Asheboro Facilities Contractor Orientation
|
|
- Jasmine McGee
- 6 years ago
- Views:
Transcription
1 Asheboro Facilities Contractor Orientation Energizer Battery Manufacturing, Inc. (To be reviewed with ALL contractors, regular basis mechanics and electricians and janitorial staff.) 1
2 Purpose of Site Orientation This purpose of this presentation is to provide information to contactors regarding Energizer's general safety rules of conduct while performing work at our Asheboro Facilities. This is in accordance with our contactor safety compliance requirements. Carolina Star Worksite We are proud to be recognized as a Carolina Star Site. Since 2003, this designation recognizes our facilities as one committed to creating and maintaining a safe and healthy workplace. 2
3 Facilities 419 Art Bryan Drive 3
4 4
5 General Information Parking: Upper North parking lot using gate 1 & 2 must be used for contactors at Albemarle and the North employee entrance gate at Central for entrance/exit to/from the plant property. Tobacco use is prohibited on company property. Including personal vehicles on property Emergency eye wash/shower stations are located throughout the facilities. Upper West parking lot at Art Bryan (Plant 2) must be used for contractor s automobiles for entrance/exit to and from the plant property. Eating on premises is confined to cafeterias/break rooms to outside. 5
6 Facility-wide Safety Requirements 6
7 Emergency Exits Know your closest emergency exits to your work area. Signs are posted throughout the facility to indicate primary and secondary exit points. 7
8 Contractor Identification Contractors must wear a photo ID badge while performing work at this facility. The badge must be visible at all times. Contractor will be issued a picture/name ID. Contractor C Badges are OBSOLETE 8
9 PPE Requirements 9
10 Safety Glasses ANSI approved safety glasses with side shields are required at all times in production and maintence areas and associated isles. Splash goggles, sides shields, or other PPE, may be required when performing hazardous task. Safety glasses are Required when performing any maintence tasks. Hearing Protection Required: Plant 1 = Metal Parts Department and Gray & Red floor production areas. Plant 2 = All Production areas. 10
11 Tools and Equipment Tools equipped with lasers must NOT have a rating higher than a Class II. This includes, but not limited to pointers and leveling devices. 11
12 Fall Protection The need for fall protection arises when there is work at elevated heights (4 feet or higher) where there are fall hazards. Examples include: Such actions as work on open sided platforms or floors, work on top of unguarded tanks, enclosures, pipes, or railroad cars, work at ceiling or rafter level, climbing on equipment to gain access to fixtures, valves, filters, or other for work above a 4 ft. elevation, or climbing out of, or leaning out of a scissors lift platform. Training in fall protection must include: Daily harness inspections A rescue plan (if person falls, retrieval must occur within 15 minutes, then first aid or medical attention must be administered) 12
13 Job Safety and Health Analyses You may be asked to review a Job Safety and Health Analysis (JSHA) for specific work that you are performing. These documents provide procedural safety information for your protection. Please review these documents carefully. If a JSHA is not available for a task that you are performing, then a JSHA may need to be written before work begins. 13
14 Facilities different Fire Extinguishers 14
15 Power Industrial Vehicles This facility utilizes powered industrial vehicles such as fork trucks, electric hand trucks, High jackers, and sweepers as well as AGV s (automatic guided vehicles; robotic fork trucks). Always maintain your awareness for these vehicles, especially at aisle intersections. 15
16 All Trades and Services Technicians This includes welders, roofers, painters, construction, HVAC, movers, system installers, equipment service tech, etc. ARE REQUIRED TO FOLLOW OSHA AND EBM SAFETY GUIDELINES AND REQUIREMENTS. Refer to House Rules Table of Content for a reference list of required standards 16
17 General Information Contractor Storage Energizer may provide areas for storing material & equipment. Each contractor and subcontractor must provide a means to secure such items. Flammable liquids Must be stored in an approved container at a safe distance from buildings and must have the approval of the EBM Environmental Coordinator prior to storing Gasoline or Diesel Engines Are not permitted to be used in the facility without proper approval (contact your ECR). Overhead Work Is not permitted in occupied areas over EBM employees or other contractors without proper approval (contact your ECR). 17
