City of Fort Smith and Frontier Metropolitan Planning Organization Request for Qualifications City of Fort Smith Traffic and Truck Study

Size: px
Start display at page:

Download "City of Fort Smith and Frontier Metropolitan Planning Organization Request for Qualifications City of Fort Smith Traffic and Truck Study"

Transcription

1 City of Fort Smith and Frontier Metropolitan Planning Organization Request for Qualifications City of Fort Smith Traffic and Truck Study Date: January 16, 2018 Response Due: February 5, 2018 at 10:00 a.m. CDT The City of Fort Smith in coordination with the Frontier Metropolitan Planning Organization seeks the services of one or more consultants for the following study: City of Fort Smith Downtown Traffic and Truck Study SCOPE OF WORK The contractor and Frontier MPO staff will work with the City of Fort Smith, the 64.6 Organization (Propelling Downtown Forward), and the Arkansas Department of Transportation along with other key freight and commercial business district stakeholders to study downtown truck traffic and create a plan to alleviate thru traffic. In specific, U.S. Highway 64, Garrison Avenue, State Hwy 255, Riverfront Drive, Wheeler, North A Street, North B Street, North 4 th Street, North 5th Street, State Hwy 71, among others. A robust public participation effort is expected. See Appendix A for the Fort Smith Truck By-Pass Routes, downtown districts, and study area issues and assets. In order to understand how truck traffic is traveling through downtown, the study shall identify the types of trucks, truck traffic counts, level of use on downtown facilities, patterns/direction of travel, and peak times of travel. American Trucking Research Institute origin and destination data will assist in understanding truck movement patterns. Data collection methodology will focus on large trucks, and tractor trailer combinations. The objective of this study is to determine the truck traffic using the downtown corridor and their effect on road space, and downtown accessibility. Video cameras, and other traffic counting devices may be deployed. The data results must be easily communicated to the public, stakeholders, the Arkansas Department of Transportation, and interested parties. Equally, impacts to trucking industry such as restricting commercial vehicles on non-downtown routes or the additional cost of indirect routes will be examined. Also, the impacts of alternative routes to local shippers and manufacturers receiving deliveries will be analyzed. This could be accomplish through oneon-one interviews. Additionally, the study will summarize how truck drivers select their routes. Also, the evaluation of the effect of freight trucks to pedestrians, bicyclists, vehicle parking, and the downtown commercial business district will be presented. A review of zoning and future land use in downtown Fort Smith should be conducted. Recommendations for safe alternative routes, needed freight infrastructure projects, or other mitigation efforts will be proposed as part of the study. The contractor will provide at least three alternatives (plus no action) with cost estimates for property acquisition, right-of-way, and utilities. These alternative routes must meet or exceed current state standards set by U.S. 64/Garrison Avenue. Impacts to alternative routes, such as forecasted truck traffic, and other elements should be considered. Also, the alternative route selections should include at a minimum, the number of traffic control devices, the length, and the time to travel. 1

2 Secondly, the study will also include a traffic evaluation of the recommended downtown mobility improvements which include the implementation of two-way street conversions and open space areas noted in the Propelling Downtown Forward Study, a copy of the referenced pages is included in Appendix B. To view the entire plan, see Forward_%20July-2017-V4-reduced.pdf. These routes include: 1. North A & B Streets corridor conversion to two-way streets along with the expansion of Cisterna Park into Garrison Plaza (see page 25 Cisterna and pages 47-48); 2. North 10 th and 11 th Streets corridor conversion to two-way streets to include Alternative 2: A Revitalized Gateway from Grand Avenue (See page th & 11 th Streets and pages 49-52; 3. Followed by Towson Avenue, and Riverfront Drive (See page 25 The Riverfront, page 26 Medical Area/Towson Avenue, and pages STATEMENT OF QUALIFICATIONS REQUIREMENTS The RFQ will permit the City of Fort Smith and the Frontier Metropolitan Planning Organization to seek the most qualified respondents for this study. The Statement of Qualifications (SOQ) shall be limited to 15 pages in length excluding the cover letter. The SOQ will address the firm s specific experience in truck traffic analysis for downtown commercial areas with interstate facilities. The RFQ shall contain the following: clear understanding of the project, level of experience related to this type of work, project management qualifications, and ability to complete the project within the specified timeframe. A summary of why the firm should be selected and the address and contact details for each party in the proposal must be included. The SOQ will contain personnel resumes and a description of five (5) relevant projects and a minimum of three (3) professional recommendations. The SOQ will be prepared on the Respondent s letterhead and identify the full legal name and address of the Respondent. The Respondent is defined as the legal entity that may execute any resulting contract with the City of Fort Smith. The letter must be (1) be signed by an authorized representative of the Respondent s organization, and (2) identify the individual who will serve as the point of contact for the Respondent. EVALUATION The City of Fort Smith and Frontier MPO s objective is to select the highest qualified firm for the services to be rendered, at compensation determined as fair and reasonable. Respondents will be evaluated in a two-part process. First, at least three (3) top firms will be selected to submit proposals for the City of Fort Smith Traffic and Truck Study. Second, the top ranked firms proposals will be evaluated in combination with their qualifications. Consultants are invited to respond to the study individually, or to propose a team to respond to the study that the firms are qualified to undertake. 2

