Balancing Registration Data User Guide

Size: px
Start display at page:

Download "Balancing Registration Data User Guide"

Transcription

1 Balancing Registration Data User Guide 29 th March 2017 Version 1.2 EirGrid Commercial In Confidence.

2 Revision History Summary of Changes Version Revised By Initial Publication 1.0 I-SEM Project Updates to provide clarification on data requirements Change in Data Confirmation requirements Updated Section 6.2 Appendix B: 1.1 I-SEM Project 1.2 I-SEM Project EirGrid Commercial In Confidence. Page 2

3 Table of Contents 1. Glossary of Terms Introduction Purpose Background Timelines Checklist for Submission Overview of Balancing Registration Data Spreadsheet Spreadsheet Structure Validation of the Balancing Registration Data Considerations when completing the Balancing Registration Data Spreadsheet Summary Party Information Address Information Participant Information Address Information Entity Model Changes Implications of I-SEM Entity Model Naming Conventions Mapping of Accounts to Participants Generator Unit Interconnector Units Assetless Units Wind Unit Demand Side Unit Supplier Unit Trading Site Trading Site Supply Units Associated Supplier Units Generator Technical Offer Data Demand Technical Offer Data EirGrid Commercial In Confidence. Page 3

4 4. Relationship between Balancing and Capacity Registration Data to be Submitted Later Changes to Balancing Registration Data Appendices Appendix A: Trading Site Supply Units Benefits of TSSUs in the SEM, but not in the I-SEM Mandated Trading Site Configurations Appendix B: B91 Balancing Data Confirmation Form Appendix C: Glossary of Terms for Balancing Registration Data Spreadsheet27 Tables Table 1 Worksheets in BRD Spreadsheet... 8 Table 2 Naming Conventions Table 3 Glossary of Balancing Registration Data Terms Table 4 Glossary of Technical Offer Data Terms Figures and Tables Figure 1: Old SEM Entity Model Figure 2: New I-SEM Entity Model Figure 3: Trading Site Configuration Single Generator Figure 4: Trading Site Configuration Multiple Generators (Option 1) Figure 5: Trading Site Configuration Multiple Generators (Option 2) Figure 6: Trading Site Configuration Demand Side Units Figure 7: Trading Site Configuration Aggregated Generation Units Figure 8: Trading Site Configuration Autoproducers EirGrid Commercial In Confidence. Page 4

5 1. Glossary of Terms Acronym/Abbreviation Definition ASU CM CMC BRD DAM DSU FAQ IDM I-SEM MDP MO NEMO RAs SEMO SONI SU TOD TSC TSO TSSU Associated Supplier Unit Capacity Market Capacity Market Code Balancing Registration Data Day Ahead Market Demand Side Unit Firm Access Quantity Intraday Market Integrated Single Electricity Market Meter Data Provider Market Operator Nominated Electricity Market Operator Regulatory Authorities Single Electricity Market Operator System Operator Northern Ireland Supplier Unit Technical Offer Data Trading and Settlement Code Transmission System Operator Trading Side Supplier Unit EirGrid Commercial In Confidence. Page 5

6 2. Introduction 2.1 Purpose This document is designed as a reference for participants when completing the validation and update of Balancing Registration Data (BRD) required for the I-SEM Balancing Market. 2.2 Background The transition from SEM to I-SEM involves ensuring the registration of parties and units for a number of different markets each of which are subject to different governance arrangements. The I-SEM markets being: Forwards (within zone), Financial Transmission Rights, Day Ahead Auctions, Intraday Auctions and Continuous, Balancing and Capacity. In addition the I-SEM includes an Agent of Last Resort Service. The transition from SEM to the I-SEM is not simply a matter of transferring data from the old to new systems. It also involves participants considering how they wish to set themselves up in the I-SEM under a new entity model, providing new registration data and supporting information, as well as potentially amending their existing registration data The first step in the registration process for the I-SEM arrangements involves the registration of Parties, Participants and Units for the Balancing Market. The registration for the Balancing Market needs to occur first as the setup for this market is key to the setup of the other I-SEM markets and services. The I-SEM registration team have issued a set of Balancing Market Registration Data to each Party in the existing SEM. This information has been mapped from the existing SEM entity setups to the new I-SEM entity setups and requires review by participants. Later steps in the Balancing Market registration process will focus on providing supporting information and authorised signatures for agreements. Full details on the Transitional Registration Plan for all markets can be found on the I-SEM website under the registration section here Timelines Parties have until the 31 st January 2017 to validate, amend and return the data spreadsheet to the I-SEM registration team via . The submission will be subject 1 EirGrid Commercial In Confidence. Page 6

7 to the terms of the SEM Trading and Settlement Code, as amended from time to time. The submission must be accompanied by a scanned copy of the form B91 Balancing Data Confirmation provided in Appendix B. This allows the months of November-January for parties to obtain the additional data required and discuss any of their core entity setup requirements (i.e. Party, Participant, Units) with the I-SEM Registration Team and Regulators (if necessary). This approach also means that the bulk of the data required for registration is validated and approved as early as possible. A webinar will be held on the 29 th November to go through the Balancing Registration Data spreadsheet and answer any questions parties may have about the validation process. Should you have any questions the I-SEM registration team can be contacted via I-SEMregistration@sem-o.com or by phone through Claire Breslin on Checklist for Submission The following provides the checklist of documents to be provided to I- SEMregistration@sem-o.com by 31 st January Completed Balancing Registration Data Spreadsheet (updated) Scanned copy of B91 Balancing Data Confirmation Form EirGrid Commercial In Confidence. Page 7

8 3. Overview of Balancing Registration Data Spreadsheet 3.1 Spreadsheet Structure The Balancing Registration Data spreadsheet has been provided to each Party for validation and update. Each spreadsheet contains Balancing Registration Data for all Units and Participants under a Party. Where possible data from the SEM has been mapped to the I-SEM. However, there is a need to validate the existing data or include additional data needed for the I-SEM. The following is the structure of the spreadsheet. There are a number of worksheets in the spreadsheet each containing information for the different entities needed to correctly represent the Party and its Units in the I-SEM. The worksheets are outlined in Table 1 below. Table 1 Worksheets in BRD Spreadsheet Tab Name Summary Party Information Participant Information Generator Unit Wind Unit Demand Side Unit Supplier Unit Trading Site Generator Technical Offer Data Demand Technical Offer Data Description Overview of the proposed I-SEM entity model setup, showing also how this relates to the existing SEM setup for the Party Party information Participant level information for all participants under the Party Information on generator units of the party (if required) Information on wind units of the Party (if required) Information on demand side units of the Party (if required) Information on supplier units of the Party (if required) Information on the trading site configurations (if required) Technical offer data for each generator unit (if required) Technical offer data for each demand side unit (if required) EirGrid Commercial In Confidence. Page 8

9 3.2 Validation of the Balancing Registration Data The Balancing Registration Data is only a first attempt at mapping the SEM entity setup to that I-SEM entity setup. The I-SEM registration team are not suggesting this is the final setup that the Party must use. Parties need to consider the setup they wish to have for the I-SEM and ensure it is represented in the Balancing Registration Data they submit. The glossary in Appendix C provides descriptions and valid values for each field in the spreadsheet. Please refer to this glossary when completing the validation and update exercise. Some of the data required is only relevant to certain types of units. Details of the relevance of data are also provided in the glossary in Appendix C. The I-SEM registration team are more than happy to provide guidance on the completion of the Balancing Market registration. Each piece of data has three columns associated with it. 1. The Attribute which is the label for the data required and can be used to reference the data in the glossary. 2. The Include in Submission column, which defines what is needed to be done by the Party in completing the validation. a) Confirm implies the value needs to be confirmed by the Party. There may already be a value mapped across from the SEM for this, but this must be validated again by the Party. Where no value is provided then the Party should provide the required information. b) Provide implies the value has not been mapped from the SEM, either because it is not available or may not be up-to-date in the SEM. The Party should provide the required information. 3. The System Name defines the corresponding system name of the attribute as used in the Central Market Systems, and is included for informational purposes only. Where a Party wishes to amend or provide a new value for any data element, it is requested that the cell fill colour is changed to red. This is to help confirm changes provided are legitimate and not made in error. It will also help with the efficient processing of amendments by the I-SEM registration team. EirGrid Commercial In Confidence. Page 9

10 3.3 Considerations when completing the Balancing Registration Data Spreadsheet This section provides further information which parties should consider in the process of completing the Balancing Registration Data validation. The information is organised based on the structure of the spreadsheet worksheets. 3.4 Summary The information contained in the Summary tab allows a quick comparison of the differences in the entity setup between the I-SEM and SEM arrangements. As outlined in the Participant Information section below, there are changes to the entity model with the I-SEM. This includes the removal of accounts from the entity structure. 3.5 Party Information The Party information worksheet looks to reconfirm the details relating to the Party. Standard information including address information is included. Information on ACER codes, EIC codes and VAT registration details is also requested. Under the TSC a Party means any person who is a party to the Framework Agreement and is thereby bound by the Code, and shall include its successors and permitted assigns. Refer to the glossary in Appendix C for descriptions of each data field and valid values Address Information Address information for the Party has been left blank in the Balancing Registration Data. We would ask all Parties to provide this information as new for I-SEM. In certain instances the company registered addresses may have changed, or the mailing address for the Party may now be different. Therefore we would request you to provide the latest information. The company address should be the registered company address of the Party. The mailing address should be the address for correspondence with the Party. 3.6 Participant Information The Participant Information worksheet looks to reconfirm the details relating to the Participants the Party has. A Party must have a Participant created for each jurisdiction (ROI or NI) that it has Units registered in. A Party may only register one Participant in each jurisdiction, unless provision for the registration of additional Participants has been expressly approved by the relevant Regulatory Authority. The TSC defines a Participant as: a Party or business division of a Party which at the relevant time has been designated as, or deemed to be, the Participant in relation to any Units which have been registered in accordance with the Code. A reference to a Participant EirGrid Commercial In Confidence. Page 10

