1 Macro Process: Manage Facilities Plant Operations and Maintenance Process Owner: Manage Facilities Plant Operations and Maintenance Process Improvements Work System Owner Ed Curry Work System Enabling Leader Dane Theodore, Director Priority Processes Owner Walt Petters, Director February 26, 2009 Revision 2

2 Macro Process: Manage Facilities Plant Operations and Maintenance Process Owner: REVISION LOG SECTION NUMBER REVISION DATE REVISION DESCRIPTION 5 2/4/09 Update KWP3 Flow Chart 10 2/4/09 Update Macro PCS 11 2/4/09 Update KWP3 PCS Multiple 2/26/09 EZ DMAIC 20 Checkpoint Review

3 Key Work Process (3): MANAGE WORK ORDER PROCESSING Process Owner: Table of Contents 1. Cover Sheet 2. Table of Contents 3. Plant Operations and Maintenance Internal and External Customers 4. Macro Flow Chart - Manage Facilities Operations and Maintenance 5. Key Work Process 3 Flow Chart - Manage Work Order Processing 6. DMAIC Lite Storyboard - Check Points Priority Process Selection Matrix Form 8. Key-In-Process Measures Determination System Form 9. BPS Process Management System 10. Macro Process Control System Form 11. Key Work Process 3 Process Control System Form 12. Countermeasure Matrix 13. Countermeasure Action Plan Matrix 14. Action Plan Root Cause #1 15. Action Plan Root Cause #2 16. Action Plan Root Cause #3 17. Key Work Process Indicator Data 18. EZ DMAIC 20 Checkpoint Review Document

4 Key Work Process (3): MANAGE WORK ORDER PROCESSING Process Owner: PO&M INTERNAL CUSTOMERS School Board Superintendent Area Superintendents District Administration School Administration School Support Staff Teachers PO&M EXTERNAL CUSTOMERS State of Florida Florida Department of Education Local Governments Parents / Guardians Students

5 Macro Process: MANAGE FACILITIES OPERATIONS AND MAINTENANCE( 9562) Process Owner: WALT PETTERS STEP WHO BPS SCHOOL BOARD FACILITIES OPERATIONS AND MAINTENANCE BPS SCHOOLS AND DEPARTMENTS NEED NEED PROVIDE WELL MAINTAINED, SAFE AND COMFORTABLE FACILITIES TO SUPPORT THE BPS EDUCATIONAL PROCESS. OPEN Note: This chart represents a typical daily operation process. The school principal operates the facility in conjunction with PO&M. OPEN FACILITY OPERATE OPERATE FACILITY MONITOR QUESTION QUESTION DELIVERABLES: D1- MONTHLY WORK ORDER REPORT D2 - ANNUAL FACILITY CONDITION ASSESSMENT REPORT KWP1 MONITOR FACILITY OPERATIONAL SYSTEMS P1 - Operational Systems Monitoring Hours of Operation IS THE FACILITY OPERATING AS PLANNED? YES? NO QUESTION PREVENTATIVE MAINTENANCE (PM) WORK NEEDED?? NO PERFORM KWP2 YES CAN PROBLEM BE FIXED BY FACILITY S CUSTODIAL STAFF? YES? NO FIX P2 - PM Work Per Month PERFORM PM WORK FIX PROBLEM QUESTION PROBLEM FIXED?? NO QUESTION PROCESS P3 - School-Generated W/O Per Month P4 - Service W/O Per Month P5 - PO&M-Generated W/O Per Month P6 - # W/O Opened / Closed Per Month P7 - # Backlogged W/O Per Month P8 - Aging W/O Per Month P9 - Operations Cost Per Month P10 - Maintenance Cost Per Month KWP3 PROCESS WORK ORDER(S) YES QUESTION WORK ORDER CLOSED? YES? NO QUESTION END OF NORMAL FACILITY OPERATION?? NO YES QUESTION END OF EXTENDED FACILITY OPERATION?? NO YES CLOSE CLOSE FACILITY MANAGED NEED IS MET Q1 - Operations Cost Per GSF Q2 - Maintenance Cost Per GSF Q3 - Total (Operations + Maintenance) Cost Per GSF Q4 - PM and W/O Activity Per Year Q5 - W/O Backlog Per Year Q6 - PM / Service W/O Ratio Q7 - PO&M / Facility-Generated W/O Ratio Q8 - PM Work Order Backlog Per Year FACILITIES SERVICES / Robert J. Wiebel & Walt Petters 12/12/08

6 Key Work Process (3): MANAGE WORK ORDER PROCESSING Process Owner: W. PETTERS STEP WHO SCHOOL SITE OR ANCILLARY PO&M LEAD FACILITY DISPATCHER SUPERVISOR TECH TECHNICIAN NEED NEED FACILITY MAINTENANCE TO EFFECTIVELY AND EFFICIENTLY MAINTAIN DISTRICT FACILITIES QUESTION CALL SUBMIT PROCESS YES? SUBMIT A ROUTINE W/O REQUEST DOES THE MAINTENANCE REQUIRE A ROUTINE WORK ORDER? NO CALL DISPATCHER P1 - PHONE CALLS PER MONTH PROCESS CALL P3.1 - School-Generated W/O Per Month P4.1 - Service W/O Per Month P5.1 - PO&M-Generated W/O Per Month P6.1 - # W/O Opened / Closed Per Month P7.1 - # Backlogged W/O Per Month P8.1 - Aging W/O Per Month PERFORM P2 - ROUTINE WORK REQUEST PER MONTH KWP3.1 PERFORM WORK ORDER SCHEDULING P3 - WORK ORDERS OPENED PER MONTH KWP3.2 PERFORM PERFORM FACILITY MAINTENANCE UPDATE P4 - WORK ORDERS CLOSED PER MONTH UPDATE DATA BASE MANAGED NEED IS MET Q4 - WORK ORDERS PER YEAR Q5 - WORK ORDER BACKLOG PER YEAR Q6 - PM / SERVICE WORK ORDER RATIO Q7 - PO&M / FACILITY - GENERATED W/O RATIO Q8 - PM WORK ORDER BACKLOG PER MONTH

7 Key Work Process (3.2): PERFORM FACILITY MAINTENANCE Process Owner: W. PETTERS STEP WHO SCHOOL SITE OR ANCILLARY FACILITY PO&M DISPATCHER SUPERVISOR LEAD TECH TECHNICIAN NEED NEED FACILITY MAINTENANCE TO EFFECTIVELY AND EFFICIENTLY MAINTAIN DISTRICT FACILITIES PRINT PRINT DAILY WORK ORDER LIST EVALUATE EVALUATE WORK ORDER LIST QUESTION ARE THERE ANY WORK ORDERS ON THE SCHEDULE LIST THAT NOW NEED IMMEDIATE ATTENTION? YES? NO YES? ARE THERE ANY WORK ORDERS ON THE LIST THAT NEED ADDITIONAL EVALUATION? NO EVALUATE QUESTION IS THE WORK TO BE COMPLETED BY THE FAST TEAM? YES? NO DISPATCH DISPATCH TECHNICIAN DISPATCH FAST TEAM EVALUATE Note: Identify repair work not associated with W/O. EVALUATE QUESTION NEED PARTS? YES? NO ORDER ORDER PARTS RECEIVE RECEIVE PARTS COMPLETE NEED MET COMPLETE MAINTENANCE MANAGED Q4 - WORK ORDERS PER YEAR Q5 - WORK ORDER BACKLOG PER YEAR Q6 - PM / SERVICE WORK ORDER RATIO Q7 - PO&M / FACILITY - GENERATED W/O RATIO Q8 - PM WORK ORDER BACKLOG PER MONTH FACILITIES SERVICES / ROBERT J. WIEBEL / WALT PETTERS 1/24/09

8 ATTACHMENT A INSTRUCTIONS: Please return your completed DMAIC Storyboard, along with your Process Control System (both flow chart and indicator information) and your completed Action Plan (see Improve checkpoint #10), via to rseemer@etsfl.com and copy Steve Muzzy on all s. Thank you, Bob Seemer, President & COO, Electronic Training Solutions, Inc. Priority Process Name: Work System / Leader: DEFINE PLANT OPERATION & MAINTENANCE WALT PETTERS DMAIC Lite Storyboard 1. Describe how the linkage between the process Q measures and the District s KPIs (or strategic objective measures) was established and confirmed. In order to meet 2008/2009 Strategic Plan (KPI) to be ranked first in Florida in the percentage of classroom and school spending and last in district administration and Improve and maintain control of fixed assets at all worksites by school year, Plant Operations and Maintenance (PO&M) has deployed a computerized maintenance management system. This system monitors and collects district-wide plant operating data and creates reports. In light of need to improve PO&M efficiencies and reduce operating costs, seven (7) Q measures have been developed to collect data that can be monitored and evaluated on a pre-determined basis. Q1. Operational Cost Per GSF (Annual) Q2. Maintenance Cost Per GSF (Annual) Q3. Total O&M Cost Per GSF (Annual) Q4. PM and W.O Activity Per Year Q5. Work Order Backlog Per Year Q6. PM / Service W/O Ratio Q7. PO&M / Facility Generated W/O Ratio 2. Explain which process Q measure(s) will be improved. In order to identify the Q measure(s) that should be focused on for improvement efforts, a Facilities PO&M Priority Process Selection Matrix and a Key In-Process Measures Determination Form were created (see Pages 7 and 8). It was determined that key process Processing Work Orders was in need of improvement. After a preliminary process analysis of the number of work orders opened / closed per month, preventative maintenance work orders to routine and the number of backlogged work orders per month, it was noted that Q measures Q4, Q5, Q6 and Q7 would be affected and improved. By improving work order processing, Q measures Q4, Q5, Q6, and Q7 would be improved thus resulting in an overall improvement of OP&M service. 3. Develop a theme statement which will focus your process improvement efforts. The theme statement must be consistent with the measure in checkpoint #2, above. Repair center routine aging work orders (backlog) have increased during the time period between July to October 2008 from the same period in See chart. ets, Inc. / CTi Page 1

