1 SNG/EEC Expansion Projects & SNG Seamless Service WebEx Training November 15,

2 Agenda Update on Expansion Status Elba Express Company ( EEC ) Expansion Fuel Southern Natural Gas ( SNG ) Seamless Service Overview Contracts for Expansion Capacity Capacity Release Rates and Fuel Seamless Nominations Pathing and Route Indicator Fuel Examples Q&A 2

3 Update on Expansion Projects In-service target is December 1, 2016 The SNG facilities necessary to commence service are complete, but service is dependent on the start of SNG s FT service on EEC EEC facilities are nearing completion for FT contract with SNG An update regarding EEC s status will be provided on November 18 We will try to provide the in-service notice by 4:00 p.m. two days prior to the effective date We may allow capacity release offers to be entered early for December 1, subject to recall 3

4 EEC Expansion Service Fuel Separate expansion fuel rate required by FERC EEC filed 0.95% as gas retained for operations for expansion service (GRO (2016 Expansion)) Existing North to South FT and IT shippers will pay the existing 0.69% fuel (GRO (North-to-South)) All shippers pay the LAUF, currently 0.23% In summary, for December 2016 May 2017 Expansion shippers will provide 1.18% fuel Existing N-S FT and IT shippers will provide 0.92% fuel EEC files updated fuel rates June of each year 4

5 SNG s Seamless Expansion Service SNG will be an FT shipper on EEC and provide seamless service to its expansion shippers 217,110 dth/d Transportation Demand ( TD ) initially 242,351 dth/d TD effective 6/1/17 EEC points and segments will be set up as Zone 3 points and segments on SNG Point Nbr Point Name Seg Nbr TRNSCO/EEC Z4 HART TRNSCO/EEC Z5 ANDERSON SO CO/EEC PLANT MCINTOSH EFFINGHAM EFFINGHM/EEC PLANT EFFINGHAM SLNG/EEC CHATHAM DCGT/EEC PORT WENTWORTH CHATHAM EEC/SNG CYPRESS EFFINGHAM EEC/SNG PT WENTWORTH CHATHAM 699 5

6 SNG s Seamless Expansion Service (cont d) SNG s firm expansion shippers will have capacity rights through the applicable EEC and SNG segments from their primary receipt PINs to their primary delivery PINs Expansion shippers will nominate on their SNG expansion contract from the Transco interconnect(s) for delivery on SNG (1 nomination across 2 pipelines, i.e., seamless ) SNG will then submit the corresponding nominations to EEC on behalf of its shippers If SNG s firm expansion shippers are not nominating all of their capacity on a day, then nominations on other contracts will be scheduled based on queue priority on SNG up to SNG s TD on EEC 6

7 Expansion Contracts & CR Expansion shippers have signed MFTE-SNG master contracts with an Exhibit C for the subscribed expansion capacity If expansion capacity is released, the Replacement Shipper must acquire it under an MFTE-SNG contract with an Exhibit C Exhibit C sets out the EEC charges the Replacement Shipper must pay to SNG if the EEC capacity is used, i.e., The FERC approved fuel retention charges as set forth in EEC s Tariff All other FERC approved surcharges and charges generally applicable to firm transportation service as set forth in EEC s Tariff, except for the ACA surcharge To request an MFTE-SNG contract, #SNGContractMGMT@KinderMorgan.com To execute the Contract and Exhibit C, select the Contracts folder, then select the MFTE-SNG agreement, and right click for the menu to select contract execution 7

8 Expansion Contracts & CR (cont d) Offer and Bid Rates The filed maximum tariff rate for the expansion service is $13.52/Dth of TD per month Shippers have the option to capacity release at a rate higher than the max tariff rate for a term of one year or less Any capacity release offers with a term greater than one year cannot be released at a rate greater than the max tariff rate Confirmed bids of released capacity will be awarded to the primary PINS After the capacity is awarded, the Replacement Shipper has the option to request a different PIN, but the choices are limited to in-the-path PINS, like any other acquired capacity 8

9 Exhibit C Requirement for Other Transportation Contracts Existing Master FT, Master FTNN and/or IT contracts with SNG may be used to submit seamless nominations from EEC/Transco receipt PINS on an out-of-path or IT basis Shipper must execute an amendment adding Exhibit C to its contract before nominations using EEC capacity will be accepted Includes firm, acquired firm, and interruptible transportation services #SNGContractMGMT@KinderMorgan.com specifying the Master contract(s) and/or IT contract to amend Please note that pool contracts on SNG are not eligible to nominate seamless service since they are not subject to transportation charges 9

10 In Summary: Charges and Fuel for Seamless Service Using EEC Capacity SNG charges are applicable: Commodity and surcharges Transportation commodity for receipt zone to delivery zone Zone matrix and maximization rules apply ACA and SCRM ACA is effective Oct. 1 to Sept. 30 each year SCRM is effective Jan. 1 to Dec. 31 each year SNG Fuel is applicable: Zone of delivery, intrazone, or eligible backhaul Winter fuel is effective Oct. 1 to Mar. 31 each year Summer fuel is effective Apr. 1 to Sept. 30 each year EEC fuel is applicable: Initial expansion fuel of 1.18% EEC refiles its fuel rates to be effective June of each year At this time, EEC does not have FT commodity charges within TD, and a second ACA charge will not apply 10

11 Nominations and Fuel Example 11

12 SNG PINs on EEC for Expansion Service EEC PINs and Segments to be added as nominatable points on SNG (Zone 3) Point Nbr Point Name Seg Nbr TRNSCO/EEC Z4 HART TRNSCO/EEC Z5 ANDERSON SO CO/EEC PLANT MCINTOSH EFFINGHAM EFFINGHM/EEC PLANT EFFINGHAM SLNG/EEC CHATHAM DCGT/EEC PORT WENTWORTH CHATHAM EEC/SNG CYPRESS EFFINGHAM EEC/SNG PT WENTWORTH CHATHAM 699 Shippers should monitor the SNG EBB for the above segments in determining available capacity 12

