BP Chemical and ABB Turn Reliability Initiative into Operational Excellence

Size: px
Start display at page:

Download "BP Chemical and ABB Turn Reliability Initiative into Operational Excellence"

Transcription

1 BP Chemical and ABB Turn Reliability Initiative into Operational Excellence Dan Glossner, Maintenance Manager, BP, Decatur, AL Glyn Thorman, Operations Manager, ABB Reliability Consulting NA High Reliability! At what cost? BP Chemical, Decatur AL had the enviable position of relatively high equipment reliability in a strong market with a good team of management and staff. (The Decatur Plant produces Paraxylene (PX), Purified Terephthalic Acid (PTA) and Naphthalene Dicarboxylate (NDC). These products are part of the Aromatics Acid family of products and are used in a variety of consumer products.) For the lost arts, the units are very mature chemical units, yet all of the units exhibited high reliability in a globally competitive commodity chemical market. Unfortunately, the reliability came at a cost well beyond where it should have been. The units were suffering from part replacement rather than part life extension. When equipment failed, it was simply another emergency job and another new part installed. To maintain the high reliability, a high percentage of the work was performed under an emergency status. Overtime was high, parts were hotshotted to the site and contractors easily picked up additional work often at overtime rates. The costs added up and in a global commodity market, even good reliability saddled with high costs equaled lower margins. If BP Decatur wished to stay competitive, lower maintenance and material costs were needed to augment the continuing reliability of its units. To achieve the desired financial performance, the reliability process would have to begin applying asset life extension rather than replacement. BP was also facing increasing global pressure from other regions, rising energy and feedstock costs and an aging workforce that would become increasingly impacted by retirements. Finally, as is often the case, maintenance investment reduction had become a path to improved profitability. program successfully implemented in Refining to determine where those opportunities were. Using a proprietary analysis titled, Accelerator, BP Decatur had a portion of what was needed. But the Accelerator did not have the advantage of a long history of other sites to benchmark to. Key measurements would need more depth to detail the extent of opportunities and what should be expected. Shortly after the decision was made to supplement Accelerator, BP Decatur contacted ABB s Reliability Services consulting division. Armed with an assessment tool, WCR (World Class Reliability), ABB was able to bring a refined 30 year product to the table. The tool not only provided additional measurement opportunities but would also compare BP Decatur to hundreds of other industrial sites. BP Decatur now had the Accelerator and the WCR Assessment tools to pin-point cost-cutting and reliability improvement areas. After spending much of the spring and summer developing the scope of the assessment and building a business case, BP and ABB conducted a joint assessment of Decatur s Maintenance and Reliability performance. The assessment took four weeks and in November 2006, the assessment team issued the results of the Decatur assessment. Both the Accelerator and the WCR Assessment were aligned on the focus needed by the site. Using scores and improvement opportunities, BP Decatur identified several key gaps to focus on as improvement initiatives. The elements to address the gaps were as follows: 1. Develop a site wide Maintenance and Reliability Strategy 2. Re-establish the Work Management Process. 3. Place reliability on a best practice status with a fenceto-fence application. 4. Streamline the parts process from Stores to Delivery Points. 5. Evaluate better management practices for contractor control. 6. Establish metrics to measure improvement and success. The Assessment Working to improve costs and keep or improve reliability required an inventory of where the opportunities were. Time and budgets did not permit a wide shotgun betterment approach. What was needed was a targeted approach that would provide the best return on the investment. In early 2006, efforts began to identify how the site could improve maintenance and reliability performance through improved execution of documented processes, while maintaining a cost competitive position. BP Decatur contacted the BP Refining group to learn more of a

2 effect, maintenance coordinators would be responsible for the schedule, schedule compliance and PM attainment. TOTAL PLANT RELIABILITY Total Plant Reliability Process People Equipment/T Measurement Cap. Project & Performance RCM /RBI Block Diagram Material Mgt Multi-Skills LCC Reliability Data Contractors Mgt ODR Standardization Customer Scheduling Team Predictive Tasks Training Planning Roles & Resp. Basic PM Financials BOM Org. structure Criticality Business Work Vision & Mission Failure Bad Actors Asset Management Empowerment Prevention Reliability BusinessManagement ProcessesandAlignment World Class Reliability Benchmark Industry Best Practices Figure # 1 - Sample Base Assessment Re-establish Work Management BP Decatur was using SAP yet the process for moving work through the system had disconnects. The plant went through a period of time when the maintenance execution and support functions became distanced from the reliable, cost effective requirements of the production group. The plant had a planning and scheduling department. A a lead planner and the team were centrally organized as a separate entity from the operations department. Maintenance execution personnel were also independent of operations. To capture the benefits of the Accelerator and WCR efforts, it became clear that changes were needed in the maintenance structure. A new Maintenance Manager position was created. The Maintenance Manager was given overall responsibility for Maintenance Excellence. The routine maintenance department was decentralized and placed within the operating units, reporting to a Maintenance Superintendent who is a part of the Operations Leadership Team. In addition, core maintenance technician positions that had been outsourced to contractors as a means to cost minimization were re-filled by BP personnel. However, the planning group, contractor management and Stores remained under the direction of the new Maintenance Manager. 2. Schedules would be assembled and monitored by the planners. A new scheduling tool was created using Microsoft Access that allowed easy selection of work and also tracked completion. This tool was developed by the Lead Planner over the course of several months and significantly improved the complexity of scheduling multiple crafts, decentralized over three major production areas. Weekly/daily scheduling meetings would be rearranged to allow planners to attend their representative meetings. Daily meetings would focus on work selection from the weekly plan. 3. Break-in work (emergency and urgent) would follow new rules of engagement. Priority fields were reestablished and the prior RIME system of work criticality would be an advisory tool rather than an abused method of forcing unplanned work into the schedule. Under the new process, operations, via maintenance coordinators, would select what work would be on the schedule and, what work would break the schedule. Within the same guidelines, operations would be responsible for overtime and the associated costs. 4. At the time the assessment was conducted, each individual process unit was executing the Maintenance Work Process in their own unique manner. As part of the new process, there would now be one way to execute the process across the site. By clearly reviewing how work flows and who is responsible along each step, the planning, scheduling and work completion element at BP Decatur moved to a higher level of performance. Maintenance coordinators now felt as owners of the process and of schedule compliance. Break-in work was considered evil and no longer viewed as the norm. As the process progressed, backlogs declined and the amount of work completed under a planned status improved. BP Decatur was clearly getting more work done and was in fact, running low on work to do. By bringing the backlog down, risk was also lowered as repairs were being made before continuing decay lead to an emergency and subsequent loss of run time. Early on, a Focus Group was formed of planners, maintenance coordinators, and maintenance foremen. Under their consensus, a new, well defined, work flow process was established. The flow included specific roles and responsibilities including: 1. Maintenance Coordinators as weekly/daily scheduling meeting leaders. The coordinators would be responsible for the selection of work both for the weekly and daily schedules. Schedules would match available resources and include PM completion. In