9 MEASURE DMAIC Lite Storyboard ATTACHMENT A 4. List up to five (5) potential problem areas in this process and the associated P measure(s) for each. Reduced PO&M and Capital budgets and Staffing restrictions. (P9) (P10) New added facilities constructed. Routine work order backlog increases because of continuous aging of buildings and equipment. (P3) (P4) (P5) Self generated work orders and / or PM activity backlogs increase because if increase in routine work orders. (P2) (P4) (P5) Increased use of our District and School facilities by outside occupants. Increased expanded use of facilities by District and Schools. 5. Select the most significant problem or opportunity and develop a problem statement which answers the questions: What? When? Gap between actual and targeted values? Problem: The same-month aging work orders for August 07& 08 through October 07 & 08 is 17,640 and 18,104 respectively. The same-month aging work orders for the period of August through October 2008/2009 school year is increasing. Problem Statement: As a result of the economic environment in Florida and Brevard County, the amount available total funds (revenues) coming into the Brevard Public School District has decreased $27.0M between school fiscal years 06/07 and 07/08 and $190.74M between fiscal years 07/08 and 08/08. This decrease in revenues has caused the operating budget between 06/07 and 07/08 to increase by $30.19M and drop by $20.46M between 07/08 and 08/09. This loss of operating funds, for the 08/09 school year, caused a freeze on staffing and a reduction of all vacant maintenance positions. From January to July 2008 the backlog of aged work orders dropped from 6042 to 4273 respectively. Starting in August the backlog of aged work orders climbed to 5,755, 6,154 in September and 6,195 in October. This upward trend is caused by the decrease in school district operating funds, the addition new facilities, and the aging of existing facilities and equipment without the addition of more resources. See aging work order, PO&M staffing and overtime charts. Gap: The gap between the amount of same-month aging work orders for August 07& 08 through October 07 & 08 is 17,640 and 18,104 respectively. There is a backlog gap of 464 between same-month repair center backlogs and it is increasing by an average of 641 per month. ets, Inc. / CTi Page 2

10 ATTACHMENT A DMAIC Lite Storyboard ANALYZE 6. List up to five (5) potential causes of the selected problem from checkpoint #5 in the Measure step. A. Reduced operating budget B. Reduced staffing C. Reduced use of overtime. D. Reduced or elimination of filling vacant positions E. Increased service-call cycle time. F. Replacement equipment and parts availability. 7. List the root causes and describe the approach used to select them from among the others. Root Causes Approach Used To Select Root Cause A. Declining State Funding Operating & Capital Budget Reports B. Reduced PO&M Budget Operating & Capital Budget Reports C. Reduced PO&M Budget Operating & Capital Budget Reports D. Reduced PO&M Budget Operating & Capital Budget Reports E. Lack of service call time standards Work Order Tracking & Reporting System F. Equipment and parts purchasing cycle time Work Order Tracking & Reporting System ets, Inc. / CTi Page 3

11 IMPROVE DMAIC Lite Storyboard ATTACHMENT A 8. List the countermeasure(s) you considered for implementation for each selected root cause from the Analyze steps A D. A. The PO&M department has no control over the amount of the annual budget. The department has control over how the budget is spread over department activities. If funding shortfalls continue the 2 nd half of 2008/ 2009 and 2009 / 2010 school years, then the budget allocation may have to be allocated to critical operation and maintenance functions. In addition to shifting budget to high priority process, use the DMAIC process to improve the cycle time and reduce waste of each repair center. As a last resort, move staff from less-important processes to repair center teams. If that does not work, request that more funding be shifted from other operations accounts to plant operations and maintenance and remove the hiring freeze and lift the restrictions for the use of over time. B. Develop service standards for completing work orders based upon health and safety priorities. Train, council and / or terminate PO&M employees. C. Analyze history of work order types and repair center activities. Analyze work order process flow to reduce work order processing cycle times. D. Work with Purchasing department to reduce the time it takes to purchase equipment and parts. 9. Determine the effectiveness x feasibility score for each countermeasure, and note the highest scores. See attached countermeasure matrix. Root Cause Effectiveness Feasibility Overall Action A Yes B Yes C Yes (Hint: Refer to six sigma DMAIC course, checkpoint #18 of the Improve step.) 10. Develop an action plan for each countermeasure to be implemented which shows the following: What (description of countermeasure) When (projected start and end dates) Who (accountable person) Which organizations need to support you Estimated cost to implement See attached countermeasure action plan matrix and action plans. (Remember: your action plan(s) with this completed DMAIC Lite Storyboard, per instructions on page 1.) ets, Inc. / CTi Page 4

12 CONTROL DMAIC Lite Storyboard ATTACHMENT A 11. Briefly explain how you know the root causes were reduced or eliminated. Cannot reduce or eliminate budget shortfalls because the budget is controlled by the District. One will know that the root causes have been reduced or eliminated when a plan has been developed to redeploy maintenance staff to high priority health and safety work orders, a service standard is published, and the purchasing cycle time improvement project is complete. 12. Briefly explain how you know the problem was reduced. When the number of backlog work orders per month shows a downward trend over a three month period. 13. Briefly explain how you know the theme measure was improved. When the number of backlog work orders per month shows a downward trend over a three month period. 14. Explain how you will prevent this problem from recurring. Consistently monitor monthly backlog reports and re-deploy maintenance staff as soon as possible. 15. Identify which other BPS locations should consider implementing your countermeasures. The countermeasures used in this project are being applied to all types of work orders. 16. Identify what other BPS locations could learn from this project. N/A 17. List the remaining problem areas in this process. Reduced budgets and resources are a problem. 18. List the key lessons learned from this process improvement. To develop a flexible maintenance organization that can be easily re-organized to meet an ever changing budgetary ets, Inc. / CTi Page 5

13 ATTACHMENT A FACILITIES OPERATIONS AND MAINTENANCE PRIORITY PROCESS SELECTION MATRIX FORM Selection Factor Key Work Processes Importance x Gap = Point Score Priority Rank Monitor Facility Operational Systems Perform Preventative Maintenance Process Work Orders SCALE: 5 = Extreme 4 = High 3 = Moderate 2 = Low 1 = None ets, Inc. / CTi Page 6

14 ATTACHMENT A KEY IN-PROCESS MEASURES DETERMINATION FORM Outcome Measures In-Process Measures Q1. Operational Cost Per GSF (Annual). 1. Operational Cost Per Month (P9) Q2. Maintenance Cost Per GSF (Annual) 1. Maintenance Cost Per Month (P10) Q3. Total O&M Cost Per GSF (Annual) Q4. PM and W/O Activity Per Year Q5. Work Order Backlog Per Year Q6. PM / Service W/O Ration Q7. PO&M / Facility Generated W/O Ration 1. Operational Cost Per Month (P9) 2. Maintenance Cost Per Month (P10) 1. PM Work Performed Per Month (P2) 2. School Generated W/O Per Month (P3) 3. Misc Facility Generated W/O Per Month (P4) 4. PO&M Generated W/O Per Month (P5) 1. School Generated W/O Per Month (P3) 2. Misc Facility Generated W/O Per Month (P4) 3. PO&M Generated W/O Per Month (P5) 1. PM Work Performed Per Month (P2) 2. School Generated W/O Per Month (P3) 3. Misc Facility Generated W/O Per Month (P4) 4. PO&M Generated W/O Per Month (P5) 1. Misc Facility Generated W/O Per Month (P4) 2. PO&M Generated W/O Per Month (P5) ets, Inc. / CTi Page 7

15 ATTACHMENT A Work System: Plant Operations and Maintenance BPS Process Management System Leader: Walt Petters Owner Members Priority Processes Name Name 1. Jim Varney varney.jim@brevard.k 12.fl.us 1. Monitor Operational Systems Walt Petters pettersw@brevard. k12.fl.us 2. Angelo Thomas 3. thomas.angelo@breva rd.k12.fl.us Perform Preventative Maintenance (PM) Work Walt Petters pettersw@brevar d.k12.fl.us 1. Jim Varney 2. Angelo Thomas 3. varney.jim@brevard. k12.fl.us thomas.angelo@brev ard.k12.fl.us Jim Varney varney.jim@brevard. k12.fl.us 3. Process Work Orders Walt Petters pettersw@brevar d.k12.fl.us 2. Angelo Thomas 3. thomas.angelo@brev ard.k12.fl.us 4. ets, Inc. / CTi Page 9

