1 Modul ke: 10 Manajemen Persediaan MRP Lot For Lot Fakultas FEB Program Studi Manajemen
2 Learning Objectives Describe the conditions under which MRP is most appropriate. Describe the inputs, outputs, and nature of MRP processing. Explain how requirements in a master production schedule are translated into material requirements for lower-level items. Discuss the benefits and requirements of MRP.
3 Learning Objectives Explain how an MRP system is useful in capacity requirements planning. Outline the potential benefits and some of the difficulties users have encountered with MRP. Describe MRP II and its benefits. Describe ERP, what it provides, and its hidden costs.
4 MRP Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased requirements for subassemblies, components, and raw materials. End products MRP Time-phase based Subassemblies Components Raw materials
5 Independent and Dependent Demand Independent Demand A Dependent Demand B(4) C(2) D(2) E(1) D(3) F(2) Independent demand is uncertain. Dependent demand is certain.
6 Dependant Demand Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Once the independent demand is known, the dependent demand can be determined.
7 Amount on hand Amount on hand Demand Demand Demand Stable demand Lumpy demand Time Time Safety stock Time Time
8 Overview of MRP MRP Inputs MRP Processing MRP Outputs Master schedule Bill of materials MRP computer programs Primary reports Secondary reports Changes Order releases Planned-order schedules Exception reports Planning reports Performancecontrol reports Inventory records Inventory transaction
9 MPR Inputs Master Production Schedule Time-phased plan specifying timing and quantity of production for each end item. Material Requirement Planning Process
10 Master Schedule Master schedule: One of three primary inputs in MRP; states which end items are to be produced, when these are needed, and in what quantities. Cumulative lead time: The sum of the lead times that sequential phases of a process require, from ordering of parts or raw materials to completion of final assembly.
11 Planning Horizon Assembly Subassembly Procurement Fabrication Time Period (weeks)
12 Bill-of-Materials Bill of materials (BOM): One of the three primary inputs of MRP; a listing of all of the raw materials, parts, subassemblies, and assemblies needed to produce one unit of a product. Product structure tree: Visual depiction of the requirements in a bill of materials, where all components are listed by levels. Low-level coding: Restructuring the bill of materials so that multiple occurrences of a component all coincide with the lowest level the component occurs
13 Level 0 Product Structure Tree Chair 1 Leg Assembly Seat Back Assembly 2 Legs (2) Cross bar Side Rails (2) Cross bar Back Supports (3) Level 0 X X 1 B (2) C B (2) C 2 D (3) E E (2) F (2) D (3) E E (2) F (2) 3 E (4) E (4) E E (2)
14 Inventory Records One of the three primary inputs in MRP Includes information on the status of each item by time period Gross requirements Scheduled receipts Amount on hand Lead times Lot sizes And more
15 Inventory Requirements Net requirements: Net Requirements = Gross Requirements Available Inventory Available Inventory: Available Inventory = Projected on hand Safety stock Inventory allocated to other items
16 Assembly Time Chart Procurement of raw material D Procurement of raw material F Fabrication of part E Procurement of part C Procurement of part H Subassembly A Subassembly B Final assembly and inspection Procurement of raw material I Fabrication of part G
17 Time-Phased Product Structure Start production of D Must have D and E completed here so production can begin on B Lead time 2 weeks 1 week G (1) D (2) 2 weeks 1 week 3 weeks 2 weeks D (2) E (2) 2 weeks to produce E (2) 1 week F (2) B (2) 1 week C (3) Time in weeks A A B C D E F G weeks weeks weeks weeks weeks weeks weeks
18 Gross Requirements Plan Week Lead Time A. Required date 50 Order release date 50 1 week B. Required date 100 Order release date weeks C. Required date 150 Order release date week E. Required date Order release date week F. Required date 300 Order release date weeks D. Required date Order release date week G. Required date 300 Order release date week
19 MRP Structure Data Files BOM Lead times (Item master file) Master production schedule Output Reports MRP by period report MRP by date report Planned order report Inventory data Purchasing data Material requirement planning programs (computer and software) Purchase advice Exception reports Order early or late or not needed Figure 14.5 Order quantity too small or too large
20 Determining Gross Requirements Starts with a production schedule for the end item 50 units of Item A in week 8 Using the lead time for the item, determine the week in which the order should be released a 1 week lead time means the order for 50 units should be released in week 7 This step is often called lead time offset or time phasing
21 Determining Gross Requirements From the BOM, every Item A requires 2 Item Bs 100 Item Bs are required in week 7 to satisfy the order release for Item A The lead time for the Item B is 2 weeks release an order for 100 units of Item B in week 5 The timing and quantity for component requirements are determined by the order release of the parent(s)
