BUREAU OF INDIAN STANDARD (Faridabad Branch Office)

Size: px
Start display at page:

Download "BUREAU OF INDIAN STANDARD (Faridabad Branch Office)"

Transcription

1 BUREAU OF INDIAN STANDARD (Faridabad Branch Office) Our ref: FRBO/9798:2013 Date Subject: Implementation of IS 9798:2013, Low Pressure Regulators for Use With Liquefied Petroleum Gas (LPG) and its revised STI:Doc STI/9798/6 January 2015 (draft STI) 1. FRBO has been advisedby CMD-II (legal) vide note reference CMD-II/16:9798 dated to examine the revised standard IS 9798:2013 Low Pressure Regulators for Use with Liquefied Petroleum Gas (LPG) Specification (Second revision) and prepare & finalize the STI and guidelines for implementation of revised ISS. 2. Based on review of revised Indian standard IS 9798:2013,FRBO has prepared a draft STI as Doc: STI/9798/6January 2015(Copy enclosed). 3. Vide circular no CMD-II/16:9798 dated 12/09/2014 and 29/10/2014 all RO s/ BO s were also requested to immediately bring the above revision in to the knowledge of all the licensees and applicants under their jurisdiction so that they may examine it and take action for its implementation and also to bring to the notice of FRBO the difficulties/comments, if any expressed by the licensees in implementing the revised standard along with their recommendations. No communications have been received at FRBO from any RO / BO as on date. 4. As per the above referred CMD II circulars, the prevailing version (i.e IS 9798:1995) will remain in force concurrently till 31 January 2015 and thereafter the same along with STI stands withdrawn. 5.For Application/Grant of licence cases a)all new applications are to be recorded as per IS 9798:2013. b) In cases where testing of samples are in progress or test reports are already received as per IS 9798:1995 version, grant of licence as per old version of the Standard(IS 9798:1995) can be processed after obtaining an undertaking from the firm for ensuring the change over to the revised standard by the date of implementationi.e 31 January In thesecases, changeover to the revised standard shall be processed as per existing guidelines for licences, by the implementation date. 6. For Existing Licence cases: a) A copy of the STI shall be sent to all licensees for their acceptance and comments, if any. b) All ROs/BOs are requested to inform the licensees under their jurisdiction about implementation of the IS 9798:2013 along with new STI. c)licensee should submit declaration regarding availability of additional manufacturing and test facilitiesand also test reports (in-house or OSL) for the conformity to all the requirements as per IS 9798:2013 for the varieties covered in the existing licence.ratings/types which do

2 not conform to the requirements of the specification shall be deleted from the scope of the licence w.e.f. the date of implementation given in the circular and necessary endorsement may be issued. d)endorsement in the license for revised IS 9798:2013and its STI shall be made after obtaining acceptance of revised STI. e) Availability of the additional facilities to be verified and additional tests as per revised IS be carried out during the lot inspection after submission of declaration by the firm. Surveillance visit shall be carried out within3 months from the date of implementation to verify the implementation of the revised standard. Any one variety/size may be tested for all possible tests in a day and based on satisfactory inspection sample (preferably of different variety/size, if available), to be drawn for independent testing. f) The case to be reviewed on receipt of independent test report. g) All inclusions to be considered as per revised IS 9798:2013 only. h) Action shall be taken as per OMPC 2004, if the licensee fails to submit the acceptance of STI in stipulated time or failure of sample in factory/independent testing. The revised and the old standard shall run concurrently till , after which theearlier version of the standard (IS 9798: 1995) and its STI shall stands withdrawn. All RO s/bo s are requested to bringthe above in to the knowledge of all the licensees and applicants for this product under their jurisdiction so that they may examine it and take action for its immediate implementation and to submit the difficulty/comments, if any, on this proposal and the enclosed STI before 10 January2015 so as to finalise the same. (S SMugali)) Sd/- Scientist-E(FRBO)

3 BUREAU OF INDIAN STANDARDS (Faridabad Branch Office) Our Ref.: FRBO/9798: Subject : Draft Scheme of Testing and Inspection for IS 9798:2013, Low Pressure Regulators for Use With Liquefied Petroleum Gas (LPG) and its STI document no: STI:Doc STI/9798/6 January 2015 (draft). Draft is as under: IS 9798:1995 has been revised and published as IS 9798:2013. In the revised specification following changes have been made:- (i) Terminology (clause 3) has been modified. Commercial butane, Commercial propane deleted. Commercial Butane/commercial propane mixure is termed as LPG. (ii) Material (clause 4) has been modified. Requirement for cover has been included. Body and cover shall now conform to IS 742. Material of construction of Body & Cover now restricted to Zinc base alloys only (clause 4.2). (iii) Compression set test (Clause 4.3.7, & 4.5) for Diaphragm, Valve and Seals material, respectively, incorporated. (iv) Body (clause 5.7.2) and Pressure Relief Valve (clause 5.9) both of 9798:1995 version deleted. (v) Requirements for excess flow valve (clause 5.9) incorporated; (iv) Strength of Connections test (clause 5.11) incorporated Consequent upon revision of IS 9798, draft STI has been prepared (copy enclosed) In the proposed draft following main changes/modifications are made. A) In text part: (i) Change in TITLE; (ii) Clause 2.1: for calibration of test instruments- traceability requirement added (iii) Clause 3.1: reference to IS/ISO 9000 series is replaced by IS/ISO 9001: 2008 (iv) Clause 4.1: Marking: a) Clause 4.1.c) Rated capacity in m3/h of gas designed for is replaced by Rated capacity, in m3/h of LPG b) Clause 4.1.e)- Name of the gas, designed for replaced by Number of this Indian Standard. (iv) Clause 5.0: Control Unit: Definition modified:- as

4 A CU shall consist of a lot of bodies and covers of the same type and size die cast in a day (covers and body may be die cast on different day) from the material of the same heat//supplier under similar process of production. B) In Table 1 Levels of control a) Re-grouping of tests under type test and routine test- in line with classification of tests given in clause 10 of revised version of IS b) Following additions are made; i) Compression set test - (clause & 4.4.5) ii) Seals - (clause 4.5) iii) Screwed Ends (clause 5.4, and 5.6.2). iv) Excess flow valve (clause 5.9, 8.10) v) Valve pad fitting - (clause 5.10) vi) Strength of connection - (clause 5.11, 8.11) vii) Sealing - (clause 9). viii) Marking-(clause11.1.d) - number of this Indian Standard. ix) Foot note 1of Table 1: Cross check of raw material at NABL approved laboratory introduced. x) Foot note 3 & 5 of Table 1: Added in line with the changes made in acceptance criteria in the revised IS 9798:2013 in clause 6.3 & 6.4. c) Deletions; i) Marking - Name of gas, designed for. d) Modifications; i) Marking (clause 11.1.c) - Rated capacity in m 3 /h of gas designed for changed to Rated capacity, in m3/h of LPG. ii) Clause 6.1.1: 2 nd sentence is deleted as the scope of IS 9798:2013 is only for LPG. iii) Clause 6.1.1, STI, Annex-B: In line with clause 6.1.1, Certificate is modified. At the top of certificate, Name and address of the manufacturer, is replaced by BUREAU OF INDIAN STANDARDS and related REGIONAL OFFICE iv) Clause and of existing STI merged and requirement of Seals (clause 4.5) included. v) Cycle test (clause ) - Sampling and frequency changed. vi) Foot note 2: Foot note 1 of existing STI, is now Note 2. vii) Foot note 4 of Table 1(note 2 of existing STI) - For cycle test, tests of cycles is done away with. Provision for release of lots of regulators based on tests conducted in previous week, in the event of non-completion of cycle test during the week of visit is made. Number of samples changed to 2.