11 shall be construed as a reference to the relevant Party in its capacity as the person registered in respect of the relevant Units. Any obligation expressed to be on a Party shall, where appropriate, be construed as an obligation on that Party in respect of each of its Participants Please refer to the glossary in Appendix C for descriptions of each data field and valid values Address Information Address information for the Participant has been left blank in the Balancing Registration Data. We would ask all Parties to provide this information as new for I- SEM. In certain instances the company registered addresses may have changed, or the billing address for the Participant may now be different. Therefore we would request you to provide the latest information. The Participant Address should be the registered company address of the Party or the business unit of the Party. The Billing Address should be the address for invoicing of the Participant Entity Model Changes The entity model for the I-SEM is different to that for the SEM. The key difference is that accounts are no longer relevant in the I-SEM. Instead all Units are linked directly to the Participant. EirGrid Commercial In Confidence. Page 11

12 Figure 1: Old SEM Entity Model Figure 2: New I-SEM Entity Model Implications of I-SEM Entity Model The implications of the new I-SEM entity model are: The existing provision that a Party may have only one Participant per jurisdiction is maintained. RA approval is required to have more than one per jurisdiction. Participant is the level at which credit cover is calculated and must be posted (unless an SRA is in place where the Participant is acting as a Secondary Participant to the SRA). For further information on SRAs, see the TSC and related Agreed Procedure. Parties receive one Settlement Document for payments and charges related to all Units that are under the same Participant. Where payments are due to Participants, a single bank account is specified per Participant for making the payment into. EirGrid Commercial In Confidence. Page 12

13 3.6.4 Naming Conventions The naming standard to be used for the I-SEM is similar to that used for the SEM. Table 2 Naming Conventions Role Party Participant Trading Site Supplier Unit (also for Trading Site Supplier Units and Associated Supplier Units) Generator Unit Demand Side Unit Assetless Unit Trading Unit Naming Convention PY_nnnnnn PT_nnnnnn TS_nnnnnn SU_nnnnnn GU_nnnnnn DSU_nnnnnn AU_nnnnnn TU_nnnnnn Mapping of Accounts to Participants The PT naming standard is to be retained for the I-SEM. However, given the accounts are no longer relevant the PT naming standard will now apply correctly to the Participant. Note: the change in naming for the Participant in Figure 2 above. In mapping the existing SEM entities to the new I-SEM entities the lowest numbered PT number was of the accounts used for the naming of the Participant. e.g. Participant (CP_400005) with Accounts (PT_ and PT_400002) has become Participant (PT_400001) in I-SEM. 3.7 Generator Unit The Generator Unit worksheet contains data pertaining to any Generator Units registered to the Party. This information, where applicable, has been taken directly from the existing approved SEM records. This Generator Unit worksheet contains information relating to standard Generator Units only, any other types of Unit are covered under separate worksheets (e.g. Wind, Demand Side, and Supplier). Refer to the glossary in Appendix C for descriptions of each data field and valid values. EirGrid Commercial In Confidence. Page 13

14 3.7.1 Interconnector Units With the changes in the market arrangements for I-SEM, the registration of Interconnector Units who bid into the market for volumes to be traded on the interconnector is no longer relevant. Therefore, details on these Interconnector Units have not been mapped from the SEM to I-SEM, and will not appear in the Balancing Registration Data. Participants who have historically only had Interconnector Units will need to determine if they wish to remain active in the I-SEM and in what capacity. The I-SEM registration team are happy to discuss this situation with existing Parties who have registered Interconnector Units Assetless Units Assetless Units are a new form of unit related to the I-SEM market. They represent a Participant s activities in the Balancing Market which is not related to a physical Generator, an item of Dispatchable plant, or a Supplier Unit. They trade in the exante markets (Day Ahead and Intraday) with the subsequent settlement of any imbalances in the Balancing Market. Assetless Units are not an existing type of unit in the SEM. Therefore there has been no mapping of Assetless Units included in the Balancing Registration Data. Parties who may be interested in setting up an Assetless Trading Unit for the purposes of trading in the I-SEM should contact the I-SEM registration team before the 10 th January 2017 to discuss their requirements. 3.8 Wind Unit The Wind Unit worksheet contains data pertaining to any wind power Generator Units registered to the Party. This information, where applicable, has been taken directly from the existing approved SEM records. This Wind Unit worksheet contains information relating to Wind Units only; any other types of units are covered under separate worksheets (e.g. Generator, Demand Side, and Supplier). Refer to the glossary in Appendix C for descriptions of each data field and valid values. 3.9 Demand Side Unit The Demand Side Unit worksheet contains data pertaining to any Demand Side Units registered to the Party. This information, where applicable, has been taken directly from the existing approved SEM records. This Demand Side Unit worksheet contains information relating to Demand Side Units only; any other types of units are covered under separate worksheets (e.g. Generator, Wind, and Supplier). As Participants registering Demand Side Units are required to register a Trading Site Supplier Unit they must also ensure the relevant Supplier Unit and Trading Site worksheets are also completed. EirGrid Commercial In Confidence. Page 14

15 Refer to the glossary in Appendix C for descriptions of each data field and valid values Supplier Unit The Supplier Unit worksheet contains data pertaining to any Supplier Units registered to the Party. This information, where applicable, has been taken directly from the existing approved SEM records. If another Party records the Trading Site demand for your Generator Unit (i.e.. an Associated Supplier Unit), then this worksheet is not relevant. This Supplier Unit worksheet contains information relating to Supplier Units only; any other types of units are covered under separate worksheets (e.g. Generator, Wind, and Demand Side). Refer to the glossary in Appendix C for descriptions of each data field and valid values Trading Site The entity setup for the Balancing Market requires that Generator Units and Demand Side Units (excluding Pump Storage Units, Battery Storage Units and Assetless Units) setup a Trading Site. A Trading Site is defined in the TSC as one or more Generator Units and at most one Trading Site Supplier Unit of which, with the exception of Trading Sites that contain Generator Units that are Aggregated Generator Units or Demand Side Units, all Generator Units are covered by a single Connection Agreement, or in the event that no Connection Agreement exists, all such Units are located on a Contiguous The TSC mandates that certain types of units have certain Trading Site setups. The most common Trading Site setups are provided in Appendix A and relate to individual Generator Units, multiple Generator Units on the one Trading Site, Demand Side Units, Aggregated Generator Units and Autoproducers. In the Trading Site worksheet, the Maximum Export Capacity value should equal to the Maximum Export Capacity of all the Generator Units registered under that Trading Site Trading Site Supply Units A Trading Site Supply Unit (TSSU) is defined in the TSC as: a Supplier Unit that contains only the Demand within a Trading Site, and is settled on a net basis against the Generator Units on that Trading Site under the rules specified in the Code. In the SEM the use of TSSU was common as it had certain advantages. These advantages are outlined in Appendix A. However, under the I-SEM these advantages no longer apply and the use of TSSUs is really only necessary for Autoproducers where the import can be significant when on-site Generator Units are not operating EirGrid Commercial In Confidence. Page 15

16 In the Balancing Registration Data provided these TSSUs have been maintained in the entity setup. Participants are requested to consider whether they still wish to maintain the TSSUs for their entity setup, or whether they wish to change to an Associated Supply Unit. Should a Participant with a Trading Site Supplier Unit, wise to change to an Associated Supplier Unit then you are required to contact the relevant retail market operator as there may be additional retail registration requirements that must be completed to facilitate this change in Supplier Unit type. The alternative to having a TSSU on a Trading Site is to have an Associated Supply Unit assigned to the Trading Site Associated Supplier Units An Associated Supplier Unit is a Supplier Unit which is recorded to a Trading Site but may also contain demand outside that Trading Site and has its demand settled on a gross basis with the Generator Unit(s) on that Trading Site. Whereas a Trading Site Supplier Unit can only record demand for a single Trading Site, an Associated Supplier Unit can record other demand also. An Associated Supplier Unit may be registered to record the demand associated with a Participant s market registered Generator Units, or may be a Supplier Unit associated with another Participant with whom they have a supply agreement. For existing Generator Units operating under a Trading Site, the Party is required to confirm if the existing recorded Supplier Unit still records the demand on that Trading Site. If not, then please specify the correct Supplier Unit ID in the spreadsheet, using the appropriate change markings Generator Technical Offer Data The Generator Technical Offer data worksheet contains the current approved SEM technical offer data for each Generator Unit. This information should not be changed and is included for informational purposes only. If this information is incorrect and needs amended, then it should go through the existing SEM process for updating Generator Technical Offer Data. The exception to this is a pump parameters element which includes new TOD and should be provided if know by pump storage units. The intention is that closer to the market trail a new version of the approved TOD data for each Generator will be taken from the existing SEM systems and used as the basis for market trial and go-live. Note: This information is not required to be completed for Wind Units. Default values of zero will be submitted by the Market Operator. EirGrid Commercial In Confidence. Page 16

17 3.13 Demand Technical Offer Data The Demand Technical Offer data worksheet contains the current approved SEM technical offer data for each Demand Side Unit. This information should not be changed and is included for informational purposes only. If this information is not correct and needs amended, then it should go through the existing SEM process for updating Demand Technical Offer Data. The intention is that closer to the market trail a new version of the approved TOD data for each Demand Side Unit will be taken from the existing SEM systems and used as the basis for market trial and go-live. EirGrid Commercial In Confidence. Page 17