22 Determining Gross Requirements The process continues through the entire BOM one level at a time often called explosion By processing the BOM by level, items with multiple parents are only processed once, saving time and resources and reducing confusion Low-level coding ensures that each item appears at only one level in the BOM
23 Net Requirements Plan
24 Net Requirements Plan
25 MRP Processing Gross requirements Schedule receipts Projected on hand Net requirements Planned-order receipts Planned-order releases
26 MPR Processing Gross requirements Total expected demand Scheduled receipts Open orders scheduled to arrive Projected on hand Expected inventory on hand at the beginning of each time period
27 MPR Processing Net requirements Actual amount needed in each time period Planned-order receipts Quantity expected to be received at the beginning of the period Offset by lead time Planned-order releases Planned amount to order in each time period
28 Lot-Sizing Techniques Lot-for-lot techniques order just what is required for production based on net requirements May not always be feasible If setup costs are high, costs may be high as well Economic order quantity (EOQ) EOQ expects a known constant demand and MRP systems often deal with unknown and variable demand
29 Lot-Sizing Techniques Part Period Balancing (PPB) looks at future orders to determine most economic lot size EPP = setup cost / holding cost Programming technique Assumes a finite time horizon Effective, but computationally burdensome
30 Lot-for-Lot Example Week Gross requirements Scheduled receipts Projected on hand Net requirements Planned order receipts Planned order releases Holding cost = $1/week; Setup cost = $100/times; Lead time = 1 week
31 Gross requirements Scheduled receipts Projected on hand Lot-for-Lot Example No on-hand inventory is carried through the system Total holding cost = $0 Net requirements Planned order receipts There are seven setups for this item in this plan Total setup cost = 7 x $100 = $700 Planned order releases Holding cost = $1/week; Setup cost = $100/times; Lead time = 1 week
32 EOQ Lot Size Example Week Gross requirements Scheduled receipts Projected on hand Net requirements Planned order receipts Planned order releases Holding cost = $1/week; Setup cost = $100/times; Lead time = 1 week Average weekly gross requirements = 27; EOQ = 73 units
33 Scheduled receipts Projected on hand Planned order receipts Planned order releases EOQ Lot Size Example Annual demand = 1,404 Total cost = setup cost + holding cost Total cost = (1,404/73) x $100 + (73/2) x ($1 x 52 weeks) Total Gross cost = $3,798 /year requirements Cost for 10 weeks = $3,798 x (10/52) = $730 Or Total Net cost = setup cost + holding cost requirements Total cost = 4 x $ x ($1 /weeks) Total cost = $ Holding cost = $1/week; Setup cost = $100/times; Lead time = 1 week Average weekly gross requirements = 27; EOQ = 73 units
34 PPB Example Gross requirements Scheduled receipts Projected on hand Net requirements Planned order receipts Planned order releases Holding cost = $1/week; Setup cost = $100; Lead time = 1 week ; EPP = 100 units
35 Gross requirements Scheduled receipts Projected on hand Net requirements Planned order receipts Planned order releases PPB Example Trial Lot Size Periods (cumulative net Costs Combined requirements) Part Periods Setup Holding Total , = 340 x , 3, = 40 x , 3, 4, = 50 x x = 170 2, 3, 4, 5, = 90 x x x 1 Combine periods 2-5 as this results in the Part Period closest to 35 the EPP , = 30 x 1 6, 7, = 30 x 1 6, 7, 8, = 60 x x = 220 Combine periods 6-9 as this results in the Part Period closest to the EPP = 100 Total cost = 490 Holding cost = $1/week; Setup cost = $100; EPP = 100 units
36 Lot-Sizing Summary For these three examples Lot-for-lot $700 EOQ $730 PPB $490 Wagner-Whitin would have yielded a plan with a total cost of $455 for this example
37 Example Gross requirements Scheduled receipts Projected on hand Net requirements Planned order receipts Planned order releases Holding cost = $1/week; Setup cost = $100; Lead time = 1 week ; EPP = 100 units
38 Lot-Sizing Summary In theory, lot sizes should be recomputed whenever there is a lot size or order quantity change In practice, this results in system nervousness and instability Lot-for-lot should be used whenever economical Lot sizes can be modified to allow for scrap, process constraints, and purchase lots
39 Lot-Sizing Summary Use lot-sizing with care as it can cause considerable distortion of requirements at lower levels of the BOM When setup costs are significant and demand is reasonably smooth, PPB, Wagner-Whitin, or EOQ should give reasonable results
40 Updating the System Regenerative system Updates MRP records periodically Net-change system Updates MPR records continuously
41 MRP Primary Reports Planned orders - schedule indicating the amount and timing of future orders. Order releases - Authorization for the execution of planned orders. Changes - revisions of due dates or order quantities, or cancellations of orders.