13 Pathing of Seamless Nominations SNG will schedule the seamless nominations from EEC to SNG using the default path through EEC-SNG Port Wentworth Shippers with contracts pathed through the SNG-EEC Cypress Interconnect must include the route indicator Cypress in the nomination to receive primary to primary scheduling priority Capacity can be nominated outside of the primary capacity path and can be scheduled on an out-of-path basis if capacity is available Priorities through these virtual segments are evaluated no differently than any other segment on SNG. No bumping on ID3, EPSQ still retained, and capacity is available for nominations by shippers with an Exhibit C. 13

14 Route Indicator SNG customers will have the ability to identify an alternate segment path in Zone 3 At the time of nominations, if you want to follow the red path below - select Cypress from the Route Indicator field Default Path Cypress Path 14

15 Uses Segment 699 to cross over from EEC into SNG Default Route 15

16 Cypress Route Uses Segment 599 to cross over from EEC into SNG 16

17 Route Indicator 17

18 Seamless Nominations Transco Zone 4 Receipt PIN SNG Zone 3 Delivery at the Seacoast PIN Cypress Route Fuel displays as a total pancaked fuel qty=187 Dth; Derived Fuel % of

19 Fuel Calculation Calculation steps: Determine the delivery volume on SNG For this example we will use 10,000 Dth Gross the delivery volume up by the SNG fuel 10,000 Dth / ( intrazone 3) = 10,067 Dth Use the calculated volume to apply the EEC fuel 10,067 Dth / ( ) = 10,187 Dth 10,187 Dth is the receipt volume to be nominated at the Transco receipt point 19

20 Fuel Example 20

21 Determining Fuel SNG encourages shippers to use the Fuel Calculator in DART From the Navigation Panel: Nominations Fuel Calculator Also, in the nomination screen, shipper can input the quantity to be delivered on SNG and DART will compute the total fuel 21

22 Fuel Calculator Be sure to enter the Route Code Notice the derived Total Fuel % = That is Total Fuel on both pipes as shown in the nomination matrix 22

23 Contacts for Assistance Account Managers Walter Coe Lisa Guthrie Jerry Nelson On-Call Account Manager Contract Administration Adam Harris Shari Jones Contracts Hotline Scheduling Gina Mabry, Manager Scheduling Hotline Katie Cornutt Veronica Esparza Phyllis Miller Tracy Minter Greg Pollard Jeremy Rainwater

24 Questions? 24

25 Thank You for Your Business 25

Winter Prep Review. Southern Natural Gas Company December 5, 2018

Winter Prep Review. Southern Natural Gas Company December 5, 2018 1 Winter Prep Review Southern Natural Gas Company December 5, 2018 Opening Remarks Gina Mabry Director- Scheduling Southern Natural Gas 2 3 Agenda Operations Review Scheduling Tools and Enhancements Pipeline

More information

Conversion to the DART System: Update on Implementation Schedule

Conversion to the DART System: Update on Implementation Schedule Conversion to the DART System: Update on Implementation Schedule March 11, 2015 WebEx at 1:00 p.m. CCT 1 Agenda Updated Timeline to Convert to DART Additional Tariff Changes Other Updates and Next Steps

More information

Nominations, Scheduling, Confirmations and Reporting

Nominations, Scheduling, Confirmations and Reporting www.kindermorgan.com Nominations, Scheduling, Confirmations and Reporting www.kindermorgan.com Gina Mabry Manager of Scheduling Southern Natural Gas www.kindermorgan.com Katie Cornutt Veronica Esparza

More information

FERC GAS TARIFF. Third Revised Volume No. 1. (Superseding Second Revised Volume No. 1) COLUMBIA GULF TRANSMISSION, LLC FILED WITH

FERC GAS TARIFF. Third Revised Volume No. 1. (Superseding Second Revised Volume No. 1) COLUMBIA GULF TRANSMISSION, LLC FILED WITH FERC GAS TARIFF (Superseding Second Revised Volume No. 1) of COLUMBIA GULF TRANSMISSION, LLC FILED WITH FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this tariff should be addressed to:

More information

EMPIRE PIPELINE, INC. FERC GAS TARIFF FIRST REVISED VOLUME NO. 1

EMPIRE PIPELINE, INC. FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 EMPIRE PIPELINE, INC. FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 (Superseding Original Volume No. 1) Communication concerning this tariff should be addressed to: Randy C. Rucinski, Esq. Empire Pipeline,

More information

Customer WebEx October 10, 2018

Customer WebEx October 10, 2018 Customer WebEx October 10, 2018 1 Type 3 OFO Provisions Purpose January 2018 Type 3 OFO Changes 2 3 Type 3 Operational Flow Orders (OFOs) are implemented when demand in an area of the system is forecasted

More information

www.kindermorgan.com 2 Segment Scheduling Transport scheduling will be at: The pipeline segment level for pipeline constraints The point level for meter capacity constraints Contract rights will determine

More information

FERC GAS TARIFF. First Revised Volume No. 1 MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION

FERC GAS TARIFF. First Revised Volume No. 1 MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION FERC GAS TARIFF First Revised Volume No. 1 Of MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: John

More information

FERC GAS TARIFF. Second Revised Volume No. 1 CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION

FERC GAS TARIFF. Second Revised Volume No. 1 CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION FERC GAS TARIFF Second Revised Volume No. 1 Of CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: James R. Downs,

More information

WEBEX Etiquette. Please do not place your phone on hold at anytime. If you have music on your hold, it disrupts the meeting.