16 Macro Process Control System Process Name: Facilities Operations and Maintenance Process Customer: The School Board of Brevard County, representing staff, students, parents and the community Process Purpose: Provide cost effective operation and maintenance of clean, healthy and safe educational facilities P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 Q1 Q2 Q3 Q4 Process and Quality Indicators Process Control Indicators Limits And Quality Specs/ Indicators Targets Target: 99% Uptime Operational Systems Monitoring Baseline: 100% Preventative Maintenance (PM) Work Target: Reduce Backlog by 20% Orders per Month Baseline: 128 School-Generated Work Orders Target: Reduce # 30D by 10% per Month Baseline: 875 Target: Reduce # by 10% Service W/O Per Month Baseline: 398 PO&M-Generated Work Orders Target: Increase # by 20% per Month Baseline: 458 # of Work Orders Opened / Closed Target: Reduce Cycle Time by 10% per Month Baseline: 23D Target: Reduce Backlog by 10% # Backlogged Work Orders per Month Baseline: 6500 Target: Reduce Backlog > 30D by 20% Aging W/O Per Month Baseline: CY 2007 = 3354 W/O Target: Below state average and Plant Operations Cost Per Month 25 th percentile of peer districts Baseline: $159,441 Target: Below state average and Maintenance Cost Per Month 25 th percentile of peer districts Baseline: $419,176 Target: Below state average and Plant Operational Cost Per GSF (Annual) 25 th percentile of peer districts Baseline: $0.16 Target: Below state average and Maintenance Cost Per GSF (Annual) 25 th percentile of peer districts Baseline: $0.43 Target: Below state average and Total PO&M Cost Per GSF (Annual) 25 th percentile of peer districts Baseline: $0.59 Target: Below state average and PM and W/O Activity Per Year 25 th percentile of peer districts Baseline: 10,960 / 46,132 Process Owner: Walt Petters Critical Customer Requirements: Current Sigma Level: TBD Outcome Indicators: Q1 Q7 Checking / Indicator Monitoring Timeframe Data to Collect (Frequency) What is Checking Item When to or Indicator Calculation Collect Data? Responsibility Who will Check? Contingency Plans / Miscellaneous Actions Required for Exceptions Procedure References Energy Management Systems Daily EMS Personnel Transfer more FTE to this task. Monthly Activity Report Monthly Activity Report Monthly Activity Report Monthly Activity Report Monthly Activity Report Monthly Activity Report Monthly Activity Report Statewide Ops. & Maint. Cost Data from FDOE; Budget Data from Peer Districts Statewide Ops. & Maint. Cost Data from FDOE; Budget Data from Peer Districts Statewide Ops. & Maint. Cost Data from FDOE; Budget Data from Peer Districts Statewide Ops. & Maint. Cost Data from FDOE; Budget Data from Peer Districts Statewide Ops. & Maint. Cost Data from FDOE; Budget Data from Peer Districts Yearly Summary Report Monthly End of month Monthly End of month Monthly End of month Monthly End of month Monthly End of month Monthly End of month Monthly End of month Monthly End of month Monthly End of month Yearly June 30 Yearly June 30 Yearly April 1 Yearly April 1 J. Hudson J. Hudson J. Hudson J. Hudson J. Hudson J. Hudson J. Hudson W.Petters Managers W.Petters Managers W.Petters Managers W.Petters Managers W.Petters Managers J. Hudson Transfer more FTE to this task. Transfer more FTE to this task. Transfer more FTE to this task. Transfer more FTE to this task. Transfer more FTE to this task. Transfer more FTE to this task. Transfer more FTE to this task. Analyze the distribution of the operations budget across all cost centers and look for opportunities for process improvements. Analyze the distribution of the maintenance budget across all cost centers and look for opportunities for process improvements Analyze the distribution of the operations budget per GSF for all schools and look for opportunities for process improvements Analyze the distribution of the maintenance budget per GSF for all schools and look for opportunities for process improvements See contingency plans for P9 & P10 and Q1 and Q2. See contingency plans for P2 P8.

17 Macro Process Control System Process Name: Facilities Operations and Maintenance Process Customer: The School Board of Brevard County, representing staff, students, parents and the community Process Purpose: Provide cost effective operation and maintenance of clean, healthy and safe educational facilities Q5 Q6 Q7 Q8 Process and Quality Indicators Process Control Indicators Limits And Quality Specs/ Indicators Targets Work Order Backlog Per Year Target: Reduce Mo Backlog By 20% Baseline: CY 2007 = 6500 PM / Service W/O Ratio Target: Ratio 3 Baseline: PO&M / Service W/O Ratio Target: Ratio 100% Baseline: 75.51% PM Work Order Backlog Target: EOFY Backlog 150 Baseline: 128 Process Owner: Walt Petters Critical Customer Requirements: Current Sigma Level: TBD Outcome Indicators: Q1 Q7 Checking / Indicator Monitoring Timeframe Data to Collect (Frequency) What is Checking Item When to or Indicator Calculation Collect Data? Yearly Summary Report Yearly April 1 Yearly Activity Report Monthly End of month Yearly Activity Report Monthly End of month Yearly Activity Report Monthly End of month Responsibility Who will Check? J. Hudson J. Hudson J. Hudson J. Hudson Contingency Plans / Miscellaneous Actions Required for Exceptions Procedure References See contingency plans for P2 P8. See contingency plans for P2 P8. See contingency plans for P2 P8. See contingency plans for P2 P8. Approved: Date: Rev #: Rev Date:

18 KWP3 Process Control System Process Name: Manage Work Order Processing Process Customer: The School Board of Brevard County, representing staff, students, parents and the community Process Purpose: Provide cost effective processing of school and ancillary work orders. Process and Quality Indicators Process Control Indicators Limits And Quality Specs/ Indicators Targets School Generated (Type 4) W/O per Target: Reduce by 10% P3.1 Month Baseline: 1,593 per Month P4.1 Service ( Type 1) W/O Per Month P5.1 PO&M (Type 9) W/O Per Month P6.1 # Of W/O Opened / Closed Per Month P7.1 # Backlog W/O Per Month Q4 Q5 Q6 Q7 Q8 PM and W/O Activity Per Year Target: Reduce by 10% Baseline: 85 per Month Target: Reduce # by 10% Baseline: 1775 per Month Target: Reduce # by 10% Baseline: 3,844 per Month Target: Reduce # by 10% Baseline: 5,360 per Month Target: Increase PM W/O By 20% and Reduce Routine and Service W/O By 20% Baseline: PM 10,960 / All Others 46,132 Work Order Backlog Per Year Target: Reduce Mo Backlog By 20% Baseline: 53,602 PM / Service W/O Ratio Target: Ratio 3 Baseline: PO&M / Service W/O Ratio Target: Ratio 100% Baseline: 75.51% PM Work Order Backlog Target: EOFY Backlog 150 Baseline: 128 Process Owner: Walt Petters Critical Customer Requirements: Current Sigma Level: TBD Outcome Indicators: Macro Q4 Q5 Q7 Checking / Indicator Monitoring Timeframe Data to Collect (Frequency) What is Checking Item When to or Indicator Calculation Collect Data? Responsibility Who will Check? Contingency Plans / Miscellaneous Actions Required for Exceptions Procedure References TMA Data Base Daily EMS Personnel Transfer more FTE to this task. Tracking the number of W/O Requests that are submitted and rejected after evaluation. TMA Data Base TMA Data Base TMA Data Base TMA Data Base Yearly Summary Report Yearly Activity Report Yearly Activity Report Yearly Activity Report Monthly End of month Monthly End of month Monthly End of month Monthly End of month Yearly April 1 Yearly April 1 Monthly End of month Monthly End of month Monthly End of month J. Hudson J. Hudson J. Hudson J. Hudson J. Hudson J. Hudson J. Hudson J. Hudson J. Hudson Transfer more FTE to this task. Transfer more FTE to this task. Transfer more FTE to this task. Transfer more FTE to this task. See contingency plans for P1 P4 See contingency plans for P2 P8. See contingency plans for P2 P8. See contingency plans for P2 P8. See contingency plans for P2 P8. Approved: Date: Rev #: Rev Date:

19 Countermeasures Matrix Facilities PO&M COUNTER- MEASURE PRACTICAL METHODS EFFECTIVENESS X FEASIBILITY = OVERALL ACTION ROOT CAUSE Declining Budget, Staffing & Overtime Reallocate PO&M Budget Meet with Assistant Superintendent of Facilities to develop plan Yes Reallocate Staff to High Priority Repair Centers Reorganize PO&M Department to Facilitate High Priority Work Yes PROBLEM A growing backlog gap of 464 between 07/08 same-month repair centers. Increased Service Call Cycle Time Analyze Repair Center Work Load Establish Service Standards Conduct Weekly Repair Center Meetings with Supervisors Conduct Weekly Repair Center Meetings with Supervisors Yes Yes Replacement parts purchasing cycle time. Work with Purchasing department to reduce the time it takes to purchase equipment and parts. Meet with Purchasing Department to Develop Plan Yes Scale: 1 = Negligble 2= Somewhat 3= Moderate 4= Very 5 = Extreme

20 DMAIC LITE STORYBOARD IMPROVE CHECKPOINT 10 Countermeasure Action Plan Matrix COUNTERMEASURE If funding shortfalls continue the 2 nd half of 2008/ 2009 and 2009 / 2010 school years, then the budget allocation may have to be allocated to critical operation and maintenance functions. In addition to shifting budget to high priority process, use the DMAIC process to improve the cycle time and reduce waste of each repair center. As a last resort, move staff from lessimportant processes to repair center teams. If that does not work, request that more funding be shifted from other operations accounts to plant operations and maintenance and remove the hiring freeze and lift the restrictions for the use of over time. (Action Plan #1) PROJECTED START DATE PROJECTED END DATE ACCOUNTABLE PERSON SUPPORT ORGANIZATION 01/12/09 02/09/09 Walt Petters None ESTIMATED COST The cost of staff time analyze budget and reallocate / shift work from low priority to high priority health and safety work. This is a monthly process. Develop service standards for completing work orders based upon health and safety priorities. Train, council and / or terminate PO&M employees. (No Action Plan Required) Analyze history of work order types and repair center activities. Analyze work order process flow to reduce work order processing cycle times. (Action Plan 2) 01/05/09 07/31/09 Walt Petters None 01/12/08 03/16/09 Walt Petters None The cost of staff time to develop new service standards. The cost of staff time to analyze W/O type and W/O processing cycle time activities. This is a monthly process. Work with Purchasing department to reduce the time it takes to purchase equipment and parts. (Action Plan #3) 01/12/09 03/09/09 Walt Petters Purchasing Department The cost of staff time to work with Purchasing Dept.