5 viii)production data: Reference to enclosed proforma-i and affidavit/ undertaking is deleted. In place of proforma reference to CM/PF- 604 is made. e) Others: (i) Clause 5.9, Excess flow valve: Shown both in type test and routine test. As per classification (clause 10.1) this is type test. However, as per last para of Annex F, provision/method for routine test is stated. Hence, for purpose of routine test this para and for type test clause F3 is to be referred. C ) In Annex A (Lot inspection procedure): (i) In the first para, relation between Lot and Control units added/clarified. This allows for offering of one or more control units in to Lot and uniform practice by all branches. (ii) In Sampling size: Additional slab included. i.e, and above is made as to and additional sample size as and above added. (iii)in criteria for acceptance: Tests are grouped in two based on the nature of tests requiring 100% inspection on sample size and sub-sampling on sample size.. (One for tests to be carried out on entire sample size and another for sampling from sample size). (iv) Criteria for re-inspection, in case of failure of samples in selected sample size, are modified. This allows for re-offer for inspection on control unit basis. D) In Annex-B (Test Certificate); a) At the top of certificate: Manufacturer s name replaced by Bureau of Indian Standards, Regional Office b) In the test report part: (i) First sentence changed to include Lot no and Control unit nos in place of batch nos in line with modified definition of control unit and sampling procedure for Lot inspection (ii) Additional test i.e Excess flow valve and Mechanical Test of Connections included. PS: (i) Highlighted clauses in Table 1 are new additions in the revised STI Encl : as above. (S S Mugali) Sc-E, FRBO

6 DRAFT Draft:STI/9798/6 January 2015 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF LOW PRESSURE REGULATORS FOR USE WITH LIQUIFIED PETROLEUM GAS (LPG) ACCORDING TO IS 9798: LABORATORY: A laboratory shall be maintained which shall be suitably equipped and staffed where different tests given in the specification shall be carried out in accordance with the methods given in the specification. 2. TEST RECORDS: All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau. 2.1 All testing apparatus/measuring instruments shall be periodically checked and calibrated and records of such checks/calibration shall be maintained. 2.2 Calibration of Testing instruments/equipments shall be carried out periodically from NABL accredited calibration laboratories wherever they are available in the same city. In case where such laboratories are not available, traceability to a National Measurement System (NPL) to be ensured. All records of such calibrations to be kept 2.3 Copies of any records and other connected papers that may be required by the Bureau shall be made available at any time on request. 3. QUALITY CONTROL: It is recommended that as far as possible, Statistical Quality Control (SQC) methods may be used for controlling the quality of the product during production as envisaged in this Scheme [See IS 397(Part I), IS 397(Part 2) and IS 397 (Part 3)]. 3.1 In addition, effort should be made to gradually introduce a quality Management system in accordance with IS/ISO 9001 series as appropriate to the activities of the organization. 4. STANDARD MARK: The Standard Mark, as given in Column (1) of the first Schedule of the licence, shall be marked on each low pressure regulators for use with LPG, provided always that the regulator to which this Mark is thus applied conforms to every requirement of the specification. 4.1 MARKING: In addition each regulator shall be provided with the following information on the regulator: a) The manufacturer s name or trade mark; b) The month and year of manufacture; 1

7 Draft:STI/9798/6 January 2015 c) Rated capacity in m 3 /h of LPG. d) Serial number of regulator, if required; e) Number of this Standard. f) Any other markings as agreed to between the purchaser and the manufacturer; and g) License Number (CM/L.) NOTE: The location and size of CM/L number to be marked on regulators is given in Annex D. 5.0 CONTROL UNIT: A CU shall consist of a lot of bodies and cover of the same type and size casted in a day from the material (body and cover can be cast on different days) of the same /supplier under similar process of production. 6.0 LEVELS OF CONTROL: The tests, as indicated in Table 1 attached and at the levels of control specified therein, shall be carried out on the whole production of the factory which is covered by this scheme and appropriate records and charts maintained in accordance with paragraph 2.0 above. All the production which conforms to the Indian Standards and covered by the licence shall be marked with certification mark of the Bureau. 6.1 Each control unit of finished regulators shall be offered for inspection to BIS before dispatch. The sampling and criteria of conformity for the lot inspection given in Annex A of this scheme shall be followed; Regulators failing to meet the requirements of the specification shall not be marked with the BIS Standard Mark A certificate shall be issued by the Bureau in respect of regulators approved for marking with BIS Standard Mark as per proforma given at Annex B. 6.2 The material shall conform to the requirements specified in Clause 4.1 and 4.2 of IS 9798:2013. A test certificate shall be supplied by the supplier for each of material. However, cross check is to be carried out once in month by testing samples at NABL approved laboratory Material of the diaphragm, valve pad & seals shall conform to the requirements as specified in clause 4.3, 4.4 and 4.5 respectively of IS 9798:2013. A test certificate shall be supplied by the supplier for each of material. The frequency of different tests shall be as indicated in Table The Bureau shall have the discretion of making an independent check test, if necessary, Material of body, cover, diaphragm, valve pad and seals. 2

8 Draft:STI/9798/6 January At the time of approval of prototypes, the regulator shall be checked, for conformity to all the requirements of IS 9798:2013. Whenever there is a change in material or design of the regulator, it shall be retested and shall conform to all the requirements of the specification. A drawing giving outline dimensions and materials of construction shall be provided along with the prototypes. 7.0 In respect of all other clauses of the specification and at all stages of manufacturer, the factory shall maintain appropriate control and checks to ensure that their product conforms to the various requirements of the specification. 8.0 REJECTIONS: A separate record shall be maintained giving information relating to the rejection of the production not conforming to the requirements of the specification and the method of its disposal. Such material shall in no circumstances be stored together with that conforming to the specification. 9.0 SAMPLES: The licence shall supply, free of charge, the samples required in accordance with the Bureau of Indian Standards (Certification) Regulations, 1988, as subsequently amended, from the factory or godowns. The Bureau shall pay for the samples taken by it from the open market REPLACEMENT: Whenever a complaint is received soon after the goods with Standard Marks have been purchased and used and if there is adequate evidence that the goods have not been misused, defective goods or their components are replaced or repaired free of cost by the licensee in case the complaint is proved to be genuine and the warranty period (where applicable) has not expired. The final authority to judge the conformity of the product to the Indian Standard shall be with the Bureau In the event of any damages caused by the goods bearing the Standard Mark, or claim being filed by the consumers against BIS Standard Mark and not conforming to the relevant Indian Standard, entire liability arising out of such non-conforming product shall be of licensee and BIS shall not in any way be responsible in such cases STOP MARKING: The marking of the product shall be stopped under intimation to the Bureau if, at any time, there is some difficulty in maintaining the conformity of their product to the specification, or the testing equipment goes out of order. the marking may be resumed as soon as the defects are removed under intimation of Bureau The marking of the product shall be stopped immediately if directed to do so by Bureau for any reason. The marking may then be resumed only after permission by the Bureau. The information regarding resumption of markings shall also be sent to the Bureau. 3

9 Draft:STI/9798/6 January PRODUCTION DATA: The licensee shall send to BIS production data duly authenticated by a Chartered Accountant at the end of every operative period as per item (b) of column 4 of the second schedule of the license, in the form CM/PF/604. Table 1. 4