3 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 Feb- Mar- BP Backlog Hours - All Crafts Apr- May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Figure # 2 - Reduction of Backlog Hours 25% 20% 15% 10% 5% 0% BP Decatur Emergency and Urgent Priority Work Jul- Aug- Sep- Oct- Nov- Dec- Jan-08 Feb-08 Mar-08 Emergency Urgent Linear (Emergency) Linear (Urgent ) Figure # 3 - Reduction of Break-In Work Place Reliability on a Best Practice Status BP Decatur had numerous mechanical and electrical engineers for maintenance, project and reliability efforts. Unfortunately, the engineers were scattered and it was a well known fact that the bulk of work was project (capital) jobs. Common measurements such as MTBF and common failure examinations such as RCFA were not key to anyone s agenda. Rather than pursue an excellence in maintenance and reliability, the site had moved to a replace or upgrade mentality. Prior years of low capital reinvestment resulted in asset improvement initiatives that had lingered and become the solution for equipment degradation. Currently, maximizing equipment life and targeting the cause of failures was not the ideal when replacement was so easily obtained. Although there were shinning stars of best practice, most of the true reliability work was done in a vacuum and behind the scenes. A fence-to-fence application of best practices across all three production units was not pursued. were committing 60%+ of their labor resource for PM work, averaged over an entire year. Not only were potential good PMs not being done, but the maintenance work force was engulfed with potential marginal PMs thus driving up the need for contractors. And that drove up the cost of maintenance. To address these issues (reinforced by results of the Accelerator and WCR examination) the Maintenance Manager organized an Equipment Reliability Focus Team. Engineers from the units and from various practices met and were given the following tasks to accomplish: 1. Develop a methodology to add or delete PMs. This would a documented process that insured new or old PMs would be addressed and agreed to before action was taken. 2. Identify the bad actors and critical equipment for PM evaluations. Delete, modify and add steps where necessary. (This is a multi-year process.) 3. New PMs would only be created when a clearly identifiable link existed for its intended purpose regulatory, safety, environmental, equipment life, production consequences, etc. 4. A clear owner of the PM process was identified. The Unit Maintenance Foreman is the single point of accountability for all PM requests. Anyone wishing to add, delete or modify a PM, including Project Engineers associated with new equipment installations, has to go through the Maintenance Foreman to create or modify a PM. To date the recently formed team is continuing with reliability issues as outlined above. It is planned for several of the engineers to focus entirely on tracking failures and improving reliability and the subsequent reduction of equipment repairs and early replacement. Another key objective is to establish requirements for the documentation of maintenance work, including identification of failure causes, so that better equipment history can be used for reliability analysis. Over the years, numerous pieces of equipment were installed without the accompanying PM routines being established. Other PMs remained unchanged over the years yet perhaps were producing minimal additional asset life. New PMs when added were done by almost anyone with little procedure. In the end, some of the maintenance crews

4 100% 95% 90% 85% 80% 75% 70% 65% 60% 55% 50% 1/21/2008 1/28/2008 BP Decatur PPM Schedule Compliance 2/4/2008 2/11/2008 Figure # 4 - PM Schedule Compliance Stores and Inventory 2/18/2008 2/25/2008 3/3/2008 3/10/2008 Parts are a key component of any planned work and a compliment for reliability. The balance is to have the right parts, at the right time yet not be over-stock. BP Decatur had a well-run Stores but in some cases, too well run. A delivery system was in place, outside vendors provided many of the parts on a JIT basis and accuracy was in the high level of acceptance. However, a maintenance effort often does not thrive on a very well run Stores entity. By using outside suppliers and keeping inventory at very low levels and for emergency use only, needed parts were often delayed in arrival. What resulted was triple orders one to satisfy the order, one for replenishment and another part hot-shotted in to meet a schedule. The order and replenish process eventually filled the order but the part sat waiting for delivery instructions that never came. The expedited part was used to fill the order and the kit became obsolete. As the Maintenance Work Flow team was moving through their implementation, it became increasingly clear that the materials management activities needed to be addressed. BP Decatur made the decision to have Stores a dedicated entity to maintenance rather than s stand-alone cost center. The goal would be the right parts delivered at the right time and yes, there would be occasional issues with slow-turning parts or parts for cancelled jobs. Before enacting a new process, the Maintenance Manager established a small team composed of the Stores Manager, the SAP Inventory Manager and the Lead Planner. They would be tasked with the following assignment: would address additional issues including physical layout and staging. Their efforts would be concentrated on: 1. Procedures for assembling kitted parts, delivery of parts and the return of parts. Previous kitting had taken place at a remote location, away from Stores and operated by contractors. This location required parts from Stores to be delivered prior to being kitted and re-delivered to the units. The team insisted that kitting be moved to the Stores. Now all kits would be assembled where many of the parts were already located. Delivery would take place from Stores as well. New kitting procedures included not releasing kits until complete, all kitted parts would be placed in bins, and bins would be clearly marked and include parts list, delivery location and a return tag. The newly devised return tag would be used anytime a part needed to be returned. The tag was designed to be very simple to use and required minimal information such as why the part was coming back. All the members of the group decided that while parts could go back for any reason, once received by Stores, the parts could be dealt with as necessary including disposal. Special order parts could not be returned to Stores but had to be returned by the units themselves. Parts taken from vendor-supplied free stock shelves would be returned there. 2. Locations for delivery and return. Each of the area units were tasked with locating space for shelving to be used for delivery and for return of kitted parts. These shelves were marked and separated as such. In some areas a 5-S was performed to make room for the shelves to begin with. All parts in bins would be delivered and returns made, from these locations. Larger parts would be on pallets and delivered to pallet designated space. Extra large parts would be staged in an off-unit location and delivered near to the work date. 3. Physical equipment required including delivery area shelving, kit tubs and documents for easy return of extra or unused parts. Sturdy shelving, reusable kitting tubs and the previous mentioned documents were all part of the kitting/delivery process. All the components were required for the kitting process to be successful. The Focus Group covered all aspects required of the process and the program was begun in short order. 1. Map a flow process for all parts on the site including where the parts are located during different stages of the process. Whether from vendors or from Stores shelves, the parts would be located in specific areas as they were received, stored, kitted or delivered. 2. Establish the correct protocol for parts ordering by planners. In addition, a Materials Focus Group comprised of planners, maintenance foremen, and Stores personnel