21 Action Plan #1 - Facilities PO&M Root Cause: Declining Budget, Staffing and Overtime Date: 24-Nov-08 Countermeasure: Reallocate PO&M Budget & Staff To High Priority Repair Centers Owners: Walt Petters Practical Method: Meeting scheduling No. Task Accountable Person 1/12/2009 1/19/2009 1/26/2009 2/2/2009 2/9/2009 2/16/2009 2/23/2009 3/2/2009 3/9/2009 3/16/2009 3/23/2009 3/30/2009 Comments Week 1 Conduct meeting with Supervisors to plan for work shifting. Director Scheduled Completed 2 Conduct Meeting With Assistant Superintendent to present work shifting methodology. Director Scheduled Completed 3 Develop New Work Shifting Procedure Director Scheduled Completed 4 Present New Work Shifting Procedure Assistant Superintendent Director Scheduled Completed Deploy New Work Shifting 5 Director Budget. Scheduled Completed

22 Action Plan #2 - Facilities PO&M Root Cause: Increased Service Call Cycle Time Date: 24-Nov-08 Countermeasure: Analyze Repair Center Work Load and Establish New Service Standards Owners: Walt Petters Practical Method: Meeting scheduling No. 1 2 Task Repair Center Supervisor Kick Off Meeting. Define Task(s). Analyze Work Order Type & Repair Center Work Load. Accountable Person Director Director Scheduled Completed Scheduled Completed 1/12/2009 1/19/2009 1/26/2009 2/2/2009 2/9/2009 2/16/2009 2/23/2009 3/2/2009 3/9/2009 3/16/2009 3/23/2009 3/30/2009 Comments Started 07/1/08 Started 07/1/08 Week 3 Develop Process Flow and Value Stream Charts for each Repair Center. Director Scheduled Completed 4 Analyze Repair Center Flow and Value Stream Charts. Director Scheduled Completed 5 Develop alternate Repair Center Process Flows to reduce cycle time. Director Scheduled Completed 6 Update Repair Center Flow Charts Team Scheduled Completed

23 Action Plan #3 - Facilities PO&M Root Cause: Replacement Parts Purchasing Cycle Time Date: 24-Nov-08 Countermeasure: Work with Purchasing Department To Reduce Time to Purchase Parts and Equipment Owners: Walt Petters Practical Method: Meeting scheduling No. Task Accountable Person 1/12/2009 1/19/2009 1/26/2009 2/2/2009 2/9/2009 2/16/2009 2/23/2009 3/2/2009 3/9/2009 3/16/2009 3/23/2009 3/30/2009 Comments Week 1 Conduct Kick Off Meeting Director(s) Scheduled Completed 2 Form Joint PO&M & Purchasing Process Improvement Team. Director(s) Scheduled Completed 3 Develop Project Charter Director(s) Scheduled Completed 4 Develop Process Flow and Value Stream Charts. Team Scheduled Completed 5 Develop DMAIC Lite Storyboard Team Scheduled Completed 6 Develop alternate Process Flows to reduce cycle time. Team Scheduled Completed 7 Update Flow Charts Team Scheduled Completed 8 Present Solution to Senior Management. Team Scheduled Completed 9 Deploy Countermeasures Team Scheduled Completed

24 SPENDING BY SCHOOL BOARD ON OPERATIONS Amended Budget Operating Budget $1,400,000,000 $1,200,000,000 $1,000,000,000 $$ PER YEAR $800,000,000 $600,000,000 $400,000,000 $200,000,000 $ REPORTING MONTHS

25 OPERATIONS AS % OF AMENDED BUDGET OB % of AB 80.00% 70.00% 60.00% % PER MONTH 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% REPORTING MONTHS

26 BPS Amended Budget Amended Budget $1,400,000,000 $1,200,000,000 $1,000,000,000 TOTAL FUNDS PER YEAR $800,000,000 $600,000,000 $400,000,000 $200,000,000 $0 97=98 98=99 99=00 00=01 01=02 02=03 03=04 04=05 05=06 06=07 07=08 08=09* REPORTING YEARS

27 OPERATING BUDGET 1997 to 2008 $625,000,000 $600,000,000 $575,000,000 $550,000,000 $525,000,000 $500,000,000 $475,000,000 $450,000,000 Operating Budget $425,000,000 $400,000,000 $375,000,000 $350,000,000 $325,000,000 $300,000,000 97=98 98=99 99=00 00=01 01=02 02=03 03=04 04=05 05=06 06=07 07=08 08=09* REPORTING YEARS

28 SBBC District Enrollment Total District Minus Charter Schools 73,000 72,000 71,000 70,000 Students Per Year 69,000 68,000 67,000 66,000 65,000 64, Total District Minus Charter Schools 66,930 67,516 68,438 69,359 70,217 71,493 72,046 71,957 71,170 70,717 Reporting Yeara

29 Total Aging Work Order Chart TOTAL AGING WORK ORDERS Total Aging W/O Aging W/O < 31D Aging W/O > 30 D WORK ORDERS PER MONTH Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 REPORTING MONTHS Page 1

30 AGING WORK ORDER PROFILE JAN 08 - Jun 09 Total Aging W/O Total Aging W/O Baseline Total Aging W/O Target Baseline = 5337 WORK ORDERS PER MONTH Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 REPORTING MONTHS Target = 4302

31 Type 1 W/O Closed JAN - NOV 2008 Type 1 W/O Closed Type 1 W/O Baseline Type 1 W/O Target # CLOSED W/O PER MONTH Target = Baseline = Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 REPORTING MONTHS

32 JULY - AUGUST 2007 AGING WORK ORDERS Series1 Series2 Series AGING WORK ORDERS PER MONTH Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 REPORTING MONTHS

33 2008 JULY - DECEMBER AGING WORK ORDERS AGING WORK ORDERS PER MON TH Total Aging W/O Aging W/O < 31D Aging W/O > 30 D Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 REPORTING MONTHS

34 07/08 JULY - DECEMBER AGING WORK ORDERS Total 07 Aging W/O Total 08 Aging W/O 6,500 6,250 6,000 AGING WORK ORDERS PER MONTH 5,750 5,500 5,250 5,000 4,750 4,500 4,250 4,000 July August September October November December REPORTING MONTHS

35 MAINTENANCE STAFFING PROFILE Maintenance FTE FTE Baseline Baseline FTE FTE PER YEAR REPORTING YEARS

36 PO&M Budget / GSF PO&M Budget / GSF $1.20 $1.00 $0.80 Dollars Per GSF $0.60 $0.40 $0.20 $ PO&M Budget / GSF $1.05 $0.34 $0.44 $0.58 $0.67 $0.68 $0.59 Reporting Years

37 MAINTENANCE 9562 BUDGET / GSF PO&M 9562 Budget / GSF $0.90 DOLLARS PER GROSS SQUARE FOOT $0.80 $0.70 $0.60 $0.50 $0.40 $0.30 $0.20 $0.10 $ PO&M 9562 Budget / GSF $0.78 $0.14 $0.20 $0.39 $0.48 $0.49 $0.43 REPORTING YEARS

38 Plant Operations Budget 9560 / GSF Plant Operations Budget 9560 / GSF $0.30 $0.25 $0.20 Dollars Per GSF $0.15 $0.10 $0.05 $ Plant Operations Budget 9560 / GSF $0.26 $0.20 $0.24 $0.19 $0.20 $0.20 $0.16 Reporting Years

39 PO&M OVERTIME USAGE ANALYSIS Overtime Hours Per Year 40, , , O/T HOURS PER YEAR 25, , , , Note: FY is a calculated number using the first six months of the fiscal year and forecasting the second six months of overtime hours. 5, FY FY FY FY FY Overtime Hours Per Year 23, , , , ,912.8 REPORTING YEARS

40 EZ DMAIC 20 CHECKPOINTS DEFINE MEASURE ANALYZE IMPROVE CONTROL Plan Do Check Act Macro Process Name: Manage Facilities Plant Operations and Maintenance Key Work Process: KWP3 Manage Work Order Processing Work System / Leader: Ed Curry DMAIC Status: Improve Cycle: Yes Process Owner: Walt Petters Refine Cycle: No DEFINE 1. The stakeholder and need were identified. Yes: X No: Rating: 5 Comment: Internal and external customers were identified. 2. An indicator measuring our performance in meeting the need was developed. Yes: X No: Rating: 5 Comment: A Q Measure Q5 Work Order (W/O) Backlog per Year and In Process Indicators P3.1 P8.1 were developed and tracked. 3. A theme statement consistent with the indicator was selected. Yes: X No: Rating: 5 Comment: Yes the theme statement is consistent with Q4 and In Process indicators P3.1 P8.1 Rating Legend: 5 = Checkpoint Fully Satisfied / 4 = Meets Most Criteria of Checkpoint / 3 = Meets Minimal Requirement of Checkpoint 2 = Checkpoint Somewhat/Partially Satisfied / 1 = Checkpoint Not Addressed EZDMAIC SM is a registered Service Mark of ets Inc. ~ Copyright 2009, ets Inc. Page 1

41 EZ DMAIC 20 CHECKPOINTS DEFINE MEASURE ANALYZE IMPROVE CONTROL Plan Do Check Act MEASURE 4. The theme was stratified from various viewpoints and a significant problem was chosen. Yes: X No: Rating: 5 Comment: The theme was stratified into six problems. Each problem was analyzed during a brainstorming session with the significant problem chosen The same-month aging work orders for August 07& 08 through October 07 & 08 is 17,640 and 18,104 respectively. The same-month aging work orders for the period of August through October 2008/2009 school year is increasing. 5. A target for improvement was established based on the stakeholder's need and its impact on the theme indicator was determined. Yes: X No: Rating: 5 Comment: A target has been established to reduce the backlog by 10% 6. A problem statement that addressed the gap between the actual and target values was developed. Yes: X No: Rating: 5 Comment: Actual and target gap values have been identified. Gap: The gap between the amount of same-month aging work orders for August 07& 08 through October 07 & 08 is 17,640 and 18,104 respectively. There is a backlog gap of 464 between same-month repair center backlogs and it is increasing by an average of 641 per month. The target is to reduce the work order backlog by 10%. The total backlog equals the total aging work orders less than 30 days and total aging work orders greater than 30 days. Baseline = 6,500 W/O back log per month. Target= 5,850 W/O backlog per month. Rating Legend: 5 = Checkpoint Fully Satisfied / 4 = Meets Most Criteria of Checkpoint / 3 = Meets Minimal Requirement of Checkpoint 2 = Checkpoint Somewhat/Partially Satisfied / 1 = Checkpoint Not Addressed EZDMAIC SM is a registered Service Mark of ets Inc. ~ Copyright 2009, ets Inc. Page 2

42 EZ DMAIC 20 CHECKPOINTS DEFINE MEASURE ANALYZE IMPROVE CONTROL Plan Do Check Act ANALYZE 7. Potential causes most likely to have the greatest impact on the problem were selected. Yes: X No: Rating: 5 Comment: Six potential causes were selected: Reduced operating budget; Reduced staffing; Reduced use of overtime; Reduced or elimination of filling vacant positions; Increased service-call cycle time; and Replacement equipment and parts availability. 8. A relationship between the root causes and the problem was verified with data. Yes: X No: Rating: 4 Comment: Three of the six root causes were verified by data. The three root causes are reduced operating budget, reduced staffing, and reduced use of overtime. The remaining three root causes, reduced or elimination of filling vacant positions, increased service-call cycle time and replacement equipment and parts availability were verified by reviewing department records. 9. Root causes were selected and the impact of each root cause on the gap was determined. Yes: No: Rating: 5 Comment: The impact of the root cause was determined. The root causes that are related to school district budget reductions will not improve until the additional operational funding is increased to pre fiscal year 06/07 funding levels. The root causes related to increased service-call cycle time and replacement equipment and parts availability have an impact on the gap. Rating Legend: 5 = Checkpoint Fully Satisfied / 4 = Meets Most Criteria of Checkpoint / 3 = Meets Minimal Requirement of Checkpoint 2 = Checkpoint Somewhat/Partially Satisfied / 1 = Checkpoint Not Addressed EZDMAIC SM is a registered Service Mark of ets Inc. ~ Copyright 2009, ets Inc. Page 3