18 4. Relationship between Balancing and Capacity There are strong links between the Party, Participant and Unit setup in the I-SEM Balancing and Capacity Market. Under TSC and Capacity Market Code (CMC) rules the Party, Participant and Units defined must be the same in both markets. Hence, the need to define Balancing Market entity setup early on as it has implications on the Capacity Market which will go-live for auctions before the main I-SEM Go-Live. As the Party, Participants and Units are the same for Balancing and Capacity Markets this means that: the Settlement Documents produced are designed to incorporate both balancing and capacity settlement the bank account used for payments to Participants is the same for both balancing and capacity payments collateral requirements for the Capacity Market are combined with the Balancing Market EirGrid Commercial In Confidence. Page 18

19 5. Registration Data to be Submitted Later There is other registration data that is not being collected as part of this Balancing Registration Data validation exercise. This information is not needed for the initial validation of the I-SEM and may only be determined at a later date - so has not been asked for here. Examples include: Commercial Offer Data This will be submitted by parties on behalf of their Generator Units and Demand Side Units directly into the market trial system Settlement Reallocation Agreements these agreements will be confirmed at a later date through the signing of formal legal documentation User Setup this will be requested as part of the submission of the balancing supporting information which is due to occur by the middle of March 2017 Other supporting documentation and information may also be required. Forms will be published in mid-january 2017 to define what this supporting information is. Examples could include: TSC Framework Agreement - signed Schedule of Signatories allowing delegation of authorised signatories Party Administrative User Authorisation nomination of a user who has authorisation to create and amend user access for the Party to the market systems. Form of Authority for TSC, if not able to grandfather the arrangements. User Access Setup of users needing access to the I-SEM systems. Remit Form authorisations to submit information to REMIT on behalf of Parties. Banking Information Confirmation and authorisation of required banking information to be used for administering payments. Collateral Information Setting up required collateral arrangements for the provision of credit cover. 5.1 Changes to Balancing Registration Data If changes are needed to the Balancing Registration Data after the submission deadline of the 31 st January 2017, then the method of amendment will be dependent on the type of data and whether the changing is also being effected in the current SEM registration. The methods are: 1. Technical Offer Data - If the change relates to Technical Offer Data then closer to the market trial a new version of the approved TOD data for each Generator or Demand Side Unit will be taken from the existing SEM systems and used as the basis for market trial and go-live. 2. Registration data needing update for existing SEM as well - If changes are being effected in the existing SEM registration, then as part of the EirGrid Commercial In Confidence. Page 19

20 amendment process there will be an additional step included to ensure the I- SEM registration data is reviewed and updated as appropriate. 3. Registration data needing update for I-SEM only - If the change is not impacting on the existing SEM registration then Parties will need to inform the I-SEM registration team using the enduring I-SEM agreed procedures of the update required. EirGrid Commercial In Confidence. Page 20

21 6. Appendices 6.1 Appendix A: Trading Site Supply Units Benefits of TSSUs in the SEM, but not in the I-SEM In the SEM some Participants have configured their Trading Sites to use Trading Site Supply Units (TSSUs). This has historically been an advantage in the SEM expost market as when a site is importing (on the TSSU), the market availability for the generators is set by taking account of the site import. This is on the basis that the generators on the site can deliver the import requirement before the site begins to export. Rules for calculation of actual availability take account of the site import and can allocate this as an available quantity for the ex-post market. Where this availability is below the minimum availability of the unit, the MSP resets the availability for the ex-post scheduling to the minimum availability. Thus, a unit which is serving a small house load quantity of 0.5MW can have an availability set to the unit s min availability which is likely to be a higher figure. This situation is less relevant for the I-SEM, given that access to the market in the I- SEM will be through the ex-ante market. Therefore the link between the Firm Access Quantity (FAQ) of the site, the ex-post demand on the site and what is available to the market no longer exists. Participants will have to determine how much they wish to offer to the ex-ante market; the TSOs will schedule the unit on the basis of system conditions and the ex-post settlement will apply relevant prices to firm and non-firm quantities for units as appropriate. The ex-post settlement calculation does still account for on-site demand in determination of the level to which each a generator is firm and this can therefore have an impact on the price against which TSO actions are settled; however, the overall impact may be less than in the SEM where a generator stands to get a significantly higher access to the ex-post market. As an example, in the SEM a small house load of 0.5MW can result in payments on the basis of min-availability of say 20MW, whereas in the I-SEM a small house load of 0.5MW will result in differences in payments on the basis of 0.5MW. In addition, in having a TSSU in place the participant will incur credit cover requirements and need to pay market operator charges for minimal benefit Mandated Trading Site Configurations The following provides the Trading Site configurations that must be maintained under the TSC for different unit types and Trading Site arrangements Single Generator Units All Generator Units and Demand Site Units, with the exception of Pump Storage Units, Battery Storage Units and Assetless Units, must have a Trading Site setup. In the examples below PT refers to the related Participant. Where there is only one unit on the Trading Site the setup would be simply: EirGrid Commercial In Confidence. Page 21

22 Figure 3: Trading Site Configuration Single Generator Multiple Generator Units on the same Trading Site (Option 1) For multiple generation units on the same Trading Site there are two options for Trading Site setup. Option 1 below uses an Associated Supplier Unit. In this case the Associated Supplier Unit is based on a supply contract taken up with another Participant. However, the same setup could be achieved with the Supplier Unit belonging to Participant 1 (PT1) as well. Figure 4: Trading Site Configuration Multiple Generators (Option 1) Please refer to section Benefits of TSSUs in the SEM, but not in the I-SEM for further information in deciding which option is most appropriate Multiple Generator Units on the same Trading Site (Option 2) For multiple Generator Units on the same Trading Site the second option is to use a Trading Site Supply Unit rather than an Associated Supplier Unit Figure 5: Trading Site Configuration Multiple Generators (Option 2) EirGrid Commercial In Confidence. Page 22

23 Demand Side Units TSC rules require that Demand Side Units must have a Trading Site Supply Unit included in the Trading Site configuration. The setup of Demand Side Units is provided below. Figure 6: Trading Site Configuration Demand Side Units Aggregated Generation Units TSC rules require that Aggregated Generation Units must have an Associated Supplier Unit included in the Trading Site configuration. The setup of an Aggregated Generation Unit is provided below. Figure 7: Trading Site Configuration Aggregated Generation Units Autoproducers Autoproducers are large industrial sites with high demand requirements, but also have significant generation capabilities. At certain times their onsite demand will be less than their generation and hence they will be able to generate power that can be supplied to the I-SEM. Under the TSC, Autoproducers may register a Trading Unit (TU) as part of their Trading Site configuration to facilitate participation in the day-ahead and intraday markets as a single Unit for all Generator Units. EirGrid Commercial In Confidence. Page 23

24 Figure 8: Trading Site Configuration Autoproducers EirGrid Commercial In Confidence. Page 24

25 6.2 Appendix B: B91 Balancing Data Confirmation Form This form must be completed, signed, scanned, and ed to I- with the corresponding Balancing Registration Data for the Party. An individual form must be returned for each separate Party. B91 Balancing Data Confirmation This form is part of the application requirements for registering a Unit in the Balancing Market as part of the Transitional Registration from the SEM to I-SEM arrangements. Full details of the application requirements are provided in document B90 Balancing Transitional Registration Guide available from the SEMO website. Please refer to the Glossary of Terms available from the SEMO website for more detailed descriptions of each item. It is recommended to complete the form electronically before signing, scanning and sending to SEMO. This will avoid delays in processing your application due to illegible text. PLEASE COMPLETE THIS FORM IN BLOCK CAPITALS. 1. Applicant Details Please provide details of the person who should be contacted regarding this confirmation. Name Address Contact Phone Number 2. Party Details Please provide details of the Party the data confirmation relates to. Party Name Party ID 3. Balancing Unit Data Details Please specify the file name of the B93 Balancing - Transitional Registration Data that this data confirmation relates to: Filename EirGrid Commercial In Confidence. Page 25

26 4. Declarations and Signature 6 (a) Declarations I confirm the Balancing Registration Data spreadsheet has been completed and submitted with the data confirmation. I confirm that the information I have submitted in the Balancing Registration Data spreadsheet is complete and accurate. 6 (b) Declarations This data confirmation must be signed by a lawfully appointed director of the company. Name (please print) Signature Date / / EirGrid Commercial In Confidence. Page 26

27 6.3 Appendix C: Glossary of Terms for Balancing Registration Data Spreadsheet Table 3 Glossary of Balancing Registration Data Terms provides the glossary of terms used in the Balancing Registration Data Spreadsheet. The table also includes information on the validity of the data allowed e.g. mandatory/optional, valid values etc. Table 4 Glossary of Technical Offer Data Terms provides the glossary of terms used in Technical Offer Data section of the Balancing Registration Data Spreadsheet. The table also includes information on the validity of the data. This information should not be changed and is included for informational purposes only. If this information is incorrect and needs amended, then it should go through the existing SEM process for updating Generator Technical Offer Data. The exception to this is a pump parameters element which includes new TOD and should be provided if know by pump storage units. Table 3 Glossary of Balancing Registration Data Terms Term Definition Validation ACER Code ACER Codes are required for reporting under REMIT. An ACER code is issued via the CEREMP portal available from CEREMP CER or CEREMP UREGNI. ACER codes are issued to a Party, not a Unit. The ACER code specified for the Participant must be the same as the Party. The ACER code specified for a Unit must be the same as the Party ACER code. If a Unit falls into any of the below categories then it must have an ACER code associated with it: - Capacity Market: Generator, Interconnector, Demand Side Unit or Capacity Aggregation Unit - NEMO Markets (DAM/IDM): Generator, Assetless Unit, Supply Unit, Trading Unit - Balancing Market: Generator and Demand Side Units, excluding Supplier Units and non-controllable generators (i.e. old autonomous definition in SEM). for Parties, Participants and Units as defined in definition Must be a valid ACER Code EirGrid Commercial In Confidence.