5 Material Return Request 1. Circle parts to be returned on Material List. 2. Check the reason for the return on this from. 3. Place Return Request form and Material List with part(s) in kitting tub. 4. (Do not return parts from shop inventory or special order parts.) occupants. As such, the group looked at the entire area and made recommendations for all entities and their equipment. No one was homeless and the relocation process occurred quickly. Please check reason for return: Job was cancelled. Correct part or model number is: Job is to be rescheduled. Please hold in kitting. 7. Reviews of vendor agreements with Purchasing and a clarification of vendor expectations. Correct parts but kit included extra part not needed or used. Correct parts on Material List but wrong parts received. Incorrect parts on Material List for this application. Job was performed with another MO. Other: Thank you for helping get you the right parts at the right time! Figure # 5 - Material Return Request form 4. Vendor consignment stocking of low cost items. Vendor supplied free stock inventory (low cost or high usage parts) had been tried in past years but had failed from an unsuccessful consolidation effort by two vendors. The errors of the previous program were compared with the potential benefit and the decision was made to again try to establish vendor supplied free stock in limited areas. Representative craft foremen developed a list of parts to be vendor supplied and circulated the list for acceptance. The two locations selected for stocking were prepared and in some cases required a cascading move of contents and prior purpose to another location. Free stock areas and a gasket area were given priority. Other inhabitants and equipment would be relocated. 5. Free stock inventory and locations. In several instances, commonly used parts were part of an enclosed and staffed area for tools. These parts included simple items such as bolts and fittings. The Focus Group decided such parts should be located near work areas and be free to use without paperwork or attendant assistance. In other areas, additional free stock was added to what was available. Planners would prepare kits knowing what was located already in the shops. If a job required numerous numbers of the same part, the quantity would be part of the kit and not deplete the shop s free stock. In many cases, free stock inventory actually became vendor consignment stocked free stock. All areas containing free stock were deemed limited access and restricted to the shop s personnel only. Contractors, capital project crews or other maintenance unit crews would have access only with permission of the shop s foremen. Over the years, vendor agreements for securing and the delivery of parts became less observed. Vendors failed to observe minimum delivery times, and required stocked parts were back-ordered. Purchasing supplied a member to the Focus group, agreements were reviewed and contacts and meetings were held with key vendors to review prior agreements. In most cases, vendor s agreed to comply and meet the requirements of BP Decatur. Contractor Control As with many industrial sites, BP Decatur employed contractors. Many worked under one resident company, although several additional providers were also used. One sub-group of the resident contractors was titled attached and worked solely in each of the units they were assigned, in conjunction with the proprietary BP workforce. The primary objective of the attached group was to supplement the BP workforce with skills deemed non-core. Another group from the same company was centralized and primarily executed capital projects. In evaluating the efficiency of the contractors who were all under the management of the Maintenance Manager, it was determined that better controls needed to be in place. As one group of attached contractors was reduced to reflect improved maintenance efficiencies, an equal amount of new faces would appear in another attached group or in the capital group. In addition, each project engineer or maintenance foreman was free to use whatever contractor they desired. The end result was that there was no clear coordination of contractors used in the site. A small Action Team reviewed these practices and better controls were put into place. Additions or deletions from any group would now require notification to the maintenance department s contract management group. Secondly, the Action Team now meets on a monthly basis to review proposed contractor staffing needs across the site, in order to maximize the effectiveness of a smaller number of contractors. 6. Physical relocations of space to accommodate the above. The entire shift of space in many cases triggered a domino effect as high priority recommendations took over space. The Focus Group recognized that taking a space would be resisted if a new space was not secured for the former

6 Backlog Wks. Mx Expenses $ Contractor Maintenance Labor Expense (major turnaround months in orange) Backlog Age % MTBF - Pumps Mo. Dollars $1,200,000 $1,000,000 $800,000 $600,000 $400,000 $200,000 Figure # 6 - Contractor Reductions Future and continuing work in this area will lead to even better rules for engaging the contract work force. Metrics $0 Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan-08 Feb-08 Mar-08 Measurements for gauging success begin with capturing key metrics. The challenge at BP Decatur was two-fold and included: 1. Metrics that were based on incorrect or invalid information; and 2. Metrics that did not isolate where the problems lied. To provide better measurements, and to address some past behavioral issues, all of the units were told in the plant that metrics would not be used as a personal success/failure tool but rather a measurement of improvement. Regardless as to where the performance level of a unit or team may be, importance would be placed on improvement and not on immediate attainment of best class numbers. To seek otherwise would only result in massaged or manipulated numbers. As the teams began to see the numbers, this concept and belief was reinforced. In addition, metrics were linked and the manipulation of one metric would often show up as a poor metric in another measurement. For example, a high degree of schedule attainment would be compared with the percentage of resources scheduled to begin with. It would be no longer wise to schedule a small number of resources in order to meet a high degree of schedule attainment. Schedule Compliance % Overtime $ PM Completion % Contractor Head Count # Resource Alignment % Inventory Accuracy % Planned Backlog % Inventory Stockouts # One-Man Jobs % Inventory Value $ Job Priority % PM/PdM Finds $ Figure # 7 - Selected KPIs A plant with several major units, each containing at least two craft teams, has the possibility of 8 measurements for each metric followed. As these measurements were rolled up to unit management, the shear number of metrics and their corresponding graphs multiplied. To determine which were the KPIs (Key Performance Indicators), a team was asked to review not only which measurements were critical to follow but also how and where to present them. This team is continuing with the selection process today and beginning to provide both detailed yet comprehensive recommendations. Summary BP Decatur looked to reducing its cost to provide good reliability by challenging how work was performed, who would perform it, what services would be supportive and what measurements would tell of improvements. Combined with this effort, the reliability goal of actual work reduction through better reliability practices across the plant was being pursued. As the plant attains these goals, costs are being reduced while reliability is being increased. In a highly competitive global market, to reach for less would be to accept economic risk.

ABB ServicePro 4.0 Service Management System

ABB ServicePro 4.0 Service Management System ABB ServicePro 4.0 Service Management System Presented by Paul Radcliffe PS Service June 6, 2014 Slide 1 Questions customers ask How successful is my maintenance program? - Am I performing the right PM

More information

Essence of Planning and Scheduling and Some Results. Doc Palmer, PE, MBA, CMRP

Essence of Planning and Scheduling and Some Results. Doc Palmer, PE, MBA, CMRP Essence of Planning and Scheduling and Some Results, PE, MBA, CMRP www.palmerplanning.com docpalmer@palmerplanning.com 300 CLOSED WORK ORDERS PER MONTH Mechanical Maintenance Started Weekly Scheduling

More information

MATERIALS AND SUPPLIES INVENTORY

MATERIALS AND SUPPLIES INVENTORY Filed: August, 0 EB-0-0 Exhibit D Schedule Page of MATERIALS AND SUPPLIES INVENTORY.0 STRATEGY Hydro One Distribution is committed to optimizing materials and supplies inventory in support of our customer

More information

NORTHERN CALIFORNIA CONSTRUCTION INSTITUTE MONTEREY, CA APRIL 22-24, "The Last Planner" by Glenn Ballard

NORTHERN CALIFORNIA CONSTRUCTION INSTITUTE MONTEREY, CA APRIL 22-24, The Last Planner by Glenn Ballard NORTHERN CALIFORNIA CONSTRUCTION INSTITUTE MONTEREY, CA APRIL 22-24, 1994 "The Last Planner" by Glenn Ballard Introduction Better planning improves productivity by reducing delays, getting the work done

More information

Traffic Department Anchorage: Performance. Value. Results.