43 EZ DMAIC 20 CHECKPOINTS DEFINE MEASURE ANALYZE IMPROVE CONTROL Plan Do Check Act IMPROVE 10. Countermeasures were selected to address verified root causes. Yes: X No: Rating: 5 Comment: Three countermeasures were developed to address the six root causes listed in Macro DMAIC Storyboard. Because three of the root causes involved BPS district funding of plant operations and maintenance, a countermeasure was not developed. The following are the three countermeasures that were selected. 1. Develop service standards for completing work orders based upon health and safety priorities. Train, council and / or terminate PO&M employees. 2. Analyze history of work order types and repair center activities. Analyze work order process flow to reduce work order processing cycle times. 3. Work with Purchasing department to reduce the time it takes to purchase equipment and parts. The countermeasure for reducing the time to purchase equipment and parts is six sigma project being conducted by the Purchasing department. A countermeasure matrix was developed. See Macro Storyboard package. 11. The method for selecting the appropriate practical methods was clear and considered effectiveness and feasibility. Yes: X No: Rating: 5 Comment: An effectiveness and feasibility matrix was used to select which countermeasures to deploy. Practical methods were developed for each counter measure by using a brainstorming session. See Macro Storyboard package for effectiveness and feasibility matrix. IMPROVE 12. The action plan reflected accountability, schedule, and cost, and was implemented. Yes: X No: Rating: 5 Comment: Three action plans were developed. One for each countermeasure deployment. A countermeasure action plan matrix was developed which shows deployment accountability, schedule and associated cost. Rating Legend: 5 = Checkpoint Fully Satisfied / 4 = Meets Most Criteria of Checkpoint / 3 = Meets Minimal Requirement of Checkpoint 2 = Checkpoint Somewhat/Partially Satisfied / 1 = Checkpoint Not Addressed EZDMAIC SM is a registered Service Mark of ets Inc. ~ Copyright 2009, ets Inc. Page 4

44 EZ DMAIC 20 CHECKPOINTS DEFINE MEASURE ANALYZE IMPROVE CONTROL Plan Do Check Act CONTROL 13. [Results] The effect of countermeasures on the root causes was demonstrated. Yes: X No: Rating: 5 Comment: As of February 26, 2009, the work order closure rate, for the nine (9) PO&M Repair centers range between 74.02% to % with only one repair center exhibiting a closure rate less than 90%. As of February 26, 2009, the cycle time to finish and close work orders for each of the nine (9) repair centers ranges between to days. See box score below. 14. [Results] The effect of countermeasures on the problem was demonstrated. Yes: X No: Rating: 5 Comment: As of the beginning of February 2009, a downward trend has started since the changes that were made as a result of the decrease in PO&M operating budget. See Total Aging Work Order chart in Macro Storyboard Package. 15. [Results] The improvement target was achieved and causes of significant variation were addressed. Yes: No: X Rating: 4 Comment: The deployment, of the countermeasure to reduce the number of aging work orders, has started a downward trend. All procedures are in place to achieve the target by the end of March See Aging Work Order Profile Jan 08 Jun 09 chart in Macro Storyboard Package. 16. [Results] The effect of countermeasures on the theme indicator representing the stakeholder s need was demonstrated. Yes: X No: Rating: Comment: Theme Statement: Repair center routine aging work orders (backlog) have increased during the time period between July to October 2008 from the same period in The data shown on the Aging Work Order Profile Jan 08 Jun 09 chart clearly shows that the countermeasure is having an effect on the theme statement. EZDMAIC SM is a registered Service Mark of ets Inc. ~ Copyright 2009, ets Inc. Page 5

45 EZ DMAIC 20 CHECKPOINTS DEFINE MEASURE ANALYZE IMPROVE CONTROL Plan Do Check Act CONTROL 17. [Standardization] A method was established to document, permanently change, and communicate the revised process or standard, and was implemented. Yes: No: X Rating: 3 Comment: The countermeasure method has been communicated verbally. The countermeasure method has not been documented to permanently change and communicate the revised process. 18. [Standardization] Specific areas for replication were identified, and an action plan was developed to promote organizational learning. Yes: X No: Rating: 5 Comment: This checkpoint was analyzed. The countermeasure has been standardized across all nine repair centers. 19. [Future Plans] Any remaining problems of the theme were addressed. Yes: X No: Rating: 5 Comment: There are no remaining problems associated with the theme. Aging work orders are reviewed each month of all nine repair centers. Corrective and preventative actions are taken when negative trends are noted. See PO&M Monthly Overview report. CONTROL 20. [Future Plans] Lessons learned, P-D-C-A of the ets Six Sigma DMAIC Method, and team growth were assessed and documented. Yes: X No: Rating: 4 Comment: The problem solving activity to improve the theme occurred over numerous brainstorming and data analysis sessions. Data was examined from varying view points to understand the problem and gap. Lessons learned were discussed but not documented. The PO&M operation uses a Computerized Maintenance Management System (CMMS) to schedule and track maintenance activities. Data can be collected at all levels of the maintenance cycle. Currently PO&M is working with TMA Systems to modify the CMMS to drill down the data collection to give the system uses more drop-down window choices when entering maintenance data. The monthly maintenance overview report is distributed to all Facilities managers and school district administrators. The report is a useful tool to identify problem trends and to inform stakeholders about maintenance activities that affect this school site or facilities infrastructure. Rating Legend: 5 = Checkpoint Fully Satisfied / 4 = Meets Most Criteria of Checkpoint / 3 = Meets Minimal Requirement of Checkpoint 2 = Checkpoint Somewhat/Partially Satisfied / 1 = Checkpoint Not Addressed EZDMAIC SM is a registered Service Mark of ets Inc. ~ Copyright 2009, ets Inc. Page 6

Measure What You Manage. Michael Cowley, CPMM President CE Maintenance Solutions, LLC

Measure What You Manage. Michael Cowley, CPMM President CE Maintenance Solutions, LLC Measure What You Manage Michael Cowley, CPMM President CE Maintenance Solutions, LLC Define Maintenance Scorecards Discuss Required Prerequisites Explain 10 Common Maintenance Scorecards Review Your Return-on-Investment

More information

Reliability Improvement using Defect Elimination

Reliability Improvement using Defect Elimination Reliability Improvement using Defect Elimination A Three-Prong Approach The Keystone to Safe, Reliable, Profitable Production Michael Voigt 2006 KBC. All Rights Reserved. 1 Introduction Michael Voigt 19

More information

ABB ServicePro 4.0 Service Management System

ABB ServicePro 4.0 Service Management System ABB ServicePro 4.0 Service Management System Presented by Paul Radcliffe PS Service June 6, 2014 Slide 1 Questions customers ask How successful is my maintenance program? - Am I performing the right PM

More information

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Administration Division Public Works Department Anchorage: Performance. Value. Results. Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,

More information

Watts Bar Nuclear Plant Unit 2 Completion Project

Watts Bar Nuclear Plant Unit 2 Completion Project Watts Bar Nuclear Plant Unit 2 Completion Project Fifth Quarterly Update to the Estimate to Complete May 2013 - July 2013 Published October 2013 Table of Contents Section 1 - Executive Summary... 3 Quarterly

More information

Facilities Management. FM Key Performance Indicators

Facilities Management. FM Key Performance Indicators Facilities Management FM Key Performance Indicators October 20, 2017 Facilities Management Key Volume Indicators Key Volume FM Change Evanston Chicago Full Time Equivalent (FTE) 370 +1 301 69 Acres 296

More information

Energy Report - February 2008

Energy Report - February 2008 Energy Report - February 28 Glossary Ampere - The unit of measurement of electrical current produced in a circuit by 1 volt acting through a resistance of 1 Ohm. British thermal unit (Btu) - The quantity

More information

AWWA UTILITY BENCHMARKING. Performance Management for Your Utility

AWWA UTILITY BENCHMARKING. Performance Management for Your Utility AWWA UTILITY BENCHMARKING Performance Management for Your Utility marks The American Water Works Association (AWWA) has a long history of quality management programs, including benchmarking, that serve

More information

Enterprise Technology Projects Fiscal Year 2012/2013 Fourth Quarter Report

Enterprise Technology Projects Fiscal Year 2012/2013 Fourth Quarter Report Enterprise Technology Projects Fiscal Year 2012/2013 Fourth Quarter Report Enterprise Projects Fiscal Year 2012/2013 Fourth Quarter The Enterprise Program Investment Council (EPIC) is responsible for governance

More information

Proven Approaches to Growing Core Deposits January 20, 2010

Proven Approaches to Growing Core Deposits January 20, 2010 Insert speaker logo here Proven Approaches to Growing Core Deposits January 20, 2010 Scott Morgano and Barbara Erskine Consulting Services Core Deposit Recent Trends 2 Industry Consolidation FDIC-Insured

More information

Call Center Benchmark

Call Center Benchmark Call Center Benchmark United States In-house/Insourced Call Centers Report Contents Benchmarking Overview Page 2 KPI Statistics and Quartiles Page 8 Benchmarking Scorecard and Rankings Page 15 Detailed

More information

Miami River Freight Improvement Plan Financial Management Number:

Miami River Freight Improvement Plan Financial Management Number: Miami River Commission January 8, 2018 Miami, FL Carlos A. Castro, District Freight Coordinator Miami River Freight Improvement Plan Financial Management Number: 437946-1-22-01 Agenda Study Background

More information

Facilities Management. FM Key Performance Indicators

Facilities Management. FM Key Performance Indicators Facilities Management FM Key Performance Indicators August 15, 2017 Facilities Management Key Volume Indicators Key Volume FM Change Evanston Chicago Full Time Equivalent (FTE) 364 +11 299 65 Acres 296

More information

AUSTIN AREA SUMMARY REPORT ON BUSINESS April 2017

AUSTIN AREA SUMMARY REPORT ON BUSINESS April 2017 INSTITUTE FOR SUPPLY MANAGEMENT- ISM AUSTIN, INC. P.O. Box 26155 Austin, Texas 78755-0155 Steven Leatherwood, CPSM, MCIPS Econ-report@ism-austin.org AUSTIN AREA SUMMARY REPORT ON BUSINESS Region Economy

More information

Okaloosa RESTORE Advisory Committee (ORAC) January 8, :30 PM 4:30 PM Emerald Coast Convention Center

Okaloosa RESTORE Advisory Committee (ORAC) January 8, :30 PM 4:30 PM Emerald Coast Convention Center Okaloosa RESTORE Advisory Committee (ORAC) January 8, 2014 2:30 PM 4:30 PM Emerald Coast Convention Center Agenda Minutes Approval Consultant s Administrative Report Scheduled Presentations - None Regional

More information

Traffic Division Public Works Department Anchorage: Performance. Value. Results.

