1 Texas Eastern Transmission, LP Planned Service Outage Postings from 07/01/2017 to 07/31/2017 Page 1 of 43

2 TSP: TSP Name: Texas Eastern Transmission, LP Critical Desc: Not a critical notice Notice Eff Date/Time: 07/07/ :00:00 PM Notice End Date/Time: 12/01/ :00:00 AM Notice ID: Notice Stat Desc: Supersede Notice Type: Planned Service Outage Post Date/Time: 07/07/ :00:00 PM Prior Notice: Reqrd Rsp Desc: No response required Rsp Date/Time: Subject: TE 2017 Planned Outage Schedule -- UPDATE Notice Text: The text below is included in the attached Word document located at the bottom of this posting. Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for the 2017 outage season. Due to unforeseen delays or scheduling conflicts, the dates of the outages listed below are subject to change. In addition, this schedule is not a complete list of all outages that will occur this outage season, and we reserve the right to update this list to reflect additional major outages when the timing of such major outages can be reasonably forecasted. Any changes to the list below will be posted at the earliest practical date. Parties are urged to monitor these postings to access the most current information. Access Area and Longview to Kosciusko: ***Vidor to Gillis 30" Line 14 (WLA) Potential Repair Dates: Complete Potential Run Comparison Repair Dates: June 26 - July 31 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Vidor to Gillis 30" Line 14. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: STARKS UTILITIES - STARKS, LA GULF SOUTH PIPELINE COMPANY - GILLIS, LA TRUNKLINE - BEAUREGARD PSH., LA ENTERGY SABINE POWER STATION - ORANGE CO., TX ENTERGY LOUISIANA,LLC BEAUREGARD PSH., LA CENTANA INTRASTATE PIPELINE CO. - ORANGE CO., TX COTTONWOOD ENERGY COMPANY, LP - NEWTON CO., TX ARCADIA OPERATING - BEAUREGARD PSH., LA ASPECT ENERGY, LLC / #1 GRIGGS - BEAUREGARD PSH., LA HOUSTON P/L VIDOR DOMINION E&P - BROWN GATHERING-ORANGE CO., TX GOLDEN PASS PIPELINE - CALCASIEU PARISH, LA CENTERPOINT ENERGY/IP ORANGE MILL-OWENS ILLINOIS RD-ORANGE Page 2 of 43

3 SEMPRA ENERGY/LIBERTY GAS STORAGE AGL/GOLDEN TRIANGLE STORAGE D73662/R73663 During the cleaning, caliper and ILI tool runs, the meters below will be unavailable for flow for a portion of the day or as the cleaning, caliber and ILI tools passes: GULF SOUTH PIPELINE COMPANY - GILLIS, LA ENTERGY SABINE POWER STATION - ORANGE CO., TX ENTERGY LOUISIANA, LLC BEAUREGARD PSH., LA CENTANA INTRASTATE PIPELINE CO. - ORANGE CO., TX COTTONWOOD ENERGY COMPANY, LP - NEWTON CO., TX HOUSTON P/L VIDOR SEMPRA ENERGY/LIBERTY GAS STORAGE- BEAUREGARD PSH., LA-BIDI AGL/GOLDEN TRIANGLE STORAGE CENTERPOINT ENERGY/IP ORANGE MILL-OWENS ILLINOIS RD-ORANGE Carthage to Longview 20" Line 13 Cleaning Tool Dates: Complete Potential Repair Dates: August 10 - September 10 Potential Run Comparison Repair Dates - September 1 - September 20 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool run on Carthage to Longview 20" Line 13. During the ILI tool run, the meter below will be unavailable for flow: ENTERPRISE TEXAS PIPELINE, LLC - PANOLA COUNTY, TX (REC) Additionally, depending on the results of the ILI Tool runs and if further detailed investigations are required, the following restrictions may be required: A.Restrictions to nominations sourced south of Longview Station for delivery between Longview and North Little Rock (ETX) or for delivery to the M1-24" or M2-24" are anticipated for interruptible and secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. B.Restrictions to nominations sourced in WLA, ELA, M1-30", M2-30" and M3 for delivery to the M1-24" and M2-24" are anticipated for interruptible, secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. Longview to Atlanta 24" Line 1 (ETX): August 25 - September 8 TE will be conducting a pipeline outage on 24" Line 1 between Longview to Atlanta compressor stations. During this outage the following meters will be unavailable for flow: NEWMAN CORP. - HARRISON CO., TX (RECEIPT) MARSHALL EXPLORATION - #1 RESCH / HARRISON CO., TX (REC) HOWELL OIL & GAS, INC. - GOOCH-GANT FIELDS CP, HARRISON CO. Page 3 of 43

4 NFR ENERGY/GATLIN GATHERING, HARRISON CO. TX BUFFCO PROD./JO ALLISON #1-HARRISON CO., TX BACHTELL O&G/KEAHEY GATHERING-MARION CO., TX KMK OIL & GAS/BENTON #1 Additionally, depending on the level of nominations during this outage, the following restrictions will be required: C.Restrictions to nominations sourced south of Longview Station for delivery between Longview and North Little Rock (ETX) or for delivery to the M1-24" or M2-24" are anticipated for interruptible and secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. D.Restrictions to nominations sourced in WLA, ELA, M1-30", M2-30" and M3 for delivery to the M1-24" and M2-24" are anticipated for interruptible, secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. During this outage, customers delivering to meters located between Longview and Sarahsville should consider sourcing gas from receipts meters located in M1-24" and M2-24" to avoid potential restrictions. M1-24" and M2-24" receipts meters within this area are: MISS RIVER FUEL TRANSMISSION - BALD KNOB, AR (REC) NEWMAN CORP. - HARRISON CO., TX (RECEIPT) CENTERPOINT ENERGY FIELD SERVICES - WASKOM, TX (RECEIPT) TEXAS GAS TRANSMISSION CORP. - LEBANON, OH TGC LICK CREEK - WILLIAMSON CO., IL (TO TE) COL. GAS - FAIRFIELD CO., OH ANR P/L CO. - FRENCH LICK, IN ENBRIDGE PIPELINES (EAST TEXAS) LP -LONGVIEW/GREGG CO., TX #2 OAKLAND / CASS, TX (RECEIPT) MARSHALL EXPLORATION - #1 RESCH / HARRISON CO., TX (REC) NORAM - BALD KNOB - WHITE, AR HOWELL OIL & GAS, INC. - GOOCH-GANT FIELDS CP, HARRISON CO OZARK GAS - GREENE CO., AR GRAYSON HILL FARMS-METHANE POWER-SALINE CO., IL VESSELS COAL - GATHERING SYSTEM - SALINE CO., IL (REC) COMPRESSED ENERGY SYSTEMS LLC - SALINE CO., IL TEXAS GAS/FAYETVILLE, AR KINDER MORGAN REX LEBANON (REC)- WARREN CO., OH NFR ENERGY/GATLIN GATHERING, HARRISON CO. TX BUFFCO PROD. /JO ALLISON #1-HARRISON CO., TX BACHTELL O&G/KEAHEY GATHERING-MARION CO., TX KMK OIL & GAS/BENTON # DTI-LEBANON, WARREN CO, OH Hempstead to Huntsville 24" Line 1 (STX): TBD TE will be conducting a pipeline outage on 24" Line 1 between Hempstead to Huntsville compressor stations. During this outage the following meters will be unavailable for flow: UNIVERSAL NATURAL GAS/INTERCONNECT - MONTGOMERY CO., TX (DE Page 4 of 43

5 GOLIAD MIDSTREAM ENERGY/CITY OF MAGNOLIA,TX-ENDERLI STREET, LONE STAR GAS COMPANY - WALLER CO., TX - REC (B/D 72778) 24" System Longview to Berne: Glen Karn Compressor Station: July 6 - August 14 TE will be conducting compressor station maintenance at its Glen Karn Compressor Station. During this outage, capacity through Glen Karn will be reduced to approximately 305,000 Dth /d for nominations delivering to locations north of Glen Karn. Based on historical nominations through Glen Karn, TE does not anticipate restrictions at this time. Furthermore, TE requests that customers/point operators on Line 69 between Lebanon and north of Gas City Compressor Station be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels. Somerset to Summerfield (Sarahsville) 26" Line 3 (Sec 3) Cleaning Tool Dates: TBD Caliper & ILI Tool Runs: August 2 Potential Repair Dates: October 3 - October 21 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool run on the Somerset to Summerfield 26 Line 3. Additionally, any gas sourced in WLA, ELA, M1-30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery south of Sarahsville to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock may be restricted. If further investigations are required, restrictions are possible for interruptible, secondary firm services and potentially primary firm services. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Walnut Ridge to Pollard 24" Line 1 (M1): September 8 -September 16 TE will be conducting a pipeline outage on 24" Line 1 between Walnut Ridge and Pollard compressor stations. During this outage the following meter will be unavailable for flow: JONESBORO CITY, WATER & LIGHT - GREENE, AR During this outage, customers delivering to meters located on Line 1 between Little Rock and Walnut Ridge compressor stations will have to source gas from receipts located on Line 1 between Little Rock and Walnut Ridge compressor stations to avoid potential restrictions. Additionally, depending on the level of nominations during this outage, the following restrictions will be required: Page 5 of 43

6 A.Nominations sourced between Longview and Walnut Ridge Stations for delivery north of Walnut Ridge Station are anticipated for interruptible, secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. B.Nominations sourced in WLA, ELA, M1-30", M2-30" and M3 for delivery between North Little Rock and Walnut Ridge Stations are anticipated for interruptible, secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. Norris City to Oakland City 24" Line 1 (M2): October 11 - October 15 TE will be conducting a pipeline outage on 24" Line 1 between Norris City to Oakland City compressor stations. During this outage, customers delivering to meters located on Line 1 between Little Rock and Norris City compressor stations will have to source gas from receipts located on Line 1 between Little Rock and Norris City compressor stations to avoid potential restrictions. Additionally, depending on the level of nominations during this outage, the following restrictions will be required: A.Nominations sourced between Longview and Norris City Stations for delivery north of Norris City Station are anticipated for interruptible, secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. B.Nominations sourced in WLA, ELA, M1-30", M2-30" and M3 for delivery between North Little Rock and Norris City Stations are anticipated for interruptible, secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. 30 Inch System and Market Area: ***Bedford Compressor Station Outage: July TE will be conducting a compressor station outage at its Bedford Compressor Station. During this outage, capacity through Bedford will be reduced to approximately 2,121,000 Dth/d. Based on historical nominations through Bedford, TE does not anticipate restrictions at this time. If flow patterns change, restrictions to interruptible and potentially secondary firm services are possible for nominations delivering to locations between Bedford and up to Lambertville on TE's 36 inch line. ***Waynesburg to Uniontown 24" Line 2 Cleaner Tool Run: Complete Potential Repair Dates: TBD To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Waynesburg to Uniontown 24" Line 2 Page 6 of 43