18 General Information Guards and Safety Devices DO NOT OPERATE EQUIPMENT WITHOUT GUARDS IN PLACE. DO NOT OPERATE EQUIPMENT WITH SAFETY DEVICES BYPASSED Working on Moving or Energized Equipment - Work on equipment that is moving or energized is STRICTLY PROHIBITED Working on Energized Equipment - You must meet LOTO requirements before work can begin Ladders - Conductive ladders are prohibited from EBM property. Fiberglass ladders must be used. Scaffolding - The use of scaffolding must comply with all standards set forth 18 in OSHA
19 Equipment Loan Agreement Business needs may permit contractors to use Energizer s equipment, subject to terms contained in the Equipment Loan Agreement form. (OHB 809) This agreement acknowledges that the contractor: a) Is trained, or has qualified operators, to use of the equipment b) Will return the equipment in good and safe working condition c) Will report any defects, damage, or loss of equipment d) Assumes liability for its use This agreement is available through your ECR or purchasing representative. 19
20 Permits and Authorization Hazardous Work Permits are REQUIRED for the following types of work: Roof Work / Fall Protection required If working within 6ft of the edge. Excavating & Trenching Confined Spaces Electrical Systems Working on or near the area. MUST be at zero energy Operating Equipment around power lines Grinding or any other spark producing work Elevated Work Torches or any open flame Opening equipment that contains pressurized materials Moving Radioactive Material
21 Hazardous Chemicals The Material Safety Data Sheet, sometimes called OSHA Form 20, must be obtained and furnished by you for any chemical you would like to bring into our facility. The MSDS must be provided to the ECR and then forwarded to and approved before the chemical can be brought onto EBC property. Please review the use of all chemicals brought on site with your ECR. All chemicals must clearly display a chemical hazard label. Check all chemicals, do not assume a chemical is safe, check it out. 21
22 Asbestos Awareness Asbestos containing Materials (ACM) are found in the following areas of Art Bryan (Plant 2); 12 X12 or 9 X9 floor tiles and mastic in the main cafeteria and kitchen, main employee entrance, under servers in MIS, Betty Connor s office, mix blow-up control room. TSI covering at pipe elbows on mezzanine above plant manager s or purchasing offices. These floor tiles and TSI covering must not be drilled into, removed, or disturbed in any way. 22
23 Advising ECR 23
Contractor / Vendor Safety Manual
Contractor / Vendor Safety Manual All contractors and vendors conducting business at the Salk Institute for Biological Studies, the Institute, at 10010 N. Torrey Pines Road, La Jolla, CA 92037 must: 1.
More informationEnvironmental, Health and Safety Policy for Contractors
Environmental, Health and Safety Policy for Contractors The attached policy is a tool to help contractors understand and comply with RBC's Environmental, Health and Safety rules. The information that follows
More informationOASIS PETROLEUM NORTH AMERICA LLC OASIS WELL SERVICES LLC. Contractor Environmental, Health and Safety (EHS) Requirements
March 8, 2012 OASIS PETROLEUM NORTH AMERICA LLC OASIS WELL SERVICES LLC Contractor Environmental, Health and Safety (EHS) Requirements March 2012 March 8, 2012 OASIS PETROLEUM NORTH AMERICA LLC OASIS WELL
More informationFACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision
FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision 1. Intent This program has been developed to reduce the risk of physical injury or property
More informationSafety and Environmental Orientation and Practices for Contractors
Safety and Environmental Orientation and Practices for Contractors Welcome to the University of California, Irvine. Some University facilities are unique and the practices listed here are for your safety
More informationPersonal Protective Equipment (PPE) Safety Program
Personal Protective Equipment (PPE) Safety Program ENVIRONMENTAL HEALTH & SAFETY pg. 1 Table of Contents A. Introduction And Purpose... 4 B. Background... 4 C. Policy... 4 D. Personal Protective Equipment
More informationCAL/OSHA ELECTRICAL HIGH VOLTAGE
Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to electrical exposure to high voltage for employees and contractors
More informationWORKING AT HEIGHT PROCEDURE
Page 1 of 8 AL-Yamama Engineering Company HSSE Department (s) WORKING AT HEIGHT PROCEDURE Page 1 of 8 Page 2 of 8 Introduction Work at height is any work activity that is performed where the work is to
More informationFACILITIES MANAGEMENT CONTRACTOR SAFETY PROGRAM
FACILITIES MANAGEMENT CONTRACTOR SAFETY PROGRAM Document History Version Date Comments 0.1 Sept 1, 2015 Initial Draft 0.2 Sept 30, 2015 Internal Review 0.3 Jan 25, 2016 External Review 0.4 March 21, 2016
More informationScissor Lift Safety for Clients and Employees or ARS
ADVANCED RESOURCE SOLUTIONS INNOVATIVE SOLUTIONS FOR PROJECT SUCCESS Scissor Lift Safety for Clients and Employees or ARS Added 1/20/2017 Employees: Guidelines addressed in OSHA 1926.451; 1926.452(w);
More informationSAFE WORK METHOD STATEMENT (SWMS)
ABN: 12 345 678 910 ACN: 123 456 789 Address: Your Company Address PH: Your Company Phone E: Your Company Email Web: Your Company Website PROJECT DETAILS: Project: SAFE WORK METHOD STATEMENT (SWMS) Area:
More informationCONTRACTOR SAFETY & HEALTH RULES
CONTRACTOR SAFETY & HEALTH RULES March 2016 (Revised) Introduction Wright State University (WSU) recognizes that many hazards are inherent in construction and other contract work. Compliance with safety
More informationCONSULTING OFFICE OF MORRIS S. FARKAS PROFESSIONAL SAFETY ENGINEER
CONSULTING OFFICE OF MORRIS S. FARKAS PROFESSIONAL SAFETY ENGINEER EDUCATION 3835 East Thousand Oaks Boulevard, #365 Westlake Village, California 91362 Telephone: (805) 494-0444 Facsimile: (805) 494-0441
More informationDemolition Safety!!!!
Sample Written Program For Your Company For Demolition Safety Provided By: P.O. Box 2136 Slidell, LA 70458 Phone: 985-781-1444 Fax: 985-718-4957 Email: info@se-safety.com Demolition Safety Program Purpose
More informationWorkplaces must be kept clean, orderly, and sanitary. Workroom floors must be maintained as clean and dry as possible.
Section C.19 University of South Carolina Safety Program Guide WALKING AND WORKING SURFACES Introduction Occupational Safety and Health Administration (OSHA) CFR 1910 Subpart D Walking and Working Surfaces
More informationCHRYSLER GROUP LLC MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY. REVIEW DATE. December 15, 2009
CHRYSLER GROUP LLC MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY Subject: SMI-163: Contractor Safety ISSUE DATE: February 1, 2005 EFFECTIVE DATE: February 1, 2005 REVIEW DATE. December 15, 2009 SERIES
More informationSAFE WORK METHOD STATEMENT
SAFE WORK METHOD STATEMENT Principal Contractor: ROBERT LIVINGSTONE Project Address: 123 SYDNEY ROAD SYDNEY NSW 2000 High Risk Work Hazards and Risks Identified Control Measures Persons working at a height
More informationWritten Safety and Health Program
Written Safety and Health Program For XYZ Company Required for all Hawaii Businesses with 25 or More Employees Incorporates Provisions of Hawaii Administrative Rules Title 12, Subtitle 8, Part 2, Chapter
More informationBOOM-SUPPORTED ELEVATING WORK PLATFORM PROGRAM
Page: 1 of 7 1.0 PURPOSE and APPLICABILITY 1.1 It is the policy of the University of Pennsylvania in coordination with the Office of Environmental Health and Radiation Safety to provide the University
More informationLockheed Martin. Emergency Phone Numbers. Medical Emergency 911. Occupational Safety & Health Plant Protection
Lockheed Martin Emergency Phone Numbers Fire-Waterton Main Plant 911 (or use FIRE ALARM BOX) Medical Emergency 911 Occupational Safety & Health 7-4444 Plant Protection 7-4646 Off-site for cell phone numbers
More informationPetro-Chemical Facility Visual Checklist
Petro-Chemical Facility Visual Checklist Is your facility visually instructive? Use the checklist below to evaluate how visual your facility is and to identify target opportunities for improvement. Rating
More informationTABLE OF CONTENT: ACOP NO. ALBA SAFETY, HEALTH & ENVIRONMENT MANAGEMENT SYSTEM. ALBA Code of Practice (ACOP) Subject PAGE
Contractors Safety Health and Environment Management 1 OF 13 TABLE OF CONTENT: 1.0 Introduction... 3 2.0 Purpose... 3 3.0 Responsibilities... 3 4.0 General Requirements... 3 5.0 Training... 4 6.0 Other
More informationPersonal Protective Equipment
Personal Protective Purpose The purpose of this policy is to meet the minimum standard for Personal Protective for Fieldwood Energy employees and contract personnel working at Fieldwood Energy facilities.