10 Draft:STI/9798/6 January 2015 ANNEX A (Cl. 6.1 of STI) Subject: Sampling Plan for Lot Inspection for Certification of LPG regulators as per IS 9798:2013. All the regulators of the same size manufactured from the same of material under similar conditions of production shall be grouped together to constitute a lot. The lot may consist of one or more control units. Samples for lot inspection shall be selected depending on the number of regulators in a lot as given below: Lot Size Sample Size Upto & above 200 Note: When a lot consists of more than one control unit, the sample size shall be divided, as far as possible, equally between the control units Criteria for Acceptance of a lot (i) Each of the regulator selected in the sample shall be subjected to the following tests: a) Construction and workmanship (clause 5.2). b) Inter-changeability (Cl. 5.3). c) Pneumatic test (Cl. 6.2, 6.4). d) Performance test (Cl ). e) Chatter (Cl ). (ii) 2 regulators from the selected samples of each lot shall be tested for ; a) Knob operations (cl 5.2). b) Outlet connection : [2 for non-threaded (Cl ) & 10 % of sample size for threaded (5.6.2). c) Excess flow valve (5.9), if regulator is to be used with excess flow valve - (one Regulator) d) Hydrostatic test (Cl. 6.3). 5

11 e) Mechanical Strength of Connection (8.11). A regulator failing to meet any of the requirements of above tests shall be termed as defective. The lot shall be accepted if no defective is found in the sample size, In case of failure(s), the entire control unit(s) of the defective regulator(s) to be rechecked for the failed parameter and reoffered for inspection, after taking corrective action, wherever required. If a control unit has been re-offered, then the same sampling criteria should be applied as indicated above. but with double the sample size. 6

12 Draft:STI/9798/6 January 2015 ANNEX B (Cl of STI) BUREAU OF INDIAN STANDARDS (. REGIONAL OFFICE) TEST CERTIFICATE FOR LPG PRESSURE REGULATORS Certificate No. : Date: Name and address of the manufacturer: Batch No.(s) : Order No. & Date: Purchaser : Description: Low Pressure LPG regulator (Max. working Pressure kgf/cm 2 ) 500 l/h outlet for 6.4/7mm Rubber Tubing to be used on SC valves with 22.0/25.6 mm outlet diameter. This is to certify that the following regulators are inspected and tested on at M/s in accordance with Scheme Of Testing and Inspection attached with BIS License No. meet the requirement of IS 9798:2013 & drawing No. approved by Chief Controller of Explosives vide letter No. dated. Raw Material Specification: Supplier s Name: Chemical Composition (%) Test Cert. No. & Date: A1 Mg Cr Pb Fe Zn Impurities Specified As per T.C Remarks

13 Draft:STI/9798/6 January 2015 Regulators bearing serial Nos from to. covered by Lot no: and Control Unit nos. are checked/tested for the following: Sr No Parameter Clause No 1 Construction & workmanship (including knob operation) 2 Interchangeability Specified value/ or as per clause 3 Leak-proof test for inlet connection 4 Soundness test 6 4.a Pneumatic test (kg/cm 2 ) b Pneumatic test (gf/cm 2 ) c Hydrostatic test (kg/cm 2 ) Outlet Connection Chatter Performance test Delivery Pr. (mm of W.C) 7.a Inlet pr: 0.5 (kgf/cm 2 ) and min 100 % flow rate 7.b Inlet pr: 17 (kgf/cm 2 ) and max % flow rate 7.c Inlet pr: 17 (kgf/cm 2 ) and lock up max 8 Excess flow valve Mechanical Strength of Connection No of pieces inspected Result QUANTITY OFFERED: QUANTITY PASSED: SR. NO. OF REGULATORS REJECTED: Method of disposal of rejected regulators: De-shaped/Dismantled: Firm s Q.C. In charge NAME Designation Date BIS Inspecting Officer NAME Designation Date 8

14 ANNEX C (Table 1 of STI) Draft:STI/9798/6 January 2015 Interchangeability Procedure for Leak-proof test for inlet connection of LPG pressure regulator as per clause 5.5 IS 9798 and Table 1 of this Scheme. The manufacturer shall provide to the inspector two self closing spring loaded LPG valves manufactured as per customer s requirements, one with all tolerances on the minimum side and another with all tolerances on the maximum side for this check For checking proper fitment and locking up with self closing spring loaded LPG valves, regulators to be coupled with the two pieces of valves provided as above and hydrostatic/pneumatic tests carried out with the valve in open position at the pressure of 25.4 kgf/cm 2 /17.0 kgf/cm 2 to check that there is no leakage from the regulator inlet portion as also from the valve outlet and the regulator inlet joint (the regulator orifice to be closed to lock up position by applying pneumatic pressure greater than 450 mm of water column through outlet of regulator). 9

15 Clause no 4 Nature of test/ requirement Material 4.1 & 4.2 Body & Cover Material TEST DETAILS Test method/ clause no Reference IS IS 9798: 2013 LOW PRESSURE REGULATORS FOR USE WITH LIQUIFIED PETROLEUM GAS (LPG) TABLE 1 LEVELS OF CONTROL (Para 6.0 of the Scheme of Testing and Inspection) No of samples 4.1 & , 742 one Each LEVELS OF CONTROL Lot Size Frequency DRAFT STI IS 9798 :2013 Remarks Each See Note Components material one do do do Brass parts , 2305 one do do do 5.2, 5.3 Construction 5.2, Each regulator 9 Sealing Each regulator 4.3 Type Tests Diaphragm Material Porosity and surface smoothness % subject to a minimum of 8 All the Diaphragm of the same quality in a Each lot See note Clamping test Ageing/Hardnes s or (pt 4) one do do Test to be carried out on representative slab/ button. See note Clamping test one do do See note Pull out and burst Annex C 9798 One sample Per 1000 All the regulators Regulators or assembled Part thereof. in one day Daily See note 2

16 Clause no Nature of test/ requirement TEST DETAILS Immersion test for diaphragm Test method/ clause no Annex D C Reference IS 9798: 2013 LOW PRESSURE REGULATORS FOR USE WITH LIQUIFIED PETROLEUM GAS (LPG) TABLE 1 LEVELS OF CONTROL (Para 6.0 of the Scheme of Testing and Inspection) No of samples 9798 one 1000 diaphragm LEVELS OF CONTROL Lot Size Frequency DRAFT STI IS 9798 :2013 Each lot Remarks See note Flexible test one 1000 diaphragm Compression set test 4.3.7, Annex E 9798 one Each lot Each lot Each lot See note 2 Test to be carried out on representative slab/ button. 4.4 Valve pad Material Porosity, pits,surface smoothness, low cold flow, creep characteristic % subject to a minimum of 8 All the Diaphragm of the same quality in a Each lot See note Immersion test for valve pad Annex D 9798 one 1000 valve pad Each lot See note Immersion test for valve pad fitted in its housing one 1000 valve pad fitted in its housing 4.5 Seals percent subject to a minimum of 8 O rings & rubber components other than diaphragm & valve pad of the same quality in & 6.3 Hydrostatic Test & Each control unit 5.7 Body Each control unit 5.9, 8.10 Excess flow valve 5.9, 8.10, 9798 one One control Annex-F(F3) unit Each lot See note 2 do See note 2 Each control unit Note 3 Each control unit once a month

17 Clause no Nature of test/ requirement TEST DETAILS Test method/ clause no Reference IS 9798: 2013 LOW PRESSURE REGULATORS FOR USE WITH LIQUIFIED PETROLEUM GAS (LPG) TABLE 1 LEVELS OF CONTROL (Para 6.0 of the Scheme of Testing and Inspection) No of samples 5.10 Valve pad fitting one Once in six month LEVELS OF CONTROL Lot Size Frequency DRAFT STI IS 9798 :2013 And at the time of type approval or whenever there is change in design. Remarks 5.11, 8.11 Strength of connection 5.11, one -- do do Cycle test Weeks production Low temp test Weeks production High temp test Weeks production Routine tests Each week. See note 4 Each week. Each week Finish Corrosion resistance Finish (Adhesion test for painted or powder coated surface) , Annexue B one one control unit 9798 one one control unit Each week. one control unit Compression set Annex E Ageing test/ Hardness 4.5 Porosity.Ageing 4.4.1,4.4.3, /Hardness/Compre ssion set 9798 one Each 3 or (Pt.4) one do Test to be carried out on representative slab/button percent subject to a minimum of 8 5.4, Screwed Ends Annex E 9798 Each regulator do do