7 Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: COLUMBIA GAS - WAYNESBURG, PA ENERGY CORPORATION OF AMERICA-RIDGE RD., GREENE CO., PA EQUITABLE GAS CO. - CRAYNE, PA (D70009/R76009) Hanover to EOLN 8" Line 20-B-1 Cleaner Tool Run: Complete Potential Repair Dates: June 30 - July 15 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Hanover to EOLN 8" Line 20-B-1. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: NEW JERSEY NATURAL - MONTVILLE, NJ Delmont to Armagh 36" Line 28 Cleaner Tool Run: Complete Potential Repair Dates: July 11 - July 31 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Delmont to Armagh 36" Line 28. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: DTI (DOMINION) - CROOKED RUN, WESTMORELAND CO., PA. TE/AGT Leased Capacity: August 1 and 3, 2017 Texas Eastern (TE) has been informed by Algonquin Gas Transmission (AGT) of the following outage that will impact receipts to TE which may include its Leased Capacity on AGT. TE will process Lease Capacity reductions based on TE priorities. 26" Main Line -Lambertville Meter Station (MR 00210) to Hudson River (downstream of Stony Point) - DOT Pipeline Integrity Project: Cleaning Tool Date: August 1 and August 3, 2017 As part of its DOT Pipeline Integrity Project, AGT will be conducting pigging operations on its 26" Main Line from the Lambertville Meter Station (MR 00210) to the Hudson River. Due to AGT's current operational flow patterns and to ensure the cleaning tool runs are successfully completed, AGT will be limited to approximately 400,000 Dth/day for delivery to TE Lambertville (MR 00210) and TE Hanover (MR 00211), which includes the TE/AGT Lease Capacity. Due to these current flow patterns AGT anticipates restrictions to interruptible, secondary services and primary firm nominations. Additionally, AGT will be limited to approximately 908,000 Dth/ day for receipts sourced from Mahwah (MR 00201), Ramapo/ Millennium (MR00214) and Columbia Hanover (00240) for deliveries east through Page 7 of 43

8 Southeast Compressor Station. AGT anticipates restrictions to interruptible, secondary out of path nominations and potentially secondary in-path nominations. Furthermore, AGT will be limited to approximately 200,000 Dth/day receipts from TE Lambertville (MR 00210) and TE Hanover (MR 00211) for deliveries east through Southeast Compressor Station. AGT anticipates restrictions to secondary out of path within entitlements, secondary in path and potentially primary firm nominations. If additional tool runs are required, AGT will post updates as soon as it is known. Tompkinsville Compressor Station: August 5 - August 25 TE will be conducting a compressor station outage at its Tompkinsville Compressor Station. During this work north to south capacity through stations on the 30 inch line will be reduced as follows: Reduced to approximately Berne 30" South1,446,000 Dth/d Wheelersburg South1,215,000 Dth/d Tompkinsville South1,136,000 Dth/d Barton South1,006,000 Dth/d Based on historical north to south nominations TE anticipates restrictions for interruptible, secondary out of path, secondary in path and potentially primary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton. Linden to EOLN 12" Line 1-D Cleaner Tool Run: Complete Potential Repair Dates: August 23 - August 31 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Linden to EOLN 12" Line 1-D. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: PUBLIC SERVICE - SEWAREN, NJ NEW JERSEY NATURAL - HANOVER, NJ TE has been informed by Algonquin Gas Transmission (AGT) of the following outage below that will impact receipts to TE which may include its Leased Capacity on AGT. TE will process Lease Capacity reductions based on TE priorities. Owingsville Compressor Station: September 7 - September 28 TE will be conducting a compressor station outage at its Owingsville Compressor Station. During this work north to south capacity through stations on the 30 inch line will be reduced as follows: Reduced to approximately Berne 30" South1,626,000 Dth/d Wheelersburg South1,395,000 Dth/d Page 8 of 43

9 Tompkinsville South1,316,000 Dth/d Barton South1,186,000 Dth/d Based on historical north to south nominations TE anticipates restrictions for interruptible, secondary out of path, secondary in path and potentially primary nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton. Athens to Wheelersburg 30" Line 10: October 3 - October 19 TE will be conducting a DOT hydro test between Athens to Wheelersburg compressor stations on 30" Line 10. During this work north to south capacity through stations on the 30 inch line will be reduced as follows: Reduced to approximately Berne 30" South1,581,000 Dth/d Wheelersburg South1,350,000 Dth/d Tompkinsville South1,271,000 Dth/d Barton South1,141,000 Dth/d Based on historical north to south nominations TE anticipates restrictions for interruptible, secondary out of path, secondary in path and potentially primary nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton. Texas Eastern DOT Pipeline Integrity Project TE will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the Texas Eastern pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run, and an ILI tool run. Also listed below are the dates of a possible investigation as a result of the in-line inspection. CaliperILIPossible Run Comp Segment Access AreaDateDateRepl DtPoss Repl Dt Provident City to Hempstead (Line 11)*---CompleteCompleteComplete Carthage to Longview (Line 13)*---Complete08/10/1709/01/17 Vidor to Gillis (Line 14)*---CompleteComplete06/26/17 Huntsville to Lufkin (Line 11)---Complete06/28/1707/28/17 Santa Fe to EOLN (Line 16B)---06/19/1708/20/ CaliperILIPossible Run Comp Segment M1/M2 AreaDateDateRepl DtPoss Repl Dt Owingsville to Wheelersburg (Line 15) ---Complete07/12/ Tompkinsville to Danville (Line 10) ---Complete07/18/ Gladeville to Tompkinsville (Line 25) ---Complete07/20/17 08/10/17 Barton to Mt. Pleasant (Line 10) ---Complete08/07/17 08/25/17 French Lick to Seymour (Line 1) ---Complete07/24/17 08/18/17 Somerset to Summerfield (Line 3 -Sec 3)* ---06/27/1710/03/ Page 9 of 43

10 Norris City to French Lick (Line 1) ---07/25/1710/19/ Somerset to Summerfield (Line 3 -Sec 3)* ---08/02/1709/04/17 09/25/17 Somerset to Summerfield (Line 3 -Sec 1) ---08/08/1709/13/17 09/27/17 CaliperILIPossible Run Comp Segment M3 AreaDateDateRepl DtPoss Repl Dt Shermansdale to Bernville (Line 19) ---Complete05/17/ Waynesburg to Uniontown (Line 2)* ---Complete05/31/ Bernville to Bechtelsville (Line 28/ Sec1) ---Complete06/07/ Bechtelsville to Lambertville (Line 28/ Sec1) ---Complete06/07/ Chester Junction to EOLN (Line 1-A-3)* ---CompleteComplete --- Holbrook to Uniontown (Line 15) ---Complete06/20/ Eagle to Lambertville (Line 2 / Sec 1) ---Complete06/23/ Lilly to Entriken (Line 28) ---Complete06/23/ Grantville to Bechtelsville (Line 28) ---Complete06/27/ Uniontown to Delmont (Line 29)*CompleteCompleteComplete --- Hanover to EOLN (Line 20 -B-1)* --- Complete06/30/17 -=- Delmont to Armagh (Line 28)*CompleteComplete07/11/ Holbrook to Uniontown (Line 10) ---Complete07/13/ Shermansdale to Grantville (Line 27/ Sec2) ---Complete07/14/ Shermansdale to Grantville (Line 27/ Sec1) ---Complete07/14/ Shermansdale to Grantville (Line 28) ---Complete07/14/ Delmont to Armagh (Line 19)CompleteComplete 07/18/ Grantville to Bechtelsville (Line 12) ---Complete07/18/ Shermansdale to Grantville (line 19 - Aux 1) ---Complete07/25/ Uniontown to Delmont (Line 39) CompleteComplete07/26/ Perulack to Grantville (Line 12) CompleteComplete08/01/ Perulack to Shermansdale (Line 28) CompleteComplete08/16/ Linden to EOLN (Line 1-D)* ---Complete08/23/ Delmont to Armagh (Line 27/ MP ) /26/1710/04/ Eagle to Lambertville (Line 2 / Sec 2)---08/15/1709/26/ Bechtelsville to Lambertville (Line 28/ Sec 2) ---08/25/1710/02/ Delmont to Armagh (Line 27 Aux) ---08/31/1710/10/ Bernville to Bechtelsville (Line 28/ Sec2) ---08/22/1710/19/ Delmont to Armagh (Line 9B) ---TBDTBD --- Delmont to Armagh (Line 9C) ---TBDTBD --- Delmont to Armagh (Line 19 Aux) ---TBDTBD --- As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known: Armagh to Lilly (Line 19) Armagh to Lilly (Line 27) Athens to Berne (Line 10) Athens to Berne (Line 15) Atlanta to Hope (Line 1) Barton to Mt. Pleasant (Line 15) Bechtelsville to Lambertville (Line 12) Bechtelsville to Lambertville (Line 19) Bedford to Chambersburg (Line 1) Page 10 of 43

11 Bedford to Chambersburg (Line 2) Berne to Holbrook (Line 10) Berne to Holbrook (Line 15) Berne to Holbrook (Line 25) Bernville to Bechtelsville (Line 19) Blessing to Angleton (Line 16) Clinton to Kosciusko (Line 14) Clinton to Kosciusko (Line 18) Danville to Owingsville (Line 10) Donaldson to North Little Rock (Line 1) Egypt to Barton (Line 10) Egypt to Barton (Line 25) Five Points to Somerset (Line 3) Gillis to Opelousas (Line18) Gladeville to Tompkinsville (Line 10) Grantville to Bernville (Line 27) Heidlersburg to Marietta (Line 2) Holbrook to Uniontown (Line 10) Holbrook to Uniontown (Line 15) Holbrook to Uniontown (Line 25) Joaquin to Red River (Line 11) Karon (EOLN) to Provident City (Line 21) Kosciusko to Egypt (Line 10) Kosciusko to Egypt (Line 15) Kosciusko to Egypt (Line 25) Lambertville to Linden (Line 1) Lebanon to Five Points (Line 1 and 2) Lilly to Perulack (Line 12) Longview to Atlanta (Line 1) Mt. Pleasant to Gladeville (Line 10) Mt. Pleasant to Gladeville (Line 25) Norris City to Oakland City (Line 1) North Little Rock to Bald Knob (Line 1) Owingsville to Wheelersburg (Line 10) Owingsville to Wheelersburg (Line 15) Pollard to Oran (Line 1-O) Provident City to Blessing (Line 17) Seymour to Batesville (Line 1) Shermansdale to Grantville (Line 19) St. Francisville to Union Church (Line 14) St. Francisville to Union Church (Line 18) St. Francisville to Union Church (Line 31) Tompkinsville to Danville (Line 15) *Walnut Ridge to Pollard (Line 1) West Monroe to Providence (Line 26) Wheelersburg to Athens (Line 10) Wheelersburg to Athens (Line 15) Download File: TE 2017 Planned Outages Schedule 24.docx Page 11 of 43

