective 2014 Geoff B Associates This document is the property of the course instructor, prepared by the course instructor for exclusive use in the delivery of technical training programmes.

More information

General Accreditation Criteria Equipment assurance, in-house calibration and equipment verification

General Accreditation Criteria Equipment assurance, in-house calibration and equipment verification General Accreditation Criteria Equipment assurance, in-house calibration and equipment verification January 2018 Copyright National Association of Testing Authorities, Australia 2009 This publication is

More information

CERTIFICATE OF FIRE APPROVAL

CERTIFICATE OF FIRE APPROVAL LR427.203.2 CERTIFICATE OF FIRE APPROVAL This is to certify that The product detailed below will be accepted for compliance with the applicable Lloyd s Register Rules and Regulations and with the International

More information

Title: PROCUREMENT QUALITY REQUIREMENTS CWCDS Dayton, OH

Title: PROCUREMENT QUALITY REQUIREMENTS CWCDS Dayton, OH Page 1 of 7 QUALITY CLAUSES Clause A - Quality System Requirements All references to the term "Government" in any of the documents referenced below shall be replaced with the term "Curtiss Wright Controls

More information

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers A. PURPOSE To define the Orbel quality assurance provisions for inventory materials received from strategic suppliers. This document is intended for use by Orbel strategic suppliers to aid in the quality

More information

LR SOFTWARE CONFORMITY ASSESSMENT SYSTEM. Assessment Module GENPMS Software Products for Planned Maintenance Schemes

LR SOFTWARE CONFORMITY ASSESSMENT SYSTEM. Assessment Module GENPMS Software Products for Planned Maintenance Schemes LR SOFTWARE CONFORMITY ASSESSMENT SYSTEM Assessment Module GENPMS Software Products for Planned Maintenance Schemes 2006 Lloyd's Register, its affiliates and subsidiaries and their respective officers,

More information

GMP+ Feed Safety Assurance scheme. Sea Transport Affreightment

GMP+ Feed Safety Assurance scheme. Sea Transport Affreightment GMP+ Feed Safety Assurance scheme Sea Transport Affreightment GMP+ B4.4 B 4.4 EN B.V. All rights reserved. The information in this publication may be consulted on the screen, downloaded and printed as

More information

Prototype Integration Facility SUPPLIER QUALITY SYSTEM REQUIREMENTS

Prototype Integration Facility SUPPLIER QUALITY SYSTEM REQUIREMENTS PIF Supplier Quality System Requirements Page 1 of 8 Prototype Integration Facility SUPPLIER QUALITY SYSTEM REQUIREMENTS Approved by: (W. Daniel Featherston- signature on file) PIF Program Manager (Mitchell

More information

pproval of rvc upplrsno. 2.9 APRIL 2013

pproval of rvc upplrsno. 2.9 APRIL 2013 pproval of rvc upplrsno. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Approval of Service Suppliers No. 405 Service Suppliers Engaged in Surveys and Maintenance of Fire Extinguishing Equipment, Systems

More information

DRAWING NUMBER REVISION TITLE REV DATE PAGE

DRAWING NUMBER REVISION TITLE REV DATE PAGE DRAWING NUMBER REVISION TITLE REV DATE PAGE 90-2000-7.5.1 C PRODUCT RESOURCES NEWBURYPORT, MA Control of Production and 11/2016 1 of 5 NOTICE: THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE

More information

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1.

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1. PROBUILD SUBCONTRACTOR QUALITY MANAGEMENT GUIDE Section Two Project Specific Quality Management Plans Version No 1. PREFACE This document has been developed to assist subcontractors to meet Probuild s

More information

A1 The supplier shall operate and maintain an approved Quality System that is subject to approval by Curtiss Wright Defense Solutions Dayton.