WEBEX Etiquette. Please do not place your phone on hold at anytime. If you have music on your hold, it disrupts the meeting. WEBEX Etiquette Please mute your phone by pressing *6. Please do not place your phone on hold at anytime. If you have music on your hold, it disrupts the meeting. Questions If you have a question, please

More information

BINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement

BINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement BINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement Page 1 of 8 REX Cheyenne Hub Enhancement Rockies Express Pipeline LLC ( REX ) is pleased to announce a binding open season ( Open Season

More information

El Paso Natural Gas Company Binding Open Season. Delaware Basin to Waha

El Paso Natural Gas Company Binding Open Season. Delaware Basin to Waha INTRODUCTION El Paso Natural Gas Company Binding Open Season Delaware Basin to Waha In response to increasing demand for take-away capacity from the Delaware Basin with deliveries to the Waha area interconnections,

More information

Cheyenne Connector Binding Open Season

Cheyenne Connector Binding Open Season Cheyenne Connector Binding Open Season Page 1 of 9 Cheyenne Connector Description Tallgrass Energy Partners, LP ( Tallgrass ) is pleased to announce a binding open season ( Open Season ) for the Cheyenne

More information

FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 CENTRAL KENTUCKY TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION

FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 CENTRAL KENTUCKY TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 OF CENTRAL KENTUCKY TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: Stanley

More information

Notice Text. Notice 17238/Previous Notice 17236

Notice Text. Notice 17238/Previous Notice 17236 TSP Name: El Paso Natural Gas Company,L.L.C TSP: 00-800-1703 Notice ID: 17238 Critical: N Notice Type Desc: Other Notice Stat Desc: Initiate Subject: Revised Line 1600 to Waha Open Season (17238) Prior

More information

West Region Customer Meeting. September 23, 2015

West Region Customer Meeting. September 23, 2015 West Region Customer Meeting September 23, 2015 Gas-Electric Coordination Update September 23, 2015 John Driscoll Manager West Region Transportation/Storage Services CIG CPG KGS Ruby WIC TCGT Young 9/23/2015

More information

Natural & Central Region Customer Group. October 13, 2016

Natural & Central Region Customer Group. October 13, 2016 Natural & Central Region Customer Group October 13, 2016 1 NGPL Maintenance Summary Maintenance Project Start Date Finish Date SEG / LOC Impacted SEGMENT 4 M&M LINE Meter Maintenance 17-Oct-16 22 - Oct-16

More information

LOCKRIDGE TO WAHA PROJECT NOTICE OF BINDING OPEN SEASON

LOCKRIDGE TO WAHA PROJECT NOTICE OF BINDING OPEN SEASON Announcement of Open Season Natural Gas Pipeline Company of America LLC ( NGPL ) has entered into a binding transaction with a third party ( Prearranged Shipper ) to develop a project to provide 500,000

More information

Agency Agreement. Both will be signed by EEC and one will be returned to you.

Agency Agreement. Both will be signed by EEC and one will be returned to you. Elba Express Company, L.L.C. Agency Agreement Under Section 24.2 of the General Terms and Conditions of Elba Express Company s Tariff, a shipper can appoint an agent and request EEC to recognize such appointment.

More information

WBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, Binding Open Season

WBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, Binding Open Season WBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, 2014 Binding Open Season WBI Energy Wind Ridge Pipeline, LLC announces a Binding Open

More information

Colorado Interstate Gas Company, L.L.C. Non-binding Open Season Soliciting Interest in DJ Expansion Capacity of up to 1.2 Bcf/day

Colorado Interstate Gas Company, L.L.C. Non-binding Open Season Soliciting Interest in DJ Expansion Capacity of up to 1.2 Bcf/day Colorado Interstate Gas Company, L.L.C. Non-binding Open Season Soliciting Interest in DJ Expansion Capacity of up to 1.2 Bcf/day Portable Document Format (.pdf) file of Open Season: https://pipeportal.kindermorgan.com/portalui/openseasondocs.aspx?tsp=cigd

More information

Table of Contents. Trailblazer Pipeline Company LLC 6th Revised Volume No. 1. Rate Schedules. Rate Schedule FTS. Rate Schedule ITS.

Table of Contents. Trailblazer Pipeline Company LLC 6th Revised Volume No. 1. Rate Schedules. Rate Schedule FTS. Rate Schedule ITS. 6th Revised Volume No. 1 Table of Contents Rate Schedules Rate Schedule FTS Rate Schedule ITS Rate Schedule FTB Rate Schedule Wheeling Service Rate Schedule PALS Rate Schedules 6th Revised Volume No. 1

More information

Philadelphia Gas Works

Philadelphia Gas Works Philadelphia Gas Works REQUEST FOR PROPOSALS For NATURAL GAS STORAGE ASSET MANAGEMENT RFP NO. 28399 April 1, 2014 through March 31, 2015 The Philadelphia Gas Works ( PGW ) is requesting proposals for asset

More information

FAQs. Frequently asked questions about Transco and 1Line TRANSCO

FAQs. Frequently asked questions about Transco and 1Line TRANSCO FAQs Frequently asked questions about Transco and 1Line TRANSCO Version 3.1 1 September 17, 2014 Frequently Asked Questions (FAQs) - Transco The information provided herein is for informational purposes

More information

DOMINION EAST OHIO CASE NO GA-EXM APRIL 2014 THROUGH MARCH 2015 STANDARD SERVICE OFFER/STANDARD CHOICE OFFER

DOMINION EAST OHIO CASE NO GA-EXM APRIL 2014 THROUGH MARCH 2015 STANDARD SERVICE OFFER/STANDARD CHOICE OFFER DOMINION EAST OHIO CASE NO. 07-1224-GA-EXM APRIL 2014 THROUGH MARCH 2015 STANDARD SERVICE OFFER/STANDARD CHOICE OFFER CAPACITY RELEASE INFORMATION PACKAGE Disclaimer The information presented in this information

More information

Authorized Overrun Service

Authorized Overrun Service Daily Commercial Operations Authorized Overrun Service Release Notes and Guide Revision Tracking Date Created 05/08/2006 Last Updated 09/11/2008 Document No. 2.0 Revision 2.0 Table of Contents Introduction...