12 TSP: TSP Name: Texas Eastern Transmission, LP Critical Desc: Not a critical notice Notice Eff Date/Time: 07/10/ :00:00 PM Notice End Date/Time: 12/01/ :00:00 AM Notice ID: Notice Stat Desc: Supersede Notice Type: Planned Service Outage Post Date/Time: 07/10/ :00:00 PM Prior Notice: Reqrd Rsp Desc: No response required Rsp Date/Time: Subject: TE 2017 Planned Outage Schedule -- UPDATE Notice Text: The text below is included in the attached Word document located at the bottom of this posting. Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for the 2017 outage season. Due to unforeseen delays or scheduling conflicts, the dates of the outages listed below are subject to change. In addition, this schedule is not a complete list of all outages that will occur this outage season, and we reserve the right to update this list to reflect additional major outages when the timing of such major outages can be reasonably forecasted. Any changes to the list below will be posted at the earliest practical date. Parties are urged to monitor these postings to access the most current information. Access Area and Longview to Kosciusko: Vidor to Gillis 30" Line 14 (WLA) Potential Repair Dates: Complete Potential Run Comparison Repair Dates: June 26 - July 31 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Vidor to Gillis 30" Line 14. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: STARKS UTILITIES - STARKS, LA GULF SOUTH PIPELINE COMPANY - GILLIS, LA TRUNKLINE - BEAUREGARD PSH., LA ENTERGY SABINE POWER STATION - ORANGE CO., TX ENTERGY LOUISIANA,LLC BEAUREGARD PSH., LA CENTANA INTRASTATE PIPELINE CO. - ORANGE CO., TX COTTONWOOD ENERGY COMPANY, LP - NEWTON CO., TX ARCADIA OPERATING - BEAUREGARD PSH., LA ASPECT ENERGY, LLC / #1 GRIGGS - BEAUREGARD PSH., LA HOUSTON P/L VIDOR DOMINION E&P - BROWN GATHERING-ORANGE CO., TX GOLDEN PASS PIPELINE - CALCASIEU PARISH, LA CENTERPOINT ENERGY/IP ORANGE MILL-OWENS ILLINOIS RD-ORANGE Page 12 of 43

13 SEMPRA ENERGY/LIBERTY GAS STORAGE AGL/GOLDEN TRIANGLE STORAGE D73662/R73663 During the cleaning, caliper and ILI tool runs, the meters below will be unavailable for flow for a portion of the day or as the cleaning, caliber and ILI tools passes: GULF SOUTH PIPELINE COMPANY - GILLIS, LA ENTERGY SABINE POWER STATION - ORANGE CO., TX ENTERGY LOUISIANA, LLC BEAUREGARD PSH., LA CENTANA INTRASTATE PIPELINE CO. - ORANGE CO., TX COTTONWOOD ENERGY COMPANY, LP - NEWTON CO., TX HOUSTON P/L VIDOR SEMPRA ENERGY/LIBERTY GAS STORAGE- BEAUREGARD PSH., LA-BIDI AGL/GOLDEN TRIANGLE STORAGE CENTERPOINT ENERGY/IP ORANGE MILL-OWENS ILLINOIS RD-ORANGE Carthage to Longview 20" Line 13 Cleaning Tool Dates: Complete Potential Repair Dates: August 10 - September 10 Potential Run Comparison Repair Dates - September 1 - September 20 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool run on Carthage to Longview 20" Line 13. During the ILI tool run, the meter below will be unavailable for flow: ENTERPRISE TEXAS PIPELINE, LLC - PANOLA COUNTY, TX (REC) Additionally, depending on the results of the ILI Tool runs and if further detailed investigations are required, the following restrictions may be required: A.Restrictions to nominations sourced south of Longview Station for delivery between Longview and North Little Rock (ETX) or for delivery to the M1-24" or M2-24" are anticipated for interruptible and secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. B.Restrictions to nominations sourced in WLA, ELA, M1-30", M2-30" and M3 for delivery to the M1-24" and M2-24" are anticipated for interruptible, secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. Longview to Atlanta 24" Line 1 (ETX): August 25 - September 8 TE will be conducting a pipeline outage on 24" Line 1 between Longview to Atlanta compressor stations. During this outage the following meters will be unavailable for flow: NEWMAN CORP. - HARRISON CO., TX (RECEIPT) MARSHALL EXPLORATION - #1 RESCH / HARRISON CO., TX (REC) HOWELL OIL & GAS, INC. - GOOCH-GANT FIELDS CP, HARRISON CO. Page 13 of 43

14 NFR ENERGY/GATLIN GATHERING, HARRISON CO. TX BUFFCO PROD./JO ALLISON #1-HARRISON CO., TX BACHTELL O&G/KEAHEY GATHERING-MARION CO., TX KMK OIL & GAS/BENTON #1 Additionally, depending on the level of nominations during this outage, the following restrictions will be required: C.Restrictions to nominations sourced south of Longview Station for delivery between Longview and North Little Rock (ETX) or for delivery to the M1-24" or M2-24" are anticipated for interruptible and secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. D.Restrictions to nominations sourced in WLA, ELA, M1-30", M2-30" and M3 for delivery to the M1-24" and M2-24" are anticipated for interruptible, secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. During this outage, customers delivering to meters located between Longview and Sarahsville should consider sourcing gas from receipts meters located in M1-24" and M2-24" to avoid potential restrictions. M1-24" and M2-24" receipts meters within this area are: MISS RIVER FUEL TRANSMISSION - BALD KNOB, AR (REC) NEWMAN CORP. - HARRISON CO., TX (RECEIPT) CENTERPOINT ENERGY FIELD SERVICES - WASKOM, TX (RECEIPT) TEXAS GAS TRANSMISSION CORP. - LEBANON, OH TGC LICK CREEK - WILLIAMSON CO., IL (TO TE) COL. GAS - FAIRFIELD CO., OH ANR P/L CO. - FRENCH LICK, IN ENBRIDGE PIPELINES (EAST TEXAS) LP -LONGVIEW/GREGG CO., TX #2 OAKLAND / CASS, TX (RECEIPT) MARSHALL EXPLORATION - #1 RESCH / HARRISON CO., TX (REC) NORAM - BALD KNOB - WHITE, AR HOWELL OIL & GAS, INC. - GOOCH-GANT FIELDS CP, HARRISON CO OZARK GAS - GREENE CO., AR GRAYSON HILL FARMS-METHANE POWER-SALINE CO., IL VESSELS COAL - GATHERING SYSTEM - SALINE CO., IL (REC) COMPRESSED ENERGY SYSTEMS LLC - SALINE CO., IL TEXAS GAS/FAYETVILLE, AR KINDER MORGAN REX LEBANON (REC)- WARREN CO., OH NFR ENERGY/GATLIN GATHERING, HARRISON CO. TX BUFFCO PROD. /JO ALLISON #1-HARRISON CO., TX BACHTELL O&G/KEAHEY GATHERING-MARION CO., TX KMK OIL & GAS/BENTON # DTI-LEBANON, WARREN CO, OH Hempstead to Huntsville 24" Line 1 (STX): TBD TE will be conducting a pipeline outage on 24" Line 1 between Hempstead to Huntsville compressor stations. During this outage the following meters will be unavailable for flow: UNIVERSAL NATURAL GAS/INTERCONNECT - MONTGOMERY CO., TX (DE Page 14 of 43

15 GOLIAD MIDSTREAM ENERGY/CITY OF MAGNOLIA,TX-ENDERLI STREET, LONE STAR GAS COMPANY - WALLER CO., TX - REC (B/D 72778) 24" System Longview to Berne: Glen Karn Compressor Station: July 6 - August 14 TE will be conducting compressor station maintenance at its Glen Karn Compressor Station. During this outage, capacity through Glen Karn will be reduced to approximately 305,000 Dth /d for nominations delivering to locations north of Glen Karn. Based on historical nominations through Glen Karn, TE does not anticipate restrictions at this time. Furthermore, TE requests that customers/point operators on Line 69 between Lebanon and north of Gas City Compressor Station be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels. Somerset to Summerfield (Sarahsville) 26" Line 3 (Sec 3) Cleaning Tool Dates: TBD Caliper & ILI Tool Runs: August 2 Potential Repair Dates: October 3 - October 21 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool run on the Somerset to Summerfield 26 Line 3. Additionally, any gas sourced in WLA, ELA, M1-30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery south of Sarahsville to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock may be restricted. If further investigations are required, restrictions are possible for interruptible, secondary firm services and potentially primary firm services. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Walnut Ridge to Pollard 24" Line 1 (M1): September 8 -September 16 TE will be conducting a pipeline outage on 24" Line 1 between Walnut Ridge and Pollard compressor stations. During this outage the following meter will be unavailable for flow: JONESBORO CITY, WATER & LIGHT - GREENE, AR During this outage, customers delivering to meters located on Line 1 between Little Rock and Walnut Ridge compressor stations will have to source gas from receipts located on Line 1 between Little Rock and Walnut Ridge compressor stations to avoid potential restrictions. Additionally, depending on the level of nominations during this outage, the following restrictions will be required: Page 15 of 43