3 SCORING The City of Fort Smith, Frontier MPO staff, and other related persons will independently rate and score each SOQ using the following criteria: 1. Knowledge and Experience 20 points 2. Professional Qualifications/Staff 20 points 3. Capacity to Perform Work 15 points 4. Professional References 20 points 5. Past Work Performance 15 points 6. Professional Reputation* 10 points *Responsiveness to Civil Rights, 100 POINTS DBE, Equal Opportunity, Federal, and State requirements. The evaluation team will assign up to the maximum points noted above to each criterion based on the respondent submittals. Respondents will then be ranked according to their total cumulative points. The RFQ is issued on January 16, Four sets of paper responses and a copy in PDF format on Compact Disc (CD). Must be received no later than 10:00 AM (CDT) on February 5, Responses received after the deadline will not be considered. All terms and conditions included shall be applicable to the study listed and undertaken in this Request for Qualifications (RFQ). This project is a component of the Frontier MPO FY2018 Unified Planning Work Program (UPWP). The UPWP is available for review at Work is expected to begin in March 2018 and must be completed by December, No agreement for this work shall be executed until all approvals and funding are in place. The point of contact (POC) for responses to the RFQ shall be Reese M. Brewer, Frontier MPO. All communications with the POC about the project shall be addressed to: Reese M. Brewer Transportation Director, Frontier MPO Western Arkansas Planning and Development District 1109 S. 16 th Street P.O.B 2067 Fort Smith, AR rbrewer@wapdd.org The City of Fort Smith is an Equal Opportunity/Affirmative Action Employer 3

4 APPENDIX A: CITY OF FORT SMITH TRUCK ROUTES CITY OF FORT SMITH CENTRAL BUSINESS IMPROVEMENT DISTRICT & DOWNTOWN DISTRICT CITY OF FORT SMITH DOWNTOWN ISSUES & ASSETS 4

5 Central Courtesy: City of Fort Smith 5

6 City of Fort Smith CBID & Historic Districts Comprehensive Plan, Nov

7 Downtown Issues & Assets City of Fort Smith Comprehensive Plan, Nov

8 APPENDIX B: PROPELLING DOWNTOWN FORWARD STUDY REFERENCED PAGES - 25, 26, 27 (Cisterna Figure),

9 9

10 10

11 Pg. 27 Pg

12 Pg. 47 Pg

13 Pg. 49 Pg

14 Pg

15 Pg

16 Pg

17 Pg 54 17

18 Pg

19 Pg

TEXAS MEXICO TRANSPORTATION BORDER MASTER PLAN UPDATE

TEXAS MEXICO TRANSPORTATION BORDER MASTER PLAN UPDATE TEXAS MEXICO TRANSPORTATION BORDER MASTER PLAN UPDATE Border Trade Advisory Committee Footer Text Date Background Information: May 31, 2017 Previous border master plans (2013 / 2014) Primarily focused

More information

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager Interstate 66 Widening from Gainesville to Haymarket RFQ Information Meeting January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager John C. Daoulas, P.E. APD Project Manager and POC Introduction

More information

USDOT PERFORMANCE BASED PLANNING AND PROGRAMMING (PBPP)

USDOT PERFORMANCE BASED PLANNING AND PROGRAMMING (PBPP) USDOT PERFORMANCE BASED PLANNING AND PROGRAMMING (PBPP) Eric Randall TPB Transportation Engineer Jane Posey TPB Transportation Engineer MWAQC TAC February 14, 2017 Agenda Item 4 Performance Based Planning

More information

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives. 4 Goals & Objectives INTRODUCTION The 2015-2040 MTP preserves and promotes the quality of life and economic prosperity of the MAB by providing a transportation system consistent with the regional goals.

More information

TEXAS FREIGHT MOBILITY PLAN 2017

TEXAS FREIGHT MOBILITY PLAN 2017 TEXAS FREIGHT MOBILITY PLAN 2017 Texas Transportation Commission September 28, 2017 Overview of the Texas Freight Mobility Plan 2016 Plan First multimodal freight mobility plan Identified freight network,

More information

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT RISK SERVICES SUPPLEMENTAL INFORMATION PACKAGE

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT RISK SERVICES SUPPLEMENTAL INFORMATION PACKAGE MASSACHUSETTS PORT AUTHORITY CAPITAL PROGRAMS DEPARTMENT SUITE 209S - LOGAN OFFICE CENTER ONE HARBORSIDE DRIVE EAST BOSTON, MASSACHUSETTS 02128-2909 REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT

More information

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013 FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS June 1, 2013 For general guidance the following information is provided as an aid to those preparing submittals in response to Design-Build solicitations.