Traffic Division Public Works Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements. Direct Services Design, operate and maintain the

More information

Dynamic Reallocation of Portfolio Funds

Dynamic Reallocation of Portfolio Funds Complete Perspective. Smart Decisions. #StrategicPMO Dynamic Reallocation of Portfolio Funds Ben Chamberlain Chief Product & Marketing Officer Ben.Chamberlain@umt360.com Agenda What s wrong with traditional

More information

ROUTINE MAINTENANCE EMERGENCY SERVICES EQUIPMENT REPAIR

ROUTINE MAINTENANCE EMERGENCY SERVICES EQUIPMENT REPAIR critical facilities preventative maintenance ROUTINE MAINTENANCE EMERGENCY SERVICES EQUIPMENT REPAIR a l p h a t e c h n o l o g i e s s e r v i c e s, i n c. m e m b e r o f t h e a l p h a g r o u p

More information

Facilities Management. FM Key Performance Indicators

Facilities Management. FM Key Performance Indicators Facilities Management FM Key Performance Indicators September 21, 2017 Facilities Management Key Volume Indicators Key Volume FM Change Evanston Chicago Full Time Equivalent (FTE) 369 +5 304 65 Acres 296

More information

Gaining Efficiencies: New Initiatives in ecommerce

Gaining Efficiencies: New Initiatives in ecommerce Gaining Efficiencies: New Initiatives in ecommerce Don Gullett Chief, Accounts Payable Operations, Defense Agencies & USMC Defense Finance and Accounting Service April 6, 2011 Agenda Systems and Customers

More information

Unleashing the Enormous Power of Call Center KPI s. Call Center Best Practices Series

Unleashing the Enormous Power of Call Center KPI s. Call Center Best Practices Series Unleashing the Enormous Power of Call Center KPI s Call Center Best Practices Series 27 Years of Call Center Benchmarking Data Global Database More than 3,700 Call Center Benchmarks 30 Key Performance

More information

The Call Center Balanced Scorecard

The Call Center Balanced Scorecard The Call Center Balanced Scorecard Your Overall Measure of Call Center Performance! MetricNet Best Practices Series Some Common Call Center KPIs Cost Cost per Contact Cost per Minute of Handle Time Quality

More information

ON-THE-JOB TRAINING BLUEPRINT

ON-THE-JOB TRAINING BLUEPRINT ON-THE-JOB TRAINING BLUEPRINT SUPERVISOR MODULE BUILDING EFFECTIVE CALL CENTRE WORK TEAMS Developed in collaboration with Customer Service Transformation Pte Ltd Copyright Singapore Productivity and Standards

More information

Business Value and Customer Benefits Derived from High Maturity

Business Value and Customer Benefits Derived from High Maturity CMMI sm Technology Conference and User Group November 2002 Business Value and Customer Benefits Derived from High Maturity Alan Pflugrad Northrop Grumman Information Technology Defense Enterprise Solutions

More information

Requirements Analysis and Design Definition. Chapter Study Group Learning Materials

Requirements Analysis and Design Definition. Chapter Study Group Learning Materials Requirements Analysis and Design Definition Chapter Study Group Learning Materials 2015, International Institute of Business Analysis (IIBA ). Permission is granted to IIBA Chapters to use and modify this

More information

Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting

Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting June 22, 2016 Discussion Outline Finance Plan for the Metrorail Project Financial Developments Since December 2015

More information

The Week at a Glance Week Ending February 23, 2007

The Week at a Glance Week Ending February 23, 2007 The Week at a Glance Week Ending February 23, 27 Traveler Information Calls Calls Taken 4,125 Average Call Length 1:3 Average Answer Time :8 Incidents Managed (not including construction) Incidents Managed

More information

Debra J. Perry Harris Corporation. How Do We Get On The Road To Maturity?

Debra J. Perry Harris Corporation. How Do We Get On The Road To Maturity? How Do We Get On The Road To Maturity? Debra J. Perry Harris Corporation NDIA Conference - 1 What do we want? From this To this But how? NDIA Conference - 2 Where Do We Start? NDIA Conference - 3 Government

More information

Sustaining Our Buildings & Grounds

Sustaining Our Buildings & Grounds Sustaining Our Buildings & Grounds The Next 100 Years University of Alberta June 1 3 2008 Located Edmonton Alberta 3rd largest University in Canada 32,000 undergrads 6,000 grad students 13.9 million sq.

More information

Facilities Maintenance

Facilities Maintenance Summary The district is using 11 of the 22 facilities maintenance best practices. The district regularly reviews the organizational structure of its maintenance department, has qualified staff, and district

More information

Extreme Agile Implementation and Creating a Value Delivery Office

Extreme Agile Implementation and Creating a Value Delivery Office Extreme Agile Implementation and Creating a Value Delivery Office Anup Deshpande Sr. Leader of Agile Portfolio Management 1 COPYRIGHT 2017 Anup Deshpande. ALL RIGHTS RESERVED For Informational Purposes

More information

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action ISO 14001 4.5.1 Monitoring and Measurement 4.5.2 Nonconformance and Corrective and Preventative Action 4.5.1 Monitoring and Measurement The organization shall establish and maintain documented procedures

More information

ELECTRONICS TECHNICIAN (Two New Positions)

ELECTRONICS TECHNICIAN (Two New Positions) Edmonton Catholic Schools is now accepting applications for the position of ELECTRONICS TECHNICIAN (Two New Positions) Edmonton Catholic Schools is a large urban school district whose mission is to provide

More information

Project Management. Learning Objectives. What are Projects? Dr. Richard Jerz. Describe or Explain:

Project Management. Learning Objectives. What are Projects? Dr. Richard Jerz. Describe or Explain: Project Management Dr. Richard Jerz 1 Learning Objectives Describe or Explain: What are projects The role of the project manager Work breakdown structure Project management tools (Gantt, PERT, & CPM) The

More information

R o l l i n g F o r e c a s t i n g :

R o l l i n g F o r e c a s t i n g : R o l l i n g F o r e c a s t i n g : A Strategy for Effective Financial Management July 24, 2014 Kentucky HFMA 2014 Kaufman, Hall & Associates, Inc. All rights reserved. 0 Agenda Overview of Rolling Forecast

More information

Governance, Risk Management & USE Workshop. 1 & 3 March 2011

Governance, Risk Management & USE Workshop. 1 & 3 March 2011 Governance, Risk Management & USE Workshop 1 & 3 March 2011 Introduction and dry run update 2 Agenda Introduction and dry run update Overview of review programme Overall approach and documentation request

More information

Electric Forward Market Report

Electric Forward Market Report Mar-01 Mar-02 Jun-02 Sep-02 Dec-02 Mar-03 Jun-03 Sep-03 Dec-03 Mar-04 Jun-04 Sep-04 Dec-04 Mar-05 May-05 Aug-05 Nov-05 Feb-06 Jun-06 Sep-06 Dec-06 Mar-07 Jun-07 Sep-07 Dec-07 Apr-08 Jun-08 Sep-08 Dec-08

More information

SUPPLY CHAIN EXCELLENCE IN WIDEX. June 2016

SUPPLY CHAIN EXCELLENCE IN WIDEX. June 2016 SUPPLY CHAIN EXCELLENCE IN WIDEX June 2016 AGENDA 1. Presentation of Widex 2. The first year Creating a solid base 3. The second year Stabilizing the performance 4. The next steps Unleashing the competitive

More information

IT Service and Support. Key Success Factors in Higher Education

IT Service and Support. Key Success Factors in Higher Education IT Service and Support Key Success Factors in Higher Education Empirical Observations from Our Global Database Global Database More than 3,700 IT Service and Support Benchmarks 70+ Key Performance Indicators

More information

New Horizons Computer Learning Centers

New Horizons Computer Learning Centers New Horizons Computer Learning Centers & Metrics that Matter Diane Tuluceanu, Product Marketing Manager New Horizons of Washington D.C. New Horizons & Metrics that Matter New Horizons Computer Learning

More information

The Service Desk Balanced Scorecard

The Service Desk Balanced Scorecard The Service Desk Balanced Scorecard Your Overall Measure of Service Desk Performance MetricNet Best Practices Series Your Speaker: Jeff Rumburg Co Founder and Managing Partner, MetricNet, LLC Winner of

More information

HV SHRM Member Survey

HV SHRM Member Survey HV SHRM Member Survey 1. Currently, we meet 7:30 a.m. 10:00 a.m. on the first Thursday of the month. In general, do Thursdays work for you? Yes 89.5% 34 No 10.5% 4 Of not, what days work better? 2 2. What

More information

Okaloosa RESTORE Advisory Committee (ORAC) October 3, :00 PM 8:00 PM Northwest Florida State College

Okaloosa RESTORE Advisory Committee (ORAC) October 3, :00 PM 8:00 PM Northwest Florida State College Okaloosa RESTORE Advisory Committee (ORAC) October 3, 2013 6:00 PM 8:00 PM Northwest Florida State College Agenda Minutes Approval Consultant s Administrative Report Scheduled Presentations - None Regional

More information

Report to the Finance Committee Comprehensive Annual Financial Report. Prepared by the Office of Finance April 2016

Report to the Finance Committee Comprehensive Annual Financial Report. Prepared by the Office of Finance April 2016 Report to the Finance Committee 2015 Comprehensive Annual Financial Report Prepared by the Office of Finance April 2016 Audit Opinion date April 11, 2016 Unmodified or clean audit opinion on financial

More information

ECU PHYSICIANS NEW PROGRAM REQUEST FORM

ECU PHYSICIANS NEW PROGRAM REQUEST FORM Date Submitted: ECU PHYSICIANS NEW PROGRAM REQUEST FORM Department: ECU Physicians Section: Administrator/Contact Person: Brian Jowers, Executive Director Program Name: Banner Fund/Org: Expected Start

More information

Call Center Benchmark India

Call Center Benchmark India Call Center Benchmark India Outsourced Call Centers Report Contents Benchmarking Overview Page 2 KPI Statistics and Quartiles Page 8 Benchmarking Scorecard and Rankings Page 13 Detailed Benchmarking Data

More information

Refuse Collections Division Solid Waste Services Department Anchorage: Performance. Value. Results.