More informationApproved Date : April 6 th, 2010 Revised : Prepared by : Health and Safety Committee
Bishop s University Safety Policy for Staff and Contractors 1.02 Construction Site Procedure Approved Date : April 6 th, 2010 Revised : Prepared by : Health and Safety Committee 1. Preamble Bishop s University
More informationExhibitor Guidelines for Booth Display Rules and Regulations
Exhibitor Guidelines for Booth Display Rules and Regulations NACE strives to provide each exhibitor with a reasonable sight line from the aisle. To help accomplish this, the following Guidelines for Booth
More informationBUILDING CODE VARIANCE
BUILDING CODE VARIANCE April 2009 06-BCV-011-R1 Page 1 of 8 DISCUSSION MULTI-LEVEL STORAGE RACKING SYSTEMS The Alberta Building Code 2006 contains no specific requirements for multi-level storage racking
More informationWalking-Working Working Surfaces. OSHA Office of Training and Education 1
Walking-Working Working Surfaces OSHA Office of Training and Education 1 Introduction Slips, trips and falls cause: the majority of general industry accidents 15 percent of all accidental deaths more fatalities
More informationCanadian National Contractor Safety Orientation Canadian Based Operating Companies Course Exam
Canadian National Contractor Safety Orientation Canadian Based Operating Companies Course Exam Question 1: Before working on CN property, the contractor must: A. Have a valid right of entry agreement.
More informationHERRON Enterprises USA, Inc.
Phone (303) 763 9639 To: City of Montrose / Mr. Mark Armstrong HERRON Project No.: 1120145 Job No.: Verbal Location: Multiple Buildings, 950 and 970 Chipeta Rd., Montrose, CO 81403 Dates of Service: November
More informationTHE EXPERT APPROACH TO PREMISES LIABILITY
THE EXPERT APPROACH TO PREMISES LIABILITY THE EXPERT APPROACH TO PREMISES LIABILITY INDEX OF CONTENTS INTRODUCTION PREMISES ACCIDENT TYPES PREMISES ACCIDENT COMPONENTS ACCIDENT INVESTIGATION EVIDENCE:
More informationMonthly Workplace Safety and Health Self-Inspection WAREHOUSES FACILITY FOR MONTH OF INSPECTED BY DURATION OF INSPECTION DATE / TIME
Monthly Workplace Safety and Health Self-Inspection WAREHOUSES FACILITY FOR MONTH OF INSPECTED BY DURATION OF INSPECTION DATE / TIME INSTRUCTIONS: This checklist is intended to help focus attention on
More informationTom Carpenter Crane Maintenance Technician
Tom Carpenter Crane Maintenance Technician OSHA 29 CFR 1910.179 Overhead and Gantry Cranes 1910.179 (b)(2) All new overhead and gantry cranes constructed and installed on or after August 31, 1971, shall
More informationPersonal Protective Equipment
Section 8, Page 1 Contents: Introduction Introduction General Requirements General Guide The North Carolina Occupational Safety and Health Act of 1973 was enacted to assure so far as possible every working
More informationReferences. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A
References EM385-1-1, Sections 22 OSHA 29CFR 1926.450 (Subpart L ) UFGS-01 35 29[Latest] ANSI A10.8-1988 What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported scaffolds
More informationSafety Policy and Procedure
Safety Policy and Procedure Policy Number 045 Authorized By: The Cianbro Companies Alan Burton Title: Asbestos Operations Effective Date: 03/25/09 Page 1 of 10 1 Status 1.1 Update of existing policy, effective
More informationConstruction Site Safety
Construction Site Safety Half (1/2) Continuing Education Hour Course #OS101 Approved Continuing Education for Design Professionals (Professional Engineers, Land Surveyors, Architects, etc.) EZ-pdh.com
More informationCONSTRUCTION ENVIRONMENTAL HEALTH & SAFETY EXHIBIT EQUIPMENT SAFETY