18 Clause no Nature of test/ requirement 5.5 Interchangeability/ Leakproof test for inlet connection 5.5.2, 6.2 & 6.4 Test method/ clause no Annex- C of STI Reference No of samples 0.25 percent subject to a minimum of 8 Pneumatic test 5.5.2, Each & 6.4 regulator 5.6 Outlet connection (non threaded) 5.6 Outlet connection (threaded) 5.9 Excess flow valve 5.9, Annex-F (F 2 & last para) 8.2, 8.9 Chatter & Performance TEST DETAILS IS 9798: 2013 LOW PRESSURE REGULATORS FOR USE WITH LIQUIFIED PETROLEUM GAS (LPG) TABLE 1 LEVELS OF CONTROL (Para 6.0 of the Scheme of Testing and Inspection) LEVELS OF CONTROL Lot Size Frequency All the regulators assembled in a day Each control unit Each regulator Each control unit 8.2, Each regulator DRAFT STI IS 9798 :2013 Each control unit Each control unit Remarks Note 5 Suitable gauges to be arranged....do Note 1: Note 2: Note 3: Note 4: Note 5: In case material is received with test certificate indicating conformity to chemical composition of relevant IS no further testing is required. However, cross check is to be carried out once in month by testing samples at NABL approved laboratory. If any of the sample fails, twice the number of samples shall be tested from the same. In case of further failures, the entire (lot) shall be rejected. In case of any change in back pressure it shall be construed as leakage through the pad/body and treated as failure of the regulator. In such case, thrice the number of fresh samples shall be tested from same lot. In case of further failures, the entire (lot) shall be rejected. In the event of non completion of the test at the time of inspection by BIS in a particular week, cycle tests carried out during immediate previous week may be accepted. Test results of on going cycle tests to be shown to BIS in succeeding visit. For clause 6.4, in case of any change in back pressure it shall be construed as leakage through the pad/body and treated as failure of the regulator. In such case, further investigation to be carried out to asertain the reason for failure and action to be taken accordingly, and quality check to be strengthened in the affected area.

19

BUREAU OF INDIAN STANDARDS (Central Marks Department - III) Our Ref : CMD-III/16: Oct 2006

BUREAU OF INDIAN STANDARDS (Central Marks Department - III) Our Ref : CMD-III/16: Oct 2006 BUREAU OF INDIAN STANDARDS (Central Marks Department - III) Our Ref : CMD-III/16:8156 18 Oct 2006 Subject : SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF FASTENERS FOR CONSUMER GOODS SYNTHETIC

More information

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau. SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF HAND-OPERATED CHAIN PULLEY BLOCKS ACCORDING TO IS 3832:2005 (Third Revision) (Incorporating Amendment No. 1) DOC:STI:3832/3 1. LABORATORY A laboratory

More information

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III Our Ref: CMD-III/16:814 31 January 2006 Subject: Implementation of Amendment No 1 to IS 814:2004 for Covered Electrodes For Manual Metal Arc Welding

More information

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF GALVANIZED STEEL BARBED WIRE FOR FENCING ACCORDING ACCORDING TO IS 278:2009 (Fourth Revision)

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF GALVANIZED STEEL BARBED WIRE FOR FENCING ACCORDING ACCORDING TO IS 278:2009 (Fourth Revision) SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF GALVANIZED STEEL BARBED WIRE FOR FENCING ACCORDING ACCORDING TO (Fourth Revision) DOC: STI/278/, 1 LABORATORY - A laboratory shall be maintained which

More information

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF RESPIRATORY PROTECTIVE DEVICES FULL FACE MASKS ACCORDING TO IS 14166:1994

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF RESPIRATORY PROTECTIVE DEVICES FULL FACE MASKS ACCORDING TO IS 14166:1994 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF RESPIRATORY PROTECTIVE DEVICES FULL FACE MASKS ACCORDING TO IS 14166:1994 1.0 Laboratory A laboratory shall be maintained, which shall be suitably

More information

STI /15392 /1 April, 2009

STI /15392 /1 April, 2009 CENTRAL MARKS DEPARTMENT-III Our Ref : CMD-III/16:15392 30 04 2009 Subject : Finalized STI as per IS 15392 : 2003 Aluminium and Aluminium Alloy Bare Foil Food Packaging The Scheme of Testing and Inspection

More information

2. Test Record - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

2. Test Record - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards. SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SALT AND REFINED IODIZED SALT, VACUUM EVAPORATED IODIZED ACCORDING TO IS 7224:2006 (Second Revision) Doc: STI/7224/5 1. Laboratory - A laboratory shall

More information

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained. DOC: STI//1 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ACCORDING TO IS/IEC:2003 1. LABORATORY A laboratory shall be maintained which shall be suitably equipped and staffed, where different tests

More information

1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained.

1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained. SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SINGLE PHASE a.c. INDUCTION MOTORS FOR GENERAL PURPOSE ACCORDING TO IS 996:2009 (Including Amendment No.1) 1. LABORATORY A laboratory shall be maintained

More information

CENTRAL MARKS DEPARTMENT-3. Our Ref: CMD-3/16: Subject: STI as per IS 13714: 1993 DUNNAGE PALLETS-WAREHOUSING

CENTRAL MARKS DEPARTMENT-3. Our Ref: CMD-3/16: Subject: STI as per IS 13714: 1993 DUNNAGE PALLETS-WAREHOUSING क द र ह व भ ग 3 द भ- क द र ह व भ ग -3/ 16: आई ए 13714 06.09. 2016 ग ह- आई ए 13714 : 1993 क ल ए ए ट आई आई ए 13714 : 1993 ल भ र (ड ज) प ट भ ड र ग़ क ल ए पर षण और ल ररषण य ज क य वय क ल ए ष ल य क य य एश ष ख

More information

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PLASTIC FEEDING BOTTLES ACCORDING TO IS : 1999 (Incorporating Amendment No.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PLASTIC FEEDING BOTTLES ACCORDING TO IS : 1999 (Incorporating Amendment No. SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PLASTIC FEEDING BOTTLES ACCORDING TO IS 14625 : 1999 (Incorporating Amendment No. 1,2 3 & 4).Doc: STI/14625/3 1.0 LABORATORY- A laboratory shall be

More information

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ALLUMINIUM ALLOY TUBES FOR IRRIGATION PURPOSES; WELDED TUBES ACCORDING TO IS: 7092 (PART I)-1992

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ALLUMINIUM ALLOY TUBES FOR IRRIGATION PURPOSES; WELDED TUBES ACCORDING TO IS: 7092 (PART I)-1992 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ALLUMINIUM ALLOY TUBES FOR IRRIGATION PURPOSES; WELDED TUBES ACCORDING TO IS: 7092 (PART I)-1992 1. LABORATORY: A laboratory shall be maintained which

More information

2. TEST RECORDS: All records of tests and analysis shall be kept in suitable forms approved by the Bureau.

2. TEST RECORDS: All records of tests and analysis shall be kept in suitable forms approved by the Bureau. SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF CARBON STEEL BILLETS, BLOOMS, SLABS AND BARS FOR FORGINGS ACCORDING TO IS:1875-1992 (Fifth Revision) 1. LABORATORY: A laboratory shall be maintained