More information

Transit Return on Investment (ROI) Study Request for Proposals (RFP)

Transit Return on Investment (ROI) Study Request for Proposals (RFP) Transit Return on Investment (ROI) Study Request for Proposals (RFP) Table of Contents 1. Introduction... 1 2. Scope of Services... 1 3. Project Schedule... 5 4. Evaluation Criteria... 5 5. Submission

More information

MONITORING IMPLEMENTATION AND PERFORMANCE

MONITORING IMPLEMENTATION AND PERFORMANCE 12 MONITORING IMPLEMENTATION AND PERFORMANCE The FAST Act continues the legislation authorized under MAP-21, which created a data-driven, performance-based multimodal program to address the many challenges

More information

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION MEMORANDUM

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION MEMORANDUM BOSTON REGION METROPOLITAN PLANNING ORGANIZATION State Transportation Building Ten Park Plaza, Suite 2150 Boston, MA 02116-3968 Tel. (617) 973-7100 Fax (617) 973-8855 TTY (617) 973-7089 www.bostonmpo.org

More information

11/20/15 SUBMISSIONS DUE: WEDNESDAY, JANUARY 13, 2016, 5:00 P.M. CDT

11/20/15 SUBMISSIONS DUE: WEDNESDAY, JANUARY 13, 2016, 5:00 P.M. CDT Request for Proposals DOWNTOWN AUSTIN PARKING SUPPLY AND DEMAND ANALYSIS AND PARKING MANAGEMENT STRATEGY For Austin DMO, Inc. d/b/a DOWNTOWN AUSTIN ALLIANCE SUBMISSIONS DUE: WEDNESDAY, JANUARY 13, 2016,

More information

REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR REAL ESTATE BROKERAGE SERVICES FOR THE CITY OF TOLLESON

REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR REAL ESTATE BROKERAGE SERVICES FOR THE CITY OF TOLLESON REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR FOR THE CITY OF TOLLESON City of Tolleson 9555 West Van Buren Street Tolleson, Arizona 85353 SOLICITATION INFORMATION AND SELECTION SCHEDULE Solicitation Number:

More information

Subject: Statement of Qualifications for Public Safety Building Design

Subject: Statement of Qualifications for Public Safety Building Design March 5, 2010 Subject: Statement of Qualifications for Public Safety Building Design The City of Porterville seeks Statements of Qualification (SOQ) from qualified architectural and engineering firms for

More information

Des Moines Area MPO. MPO Planning Subcommittee Meeting March 3, Des M oines Area M etropolitan Planning Organization

Des Moines Area MPO. MPO Planning Subcommittee Meeting March 3, Des M oines Area M etropolitan Planning Organization Des Moines Area MPO MPO Planning Subcommittee Meeting March 3, 2014 2014 Des M oines Area M etropolitan Planning Organization Agenda 1. Call To Order 2. VOTE: Approval of Agenda 3. VOTE: Approval of Meeting

More information

Request for Consultant Statements of Interest and Qualifications POINT DEFIANCE ZOO & AQUARIUM

Request for Consultant Statements of Interest and Qualifications POINT DEFIANCE ZOO & AQUARIUM Request for Consultant Statements of Interest and Qualifications POINT DEFIANCE ZOO & AQUARIUM Capital Bond Program Implementation Planning Services 5/20/14 The Point Defiance Zoo & Aquarium (PDZA) will

More information

Traffic Study Guidelines

Traffic Study Guidelines Traffic Study Guidelines March 2015 Manatee County Public Works Transportation Planning Division 1022 26 th Avenue East Bradenton, FL 34208 Phone: (941) 708-7450 Fax: (941) 708-7503 TABLE OF CONTENTS

More information

SH99 Grand Parkway Segments H, I1, and I2 Proposer RFQ Q&A Matrix No. 3 September 22, 2014

SH99 Grand Parkway Segments H, I1, and I2 Proposer RFQ Q&A Matrix No. 3 September 22, 2014 Proposer RFQ Q&A Matrix 3 Section and Page Document * Any document changes (other than RID updates) described in TxDOT's responses will be made in an Addendum to the RFQ unless otherwise indicated. RID

More information

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS Construction Impact Mitigation Strategy Guidelines for Major Developments The District of North Vancouver

More information

INTERSTATE CORRIDOR PLANNING

INTERSTATE CORRIDOR PLANNING INTERSTATE CORRIDOR PLANNING Prioritization of Corridor Studies July 29, 2015 Importance of the Interstate System Texas is an integral part of the national interstate system. The interstate system provides

More information

Request for Proposals Redevelopment of the White Street Municipal Parking Lot

Request for Proposals Redevelopment of the White Street Municipal Parking Lot Request for Proposals Redevelopment of the White Street Municipal Parking Lot Block 31, Lot 2.01 Borough of Red Bank Monmouth County New Jersey Submission Deadline: Tuesday, April 26, 2017, 10:00 a.m.