I. General Requirements A. At a minimum, the use of equipment and tools shall comply with the recommendations and requirements for safe use, as set forth by the manufacturer, or with the requirements set
More informationAdvisory Note Number 024 Work At Height Edge Protection and Access
To: Construction/Site Managers and Design Teams Date: May 2015 Basic Principles The Work at Height Regulations apply to any work where a fall could give rise to personal injury. The regulations require
More informationRECOMMENDED SAFETY TRAINING REQUIREMENTS page 1 of 4
RECOMMENDED SAFETY TRAINING REQUIREMENTS page 1 of 4 OHSA s. 9 (12) - 2 JHSC Members (1 Management, 1 Worker) - Upon selection of the 2 to 3 days - Certified Workers are to be trained, at the employers
More informationTENTS AND OTHER MEMBRANE STRUCTURES
CHAPTER 31 TENTS AND OTHER MEMBRANE STRUCTURES SECTION 3101 GENERAL 3101.1 Scope. Tents and membrane structures shall comply with this chapter. The provisions of Section 3103 are applicable only to temporary
More informationPOWERED MOBILE EQUIPMENT PROGRAM
POWERED MOBILE EQUIPMENT PROGRAM INTRODUCTION/OVERVIEW The safe operation of material handling and/or personnel lifting equipment on and around the jobsite is essential. To help prevent injury to fellow
More informationSample PPE Hazard Assessment Certification Form
Risk Solutions Sample PPE Hazard Assessment Certification Form Found in the OSHA General Industry Standard 29 CFR 1910.132 is the requirement for employers to conduct a workplace assessment of the hazards
More informationRISK ASSESSMENT SHEET
Task Generic install telecoms equipment Assessment date 3rd October 2017 Location Various Review date 2nd October 2018 Number of staff at work Various Signature 1 Selected locations Works carried out during
More informationGUIDANCE ON THE SELECTION OF APPROPRIATE WORK EQUIPMENT FOR WORK AT HEIGHT ACTIVITIES WITHIN A COLD STORE ENVIRONMENT
GUIDANCE ON THE SELECTION OF APPROPRIATE WORK EQUIPMENT FOR WORK AT HEIGHT ACTIVITIES WITHIN A COLD STORE ENVIRONMENT This guidance is issued jointly by the BFFF and the FSDF and is supplementary guidance
More informationWalking-Working Surfaces
Walking-Working Surfaces Introduction Slips, trips and falls cause: the majority of general industry accidents 15 percent of all accidental deaths more fatalities than all other causes but motor vehicles
More informationCompany s Name: GHI Warehouse Date of Risk Assessment:
Company s Name: GHI Warehouse Date of Risk Assessment: 10-01-06 What are the hazards? Falls from height Who might be harmed and how? Staff could suffer severe or even fatal injuries if they fell whilst
More informationDate Prepared: Location: Time: Approximate Temperature (degrees F): Weather Conditions: Project Name:
Appendix C Hazard Assessment and Trench Entry and Authorization Form for regularly scheduled and emergency trenching activities Date Prepared: Location: Time: Approximate Temperature (degrees F): Weather
More informationPowered Industrial Trucks Safety Checklist
Powered Industrial Trucks Safety Checklist This safety checklist will help employees and supervisors follow minimal safety practices. This list is not meant to be comprehensive nor is it meant to form
More informationCITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO
SECTION 01010 - SCOPE OF WORK PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General provisions of Contract, General Conditions and Technical Specification Sections, apply to this Section. 1.02 PROJECT DESCRIPTION
More informationConfined Space Program
Confined Space Program Effective Date: November 15, 2007 Revision Date: I. PURPOSE... 2 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES... 2 A.Reed College Administration... 2 B.Supervisors...