More information

2. Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

2. Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards. Doc. STI 1848/6 January 1995 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF WRITING AND PRINTING PAPERS ACCORDING TO IS : 1848-1991 (Third Revision) (Amendment No.1 OF September 1993) 1. Laboratory

More information

(अन भ ग अध क र ) (स ए ड -3)

(अन भ ग अध क र ) (स ए ड -3) क द र ह व भ ग 3 स द भ- क द र ह व भ ग -3/16: आई एस 15511 17 भ 2016 ग षह- आई एस 15511:2004 स ईककल ज ज भ एस.ट.आई क क ह भद ह सषम अध क र व र स लगन एस.ट.आई क अन म दन कर ददय गय ह यह सभ क रय ग ह त ह आई एस 15511:2004

More information

स ल न प ए, (द सर स श धन) (स श धन 1 स 6 श "मल)

स ल न प ए, (द सर स श धन) (स श धन 1 स 6 श मल) क य म हर वभ ग 2 हम र स दभ: स एमड 2/16:7123 16 12 2015 वषय : परण और नरण क# य जन, एसटआई Doc:STI/7123/4 *दस बर 2015 क श त ल क 0लए आई एस 7123:1993 क 2प म3 क पय स लन प ए, परण और नरण क# य जन, एसटआई Doc:STI/7123/4

More information

ALUMINIUM CONDUCTORS FOR OVERHEAD TRANSMISSION PURPOSES

ALUMINIUM CONDUCTORS FOR OVERHEAD TRANSMISSION PURPOSES DRAFT Doc No.: SM/IS 398 (Pt.1) PRODUCT MANUAL FOR ALUMINIUM CONDUCTORS FOR OVERHEAD TRANSMISSION PURPOSES PART 1 ALUMINIUM STRANDED CONDUCTORS ACCORDING TO IS 398 (Part 1):1996 (with Amendment No.01 APR

More information

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT- I. Our Ref: CMD I/

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT- I. Our Ref: CMD I/ BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT- I Our Ref: CMD I/31 01 11 2011 Subject: Amendment No. 17 to Operating Manual for Product Certification, 2004 The procedure for Stop Marking and Resumption

More information

úê üßµö ÖãÆü ü ¾Ö³ÖÖÖ - III

úê üßµö ÖãÆü ü ¾Ö³ÖÖÖ - III Subject: Implementation of IS/IEC 60947-2:2003 due to revision of IS 13947 series of specifications as IS/IEC 60947 series 1. ETD has informed regarding the publication of the series of specifications

More information

CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS

CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS 1. Introduction 1.1 Scheme for type approval of products of Indian Register of Shipping (IRS) is an impartial certification system based on a design review

More information

BIS or used as Amendment to STANDARD comments is 15 Nov. 2008

BIS or used as Amendment to STANDARD comments is 15 Nov. 2008 Doc: MTD 4 (4730) For comments only BUREAU OF INDIAN STANDARDS Modified draft Indian Standard HOT ROLLED CARBON STEEL SHEET AND STRIP (Sixth Revision of IS 1079) ICS 77.140.50 Not to be reproduced without

More information

Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry

Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry ANSI/API SPECIFICATION Q1 EIGHTH EDITION, DECEMBER 2007 EFFECTIVE DATE: JUNE 15, 2008 CONTAINS API MONOGRAM

More information

CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT

CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT TF N 548 Rev1 2012-03-29 CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT How to draft clauses on Assessment and Verification of the Constancy of Performance (AVCP) in harmonized standards for construction

More information

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition CEN Keymark Scheme Rules for Thermostatic Radiator Valves 2 nd Edition Content Foreword... 3 Introduction... 3 1 Scope... 4 2 References... 4 3 Terms and Definitions... 4 4 Application... 5 4.1 Product

More information

HOT ROLLED STEEL FLAT PRODUCTS FOR STRUCTURAL FORMING AND FLANGING PURPOSES SPECIFICATION (Third Revision of IS 5986)

HOT ROLLED STEEL FLAT PRODUCTS FOR STRUCTURAL FORMING AND FLANGING PURPOSES SPECIFICATION (Third Revision of IS 5986) For Comments Only Draft Indian Standard Doc: MTD 4(4939) HOT ROLLED STEEL FLAT PRODUCTS FOR STRUCTURAL FORMING AND FLANGING PURPOSES SPECIFICATION (Third Revision of IS 5986) ICS 77.140.50 Not to be reproduced

More information

SARDAR VALLABHBHAI NATIONAL INSTITUTE OF TECHNOLOGY,SURAT

SARDAR VALLABHBHAI NATIONAL INSTITUTE OF TECHNOLOGY,SURAT SARDAR VALLABHBHAI NATIONAL INSTITUTE OF TECHNOLOGY,SURAT TENDER NOTICE Sealed tenders are invited in duplicate from the supplier/manufacturer/distributor/vendor for the supply of the following items.

More information

UGANDA NATIONAL BUREAU OF STANDARDS CERTIFICATION SCHEME

UGANDA NATIONAL BUREAU OF STANDARDS CERTIFICATION SCHEME 1. NAME AND ADDRESS OF APPLICANT Company Name Company Tax Identification Number (TIN) A. APPLICANT S INFORMATION Business Registration Please attach certificate of registration of business COMPANY ADDRESS

More information

Amendment BRL K17504/02

Amendment BRL K17504/02 Amendment BRL K17504/02 DRAFT vulcanised rubber products for cold and hot drinking water applications Date ammendment dd-mm-jjjj Validated by Kiwa Board of Experts Water Chain (CWK) on dd-mm-jjjj. The

More information

INSTRUCTIONS FOR CERTIFICATION OF FACTORY PRODUCTION CONTROL

INSTRUCTIONS FOR CERTIFICATION OF FACTORY PRODUCTION CONTROL . August 2017 were approved by Manager of Product Certification Bureau of the Polish Register of Shipping on 25 August 2017 Copyright by, 2017. GDAŃSK, AUGUST 2017 1/12 CONTENTS 1. Factory Production Control

More information

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.

More information

TECHNICAL SPECIFICATION FOR CLAMPS & CONNECTORS FOR 66/132/220/400 KV SUB-STATION

TECHNICAL SPECIFICATION FOR CLAMPS & CONNECTORS FOR 66/132/220/400 KV SUB-STATION GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATION FOR CLAMPS & CONNECTORS FOR 66/132/220/400 KV SUB-STATION GETCO/E/TS-C&C

More information

DOMESTIC GAS REGULATORS

DOMESTIC GAS REGULATORS CNG & CITY GAS DISTRIBUTION PROJECT FOR BID DOCUMENT FOR DOMESTIC GAS REGULATORS UNDER DOMESTIC COMPETITIVE BIDDING Bid Document No.: TNGCL/C&P/P(101)/PRV/2013-14 Dated 06/06/2013 VOLUME II OF II PREPARED

More information

GENERAL TERMS and CONDITIONS OF SALE

GENERAL TERMS and CONDITIONS OF SALE GENERAL TERMS and CONDITIONS OF SALE between COMPANIES OF DEATEX GROUP ITALY Hereinafter also named Seller and hereinafter The Client or The buyer Preamble The present Agreement governs the partnership

More information

Draft Indian Standard Galvanized Steel Sheets (Plain and Corrugated)- Specification (Seventh Revision of IS 277) ICS

Draft Indian Standard Galvanized Steel Sheets (Plain and Corrugated)- Specification (Seventh Revision of IS 277) ICS FOR BIS Use Only Doc: No. MTD 4 (5207) Draft Indian Standard Galvanized Steel Sheets (Plain and Corrugated)- Specification (Seventh Revision of IS 277) ICS 77.140.50 Not be reproduced without the permission