More information

Work Type Definition

Work Type Definition Work Type Definition Pages 1-3 detail the work type definition. In order to become pre-qualified for this work type, please see the Work Type Submittal Requirements on pages 4-5. I. Description Planning

More information

Presentation to DATA on VTrans 2040 / HB2. October 21, 2015

Presentation to DATA on VTrans 2040 / HB2. October 21, 2015 Presentation to DATA on VTrans 2040 / HB2 October 21, 2015 Life Cycle of a Candidate Project How it s planned. How it s scored. How it s funded. 2 How it s planned. VTrans2040 VTRANS 2040 serves two functions,

More information

WEBB COUNTY CITY OF LAREDO REGIONAL MOBILITY AUTHORITY 7917 McPherson Road, Suite 203 Laredo, Texas 78045 956-723-9841 November 30, 2016 The Honorable Anthony R. Foxx Secretary U.S. Department of Transportation

More information

MAP 21 Freight Provisions and Seaports

MAP 21 Freight Provisions and Seaports MAP 21 Freight Provisions and Seaports September 20, 2012 American Association of Port Authorities 703.684.5700 www.aapa-ports.org 3 New Freight Eligibility in Core Highway Formula Programs Surface Transportation

More information

Chapter 1 Introduction

Chapter 1 Introduction Chapter 1 Introduction KEY POINTS The amount and value of freight are critical components of the overall economic health of Missouri. Missouri s multimodal freight system supports the movement of trucks,

More information

House Doctor Consulting Services Application Package

House Doctor Consulting Services Application Package Public Facilities Department House Doctor Consulting Services Application Package For FY2013 FY2015 House Doctor Consulting Services Project #7005 City of Boston Thomas M. Menino, Mayor Michael Galvin

More information

IOWA DEPARTMENT OF TRANSPORTATION. Request for Proposal

IOWA DEPARTMENT OF TRANSPORTATION. Request for Proposal IOWA DEPARTMENT OF TRANSPORTATION Request for Proposal for 4-YEAR ON-CALL CONSULTANT TRAVEL DEMAND MODELING and FORECASTING SUPPORT IN IOWA Table of Contents I.... GENERAL... 3 A. OBJECTIVE... 3 B. PROJECT

More information

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES 3.20.2017 PREPARED FOR: CITY OF JACKSONVILLE 55 Railroad Row White River Junction, VT 05001 802.295.4999

More information

3.6 GROUND TRANSPORTATION

3.6 GROUND TRANSPORTATION 3.6.1 Environmental Setting 3.6.1.1 Area of Influence The area of influence for ground transportation consists of the streets and intersections that could be affected by automobile or truck traffic to

More information

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence. THE PROJECT A freeway segment ranked 6th worst in the Nation, with levels of congestion, pollution and accidents that are simply unacceptable and which have Statewide and National implications. Executive

More information

EXHIBIT A. TRANSIT AND MULTIMODAL DEVELOPMENT SUPPORT CONTINUING SERVICES SCOPE OF SERVICES FM No

EXHIBIT A. TRANSIT AND MULTIMODAL DEVELOPMENT SUPPORT CONTINUING SERVICES SCOPE OF SERVICES FM No EXHIBIT A TRANSIT AND MULTIMODAL DEVELOPMENT SUPPORT CONTINUING SERVICES SCOPE OF SERVICES FM No. 429768-4-12-01 This Exhibit forms an integral part of the Agreement between the DEPARTMENT and, the CONSULTANT,

More information

OPEN DATA & PROJECT TRACKER. Michael Chamberlain TPP, Data Management

OPEN DATA & PROJECT TRACKER. Michael Chamberlain TPP, Data Management OPEN DATA & PROJECT TRACKER Michael Chamberlain TPP, Data Management October 11, 017 Table of contents 1 People 3 Attributes 4 3 Locations 5 4 Systems 6 5 Reports 7-8 6 Applications 8-13 7 Closing 14 Data

More information

Greater Cleveland Regional Transit Authority

Greater Cleveland Regional Transit Authority Greater Cleveland Regional Transit Authority CALL FOR ARTISTS - PUBLIC ART CLIFTON ENHANCEMENT PROJECT CFA NO. 1-2014 Due Date: Friday, March 14, 2014 4:00 P.M. Official Time February 14, 2014 Prospective

More information

HB2 Implementation Policy Guide

HB2 Implementation Policy Guide report HB2 Implementation Policy Guide prepared for Commonwealth Transportation Board date August 1, 2015 Table of Contents 1.0 Introduction... 1 1.1 HB2 Legislation Requirements... 1 1.2 Roles and Responsibilities...