Refuse Collections Division Solid Waste Services Department Anchorage: Performance. Value. Results. Refuse Collections Division Solid Waste Services Department Anchorage: Performance. Value. Results. Mission Provide solid waste collection and disposal service to rate-paying customers within our defined

More information

Internal Medicine Faculty Affairs Staffing Analysis Program & Operations Analysis University of Michigan Health System

Internal Medicine Faculty Affairs Staffing Analysis Program & Operations Analysis University of Michigan Health System Internal Medicine Faculty Affairs Staffing Analysis Program & Operations Analysis University of Michigan Health System Final Report Delivered to: Cheryl Sweetland Manager, Faculty Affairs Internal Medicine

More information

Facilities Maintenance

Facilities Maintenance Summary The Collier County School District is using 20 of 22 best practices relating to facilities maintenance. District facilities are safe, secure, clean, and equitably maintained. The department is

More information

OTA. BT has expanded the staff and managers who look after LLU at the Chester Service Centre and are implementing a parallel Service Centre in Leeds.

OTA. BT has expanded the staff and managers who look after LLU at the Chester Service Centre and are implementing a parallel Service Centre in Leeds. 7th February 25 Progress Update on Adjudication Scheme - 3 I wish to update you further on the progress Adjudication Scheme as applied to LLU. Since my last letter 23 rd November 24 we have achieved some

More information

CARPENTER Apprentice (Existing position)

CARPENTER Apprentice (Existing position) Edmonton Catholic Schools is now accepting applications for the position of CARPENTER Apprentice (Existing position) For additional information on this position please contact Mariel Brochu at Mariel.Brochu@ecsd.net

More information

Service Level Agreement Policy. Table of Contents

Service Level Agreement Policy. Table of Contents Table of Contents Service Level Agreement... 3 Definition of What a Service Level Agreement is... 3 Sample Service Level Agreement... 4 Assumptions... 4 Service Stakeholders... 5 Service Scope... 5 IT

More information

Transforming your Historical Metrics to a Futuristic State

Transforming your Historical Metrics to a Futuristic State Transforming your Historical Metrics to a Futuristic State Forrest W. Breyfogle III CEO, Smarter Solutions, Inc. SmarterSolutions.com +1 512.918.0280 Forrest@SmarterSolutions.com Copyright 1992 2014. All

More information

COURSE LISTING. Courses Listed. with SAP ERP. 3 January 2018 (00:08 GMT) SCM600 - Business Processes in Sales and Distribution

COURSE LISTING. Courses Listed. with SAP ERP. 3 January 2018 (00:08 GMT) SCM600 - Business Processes in Sales and Distribution with SAP ERP COURSE LISTING Courses Listed SCM600 - Business Processes in Sales and Distribution SCM605 - SCM610 - Delivery Processing in SAP ERP SCM615 - Billing in SAP ERP SCM620 - SCM650 - Cross-Functional

More information

Understanding the NAAQS and the Designation Process

Understanding the NAAQS and the Designation Process Understanding the NAAQS and the Designation Process Shawn Seals Senior Environmental Manager Office of Air Quality Indiana Department of Environmental Management (IDEM) September 21, 2016 1 Presentation

More information

To-Be Process Review Workshop

To-Be Process Review Workshop 1 To-Be Process Review Workshop Human Resources Scheduling and Overpayments Location: ROSS Building Room: 130 Time: 1:00 pm - 5:00 pm Date: 8/17/05 2 Welcome! Introductions of Group Representatives from:»

More information

Los Angeles 3 rd Regional

Los Angeles 3 rd Regional Los Angeles 3 rd Regional Investors Conference Los Angeles, California March 31, 2016 Metropolitan Water District of Southern California 1 Metropolitan Water District of of Southern California 2 Metropolitan

More information

PI as a Utility- Scale PV Monitoring Platform

PI as a Utility- Scale PV Monitoring Platform PI as a Utility- Scale PV Monitoring Platform Presented by Steve Hanawalt, President Outline State of the Market Issues and Challenges Potential Solutions Benefits Summary and Q&A 2 Outline State of the

More information

U.S. Farm and Retail Egg Price Relationships to 2005 Changing Share of the Consumer's Egg Dollar

U.S. Farm and Retail Egg Price Relationships to 2005 Changing Share of the Consumer's Egg Dollar 6/9/2006 U.S. Farm/Retail Egg Prices 1 Egg Economics Update # 274 U.S. Farm and Retail Egg Price Relationships - Changing Share of the Consumer's Egg Dollar This review of U.S. farm and retail egg prices

More information

Leading Indicators for Systems Engineering Effectiveness Presentation for NDIA SE Conference October 28, 2009

Leading Indicators for Systems Engineering Effectiveness Presentation for NDIA SE Conference October 28, 2009 Leading Indicators for Systems Engineering Effectiveness Presentation for NDIA SE Conference October 28, 2009 Garry Roedler Lockheed Martin 1 Growing Interest in SE Effectiveness Questions about the effectiveness

More information

Lehman Brothers T Conference San Francisco. Craig DeYoung, Vice President Investor Relations December 9, 2004

Lehman Brothers T Conference San Francisco. Craig DeYoung, Vice President Investor Relations December 9, 2004 Lehman Brothers T4 2004 Conference San Francisco Craig DeYoung, Vice President Investor Relations December 9, 2004 Safe Harbor Safe Harbor Statement under the U.S. Private Securities Litigation Reform

More information

William Calder Asset Maintenance Manager, Kelvin Power, South Africa

William Calder Asset Maintenance Manager, Kelvin Power, South Africa William Calder Asset Maintenance Manager, Kelvin Power, South Africa KELVIN POWER 22-24 November 2010, Johannesburg HISTORY OF KELVIN POWER 1950 S: 1960 S: City of Johannesburg A STATION (11 Boilers &

More information

TERMS OF REFERENCE FOR THE HUMAN RESOURCES AND COMPENSATION COMMITTEE

TERMS OF REFERENCE FOR THE HUMAN RESOURCES AND COMPENSATION COMMITTEE TERMS OF REFERENCE FOR THE I. PURPOSE The purpose of the Human Resources and Compensation Committee (the Committee ) is to assist the Board in fulfilling its obligations relating to human resource and

More information

Financial Intelligence NCIA 2016 National Training Conference Pittsburg April 18 th & 19 th

Financial Intelligence NCIA 2016 National Training Conference Pittsburg April 18 th & 19 th Financial Intelligence NCIA 2016 National Training Conference Pittsburg April 18 th & 19 th What is financial intelligence? Financial Intelligence Overview of Training Topics Process for developing key

More information

Dairy Outlook. September By Jim Dunn Professor of Agricultural Economics, Penn State University. Market Psychology

Dairy Outlook. September By Jim Dunn Professor of Agricultural Economics, Penn State University. Market Psychology Dairy Outlook September 2015 By Jim Dunn Professor of Agricultural Economics, Penn State University Market Psychology The world s financial markets were rattled last month by a pair of Chinese currency

More information

5 Star London Hotels - Example Report

5 Star London Hotels - Example Report 5 Star London Hotels - Example Report January 2018 CONTENTS Your Benchmark Report Website Traffic Conversion Rates Ecommerce Performance AdWords Spend Your Traffic Index Your Conversion Rate Index Your

More information

Certification Areas Grade Levels Test Titles Fees Early Childhood Education & Elementary Education

Certification Areas Grade Levels Test Titles Fees Early Childhood Education & Elementary Education Missouri Educator Gateway Assessments Missouri Content Assessments Individual Certification Areas, Test Titles, and Costs for 2015-2016 (Including Highly Qualified Teacher (HQT) Requirements) Certification

More information

Nova Scotia Power Inc. Fleet Asset Management

Nova Scotia Power Inc. Fleet Asset Management Nova Scotia Power Inc. Fleet Asset Management NL Nova Scotia Power: Generation NSPI Challenges Aging Fleet Growing Knowledge Gap Planned End of Life Changing Generation Profile and Utilization Stakeholder

More information

Marysville School District Resource Conservation Program. John Bingham Marysville S.D. Ray Burton Snohomish Co. P.U.D.

Marysville School District Resource Conservation Program. John Bingham Marysville S.D. Ray Burton Snohomish Co. P.U.D. Marysville School District Resource Conservation Program John Bingham Marysville S.D. Ray Burton Snohomish Co. P.U.D. Tools Resource Conservation Program Utility budget Utility tracking Benchmarking Load

More information

Predictive Safety s Fatigue Management System: Benefits Realization Report

Predictive Safety s Fatigue Management System: Benefits Realization Report Predictive Safety s Fatigue Management System: Benefits Realization Report 1. Scope This document contains the benefits realization information as required for a follow up on FMS Implementation project.