28 Term Definition Validation Acting as Intermediary Aggregated Generator For intermediaries, the ACER code of the Unit should be the ACER code of the Party that is acting as the intermediary. A flag indicating that a Party is acting as an intermediary for a Unit. The Party has been appointed by a Unit Owner under a Form of Authority set out in TSC Appendix C: Form of Authority, for the purposes of registration of, and participation in the SEM in respect of the Unit Owner s Unit. A flag to identify if the Generator Unit is an Aggregated Generator registered by a Party in compliance with the relevant provisions of the applicable Grid Code. TRUE, FALSE TRUE, FALSE Associated Party Name The Party (PY_xxxxxx) associated with the registered Participant. Associated Supplier Unit Field to be populated where the Trading Site demand is to be recorded against an Associated Supplier Unit (ASU), as set out under the Code. If the Supplier Unit included in the Balancing Registration Data no longer records the demand on the relevant Trading Site, then please record the current Supplier Unit ID. where demand is recorded by an ASU, must be a valid Supplier Unit i.e. SU_4xxxxx or SU_5xxxxx Autoproducer Billing Address Combined Cycle Communication Qualification If you do not have this information, they you may need to contact your Supplier. The I-SEM Registration Team to not have this information available. A flag to identify if the Trading Site is an Autoproducer Site. An Autoproducer being a Demand Site where the Demand is not solely for the purpose of Generation (i.e. Demand is not just associated with Unit Load) which contains one or more Generator Units which are not Demand Side Units. The address to be used for the purposes of postal delivery to the Participant of billing information and other correspondence. Note: This may be different from the registered company address. for all Trading Sites. Must be Yes for Autoproducers. TRUE, FALSE A flag to indicate whether a Generator Unit is a Combined Cycle Unit. TRUE, FALSE The Party should specify the Communication Channel they wish to use for communication with the Balancing Market (i.e. submitting bids Type 2, Type 2 and Type 3 EirGrid Commercial In Confidence. Page 28

29 Term Definition Validation or downloading reports). Each Participant will be required to go through Communication Qualification Channel Testing for the type of Communication Channel they wish to qualify for. Type 2 = Human to Computer Type 3 = Computer to Computer Company Address The full registered company address of the Party. Company Name For a Party, the full registered company name. For a Participant, either the full registered company name of the Party, or the name of the business unit of the Party. Connection Agreement An agreement between a Party and a System Operator or Distribution System Operator, as appropriate, specifying terms and conditions for Connection to the Transmission System or Distribution System and physical and technical parameters for that Connection. Connection Agreement Reference Connection Type Controllable Demand Side Unit The reference number of the Connection Agreement. The type of connection to the Transmission System or Distribution System, as appropriate, as contained in the Connection Agreement between a Party and a System Operator or Distribution System Operator. A flag to indicate whether a Generator Unit is Controllable or not. This is in relation to a Generator Unit that is capable of Active Power control by the relevant System Operator. The term not Controllable shall be interpreted accordingly. A Generator Unit cannot be both Dispatchable and Controllable. In SEM, this equates to a wind power unit that has been issued with its operational readiness certification and has qualified to register as variable price taker unit. One or more Demand Sites which comply individually or collectively as appropriate with the criteria set out in TSC paragraph B and is so registered by a Participant. For all existing Units this will be set to C- COMPLETED Must be a valid connection agreement reference. D DISTRIBUTION = Distribution Connected T TRANSMISSION = Transmission Connected TRUE = Controllable FALSE= Non-Controllable Not applicable (definition only) EirGrid Commercial In Confidence. Page 29

30 Term Definition Validation Dispatchable Capacity Dispatchable Droop The Maximum Generation for a Demand Side Unit as specified in the most recently approved operational certificate. A flag to indicate whether a Generator Unit or Demand Side Unit is a Dispatchable. A Generator Unit or Demand side Unit cannot be both Dispatchable and Controllable. In relation to a Generator Unit or Demand Side Unit, the ability of the Generator Unit or Demand Side Unit to receive and act upon an instruction given by the System Operator to the Participant s approved contact person or location to change the output or manner of operation of the Generator Unit in accordance with the relevant Grid Code. The terms not Dispatchable, Dispatch, Dispatched and non-dispatched shall be interpreted accordingly. This is the percentage drop in frequency that would cause the generating unit under free governor action to change its output from zero to full capacity. Must be a and TRUE = Dispatchable FALSE = Non-Dispatchable This value is set to 4% for all Units; if different please specify. Dual Rated Unit A flag to indicate whether a Generator Unit is a Dual Rated Unit. TRUE = Dual Rated FALSE = Not Dual Rated DUoS Agreement DSU-SO Agreement EIC Code A flag to indicate that the Unit has a Distribution Use of System agreement in place. A flag to indicate that the Demand Side Unit has completed any required system operator agreements. Relevant for Northern Ireland only. Under Transparency regulations the Market Operator is required to provide reporting to the Transparency Platform on Generator Units & Production Units which are greater than or equal to 100MW. This means that W type EIC codes need to be associated with these larger units. Please provide the W type EIC code that relates to each Generation C- COMPLETED for Completed NA for Not Applicable Y, N, NA for Generation Units >= 100MW EirGrid Commercial In Confidence. Page 30

31 Term Definition Validation Energy Limited Unit Exemption from License Exemption from TUoS Agreement Firm Access Quantity Fixed Unit Load Fuel Type Unit. The following definitions are relevant in this case: Generation Unit: A single electricity generator belonging to a production unit (Regulation 543/2013) Production Unit: A facility for generation of electricity made up of a single generation unit or of an aggregation of generation units (Regulation 543/2013) As these EIC codes are used in the current SEM, it is unlikely that new EIC codes will need to be registered in order to complete the I- SEM balancing registration. Frequently Asked Questions on EIC codes are provided at the following link and include details of how to request an EIC code. Identification-Codes-FAQ.docx A flag to indicate where the Generator Unit is Energy Limited. Therefore has a physical upper limit on the amount of energy that can be generated by the Generator Unit for a Trading Day. A flag to indicate where a Generator Unit has been has an exemption from requiring a Generation or Supplier License. A flag to indicate where the Generator Unit or Supplier Unit has an exemption from requiring a TUoS Agreement. The quantity of Output that a Generator Unit has firm rights under a Connection Agreement to be able to export onto the system at the point of Connection. The fixed linear factor used to calculate net output from a Generator Unit such that Fixed Unit Load (FUL) 0. The fuel registered in accordance with the Grid Code as the principal fuel authorised for energy production by the Generator Unit. TRUE, FALSE TRUE, FALSE TRUE, FALSE or NA Must be a NUMBER (min 0 to max ) Must be a NUMBER (min 0 to max ). Must be a valid Fuel Type; BATTERY_STORAGE (BATTERY), BIOMASS, COAL, COMBINED_HEAT_AND_POWER (CHP), EirGrid Commercial In Confidence. Page 31

32 Term Definition Validation GASOA Agreement Jurisdiction In respect of an Aggregated Generator Unit, means the agreement between the Participant (or Applicant, as appropriate) in respect of the Unit ( Generator Aggregator ) and the System Operator which details the precise list of Generators that comprise the Aggregated Generator Unit. For a Participant which SEM jurisdiction the Participant is trading in. Either Ireland, Northern Ireland. For a Unit the jurisdiction the unit is trading in, and must be the same as the Participant e.g. Ireland or Northern Ireland. COMPRESSED_AIR_STORAGE (CAS), DISTILLATE, FLY_WHEEL, GAS, HYDRO, MULTI_FUEL, NUCLEAR, OIL, PEAT, PUMP_STORAGE (PUMP), SOLAR, WIND, OTHER for AGUs Leave blank for all other units Agreement Number Participant = ROI/NI Unit= ROI/NI Jurisdiction of Party Jurisdiction is not elevant to Parties. Not relevant Leave blank. Licence Effective Date The date from which the relevant Licence is effective. Licence ID For existing SEM registered Units this field may be left blank. The reference number of the relevant Supply and/or Generation Licence(s); Date Format dd/mm/yyyy Mailing Address Maximum Export Capacity Or the name of the registered company that the Licence has been issued to. The address to be used for the purposes of postal correspondence with the Party. Note: This may be different from the registered company address. The Maximum Export Capacity of a site in MW as defined under the site's Connection Agreement or equivalent. Trading Site Maximum Export Capacity This value should be the sum of the Unit Maximum Export Capacity for all the Units registered Must be a NUMBER (min 0 to max EirGrid Commercial In Confidence. Page 32