A1 The supplier shall operate and maintain an approved Quality System that is subject to approval by Curtiss Wright Defense Solutions Dayton. Curtiss-Wright Defense Solutions-Dayton (CW-DSD) Quality Procedure QP 8.4.1 Title: Supplier Quality Requirements QP 8.4.1 Revision: 0 Issue Date: 8/1/18 QUALITY CLAUSES Clause A Quality System Requirements

More information

QUALITY SYSTEM MANUAL

QUALITY SYSTEM MANUAL TITLE: QUALITY SYSTEM MANUAL Page 1 of 15 QUALITY SYSTEM MANUAL TITLE: QUALITY SYSTEM MANUAL Page 2 of 15 Index PARAGRAPH TITLE... PAGE 1.0 GENERAL INFORMATION... 3 2.0 DEFINITIONS... 5 3.0 RELATED DOCUMENTS...

More information

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE AEROSPACE STANDARD AS9003 Issued 2001-10 Revised 2012-07 REV. A Superseding AS9003 (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE This standard

More information

MATERIALS AND WELDING 2017

MATERIALS AND WELDING 2017 Part 2: Rules for Materials and Welding Aluminum and Fiber Reinforced Plastics (FRP) Chapters 5-6) RULES FOR MATERIALS AND WELDING 2017 PART 2 ALUMINUM and FIBER REINFORCED PLASTICS (FRP) (CHAPTERS 5-6)

More information

Cast Steel Propellers W27. (May 2000) (Rev.1 May 2004)

Cast Steel Propellers W27. (May 2000) (Rev.1 May 2004) (May 2000) (Rev.1 May 2004) Cast Steel Propellers 1. Scope 1.1 These unified requirements are applicable to the manufacture of cast steel propellers, blades and bosses. 1.2 Where the use of alternative

More information

Pressure Control Supplier Quality Requirements Raw Materials Forgings and Wrought Forms SQ-12 Rev: 1.1

Pressure Control Supplier Quality Requirements Raw Materials Forgings and Wrought Forms SQ-12 Rev: 1.1 Approved By: Jerry Longmire Vice President - Quality Jim Harris Quality Leader - NAM Document Revision Chart The following chart lists the revisions made to this document tracked by version. Use this to

More information

Orbel Corporation AS9100D Supplier Flow Down Requirements

Orbel Corporation AS9100D Supplier Flow Down Requirements The Supplier requirements below apply to all Suppliers and sub-tier Suppliers to Orbel Corporation providing raw materials, manufactured components and products as well as performing material processing

More information

VERTICAL ASSESSMENT INSPECTION ISO/IEC 17020:2012

VERTICAL ASSESSMENT INSPECTION ISO/IEC 17020:2012 VERTICAL ASSESSMENT INSPECTION ISO/IEC 17020:2012 Organisation s SANAS No/s. Date/s of evaluation Name of Organisation Organisation Representative Area/Field of Accreditation as per schedule of accreditation

More information

AMERICAN INSTITUTE OF TIMBER CONSTRUCTION AITC

AMERICAN INSTITUTE OF TIMBER CONSTRUCTION AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION 7012 South Revere Parkway Suite 140 Centennial, Colorado 80112 Telephone (303) 792-9559 http://www.aitc-glulam.org AITC 115-2009 STANDARD FOR FABRICATED STRUCTURAL

More information

This document describes the minimum quality assurance requirements suppliers of RUAG Switzerland Ltd. have to comply with.

This document describes the minimum quality assurance requirements suppliers of RUAG Switzerland Ltd. have to comply with. of 14.02.2013 Page 1 / 6 This document describes the minimum quality assurance requirements suppliers of RUAG Switzerland Ltd. have to comply with. This requirements are not terminal, but may be additional

More information

ISO INTERNATIONAL STANDARD. Quality requirements for fusion welding of metallic materials Part 3: Standard quality requirements

ISO INTERNATIONAL STANDARD. Quality requirements for fusion welding of metallic materials Part 3: Standard quality requirements INTERNATIONAL STANDARD ISO 3834-3 Second edition 2005-12-15 Quality requirements for fusion welding of metallic materials Part 3: Standard quality requirements Exigences de qualité en soudage par fusion