42 MRP Secondary Reports Performance-control reports system evaluation, deviation, late delivery, stockouts Planning reports useful for forecasting future inventory, assess future material requirement Exception reports late or overdue orders, excessive scrap rate, requirement of nonexisting parts
43 Material Checking & Balancing Use for monitoring of amount of part and product during processes Needs information to balance materials Accumulative production planning or target plan BOM or Assembly diagram Normally periodic checked
44 Accumulative production Material Checking & Balancing B C G Assembly diagram D A E H I J K F Target Plan Week Balancing chart J F M A M J J A S O N D A B C D E F G H I J K
45 Standard labor hours Standard labor hours Resource Requirements Profile 200 Capacity exceeded in periods 4 & Lot 6 split Lot 11 moved Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Lot 11 Lot 9 Lot 12 Lot 10 Lot 13 Available capacity Lot 15 Lot 14 Lot Period (a) Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Lot 9 Lot 12 Lot 10 Lot 13 Available capacity Lot 11 Lot 15 Lot 14 Lot Period (b)
46 Smoothing Tactics 1. Overlapping Sends part of the work to following operations before the entire lot is complete Reduces lead time 2. Operations splitting Sends the lot to two different machines for the same operation Shorter throughput time but increased setup costs 3. Lot splitting Breaking up the order into smaller lots and running part ahead of schedule
47 Other Considerations Safety Stock Lot sizing Lot-for-lot ordering Economic order quantity Fixed-period ordering
48 MRP in Services Food catering service End item => catered food Dependent demand => ingredients for each recipe, i.e. bill of materials
49 Benefits of MRP Low levels of in-process inventories Ability to track material requirements Ability to evaluate capacity requirements Means of allocating production time Ability to easily determine inventory usage by backflushing Backflushing: Exploding an end item s bill of materials to determine the quantities of the components that were used to make the item.
50 Requirements of MRP Computer and necessary software Accurate and up-to-date Master schedules Bills of materials Inventory records Integrity of data
51 MRP II Expanded MRP with emphasis placed on integration Financial planning Marketing Engineering Purchasing Manufacturing
52 Adjust master schedule MRP II Finance Market Demand Manufacturing Master production schedule Marketing Production plan MRP Adjust production plan Rough-cut capacity planning Capacity planning Yes No Requirements No Yes Problems? Problems? schedules
53 ERP Enterprise resource planning (ERP): Next step in an evolution that began with MPR and evolved into MRPII Integration of financial, manufacturing, and human resources on a single computer system.
54 ERP Software ERP software provides a system to capture and make data available in real time to decision makers and other users in the organization Provides tools for planning and monitoring various business processes Includes Production planning and scheduling Inventory management Product costing Distribution
55 MRP in Services Service applications such as: Professional services Postal services Retail Banking Healthcare Higher education Engineering Logistical services Real estate
56 ERP Strategy Considerations High initial cost High cost to maintain Future upgrades Training
57 Daftar Pustaka Richardus Eko Indrajit, (2005), Manajemen Persediaan, Grasindo, Jakarta Heizer Jay, B.Rander, (206), Manajemen Operasi, Salemba Empat, Jakarta Hani handoko, (2002), Manajemen Produksi dan Operasi, BPFE, Yogyakarta Siswanto, (2005), Riset Operasi, Erlangga, Jakarta M. Syamsul Ma arif, (2003), Manajemen Operasi, Grasindo, Jakarta Sofyan Assauri, (2001), Manajemen Operasi, BPFE, Jakarta Martinich, (2003), Operation Manaement, Prenice hall, New Yory
58 Terima Kasih
Net Requirements Plan. The logic of net requirements. MRP Planning Sheet. Gross Requirements Schedule
Net Requirements Plan The logic of net requirements Gross Requirements Schedule MRP Planning Sheet Safety Stock BOMs, inventory records, purchase and production quantities may not be perfect Consideration
More informationMaterial Requirements Planning (MRP) and ERP 14. Outline
Material Requirements Planning (MRP) and ERP 14 1 Outline Global Company Profile: Wheeled Coach Dependent Demand Dependent Inventory Model Requirements MRP Structure MRP Management 2 1 Outline - Continued
More informationMaterials Requirements Planning
Materials Requirements Planning Independent and Dependent Demand Independent Demand A Dependent Demand B(4) C(2) D(2) E(1) D(3) F(2) Independent demand is uncertain. Dependent demand is certain. Dependent
More informationHistory IE 376 PRODUCTION INFORMATION SYSTEMS. Course Notes Lecture #2.A Material Requirements Planning
IE PRODUCTION INFORMATION SYSTEMS Course Notes Lecture #.A Material Requirements Planning IE Bilkent University Manufacturing Planning and Control System Routing file Resource planning Bills of material
More information7/14/2010. Copyright 2010 Pearson Education, Inc. Publishing as Prentice Hall.