More information

6th Revised Volume No. 1 Section Version: TABLE OF CONTENTS

6th Revised Volume No. 1 Section Version: TABLE OF CONTENTS Table of Contents TABLE OF CONTENTS Sixth Revised Volume No. 1 Table of Contents Preliminary Statement System Map Section Name Table of Contents Preliminary Statement System Map Currently Effective Rates

More information

FERC NGA GAS TARIFF. THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) SEA ROBIN PIPELINE COMPANY, LLC.

FERC NGA GAS TARIFF. THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) SEA ROBIN PIPELINE COMPANY, LLC. FERC NGA GAS TARIFF THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) of SEA ROBIN PIPELINE COMPANY, LLC Filed With The Federal Energy Regulatory Commission Communications Concerning

More information

Data Request of FERC Staff OEP/DPC/CB-2 Dated June 11, 2015

Data Request of FERC Staff OEP/DPC/CB-2 Dated June 11, 2015 Docket No. CP15-93-000 Data Request of FERC Staff OEP/DPC/CB-2 Dated June 11, 2015 8. Rover proposes at Part VI General Terms and Conditions, GT&C Section 1. Definitions, to define Transportation to include

More information

September 28, 2015 WEBEX

September 28, 2015 WEBEX www.kindermorgan.com September 28, 2015 WEBEX Agenda Invoicing View Firm Reservation Charges View an Invoice View Invoice Summary & Invoice of Services Q&A 2 www.kindermorgan.com From the Navigation Panel,

More information

FERC GAS TARIFF. First Revised Volume No. 1 NORTHERN BORDER PIPELINE COMPANY. Filed with. Federal Energy Regulatory Commission

FERC GAS TARIFF. First Revised Volume No. 1 NORTHERN BORDER PIPELINE COMPANY. Filed with. Federal Energy Regulatory Commission FERC GAS TARIFF of NORTHERN BORDER PIPELINE COMPANY Filed with Federal Energy Regulatory Commission Communications Concerning This Tariff Should Be Addressed To: Joan Collins Manager, Tariffs and Compliance

More information

FERC GAS TARIFF THIRD REVISED VOLUME NO. 2. (Superseding Second Revised Volume No. 2) WYOMING INTERSTATE COMPANY, L.L.C.

FERC GAS TARIFF THIRD REVISED VOLUME NO. 2. (Superseding Second Revised Volume No. 2) WYOMING INTERSTATE COMPANY, L.L.C. FERC GAS TARIFF THIRD REVISED VOLUME NO. 2 (Superseding Second Revised Volume No. 2) of WYOMING INTERSTATE COMPANY, L.L.C. filed with the FEDERAL ENERGY REGULATORY COMMISSION Communication Covering This

More information

Capacity Release Frequently Asked Questions

Capacity Release Frequently Asked Questions What is? Capacity release is a tool available for Northern s customers to maximize the use of their contracted firm transportation and storage capacity. Capacity release allows a customer that holds firm

More information

Vector Pipeline L.P. Original Sheet No. 30 FERC Gas Tariff First Revised Volume No. 1 v0.0.0 RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE

Vector Pipeline L.P. Original Sheet No. 30 FERC Gas Tariff First Revised Volume No. 1 v0.0.0 RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE Vector Pipeline L.P. Original Sheet No. 30 1. AVAILABILITY RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE This FT-1 Rate Schedule is available to any party (hereinafter called "Shipper"), for firm transportation

More information

Review of Pipeline Regions

Review of Pipeline Regions Review of Pipeline Regions 76 Eastern Pipelines 77 Eastern Pipeline Group Overview Strategic Initiatives Project Development New Business Platforms Summary 78 Eastern Pipelines Great Lakes Gas Transmission

More information

Open Season Notice of Available and Expansion Firm Capacity on El Paso Natural Gas Company, L.L.C. (EPNG)

Open Season Notice of Available and Expansion Firm Capacity on El Paso Natural Gas Company, L.L.C. (EPNG) Open Season Notice of Available and Expansion Firm Capacity on El Paso Natural Gas Company, L.L.C. (EPNG) Bid Deadline 2:00 PM Mountain Time, March 22, 2018 Portable Document Format (.pdf) file of Open

More information

Currently Effective Rates - FTS and FTB Existing System. Currently Effective Rates FTS and FTB Expansion System

Currently Effective Rates - FTS and FTB Existing System. Currently Effective Rates FTS and FTB Expansion System 6th Revised Volume No. 1 Table of Contents Table of Contents Preliminary Statement System Map Currently Effective Rates Currently Effective Rates - FTS and FTB Existing System Currently Effective Rates

More information

March 2014

March 2014 www.kindermorgan.com March 2014 www.kindermorgan.com Francisco Tarin Director Regulatory Affairs DART Tariff Proposal Each of the Rockies Pipelines will submit a tariff filing to the Federal Energy Regulatory

More information

Texas Eastern Transmission, LP. Transactional Reports - Firm Run Time: 21:30 Page 1 of 6

Texas Eastern Transmission, LP. Transactional Reports - Firm Run Time: 21:30 Page 1 of 6 Run Time: 21:30 Page 1 of 6 TSP Name: K Qty - K: K Beg : K End : K Ent Beg : K Ent End : 50000 04/01/2017 03/31/2020 04/01/2017 03/31/2020 Surchg Ind Desc: Mkt Based Ind: Ngtd Ind Desc: Res Basis Desc:

More information

Table of Contents. Great Lakes Gas Transmission Limited Partnership. Third Revised Volume No. 1. Third Revised Volume No. 1 1 TABLE OF CONTENTS

Table of Contents. Great Lakes Gas Transmission Limited Partnership. Third Revised Volume No. 1. Third Revised Volume No. 1 1 TABLE OF CONTENTS Great Lakes Gas Transmission Limited Partnership Table of Contents 1 TABLE OF CONTENTS 2 PRELIMINARY STATEMENT 3 MAPS 4 STATEMENT OF RATES 4.1 Rate Schedules FT, LFT & EFT 4.2 Reserved for Future Use 4.3

More information

NOTICE OF NON-BINDING OPEN SEASON AG LINE EXPANSION PROJECT

NOTICE OF NON-BINDING OPEN SEASON AG LINE EXPANSION PROJECT Announcement of Non-Binding Open Season Natural Gas Pipeline Company of America LLC ( NGPL ) is soliciting interest from the market in developing a project to provide approximately 200,000 Dth/d of firm

More information

January 31, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Kimberly D.