Traffic Department Anchorage: Performance. Value. Results. Traffic Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements.

More information

Measure What You Manage. Michael Cowley, CPMM President CE Maintenance Solutions, LLC

Measure What You Manage. Michael Cowley, CPMM President CE Maintenance Solutions, LLC Measure What You Manage Michael Cowley, CPMM President CE Maintenance Solutions, LLC Define Maintenance Scorecards Discuss Required Prerequisites Explain 10 Common Maintenance Scorecards Review Your Return-on-Investment

More information

Traffic Division Public Works Department Anchorage: Performance. Value. Results.

Traffic Division Public Works Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements. Direct Services Design, operate and maintain the

More information

Refuse Collections Division Solid Waste Services Department Anchorage: Performance. Value. Results.

Refuse Collections Division Solid Waste Services Department Anchorage: Performance. Value. Results. Refuse Collections Division Solid Waste Services Department Anchorage: Performance. Value. Results. Mission Provide solid waste collection and disposal service to rate-paying customers within our defined

More information

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Administration Division Public Works Department Anchorage: Performance. Value. Results. Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,

More information

Utility Bill Data Accounts Payable s Secret Weapon for Managing Costs and Addressing Stakeholder Questions

Utility Bill Data Accounts Payable s Secret Weapon for Managing Costs and Addressing Stakeholder Questions EBook Utility Bill Data Accounts Payable s Secret Weapon for Managing Costs and Addressing Stakeholder Questions Part 1 Situation Analysis Utility costs often rank in the top three operational expenses

More information

Implementing Reliability Excellence By Randy Heisler, CMRP As appeared in the February 2005 issue of Maintenance Technology

Implementing Reliability Excellence By Randy Heisler, CMRP As appeared in the February 2005 issue of Maintenance Technology Implementing Reliability Excellence By Randy Heisler, CMRP As appeared in the February 2005 issue of Maintenance Technology The first question often asked is: What is Reliability Excellence? The answer

More information

Accelerating the Whiteshell Laboratories Decommissioning Through the Implementation of a Projectized and Delivery-Focused Organization 13074

Accelerating the Whiteshell Laboratories Decommissioning Through the Implementation of a Projectized and Delivery-Focused Organization 13074 Accelerating the Whiteshell Laboratories Decommissioning Through the Implementation of a Projectized and Delivery-Focused Organization 13074 Brian Wilcox, Russ Mellor and Craig Michaluk Atomic Energy of

More information

Watts Bar Nuclear Plant Unit 2 Completion Project

Watts Bar Nuclear Plant Unit 2 Completion Project Watts Bar Nuclear Plant Unit 2 Completion Project Fifth Quarterly Update to the Estimate to Complete May 2013 - July 2013 Published October 2013 Table of Contents Section 1 - Executive Summary... 3 Quarterly

More information

Enterprise Operational Efficiency. - Leveraging to Reduce Costs. Mike Sparkman CSC Houston Energy Practice

Enterprise Operational Efficiency. - Leveraging to Reduce Costs. Mike Sparkman CSC Houston Energy Practice Enterprise Operational Efficiency - Leveraging to Reduce Costs Mike Sparkman CSC Houston Energy Practice March 18, 2003 The Business Imperative From Annual Reports of Major Energy Companies... "We will

More information

U.S. Sugar Agriculture Division - Clewiston, Florida

U.S. Sugar Agriculture Division - Clewiston, Florida Success Story POINTS OF INTEREST PAGE 1: The Background The Challenges PAGE 3: The Approach PAGE 4: The Results PAGE 5: Conclusions About Life Cycle Engineering U.S. Sugar Agriculture Division - Clewiston,

More information

NHS Highland Internal Audit Report Managing Sickness Absence August 2011

NHS Highland Internal Audit Report Managing Sickness Absence August 2011 Internal Audit Report Managing Sickness Absence August 2011 Internal Audit Report Managing Sickness Absence August 2011 1 Executive Summary...1 2 Background...2 3 Scope...2 4 Summary of Findings...2 5

More information

Reliability Improvement using Defect Elimination

Reliability Improvement using Defect Elimination Reliability Improvement using Defect Elimination A Three-Prong Approach The Keystone to Safe, Reliable, Profitable Production Michael Voigt 2006 KBC. All Rights Reserved. 1 Introduction Michael Voigt 19

More information

Developing an Accurate Baseline for Electricity Consumption, Focusing on University Residence Halls

Developing an Accurate Baseline for Electricity Consumption, Focusing on University Residence Halls Developing an Accurate Baseline for Electricity Consumption, Focusing on University Residence Halls Richard Turner Mechanical Engineer UNC Chapel Hill Energy Management turnerrwjr@gmail.com 5/1/2012 Abstract

More information

Forecasting Survey. How far into the future do you typically project when trying to forecast the health of your industry? less than 4 months 3%

Forecasting Survey. How far into the future do you typically project when trying to forecast the health of your industry? less than 4 months 3% Forecasting Forecasting Survey How far into the future do you typically project when trying to forecast the health of your industry? less than 4 months 3% 4-6 months 12% 7-12 months 28% > 12 months 57%

More information

Are your planning and scheduling processes using best practices?

Are your planning and scheduling processes using best practices? Empowering ERP Asset Management Solutions Are your planning and scheduling processes using best practices? Improve asset utilization and uptime By Aleks Vujicic, VP Product Management Few people have as

More information

ANADARKO REDUCES INVOICE CYCLE TIME AND ACHIEVES MORE ACCURATE COST MANAGEMENT THROUGH DIGITAL FIELD TICKET ADOPTION

ANADARKO REDUCES INVOICE CYCLE TIME AND ACHIEVES MORE ACCURATE COST MANAGEMENT THROUGH DIGITAL FIELD TICKET ADOPTION ANADARKO REDUCES INVOICE CYCLE TIME AND ACHIEVES MORE ACCURATE COST MANAGEMENT THROUGH DIGITAL FIELD TICKET ADOPTION CONNECT AUTOMATE COLLABORATE 04.18 KEY CHALLENGES As shale drilling, completions and

More information

What is a Successful Company

What is a Successful Company Welcome 15 Things All Successful Companies Have in Common! We have trained over 14,000 contractors, from coast-to-coast, how to run profitable companies! Bill Kinnard, Vice President What is a Successful

More information

Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero

Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories Learning Objectives At the end of the class the student will be able to: 1. Describe the production budget process

More information

the council initiative on public engagement

the council initiative on public engagement public engagement at the city of edmonton share your voice shape our city the council initiative on public engagement new public engagement practice and implementation roadmap final report CITY OF EDMONTON