More information

Sabbir Saiyed, PhD., P.Eng. Manager, Transportation System Planning

Sabbir Saiyed, PhD., P.Eng. Manager, Transportation System Planning Sabbir Saiyed, PhD., P.Eng. Manager, Transportation System Planning February 5, 2016 Goods Movement is a Major Part of Peel s Economy Peel is one of Canada s most important freight hubs Close to major

More information

Chapter 4: Transportation and Land Use

Chapter 4: Transportation and Land Use Chapter 4: Transportation and Land Use Transportation and land use together make possible the wide range of destination opportunities in the region. Transportation provides the connections, and, in turn,

More information

HB2 Implementation Policy Guide

HB2 Implementation Policy Guide report HB2 Implementation Policy Guide prepared for Commonwealth Transportation Board date March 18, 2015 Table of Contents 1.0 Introduction... 9 1.1 HB2 Legislation Requirements... 10 House Bill 1887...

More information

Transform 66 Multimodal Project: Prioritization Process and Evaluation Criteria Approved March 3, 2016

Transform 66 Multimodal Project: Prioritization Process and Evaluation Criteria Approved March 3, 2016 Transform 66 Multimodal Project: Prioritization Process and Evaluation Criteria Approved March 3, 2016 The Memorandum of Agreement (MOA) for the Transform 66: Inside the Beltway Project directs NVTC to

More information

Congestion Management Process 2013 Update

Congestion Management Process 2013 Update OVERVIEW OF THE DALLAS-FORT WORTH CONGESTION MANAGEMENT PROCESS Traffic Congestion In The Dallas-Fort Worth Region With the Dallas-Fort Worth (DFW) urban area as its center, the North Central Texas region

More information

APPENDIX H: TRAVEL DEMAND MODEL VALIDATION AND ANALYSIS

APPENDIX H: TRAVEL DEMAND MODEL VALIDATION AND ANALYSIS APPENDIX H: TRAVEL DEMAND MODEL VALIDATION AND ANALYSIS Travel demand models (TDM) simulate current travel conditions and forecast future travel patterns and conditions based on planned system improvements

More information

Statewide Model Application Using the Texas SAM

Statewide Model Application Using the Texas SAM Statewide Model Application Using the Texas SAM Presented by: William Smithson Wilbur Smith Associates September 2008 Texas Statewide Analysis Model Application Presentation Outline Brief Model Description

More information

CRITICAL RURAL FREIGHT CORRIDORS SWRPC Transportation Advisory Committee May 7, 2018

CRITICAL RURAL FREIGHT CORRIDORS SWRPC Transportation Advisory Committee May 7, 2018 CRITICAL RURAL FREIGHT CORRIDORS SWRPC Transportation Advisory Committee May 7, 2018 At the March 5 th TAC meeting, NHDOT provided an introductory presentation on the development of the State Freight Plan

More information

PRELIMINARY SCOPE OF SERVICES

PRELIMINARY SCOPE OF SERVICES PRELIMINARY SCOPE OF SERVICES (Owner) (Project) The, through its, is (owner) (governing body if applicable - i.e. Board of Directors) in the process of selecting professional services for. This project

More information

TABLE OF CONTENTS NEW BRAUNFELS REGIONAL AIRPORT TXDOT CSJ# 17MPNEWBR

TABLE OF CONTENTS NEW BRAUNFELS REGIONAL AIRPORT TXDOT CSJ# 17MPNEWBR TABLE OF CONTENTS NEW BRAUNFELS REGIONAL AIRPORT TXDOT CSJ# 17MPNEWBR 1. REQUEST FOR QUALIFICATIONS ANNOUNCEMENT 2. EVALUATION CRITERIA 3. FORM AVN-551 (PLEASE BE SURE TO DOWNLOAD THE MOST RECENT REVISED

More information

Applicant Name. Today s Date

Applicant Name. Today s Date Applicant Name Today s Date Employment Application Butler Electric Cooperative 216 S. Vine PO Box 1242 El Dorado KS 67042 Butler Electric Cooperative places great emphasis on customer service, teamwork,

More information

U.S. 70 Corridor Economic Assessment

U.S. 70 Corridor Economic Assessment U.S. 70 Corridor Economic Assessment prepared for U.S. 70 Corridor Commission and NCDOT prepared by Cambridge Systematics, Inc. with Sanford Holshouser Economic Development Consulting March 07, 2014 www.camsys.com

More information

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012 2030 Transportation Policy Plan SUMMARY PRESENTATION Land Use Advisory Committee November 15, 2012 Today s Topics Transportation Policy Plan (TPP) Requirements and Background Current TPP Policies, Issues

More information

From Policy to Reality

From Policy to Reality From Policy to Reality Updated ^ Model Ordinances for Sustainable Development 2000 Environmental Quality Board 2008 Minnesota Pollution Control Agency Funded by a Minnesota Pollution Control Agency Sustainable

More information

Caitlin Hughes Rayman Director, FHWA Office of Freight Management and Operations May 2013

Caitlin Hughes Rayman Director, FHWA Office of Freight Management and Operations May 2013 Caitlin Hughes Rayman Director, FHWA Office of Freight Management and Operations May 2013 MAP-21 Era: Changing the Freight Transportation Landscape Performance-based transportation system; Corridor-level