16 A.Nominations sourced between Longview and Walnut Ridge Stations for delivery north of Walnut Ridge Station are anticipated for interruptible, secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. B.Nominations sourced in WLA, ELA, M1-30", M2-30" and M3 for delivery between North Little Rock and Walnut Ridge Stations are anticipated for interruptible, secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. Norris City to Oakland City 24" Line 1 (M2): October 11 - October 15 TE will be conducting a pipeline outage on 24" Line 1 between Norris City to Oakland City compressor stations. During this outage, customers delivering to meters located on Line 1 between Little Rock and Norris City compressor stations will have to source gas from receipts located on Line 1 between Little Rock and Norris City compressor stations to avoid potential restrictions. Additionally, depending on the level of nominations during this outage, the following restrictions will be required: A.Nominations sourced between Longview and Norris City Stations for delivery north of Norris City Station are anticipated for interruptible, secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. B.Nominations sourced in WLA, ELA, M1-30", M2-30" and M3 for delivery between North Little Rock and Norris City Stations are anticipated for interruptible, secondary services and possibly for primary firm services. Restrictions to primary firm nominations are not anticipated at this time. 30 Inch System and Market Area: Hanover to EOLN 8" Line 20-B-1 Cleaner Tool Run: Complete Potential Repair Dates: June 30 - July 15 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Hanover to EOLN 8" Line 20-B-1. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: NEW JERSEY NATURAL - MONTVILLE, NJ Bedford Compressor Station Outage: July Page 16 of 43

17 TE will be conducting a compressor station outage at its Bedford Compressor Station. During this outage, capacity through Bedford will be reduced to approximately 2,121,000 Dth/d. Based on historical nominations through Bedford, TE does not anticipate restrictions at this time. If flow patterns change, restrictions to interruptible and potentially secondary firm services are possible for nominations delivering to locations between Bedford and up to Lambertville on TE's 36 inch line. Delmont to Armagh 36" Line 28 Cleaner Tool Run: Complete Potential Repair Dates: July 11 - July 31 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Delmont to Armagh 36" Line 28. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: DTI (DOMINION) - CROOKED RUN, WESTMORELAND CO., PA. ***Waynesburg Compressor Station Work: July TE will be conducting a compressor station outage at its Waynesburg Compressor Station. During this outage, the following receipt meter will be unavailable for flow: COLUMBIA GAS - WAYNESBURG, PA ***Waynesburg to Uniontown 24" Line 2 Cleaner Tool Run: Complete Potential Repair Dates: July To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Waynesburg to Uniontown 24" Line 2 Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: COLUMBIA GAS - WAYNESBURG, PA ENERGY CORPORATION OF AMERICA-RIDGE RD., GREENE CO., PA EQUITABLE GAS CO. - CRAYNE, PA (D70009/R76009) TE/AGT Leased Capacity: August 1 and 3, 2017 Texas Eastern (TE) has been informed by Algonquin Gas Transmission (AGT) of the following outage that will impact receipts to TE which may include its Leased Capacity on AGT. TE will process Lease Capacity reductions based on TE priorities. 26" Main Line -Lambertville Meter Station (MR 00210) to Hudson River (downstream of Stony Point) - Page 17 of 43

18 DOT Pipeline Integrity Project: Cleaning Tool Date: August 1 and August 3, 2017 As part of its DOT Pipeline Integrity Project, AGT will be conducting pigging operations on its 26" Main Line from the Lambertville Meter Station (MR 00210) to the Hudson River. Due to AGT's current operational flow patterns and to ensure the cleaning tool runs are successfully completed, AGT will be limited to approximately 400,000 Dth/day for delivery to TE Lambertville (MR 00210) and TE Hanover (MR 00211), which includes the TE/AGT Lease Capacity. Due to these current flow patterns AGT anticipates restrictions to interruptible, secondary services and primary firm nominations. Additionally, AGT will be limited to approximately 908,000 Dth/ day for receipts sourced from Mahwah (MR 00201), Ramapo/ Millennium (MR00214) and Columbia Hanover (00240) for deliveries east through Southeast Compressor Station. AGT anticipates restrictions to interruptible, secondary out of path nominations and potentially secondary in-path nominations. Furthermore, AGT will be limited to approximately 200,000 Dth/day receipts from TE Lambertville (MR 00210) and TE Hanover (MR 00211) for deliveries east through Southeast Compressor Station. AGT anticipates restrictions to secondary out of path within entitlements, secondary in path and potentially primary firm nominations. If additional tool runs are required, AGT will post updates as soon as it is known. Tompkinsville Compressor Station: August 5 - August 25 TE will be conducting a compressor station outage at its Tompkinsville Compressor Station. During this work north to south capacity through stations on the 30 inch line will be reduced as follows: Reduced to approximately Berne 30" South1,446,000 Dth/d Wheelersburg South1,215,000 Dth/d Tompkinsville South1,136,000 Dth/d Barton South1,006,000 Dth/d Based on historical north to south nominations TE anticipates restrictions for interruptible, secondary out of path, secondary in path and potentially primary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton. Linden to EOLN 12" Line 1-D Cleaner Tool Run: Complete Potential Repair Dates: August 23 - August 31 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Linden to EOLN 12" Line 1-D. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: PUBLIC SERVICE - SEWAREN, NJ NEW JERSEY NATURAL - HANOVER, NJ Page 18 of 43

19 TE has been informed by Algonquin Gas Transmission (AGT) of the following outage below that will impact receipts to TE which may include its Leased Capacity on AGT. TE will process Lease Capacity reductions based on TE priorities. Owingsville Compressor Station: September 7 - September 28 TE will be conducting a compressor station outage at its Owingsville Compressor Station. During this work north to south capacity through stations on the 30 inch line will be reduced as follows: Reduced to approximately Berne 30" South1,626,000 Dth/d Wheelersburg South1,395,000 Dth/d Tompkinsville South1,316,000 Dth/d Barton South1,186,000 Dth/d Based on historical north to south nominations TE anticipates restrictions for interruptible, secondary out of path, secondary in path and potentially primary nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton. Athens to Wheelersburg 30" Line 10: October 3 - October 19 TE will be conducting a DOT hydro test between Athens to Wheelersburg compressor stations on 30" Line 10. During this work north to south capacity through stations on the 30 inch line will be reduced as follows: Reduced to approximately Berne 30" South1,581,000 Dth/d Wheelersburg South1,350,000 Dth/d Tompkinsville South1,271,000 Dth/d Barton South1,141,000 Dth/d Based on historical north to south nominations TE anticipates restrictions for interruptible, secondary out of path, secondary in path and potentially primary nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton. Texas Eastern DOT Pipeline Integrity Project TE will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the Texas Eastern pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run, and an ILI tool run. Also listed below are the dates of a possible investigation as a result of the in-line inspection. CaliperILIPossible Run Comp Page 19 of 43

20 Segment Access AreaDateDateRepl DtPoss Repl Dt Provident City to Hempstead (Line 11)*---CompleteCompleteComplete Carthage to Longview (Line 13)*---Complete08/10/1709/01/17 Vidor to Gillis (Line 14)*---CompleteComplete06/26/17 ***Huntsville to Lufkin (Line 11)---Complete08/18/1709/11/17 ***Santa Fe to EOLN (Line 16B)---08/01/1710/03/ CaliperILIPossible Run Comp Segment M1/M2 AreaDateDateRepl DtPoss Repl Dt Owingsville to Wheelersburg (Line 15) ---Complete07/12/ Tompkinsville to Danville (Line 10) ---Complete07/18/ Gladeville to Tompkinsville (Line 25) ---Complete07/20/17 08/10/17 Barton to Mt. Pleasant (Line 10) ---Complete08/07/17 08/25/17 French Lick to Seymour (Line 1) ---Complete07/24/17 08/18/17 Somerset to Summerfield (Line 3 -Sec 3)* ---06/27/1710/03/ Norris City to French Lick (Line 1) ---07/25/1710/19/ Somerset to Summerfield (Line 3 -Sec 3)* ---08/02/1709/04/17 09/25/17 Somerset to Summerfield (Line 3 -Sec 1) ---08/08/1709/13/17 09/27/17 CaliperILIPossible Run Comp Segment M3 AreaDateDateRepl DtPoss Repl Dt ***Shermansdale to Bernville (Line 19) ---Complete07/05/ ***Waynesburg to Uniontown (Line 2)* ---Complete07/24/ Bernville to Bechtelsville (Line 28/ Sec1) ---Complete06/07/ ***Bechtelsville to Lambertville (Line 28/ Sec1) ---Complete07/13/ Chester Junction to EOLN (Line 1-A-3)* ---CompleteComplete --- Holbrook to Uniontown (Line 15) ---Complete06/20/ ***Eagle to Lambertville (Line 2 / Sec 1) ---CompleteTBD --- Lilly to Entriken (Line 28) ---CompleteComplete --- Grantville to Bechtelsville (Line 28) ---Complete06/27/ Uniontown to Delmont (Line 29)*CompleteCompleteComplete --- ***Hanover to EOLN (Line 20 -B-1)* --- Complete07/05/17 -=- Delmont to Armagh (Line 28)*CompleteComplete07/11/ Holbrook to Uniontown (Line 10) ---Complete07/13/ Shermansdale to Grantville (Line 27/ Sec2) ---Complete07/14/ Shermansdale to Grantville (Line 27/ Sec1) ---Complete07/14/ Shermansdale to Grantville (Line 28) ---Complete07/14/ Delmont to Armagh (Line 19)CompleteComplete 07/18/ Grantville to Bechtelsville (Line 12) ---Complete07/18/ Shermansdale to Grantville (line 19 - Aux 1) ---Complete07/25/17 ---Uniontown to Delmont (Line 39) CompleteComplete07/26/ Perulack to Grantville (Line 12) CompleteComplete08/01/ Perulack to Shermansdale (Line 28) CompleteComplete08/16/ Linden to EOLN (Line 1-D)* ---Complete08/23/ Delmont to Armagh (Line 27/ MP ) /26/1710/04/ Eagle to Lambertville (Line 2 / Sec 2)---08/15/1709/26/ Bechtelsville to Lambertville (Line 28/ Sec 2) ---08/25/1710/02/ Delmont to Armagh (Line 27 Aux) ---08/31/1710/10/ Bernville to Bechtelsville (Line 28/ Sec2) ---08/22/1710/19/ Delmont to Armagh (Line 9B) ---TBDTBD --- Delmont to Armagh (Line 9C) ---TBDTBD --- Delmont to Armagh (Line 19 Aux) ---TBDTBD --- Page 20 of 43