More information

Maintenance Planning Principles

Maintenance Planning Principles Maintenance Planning Principles Increase Your Workforce without Hiring R. D. (Doc) Palmer, PE, MBA, CMRP Richard Palmer & Associates McGraw-Hill s Maintenance Planning and Scheduling Handbook Case Study:

More information

Call Center Benchmark India

Call Center Benchmark India Call Center Benchmark India Outsourced Call Centers Report Contents Benchmarking Overview Page 2 KPI Statistics and Quartiles Page 8 Benchmarking Scorecard and Rankings Page 13 Detailed Benchmarking Data

More information

Session 102: Benchmark Your Way to World-Class Performance! Jeff Rumburg, Managing Partner, MetricNet, LLC

Session 102: Benchmark Your Way to World-Class Performance! Jeff Rumburg, Managing Partner, MetricNet, LLC Session 102: Benchmark Your Way to World-Class Performance! Jeff Rumburg, Managing Partner, MetricNet, LLC Characteristics of a World-Class Contact Center Contact center consistently exceeds customer expectations

More information

Progress in achieving goals shall be measured by:

Progress in achieving goals shall be measured by: Anchorage: Performance. Value. Results. Mission Provide state-of-the-art, structured, controlled and secured computing environment that delivers responsible and cost-efficient services to Municipal Departments

More information

2017 KEY INSIGHTS ON. Employee Attendance and Tardiness

2017 KEY INSIGHTS ON. Employee Attendance and Tardiness 2017 KEY INSIGHTS ON Employee Attendance and Tardiness THE AVERAGE NUMBER OF MINUTES THAT EMPLOYEES IN THE XIMBLE SYSTEM ARE LATE IS MINUTES. 114.2 MINUTES Statistical sample of 263258 clock-in records,

More information

LEGAL SERVICE DESK SUPPORT

LEGAL SERVICE DESK SUPPORT 2nd Edition September 2011 THE GURU S GUIDE FOR LEGAL SERVICE DESK SUPPORT LAW FIRM SPECIFIC METRICS & KEY PERFORMANCE INDICATORS 1 GURU S GUIDE: DATA & SYSTEM ASSUMPTIONS As was the case with the original

More information

2007 Northeast Supply Chain Education Conference & Exhibition Executive S&OP

2007 Northeast Supply Chain Education Conference & Exhibition Executive S&OP Education Conference & Exhibition Executive S&OP Top Management s Handle on on the the Business Best Western Royal Plaza Conference Center Marlborough, MA Tuesday, October 2 nd, 2007 The Books QuickTime

More information

Street Maintenance Section Maintenance and Operations Division Public Works Department Anchorage: Performance. Value. Results.

Street Maintenance Section Maintenance and Operations Division Public Works Department Anchorage: Performance. Value. Results. Street Maintenance Section Anchorage: Performance. Value. Results. Purpose Protect, maintain, and improve Municipal roads and drainage systems through organized efforts and effective use of resources.

More information

THE MISSING Tool OF MRO INVENTORY CONTROL

THE MISSING Tool OF MRO INVENTORY CONTROL THE MISSING Tool OF MRO INVENTORY CONTROL BOMs An MRO Inventory Savings Model MRG has performed hundreds of plant assessments in a wide range of industries, including Power Generation, Chemical Processing,

More information

CILT Certificate in Stock Management, Forecasting and Demand Planning. Contents are subject to change. For the latest updates visit

CILT Certificate in Stock Management, Forecasting and Demand Planning. Contents are subject to change. For the latest updates visit CILT Certificate in Stock, Forecasting and Demand Planning Page 1 of 7 Why Attend Demand planning is a critical process within Supply Chain (SCM) which ensures continuity of supply of the inventory at

More information

Global Asset Sustainability:

Global Asset Sustainability: Infor EAM Global Asset Sustainability: Breakthrough lean best practice counters rising energy costs Table of contents Executive summary... 3 Adapting to energy costs is not optional... 5 New lean approach:

More information

Coachella Valley Median Detached Home Price Mar Mar 2017

Coachella Valley Median Detached Home Price Mar Mar 2017 Median Price $450,000 $400,000 Coachella Valley Median Detached Home Price Mar 2002 - Mar 2017 $335,000 $366,285 $350,000 $300,000 $250,000 $200,000 $150,000 CV Detached Median Price 4% growth curve Summary

More information

The Market Watch Monthly Housing Report

The Market Watch Monthly Housing Report Price per sq. ft. $260 CV median price per sq. ft. 2002 - Jan 2016 $240 $220 $200 $180 $160 $140 $180.00 $177.32 $120 $100 Median Price per Sq. Ft. 3.5% Growth Curve Summary We have decided to alternate

More information

Third Party Fiduciary Agent. Guam Department of Education. In partial fulfillment of Contract: Monthly Project Status Report.

Third Party Fiduciary Agent. Guam Department of Education. In partial fulfillment of Contract: Monthly Project Status Report. Third Party Fiduciary Agent Guam Department of Education In partial fulfillment of Contract: 011-2010 Monthly Project Status Report Report 29 February 15, 2013 1 This Page Blank 2 Overview of Accomplishments

More information

Call Center Benchmark

Call Center Benchmark Call Center Benchmark United States In-house/Insourced Call Centers Report Contents Benchmarking Overview Page 2 KPI Statistics and Quartiles Page 8 Benchmarking Scorecard and Rankings Page 15 Detailed

More information

Call Center Industry Benchmark

Call Center Industry Benchmark Call Center Industry Benchmark In-house/Insourced Call Centers Report Contents Benchmarking Overview Page 2 KPI Statistics and Quartiles Page 8 Benchmarking Scorecard and Rankings Page 15 Detailed Benchmarking

More information

ITSM Process/Change Management

ITSM Process/Change Management ITSM Process/Change Management Process Documentation Revision Date: December 13, 2017 Version Number: 2.0 Document Ownership Document Owner Maury Collins Revision History ITSM Role, Department Service

More information

Are you prepared to make the decisions that matter most? Decision making in power & utilities

Are you prepared to make the decisions that matter most? Decision making in power & utilities www.pwc.com/bigdecisions Are you prepared to make the decisions that matter most Decision making in power & utilities Results from PwC s Global Data & Analytics Survey 2014 power & utilities Renewables.