15 Resource Planning PowerPoint Slides by Jeff Heyl For Operations Management, 9e by Krajewski/Ritzman/Malhotra 21 Pearson Education 15 1 Resource Planning At the heart of any organization Starts t with
More informationMaterial Resources Planning
Operations and Supply Planning PGDM 2018-20 Material Resources Planning Vinay Kumar Kalakbandi Assistant Professor Operations Management 170 Introduction Computerised information system Aids in planning
More informationMaterials and Resource Requirements Planning
CHAPTER FIFTEEN Materials and Resource Requirements Planning McGraw-Hill/Irwin Copyright 2011 by the McGraw-Hill Companies, Inc. All rights reserved. Where We Are Now Relationships Sustainability Globalization
More informationPlanning. Dr. Richard Jerz rjerz.com
Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages
More informationIV/IV B.Tech (Mech. Engg.) 7th sem, Regular Exam, Nov Sub: OPERATIONS MANAGEMENT [14ME705/A] Scheme of valuation cum Solution set
IV/IV B.Tech (Mech. Engg.) 7th sem, Regular Exam, Nov 2017 Sub: OPERATIONS MANAGEMENT [14ME705/A] Scheme of valuation cum Solution set 1 1 x 12 = 12 M a) Forecasts are estimates of occurrence, timing or
More informationPlanning. Planning Horizon. Stages of Planning. Dr. Richard Jerz
Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages
More informationPlanning. Planning Horizon. Stages of Planning. Dr. Richard Jerz
Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages
More informationResources Planning. Introduction
Operations Management - II PGDM 2017-19 Resources Planning Vinay Kumar Kalakbandi Assistant Professor Operations Management Survey No. 38, Cherlaguda Village, Shamshabad Mandal, RR District, Hyderabad-
More informationNotes for Production and Operations Management- I
Notes for Production and Operations Management- I Factors affecting Process Design Decisions Nature of product/service demand Degree of vertical integration Production Flexibility Degree of automation
More informationMaterial Requirements Planning (MRP), chap 15
Material Requirements Planning (MRP), chap 15 Chapter 15: Learning Outcomes When you complete this chapter you should be able to: 1. Develop a product structure 2. Build a gross requirements plan 3. Build
More informationChapter 18. Materials Requirements Planning
1 Chapter 18 Materials Requirements Planning Material Requirements Planning 2 Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed to produce
More informationPRODUCTION PLANNING ANDCONTROL AND COMPUTER AIDED PRODUCTION PLANNING Production is a process whereby raw material is converted into semi-finished products and thereby adds to the value of utility of products,
More informationA typical manufacturing plant
CHAPTER6: PRODUCTION PLANNING & CONTROL Production planning is concerned with the determination of production, inventory, and work force levels to meet fluctuating demand A typical manufacturing plant
More informationLOT SIZING IN MRP. Week Gross requirements Scheduled receipts Projected available balance Net Requirements
LOT SIZING IN MRP The net data is subjected lot sizing Lot sizes developed can satisfy the net for one or more weeks The basic trade-off involves the elimination of one or more setups at the expense of
More informationOman College of Management and Technology
Oman College of Management and Technology Course 803303 PIS Chapter 7 Material Requirements Planning (MRP) CS/MIS Department What is MRP? (Material Requirements Planning) Is a basic tool for performing
More informationMATERIAL AND CAPACITY REQUIREMENTS PLANNING (MRP AND CRP) Part -1. Dr. Mahmoud Abbas Mahmoud Al-Naimi Assistant Professor
MATERIAL AND CAPACITY REQUIREMENTS PLANNING (MRP AND CRP) Part -1 Al-Naimi Assistant Professor Industrial Engineering Branch Department of Production Engineering and Metallurgy University of Technology
More informationEnterprise Resource Planning
Resource Planning Enterprise Resource Planning What Is ERP? Software designed for organizing and managing business processes Modules share information across all business functions Can share customer sales
More informationChapter 6 RESOURCE PLANNING SYSTEMS. Prepared by Mark A. Jacobs, PhD
Chapter 6 RESOURCE PLANNING SYSTEMS Prepared by Mark A. Jacobs, PhD LEARNING OBJECTIVES You should be able to: Describe the hierarchical operations planning process in terms of materials planning (APP,
More informationHybrid Manufacturing Methods
Hybrid Manufacturing Methods The following manufacturing execution and costing methods are supported in SyteLine. These methods can be combined in a single environment so that the optimal method is used
More informationPriority for MRP. Run MRP based on actual orders, forecasts or static requirements. Run MRP simulations until you re satisfied with the plans
WHY CHOOSE PRIORITY? WORLD S MOST CONFIGURABLE ERP tailor fields, screens, menus, reports, stationery drag and drop workflows business rules, automated data entry, automated repetitive tasks Priority for
More informationPLANNING FOR PRODUCTION
PLANNING FOR PRODUCTION Forecasting Forecasting is the first major activity in the planning, involving careful study of past data and present scenario to estimate the occurence, timing or magnitude of
More informationIntroduction. Introduction. Introduction LEARNING OBJECTIVES LEARNING OBJECTIVES
Valua%on and pricing (November 5, 2013) LEARNING OBJECTIVES Lecture 9 Control 1. Understand the importance of inventory control and ABC analysis. 2. Use the economic order quantity (EOQ) to determine how
More informationIntroduction Manufacturing Data Management
Introduction Data Data ERP LX Product Integration CAP Rough Cut CAP MRP Detail Finite Forward Scheduling Daily Work Center Available Daily Work Center Available Daily Work Center Available INV Inventory
More informationAl-Qadisiya Journal For Engineering Sciences Vol. 4 No. 3 Year 2011
COMPUTER-AIDED SELECTION OF THE OPTIMAL LOT SIZING SYSTEM (CALS) Farah Kamil Abd Muslim Department of Mechanics Technical Institute/ Dewanya ABSTRACT A lot of works have been done by the researchers to
More informationUNIT II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING
UNIT II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING 2 Process Planning Product design for each product has been developed in the design department. To convert the product design into
More informationFactory Modeling. The Priority Enterprise Management System. Contents
The Priority Enterprise Management System Factory Modeling Contents Introduction...2 Parts...3 Bills of Materials and Revisions...3 Engineering Change Orders (ECO)...4 Part Routings...4 s...5 Work Cells...5
More informationLFL. KEYWORDS: Lot sizing techniques, Material requirements planning.