More information

GUIDING PRINCIPLES MEMORANDUM

GUIDING PRINCIPLES MEMORANDUM M E T R O P O L I TAN TRA NS P O RTATI O N PLAN GUIDING PRINCIPLES MEMORANDUM El Paso Metropolitan Planning Organization INTRODUCTION The guiding principles for development of the El Paso MPO s Destino

More information

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014 2040 Transportation Policy Plan Conversion to Performance Based Planning Basis 25 th Annual CTS Transportation Research Conference May 21, 2014 1 About the plan Long-range transportation plan for the Twin

More information

REQUEST FOR PROPOSAL WAYFINDING SIGN DESIGN AND FABRICATION FOR THE CITY OF SALIDA, COLORADO

REQUEST FOR PROPOSAL WAYFINDING SIGN DESIGN AND FABRICATION FOR THE CITY OF SALIDA, COLORADO REQUEST FOR PROPOSAL WAYFINDING SIGN DESIGN AND FABRICATION FOR THE CITY OF SALIDA, COLORADO I. INVITATION AND INTENT The City of Salida invites all interested, qualified persons or firms capable of providing

More information

To 3PL or Not to 3PL:

To 3PL or Not to 3PL: To 3PL or Not to 3PL: An Overview of Third Party Logistics Outsourcing 866.672.2862 m33integrated.com 511 Rhett Street, Suite 3 Greenville, South Carolina 29601 Third party logistics (3PL) is the business

More information

Regional Transportation Studies Regional Council

Regional Transportation Studies Regional Council Pima Association of Governments 1 E. Broadway, Tucson, Arizona Santa Rita Conference Room Regional Transportation Studies Regional Council September 28, 2017 I-11 Tier 1 Environmental Impact Statement

More information

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES The City Engineer, under the authority of the Public Works Director and recommendations from the Traffic Engineer, will make the final decision on the need for a traffic study. The purpose of the traffic

More information

Sunrise Project South I-205 Corridor Improvement Project

Sunrise Project South I-205 Corridor Improvement Project Sunrise Project South I-205 Corridor Improvement Project January 24, 2007 Sunrise and I-205 Project Summary Conclusions Sunrise Scoping Study Key Results South I-205 Scoping Study Key Results South I-205

More information

Request for Proposal: City of Claremont Parking Garage Evaluation & Maintenance Program

Request for Proposal: City of Claremont Parking Garage Evaluation & Maintenance Program Request for Proposal: City of Claremont Parking Garage Evaluation & Maintenance Program October 2015 Page 1 of 10 Table of Contents 1.0 General Information 2.0 Evaluation & Maintenance Program Overview

More information

Metropolitan Washington Airports Authority. Request for Qualifications Information (RFQI) RFQI No C084. for

Metropolitan Washington Airports Authority. Request for Qualifications Information (RFQI) RFQI No C084. for Request for Qualifications Information (RFQI) RFQI No. for Project Controls Task Contract for Project Support & Management at Washington Dulles International Airport and Ronald Reagan Washington National

More information

PLANES, TRAINS & SEMIS South Carolina s Statewide Freight Plan

PLANES, TRAINS & SEMIS South Carolina s Statewide Freight Plan PLANES, TRAINS & SEMIS South Carolina s Statewide Freight Plan Multi-Agency Partners Freight Plan Stakeholder Input MTP Kick-Off Meeting with Freight Break-Out Freight Stakeholder Interviews Online Surveys

More information

REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT

REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT Camp Hall Commerce Park (Camp Hall) Ridgeville, South Carolina March 2, 2018 Addendum 2 March 29, 2018 Comment Sheet 1 of 5 Sheets

More information

HCM 6th Edition Planning and Preliminary Engineering Applications Guide (PPEAG) to the HCM Bringing Back-of-the-Envelope Back.

HCM 6th Edition Planning and Preliminary Engineering Applications Guide (PPEAG) to the HCM Bringing Back-of-the-Envelope Back. HCM 6th Edition Planning and Preliminary Engineering Applications Guide (PPEAG) to the HCM Bringing Back-of-the-Envelope Back April, 2017 Potential Use of the HCM in Planning The HCM is commonly used to

More information

Request for Expression of Interest - Call to Artists. Low Level Road Project Low Level Road, North Vancouver, B.C.