More information

KENDRIYA BHANDAR GROCERY DIVISION NEW DELHI. Registration of Suppliers of Pulses & Rice Terms & Conditions

KENDRIYA BHANDAR GROCERY DIVISION NEW DELHI. Registration of Suppliers of Pulses & Rice Terms & Conditions KENDRIYA BHANDAR GROCERY DIVISION NEW DELHI Registration of Suppliers of Pulses & Rice Terms & Conditions Reference Kendriya Bhandar s advertisement appeared in the Times of India dt. 9 th June, 2015 inviting

More information

TECHNICAL SPECIFICATION DANTECO HERMANNS. CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device

TECHNICAL SPECIFICATION DANTECO HERMANNS. CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device TECHNICAL SPECIFICATION DANTECO HERMANNS CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device 6058(20') x 2438(8') x 2591(8'6") MODEL NO. : CX09-20SNX1 SPEC. NO : CX09-20SNX1-S3

More information

LC 16 SITE PLANS, DESIGNS AND SPECIFICATIONS

LC 16 SITE PLANS, DESIGNS AND SPECIFICATIONS Title of document ONR GUIDE LC 16 SITE PLANS, DESIGNS AND SPECIFICATIONS Document Type: Unique Document ID and Revision No: Nuclear Safety Technical Inspection Guide Date Issued: September 2015 Review

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 8535-1 Fourth edition 2006-08-01 Diesel engines Steel tubes for highpressure fuel injection pipes Part 1: Requirements for seamless cold-drawn single-wall tubes Moteurs diesels

More information

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies Accreditation International Association for Certifying Bodies Guidance on the Application of ISO / IEC 17020 Guidance on the Application of ISO/IEC 17020 Page 1 of 16 Introduction This guidance document

More information

STEEL TUBES FOR STRUCTURAL PURPOSES

STEEL TUBES FOR STRUCTURAL PURPOSES Steel Tubes for Structural Purpose IS Number IS 1161 Page No: 1 of 20 BUREAU OF INDIAN STANDARDS (Eastern Region Office, Kolkata) DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS Our Ref: DDGE/22/IS 1161

More information

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER PETROLEUM, PETROCHEMICAL AND NATURAL GAS INDUSTRIES -- SECTOR-SPECIFIC QUALITY MANAGEMENT SYSTEMS -- REQUIREMENTS FOR PRODUCT AND SERVICE SUPPLY ORGANIZATIONS

More information

INSULATED JOINTS. Monolithic Joints for Electrically Isolating Pipelines

INSULATED JOINTS. Monolithic Joints for Electrically Isolating Pipelines INSULATED JOINTS Monolithic Joints for Electrically Isolating Pipelines INSULATED JOINTS TUBE TURNS INSULATED JOINTS are a pre-fabricated, non-separable, union used to isolate specific sections of pipelines

More information

Specifications of Impeller forgings. Quantity: 2 No s. (Please find the attachment for material specification HY19391)

Specifications of Impeller forgings. Quantity: 2 No s. (Please find the attachment for material specification HY19391) Specifications of Impeller forgings Material Specification: HY19391 Grade: V X12 Cr13 G Dimensions: OD 830 X ID 370 X Thickness 120 (all are in mm) Quantity: 2 No s. (Please find the attachment for material

More information

IECEE OPERATIONAL DOCUMENT

IECEE OPERATIONAL DOCUMENT IECEE OD-G-4001 Edition 1.3 2013-06-20 IECEE OPERATIONAL DOCUMENT IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System) Guidance for Factory Inspectors

More information

P.V.C. INSULATED ALUMINIUM SERVICE MAIN WIRE-FINISHED PRODUCT

P.V.C. INSULATED ALUMINIUM SERVICE MAIN WIRE-FINISHED PRODUCT CEB SPECIFICATION 005-1: 2012 P.V.C. INSULATED ALUMINIUM SERVICE MAIN WIRE-FINISHED PRODUCT CEYLON ELECTRICITY BOARD SRI LANKA Telephone: +94 11 232 0953 Fax: +94 11 232 3935 CONTENTS PAGE 1. Scope 03

More information

STANDARD PROCEDURE: NWSP R0 (15) Breaking Force and Elongation of Nonwoven Materials (Strip Method)

STANDARD PROCEDURE: NWSP R0 (15) Breaking Force and Elongation of Nonwoven Materials (Strip Method) STANDARD PROCEDURE: Breaking Force and Elongation of Nonwoven Materials (Strip Method) 1. Scope This test method covers cut strip test procedures for determining the breaking force and elongation of most

More information

ISO/TS TECHNICAL SPECIFICATION

ISO/TS TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ISO/TS 29001 Third edition 2010-06-01 Petroleum, petrochemical and natural gas industries Sector-specific quality management systems Requirements for product and service supply

More information

TECHNICAL BID. Name of the party :

TECHNICAL BID. Name of the party : TENDER FORM FOR QUOTED RATE FOR THE SUPPLY OF. TENDER FORM II TECHNICAL BID Name of the party : --------------------------------------- Address : ---------------------------------------- ----------------------------------------

More information

Sir, We hereby place an order on you for the services as described below: Collector Area (m²) No. of samples

Sir, We hereby place an order on you for the services as described below: Collector Area (m²) No. of samples APPLICATION FORM SOLAR FLAT PLATE COLLECTOR (FPC) From: - Company (Please write complete Postal address) Sir, We hereby place an order on you for the services as described below: Sr. No. Description Collector

More information

SPECIFICATIONS FOR A QUALITY LABEL FOR DECORATION OF COATED ALUMINIUM USED IN ARCHITECTURAL APPLICATIONS Edition

SPECIFICATIONS FOR A QUALITY LABEL FOR DECORATION OF COATED ALUMINIUM USED IN ARCHITECTURAL APPLICATIONS Edition SPECIFICATIONS FOR A QUALITY LABEL FOR DECORATION OF COATED ALUMINIUM USED IN ARCHITECTURAL APPLICATIONS Master version approved by the QUALIDECO Committee on 14 December 2011 Effective from 1 January

More information

Protocol Page 1 of 11. Protocol for Proficiency testing scheme for Bitumen Programme No. GPTS/PT 05

Protocol Page 1 of 11. Protocol for Proficiency testing scheme for Bitumen Programme No. GPTS/PT 05 Tel Nos. +91 79 2656 5405, 2656 1104, Mob Nos. +91 98254 13148, 93270 17517, Fax Nos. +91 79 2656 3240 Email sales@globalptservices.com, nilesh@globalptservices.com Protocol Page 1 of 11 Protocol for Proficiency

More information

JOHN WOOD UNCONTROLLED COPY: THE JOHN WOOD COMPANY PO BOX HIGHLAND AVENUE OAKS, PENNSYLVANIA 19456

JOHN WOOD UNCONTROLLED COPY: THE JOHN WOOD COMPANY PO BOX HIGHLAND AVENUE OAKS, PENNSYLVANIA 19456 JOHN WOOD QUALITY CONTROL SYSTEM MANUAL FOR PRESSURE VESSELS CONSTRUCTED TO ASME BOILER & PRESSURE VESSEL CODE SECTION VIII, DIVISION 1 AND REPAIRS AND ALTERATIONS TO METALLIC PRESSURE RETAINING ITEMS

More information

Jhabua Power Ltd. NOTICE INVITING BIDS

Jhabua Power Ltd. NOTICE INVITING BIDS Jhabua Power Ltd. 2nd Floor, Centrum plaza, Golf Course Road, Sector- 53, Gurgaon-122002 Ph.: +91-124-4392000 Fax: +91-124-4376496 NOTICE INVITING BIDS BY JHABUA POWER LIMITED (JPL) 2nd Floor, Centrum