More informationThe Corporation of The City of London
The Corporation of The City of London Legislative Health and Safety Requirements The following is a health and safety guide for those providing a tender to assist in determining legislative health and
More informationScissor Lift Safety. Supervisor Manual 29 CFR , 451, 452, 454. Page 0
Scissor Lift Safety 29 CFR.1926.450, 451, 452, 454 Supervisor Manual Page 0 Table of Contents Purpose... 2 Program Responsibilities... 2 Management... 2 Supervisors... 2 Employees... 2 Definitions... 3
More informationUNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 2005 SECTION WALKING/WORKING SURFACE AND FALL PROTECTION
SECTION 01911 - WALKING/WORKING SURFACE AND FALL PROTECTION 1.1 GENERAL This design standard requires that a safe means of access and fall protection be incorporated into the design of new buildings and
More informationThe Safety Professionals Guide to Planning and Executing Capital Projects
The Safety Professionals Guide to Planning and Executing Capital Projects Steven M. Hochstadt, P.E., CSP Sr. Environmental, Health & Safety Manager Bay Area Safety Symposium American Society of Safety
More informationSection 8. Walking/Working Surfaces. 8.1 Objective. 8.2 Roles and Responsibilities. 8.3 General Requirements. Competent Person
International Environmental Health and Safety (IEHS) Section 8 Walking/Working Surfaces 8.1 Objective The Walking/Working Surfaces program has been developed for IEHS and project employees working on site,
More informationTRENCH SAFETY SPECIFICATIONS FOR THE DENTAL DEPOT CITY OF THE COLONY, TEXAS. Prepared for BLUESTONE PARTNERS. Project # 18115
TRENCH SAFETY SPECIFICATIONS FOR THE DENTAL DEPOT CITY OF THE COLONY, TEXAS Prepared for BLUESTONE PARTNERS Project # 18115 US TREN-TECH, LLC 828 HOWELL DR. COPPELL, TEXAS 75019 TBPE#F9824 Anderson Consultant
More informationCUSP Base Exams and T&D Endorsement Exam Sample Questions and Format
STANDARDS or OPERATIONS 1. A PIT (forklift) is considered unattended when the operator is how far away from a running machine? A. 10 feet B. 25 feet C. 50 feet D. 75 feet PITs are used at every utility
More informationExcavation Safety Program
Excavation Safety Program Excavation, Trenching & Shoring Safety I. Purpose The purpose of this policy is to establish safe operating procedures for any earthwork or underground work that is done on a
More informationWelding, Cutting and Brazing Safety Guidelines
Welding, Cutting and Brazing Safety Guidelines March 2016 Welding, Cutting and Brazing Safety Guidelines Table of Contents I. Purpose II. III. IV. Responsibilities Hazard Identification & Prevention Protection
More informationFORKLIFT OPERATOR SAFETY
Table of Contents SECTION 1. TRAINING PROGRAM INTRODUCTION..................3 Training Objectives...........................................3 Rationale for Training.........................................3
More informationCONTRACTOR JOB-SITE SAFETY INFORMATION & GUIDELINES
CONTRACTOR JOB-SITE SAFETY INFORMATION & GUIDELINES Produced by the University of Texas Health Science Center at Houston Environmental Health & Safety Program 1 UTHSC-H CONTRACTOR JOB-SITE SAFETY INFORMATION
More informationSafety Program. For Packaging, Manufacturing, Distribution
Safety Program For Packaging, Manufacturing, Distribution SAFETY PROGRAM Clarification This document is provided only as a guide to assist employers and employees in developing a Safety Program designed
More informationJob Safety Health Quarterly Job Safety & Health Quarterly
22 22 Job Safety Health Quarterly Protecting Construction Workers from Power Lines by Earl W. Hicks Power Lines and Electrocutions Every day four construction workers die on the job in this country. Think
More informationCopies of the written program may be obtained at Where are copies of this written plan kept? (Insert building/room, etc.).
Scaffolding Safety Procedures for Construction Purpose It is this company's purpose in issuing these procedures to further ensure a safe workplace based on the following formal, written procedures for
More information(6) Crawl boards and ladders used for roof work shall be securely fastened over the ridge of the roof or be otherwise effectively anchored.
Newfoundland & Labrador - Terre-Neuve-et-Labrador Ladder Safety - Sécurité des échelles This material has been extracted from the Acts and Regulations of the Province to help students understand the subject.