More information

University of Michigan Eco-Driving Index (EDI) Latest data: August 2017

University of Michigan Eco-Driving Index (EDI)   Latest data: August 2017 University of Michigan Eco-Driving Index () http://www.ecodrivingindex.org Latest data: August 2017 Developed and issued monthly by Michael Sivak and Brandon Schoettle Sustainable Worldwide Transportation

More information

Watts Bar Nuclear Plant Unit 2 Completion Project

Watts Bar Nuclear Plant Unit 2 Completion Project Watts Bar Nuclear Plant Unit 2 Completion Project Tenth Quarterly Update to the Estimate to Complete August - October Published January 2015 Table of Contents Section 1 - Executive Summary... 3 Section

More information

Inventory Control in Supply Chain Management: Concept and Workshop

Inventory Control in Supply Chain Management: Concept and Workshop .. Inventory Control in Supply Chain Management: Concept and Workshop Oran Kittithreerapronchai 1 1 Department of Industrial Engineering, Chulalongkorn University Bangkok 10330 THAILAND last updated: November

More information

Unleashing the Enormous Power of Call Center KPI s. Call Center Best Practices Series

Unleashing the Enormous Power of Call Center KPI s. Call Center Best Practices Series Unleashing the Enormous Power of Call Center KPI s Call Center Best Practices Series 27 Years of Call Center Benchmarking Data Global Database More than 3,700 Call Center Benchmarks 30 Key Performance

More information

Bosch Australia Increased safety, reduced costs: Hazard, near miss reporting system successfully implemented

Bosch Australia Increased safety, reduced costs: Hazard, near miss reporting system successfully implemented November 2013 Bosch Australia Increased safety, reduced costs: Hazard, near miss reporting system successfully implemented Fleet Size: 150 Vehicle Type: Passenger and light commercial vehicles NRSPP Organisation:

More information

Managing Supplies in an Operating Room Environment

Managing Supplies in an Operating Room Environment Managing Supplies in an Operating Room Environment May 23, 2012 Meeting Key Objectives Understand the benefits of proper databases and how to build and maintain them Evaluate current state of the supplies

More information

Using Maintenance Plan in Spare Part Demand. Forecasting and Inventory Control

Using Maintenance Plan in Spare Part Demand. Forecasting and Inventory Control Using Maintenance Plan in Spare Part Demand Forecasting and Inventory Control Sha Zhu, Willem van Jaarsveld, Rommert Dekker Erasmus University Rotterdam Problem background Model Case study Conclusions

More information

Third Party Fiduciary Agent. Guam Department of Education. In partial fulfillment of Contract: Monthly Project Status Report.

Third Party Fiduciary Agent. Guam Department of Education. In partial fulfillment of Contract: Monthly Project Status Report. Third Party Fiduciary Agent Guam Department of Education In partial fulfillment of Contract: 011-2010 Monthly Project Status Report Report 35 August 15, 2013 1 This Page Blank 2 Overview of Accomplishments

More information

Minnkota Power Cooperative Improves Work Management, Planning and Scheduling with Life Cycle Engineering

Minnkota Power Cooperative Improves Work Management, Planning and Scheduling with Life Cycle Engineering The Need Minnkota s machine downtime was increasing and production levels were decreasing, so the business needed a full-scale review of its work management processes to change maintenance activities from

More information

Facilities Management. FM Key Performance Indicators

Facilities Management. FM Key Performance Indicators Facilities Management FM Key Performance Indicators September 21, 2017 Facilities Management Key Volume Indicators Key Volume FM Change Evanston Chicago Full Time Equivalent (FTE) 369 +5 304 65 Acres 296

More information

Manage Facilities Plant Operations and Maintenance. Process Improvements

Manage Facilities Plant Operations and Maintenance. Process Improvements Macro Process: Manage Facilities Plant Operations and Maintenance Process Owner: Manage Facilities Plant Operations and Maintenance Process Improvements Work System Owner Ed Curry Work System Enabling

More information

Facilities Management. FM Key Performance Indicators

Facilities Management. FM Key Performance Indicators Facilities Management FM Key Performance Indicators August 15, 2017 Facilities Management Key Volume Indicators Key Volume FM Change Evanston Chicago Full Time Equivalent (FTE) 364 +11 299 65 Acres 296

More information

Planning & Scheduling Improves Reliability

Planning & Scheduling Improves Reliability Planning & Scheduling Improves Reliability Presented by Matt Midas Senior Account Executive Solufy Users Meeting Tampa, FL April 20, 2015 11 Agenda 2 Introductions Planning & Scheduling Reliability Centered

More information

Metals Manufacturer Upgrades Work Planning and Scheduling

Metals Manufacturer Upgrades Work Planning and Scheduling Empowering ERP Asset Management Solutions Metals Manufacturer Upgrades Work Planning and Scheduling VIZIYA WorkAlign Scheduler fills the gaps in asset management software When a major U.S. metals manufacturer

More information

ANALYZING THE COMPUTER-AIDED MAINTENANCE DATA OF A COMMERCIAL BUILDING COMPLEX

ANALYZING THE COMPUTER-AIDED MAINTENANCE DATA OF A COMMERCIAL BUILDING COMPLEX ANALYZING THE COMPUTER-AIDED MAINTENANCE DATA OF A COMMERCIAL BUILDING COMPLEX Joseph H.K. Lai* and Francis W.H. Yik Department of Building Services Engineering, Hong Kong Polytechnic University, Hong

More information

William Calder Asset Maintenance Manager, Kelvin Power, South Africa

William Calder Asset Maintenance Manager, Kelvin Power, South Africa William Calder Asset Maintenance Manager, Kelvin Power, South Africa KELVIN POWER 22-24 November 2010, Johannesburg HISTORY OF KELVIN POWER 1950 S: 1960 S: City of Johannesburg A STATION (11 Boilers &

More information

Introduction to Autodesk Utilities Design: Integrating the Network Design Process

Introduction to Autodesk Utilities Design: Integrating the Network Design Process Introduction to Autodesk Utilities Design: Integrating the Network Design Process Introduction Electric, water, and gas utilities share a number of similarities. They depend on distribution networks to

More information

Ariba Project Outcomes October 2017 Update. Presented by Procurement Department October 2017

Ariba Project Outcomes October 2017 Update. Presented by Procurement Department October 2017 Ariba Project Outcomes October 2017 Update Presented by Procurement Department October 2017 1 Topics 1. P2P Module Transactional Procurement 2. Purchase Requisition Cycle Time 3. Supplier Enablement and

More information

A how-to session featuring a behind-the-scenes look at how Best-in-Show winner, HCSS, decides when to outsource and when to create from within

A how-to session featuring a behind-the-scenes look at how Best-in-Show winner, HCSS, decides when to outsource and when to create from within A how-to session featuring a behind-the-scenes look at how Best-in-Show winner, HCSS, decides when to outsource and when to create from within Director of Marketing Operations, HCSS Speaker Headshot Director

More information

SAP Fieldglass Case Study A U.S. ELECTRIC UTILITY COMPANY GAINED NEW DATA VISIBILITY FOR THEIR ENTIRE WORKFORCE A U.S. ELECTRIC UTILITY CASE STUDY