21 As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known: Armagh to Lilly (Line 19) Armagh to Lilly (Line 27) Athens to Berne (Line 10) Athens to Berne (Line 15) Atlanta to Hope (Line 1) Barton to Mt. Pleasant (Line 15) Bechtelsville to Lambertville (Line 12) Bechtelsville to Lambertville (Line 19) Bedford to Chambersburg (Line 1) Bedford to Chambersburg (Line 2) Berne to Holbrook (Line 10) Berne to Holbrook (Line 15) Berne to Holbrook (Line 25) Bernville to Bechtelsville (Line 19) Blessing to Angleton (Line 16) Clinton to Kosciusko (Line 14) Clinton to Kosciusko (Line 18) Danville to Owingsville (Line 10) Donaldson to North Little Rock (Line 1) Egypt to Barton (Line 10) Egypt to Barton (Line 25) Five Points to Somerset (Line 3) Gillis to Opelousas (Line18) Gladeville to Tompkinsville (Line 10) Grantville to Bernville (Line 27) Heidlersburg to Marietta (Line 2) Holbrook to Uniontown (Line 10) Holbrook to Uniontown (Line 15) Holbrook to Uniontown (Line 25) Joaquin to Red River (Line 11) Karon (EOLN) to Provident City (Line 21) Kosciusko to Egypt (Line 10) Kosciusko to Egypt (Line 15) Kosciusko to Egypt (Line 25) Lambertville to Linden (Line 1) Lebanon to Five Points (Line 1 and 2) Lilly to Perulack (Line 12) Longview to Atlanta (Line 1) Mt. Pleasant to Gladeville (Line 10) Mt. Pleasant to Gladeville (Line 25) Norris City to Oakland City (Line 1) North Little Rock to Bald Knob (Line 1) Owingsville to Wheelersburg (Line 10) Owingsville to Wheelersburg (Line 15) Pollard to Oran (Line 1-O) Provident City to Blessing (Line 17) Seymour to Batesville (Line 1) Page 21 of 43

22 Shermansdale to Grantville (Line 19) St. Francisville to Union Church (Line 14) St. Francisville to Union Church (Line 18) St. Francisville to Union Church (Line 31) Tompkinsville to Danville (Line 15) *Walnut Ridge to Pollard (Line 1) West Monroe to Providence (Line 26) Wheelersburg to Athens (Line 10) Wheelersburg to Athens (Line 15) Download File: TE 2017 Planned Outages Schedule 25.docx Page 22 of 43

23 TSP: TSP Name: Texas Eastern Transmission, LP Critical Desc: Not a critical notice Notice Eff Date/Time: 07/13/ :30:04 PM Notice End Date/Time: 12/01/ :00:00 AM Notice ID: Notice Stat Desc: Supersede Notice Type: Planned Service Outage Post Date/Time: 07/13/ :30:04 PM Prior Notice: Reqrd Rsp Desc: No response required Rsp Date/Time: Subject: TE 2017 Planned Outage Schedule -- UPDATE Notice Text: The text below is included in the attached Word document located at the bottom of this posting. Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for the 2017 outage season. Due to unforeseen delays or scheduling conflicts, the dates of the outages listed below are subject to change. In addition, this schedule is not a complete list of all outages that will occur this outage season, and we reserve the right to update this list to reflect additional major outages when the timing of such major outages can be reasonably forecasted. Any changes to the list below will be posted at the earliest practical date. Parties are urged to monitor these postings to access the most current information. Access Area and Longview to Kosciusko: Vidor to Gillis 30" Line 14 (WLA) Potential Repair Dates: Complete Potential Run Comparison Repair Dates: June 26 - July 31 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Vidor to Gillis 30" Line 14. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: STARKS UTILITIES - STARKS, LA GULF SOUTH PIPELINE COMPANY - GILLIS, LA TRUNKLINE - BEAUREGARD PSH., LA ENTERGY SABINE POWER STATION - ORANGE CO., TX ENTERGY LOUISIANA,LLC BEAUREGARD PSH., LA CENTANA INTRASTATE PIPELINE CO. - ORANGE CO., TX COTTONWOOD ENERGY COMPANY, LP - NEWTON CO., TX ARCADIA OPERATING - BEAUREGARD PSH., LA ASPECT ENERGY, LLC / #1 GRIGGS - BEAUREGARD PSH., LA HOUSTON P/L VIDOR DOMINION E&P - BROWN GATHERING-ORANGE CO., TX GOLDEN PASS PIPELINE - CALCASIEU PARISH, LA Page 23 of 43

Algonquin Gas Transmission, LLC

Algonquin Gas Transmission, LLC Algonquin Gas Transmission, LLC Planned Service Outage Postings from 10/01/2016 to 10/31/2016 Page 1 of 11 TSP: 006951446 TSP Name: Algonquin Gas Transmission, LLC Critical Desc: Not a critical notice

More information

Algonquin Gas Transmission, LLC

Algonquin Gas Transmission, LLC Algonquin Gas Transmission, LLC Planned Service Outage Postings from 11/01/2015 to 11/30/2015 Page 1 of 10 TSP: 006951446 TSP Name: Algonquin Gas Transmission, LLC Critical Desc: Not a critical notice

More information

CBIA Energy Conference Natural Gas- Coming to Your Neighborhood Soon October 10, 2013 Cromwell, Connecticut Michael Dirrane Director, Northeast

CBIA Energy Conference Natural Gas- Coming to Your Neighborhood Soon October 10, 2013 Cromwell, Connecticut Michael Dirrane Director, Northeast CBIA Energy Conference Natural Gas- Coming to Your Neighborhood Soon October 10, 2013 Cromwell, Connecticut Michael Dirrane Director, Northeast Marketing Spectra Energy U.S. Transmission Map Miles of Pipe

More information

Texas Eastern Appalachiaa to Market Expansion Project (TEAM

Texas Eastern Appalachiaa to Market Expansion Project (TEAM Texas Eastern Appalachiaa to Market Expansion Project (TEAM 2014) Moving emerging natural gas supplies from the Appalachian region to diverse market destinations along the existing Texas Eastern footprint

More information

2017 Annual Seaview Customer Meeting. SEAVIEW RESORT, Galloway, NJ May 4, 2017

2017 Annual Seaview Customer Meeting. SEAVIEW RESORT, Galloway, NJ May 4, 2017 2017 Annual Seaview Customer Meeting SEAVIEW RESORT, Galloway, NJ May 4, 2017 1 Agenda 2017 Seaview Customer Event Welcome/Enbridge Update Winter Operations Pipeline Postings New Pipeline Development Regulatory

More information

Gas Quality Meeting October 14, 2008 Washington, D.C.

Gas Quality Meeting October 14, 2008 Washington, D.C. Texas Eastern Transmission, LP Gas Quality Meeting October 14, 2008 Washington, D.C. GQ 081014 (1) Gas Quality Meeting October 14, 2008 Meeting Agenda Overview Richard Kruse Changing Supply Bill Penney

More information

East Tennessee Natural Gas. Shipper Meeting. Fox Den Country Club Knoxville, TN April 20, 2017

East Tennessee Natural Gas. Shipper Meeting. Fox Den Country Club Knoxville, TN April 20, 2017 East Tennessee Natural Gas Shipper Meeting Fox Den Country Club Knoxville, TN April 20, 2017 Safe Harbor Statement Some of what we ll discuss today concerning future company performance will be forward-looking

More information

Texas Eastern Transmission, LP 5. QUALITY OF GAS. The provisions set forth in this Section 5 shall apply to all gas received or delivered by Pipeline.

Texas Eastern Transmission, LP 5. QUALITY OF GAS. The provisions set forth in this Section 5 shall apply to all gas received or delivered by Pipeline. Page 1 of 16 5. QUALITY OF GAS The provisions set forth in this Section 5 shall apply to all gas received or delivered by Pipeline. 5.1 Natural or Artificial Gas The gas received or delivered by Pipeline

More information

Issued March 21, Permian Global Access Pipeline LLC. Notice of Non-Binding Open Season

Issued March 21, Permian Global Access Pipeline LLC. Notice of Non-Binding Open Season Issued March 21, 2018 Permian Global Access Pipeline LLC Notice of Non-Binding Open Season Notice of Non-Binding Open Season Permian Global Access Pipeline LLC ( PGAP ), a wholly-owned subsidiary of Tellurian

More information

2014 EAST TENNESSEE NATURAL GAS PIPELINE AND SALTVILLE GAS STORAGE CUSTOMER MEETING. Welcome to Barnsley Gardens!

2014 EAST TENNESSEE NATURAL GAS PIPELINE AND SALTVILLE GAS STORAGE CUSTOMER MEETING. Welcome to Barnsley Gardens! 2014 EAST TENNESSEE NATURAL GAS PIPELINE AND SALTVILLE GAS STORAGE CUSTOMER MEETING 2014 EAST TENNESSEE NATURAL GAS PIPELINE AND SALTVILLE GAS STORAGE CUSTOMER MEETING Welcome to Barnsley Gardens! Welcome

More information

Spectra Energy: Moving Ahead, Gaining Momentum

Spectra Energy: Moving Ahead, Gaining Momentum 8 th ANNUAL PLATTS PIPELINE EXPANSION & DEVELOPMENT CONFERENCE HOUSTON, TX SEPTEMBER 17, 2013 Spectra Energy: Greg Crisp Director, Business Development Safe Harbor Statement Some of the statements in this

More information

The project consisted of 7 miles of 36-inch pipeline and associated facilities. UPI provide EPCM

The project consisted of 7 miles of 36-inch pipeline and associated facilities. UPI provide EPCM Haynesville Shale EXCO / TGGT Haynesville Development 36-inch Jebel Spine North The project consisted of five (5) miles of 36-inch pipeline and associated facilities. UPI provided EPCM services including,

More information

FERC Job Title Description (Updated 2/2/2018) Account Representative II, Capacity Services

FERC Job Title Description (Updated 2/2/2018) Account Representative II, Capacity Services FERC Job Title Description (Updated 2/2/2018) Account Representative II, Capacity Services Account Representative II, Offshore Transportation Account Representative II, System Balances Members of this

More information

Account Representative II, Capacity Services

Account Representative II, Capacity Services FERC Job Title Account Representative II, Capacity Services Description Members of this team are primarily responsible for assisting customers in transacting their daily business on the pipeline with a

More information

Investor Chat Series December 17, Tom O Connor. President & CEO Duke Energy Gas Transmission

Investor Chat Series December 17, Tom O Connor. President & CEO Duke Energy Gas Transmission Investor Chat Series December 17, 2004 Tom O Connor President & CEO Duke Energy Gas Transmission Safe Harbor Statement Under the Private Securities Litigation Act of 1995 This document contains forward