COMPUTER-AIDED SELECTION OF THE OPTIMAL LOT SIZING SYSTEM (CALS) Farah Kamil Abd Muslim Department of Mechanics Technical Institute/ Dewanya ABSTRACT A lot of works have been done by the researchers to
More informationAUTOSIMPLY. Manufacturing Order. Features. About AutoSimply
AUTOSIMPLY Manufacturing Order About AutoSimply Autosimply is a Sage Developer Partner since 2004. Founded by a group of ACCPAC consultants with over 10 years project experience, we know and understand
More informationOne Software to manage your entire bakery business.
One Software to manage your entire bakery business. Why choose ibake ERP : ibake ERP is an enterprise-class ERP solution for bakeries that manages POS, front office, manufacturing, warehouse, inventory
More informationNote 8: Materials Requirements Planning
Note 8: Materials Requirements Planning In materials requirements planning (MRP), orders for component parts are timed to coincide with the production schedule of the products in which they are used. We
More informationMicrosoft Business Solutions-Axapta Production enables you to flexibly manage your manufacturing processes for increased profitability.
Microsoft Business Solutions Axapta Production gives you real-time insight into your manufacturing processes to help you increase production efficiency and reduce costs. Key Benefits: Minimize lead times
More informationManaging Items. Explanation on beas extended view of Item Master Data
Managing Items Explanation on beas extended view of Item Master Data Boyum Solutions IT A/S beas Tutorial TABLE OF CONTENTS 1. INTRODUCTION... 3 2. PROCESS... 3 2.1. Header... 4 2.2. General Tab... 4 2.3.
More informationAkuntansi Biaya. Modul ke: 09FEB. Direct Material Cost. Fakultas. Diah Iskandar SE., M.Si dan Nurul Hidayah,SE,Ak,MSi. Program Studi Akuntansi
Modul ke: Akuntansi Biaya Direct Material Cost Fakultas 09FEB Diah Iskandar SE., M.Si dan Nurul Hidayah,SE,Ak,MSi Program Studi Akuntansi Effective Cost Control Specific assignment of duties and responsibilities.
More informationMATERIAL REQUIREMENT PLANNING
2 MATERIAL REQUIREMENT PLANNING MGT2405, University of Toronto, Denny Hong-Mo Yeh Material requirement planning is not only a technique for planning material requirements. It is also a logic that relates
More informationChapter 12. Enterprise Resource Planning
Chapter 12 Enterprise Resource Planning Enterprise Resource Planning (ERP) Organizes and manages a company s business processes by sharing information across functional areas Connects with supply-chain
More informationOperational Logistics Management (OLM612S)
Ester Kalipi (M.LSCM.; B. Hons Logistics; B-tech. BA.; Dip. BA.; Cert. BA.) Operational Logistics Management (OLM612S) Unit 2: Logistics Planning 21 February 2018 Table of contents Unit Objectives The
More informationWHITE PAPER. Control Manufacturing Costs with Odoo Open ERP
WHITE PAPER Control Manufacturing Costs with Odoo Open ERP USA ODOO WHITE PAPER 1 The challenge of controlling costs looms large in many manufacturing sectors but clearing this hurdle is not insurmountable.
More informationMANUFACTURING SYSTEMS MATERIAL REQUIREMENTS PLANNING
MANUFACTURING SYSTEMS MATERIAL REQUIREMENTS PLANNING MATERIAL REQUIREMENTS PLANNING INTRODUCTION Itis a computational technique that converts themaster schedule for end products into a detailed schedule
More informationPRODUCTION SCHEDULING PART-A
PRODUCTION SCHEDULING PART-A 1. List out any five priority sequencing rules. (Nov-2017) First come, first served (FCFS) Last come, first served (LCFS) Earliest due date (EDD) Shortest processing time (SPT)
More informationOperation Management QUESTION BANK
1. Explain forecasting methods 2. Explain classification of inventory Operation Management QUESTION BANK 3. Calculate a and b constants for the given no of births in previous years and cycles so Year 1
More informationAVANTUS TRAINING PTE LTD
Manufacturing II in Microsoft Dynamics NAV 2009 Course 80261A: 3 Days; Instructor-Led About this Course This three-day course explores the advanced manufacturing functionality of Microsoft Dynamics NAV
More information9. What are the activities within the scope of production planning? 1. Aggregate production planning
UNIT-II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING 1. Define Process Planning Process planning involves determining the sequence of processing and assembly steps that must be accomplished
More informationOutline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations
JIT and Lean Operations Outline Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations Eliminate Waste Remove Variability Improve
More informationKEY ISSUES in Advanced Operations Management. Timo Seppälä
KEY ISSUES in Advanced Operations Management Timo Seppälä Production as a value creation process Operations system forms the transformation process between the inputs and the outputs of a manufacturing
More informationSubbu Ramakrishnan. Manufacturing Finance with SAP. ERP Financials. Bonn Boston
Subbu Ramakrishnan Manufacturing Finance with SAP ERP Financials Bonn Boston Contents at a Glance 1 Overview of Manufacturing Scenarios Supported by SAP... 25 2 Overview of Finance Activities in a Make-to-Stock
More informationMULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.
MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. 1) The ability of manufacturing to produce goods and services is called: A) production planning. B)
More information02/10/2016. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems
ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Functional Area Systems Production / Operation Systems Lecture Outline 5, Part 4 ACS-1803 Introduction to Information Systems Examples:
More informationBreakdown. Learn the implications of the breakdown field in Item Master Data
Breakdown Learn the implications of the breakdown field in Item Master Data Boyum Solution IT A/S beas tutorial TABLE OF CONTENTS 1. INTRODUCTION... 2 2. Process... 2 2.1. Mode of procurement in beas...
More informationManufacturing Resource Planning
Outline Manufacturing Resource Planning MRP The Strategic Importance of Short- Term Scheduling Scheduling Issues Forward and Backward Scheduling Scheduling Criteria Outline Continued Scheduling Process-Focused
More informationTU-E2020 ADVANCED OPERATIONS MANAGEMENT. Master Production Scheduling Material Requirements Planning
TU-E2020 ADVANCED OPERATIONS MANAGEMENT Master Production Scheduling Material Requirements Planning Schedule for classes 26.10 Introduction to the Course / TS 27.10 Different models of Planning for Production
More informationFAQ: Efficiency in the Supply Chain
Question 1: What is a postponement strategy? Answer 1: A postponement or delayed differentiation strategy involves manipulating the point at which a company differentiates its product or service. These
More informationIMPORTED RAW MATERIAL INVENTORY CONTROL SYSTEM AS AN EFFORT TO MINIMIZE INVENTORY COST (A CASE STUDY IN PT APPAREL ONE INDONESIA)
IMPORTED RAW MATERIAL INVENTORY CONTROL SYSTEM AS AN EFFORT TO MINIMIZE INVENTORY COST (A CASE STUDY IN PT APPAREL ONE INDONESIA) Novelia Selvy Kurniasari, Yusmar Ardhi Hidayat, Nur Rini Jurusan Administrasi
More informationUniversity of Puerto Rico Mayagüez Campus Industrial Engineering Department
University of Puerto Rico Mayagüez Campus Industrial Engineering Department Research Study Titled: Teaching Industrial Engineering to Generation Y Students through Computer Games National Science Foundation
More informationMASTER PRODUCTION SCHEDULE (MPS)
MASTER PRODUCTION SCHEDULE (MPS) Anticipated build schedule for manufacturing end products (or product options) A statement of production, not a statement of market demand MPS takes into account capacity
More informationManagement Tool based on MRP and Lot-sizing A case study for comparing different cases
Business Sustainability III 1 Bahadir Akyuz, Adriana Araújo, Leonilde Varela, António Monteiro University of Minho School of Engineering 4800-058 Guimarães Portugal bhakyuz@gmail.com, dricafaraujo@gmail.com
More informationDynamics AX 2012 Trade & Logistics
Dynamics AX 2012 Trade & Logistics COURSE OVERIEW About this Course Supply Chain Foundation in Microsoft Dynamics AX 2012, provides students with the necessary tools and resources to perform basic tasks
More informationChapter 6 Resource Planning Systems
Chapter 6 Resource Planning Systems TRUE/FALSE 1. The resource and operations planning done by operations managers is intended to balance capacity and output. 2. MRP is the production planning system intended
More informationSage 200 Manufacturing Datasheet
Sage 200 Datasheet Sage 200 is a powerful manufacturing solution that enables you to manage your entire supply chain in detail, end to end, giving you the information needed to manage and control your
More informationPart IV Methods for Dependent Demand
Part IV Methods for Dependent Demand Chapter 9 Material Requirements Planning 1 Aims of the Chapter After reading this chapter you should be able to do the following: Understand the limitations of independent
More informationFunctional Area Systems Production / Operation Systems
Functional Area Systems Production / Operation Systems Lecture Outline 5 Part 4 Instructor: Trevor Nadeau Examples: Functional Area Info Systems 2 Functional Area Information Systems 3 Computers in Manufacturing
More informationSTP351: Purchase Order Collaboration in SNC
SAP Training Source To Pay STP351: Purchase Order Collaboration in SNC External User Training Version: 4.0 Last Updated: 03-Apr-2017 3M Business Transformation & Information Technology Progress set in
More informationWhat is ERP? Source: Wikipedia
Brad Staats What is ERP? Enterprise resource planning (ERP) systems integrate internal and external management information across an entire organization. The purpose of ERP is to facilitate the flow of
More informationManufacturing Functionlity in Microsoft Dynamics GP. Gain complete control over your inventory, production and orders.