More information

Organics Collection Program and Yard Material Pile Collection Update

Organics Collection Program and Yard Material Pile Collection Update STAFF REPORT DATE: August 29, 2017 TO: FROM: SUBJECT: City Council Robert A. Clarke, Public Works Director Stan Gryczko, Assistant Public Works Director Richard Tsai, Environmental Resources Manager Organics

More information

! "#$$%& MY BLOG 2014

! #$$%& MY BLOG 2014 !"#%& 2014 =/*55&- 789:/4; RESOLUNTIONS!"# 20(5< SMART GOAL: GOAL: GOAL: GOAL: Often people set resolutions and don t look at them again after the month of January. One way to make sure that you are actively

More information

Operations Management

Operations Management 17-1 Project Management Operations Management William J. Stevenson 8 th edition 17-2 Project Management CHAPTER 17 Project Management McGraw-Hill/Irwin Operations Management, Eighth Edition, by William

More information

FY17-FY18 Audit Plan. Office of Internal Auditing

FY17-FY18 Audit Plan. Office of Internal Auditing FY17-FY18 Audit Plan Office of Internal Auditing -Page Intentionally Blank- TABLE OF CONTENTS Executive Summary... 4 Audit Plan Details... 6 Budgeted Hours... 7 Risk Assessment... 8 Allocation of Resources...

More information

Commission Workshop Building Success

Commission Workshop Building Success May 21, 2013 Commission Workshop Building Success www.broward.org/erp 2013 PKING Consulting, Inc. PACERS CM&T & Broward County 1 ERP Defined Enterprise Resource Planning (ERP) is a set of business systems

More information

A Case Study of Strategic Metrics Use in a CMM- Based Outsourcing Environment

A Case Study of Strategic Metrics Use in a CMM- Based Outsourcing Environment Association for Information Systems AIS Electronic Library (AISeL) AMCIS 2000 Proceedings Americas Conference on Information Systems (AMCIS) 2000 A Case Study of Strategic Metrics Use in a CMM- Based Outsourcing

More information

COMPANY PROFILE 2016

COMPANY PROFILE 2016 COMPANY PROFILE 2016 takasolutions upgrades buildings to reduce the energy, water and costs at no expense to the owner while sharing the savings. TARGET CLIENTS THE CONCEPT Clients and buildings that are

More information

STRATEGIC PLANNING 2016 NACSA LEADERSHIP CONFERENCE OCTOBER 26, 2016 PRESENTERS

STRATEGIC PLANNING 2016 NACSA LEADERSHIP CONFERENCE OCTOBER 26, 2016 PRESENTERS STRATEGIC PLANNING 2016 NACSA LEADERSHIP CONFERENCE OCTOBER 26, 2016 PRESENTERS MARY BRADLEY Executive Director, Chicago Public Schools Office of Innovation and Incubation MBradley15@cps.edu CINDY SCHUMACHER

More information

National Capital Region Congestion Report

National Capital Region Congestion Report NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD National Capital Region Congestion Report 2nd Quarter 2014 Metropolitan Washington Council of Governments 777 North Capitol Street, N.E., Suite 300,

More information

Dairy Outlook. January By Jim Dunn Professor of Agricultural Economics, Penn State University. Market Psychology

Dairy Outlook. January By Jim Dunn Professor of Agricultural Economics, Penn State University. Market Psychology Dairy Outlook January 2015 By Jim Dunn Professor of Agricultural Economics, Penn State University Market Psychology Dairy prices have fallen in the past month, especially butter prices. The dollar is still

More information

% Change. Total. Total Retail Sales Index* Estimate ($M)

% Change. Total. Total Retail Sales Index* Estimate ($M) Index % Change RETAIL SALES INDEX RETAIL SALES ROSE 2.6 PER CENT The total retail sales index was 2.6 per cent higher than the level reached in January. Building material stores recorded the largest growth

More information

The Power of Visibility: Driving a Lean-Agile Transition. Kelley Horton Director, Corporate IT Program Management Office

The Power of Visibility: Driving a Lean-Agile Transition. Kelley Horton Director, Corporate IT Program Management Office The Power of Visibility: Driving a Lean-Agile Transition Kelley Horton Director, Corporate IT Program Management Office The Power of Visibility - Agenda About Premier, Inc. Why we transitioned to Lean-Agile

More information

Carpenter (Journeyman) (Existing position)

Carpenter (Journeyman) (Existing position) Edmonton Catholic Schools is now accepting applications for the position of (Journeyman) (Existing position) Edmonton Catholic Schools is a large urban school District whose mission is to provide a Catholic

More information

Dave Honkanen Sr. Director, EPO Prime Therapeutics. The EPMO: Strategy to Execution

Dave Honkanen Sr. Director, EPO Prime Therapeutics. The EPMO: Strategy to Execution Dave Honkanen Sr. Director, EPO Prime Therapeutics The EPMO: Strategy to Execution September 30, 2010 Speaker Background Intro 2 Honkanen Consulting, Inc. Intro Prime Therapeutics is a thought leader in

More information

The Non Market Value of Water in Oklahoma

The Non Market Value of Water in Oklahoma The Non Market Value of Water in Oklahoma Tracy Boyer, Assistant Professor Department of Agricultural Economics Presentation to NRCS October 20, 2009 Research Funded by a combination of funding sources

More information

Impacted Systems Kick-off. Joyce Lush Dick Bascom January 28 and February 2, 2016

Impacted Systems Kick-off. Joyce Lush Dick Bascom January 28 and February 2, 2016 Impacted Systems Kick-off Joyce Lush Dick Bascom January 28 and February 2, 2016 Objectives Introduce the Impacted Systems initiative Raise awareness of the work to be done yours and the Workday Program

More information

North Carolina Innovative School District

North Carolina Innovative School District North Carolina Innovative School District NORTH CAROLINA INNOVATIVE SCHOOL DISTRICT Partnering with local communities to create innovative conditions for accelerating student achievement Partnering with

More information

Third Party Fiduciary Agent. Guam Department of Education. In partial fulfillment of Contract: Monthly Project Status Report.

Third Party Fiduciary Agent. Guam Department of Education. In partial fulfillment of Contract: Monthly Project Status Report. Third Party Fiduciary Agent Guam Department of Education In partial fulfillment of Contract: 011-2010 Monthly Project Status Report Report 35 August 15, 2013 1 This Page Blank 2 Overview of Accomplishments

More information

Sanitation Services Bulk and Brush Program - Update. Quality of Life & Environment Committee November 14, 2016

Sanitation Services Bulk and Brush Program - Update. Quality of Life & Environment Committee November 14, 2016 Sanitation Services Bulk and Brush Program - Update Quality of Life & Environment Committee November 14, 2016 Briefing Overview Provide a recap of the current collection program Provide information related

More information

Call Center Best Practices

Call Center Best Practices Call Center Best Practices The Road to World Class Performance! MetricNet Best Practices Series 27 Years of Call Center Benchmarking Data Global Database More than 3,700 Call Center Benchmarks 30 Key Performance

More information

HIT and Services Strategic Alignment

HIT and Services Strategic Alignment HIT and Services Strategic Alignment April 14, 2015 Mr. David M. Bowen, Director Health Information Technology (HIT), Defense Health Agency CAPT Margaret S. Beaubien, Deputy Director HIT Col Eric D. Huweart,

More information

NHS Highland Internal Audit Report Managing Sickness Absence August 2011

NHS Highland Internal Audit Report Managing Sickness Absence August 2011 Internal Audit Report Managing Sickness Absence August 2011 Internal Audit Report Managing Sickness Absence August 2011 1 Executive Summary...1 2 Background...2 3 Scope...2 4 Summary of Findings...2 5

More information

Presentation for the Local Government Commission and the Community Environmental Council. July 13, 2007

Presentation for the Local Government Commission and the Community Environmental Council. July 13, 2007 Community Choice Aggregation Presentation for the Local Government Commission and the Community Environmental Council July 13, 2007 1 Community Choice Aggregation (CCA) CCA Legislation (AB117) allows cities

More information

Heat and the Smart Energy System

Heat and the Smart Energy System Heat and the Smart Energy System Jeff Douglas Energy Technologies Institute Heat and the Smart Energy System 1. Why is Heat Important? 2. Meeting National Emissions Targets 3. Developing Power Networks

More information

COURSE LISTING. Courses Listed. 4 February 2018 (12:50 GMT) SAPSCM - SAP SCM. SCM200 - Business Processes in Planning (SCM)

COURSE LISTING. Courses Listed. 4 February 2018 (12:50 GMT) SAPSCM - SAP SCM. SCM200 - Business Processes in Planning (SCM) with, SAP SCM Courses Listed SAPSCM - SAP SCM SCM200 - Business Processes in Planning (SCM) SCM210 - SCM Core Interface APO SCM220 - Demand Planning (APO DP) SCM212 - Core Interface and Supply Chain Integration

More information

AEP Utilities Presentation to Edison Electric Institute

AEP Utilities Presentation to Edison Electric Institute AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities Human Performance Improvement October 4, 2009 Background - Why HPI in AEP Utilities? In 2008, AEP Utilities was top quartile

More information

POSITION CLASSIFICATION QUESTIONNAIRE

POSITION CLASSIFICATION QUESTIONNAIRE POSITION CLASSIFICATION QUESTIONNAIRE Date: Nature of request Re-evaluation (no significant change in duties) Reclassification (significant change in duties) New Position Other (please specify) Position

More information

The Basics of ITIL Help Desk for SMB s

The Basics of ITIL Help Desk for SMB s The Basics of ITIL Help Desk for SMB s This three-step process will provide you the information necessary to understand ITIL, help you write your strategic IT plan and develop the implementation plan for

More information

A Time Series Approach to Instream Flow Mitigation Forecasting. Presented by Alan Keizur

A Time Series Approach to Instream Flow Mitigation Forecasting. Presented by Alan Keizur A Time Series Approach to Instream Flow Mitigation Forecasting Presented by Alan Keizur Agenda Brief background on project Brief overview of model Some results and application GoldSim highlights Introduction

More information

Energy Future Holdings (EFH)

Energy Future Holdings (EFH) Energy Future Holdings (EFH) Inclusion of Data Analytics into the Internal Audit Lifecycle June 3, 2015 Starting Place Baseline Questions Pertaining to the utilization of data analytics in the internal