SAP Fieldglass Case Study A U.S. ELECTRIC UTILITY COMPANY GAINED NEW DATA VISIBILITY FOR THEIR ENTIRE WORKFORCE A U.S. ELECTRIC UTILITY CASE STUDY SAP Fieldglass Case Study A U.S. ELECTRIC UTILITY COMPANY GAINED NEW DATA VISIBILITY FOR THEIR ENTIRE WORKFORCE A U.S. ELECTRIC UTILITY CASE STUDY DESIGNING A SOLUTION Our customer, a large regional utility,

More information

5 Star London Hotels - Example Report

5 Star London Hotels - Example Report 5 Star London Hotels - Example Report January 2018 CONTENTS Your Benchmark Report Website Traffic Conversion Rates Ecommerce Performance AdWords Spend Your Traffic Index Your Conversion Rate Index Your

More information

Workday Network. Patti Rowe Julie Vlier Jane Zbyszynski

Workday Network. Patti Rowe Julie Vlier Jane Zbyszynski Workday Network Patti Rowe Julie Vlier Jane Zbyszynski March 30, 2016 Welcome Agenda Introductions Workday Project Demo and Overview Workday Network and Ambassadors: Roles & Responsibilities Understanding

More information

CILT Certified Procurement Professional. Contents are subject to change. For the latest updates visit

CILT Certified Procurement Professional. Contents are subject to change. For the latest updates visit CILT Certified Procurement Professional Page 1 of 7 Why Attend Procurement is at the heart of the supply chain function as the purchasing department can spend up to 70% of a company's money. In this course,

More information

Introduction. Lost business hours. Change success rate. Infrastructure stability. Ticket volume trends. SLA compliance rate.

Introduction. Lost business hours. Change success rate. Infrastructure stability. Ticket volume trends. SLA compliance rate. CONTENTS 01 02 04 07 11 14 18 21 24 27 28 Introduction Lost business hours Change success rate Infrastructure stability Ticket volume trends First call resolution rate (FCRR) SLA compliance rate Cost per

More information

Strategy Analysis. Chapter Study Group Learning Materials

Strategy Analysis. Chapter Study Group Learning Materials Chapter Study Group Learning Materials 2015, International Institute of Business Analysis (IIBA ). Permission is granted to IIBA Chapters to use and modify this content to support chapter activities. All

More information

On Demand IT Governance: A powerful tool for enhancing the strategic value of IT.

On Demand IT Governance: A powerful tool for enhancing the strategic value of IT. White Paper On Demand IT Governance: A powerful tool for enhancing the strategic value of IT. Today, IT plays a key role in determining a company's success by leading strategic initiatives and providing

More information

Dynamic Reallocation of Portfolio Funds

Dynamic Reallocation of Portfolio Funds Complete Perspective. Smart Decisions. #StrategicPMO Dynamic Reallocation of Portfolio Funds Ben Chamberlain Chief Product & Marketing Officer Ben.Chamberlain@umt360.com Agenda What s wrong with traditional

More information

Implementing VMI to Reduce Direct and Indirect Cost

Implementing VMI to Reduce Direct and Indirect Cost Implementing VMI to Reduce Direct and Indirect Cost James M. Truog, Manager Strategic Purchasing Wacker Corp. 262-250-3518; james.truog@am.wackergroup.com 89 th Annual International Supply Management Conference,

More information

Perseus 1B North Rankin Drilling Rig Reinstatement. Perseus 1B North Rankin Drilling Rig Reinstatement. Presentation

Perseus 1B North Rankin Drilling Rig Reinstatement. Perseus 1B North Rankin Drilling Rig Reinstatement. Presentation Perseus 1B North Rankin Drilling Rig Reinstatement 8 th December 2005 RIG MOBILISATION Star Racker Efficiency Improvements Transfer & Rig Up Equipment Shared With GWA Maintenance To Return Facility Functionality

More information

Certified Purchasing Professional. Contents are subject to change. For the latest updates visit

Certified Purchasing Professional. Contents are subject to change. For the latest updates visit Certified Purchasing Professional Page 1 of 7 Why Attend Purchasing is at the heart of the supply chain function as the purchasing department can spend up to 70% of a company's money. In this course, we

More information

CIP Routine/Small Purchasing Team Close-out

CIP Routine/Small Purchasing Team Close-out CIP Routine/Small Purchasing Team Close-out Define Ken Koebel Control Measure January 26, 2011 Improve Analyze Cross Functional Team 2 Charter / Business Case Define Measure Routine purchasing (orders

More information

ENERGY MARKET UPDATE October 9, 2014

ENERGY MARKET UPDATE October 9, 2014 ENERGY MARKET UPDATE October 9, 2014 Winter is Right Around the Corner Are You Ready? Six months ago one of the most brutal winters on record in the US was winding down. Many energy consumers, who had

More information

Custodial Services Update. Nita Mensia-Joseph, COO October 24, 2018 Presented to the CBAC

Custodial Services Update. Nita Mensia-Joseph, COO October 24, 2018 Presented to the CBAC Custodial Services Update Nita Mensia-Joseph, COO October 24, 2018 Presented to the CBAC Overview 1. BACKGROUND: Custodial Plan presented to the School Board in November 2017 a. APPA standard b. Effective

More information

Paper ref: TB (04/19) 016

Paper ref: TB (04/19) 016 Paper ref: TB (04/19) 016 Report Title Workforce and pay bill phasing and Fully Staffed scorecard Sponsoring Executive Raffaela Goodby Director of People and Organisation Development Author Raffaela Goodby

More information

Production planning and. Unit 3

Production planning and. Unit 3 1 Production planning and scheduling Unit 3 2 Background Because the aircraft manufacturing industry is highly sensitive to fluctuating demands and to their corresponding impact on production costs, a

More information

SUPPLY CHAIN EXCELLENCE IN WIDEX. June 2016

SUPPLY CHAIN EXCELLENCE IN WIDEX. June 2016 SUPPLY CHAIN EXCELLENCE IN WIDEX June 2016 AGENDA 1. Presentation of Widex 2. The first year Creating a solid base 3. The second year Stabilizing the performance 4. The next steps Unleashing the competitive

More information

OFFICIAL ANNOUNCEMENT REGARDING: SPEEDLOGIX

OFFICIAL ANNOUNCEMENT REGARDING: SPEEDLOGIX Contact Heidi Miller Telephone 561.582.6171 Email info@billettechnology.com Website http://billettechnology.com FOR IMMEDIATE RELEASE April 16, 2014 OFFICIAL ANNOUNCEMENT REGARDING: SPEEDLOGIX Effective

More information

Asset criticality is not just a reliability tool

Asset criticality is not just a reliability tool Empowering ERP Asset Management Solutions Asset criticality is not just a reliability tool Properly applied ranking improves business performance and profitability By Scott Gorsuch, Former Director of

More information

AXIONAL Enterprise CMMS. Enterprise Computerized Maintenance Management System

AXIONAL Enterprise CMMS. Enterprise Computerized Maintenance Management System deister software AXIONAL Enterprise CMMS Enterprise Computerized Maintenance Management System Contents FUNCTIONS..................................................................................3 Asset