Manufacturing Functionlity in Microsoft Dynamics GP Gain complete control over your inventory, production and orders. Control your Inventory Costing and Inventory Control Are you confident and in control
More informationWhat can Visual Planner do for you Rick Worley TriMin Systems April 2016
What can Visual Planner do for you Rick Worley TriMin Systems April 2016 Infor Planning Tools MRP Traditional Materials Planning in Batch Mode Requires support from CRP Visual Planner Advanced Material
More informationIntroduction to Production Planning
Introduction to Production Planning Production Planning: what does it deal with? 2 The Production Manager question is: WHAT ( which product ), WHEN ( considered some time horizon ), HOW ( with which materials
More informationWhat is MRP (I, II, III) 1. MRP-I
What is MRP (I, II, III) 1. MRP-I Introduction: Material Requirements Planning (MRP) is a software based production planning and inventory control system used to manage manufacturing processes. Although
More informationOperation Process Charting: How It s Made Here. APICS Fraser Valley November 2016 Presented by: Richard Ranftl (BCIT)
Operation Process Charting: How It s Made Here APICS Fraser Valley November 2016 Presented by: Richard Ranftl (BCIT) Manufacturing Systems What do we need to have in place to make the system functional?
More informationTest-king.C_TSCM42_65.80 Questions
Test-king.C_TSCM42_65.80 Questions Number: C_TSCM42_65 Passing Score: 800 Time Limit: 120 min File Version: 4.9 http://www.gratisexam.com/ C_TSCM42_65 SAP Certified Application Associate - Production -
More informationChapter two. Product and Process design
Chapter two Product and Process design 2-1- Product design Product design is the process of defining all the features and characteristics of the product to manufacture. Product design also includes the
More informationWhich of the following are subareas of the People Integration subcomponent of SAP NetWeaver?
SAP EDUCATION SAMPLE QUESTIONS: C_TERP10_60 SAP Certified Business Associate with SAP ERP 6.0 print view Disclaimer: These sample questions are for self-evaluation purposes only and do not appear on the
More informationYuji Yamamoto PPU411. Today s topic. What is MPS and MRP Developing MPS How to make MRP Enterprise Resource Planning Kanban system
Yuji Yamamoto PPU411 Today s topic What is MPS and MRP Developing MPS How to make MRP Enterprise Resource Planning Kanban system 1 Production planning and scheduling Demand Production planning 1,400pcs/m
More informationProduct Costing: Analyze the Financial Entries in Make-to-Stock. Birgit Starmanns SAP Marketing
Product Costing: Analyze the Financial Entries in Make-to-Stock Birgit Starmanns SAP Marketing Agenda Financial Excellence with SAP Solutions The End-to-End Process Plan to Manufacture: The Process Introduction
More informationINVENTORY CONTROL SYSTEM ANALYSIS OF GOODS AT COMPANY X S MODERN TRADE
INVENTORY CONTROL SYSTEM ANALYSIS OF GOODS AT COMPANY X S MODERN TRADE Victor Suhandi 1, Lydiawari Silalahi 2, Vivi Arisandhy 3 Industrial Engineering Department, Maranatha Christian University Jl. Suria
More informationTime to Shipment MRP Guide DBA Software Inc.