More information

Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries

Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries API SPECIFICATION 20F FIRST EDITION, XXX 201X 1 1. Scope 1.1 Purpose This API specification specifies requirements for the

More information

ISO INTERNATIONAL STANDARD. Safety devices for protection against excessive pressure Part 2: Bursting disc safety devices

ISO INTERNATIONAL STANDARD. Safety devices for protection against excessive pressure Part 2: Bursting disc safety devices INTERNATIONAL STANDARD ISO 4126-2 First edition 2003-01-15 Safety devices for protection against excessive pressure Part 2: Bursting disc safety devices Dispositifs de sécurité pour protection contre les

More information

EURASIAN ECONOMIC COMMISSION COUNCIL

EURASIAN ECONOMIC COMMISSION COUNCIL EURASIAN ECONOMIC COMMISSION COUNCIL Working translation: DECISION October 9, 2014 No.94 Minsk On the Regulation on the Harmonized Procedure of Joint On-Site Inspections and of Taking Samples of Goods

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

ISO Steels for the reinforcement of concrete Reinforcement couplers for mechanical splices of bars Requirements

ISO Steels for the reinforcement of concrete Reinforcement couplers for mechanical splices of bars Requirements INTERNATIONAL STANDARD ISO 15835-1 First edition 2009-04-01 Steels for the reinforcement of concrete Reinforcement couplers for mechanical splices of bars Part 1: Requirements Aciers pour l'armature du

More information

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS 13VAC5-91-10. Definitions. The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise. Administrator means the Director of

More information

ISO/TS TECHNICAL SPECIFICATION

ISO/TS TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ISO/TS 29001 Third edition 2010-06-01 Petroleum, petrochemical and natural gas industries Sector-specific quality management systems Requirements for product and service supply

More information

Amendment to Schedule 8 for Ceiling Fan. (i) in paragraph 8, for sub-paragraph (i) the following shall be substituted, namely:-

Amendment to Schedule 8 for Ceiling Fan. (i) in paragraph 8, for sub-paragraph (i) the following shall be substituted, namely:- Revision 1 Date: 28/01/2016 Amendment to Schedule 8 for Ceiling Fan In the said schedule, (i) in paragraph 8, for sub-paragraph (i) the following shall be substituted, namely:- Effective from 1 st January

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Horizontal Centrifugal Water Pumps C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Horizontal Centrifugal Water Pumps C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 11931 - Horizontal Centrifugal Water Pumps C O N T E N T S PART 1 - GENERAL... 1 1.01 PUMP - GENERAL... 1 1.02 CERTIFIED PUMP CURVES... 1 1.03 NPSH REQUIREMENTS...

More information

1. You are requested to please forward your offer for the following:-

1. You are requested to please forward your offer for the following:- 1 TO: M/S REGISTERED/IMMEDIATE Heavy Industries Taxila Marketing and Procurement Directorate (Commercial Cell) Taxila Cantt, Pakistan Tel: (051) 9315033-62933 Fax No. (051) 9315029 & 31 CC/17/5061/IT-231/Ind-17/P-

More information

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS 1. GOVERNMENT/CUSTOMER SOURCE INSPECTION: a. Government/Customer inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government/Customer representative

More information

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 1.0 SCOPE This document establishes the quality program requirements for an organization providing engineering

More information

BUREAU OF INDIAN STANDARDS OFFICE ORDER. Subject: Preparation of Product Manuals by RO/BOs by Custodian BOs

BUREAU OF INDIAN STANDARDS OFFICE ORDER. Subject: Preparation of Product Manuals by RO/BOs by Custodian BOs BIS/DGO( 428 )/2015 15 January 2015 BUREAU OF INDIAN STANDARDS OFFICE ORDER Subject: Preparation of Product Manuals by RO/BOs by Custodian BOs Attention of RO/BOs is drawn towards Cl.10.1 of DGO(404) whereupon

More information

SPECIFICATION Insulated Steam Injection Tubing Revision 6, dated 24 July 2011

SPECIFICATION Insulated Steam Injection Tubing Revision 6, dated 24 July 2011 OIL TECH SERVICES, INC. 800 Wilcrest, Suite 100 Houston, TX 77042-1359 (310)-527-2695 (713) 789-5144 E Mail: mlombard@itmreps.com Website: www.itmreps.com SPECIFICATION Insulated Steam Injection Tubing,

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 9974-4 Minor Revision Draft 2016-04-12 Connections for general use and fluid power Ports and stud ends with ISO 261 threads with elastomeric or metal-to-metal sealing Part 4:

More information

BUREAU OF INDIAN STANDARDS (Central Regional Office) EXPRESSION OF INTEREST

BUREAU OF INDIAN STANDARDS (Central Regional Office) EXPRESSION OF INTEREST BUREAU OF INDIAN STANDARDS (Central Regional Office) EXPRESSION OF INTEREST Expression of Interest for Undertaking Factory Assessment/Surveillance audits under Product Certification Scheme of Bureau of

More information

TENDER NOTICE

TENDER NOTICE Rajarambapu Patil Sahakari Dudh Sangh Maryadit, Islampur Plot no. A16 to 19, MIDC, Islampur - 415409. Tel No.: (02342) 2226661 Fax No.: (02342) 220671 Email: purchase@krushnadudh.com ---------------------------------------------------------------------------------------------------

More information

Electricity Supply Agreement

Electricity Supply Agreement Electricity Supply Agreement 1. General 1.1 Mazoon Electricity Company SAOC (the Supplier) shall on or from the Start Date, subject to the satisfactory completion of a Supply Application Form, provide

More information

TECHNICAL SPECIFICATION OF MS TOR BARS FOR TRANSMISSION LINES

TECHNICAL SPECIFICATION OF MS TOR BARS FOR TRANSMISSION LINES GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATION OF MS TOR BARS FOR TRANSMISSION LINES GETCO/E/TS-MS024/R2 DT08-02-2012 TECHNICAL

More information

PS-31 (SUS304, 300 mm) PS-31 (SUS304, 1,000 mm)

PS-31 (SUS304, 300 mm) PS-31 (SUS304, 1,000 mm) CSM_PS-_S(R)_-31_DS_E_7_1 Separate s for Water Supply and Drainage Control in Buildings. Small, Lightweight s for Use as Built-in Components. The PS-@S(R) are separate s that allow the s to be withdrawn

More information

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised. REF ONLY-DATA MANAGEMENT: 1 ST (2) PAGES IS NOT PART OF FORM 1135. QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised. FORM 1135 QUALITY ASSURANCE CLAUSES

More information

SUPPLIER QUALITY CODES

SUPPLIER QUALITY CODES Supplier Quality s D07-00125 Rev A APPROVALS NAME AND TITLE SIGNATURE DATE M.G. Blankenship Senior Director, Operations I. Jimenez Materials Manager D07-00125-02 Page 1 of 5 SQC 1 SQC 2 SQC 3 SQC 4 SQC

More information

Session 10: The UNFPA Prequalification Site Inspection

Session 10: The UNFPA Prequalification Site Inspection Session 10: The UNFPA Prequalification Site Inspection Group Brainstorm: Site Inspection In your experience, in what areas have you disagreed with the inspectors? Objectives Provide overview of what inspectors

More information

Presented by: Gary Scribner Manager of Technical Services. Shanghai April The National Board of Boiler and Pressure Vessel Inspectors

Presented by: Gary Scribner Manager of Technical Services. Shanghai April The National Board of Boiler and Pressure Vessel Inspectors Presented by: Gary Scribner Manager of Technical Services Shanghai April 2016 1. Provides administrative and technical rules, and guidelines to follow for repairing or altering a pressure retaining item.