More information

NORTHEAST STATE PROFILES

NORTHEAST STATE PROFILES NORTHEAST STATE PROFILES CONNECTICUT Natural Gas Use in Connecticut Primary energy: 35% Electric generation capacity: 39% heating fuel: 35% Annual consumption: 243 billion cubic Natural Gas Pipelines Serving

More information

Crestwood Midstream Partners LP

Crestwood Midstream Partners LP Crestwood Midstream Partners LP Tracy Halleck Director, Northeast Marketing AGENDA Current Crestwood Asset Overview Competition correlation with many industries. Market Flows and Liquidity New Crestwood

More information

Building Pipelines Continuous Improvement (QA/QC) Business Environment

Building Pipelines Continuous Improvement (QA/QC) Business Environment Building Pipelines Continuous Improvement (QA/QC) Business Environment The INGAA Foundation Inc. Building Interstate Natural Gas Pipelines Continuous Improvement (QA/QC) Workshop Houston, Texas March 25

More information

E-RSC WORKING GROUP. Question No.: E-RSC 2-1 Part No.: Addendum:

E-RSC WORKING GROUP. Question No.: E-RSC 2-1 Part No.: Addendum: Question No.: E-RSC 2-1 Part No.: Addendum: Question: What is the total merchant generation currently interconnected to the Entergy transmission system? Please provide as a list with the location of the

More information

Methodology and code of conduct. Americas. Last Updated: April

Methodology and code of conduct. Americas. Last Updated: April Argus Natural Gas Americas Contents: Methodological principles 2 Index method and verification 2 Relationship to industry 2 Code of conduct and compliance 2 Markets covered 2 Day-ahead and weekend gas

More information

Platts NGLs Conference. September 24, 2013

Platts NGLs Conference. September 24, 2013 Platts NGLs Conference September 24, 2013 Agenda 2013 - Executing the Plan 2014 Responding to Delineation Results 2015 Major Ramp Up 2016 Utica to Reach 50% of Marcellus Wet Conclusions 1 Executing the

More information

Infrastructure Update

Infrastructure Update Infrastructure Update Office of Energy Projects February 23, 2017 Agency Overview Independent regulatory agency Quasi-judicial agency Regulates the rates for interstate transmission of electricity, natural

More information

Southern Natural Gas Company 2018 Outage Review Meeting. Customer con call and Webex April 18, 2018

Southern Natural Gas Company 2018 Outage Review Meeting. Customer con call and Webex April 18, 2018 Southern Natural Gas Company 2018 Outage Review Meeting Customer con call and Webex April 18, 2018 1 Welcome 2 Agenda Review of current and upcoming notable Outages- April/May/June Unscheduled outages

More information

Southern Natural Gas Company 2016 Outage Review Meeting. Customer con call and Webex April 20, 2016

Southern Natural Gas Company 2016 Outage Review Meeting. Customer con call and Webex April 20, 2016 Southern Natural Gas Company 2016 Outage Review Meeting Customer con call and Webex April 20, 2016 1 Welcome 2 Agenda Review of current and upcoming notable Outages- April/May/June North System South System

More information

Vector Pipeline TM. Vector Pipeline. Customer Meeting Nashville, Tennessee September 21, 2017

Vector Pipeline TM. Vector Pipeline. Customer Meeting Nashville, Tennessee September 21, 2017 Vector Pipeline Customer Meeting Nashville, Tennessee September 21, 2017 Amy Bruhn Sr Manager, Transportation Services Mastio Customer Survey Baseline Requirements Items a company is expected to be competent

More information

FERC GAS TARIFF. First Revised Volume No. 1 MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION

FERC GAS TARIFF. First Revised Volume No. 1 MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION FERC GAS TARIFF First Revised Volume No. 1 Of MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: John

More information

COLUMBIA MIDSTREAM BUILT TO LAST

COLUMBIA MIDSTREAM BUILT TO LAST COLUMBIA MIDSTREAM BUILT TO LAST After 100 years of experience in the Appalachian Basin, Columbia Midstream is developing partnerships and infrastructure in the emerging shale plays that are being built

More information

New Jersey Natural Gas Market Update

New Jersey Natural Gas Market Update March 25, 2015 Mullica Hill, NJ New Jersey Natural Gas Market Update Presentation to: SNJDC Natural Gas Seminar Tom Kiley Northeast Gas Association Issues Regional Market Developments New Jersey Gas Market

More information

Southern Natural Gas Company 2017 Outage Review Meeting. Customer con call and Webex February 15, 2017

Southern Natural Gas Company 2017 Outage Review Meeting. Customer con call and Webex February 15, 2017 Southern Natural Gas Company 2017 Outage Review Meeting Customer con call and Webex February 15, 2017 1 Welcome 2 Agenda Review of current and upcoming notable Outages- February/March/April Contacts Unscheduled

More information

130 FERC 61,257 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON TARIFFS. (Issued March 30, 2010)

130 FERC 61,257 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON TARIFFS. (Issued March 30, 2010) 130 FERC 61,257 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, and John R. Norris. TE Products Pipeline

More information

Tennessee Gas Pipeline Co, L.L.C. Northeast Energy and Commerce Association September 27, 2012

Tennessee Gas Pipeline Co, L.L.C. Northeast Energy and Commerce Association September 27, 2012 Tennessee Gas Pipeline Co, L.L.C. Northeast Energy and Commerce Association September 27, 2012 The Kinder Morgan System 4 th largest energy company in North America Enterprise value ~ $95 billion Largest

More information

WELCOME Fall Customer Meeting 2. Today s Agenda 9/30/2014. The Hotel Hershey September Break. Rich Paglia

WELCOME Fall Customer Meeting 2. Today s Agenda 9/30/2014. The Hotel Hershey September Break. Rich Paglia 214 Fall Customer Meeting WELCOME The Hotel Hershey September 24 26 Today s Agenda Welcome Rich Paglia Operations Update Shamus Donahoe The Last One Picked Dave McGillivray Break ProjectPermitting Permitting

More information

Bank of America 2008 Energy Conference. Fred Fowler President and CEO

Bank of America 2008 Energy Conference. Fred Fowler President and CEO Bank of America 2008 Energy Conference Fred Fowler President and CEO November 13, 2008 Safe Harbor Statement Some of the statements in this document concerning future company performance will be forward-looking

More information

Southern Natural Gas Company 2017 Outage Review Meeting. Customer con call and Webex May 17, 2017

Southern Natural Gas Company 2017 Outage Review Meeting. Customer con call and Webex May 17, 2017 Southern Natural Gas Company 2017 Outage Review Meeting Customer con call and Webex May 17, 2017 1 Welcome 2 Agenda Review of current and upcoming notable Outages- May/June/July Contacts Unscheduled outages

More information

Biomass from Logging Residue and Mill Residue in East Texas, 2003

Biomass from Logging Residue and Mill Residue in East Texas, 2003 Biomass from Logging Residue and Mill Residue in East Texas, 2003 By Weihuan Xu, Ph.D., Principal Economist Burl Carraway, Assistant Department Head Sustainable Forestry & Economic Development June 2005

More information

Brad Hall Midstream & Marketing

Brad Hall Midstream & Marketing Brad Hall Midstream & Marketing October 17, 2012 Overview Lines of Business Marketing Generation Midstream Natural Gas >100 Bcf > 30,000 locations 33 LDCs Power > 2 MM MWhrs > 10,000 locations 19 EDCs

More information

Biomass from Logging Residue and Mill Residue in East Texas, 2005

Biomass from Logging Residue and Mill Residue in East Texas, 2005 Biomass from Logging Residue and Mill Residue in East Texas, 2005 By Weihuan Xu, Ph.D., Principal Economist Burl Carraway, Assistant Department Head Sustainable Forestry & Economic Development May 2007

More information

Enable Midstream Partners Transportation & Storage

Enable Midstream Partners Transportation & Storage Enable Midstream Partners Transportation & Storage Natural Gas Society of East Texas Roundtable March 19, 2015 Carol Burchfield EMP Corporate Structure 2 Enable Midstream Partners Diverse Set of Interconnected

More information

Expanding Existing Pipeline Capacity to Meet New England s Energy Needs. Mike Dirrane Director, Marketing

Expanding Existing Pipeline Capacity to Meet New England s Energy Needs. Mike Dirrane Director, Marketing Expanding Existing Pipeline Capacity to Meet New England s Energy Needs Mike Dirrane Director, Marketing January 27, 2015 Spectra Energy s Portfolio of Assets Based in Houston, TX with operations in 30

More information

The Power of East Texas. TM REQUEST FOR PROPOSALS TO SUPPLY PARTIAL REQUIREMENTS POWER TO SELECTED LOADS IN SPP AND ENTERGY

The Power of East Texas. TM REQUEST FOR PROPOSALS TO SUPPLY PARTIAL REQUIREMENTS POWER TO SELECTED LOADS IN SPP AND ENTERGY The Power of East Texas. TM REQUEST FOR PROPOSALS TO SUPPLY PARTIAL REQUIREMENTS POWER TO SELECTED LOADS IN SPP AND ENTERGY August 15, 2011 TABLE OF CONTENTS Section 1 Scope 1 Section 2 RFP Communication

More information

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP VALLEY LATERAL PROJECT RESOURCE REPORT 11 Reliability and Safety FERC Docket No. CP16- -000 November 2015 Section TABLE OF CONTENTS Page 11.0 RELIABILITY AND SAFETY... 11-1 11.1 NATURAL GAS PIPELINE INDUSTRY

More information

BINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement

BINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement BINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement Page 1 of 8 REX Cheyenne Hub Enhancement Rockies Express Pipeline LLC ( REX ) is pleased to announce a binding open season ( Open Season

More information

January 13, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

January 13, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 January 13, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 RE: ANR Pipeline Company Compliance Filing to RP16-440-000 RP17- - ANR Pipeline

More information

Implications of an Emerging NGV Market

Implications of an Emerging NGV Market Implications of an Emerging NGV Market Natural Gas Vehicles: Fuel savings, emission reductions, and energy independence February 8, 2012 What s Driving Interest in NGVs? 5.00 US Retail Fuel Prices Current

More information

National Association of Publicly Traded Partnerships MLP Conference Presentation New York, New York May 21, 2008

National Association of Publicly Traded Partnerships MLP Conference Presentation New York, New York May 21, 2008 National Association of Publicly Traded Partnerships MLP Conference Presentation New York, New York May 21, 2008 Safe Harbor Statement Some of the statements in this document concerning future company

More information

Natural Gas Pipelines and New Jersey. Patty Cronheim ReThink Energy NJ Outreach Coordinator

Natural Gas Pipelines and New Jersey. Patty Cronheim ReThink Energy NJ Outreach Coordinator Natural Gas Pipelines and New Jersey Patty Cronheim ReThink Energy NJ Outreach Coordinator 1 Campaign Mission We empower New Jersey citizens by informing them about the need for a swift transition to clean,

More information

TABLE OF CONTENTS LIST OF FIGURES LIST OF ATTACHMENTS

TABLE OF CONTENTS LIST OF FIGURES LIST OF ATTACHMENTS TABLE OF CONTENTS 2.0 TRANSMISSION SYSTEM OVERVIEW... 2-1 2.1 PROPOSED PROJECT OBJECTIVES... 2-2 2.2 SAFETY, RELIABILITY AND RESILIENCY, AND OPERATIONAL FLEXIBILITY AND CAPACITY... 2-5 2.2.0 Pipeline Safety...