Request for Expression of Interest - Call to Artists. Low Level Road Project Low Level Road, North Vancouver, B.C. Request for Expression of Interest - Call to Artists Low Level Road Project Low Level Road, North Vancouver, B.C. Request for Expression of Interest Call to Artists Low Level Road Project Port Metro Vancouver,

More information

HIGHWAY 14 NEW ULM TO NICOLLET 4-Lane Expansion Open House

HIGHWAY 14 NEW ULM TO NICOLLET 4-Lane Expansion Open House HIGHWAY 14 NEW ULM TO NICOLLET 4-Lane Expansion Open House HIGHLIGHTS OF HWY 14 PROGRESS 1960s & 70s Four-lane expansion in Rochester and Mankato areas 1993 Owatonna to Kasson EIS Completed (redone to

More information

University of Kentucky 1 Southeastern Transportation Center Safety Performance in a Connected Vehicle Environment. FIGURE 1: V2V and V2I Connectivity

University of Kentucky 1 Southeastern Transportation Center Safety Performance in a Connected Vehicle Environment. FIGURE 1: V2V and V2I Connectivity PROBLEM STATEMENT The US Department of Transportation has advised planning agencies across the country to begin considering how their local transportation systems will function in a connected vehicle environment.

More information

Quality Counts! Qualifications Based Selection (QBS)

Quality Counts! Qualifications Based Selection (QBS) Fall 2015 Kane County Division of Transportation Quality Counts! Qualifications Based Selection (QBS) Professional Services Procurement Process Kane County Division of Transportation 41W011 Burlington

More information

Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals:

Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals: Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals: The King County Flood District (District) is seeking proposals from firms to prepare a programmatic

More information

1.1.1.b. Agencies share best practices as they integrate COMPASS facilitates

1.1.1.b. Agencies share best practices as they integrate COMPASS facilitates Transportation Goals 1.1 Enhance the system to improve accessibility and connectivity to jobs, schools, and services; allow the efficient movement of people and goods; and ensure the reliability of travel

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES OCTOBER 09, 2014 EAST BAY REGIONAL PARK DISTRICT Atlas Road Extension Improvements POINT PINOLE REGIONAL SHORELINE PROPOSALS DUE: 2:00PM, NOVEMBER

More information

IOWA DEPARTMENT OF TRANSPORTATION. Request for Proposal

IOWA DEPARTMENT OF TRANSPORTATION. Request for Proposal IOWA DEPARTMENT OF TRANSPORTATION Request for Proposal for PHASE II DEVELOPMENT OF A STATEWIDE TRAVEL DEMAND MODEL for THE STATE OF IOWA Table of Contents I. GENERAL... 3 A. Introduction... 3 B. Project

More information

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS Professional Construction Management Services Harrisburg International Airport Rehabilitate Runway 13-31 Susquehanna Area Regional

More information

REQUEST FOR STATEMENT OF QUALIFICATIONS SOQ #

REQUEST FOR STATEMENT OF QUALIFICATIONS SOQ # REQUEST FOR STATEMENT OF QUALIFICATIONS SOQ #2018-010 for PROFESSIONAL SERVICES Architectural, Landscape Architectural, Appraisal, Title, Engineering and Survey FY 2018 Issue date: January 25, 2018 Lake

More information

Request for Proposals for Marketing Services

Request for Proposals for Marketing Services Request for Proposals for Marketing Services Proposal Deadline: 5:00 PM; Monday, October 30, 2017. The Vacaville Downtown Business Improvement District. (DVBID), a nonprofit organization located in Vacaville,

More information

Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc.

Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc. AMENDMENT #3 + Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc. Adopted October 16, 2014 by the Board of Directors Palm Beach

More information

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation

More information

Exhibit A Scope of Services Technology and Data Support Consultant for Emerging Transportation Systems

Exhibit A Scope of Services Technology and Data Support Consultant for Emerging Transportation Systems I. Purpose Exhibit A Scope of Services Technology and Data Support Consultant for Emerging Transportation Systems The Florida Department of Transportation (DOT) has been at the forefront of other State

More information

CHAPTER 1: INTRODUCTION/ GOALS AND OBJECTIVES

CHAPTER 1: INTRODUCTION/ GOALS AND OBJECTIVES CHAPTER 1: INTRODUCTION/ GOALS AND OBJECTIVES 1.1: INTRODUCTION ABOUT THE FREDERICKSBURG AREA METROPOLITAN PLANNING ORGANIZATION (FAMPO) Established in 1992, the Fredericksburg Area Metropolitan Planning

More information

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT RISK SERVICES SUPPLEMENTAL INFORMATION PACKAGE

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT RISK SERVICES SUPPLEMENTAL INFORMATION PACKAGE MASSACHUSETTS PORT AUTHORITY CAPITAL PROGRAMS DEPARTMENT SUITE 209S - LOGAN OFFICE CENTER ONE HARBORSIDE DRIVE EAST BOSTON, MASSACHUSETTS 02128-2909 REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT

More information

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES Bureau of Transportation Safety and Technology 700 SW Harrison, Topeka, KS 66603 July 30, 2008 Definitions Significant Project All Federal-aid

More information

$96, $116, annually plus benefits Employee pays up to 7% of salary/wage toward CalPERS retirement plan

$96, $116, annually plus benefits Employee pays up to 7% of salary/wage toward CalPERS retirement plan POSITION: SALARY RANGE: OPEN TO: PROCUREMENT PROGRAM ANALYST (PS101256) Position is located at the Toll Plaza, San Francisco. $96,387.00 $116,504.00 annually plus benefits Employee pays up to 7% of salary/wage