33 Term Definition Validation Maximum Generation Maximum Storage Capacity Meter Data Provider Minimum Generation Minimum Storage Capacity MPRN under the Trading Site, or as provided under the relevant Connection Agreement. Unit Maximum Export Capacity Should be the Maximum Export Capacity of the Unit. The Maximum Output for a Generator Unit and should be set equal to the Registered Capacity of the Unit. Part of the Technical Offer Data for a Pumped Storage Unit and means the maximum quantity of Generation that can be produced by the reservoir for a Trading Day submitted in accordance with the Code. This field is also used to capture the Maximum Battery Storage Capacity for a Battery Storage Unit. The External Data Provider that shall send Meter Data on behalf of the Generator Unit. The minimum MW Output of a Generator Unit. This is different the minimum load. The value must be 0 for all generator units except Pump Storage. For Pump Storage, it can be a negative value. Is part of the Technical Offer Data for a Pumped Storage Unit and means the minimum quantity of Generation that can be produced by the reservoir for a Trading Day submitted in accordance with the Code. This field is also used to capture the Minimum Battery Storage Capacity for a Battery Storage Unit. The Meter Point Reference Number as defined in the applicable Metering Code. Relevant for all Generators excluding Demand Side Units or Aggregated Generation Units. Must be a NUMBER (min 0 to max ) in MW for pumped storage. Zero for all other units. Must be a NUMBER (min 0 to max ) in MWh Entered by the Market Operator. Included for visibility. for pumped storage. Zero for all other units. Must be a NUMBER (min to max 0) in MW for pumped storage. Zero for all other units. Must be a NUMBER (min 0 to max ) in MWh Must be a valid MPRN. Name of DSU The name of the DSU as specified on the Operational Certificate Non Dispatchable The portion of total demand of a Demand Side Unit which is not EirGrid Commercial In Confidence. Page 33

34 Term Definition Validation Capacity available for curtailment. Must be a NUMBER (min 0 to max ) Non-Firm Access Flag If a Unit exists on a Trading Site with Non-Firm Access, then the Non- Firm Access Flag will equal TRUE. TRUE = Generator Unit not on a fully firm Trading Site. FALSE = Generator Unit is on a Non-Firm Access Quantity Operational Certificate Issued Operational Certificate Effective Date Party EIC Code The quantity of Output of a Generator Unit for which the relevant Participant does not have firm access rights under a Connection Agreement to be able to export onto the system at the point of Connection. A flag to indicate that a Generator Unit has received a notice from the relevant System Operator that it has been sufficiently demonstrated that the Generator Unit is Dispatchable and/or Controllable in order to discharge the relevant obligations under the relevant Grid Code. The date the Operational Certificate took effect. For existing SEM registered Generator Units and Demand Side Units this field may be left blank. It will be required to be submitted for new Units registering for the Balancing Market post I-SEM go live, only. If the Party has a X type EIC Code issued then please provide this. Further details on EIC codes are provided under the glossary definition for EIC Codes, the Market EIC fully firm Trading Site Must be a NUMBER (min 0 to max ) TRUE, FALSE for Generator and Demand Side Units Date Format dd/mm/yyyy Optional, provide if EIC code known. Must be a valid EIC Code. Party Name The unique code (e.g. format PY_nnnnnn) used to identify a Party. Participant A Party or business division of a Party which at the relevant time has Not applicable (definition only) been designated as, or deemed to be, the Participant in relation to any Units which have been registered in accordance with the Code. Participant Address The full registered company address of the Participant. Either the registered company address of the Party, or the company address of the Participant (as a business unit of the Party). Participant Class For all Parties this should be set to PY for Party For all Participants this should be set to TP for Trading Participant. PY- PARTY for Party EirGrid Commercial In Confidence. Page 34

I-SEM Testing Tariff High Level Options Consultation

I-SEM Testing Tariff High Level Options Consultation I-SEM Testing Tariff High Level Options Consultation 02 June 2017 Version 1.0 EXECUTIVE SUMMARY Testing Tariffs are currently applied to Units Under Test (UUT) in the Single Electricity Market (SEM) on

More information

Market Trial Working Group I-SEM Project

Market Trial Working Group I-SEM Project Market Trial Working Group I-SEM Project Dublin, 31 August 2017 1 Overview of the Session Meeting Details Meeting Purpose Chair Secretariat I-SEM Market Trial Working Group Mark Needham Louise Dalton Amy

More information

I-SEM Interconnectors Project

I-SEM Interconnectors Project Moyle EWIC I-SEM Interconnectors Project Financial Transmission Rights Auction: Initial Trial Report VERSION: 1.0 STATUS: Final for Publication DATE: 29 th SEPTEMBER 2017 Contents Introduction... 3 Objectives

More information

Consultation on DS3 System Services Contracts for Interim Arrangements. DS3 System Services Implementation Project

Consultation on DS3 System Services Contracts for Interim Arrangements. DS3 System Services Implementation Project Consultation on DS3 System Services Contracts for Interim Arrangements DS3 System Services Implementation Project 21 April 2016 Disclaimer EirGrid as the Transmission System Operator (TSO) for Ireland,

More information

I-SEM Business Liaison Group NEMO. 09 November2017

I-SEM Business Liaison Group NEMO. 09 November2017 I-SEM Business Liaison Group NEMO 09 November2017 1 Agenda Update on NEMO Implementation Project TSO Counter trading Market Trial 2 Agenda Update on NEMO Implementation Project TSO Counter trading Market

More information

Reverse Charge Gas, Electricity, Gas and Electricity Certificates

Reverse Charge Gas, Electricity, Gas and Electricity Certificates Reverse Charge Gas, Electricity, Gas and Electricity Certificates This document should be read in conjunction with section 16 of the VAT Consolidation Act 2010 (VATCA 2010) Document last Reviewed October

More information

Business Practice Manual for Reliability Requirements. Version 34

Business Practice Manual for Reliability Requirements. Version 34 Business Practice Manual for Reliability Requirements Version 34 Last Revised: January 1, 2009July 28, 2010 Approval History Approval Date: 3/27/09 Effective Date: 3/31/09 BPM Owner: Chetty Mamandur BPM

More information

THE HARMONISED ELECTRICITY MARKET ROLE MODEL

THE HARMONISED ELECTRICITY MARKET ROLE MODEL 1 THE HARMONISED ELECTRICITY MARKET ROLE MODEL ASSOCIATED ORGANISATIONS: APPROVED 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 TABLE OF CONTENTS 1 INTRODUCTION...

More information

Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market

Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market DOCUMENT Consultation Paper TYPE: REFERENCE: CER 11/039 DATE PUBLISHED: CLOSING DATE: RESPONSES

More information

I-SEM Milestones. November 2017

I-SEM Milestones. November 2017 I-SEM Milestones November 2017 1 1.1 Milestone Descriptions Includes update since the approval of JCR 170 Ref Milestone & Description RA / TSO Baseline Date 1 2 3 4 5 6 7a 7b 7c Start Balancing Market

More information

Intra-Day Trading Project. Market Participant Technical Overview. Conference call number: , pin: 79592

Intra-Day Trading Project. Market Participant Technical Overview. Conference call number: , pin: 79592 Intra-Day Trading Project Market Participant Technical Overview 3 rd August 2011, 10.30 am 13:00 pm Conference call number: 00353 1 6647777, pin: 79592 Welcome Welcome to this information session on the

More information

CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS. Program Guide

CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS. Program Guide CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS Program Guide TABLE OF CONTENTS Introduction... 2 Purpose... 2 About CHP... 2 Program Description... 2 Call for CHP Projects... 3 Participant Webinar...

More information

Invest Northern Ireland. Cost Based Claims Guidance Notes

Invest Northern Ireland. Cost Based Claims Guidance Notes Invest Northern Ireland Cost Based Claims Notes Claims Notes Version: 3.5 Issue Date 03/10/17 Review Date:03/10/18 1 Contents 1. PREPARING YOUR CLAIM... 3 1.1 Complete Cost Schedules... 3 1.2 Claim Periods...

More information

Day-ahead ahead Scheduling Reserve (DASR) Market

Day-ahead ahead Scheduling Reserve (DASR) Market Day-ahead ahead Scheduling Reserve (DASR) Market Agenda Implementation Overview of the DASR Market Market Clearing Process Market Clearing Example Performance Compliance Market Settlements Appendix: emkt

More information

MAINTENANCE FOR UOB BUSINESS INTERNET BANKING (BIB) SERVICES AND USER MAINTENANCE

MAINTENANCE FOR UOB BUSINESS INTERNET BANKING (BIB) SERVICES AND USER MAINTENANCE MAINTENANCE F UOB BUSINESS INTERNET BANKING (BIB) SERVICES AND USER MAINTENANCE 1. Applicant s ( My ) business details Registered Business Business Registration No. Existing BIB Login Group ID 2. Update

More information

I-SEM. Integrated Single Electricity Market. Energy Portfolio Management solutions.

I-SEM. Integrated Single Electricity Market. Energy Portfolio Management solutions. I-SEM Integrated Single Electricity Market. Energy Portfolio Management solutions. Why ABB? I-SEM Integrated Single Electricity Market. When choosing any vendor, Bord Gáis Energy looks for a company with

More information

AB AMBER GRID RULES FOR ACCESS TO THE NATURAL GAS TRANSMISSION SYSTEM

AB AMBER GRID RULES FOR ACCESS TO THE NATURAL GAS TRANSMISSION SYSTEM TRANSMISSION SYSTEM OPERATOR AB AMBER GRID AB AMBER GRID RULES FOR ACCESS TO THE NATURAL GAS TRANSMISSION SYSTEM Version 3.0 Vilnius, 2015 TABLE OF CONTENTS 1. GENERAL PROVISIONS... 3 2. DEFINITIONS AND

More information

SEMOpx Day-ahead Market Products Stage 3 Progress Report. May 2017

SEMOpx Day-ahead Market Products Stage 3 Progress Report. May 2017 SEMOpx Day-ahead Market Products Stage 3 Progress Report May 2017 Contents 1 Introduction... 3 2 Purpose of the Document... 4 3 IAT STAGES... 4 4 Scope of IAT... 6 5 Structure of IAT... 6 5.1 Creation

More information

3. Overview of Market Instruments

3. Overview of Market Instruments 3. Overview of Market Instruments 3.2 Ancillary Services Bids Four types of Ancillary Services are used by CAISO in its markets Regulation Up, Regulation Down, Spinning Reserve, and Non-Spinning Reserve.