More information

May 18, Federal Energy Regulatory Commission Attn. Ms. Magalie R. Salas, Secretary 888 First Street, N.E. Washington, D.C.

May 18, Federal Energy Regulatory Commission Attn. Ms. Magalie R. Salas, Secretary 888 First Street, N.E. Washington, D.C. Transcontinental Gas Pipe Line Corporation 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 713/215-3380 May 18, 2006 Federal Energy Regulatory Commission Attn. Ms. Magalie R. Salas,

More information

FERC NGA GAS TARIFF. THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) SEA ROBIN PIPELINE COMPANY, LLC.

FERC NGA GAS TARIFF. THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) SEA ROBIN PIPELINE COMPANY, LLC. FERC NGA GAS TARIFF THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) of SEA ROBIN PIPELINE COMPANY, LLC Filed With The Federal Energy Regulatory Commission Communications Concerning

More information

Outline. Outlook for Crop Farm Income, Cash Rents, Farmland Prices, and Agricultural Credit. U.S. Corn Yield, U.S.

Outline. Outlook for Crop Farm Income, Cash Rents, Farmland Prices, and Agricultural Credit. U.S. Corn Yield, U.S. Outlook for Crop Farm Income, Cash Rents, Farmland Prices, and Agricultural Credit September 1st, 217 Outline Outlook for Crop Farm Income, Cash Rents, Farmland Prices, and Agricultural Credit Gary Schnitkey,

More information

NEXUS Gas Transmission

NEXUS Gas Transmission NEXUS Gas Transmission Bringing New Supplies to Market Ohio Manufacturers Association - October 2012 Agenda Project Introduction Utica and Marcellus Gas Supply Michigan and Ontario Markets Conclusion &

More information

Pipeline Experts. Pipelines are back in business was the consensus of top industry. Expect Major Construction Boom. by Rita Tubb Managing Editor

Pipeline Experts. Pipelines are back in business was the consensus of top industry. Expect Major Construction Boom. by Rita Tubb Managing Editor by Rita Tubb Managing Editor Pipeline Experts Expect Major Construction Boom UC Home Permission to Copy Order Reprints Pipelines are back in business was the consensus of top industry executives at the

More information

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate.

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate. FEDERAL ENERGY REGULATORY COMMISSION ENVIRONMENTAL COMPLIANCE MONITORING PROGRAM WEEKLY SUMMARY REPORT NEXUS GAS TRANSMISSION PROJECT DOCKET NO.: CP16-22-000 FOR THE PERIOD: MARCH 19 THROUGH MARCH 25,

More information

Joint venture ownership stakes in the pipeline are: Dominion, 45%; Duke Energy, 40%; Piedmont, 10%; and AGL Resources, 5%.

Joint venture ownership stakes in the pipeline are: Dominion, 45%; Duke Energy, 40%; Piedmont, 10%; and AGL Resources, 5%. Pipeline Project #1298 Pipeline project Name and Ownership Project Name: Atlantic Coast Pipeline C Three ID#: 1298 Holding Company or Parent Organization: Dominion Resources View Project Map See All of

More information

Opportunities and Challenges in the Energy Infrastructure Industry. Louisiana State University Energy Summit

Opportunities and Challenges in the Energy Infrastructure Industry. Louisiana State University Energy Summit Opportunities and Challenges in the Energy Infrastructure Industry Louisiana State University Energy Summit 1 Kinder Morgan Overview Kinder Morgan is the largest midstream and the third largest energy

More information

Cheyenne Connector Binding Open Season

Cheyenne Connector Binding Open Season Cheyenne Connector Binding Open Season Page 1 of 9 Cheyenne Connector Description Tallgrass Energy Partners, LP ( Tallgrass ) is pleased to announce a binding open season ( Open Season ) for the Cheyenne

More information

Philadelphia Gas Works

Philadelphia Gas Works Philadelphia Gas Works REQUEST FOR PROPOSALS For NATURAL GAS STORAGE ASSET MANAGEMENT RFP NO. 28399 April 1, 2014 through March 31, 2015 The Philadelphia Gas Works ( PGW ) is requesting proposals for asset

More information

Southern Natural Gas Company 2017 Outage Review Meeting. Customer con call and Webex September 13, 2017

Southern Natural Gas Company 2017 Outage Review Meeting. Customer con call and Webex September 13, 2017 Southern Natural Gas Company 2017 Outage Review Meeting Customer con call and Webex September 13, 2017 1 Welcome 2 Agenda Review of current and upcoming notable Outages- September/October/November Contacts

More information

Southern Natural Gas Company 2016 Outage Review Meeting. Customer con call and Webex October 19, 2016

Southern Natural Gas Company 2016 Outage Review Meeting. Customer con call and Webex October 19, 2016 Southern Natural Gas Company 2016 Outage Review Meeting Customer con call and Webex October 19, 2016 1 Welcome 2 Agenda Review of current and upcoming notable Outages- October/November/December Unscheduled

More information

Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 FERC Gas Tariff First Revised Volume No. 1

Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 FERC Gas Tariff First Revised Volume No. 1 Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 RATE SCHEDULE FTS FIRM TRANSPORTATION SERVICE 1. AVAILABILITY This Rate Schedule FTS is available to any entity (hereinafter called Shipper) which:

More information

FERC GAS TARIFF FOURTH REVISED VOLUME NO. 1. (Superseding Third Revised Volume No. 1) COLUMBIA GAS TRANSMISSION, LLC FILED WITH

FERC GAS TARIFF FOURTH REVISED VOLUME NO. 1. (Superseding Third Revised Volume No. 1) COLUMBIA GAS TRANSMISSION, LLC FILED WITH FERC GAS TARIFF FOURTH REVISED VOLUME NO. 1 (Superseding Third Revised Volume No. 1) of COLUMBIA GAS TRANSMISSION, LLC FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this

More information

Major Changes in Natural Gas Transportation Capacity,

Major Changes in Natural Gas Transportation Capacity, Major Changes in Natural Gas Transportation, The following presentation was prepared to illustrate graphically the areas of major growth on the national natural gas pipeline transmission network between

More information

OWNERS WILL ENTERTAIN NON-CONTINGENT OFFERS ON ENTIRE PORTFOLIO ONLY AS A TOTAL PACKAGE UNTIL AUGUST 20TH

OWNERS WILL ENTERTAIN NON-CONTINGENT OFFERS ON ENTIRE PORTFOLIO ONLY AS A TOTAL PACKAGE UNTIL AUGUST 20TH OWNERS WILL ENTERTAIN NON-CONTINGENT OFFERS ON ENTIRE PORTFOLIO ONLY AS A TOTAL PACKAGE UNTIL AUGUST 20TH PORTFOLIO OVERVIEW STATE COUNTY/ PARISH ACRES CROPLAND (FSA) AUCTION DATE Illinois Warren 236 235

More information

Atlantic Coast Pipeline: Economics and Manufacturing Jobs

Atlantic Coast Pipeline: Economics and Manufacturing Jobs Atlantic Coast Pipeline: Economics and Manufacturing Jobs Prepared for the Natural Resources Defense Council Authors: Rachel Wilson Sagal Alisalad Emrat Nur Marzan Bryndis Woods December 5, 2017 Page 1

More information

Platts 8 th Annual Pipeline Development & Expansion Conference. Gas-Electric Coordination Update

Platts 8 th Annual Pipeline Development & Expansion Conference. Gas-Electric Coordination Update Platts 8 th Annual Pipeline Development & Expansion Conference Gas-Electric Coordination Update Anders Johnson, Director System Design KinderMorgan Pipelines September 17, 2013 Hilton Houston Post Oak,

More information

* - Denotes new project ** - Denotes change in project/schedule

* - Denotes new project ** - Denotes change in project/schedule June 13, 2014 Planned Service Outage Listed below is the scheduled maintenance, and pipeline outages, for 2014 that could affect pipeline capacity on the Southern Star Central (SSC) system. Changes to

More information

Permian to Katy Pipeline. Non-Binding Open Season

Permian to Katy Pipeline. Non-Binding Open Season August - September 2017 TABLE OF CONTENTS Notice of Open Season and Project Overview...3 P2K Katy Hub...4 Anchor Shipper Status...6 Length of Open Season...6 Participation in the...6 Bid Evaluation Criteria...7

More information

and Resource Report 1 General Project Description

and Resource Report 1 General Project Description ATLANTIC COAST PIPELINE, LLC ATLANTIC COAST PIPELINE Docket No. PF15-6-000 and DOMINION TRANSMISSION, INC SUPPLY HEADER PROJECT Docket No. PF15-5-000 Resource Report 1 Preliminary Draft Prepared by December

More information

CareSource Provider Portal. I H C P A n n u a l S e m i n a r

CareSource Provider Portal. I H C P A n n u a l S e m i n a r CareSource Provider Portal I H C P 2 0 1 7 A n n u a l S e m i n a r CareSource Provider Portal Registration 1. Go to CareSource.com. On the right side of the page, click on Provider Portal under Provider

More information

QUESTAR PIPELINE OPERATIONS & CUSTOMER SERVICE MEETING

QUESTAR PIPELINE OPERATIONS & CUSTOMER SERVICE MEETING QUESTAR PIPELINE OPERATIONS & CUSTOMER SERVICE MEETING 2013 Meeting Hotel Park City Park City, Utah WELCOME Larry Conti V.P. Operations & Engineering NEW PIPEVIEWER Jeannie Yerkovich SCADA Analyst Classic

More information

J-W Operating Company Corporate Objectives

J-W Operating Company Corporate Objectives Corporate Objectives Sustainable growth and profitability. Add value to Stakeholders. Preserve the long-term financial health of the enterprise through appropriate risk management. Develop organization