More information

AS9120 Quality System Manual Street Address City, State, Zip

AS9120 Quality System Manual Street Address City, State, Zip AS9120 Quality System Manual Street Address City, State, Zip *This manual is to be used as a template in developing your ISO 9001 Quality Manual. Review the text; replace text to match your quality system

More information

Quality Procurement Requirements

Quality Procurement Requirements Page 1 of 7 The following clauses are supplemental requirements to any purchase order. Only the clauses or sub-clauses specified on a particular PO are applicable to that PO, a requirement of that PO and

More information

SABRe : Inspection Processes. Supplier Briefing Pack.

SABRe : Inspection Processes. Supplier Briefing Pack. SABRe : Inspection Processes. Supplier Briefing Pack. 2008 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or

More information

DNVGL-CP-0248 Edition May 2016

DNVGL-CP-0248 Edition May 2016 CLASS PROGRAMME Approval of manufacturers DNVGL-CP-0248 Edition May 2016 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that

More information

Plan QAQ Supplier Quality Requirements (Rev 13)

Plan QAQ Supplier Quality Requirements (Rev 13) 1.0 Purpose To outline Insitu s quality management system requirements for suppliers. 2.0 Scope This document applies to suppliers and subcontractors that provide products and/or services that affect the

More information

External Providers Quality Requirements.

External Providers Quality Requirements. External Providers Quality Requirements. 1. General Requirements. 1.1 Introduction. This document establishes the quality assurance requirements for external providers of process, product and service pursuant

More information

Pressure Piping Construction Requirements QMS written description verification CHECKLIST AB-518b

Pressure Piping Construction Requirements QMS written description verification CHECKLIST AB-518b QMS written description verification CHECKLIST AB-518b Company Name: Company Address: Title of the written description of the management system or manual(s): Person responsible for the overall management

More information

MATERIALS AND WELDING 2014

MATERIALS AND WELDING 2014 Part 2: Rules for Materials and Welding Aluminum and Fiber Reinforced Plastics (FRP) Chapters 5-6) RULES FOR MATERIALS AND WELDING 2014 PART 2 ALUMINUM and FIBER REINFORCED PLASTICS (FRP) (CHAPTERS 5-6)

More information

Process Optimization Workshop. Rosemont, Illinois October 25-26, 2016

Process Optimization Workshop. Rosemont, Illinois October 25-26, 2016 Process Optimization Workshop Rosemont, Illinois October 25-26, 2016 Process Optimization Workshop Considerations for Profile Tolerancing Rosemont, Illinois October 25-26, 2016 Process Optimization Workshop

More information

SUPPLIER QUALITY CODES

SUPPLIER QUALITY CODES Supplier Quality s D07-00125 Rev A APPROVALS NAME AND TITLE SIGNATURE DATE M.G. Blankenship Senior Director, Operations I. Jimenez Materials Manager D07-00125-02 Page 1 of 5 SQC 1 SQC 2 SQC 3 SQC 4 SQC

More information

The purpose of this document is to describe the process and due diligence performed by

The purpose of this document is to describe the process and due diligence performed by 1.0 Purpose The purpose of this document is to describe the process and due diligence performed by Vector Electronics and Technology, Inc. (VET) to prevent the purchase and / or use of Counterfeit Parts

More information

Supplier Quality Assurance Requirements

Supplier Quality Assurance Requirements 1 Scope No. 1.1 This document details the requirements to be satisfied by suppliers to Tekdata Interconnections Ltd (TIL). TIL requires each supplier and their sub-tier suppliers to comply with the quality

More information

Recycling Program Standard

Recycling Program Standard SCS Global Services Recycling Program Standard Environmental Certification Services 2000 Powell Street, Ste. 600, Emeryville, CA 94608 USA +1.510.452.8000 main +1.510.452.8001 fax www.scsglobalservices.com

More information