More information

3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the

3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the FERC ELECTRIC TARIFF First Revised Sheet No. 121 ORIGINAL VOLUME NO. I Replacing Original Sheet No. 121 3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. 3.1 Nature of Relationship. Each Participating

More information

I-SEM Interconnectors Project

I-SEM Interconnectors Project Moyle EWIC I-SEM Interconnectors Project Financial Transmission Rights Auction: Trial and Participant Test Plan VERSION: 1.1 STATUS: Final for Publication DATE: 17 th JULY 2017 Contents Introduction...

More information

2. Market Operations Overview

2. Market Operations Overview 2. Market Operations Overview 2.5 Market Information This section summarizes and describes the common information that is used by the Day-Ahead and Real-Time processes. 2.5.1 Resource Static Data Static

More information

SETTLEMENTS & BILLING BUSINESS PRACTICE

SETTLEMENTS & BILLING BUSINESS PRACTICE SETTLEMENTS & BILLING BUSINESS PRACTICE In this Section: Overview Daily Settlement Reports Monthly Invoice and Payment Terms Resale of Transmission Rights Transfer of Transmission Rights Redirect of Transmission

More information

Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) Title 1 Principles

Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) Title 1 Principles Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) In exercise of section 41 Gaswirtschaftsgesetz (Natural Gas Act) 2011, BGBl. (Federal

More information

APPLICATION FOR COMBINED HEAT AND POWER INCENTIVES

APPLICATION FOR COMBINED HEAT AND POWER INCENTIVES APPLICATION FOR COMBINED HEAT AND POWER INCENTIVES PECO is offering cash incentives for qualified Combined Heat and Power (CHP) technology projects 1 to encourage the development of projects that improve

More information

Ireland Country Report

Ireland Country Report Ireland Country Report Innovative Electricity Markets to Incorporate Variable Production IEA Renewable Energy Technology Deployment to May 2008 IPA Energy + Water Consulting COWI A/S SGA Energy Innovative

More information

De-Energisation Code of Practice

De-Energisation Code of Practice De-Energisation Code of Practice NIE Power Networks Changes for SEM/IME Implementation Issued 30 th August 2007 30/08/2007 DE-ENERGISATION CODE OF PRACTICE Contents Revision History... 3 1. Introduction...

More information

Methodological tool Tool to calculate the emission factor for an electricity system

Methodological tool Tool to calculate the emission factor for an electricity system CLEAN DEVELOPMENT MECHANISM TOOL07 Methodological tool Tool to calculate the emission factor for an electricity system TABLE OF CONTENTS Page 1. INTRODUCTION... 4 2. SCOPE, APPLICABILITY, AND ENTRY INTO

More information

Umbrella Body Guidance

Umbrella Body Guidance Umbrella Body Guidance 1. Introduction 2. Background 3. Should I become an Umbrella Body? 4. Process 5. Recruitment decisions 6. Liabilities 7. Obligations 8. Service standards 9. Agreements 10. Charges

More information

Supplier Management System. Supplier User Manual

Supplier Management System. Supplier User Manual Supplier Management System Supplier User Manual 1 Table of Contents TABLE OF CONTENTS... 2 1. LOGON TO THE PORTAL PAGE... 3 2. HOME PAGE... 4 3. SUPPLIER DATA... 5 4. MASTER DATA... 6 5. ADDRESSES AND

More information

Auctions preparation, course, wins. Katarzyna Szwed Lipińska, counsellor at law Director, Department of Support Systems Energy Regulatory Office

Auctions preparation, course, wins. Katarzyna Szwed Lipińska, counsellor at law Director, Department of Support Systems Energy Regulatory Office Katarzyna Szwed Lipińska, counsellor at law Director, Department of Support Systems Energy Regulatory Office Warsaw, March 2015 Installations subject to the auction procedure: existing including modernised

More information

PARTICIPANT S GUIDE Commercial and institutional customers and small and medium-sized industrial companies

PARTICIPANT S GUIDE Commercial and institutional customers and small and medium-sized industrial companies PARTICIPANT S GUIDE Commercial and institutional customers and small and medium-sized industrial companies Hydro-Québec Vol. 1, No. 1 April 1, 2016 Contents Foreword... 3 Definitions... 4 Conditions and

More information

THE DANISH ELECTRICITY RETAIL MARKET. Introduction to DataHub and the Danish supplier-centric model

THE DANISH ELECTRICITY RETAIL MARKET. Introduction to DataHub and the Danish supplier-centric model THE DANISH ELECTRICITY RETAIL MARKET Introduction to DataHub and the Danish supplier-centric model 2 THE DANISH ELECTRICITY RETAIL MARKET Denmark s electricity retail market has been going through a remarkable

More information

Demand Response. Overview. Recommendations

Demand Response. Overview. Recommendations Section 6 Demand Response Demand Response Markets require both a supply side and a demand side to function effectively. The demand side of wholesale electricity markets is underdeveloped. Wholesale power

More information

Supply Chain EDI Supplier Accreditation Guide. EDI Supplier Accreditation Guide Page 1 of 25 July 2017 Myer Pty Ltd

Supply Chain EDI Supplier Accreditation Guide. EDI Supplier Accreditation Guide Page 1 of 25 July 2017 Myer Pty Ltd Supply Chain EDI Supplier Accreditation Guide EDI Supplier Accreditation Guide Page 1 of 25 Accreditation Guide This guide provides Suppliers with the necessary information to complete their Accreditation

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Appendix N... 2 Pseudo-Tie Protocol... 2 1. Pseudo-Ties of Generating Units to the CAISO Balancing Authority Area... 2 1.1 Consistency with NERC/WECC Requirements... 2 1.2 CAISO Operating,

More information

Regulated Price Plan. Manual

Regulated Price Plan. Manual Regulated Price Plan Manual Ontario Energy Board Issued February 16, 2016 (Replacing version issued on November 5, 2013) NOTE TO READERS: The February 16, 2016 revisions update the time of use pricing

More information

Transportation Management Accounting Portal Invoice Upload

Transportation Management Accounting Portal Invoice Upload Transportation Management Accounting Portal Invoice Upload USER REFERENCE V.5 To help facilitate the submission of transportation invoices for payment, Crowley has designed a solution for the carrier to

More information

PRE-QUALIFICATION FOR PROVISION OF TEAM BUILDING CONSULTANCY SERVICES TENDER NO. KPPF /HRA-B/1-A/22/17-18

PRE-QUALIFICATION FOR PROVISION OF TEAM BUILDING CONSULTANCY SERVICES TENDER NO. KPPF /HRA-B/1-A/22/17-18 PRE-QUALIFICATION FOR PROVISION OF TEAM BUILDING CONSULTANCY SERVICES TENDER NO. KPPF /HRA-B/1-A/22/17-18 (JAN 2017 DEC 2018) PRE QUALIFICATION DOCUMENT Stima Plaza, Kolobot Road, P.O. Box 1548-00600 Nairobi,

More information

INVITATION FOR EXPRESSION OF INTEREST (EOI)

INVITATION FOR EXPRESSION OF INTEREST (EOI) INVITATION FOR EXPRESSION OF INTEREST (EOI) PetroleumBRUNEI wishes to invite interested Contractors to submit Expressions of Interest (EOI) to participate in the following future tenders: EOI No EOI Title

More information

GE Transportation isupplier Portal (isp) Training

GE Transportation isupplier Portal (isp) Training GE Transportation isupplier Portal (isp) Training Overview GE Transportation provides our suppliers an excellent resource to easily submit invoices and check invoice and payment status through the GETS

More information

IAB LEVEL 3 CERTIFICATE IN COMPUTERISED ACCOUNTING FOR BUSINESS (QCF)

IAB LEVEL 3 CERTIFICATE IN COMPUTERISED ACCOUNTING FOR BUSINESS (QCF) IAB LEVEL 3 CERTIFICATE IN COMPUTERISED ACCOUNTING FOR BUSINESS (QCF) (Qualification Accreditation Number 500/9622/9) Accreditation end date 31 st December 2012 CONTENTS QUALIFICATION SPECIFICATION 1.