More information

European Technical Approval No. ETA-12/0056

European Technical Approval No. ETA-12/0056 SINTEF Building and Infrastructure P.O.Box 124 Blindern N-0314 Oslo Tel. 47 22 96 55 55 Fax 47 22 69 94 38 Authorised and notified according to Article 10 of the Council Directive 89/106/EEC of 21 December

More information

MOTHER DAIRY. A Unit of Gujarat Co-operative Milk Marketing Federation Limited. MDG:PUR:PFP:CORE:13:03 December 16, 2013

MOTHER DAIRY. A Unit of Gujarat Co-operative Milk Marketing Federation Limited. MDG:PUR:PFP:CORE:13:03 December 16, 2013 MDG:PUR:PFP:CORE:13:03 December 16, 2013 TENDER FOR SUPPLY OF PAPER / POY CORES Subject: - Tender enquiry for Paper core and POY Tubes for PFP unit, Mother Dairy, Gandhinagar. We invite your most competitive

More information

DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS. Our Ref.: NRO/PRBO 13 Jan 2014

DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS. Our Ref.: NRO/PRBO 13 Jan 2014 DRAFT MANUAL FOR COMMENTS Our Ref.: NRO/PRBO 13 Jan 2014 Please find enclosed the following draft certification manual: Product manual on Electric Iron as per IS 366: 1991 Kindly examine the draft product

More information

This electronic edition is licensed to for 1 copy. International Maritime Organization

This electronic edition is licensed to for 1 copy. International Maritime Organization This electronic edition is licensed to 0309317 for 1 copy. International Maritime Organization ISM Code INTERNATIONAL SAFETY MANAGEMENT CODE and guidelines on implementation of the ISM Code 2010 Edition

More information

This document is a preview generated by EVS

This document is a preview generated by EVS INTERNATIONAL STANDARD ISO 683-2 Second edition 2016-07-01 Heat-treatable steels, alloy steels and free-cutting steels Part 2: Alloy steels for quenching and tempering Aciers pour traitement thermique,

More information

Service Suppliers Performing Tightness Testing of Hatches With Ultrasonic Equipment on Ships, High Speed and Light Craft and Mobile Offshore Units

Service Suppliers Performing Tightness Testing of Hatches With Ultrasonic Equipment on Ships, High Speed and Light Craft and Mobile Offshore Units pproval of rvc upplrsno. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Approval of Service Suppliers No. 403 Service Suppliers Performing Tightness Testing of Hatches With Ultrasonic Equipment on

More information

INDUSTRIAL ATTACK 800

INDUSTRIAL ATTACK 800 ! INDUSTRIAL ATTACK 800 SPECIFICATION FOR 1, 1½, 1¾", 2, 2½", & 3 DOUBLE JACKET INDUSTRIAL FIRE HOSE POLYESTER FIBER CONSTRUCTION PLAIN WHITE OUTSIDE JACKET OR ULTRA-SHIELD IMPREGNATED OUTSIDE JACKET EPDM

More information

MONITORING ASSURANCES

MONITORING ASSURANCES 99 9 MONITORING ASSURANCES BACKGROUND In the parliamentary system of governance, the Council of Ministers is responsible and accountable to the Legislature. The Executive acts with the approval and concurrence

More information

Facilities Planning and Construction (FP&C)

Facilities Planning and Construction (FP&C) Appendix 8.4a Facilities Planning and Construction (FP&C) UAA FP&C Quality Assessment Checklist (A) Project: PM: Project ID: Updated:

More information

Pioneer Forced Draft Cooling Tower Specifications

Pioneer Forced Draft Cooling Tower Specifications Delta Cooling Towers, Inc. 41 Pine Street P.O. Box 315 Rockaway, New Jersey 07866-0315 Telephone 973.586.2201 Fax 973.586.2243 www.deltacooling.com sales@deltacooling.com Pioneer Forced Draft Cooling Tower

More information

ISTA Accreditation Standard for Seed Testing and Seed Sampling

ISTA Accreditation Standard for Seed Testing and Seed Sampling INTERNATIONAL SEED TESTING ASSOCIATION (ISTA) Secretariat, Zürichstrasse 50, 8303 Bassersdorf, CH-Switzerland Phone: +41-44-838 60 00, Fax: +41-44-838 60 01, Email: ista.office@ista.ch, http://www.seedtest.org

More information

Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry (Draft 10)

Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry (Draft 10) Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry (Draft 10) ANSI/API SPECIFICATION Q1 NINTH EDITION, XXXX 2012 EFFECTIVE DATE: XXXX 2012 + 6 Months \iii Contents

More information

Required Elements of a Quality Management System

Required Elements of a Quality Management System Quality Management System Review Procedures IAPMO Evaluation Service (IAPMO UES) No.: ES-010 Title: Review Procedures for Certified Manufacturer s Quality Management System (QMS) Documentation By: B. Berneche

More information

The following Computers and Scanners are urgently required for the implementation of e-office at all Agrl Market Committees in West Godavari District.

The following Computers and Scanners are urgently required for the implementation of e-office at all Agrl Market Committees in West Godavari District. Roc.No.152/B/2016 Date.22.03.2017. Office of the Assistant Director of Marketing, West Godavari : Eluru. SHORT TENDER NOTIFICAION The following Computers and Scanners are urgently required for the implementation

More information

Nordic requirements for quality control of industrially Protected wood

Nordic requirements for quality control of industrially Protected wood Nordic requirements for quality control of industrially Protected wood Part 3: Heartwood of Scots pine and other durable woods NTR Document no. 3 Part 3:2017 Nordic Wood Preservation Council 2017 Nordic

More information

TECHNICAL SPECIFICATION FOR CONDUCTORS

TECHNICAL SPECIFICATION FOR CONDUCTORS TECHNICAL SPECIFICATION FOR CONDUCTORS SEAL & SIGNATURE OF THE TENDERER PAGE 1 OF 9 TECHNICAL SPECIFICATION FOR CONDUCTORS SPECIFYING TECHNICAL PARAMETERS OF THE CONDUCTOR SPECIFICATION NO. RE/ II/ ACSR

More information

OPAC EN Operating Procedure for the Attestation of Conformity of Structural Bearings in compliance with Annex ZA of EN 1337/3/4/5/6/7

OPAC EN Operating Procedure for the Attestation of Conformity of Structural Bearings in compliance with Annex ZA of EN 1337/3/4/5/6/7 OPAC EN1337-00 Operating Procedure for the Attestation of Conformity to EN1337 Revision 00 Approved by BT3 on 20050525, by Board of directors on 20050610 Operating Procedure for the Attestation of Conformity

More information

EHPA regulations for granting the international quality label for electrically driven heat pumps

EHPA regulations for granting the international quality label for electrically driven heat pumps EHPA regulations for granting the international quality label for electrically driven heat pumps Version 1.6 Release 16.02.17 European Heat Pump Association Rue d Arlon 63-67 B-1040 Brussels www.ehpa.org

More information

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,

More information

NEW SUPPLIER REGISTRATION FORM (SRF)

NEW SUPPLIER REGISTRATION FORM (SRF) RECEIPT NO.: INDIAN RAILWAY CATERING AND TOURISM CORPORATION LTD. (A Govt. of India Enterprise) th 9 FLOOR, BANK OF BARODA BUILDING 16 - PARLIAMENT STREET NEW DELHI - 110 001 Tel:-011-23311263-64, Fax:-011-23311259

More information

CIRCULAR GENERAL PROVISIONS

CIRCULAR GENERAL PROVISIONS MINISTRY OF CONSTRUCTION -------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 10/2013/TT-BXD Hanoi, July 25, 2013 CIRCULAR ON CONSTRUCTION QUALITY MANAGEMENT Pursuant

More information