January 31, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Kimberly D. Transcontinental Gas Pipe Line Company, LLC 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 (713) 215-2000 Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

1Line Customer Reports

1Line Customer Reports 1Line Customer s Number Name Description under ALLOCATIONS Allocations 1226 Allocation Audit LDC/Power Generation (Transco) Scheduled and Allocated quantities, Ranks, and Limit Values at a citygate location

More information

DOMINION EAST OHIO CASE NO GA-EXM STANDARD SERVICE OFFER/STANDARD CHOICE OFFER CAPACITY RELEASE INFORMATION PACKAGE

DOMINION EAST OHIO CASE NO GA-EXM STANDARD SERVICE OFFER/STANDARD CHOICE OFFER CAPACITY RELEASE INFORMATION PACKAGE DOMINION EAST OHIO CASE NO. 07-1224-GA-EXM STANDARD SERVICE OFFER/STANDARD CHOICE OFFER CAPACITY RELEASE INFORMATION PACKAGE Disclaimer The information presented in this information package, at the information

More information

Millennium Pipeline Company, L.L.C. 5 th Annual Customer Meeting October 8, Joseph P. Shields President

Millennium Pipeline Company, L.L.C. 5 th Annual Customer Meeting October 8, Joseph P. Shields President Millennium Pipeline Company, L.L.C. 5 th Annual Customer Meeting October 8, 2014 Joseph P. Shields President 1 Welcome! 2 Our Speakers 3 Guest Speakers Presenters James Eckert - VP Commercial Operations,

More information

Issued March 21, Permian Global Access Pipeline LLC. Notice of Non-Binding Open Season

Issued March 21, Permian Global Access Pipeline LLC. Notice of Non-Binding Open Season Issued March 21, 2018 Permian Global Access Pipeline LLC Notice of Non-Binding Open Season Notice of Non-Binding Open Season Permian Global Access Pipeline LLC ( PGAP ), a wholly-owned subsidiary of Tellurian

More information

Director TGP Facility Planning and Gas Control June 3, Prepared for the Harvard Electricity Policy Group

Director TGP Facility Planning and Gas Control June 3, Prepared for the Harvard Electricity Policy Group www.elpaso.com NYSE:EP Anders Johnson Director TGP Facility Planning and Gas Control June 3, 2011 Prepared for the Harvard Electricity Policy Group D E P E N D A B L E N A T U R A L G A S El Paso Corporation

More information

Open Season Market-Based Storage in the Heart of the PA Marcellus Shale Region

Open Season Market-Based Storage in the Heart of the PA Marcellus Shale Region Open Season Market-Based Storage in the Heart of the PA Marcellus Shale Region Open Season starts 8:00AM Feb 12, 2018 Open Season bids due 12:00PM Feb 21, 2018 Contracts awarded on 12:00PM Feb 23, 2018

More information

Table of Contents Original Sheet No. 0 6 Original Sheet No. 1 7 First Revised Sheet No. 2 8 Original Sheet No. 3 9 First Revised Sheet No.

Table of Contents Original Sheet No. 0 6 Original Sheet No. 1 7 First Revised Sheet No. 2 8 Original Sheet No. 3 9 First Revised Sheet No. Table of Contents Original Sheet No. 0 6 Original Sheet No. 1 7 First Revised Sheet No. 2 8 Original Sheet No. 3 9 First Revised Sheet No. 4 10 Sheet Nos. 5-99 11 Third Revised Sheet No. 100 12 Seventh

More information

November 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

November 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 November 20, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Gas Transmission Northwest LLC 700 Louisiana Street, Suite 700 Houston,

More information

Welcome to the Southern Natural Gas Company Shipper Meeting

Welcome to the Southern Natural Gas Company Shipper Meeting Welcome to the Southern Natural Gas Company Shipper Meeting Birmingham, Alabama 1 Opening Remarks Norman Holmes Vice President, Marketing May 6, 13, 2015 2014 2 Forward Looking Statements This presentation

More information

Southern Natural Gas Company 2016 Outage Review Meeting. Customer con call and Webex April 20, 2016

Southern Natural Gas Company 2016 Outage Review Meeting. Customer con call and Webex April 20, 2016 Southern Natural Gas Company 2016 Outage Review Meeting Customer con call and Webex April 20, 2016 1 Welcome 2 Agenda Review of current and upcoming notable Outages- April/May/June North System South System

More information

Transcontinental Gas Pipe Line Company, LLC RP Technical Conference March 28, 2018

Transcontinental Gas Pipe Line Company, LLC RP Technical Conference March 28, 2018 WE MAKE ENERGY HAPPEN Transcontinental Gas Pipe Line Company, LLC RP18-314-000 Technical Conference March 28, 2018 NYSE: WMB williams.com AGENDA > Introductions > Background Information > No-Notice Priorities

More information

FERC GAS TARIFF VOLUME NO. 1 KO TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION

FERC GAS TARIFF VOLUME NO. 1 KO TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION KO Transmission Company Filing Category: Amendment Filing Date: 07/27/2016 FERC Docket: RP16-01097-001 FERC Action: Accept FERC Order: 156 FERC 61,147 Order Date: 08/31/2016 Effective Date: 02/01/2017

More information

TransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018

TransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018 TransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018 Proposing firm service from Empress to the Chicago market area, including

More information

Customer Select Supply/Storage. Effective May 2009

Customer Select Supply/Storage. Effective May 2009 Customer Select Supply/Storage Effective May 2009 Service Territory Nicor Gas Territory Area: 17,000 square miles Population: 5.7 million (est.) Communities Served: 640 Customers: 2.2 million Rockford