More information

GENERAL TERMS AND CONDITIONS FOR USING THE JUVENTUS eprocurement PORTAL

GENERAL TERMS AND CONDITIONS FOR USING THE JUVENTUS eprocurement PORTAL GENERAL TERMS AND CONDITIONS FOR USING THE JUVENTUS eprocurement PORTAL 1 INTRODUCTION JUVENTUS Football Club S.p.A. (hereinafter "JUVENTUS") is data controller of JUVENTUS eprocurement, an e-business

More information

Casework Technical Support (Social Welfare - Project Management)

Casework Technical Support (Social Welfare - Project Management) Casework Technical Support (Social Welfare - Project Management) Request for Tenders for Services to MABS NATIONAL DEVELOPMENT The latest date for receipt of tenders is 09 June 2017 Commercial House Westend

More information

NETWORK USE OF SYSTEM CHARGES FOR CHP GENERATORS AND AUTOPRODUCERS PROPOSED DIRECTION BY COMMISSION FOR ENERGY REGULATION

NETWORK USE OF SYSTEM CHARGES FOR CHP GENERATORS AND AUTOPRODUCERS PROPOSED DIRECTION BY COMMISSION FOR ENERGY REGULATION NETWORK USE OF SYSTEM CHARGES FOR CHP GENERATORS AND AUTOPRODUCERS PROPOSED DIRECTION BY COMMISSION FOR ENERGY REGULATION CER/03/167 July 2003 Background: Autoproducers Direction 1. On 17 April 2002 the

More information

Call for tender for translation services for the Translation Centre Frequently asked questions (FAQs) FL/LEG17

Call for tender for translation services for the Translation Centre Frequently asked questions (FAQs) FL/LEG17 Call for tender for translation services for the Translation Centre Frequently asked questions (FAQs) FL/LEG17 Question no. 1: Could you send us the relevant documents for call for tenders FL/LEG17? Answer

More information

PJM ExSchedule User Guide

PJM ExSchedule User Guide PJM ExSchedule User Guide Revision: 07 Effective Date: July 13, 2017 Prepared by Transmission Service Department PJM 2017 i Approval and Revision History PJM User Guide: ExSchedule Table of Contents Table

More information

Introduction to the Demand Response Auction. IESO Training

Introduction to the Demand Response Auction. IESO Training Introduction to the Demand Response Auction IESO Training May 2017 Introduction to the Demand Response Auction AN IESO TRAINING PUBLICATION This guide has been prepared to assist in the IESO training of

More information

I-SEM Trialing of EUPHEMIA: Initial Phase Results Overview. I-SEM EUPHEMIA Working Group 16 th April 2015

I-SEM Trialing of EUPHEMIA: Initial Phase Results Overview. I-SEM EUPHEMIA Working Group 16 th April 2015 I-SEM Trialing of EUPHEMIA: Initial Phase Results Overview I-SEM EUPHEMIA Working Group 16 th April 2015 EUPHEMIA Workshop Agenda Background of EUPHEMIA algorithm Overview of background and goal of EUPHEMIA

More information

CAPACITY BOOKING... 1 PART I - REQUIREMENTS FOR ACCESS TO THE TRANSPORTATION SERVICE ) REQUIREMENTS... 5

CAPACITY BOOKING... 1 PART I - REQUIREMENTS FOR ACCESS TO THE TRANSPORTATION SERVICE ) REQUIREMENTS... 5 CAPACITY BOOKING CAPACITY BOOKING... 1 PART I - REQUIREMENTS FOR ACCESS TO THE TRANSPORTATION SERVICE... 5 1) REQUIREMENTS... 5 1.1) REQUIREMENTS IN ACCORDANCE WITH RESOLUTION NO. 137/02... 5 1.1.1) Possession

More information

Expanded Metering and Telemetry Options Phase 2. Distributed Energy Resource Provider (DERP) Draft Final Proposal

Expanded Metering and Telemetry Options Phase 2. Distributed Energy Resource Provider (DERP) Draft Final Proposal Expanded Metering and Telemetry Options Phase 2 Distributed Energy Resource Provider (DERP) June 10, 2015 Table of Contents 1 Introduction... 4 2 Summary of key advances, revisions to the revised straw

More information

Company Profile User Guide

Company Profile User Guide Company Profile User Guide Introduction ICN Gateway is Australia s largest business networking platform. In an increasingly competitive market, ICN Gateway gives you access to a sophisticated business

More information

ORACLE R12 IPROCUREMENT REFERENCE GUIDE

ORACLE R12 IPROCUREMENT REFERENCE GUIDE ORACLE R12 IPROCUREMENT REFERENCE GUIDE Table of Contents 1. Introduction 1.1 Introduction to iprocurement 1.2 What is iprocurement 1.3 Why we use iprocurement 1.4 Logging into iprocurement 1.5 iprocurement

More information

PROCEDURE. Part 5.6: Physical Markets Settlement Invoicing PUBLIC. Market Manual 5: Settlements. Issue 15.0 MDP_PRO_0035

PROCEDURE. Part 5.6: Physical Markets Settlement Invoicing PUBLIC. Market Manual 5: Settlements. Issue 15.0 MDP_PRO_0035 PUBLIC MDP_PRO_0035, PROCEDURE Market Manual 5: Settlements Part 5.6: Physical Markets Settlement Invoicing Issue 15.0 This procedure provides information required by the IESO and market participants to

More information

SEMOpx Day-ahead Market Products Stage 2 Progress Report. March 2017

SEMOpx Day-ahead Market Products Stage 2 Progress Report. March 2017 SEMOpx Day-ahead Market Products Stage 2 Progress Report March 2017 Contents 1 Introduction... 2 2 Purpose of the Document... 3 3 IAT STAGES... 4 4 Scope of IAT... 4 5 Structure of IAT... 5 5.1 Creation

More information

Energy Auction for the CPV Sentinel Generating Facility

Energy Auction for the CPV Sentinel Generating Facility Energy Auction for the CPV Sentinel Generating Facility Energy Auction Instructions and Terms and Conditions of Participation Updated June 11, 2013 A. GENERAL A.1. Company ( SCE ) seeks to sell, by this

More information

P315 Publication of Gross Supplier Market Share Data

P315 Publication of Gross Supplier Market Share Data Publication of Gross Supplier Market Share Data aims to increase transparency of Suppliers Metered Volumes and MPAN counts to give industry participants more equal access to basic market share information.

More information

PRE-QUALIFICATION OF SUPPLIERS PROVISION OF FUMIGATION, SANITATION AND SANITAL DISPOSAL SERVICES TENDER NO.KPLC1/5BC/9A/PT-ST/113/2010

PRE-QUALIFICATION OF SUPPLIERS PROVISION OF FUMIGATION, SANITATION AND SANITAL DISPOSAL SERVICES TENDER NO.KPLC1/5BC/9A/PT-ST/113/2010 The Kenya Power & Lighting Co. Ltd. The Kenya Power & Lighting Co. Ltd. Central Office P.O. Box 30099 Nairobi, Kenya Telephone 254-02-3201 000/3201 323 Fax No. 254-02-310336 or 3753833 Website: www.kplc.co.ke

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 34. Real-Time Market... 3 34.1 Inputs To The Real-Time Market... 3 34.1.1 Day-Ahead Market Results as Inputs to the Real-Time Market... 3 34.1.2 Market Model and System Information...

More information

Business Practice Manual for Metering. Version 56

Business Practice Manual for Metering. Version 56 Business Practice Manual for Metering Version 56 Last Revised: September 09, 2011 May 7, 2012 Approval History Approval Date: March 13, 2009 Effective Date: March 31, 2009 BPM Owner: Nancy TraweekBenik

More information

Market Procedure: Network Control Services

Market Procedure: Network Control Services ELECTRICITY INDUSTRY ACT 2004 ELECTRICITY INDUSTRY (WHOLESALE ELECTRICITY MARKET) REGULATIONS 2004 WHOLESALE ELECTRICITY MARKET RULES Market Procedure: Network Control Services Version 2 Commencement:

More information

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for a common set of requirements, in accordance with Article

More information

DISTRIBUTION LOSS ADJUSTMENT FACTORS ESB SUBMISSION THE COMMISSION FOR ELECTRICITY REGULATION

DISTRIBUTION LOSS ADJUSTMENT FACTORS ESB SUBMISSION THE COMMISSION FOR ELECTRICITY REGULATION DISTRIBUTION LOSS ADJUSTMENT FACTORS ESB SUBMISSION TO THE COMMISSION FOR ELECTRICITY REGULATION Document No: DOC-140105-AIL 7/02/2000 Introduction: The Commission for Electricity Regulation (CER) have

More information

Interim Governance Arrangements for All Island Retail Market Harmonisation Project

Interim Governance Arrangements for All Island Retail Market Harmonisation Project Interim Governance Arrangements for All Island Retail Market Harmonisation Project Document Revision History Version Date Summary of Change Author Number 2 21 Oct 2009 First draft for review Various 3

More information

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017 PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017 Prepared by Market Settlements Development Department PJM 2017 Table of Contents Table of Contents

More information

terms and conditions for business

terms and conditions for business Version 10.1, December 2013 terms and conditions for business britishgas.co.uk/business Contents 1.0 This contract 4 2.0 Charges 6 3.0 Payment and billing 10 4.0 Security deposit 12 5.0 Meters and access

More information

2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC

2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016 TABLE OF CONTENTS 1. GENERAL INFORMATION... 1 1.1. Introduction...