More information

Lehman Brothers T Conference San Francisco. Craig DeYoung, Vice President Investor Relations December 9, 2004

Lehman Brothers T Conference San Francisco. Craig DeYoung, Vice President Investor Relations December 9, 2004 Lehman Brothers T4 2004 Conference San Francisco Craig DeYoung, Vice President Investor Relations December 9, 2004 Safe Harbor Safe Harbor Statement under the U.S. Private Securities Litigation Reform

More information

Metrics Madness. What Gets Measured Gets Managed? Examining the Gaps Between Managers Beliefs About Metrics and What Workers Actually Do

Metrics Madness. What Gets Measured Gets Managed? Examining the Gaps Between Managers Beliefs About Metrics and What Workers Actually Do Metrics Madness What Gets Measured Gets Managed? Examining the Gaps Between Managers Beliefs About Metrics and What Workers Actually Do Unpublished Research, 2007-2012 February 2018 bobemiliani www.bobemiliani.com

More information

A REPORT FROM THE OFFICE OF INTERNAL AUDIT

A REPORT FROM THE OFFICE OF INTERNAL AUDIT A REPORT FROM THE OFFICE OF INTERNAL AUDIT PRESENTED TO THE CITY COUNCIL CITY OF BOISE, IDAHO AUDIT / TASK: #11-09 S2, P-Card Purchasing Review AUDIT CLIENT: DFA / Cross-Functional REPORT DATE: December

More information

Schedule Guidance Document

Schedule Guidance Document Schedule Guidance Document Version: 1.2 Effective Date: August 20, 2013 Contents 1. Purpose... 1 2. Applicability and Basic Requirements... 2 3. Baseline Schedule... 3 3.1. General... 3 3.2. Schedule Work

More information

Turbocharge Your Metrics. With Benchmarking. Jeff Rumburg, Managing Partner at MetricNet

Turbocharge Your Metrics. With Benchmarking. Jeff Rumburg, Managing Partner at MetricNet Turbocharge Your Metrics With Benchmarking Jeff Rumburg, Managing Partner at MetricNet Read the Whitepaper in HDI s Support World http://www.thinkhdi.com/library/supportworld/2017/ turbocharge-your-metrics-with-benchmarking.aspx

More information

Energy Savings Analysis Generated by a Real Time Energy Management System for Water Distribution

Energy Savings Analysis Generated by a Real Time Energy Management System for Water Distribution Energy Savings Analysis Generated by a Real Time Energy Management System for Water Distribution Sarah Thorstensen Derceto Ltd, Auckland, New Zealand sthorstensen@derceto.com Abstract Washington Suburban

More information

CITY OF JOLIET, ILLINOIS FINAL

CITY OF JOLIET, ILLINOIS FINAL Water and Sewer Operations Efficiency Study Implementation Plan FINAL August, The implementation plan detailed on the following pages provides a path to improve efficiency in the City s Department of Public

More information

The What, How, When and Why of Warehouse Slotting

The What, How, When and Why of Warehouse Slotting The What, How, When and Why of Warehouse Slotting The Impact of Slotting Decisions (and Non-Decisions) on the Bottom Line Measuring The Operational & Financial Impact of Slotting One problem in judging

More information

Optimized Maintenance, a Roadmap to Excellence

Optimized Maintenance, a Roadmap to Excellence Optimized Maintenance, a Roadmap to Excellence Roop Lutchman, P.Eng Vice President, Utility Management Solutions CH2M HILL 255 Consumers Road Suite 300 Toronto, Ontario M2J 5B6 Canada rlutchma@ch2m.com

More information

Plutonium Pit Production Engineering Assessment (EA) Results

Plutonium Pit Production Engineering Assessment (EA) Results Plutonium Pit Production Engineering Assessment (EA) Results Kelly Cummins Program Executive Officer for Strategic Materials May 2018 Introduction In accordance with the Nuclear Weapons Council Strategic

More information

National Institute of Technology Calicut Department of Mechanical Engineering PRODUCTION PLANNING (AGGREGATE PLANNING)

National Institute of Technology Calicut Department of Mechanical Engineering PRODUCTION PLANNING (AGGREGATE PLANNING) PRODUCTION PLANNING (AGGREGATE PLANNING) Concerned with the overall operations of an organisation over a specified time horizon Determines the efficient way of responding (allocating resources) to market

More information

HKU announces 2017 Q4 HK Macroeconomic Forecast

HKU announces 2017 Q4 HK Macroeconomic Forecast HKU announces 2017 Q4 HK Macroeconomic Forecast October 10, 2017 The of the Hong Kong Institute of Economics and Business Strategy at the University of Hong Kong (HKU) released its quarterly Hong Kong

More information

SMA Case Study: Unlocking Productivity through Sales Pipeline Management

SMA Case Study: Unlocking Productivity through Sales Pipeline Management SMA Case Study: Unlocking Productivity through Sales Pipeline Management Kate Laneve Director, Global Sales Operations NCR Corporation April 30, 2010 The Sales Management Association A global, cross-industry

More information

Elements of Excellence

Elements of Excellence Elements of Excellence Managing With Analytics Harnessing the Balanced Scorecard (The Enterprise Performance Index) Missiles and Fire Control Steve Arms Director, QMS - Missile Defense LOB MFC Excellence

More information

Development of an effective maintenance concept for enhancement of competitive advantage: a case study of East African Portland Cement Company

Development of an effective maintenance concept for enhancement of competitive advantage: a case study of East African Portland Cement Company Development of an effective maintenance concept for enhancement of competitive advantage: a case study of East African Portland Cement Company Japheth Ombogo East African Portland Cement Kenya Abstract

More information

BABERGH DISTRICT COUNCIL

BABERGH DISTRICT COUNCIL BABERGH DISTRICT COUNCIL COMMITTEE: BDC OVERVIEW & SCRUTINY COMMITTEE FROM: JAN OSBORNE CABINET MEMBER HOUSING OFFICER: JUSTIN WRIGHT-NEWTON - CORPORATE MANAGER BMBS REPORT NUMBER: JOS/18/14 DATE OF MEETING:

More information

Achieve greater efficiency in asset management by managing all your asset types on a single platform.

Achieve greater efficiency in asset management by managing all your asset types on a single platform. Asset solutions To support your business objectives Achieve greater efficiency in asset by managing all your asset types on a single platform. Obtain an entirely new level of asset awareness Every company

More information

Advanced Maintenance Management. Contents are subject to change. For the latest updates visit

Advanced Maintenance Management. Contents are subject to change. For the latest updates visit Advanced Maintenance Management Page 1 of 7 Why Attend To survive in today s world of 'lean and mean' operations, we cannot wait for breakdowns. As a matter of fact, we should make responding to breakdowns

More information