More information

Freddie Salas Manager Passport Nominations and Scheduling

Freddie Salas Manager Passport Nominations and Scheduling www.kindermorgan.com Freddie Salas Manager Passport Nominations and Scheduling Agenda Passport2DART Implementation Timeline What you can do to prepare Available Tools Nomination Model Questions 2 Timeline

More information

West Region March 20, 2013

West Region March 20, 2013 www.kindermorgan.com West Region March 20, 2013 WELCOME Paul Haas West Region Director Transportation and Storage Services 2 Agenda DART Implementation Timeline DART Features Security GIDs Contract Numbers/Capacity

More information

Backbone Transportation Service

Backbone Transportation Service Backbone Transportation Service California Producer Set-Aside Rights 2005 San Diego Gas and Electric and Southern California Gas Company. All copyright and trademark rights reserved Overview Firm Access

More information

Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 FERC Gas Tariff First Revised Volume No. 1

Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 FERC Gas Tariff First Revised Volume No. 1 Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 RATE SCHEDULE FTS FIRM TRANSPORTATION SERVICE 1. AVAILABILITY This Rate Schedule FTS is available to any entity (hereinafter called Shipper) which:

More information

PHILADELPHIA GAS WORKS LNG SALES AND ASSET OPTIMIZATION RFP # Questions & Answers April 26, 2016

PHILADELPHIA GAS WORKS LNG SALES AND ASSET OPTIMIZATION RFP # Questions & Answers April 26, 2016 Q1 QUESTIONS Daily Load history for PGW utility and for third parties. A1 Response to follow. ANSWERS a. Could you please provide daily historical Firm load and nonfirm load history split by TETCO and

More information

Frequently Asked Questions. DART Implementation

Frequently Asked Questions. DART Implementation October 7, 2016 Frequently Asked Questions DART Implementation The Kinder Morgan West Region Pipelines, which include El Paso Natural Gas Company, LLC, (EPNG) and Mojave Pipeline Company, LLC, (Mojave)

More information

Southern Natural Gas Company 2018 Outage Review Meeting. Customer con call and Webex July 18, 2018

Southern Natural Gas Company 2018 Outage Review Meeting. Customer con call and Webex July 18, 2018 Southern Natural Gas Company 2018 Outage Review Meeting Customer con call and Webex July 18, 2018 1 Welcome 2 Agenda Review of current and upcoming notable Outages- July/August/September Unscheduled outages

More information

FIRM TRANSPORTATION SERVICE AGREEMENT Rate Schedule KRF-1 CONTRACT NO. 1662

FIRM TRANSPORTATION SERVICE AGREEMENT Rate Schedule KRF-1 CONTRACT NO. 1662 FIRM TRANSPORTATION SERVICE AGREEMENT Rate Schedule KRF-1 CONTRACT NO. 1662 THIS FIRM TRANSPORTATION SERVICE AGREEMENT ( Agreement ) is made and entered into as of this 29th day of November, 2017, by and

More information

Southern Natural Gas Company 2018 Outage Review Meeting. Customer con call and Webex May 23, 2018

Southern Natural Gas Company 2018 Outage Review Meeting. Customer con call and Webex May 23, 2018 Southern Natural Gas Company 2018 Outage Review Meeting Customer con call and Webex May 23, 2018 1 Welcome 2 Agenda Review of current and upcoming notable Outages- May/June/July Unscheduled outages North

More information

Issued February 21, Haynesville Global Access Pipeline LLC. Notice of Non-Binding Open Season

Issued February 21, Haynesville Global Access Pipeline LLC. Notice of Non-Binding Open Season Issued February 21, 2018 Haynesville Global Access Pipeline LLC Notice of Non-Binding Open Season Notice of Non-Binding Open Season Haynesville Global Access Pipeline LLC ( HGAP ), a wholly-owned subsidiary

More information

Rate Schedule FT Firm Transportation Service

Rate Schedule FT Firm Transportation Service Rate Schedule FT Firm Transportation Service 1. Availability This Rate Schedule is available for the transportation of natural gas by Heartland Gas Pipeline for any Customer: 1.1 Where Customer: a) Has

More information

Southern Natural Gas Company 2018 Outage Review Meeting. Customer con call and Webex April 18, 2018

Southern Natural Gas Company 2018 Outage Review Meeting. Customer con call and Webex April 18, 2018 Southern Natural Gas Company 2018 Outage Review Meeting Customer con call and Webex April 18, 2018 1 Welcome 2 Agenda Review of current and upcoming notable Outages- April/May/June Unscheduled outages

More information

Natural Gas Pipeline Company of America LLC. Winter Scheduling 2018/19

Natural Gas Pipeline Company of America LLC. Winter Scheduling 2018/19 Natural Gas Pipeline Company of America LLC Winter Scheduling 2018/19 1 Natural Gas Pipeline Company of America LLC This presentation is provided as general guidance, and reflects NGPL s view as of October

More information

NORTHERN UTILITIES, INC. NEW HAMPSHIRE DIVISION ANNUAL COST OF GAS ADJUSTMENT FILING PREFILED TESTIMONY OF FRANCIS X.

NORTHERN UTILITIES, INC. NEW HAMPSHIRE DIVISION ANNUAL COST OF GAS ADJUSTMENT FILING PREFILED TESTIMONY OF FRANCIS X. NORTHERN UTILITIES, INC. NEW HAMPSHIRE DIVISION ANNUAL 0-0 COST OF GAS ADJUSTMENT FILING PREFILED TESTIMONY OF FRANCIS X. WELLS Prefiled Testimony of Francis X. Wells Annual 0-0 COG Filing Page of I. INTRODUCTION

More information

Iroquois. Capacity Release. Training Guide

Iroquois. Capacity Release. Training Guide PAGE 1 OF 20 Iroquois Capacity Release Training Guide 10/14/2014 PAGE 2 OF 20 TABLE OF CONTENTS OVERVIEW... 3 DEFINITIONS OF TERMS... 3 INITIAL CONTRACTING REQUIREMENTS FOR RELEASING SHIPPERS... 4 INITIAL