More information

Business Development Outlook. Paul Smith Director, Business Development

Business Development Outlook. Paul Smith Director, Business Development Business Development Outlook Paul Smith Director, Business Development 1 Development Trends TGP projects nearing in-service Supply Push: Susquehanna West: 145k In Service (9/1) Orion: 135k 11/1/2017 Broad

More information

The PennEast Pipeline Project

The PennEast Pipeline Project The Project About the Project AGL Resources; NJR Pipeline Company; PSEG Power; South Jersey Industries; Spectra Energy and UGI Energy Services (UGIES) comprise Company, LLC. Over $1 billion investment

More information

Frequently Asked Questions. DART Implementation

Frequently Asked Questions. DART Implementation October 7, 2016 Frequently Asked Questions DART Implementation The Kinder Morgan West Region Pipelines, which include El Paso Natural Gas Company, LLC, (EPNG) and Mojave Pipeline Company, LLC, (Mojave)

More information

TEXAS TIMBER PRICE TRENDS

TEXAS TIMBER PRICE TRENDS TEXAS TIMBER PRICE TRENDS BIMONTHLY MARKET REPORT VOL. 23 NO. 4 July/August 2005 TEXAS TIMBER PRICE TRENDS WHAT IS THE PURPOSE OF THIS REPORT? Texas Timber Price Trends is a bi-monthly publication reporting

More information

146 FERC 61,182 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

146 FERC 61,182 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 146 FERC 61,182 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Acting Chairman; Philip D. Moeller, John R. Norris, and Tony Clark. Crosstex NGL Pipeline,

More information

Benton Personal Property Tax Commitment Book :55 PM

Benton Personal Property Tax Commitment Book :55 PM Benton Personal Property Book - 2017 14.400 Account Name & Address Category Breakdown 73 ADT LLC 600 600 0 0.00 PROPERTY TAX DEPT. PO BOX 310773 BOCA RATON FL 33431-0773 600 1 18 ASSISTANCE PLUS & BOWEN,JOHNNA

More information

Reducing Peak Energy Demand: The Hidden Benefit of Cool Roofs

Reducing Peak Energy Demand: The Hidden Benefit of Cool Roofs Reducing Peak Energy Demand: The Hidden Benefit of Cool Roofs Dr. James L. Hoff, DBA, TEGNOS Research, Inc., Keith Gere and Robert Carnick, Duro-Last Inc. November 11, 2014 MW Peak Energy Demand 30,000

More information

TransCanada U.S. Pipelines Central ANR Pipeline, ANR Storage, and Great Lakes Gas

TransCanada U.S. Pipelines Central ANR Pipeline, ANR Storage, and Great Lakes Gas TransCanada U.S. Pipelines Central ANR Pipeline, ANR Storage, and Great Lakes Gas SNAME Conference Great Lakes-Great Rivers Section February 13-14, 2013 Natural Gas Basics Players and Functions 1. Exploration

More information

A Comparison of In-Service Statistical Test Programs

A Comparison of In-Service Statistical Test Programs A Comparison of In-Service Statistical Test Programs North Carolina Electric Meter School & Conference June 30, 2004 1 Program Background Advent Design Corporation has conducted numerous studies of in-service

More information

ASSET INTEGRITY Project Case Studies

ASSET INTEGRITY Project Case Studies Project Case Studies Development of Corrosion Under Insulation (CUI) Protocol and Inspection Procedure Multi-National Natural Gas Pipeline Operator Texas Contacts Background A large multi-national energy

More information

Transmission Pipeline Opportunities. Advancing Project Development in India through Public Private Partnerships

Transmission Pipeline Opportunities. Advancing Project Development in India through Public Private Partnerships Transmission Pipeline Opportunities Advancing Project Development in India through Public Private Partnerships 22 23 February, 2007 Pipeline Maintenance and Repair: Agenda Methane Losses from Pipeline

More information

MOUNTAINEER XPRESS. Columbia Pipeline Group

MOUNTAINEER XPRESS. Columbia Pipeline Group MOUNTAINEER XPRESS Columbia Pipeline Group C169566.indd 1 TABLE OF CONTENTS CPG AT A GLANCE THE PLAN/PROJECT COMPONENTS COMMITMENT TO KEEPING YOU INFORMED PROJECT BENEFITS SAFETY FREQUENTLY ASKED QUESTIONS

More information

Southern California Edison Energy Affiliates

Southern California Edison Energy Affiliates Southern California Edison Energy Affiliates Aguila Energy Company ALP Wind, L.L.C. 55237 City Rd. 3 Mountain Lake, MN 56159 American Bituminous Power Partners, L.P. Grant Town Power Plant Highway 17 Grant

More information

TEXAS TIMBER PRICE TRENDS

TEXAS TIMBER PRICE TRENDS TEXAS TIMBER PRICE TRENDS BIMONTHLY MARKET REPORT VOL. 25 NO. 2 March/April 2007 TEXAS TIMBER PRICE TRENDS WHAT IS THE PURPOSE OF THIS REPORT? Texas Timber Price Trends is a bi-monthly publication reporting

More information

An Employee-Owned Company

An Employee-Owned Company An Employee-Owned Company October 26, 2016 Clinton Township Floodplain Administrator P.O. Box 256, Creek Road Factoryville, PA 18419 Re: Atlantic Sunrise Project Central Penn Line North Clinton Township,

More information

Broad market presence: Growing demand regions, key supply basins, LNG terminals. Excellent connections to markets and supply

Broad market presence: Growing demand regions, key supply basins, LNG terminals. Excellent connections to markets and supply Pipeline Group Strong and Growing Broad market presence: Growing demand regions, key supply basins, LNG terminals Excellent connections to markets and supply Almost $4 billion of committed growth projects

More information

Texas Gas Association

Texas Gas Association Coastal Chemical Co., L.L.C./Brenntag Texas Gas Association 2016 Transmission Roundtable (Pipeline Cleanliness is What?) San Antonio, Texas November 10, 2016 Randy L. Roberts (337) 654-9930 N-SPEC Applications/Sales

More information

MISO Winter Generator Fuel Survey Results on Gas Fired Generation

MISO Winter Generator Fuel Survey Results on Gas Fired Generation MISO Winter Generator Fuel Survey Results on Gas Fired Generation Mark Thomas Electric Gas Operations Coordinator Phil Van Schaack Manager Unit Commitment and Dispatch November 30, 2016 Executive Summary

More information

Powering Beyond. Europe Investor Meetings March 20 22, 2018

Powering Beyond. Europe Investor Meetings March 20 22, 2018 Powering Beyond Europe Investor Meetings March 20 22, 2018 Safe Harbor This presentation contains statements that may be considered forward looking statements, such as management s expectations of financial

More information

April 9, 2015 The LNG Export Review Process: A Projectby-Project

April 9, 2015 The LNG Export Review Process: A Projectby-Project April 9, 2015 The LNG Export Review Process: A Projectby-Project Analysis for April What's Happening: Royal Dutch Shell announced a deal yesterday to buy BG Group, a move that will make Shell a major competitor

More information

TEXAS TIMBER PRICE TRENDS

TEXAS TIMBER PRICE TRENDS TEXAS TIMBER PRICE TRENDS BIMONTHLY MARKET REPORT VOL. 25 NO. 1 January/February 2007 TEXAS TIMBER PRICE TRENDS WHAT IS THE PURPOSE OF THIS REPORT? Texas Timber Price Trends is a bi-monthly publication

More information

Director TGP Facility Planning and Gas Control June 3, Prepared for the Harvard Electricity Policy Group

Director TGP Facility Planning and Gas Control June 3, Prepared for the Harvard Electricity Policy Group www.elpaso.com NYSE:EP Anders Johnson Director TGP Facility Planning and Gas Control June 3, 2011 Prepared for the Harvard Electricity Policy Group D E P E N D A B L E N A T U R A L G A S El Paso Corporation

More information

Williams in the Northeast. Canton The Utica Capital Seminar Kristopher Evanto, Manager - Development, Utica June 10, 2015

Williams in the Northeast. Canton The Utica Capital Seminar Kristopher Evanto, Manager - Development, Utica June 10, 2015 Williams in the Northeast Canton The Utica Capital Seminar Kristopher Evanto, Manager - Development, Utica June 10, 2015 Call Before You Dig Know what s below Call at least 48 hours before you dig 811

More information

ENERGY TRANSFER ROVER PIPELINE. Beth Hickey - Sr. Vice President, Interstate

ENERGY TRANSFER ROVER PIPELINE. Beth Hickey - Sr. Vice President, Interstate ENERGY TRANSFER ROVER PIPELINE Beth Hickey - Sr. Vice President, Interstate ENERGY TRANSFER ASSET OVERVIEW Excludes retail locations ETP Assets Marcus Hook SXL Assets Eagle Point Nederland 2 ENERGY TRANSFER

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated May 4, 2018 FULTON COUNTY SR 0000(FMC) #109343 PROPOSAL:$21.36 PLANS:$9.02 12X18:$11.07 24X36:$159.90 X-SEC:$7.48 12X18:$9.18 24X36:$132.60 This project involves

More information

6 th Annual Wyoming CO2 Conference July 12, 2012 Casper, Wyoming Rocky Mountain Region Activities Update NYSE: DNR

6 th Annual Wyoming CO2 Conference July 12, 2012 Casper, Wyoming Rocky Mountain Region Activities Update NYSE: DNR 6 th Annual Wyoming CO2 Conference July 12, 2012 Casper, Wyoming Rocky Mountain Region Activities Update NYSE: DNR About Forward Looking Statements The data contained in this presentation that are not

More information

Shock and Aftershock: A Look at this Last Winter and the Outlook for Future Supply Disruptions

Shock and Aftershock: A Look at this Last Winter and the Outlook for Future Supply Disruptions 0 Shock and Aftershock: A Look at this Last Winter and the Outlook for Future Supply Disruptions Prepared for the North Carolina Propane Gas Association September 16, 2014 Presented by: Warren Wilczewski

More information

AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality

AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P. O. BOX 1229 GALVESTON, TEXAS 77553-1229 April 11, 2017 AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental

More information

5. ACCOUNTING PROCEDURES

5. ACCOUNTING PROCEDURES 5. ACCOUNTING PROCEDURES 5.1 CREDIT REQUIREMENTS Credit is extended to Shippers provided that minimum financial requirements are initially met and that an acceptable financial posture and payment history

More information