Contents 3 Table of Contents 1 Benefits and Features 4 2 MRP Overview 6 3 MRP Phases 10 4 Phase 1 - Plan Times to Shipment 12 5 Phase 2 - Plan Supply Pipelines 25 6 Phase 3 - Generate Jobs and POs 34 7
More informationCP-81 The best waze to get to destination MRP! Paul Whiteman Lexell Blue Susan Pucciano Lexell Blue
CP-81 The best waze to get to destination MRP! Paul Whiteman Lexell Blue Susan Pucciano Lexell Blue Agenda Introductions Manufacturing Maturity and MRP Roadmap System Configuration and Master Data Setup
More informationGBI - Introductory Course 6/11/2015
SAP University Alliances Version 2.11 Authors Bret Wagner Stefan Weidner Production Planning and Execution (PP) Product 6.0 EhP4 Global Bike Inc. Level Beginner Focus Cross-functional integration Production
More informationResource Portal for Management Sciences Students, Teachers and Business Professionals. Visit
Resource Portal for Management Sciences Students, Teachers and Business Professionals Visit www.accountancyknowledge.com MCQs 1-50 1. Which of the following statements is correct? (a) Marketing is the
More informationPrinciples of Production & Inventory Management PPIM
Principles of Production & Inventory Management PPIM PPIM course sessions. 1. Manufacturing Strategies & Resource Management 2. Product Development Cycle 3. Forecasting and Forecasting Techniques 4. Production
More informationThere are three options available for coping with variations in demand:
Module 3E10 Operations management for Engineers - Crib 1 (a) Define the theoretical capacity of a manufacturing line. Explain why the actual capacity of a manufacturing line is often different from its
More informationFEATURES IN TRIMIT FURNITURE 2017
FEATURES IN TRIMIT FURNITURE 2017 This document provides an overview of the most important features available in TRIMIT Furniture, as they are available in version 2017 of December 2016. The purpose of
More informationMANUFACTURING RESOURCE PLANNING AND ENTERPRISE RESOURCE PLANNING SYSTEMS: AN OVERVIEW
MANUFACTURING RESOURCE PLANNING AND ENTERPRISE RESOURCE PLANNING SYSTEMS: AN OVERVIEW Al-Naimi Assistant Professor Industrial Engineering Branch Department of Production Engineering and Metallurgy University
More informationPRODUCTION EXECUTION
PRODUCTION EXECUTION Table of contents Course Map Module 1: Production Planning Overview Module 2: Master Data Module 3: Production Execution Process Module 4: Process Manufacturing Module 5: Summary What
More informationInventory Control. Inventory. Inventories in a manufacturing plant. Why inventory? Reasons for holding Raw Materials. Reasons for holding WIP
Inventory Control Inventory the oldest result of the scientific management efforts inventory plays a key role in the logistical behavior of virtually all manufacturing systems the classical inventory results
More informationCRC Press Taylor &. Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Group, an Informa business
Basics of Supply Chain Management Jayanta Kumar Bandyopadhyay CRC Press Taylor &. Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Group, an Informa business Contents
More informationTHE USE OF SPREADSHEETS TO TEACH MASTER PRODUCTION SCHEDULE (MPS) AND MATERIALS REQUIREMENTS PLANNING (MRP)
THE USE OF SPREADSHEETS TO TEACH MASTER PRODUCTION SCHEDULE (MPS) AND MATERIALS REQUIREMENTS PLANNING (MRP) Richard E. Crandall, Appalachian State University, CIS Department, Raley Hall, Boone, NC 28608,
More informationAPICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS
APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS About this Topic Outline This outline details the concepts and applications coved in all five of the APICS Principles of
More informationForeword 7. 1 Production planning Planning approaches Planning strategies Definition of the example 17
TABLE OF CONTENTS Table of Contents Foreword 7 1 Production planning 11 1.1 Planning approaches 11 1.2 Planning strategies 14 1.3 Definition of the example 17 2 Design and work scheduling 19 2.1 Material
More informationJob Manager for Job Shops
Job Manager for Job Shops What makes Job Shops unique? First, most orders are for a unique item or service. No two Jobs are alike. The Job is a one of a kind job, not a mass production type job. Mass Production
More informationPP 1: Display Stock/Requirements List
PP 1: Display Stock/Requirements List Exercise Use the SAP Easy Access Menu to display the Stock/Requirements List. Time 5 min Task Review the material status of your Deluxe Touring bike (finished good)
More informationAccounting Information Systems, 12e (Romney/Steinbart) Chapter 14 The Production Cycle
Accounting Information Systems, 12e (Romney/Steinbart) Chapter 14 The Production Cycle 1) The AIS compiles and feeds information among the business cycles. What is the relationship between the revenue
More informationBest practices in demand and inventory planning
whitepaper Best practices in demand and inventory planning WHITEPAPER Best Practices in Demand and Inventory Planning 2 about In support of its present and future customers, Aptean sponsored this white
More informationSAP Material Master A Practical Guide. Matthew Johnson
SAP Material Master A Practical Guide Matthew Johnson TABLE OF CONTENTS Table of Contents Preface 7 1 Introduction 11 2 Material Master Basics 17 2.1 Material master structure 17 2.2 Creating and accessing
More informationDistribution and Trade in Microsoft Dynamics AX 2012
Course 80306A: Distribution and Trade in Microsoft Dynamics AX 2012 Course Details Course Outline Module 1: Overview This module provides an overview of the content of the Distribution and Trade in Microsoft
More informationManufacturing Information Systems. deden08m.com 1
Manufacturing Information Systems deden08m.com 1 Computers in the Physical System CAD (computer-aided design) Design database CAM (computer aided manufacturing) Robotics deden08m.com 2 Reorder Point (ROP)
More informationInfor LN DEM Content Pack Content Description
Infor LN DEM Content Pack Content Copyright 2015 Infor Important Notices The material contained in this publication (including any supplementary information) constitutes and contains confidential and proprietary
More informationThe Priority Enterprise Management System
The Priority Enterprise Management System Production Control Contents Introduction...2 Work Orders...2 Issues to the Plant Floor...3 Issues Plan...3 Issues to Floor Stock...3 Issues to Kits...4 Manual
More information