More information

LOAD SERVING ENTITIES PJM REGION

LOAD SERVING ENTITIES PJM REGION Intra-PJM Tariffs --> RELIABILITY ASSURANCE AGREEMENT PJM Interconnection, L.L.C. Rate Schedule FERC No. 44 RELIABILITY ASSURANCE AGREEMENT Among LOAD SERVING ENTITIES in the PJM REGION Effective Date:

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specification Energy Storage and Distributed Energy Resources Phase -2 Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 18 Disclaimer All information contained in this draft Business Requirements

More information

SUBMITTED VIA E-TARIFF FILING. August 4, 2017

SUBMITTED VIA E-TARIFF FILING. August 4, 2017 Millennium Tower 719 Second Avenue, Suite 1150 Seattle, WA 98104 (206) 623-9372 Phone (206) 623-4986 Fax SUBMITTED VIA E-TARIFF FILING August 4, 2017 The Honorable Kimberly D. Bose Secretary Federal Energy

More information

PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017

PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017 PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017 Prepared by System Planning Department PJM 2017 Table of Contents Table of Contents

More information

European Water Stewardship (EWS) EWS Membership Outline Version May 2013

European Water Stewardship (EWS) EWS Membership Outline Version May 2013 EWS Membership Outline Version May 2013 I. Preamble The European Water Stewardship (EWS) is the integrative system for business and agriculture to assess, verify and communicate sustainable water management

More information

Sage 200 Business Intelligence Cubes and Reports

Sage 200 Business Intelligence Cubes and Reports Sage 200 Business Intelligence Cubes and Reports Sage (UK) Limited Copyright Statement Sage (UK) Limited, 2017. All rights reserved If this documentation includes advice or information relating to any

More information

Renewable Heat Incentive Guidance Volume One: Eligibility and how to apply

Renewable Heat Incentive Guidance Volume One: Eligibility and how to apply Promoting choice and value for all gas and electricity customers Renewable Heat Incentive Guidance Guidance Reference: 147/11 Contact: RHI Operational Team Publication date: 10 November 2011 Team: New

More information

Procedure: Station Power Portfolio Application

Procedure: Station Power Portfolio Application Overview Introduction FERC has established a policy that allows a single corporate entity that owns one or more Generating Units to self-supply Station Power over a monthly netting period using Energy

More information

on remuneration policies and practices related to the sale and provision of retail banking products and services

on remuneration policies and practices related to the sale and provision of retail banking products and services EBA/GL/2016/06 13/12/2016 Guidelines on remuneration policies and practices related to the sale and provision of retail banking products and services 1. Compliance and reporting obligations Status of these

More information

EUROPEAN SPACE AGENCY ESA EXPRESS PROCUREMENT PROCEDURE EXPRO / EXPRO+ TENDERING CONDITIONS ( EXPRO/TC ) NOTE

EUROPEAN SPACE AGENCY ESA EXPRESS PROCUREMENT PROCEDURE EXPRO / EXPRO+ TENDERING CONDITIONS ( EXPRO/TC ) NOTE P a g e 1 EUROPEAN SPACE AGENCY ESA EXPRESS PROCUREMENT PROCEDURE EXPRO / EXPRO+ TENDERING CONDITIONS ( EXPRO/TC ) NOTE For the purposes of EXPRO and EXPRO+ categories of Requests for Proposal (RFP) and

More information

Application to Join PVG

Application to Join PVG Application to Join PVG Guidance for Signatory/Identification Checker It is the role of the signatory to check that the application is correctly completed, check applicant s identification, complete sections

More information

Guidance for Airport Operators Designating Known Suppliers of Airport Supplies

Guidance for Airport Operators Designating Known Suppliers of Airport Supplies Aviation Security Guidance for Airport Operators Designating Known Suppliers of Airport Supplies CAP 1260 Published by the Civil Aviation Authority 2015 Civil Aviation Authority Aviation House Gatwick

More information

AGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM

AGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM AGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM BETWEEN AND (1) [Eastern / London / South Eastern] Power Networks plc Company Number [02366906 / 03929195

More information

SAI Global Full Service Team

SAI Global Full Service Team General information regarding elements of the certification process is described below. A degree of flexibility and options in the certification process are available so please feel free to contact us

More information

Operational Constraints Update 13/07/2017

Operational Constraints Update 13/07/2017 Operational Constraints Update 13/07/2017 Key Updates No updates Disclaimer EirGrid plc, the Transmission Operator (TSO) for, and SONI Limited, the TSO for Northern, make no warranties or representations

More information

IBM Business Partner Operations Guide for Solution Provider for IBM Software as a Service

IBM Business Partner Operations Guide for Solution Provider for IBM Software as a Service IBM Business Partner Operations Guide for Solution Provider for IBM Software as a Service Europe, Middle East and Africa Version 1.12 This Operations Guide and updated versions will be posted on the IBM

More information

Data Protection Policy

Data Protection Policy THE CIPPENHAM SCHOOLS TRUST Data Protection Policy *Date for revision: Summer Term 2018 Responsibility for policy: Responsibility for operational: Trustees Trustees Reviewed by Directors: *subject to any

More information

VERTICAL ASSESSMENT INSPECTION ISO/IEC 17020:2012

VERTICAL ASSESSMENT INSPECTION ISO/IEC 17020:2012 VERTICAL ASSESSMENT INSPECTION ISO/IEC 17020:2012 Organisation s SANAS No/s. Date/s of evaluation Name of Organisation Organisation Representative Area/Field of Accreditation as per schedule of accreditation

More information

Guide to Applications for Certificates of Free Sale for Cosmetics

Guide to Applications for Certificates of Free Sale for Cosmetics Guide to Applications for Certificates of Free Sale for Cosmetics AUT-G0051-6 23 FEBRUARY 2017 This guide does not purport to be an interpretation of law and/or regulations and is for guidance purposes

More information

BUSINESS TRAVEL SOLUTION

BUSINESS TRAVEL SOLUTION BUSINESS TRAVEL SOLUTION Nominated Travel Administrator Procedures This Procedure Guide is for Nominated Travel Administrators (NTA s) who are using the Business Travel Solution (BTS), provided by Lloyds

More information

Minimum Solar Zone Area Worksheet New Construction (Page 1 of 3) A. General Information 01 Building Type:

Minimum Solar Zone Area Worksheet New Construction (Page 1 of 3) A. General Information 01 Building Type: Minimum Solar Zone Area Worksheet New Construction (Page 1 of 3) Solar Zone Area (requirements in 110.10 (b)1a Exception 3, 4, 5, or 6 and 110.10 (b)1b) This worksheet applies to: Single family residences

More information

CONSUMER PROTECTION CONDITION 2 1 : POSTAL COMMON OPERATIONAL PROCEDURES

CONSUMER PROTECTION CONDITION 2 1 : POSTAL COMMON OPERATIONAL PROCEDURES CONSUMER PROTECTION CONDITION 2 1 : POSTAL COMMON OPERATIONAL PROCEDURES 1. Application, Definitions and Interpretation CP 2.1.1 CP 2.1.2 This consumer protection condition ( CP Condition ) shall apply

More information

DS3: System Services Review TSO Recommendations

DS3: System Services Review TSO Recommendations DS3: System Services Review TSO Recommendations A Synopsis for the SEM Committee EirGrid and SONI, 2012 Page 1 1. Executive Summary 1.1 Introduction The power system of Ireland and Northern Ireland is

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS UTILITY BILLING SOFTWARE DUE DATE: NO LATER THAN 5:00 PM EASTERN TIME, MARCH 11, 2016 QUESTIONS: JESSICA MARTIN-LANE JESSICA@MARTIN-MCGILL.COM NOTE: THE COUNTY OF HARNETT RESERVES

More information

SupplyOn information for suppliers who will use the CSV upload functionality for invoicing with Airbus

SupplyOn information for suppliers who will use the CSV upload functionality for invoicing with Airbus SupplyOn information for suppliers who will use the CSV upload functionality for invoicing with Airbus Document Owner: SupplyOn PM SCM Aero Dece,ber 2017 Version 1.11 SupplyOn Public 1/17 Document History

More information

Bookkeeping and Accounting Skills (Manual) Level 2 Award Bookkeeping and Accounting Skills (Computerised) Level 2 Award 05528

Bookkeeping and Accounting Skills (Manual) Level 2 Award Bookkeeping and Accounting Skills (Computerised) Level 2 Award 05528 Vocational Qualifications (QCF, NVQ, NQF) Bookkeeping and Accounting Skills Bookkeeping and Accounting Skills (Manual) Level 2 Award 05527 Bookkeeping and Accounting Skills (Computerised) Level 2 Award

More information

This guide covers how you should record and post disbursements and expenses accurately in ilaw Case Management and ilaw Accounts.

This guide covers how you should record and post disbursements and expenses accurately in ilaw Case Management and ilaw Accounts. Expenses and Disbursements: what to do with them Guide for ilaw Case Management and Accounts This guide covers how you should record and post disbursements and expenses accurately in ilaw Case Management

More information

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation. Section 3 Operating Reserve Operating Reserve Day-ahead and real-time operating reserve credits are paid to market participants under specified conditions in order to ensure that resources are not required

More information

SANTANDER TREASURY LINK TRANSITION GUIDE

SANTANDER TREASURY LINK TRANSITION GUIDE SANTANDER TREASURY LINK TRANSITION GUIDE Introduction Introducing Santander Treasury Link for Online Banking A new experience ahead We are pleased to introduce you to Santander Treasury Link and look forward

More information

Load Serving Entity Definition Refinement Draft Final Proposal

Load Serving Entity Definition Refinement Draft Final Proposal Updated: September 21, 2016 Table of Contents 1. Executive Summary... 4 2. Scope of Initiative... 6 3. Changes to this proposal... 6 4. Stakeholder Engagement... 7 5. Background... 8 Allocation of Congestion

More information

Demand Response and Scarcity Pricing

Demand Response and Scarcity Pricing Item #/ Check When Complete Demand and Scarcity Pricing Begin End Category Sub-Category Order 719 Summary Draft Status SPP Notes References Assignment 41 47 63 Demand Allow DR to provide ancillary services

More information

NPCC Regional Reliability Reference Directory # 9 Verification of Generator Gross and Net Real Power Capability

NPCC Regional Reliability Reference Directory # 9 Verification of Generator Gross and Net Real Power Capability NPCC Regional Reliability Reference Directory # 9 Task Force on Coordination of Operations Revision Review Record: December 22, 2008 December 28, 2011 Adopted by the Members of the Northeast Power Coordinating

More information

Non-Display and Other Application Usage

Non-Display and Other Application Usage Non-Display and Other Application Usage Customer Declaration Version 6 This document is a declaration required for customers to specify their Non-Display and Other Application usage of real time and/or

More information