More informationScaffolding Procedures
Procedures Purpose It is the purpose of this company in issuing these procedures to further ensure a safe workplace based on the following formal, written procedures for scaffold work. Application This
More informationCause of Loss and Risk Control Techniques
Cause of Loss and Control Techniques Regular training and proper supervision are two key elements in being proactive on safety and reducing exposure for work related injuries. Caution and safety signs
More informationSAFETY ORIENTATION FOR EXCAVATION WORKERS
SAFETY ORIENTATION FOR EXCAVATION WORKERS Every excavation job is different: soil, work zone characteristics, near by structures, utilities, nothing is ever the same. Because of this, an effective worker
More informationSafe Work Method Statement
Safe Work Method Statement Disclaimer: Use of Master Builders Generic Safe Work Method Statements The Master Builders Association of Victoria expressly disclaim all and any liability to any person in respect
More informationRules & Regulations. Rules & Regulations GENERAL RULES AND REGULATIONS. Cobo Center Rules & Regulations 1
Rules & Regulations GENERAL RULES AND REGULATIONS The location of entrance units, provided by the decorator, must be approved by Cobo Center Use of Center equipment, supplies and other materials is limited
More informationBRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02
BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 Department Title: Safety Department Page: 2 Department Title: Safety Department Page:
More informationWalking & Working Surfaces / Back Safety and Ergonomics
Walking & Working Surfaces / Back Safety and Ergonomics 29 CFR 1910.21-30 29 CFR 1910.66-67 67 29 CFR 1926.450-454 454 29 CFR 1926.1050-1060 1060 Scope Federal regulations cover the rules for the design
More informationXYX Company. Safety Program. XYZ Company 100 Main Street Somewhere, NH Implementation Date: August 12, 1901 Revision Date: September 31, 1955
XYX Company Safety Program XYZ Company 100 Main Street Somewhere, NH 03000 Implementation Date: August 12, 1901 Revision Date: September 31, 1955 1 Table of Contents 1. Introduction... 3 2. Objectives...
More informationContact Clark Public Utilities Construction Services department at (360) to initiate a request for service.
CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation
More information[ sample ] Copyright 2014 by PEC Safety, Inc. First Edition, revised October 23, 2014
Copyright 2014 by PEC Safety, Inc. First Edition, revised October 23, 2014 All rights reserved. Printed in the United States of America. Per the United States Copyright Act of 1976, no part of this publication
More informationAerial and Scissor Lift
This document is intended to provide basic safety guidelines for the Physical Plant Department at Community College of Allegheny County. The information provided in this guide may vary by site. Version
More informationConstruction Environmental, Health & Safety Plan (CEHSP)
Construction Environmental, Health & Safety Plan (CEHSP) INSTRUCTIONS This Construction Environmental, Health & Health Plan (CEHSP) is required of each construction project at the Sanford Underground Research
More informationACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS SAFETY HEIRARCHY
ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS SAFETY HEIRARCHY Engineering Controls Work Practices Personal Protective Equipment (PPE) SAFETY HEIRARCHY Engineering Controls Example: Three foot high parapet
More informationCONSTRUCTION SAFETY GUIDE
California Institute of Technology CONSTRUCTION SAFETY GUIDE Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028 Email:
More informationHANDING-OVER CERTIFICATE - SCAFFOLDING
HANDING-OVER CERTIFICATE - SCAFFOLDING Contractor : Site : Contractor. customername Site. Site name Date : Time : Erected by : Signature : Description of section handed over Job specification. description
More informationLAST REVIEWED 05/3/13 CHEVRON
TOOL TYPE GEOGRAPHY US MODEL POLICY LAST REVIEWED 05/3/13 SOURCE: CHEVRON MODEL POLICY FOR WORKING SAFELY NEAR OVERHEAD POWER LINES PROBLEM: Risk of contact with overhead power lines is a major safety
More informationDUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS
DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 1 Responsibilities 1 Scaffolding 2 Ladders
More informationExcavations. OSHA (Revised)
Excavations OSHA 2226 2002 (Revised) Contents Introduction... 1 What is the difference between an excavation and a trench?... 1 What are the dangers of trenching and excavation operations?... 1 OSHA s
More informationDUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM
DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM Revised January 2017 Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Introduction 1 Scope 1 Policy Statement
More informationSCAFFOLDS Revision No: 3
PAGE 1 OF 6 1.0 PURPOSE/ SCOPE To communicate the safety requirements for the erection, inspection and safe use of scaffolds. Compliance with these requirements will assure employee safety while working
More informationTAMPA ELECTRIC COMPANY ENERGY SUPPLY SCAFFOLD PROGRAM
TABLE OF CONTENTS TITLE PAGE # PURPOSE / INTRODUCTION 1 RESPONSIBILITY 2 EMPLOYEE TRAINING AND DOCUMENTATION 3-4 PERIODIC PROGRAM EVALUATION 4 GENERAL SCAFFOLD ERECTING/DISASSEMBLING REQUIREMENTS 5-7 SCAFFOLDING
More informationTHINKHR LEARN COURSE CATALOG
COMPLIANCE ACA Affordable Care Act What Supervisors Need To Know Complying with the Americans with Disabilities Act Compliance Documentation Hiring Legally NLRA and Unions What Supervisors Need To Know
More informationProject Monitoring & Air Sampling
Project Monitoring & Air Sampling 1. Qualifications of Air Sampling Personnel. The project air sampling shall be conducted by an asbestos project air sampling technician who has been trained in the selected
More informationTENTS AND MEMBRANE STRUCTURES
CHAPTER 24 TENTS AND MEMBRANE STRUCTURES SECTION 2401 GENERAL 2401.1 Scope. Tents and membrane structures shall comply with this chapter. The provisions of Section 2403 are applicable only to temporary
More informationRowan University Asbestos Management Program
Rowan University Asbestos Management Program Table of Contents I. Introduction II. Regulatory Compliance III. Department Responsibilities for Asbestos A. EHS (Safety Specialist Staff) B. EHS (Asbestos
More informationHazardous Materials and Chemicals
Standard Operating Procedures Hazardous Materials and Chemicals Last Modified: JAN 2013 1 of 11 Hazardous Materials and Chemicals I PURPOSE To ensure that controls are in place to minimize the risk to
More informationThe Building Codes A.R.E. Building Design and Construction Exam Prep
Know Thy Codes! The Building Codes Building Codes The Code of Hammurabi 4000bc Developed 19 th and 20 th c. Codes define what you can and can t do Allowable area and height based on degree of danger Fire
More informationPrepared By: Progressive Safety Services LLC
Prepared By: Progressive Safety Services LLC Definition Goals/Benefits Involvement Job Safety Analysis (JSA) Review The assessment of risks present in a particular environment Classification of exposure
More informationGuidelines for the safe unloading and storage of Polyolefins in packed form V1 August 2012
Guidelines for the safe unloading and storage of Polyolefins in packed form V1 August 2012 Page 1 CONTENTS CONTENTS...2 INEOS O&P CUSTOMER COMMITMENT...3 1: Purpose of this document...4 2: Driver safety
More information1. Asbestos Facts NEW SOP
In this issue of the Environmental Health and Safety (EHS) Listserv, June 8, 2015: 1. Asbestos Facts NEW SOP 2. Dewatering NEW SOP 3. Promoting an Academic Safety Culture - Recap 4. National Forklift Safety
More informationOHS - Making Contracts Work. Contractor Safety Checklists
OHS - Making Contracts Work Contractor Safety Checklists OHS - Making Contracts Work Contractor Safety Checklists Authors: Greg Dodd and Kathy Haseloff Safety Valve Consulting Publisher: Mining and Quarrying
More informationBEST PRACTICE GUIDANCE THE SAFE OFF-LOADING OF REINFORCEMENT FABRIC.
BEST PRACTICE GUIDANCE THE SAFE OFF-LOADING OF REINFORCEMENT FABRIC www.uk-bar.org CONTENTS Introduction.... 3 Hazards.... 4 Accidents... 5 Working at Height... 6 Dunnage.... 7 Planning for a Safe Delivery....
More informationWelding and Cutting Safety
Welding and Cutting Safety Welding and Cutting Objectives Describe welding safety requirements for: Eye protection Protective clothing Fire Prevention Requirements Ventilation Safety Requirements Electrical
More informationDEPARTMENT OF LICENSING AND REGULATORY AFFAIRS CONSUMER AND INDUSTRY SERVICES DIRECTOR S OFFICE BUREAU OF SAFETY AND REGULATION
DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS CONSUMER AND INDUSTRY SERVICES DIRECTOR S OFFICE BUREAU OF SAFETY AND REGULATION GENERAL INDUSTRY SAFETY AND HEALTH STANDARD GENERAL INDUSTRY SAFETY STANDARDS
More informationLevel 2 NVQ Certificate in Erection of Precast Concrete (Construction)
Level 2 NVQ Certificate in Erection of Precast Concrete (Construction) Qualification Specification ProQual 2016 Contents Introduction 3 Qualification profile 3 Qualification Structure 4 Pathway 1 Flooring
More information