More information

FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 CHEYENNE PLAINS GAS PIPELINE COMPANY, L.L.C. filed with the FEDERAL ENERGY REGULATORY COMMISSION

FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 CHEYENNE PLAINS GAS PIPELINE COMPANY, L.L.C. filed with the FEDERAL ENERGY REGULATORY COMMISSION FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 of CHEYENNE PLAINS GAS PIPELINE COMPANY, L.L.C. filed with the FEDERAL ENERGY REGULATORY COMMISSION Communications regarding this Tariff should be addressed to:

More information

Millennium Pipeline Company, LLC. Capacity Release Quick Reference Millennium Pipeline Shipper Meeting

Millennium Pipeline Company, LLC. Capacity Release Quick Reference Millennium Pipeline Shipper Meeting Millennium Pipeline Company, LLC Capacity Release Quick Reference 2014 Millennium Pipeline Shipper Meeting Types of Releases Per NAESB Requirements, the following are guidelines for Capacity Release: Biddable

More information

NJ Solar Market Update

NJ Solar Market Update NJ Solar Market Update March 10, 2015 Renewable Energy Committee Meeting Trenton, NJ Prepared by Charlie Garrison Solar Installed Capacity Data The preliminary installed solar capacity as of 2/28/15 is

More information

Customer Seminar September 28, SCE&G 2016 Large Customer Seminar 1

Customer Seminar September 28, SCE&G 2016 Large Customer Seminar 1 Customer Seminar September 28, 2016 SCE&G 2016 Large Customer Seminar 1 Refreshments & Lunch Bathrooms Auditorium Entrance Designated Smoking Area SCE&G 2016 Large Customer Seminar 2 Meeting Agenda 8:00

More information

Dominion Energy Transmission, Inc. FERC Gas Tariff Tariff Record No. 20. Fifth Revised Volume No. 1 Version TARIFF RATE SCHEDULES

Dominion Energy Transmission, Inc. FERC Gas Tariff Tariff Record No. 20. Fifth Revised Volume No. 1 Version TARIFF RATE SCHEDULES Rate Schedules FERC Gas Tariff Tariff Record No. 20. TARIFF RATE SCHEDULES TARIFF RATE RECORD SCHEDULE SERVICE NO. FT Firm Transportation Service 20.1 FTNN Firm Transportation, No-Notice Service 20.2 IT

More information

FERC GAS TARIFF FIRST REVISED VOLUME NO. 1. (Superseding Original Volume No. 1) SOUTHERN STAR CENTRAL GAS PIPELINE, INC.

FERC GAS TARIFF FIRST REVISED VOLUME NO. 1. (Superseding Original Volume No. 1) SOUTHERN STAR CENTRAL GAS PIPELINE, INC. FERC Gas Tariff FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 ( Original Volume No. 1) Of SOUTHERN STAR CENTRAL GAS PIPELINE, INC. Filed With FEDERAL ENERGY REGULATORY COMMISSION Communications Covering Rates

More information

QUESTAR PIPELINE CUSTOMER MEETING MARCH 2017 PARK CITY, UTAH

QUESTAR PIPELINE CUSTOMER MEETING MARCH 2017 PARK CITY, UTAH QUESTAR PIPELINE CUSTOMER MEETING MARCH 2017 PARK CITY, UTAH Ron Jorgensen Vice President Operations & Gas Control, Questar Pipeline 2 Merger Related Update February 1, 2016 Dominion/Questar merger announced

More information

QUESTAR PIPELINE OPERATIONS & CUSTOMER SERVICE MEETING

QUESTAR PIPELINE OPERATIONS & CUSTOMER SERVICE MEETING QUESTAR PIPELINE OPERATIONS & CUSTOMER SERVICE MEETING 2013 Meeting Hotel Park City Park City, Utah WELCOME Larry Conti V.P. Operations & Engineering NEW PIPEVIEWER Jeannie Yerkovich SCADA Analyst Classic

More information

WELCOME TO IROQUOIS CAPACITY RELEASE TRAINING

WELCOME TO IROQUOIS CAPACITY RELEASE TRAINING WELCOME TO CAPACITY RELEASE TRAINING George Alcoforado Helena Clancy Business Analyst Sr. Transportation Services Rep (203) 944-7081 (203) 944-7047 George_Alcoforado@Iroquois.com Helena_Clancy@Iroquois.com

More information

Questar Pipeline Current Capacity and Development

Questar Pipeline Current Capacity and Development Questar Pipeline Current Capacity and Development Gary A. Schmitt Manager, Marketing and Business Development April 27, 2007 Platts Rockies Gas and Oil Conference 1 Agenda Questar Pipeline Overview Basin

More information

Southern Natural Gas Company 2018 Outage Review Meeting. Customer con call and Webex March 21, 2018

Southern Natural Gas Company 2018 Outage Review Meeting. Customer con call and Webex March 21, 2018 Southern Natural Gas Company 2018 Outage Review Meeting Customer con call and Webex March 21, 2018 1 Welcome 2 Agenda Review of current and upcoming notable Outages- March/April/May Unscheduled outages

More information

White River Hub Customer Meeting November 6, 2008

White River Hub Customer Meeting November 6, 2008 White River Hub Customer Meeting November 6, 2008 Gary A. Schmitt Questar Pipeline Company General Manager, Marketing and Business Development Enterprise White River Hub Questar Northwest REX TransColorado

More information

Kinder Morgan Louisiana Pipeline LLC First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS

Kinder Morgan Louisiana Pipeline LLC First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS Kinder Morgan Louisiana Pipeline LLC First Revised Sheet No. 100 First Revised Volume No. 1 Original Sheet No. 100 1. DEFINITIONS 1.1 AGREEMENT "Agreement" shall mean a transportation agreement subject

More information

Columbia Gas Transmission, LLC. Fourth Revised Volume No. 1 Version TABLE OF CONTENTS TO GENERAL TERMS AND CONDITIONS

Columbia Gas Transmission, LLC. Fourth Revised Volume No. 1 Version TABLE OF CONTENTS TO GENERAL TERMS AND CONDITIONS Part VII. Version 9.0.0 Section 1 Definitions 2 Electronic Bulletin Board (EBB) 3 Requests for Service TABLE OF CONTENTS TO GENERAL TERMS AND CONDITIONS 4 Availability of Capacity for Firm Services 5 Service

More information

Sheet No. 5 - Currently Effective Rates - Rate Schedules FTS and ITS. Sheet No. 6 - Statement of Negotiated Rate Transactions

Sheet No. 5 - Currently Effective Rates - Rate Schedules FTS and ITS. Sheet No. 6 - Statement of Negotiated Rate Transactions Kinder Morgan Illinois Pipeline LLC Table of Contents Sheet No. 1 - Table of Contents Sheet No. 3 - Preliminary Statement Sheet No. 4 - System Map Sheet No. 5 - Currently Effective Rates - Rate Schedules

More information

Texas Eastern Appalachiaa to Market Expansion Project (TEAM

Texas Eastern Appalachiaa to Market Expansion Project (TEAM Texas Eastern Appalachiaa to Market Expansion Project (TEAM 2014) Moving emerging natural gas supplies from the Appalachian region to diverse market destinations along the existing Texas Eastern footprint

More information

Defining Outage States to Include a Mothball Outage

Defining Outage States to Include a Mothball Outage Defining Outage States to Include a Mothball Outage Emilie Nelson Director, Operations Josh Boles Manager ICAP Market Market Issues Working Group November 7, 2013 2013 New York Independent System Operator,

More information

Foothills Pipe Lines Ltd.

Foothills Pipe Lines Ltd. Page 1 SERVICE AGREEMENT FIRM TRANSPORTATION SERVICE FOR TRANSPORTATION OF GAS This AGREEMENT made, 20 BETWEEN: AND: FOOTHILLS PIPE LINES LTD., a body corporate having an office and carrying on business

More information

FERC GAS TARIFF FOURTH REVISED VOLUME NO. 1. (Superseding Third Revised Volume No. 1) COLUMBIA GAS TRANSMISSION, LLC FILED WITH

FERC GAS TARIFF FOURTH REVISED VOLUME NO. 1. (Superseding Third Revised Volume No. 1) COLUMBIA GAS TRANSMISSION, LLC FILED WITH FERC GAS TARIFF FOURTH REVISED VOLUME NO. 1 (Superseding Third Revised Volume No. 1) of COLUMBIA GAS TRANSMISSION, LLC FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this

More information

Author: Greg Lander For The New Jersey Conservation Foundation.

Author: Greg Lander For The New Jersey Conservation Foundation. Analysis of Regional Pipeline System's Ability to Deliver Sufficient Quantities of Natural Gas During Prolonged and Extreme Cold Weather (Winter 2017-2018) Author: Greg Lander For The New Jersey Conservation

More information

NJ Solar Market Update

NJ Solar Market Update NJ Solar Market Update February 9, 2015 Renewable Energy Committee Meeting Trenton, NJ Prepared by Charlie Garrison Solar Installed Capacity Data The preliminary installed solar capacity as of 1/31/15

More information

SOUTHERN LNG SERVICE REQUEST FORM

SOUTHERN LNG SERVICE REQUEST FORM SOUTHERN LNG SERVICE REQUEST FORM Southern LNG Company, L.L.C. Post Office Box 2563 Birmingham, AL 35202 Gentlemen: (Customer) hereby requests services from Southern LNG Company, L.L.C. (Southern LNG)

More information

Horizon Pipeline Company, L.L.C. First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS

Horizon Pipeline Company, L.L.C. First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS Horizon Pipeline Company, L.L.C. First Revised Sheet No. 100 Superseding Original Sheet No. 100 1. DEFINITIONS 1.1 AGREEMENT "Agreement" shall mean a transportation agreement subject to, as applicable,

More information

Renewable Market Adjusting Tariff (ReMAT) Feed-In Tariff (FIT)

Renewable Market Adjusting Tariff (ReMAT) Feed-In Tariff (FIT) Renewable Market Adjusting Tariff (ReMAT) Feed-In Tariff (FIT) Program Overview August 8, 2013 1 ReMAT Schedule Date (2013) July 23 July 24 August 8 August 16 TBD TBD October 1 November 1 Event E-PWF &

More information

WEST to EAST PIPELINE PROJECT

WEST to EAST PIPELINE PROJECT WEST to EAST PIPELINE PROJECT Lake Ontario CANADA TransCanada Niagara Pendleton Empire Pipeline Chippawa EMPIRE CONNECTOR (NOV 2008) Lake Erie National Fuel Supply Corp. Independence Corning MILLENNIUM

More information

January 13, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

January 13, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 January 13, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 RE: ANR Pipeline Company Compliance Filing to RP16-440-000 RP17- - ANR Pipeline

More information

Throughput Management System (TMS) Nominations and Scheduling Reference Guide

Throughput Management System (TMS) Nominations and Scheduling Reference Guide Throughput Management System (TMS) Nominations and Scheduling Reference Guide Nomination Nomination Maintenance Copy Function Add Button (Creates a new line item) Change Button (Replaces an existing nomination)

More information

GLOSSARY OF TERMS. Allocating Party - The party that performs the allocation based on the PDAs submitted by the CSO.

GLOSSARY OF TERMS. Allocating Party - The party that performs the allocation based on the PDAs submitted by the CSO. GLOSSARY OF TERMS A Allocating Party - The party that performs the allocation based on the PDAs submitted by the CSO. Allocating Entity The party that submits the PDA Allocated Entity - Entity that receives

More information

Aliso Canyon Gas Electric Coordination Discussion

Aliso Canyon Gas Electric Coordination Discussion Aliso Canyon Gas Electric Coordination Discussion Market Surveillance Committee Meeting April 19, 2016 Cathleen Colbert Senior Market Design and Policy Developer Market & Infrastructure Policy Aliso Canyon

More information