More information

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS Page 1 of 15 ST-01: I-95 ITS DEPLOYMENT (DE STATE LINE TO AIRPORT) PROJECT DESCRIPTION AND SCOPE: Project will address gaps in ITS device coverage on I-95 from

More information

REQUEST FOR LETTERS OF INTEREST IN PROFESSIONAL ENGINEERING SERVICES PROJECT NO /05. Ref: General Engineering Services

REQUEST FOR LETTERS OF INTEREST IN PROFESSIONAL ENGINEERING SERVICES PROJECT NO /05. Ref: General Engineering Services REQUEST FOR LETTERS OF INTEREST IN PROFESSIONAL ENGINEERING SERVICES PROJECT NO. 99-16-04/05 Ref: General Engineering Services The Ohio Turnpike and Infrastructure Commission ( Commission ) issues this

More information

Village of Lincolnwood

Village of Lincolnwood Village of Lincolnwood REQUEST FOR QUALIFICATIONS (RFQ) MUNICIPAL ENGINEERING SERVICES Response Due Date: Friday, March 21, 2014, 4:00 p.m. Send Sealed Qualifications to: Timothy C. Wiberg Village Manager

More information

TRAFFIC STUDY GUIDELINES

TRAFFIC STUDY GUIDELINES TRAFFIC STUDY GUIDELINES December 2013 The scope of the traffic impact analysis (TIA) should follow these guidelines and the requirements of VMC 11.80.130 and VMC 11.70, transportation concurrency (attached

More information

Utilizing Transportation Data for Low Cost Safety Improvements

Utilizing Transportation Data for Low Cost Safety Improvements Utilizing Transportation Data for Low Cost Safety Improvements Samuel Sturtz Transportation Planner Iowa Department of Transportation samuel.sturtz@dot.iowa.gov Photo Credits: Ken West- Kenneth G. West

More information

INTRODUCTION... 4 DATA COLLECTION AND ASSESSMENT... 6 I-1. DATA COLLECTION AND ASSESSMENT... 6 I-1.1 CTP Inventory and Assessment... 6 I-1.

INTRODUCTION... 4 DATA COLLECTION AND ASSESSMENT... 6 I-1. DATA COLLECTION AND ASSESSMENT... 6 I-1.1 CTP Inventory and Assessment... 6 I-1. 1 INTRODUCTION... 4 DATA COLLECTION AND ASSESSMENT... 6 I-1. DATA COLLECTION AND ASSESSMENT... 6 I-1.1 CTP Inventory and Assessment... 6 I-1.2 Bicycle and Pedestrian Inventory and Assessment... 6 I-1.3

More information

Mobility and System Reliability Goal

Mobility and System Reliability Goal Mobility and System Reliability Goal Provide surface transportation infrastructure and services that will advance the efficient and reliable movement of people and goods throughout the state. Background:

More information

6.2.2 Environmental Consequences and Mitigation Measures

6.2.2 Environmental Consequences and Mitigation Measures 6.2 6.2.1 Introduction The existing conditions, regulatory setting, and methods of analysis for transportation under CEQA are described in Chapter 3, NEPA and CEQA Analysis. Impacts that would result from

More information

O & D Data. Results. Traffic Increase. Heavier Payloads. Total and Average Value of Freight Payload for Selected Highways

O & D Data. Results. Traffic Increase. Heavier Payloads. Total and Average Value of Freight Payload for Selected Highways Presentation To SFTA Steering Committee O&D Data Results: FREIGHT VALUE! Eric Jessup Assistant Professor, State University Michael Clark Research Associate, State University O & D Data. Results Traffic

More information

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA Introduction: North Jersey Transportation Planning Authority NJTPA Congestion Management Process Study Goals Analysis

More information

APPENDIX A. Consultant Solicitation for Fiscal Year for Four As-Needed Environmental Services Contracts. Issue Date: January 10, 2014

APPENDIX A. Consultant Solicitation for Fiscal Year for Four As-Needed Environmental Services Contracts. Issue Date: January 10, 2014 APPENDIX A INSTRUCTIONS FOR THE LA DOTD STANDARD FORM 24-102 As modified for the Port of New Orleans (SF 24-102) Revised September 2011 (herein referred to as PONO SF24-102) Consultant Solicitation for

More information

The City of Redwood City SENIOR. (Public Works Superintendent)

The City of Redwood City SENIOR. (Public Works Superintendent) The City of Redwood City SENIOR UTILITY MANAGER (Public Works Superintendent) THE CITY THE POSITION The City of Redwood City is a San Francisco Bay Area community located in the heart of Silicon Valley,

More information

TABLE OF CONTENTS FOR THE REQUEST FOR STATEMENTS OF QUALIFICATION FOR RIGHT OF WAY SURVEYING SERVICES INTERNATIONAL BRIDE TRADE CORRIDOR

TABLE OF CONTENTS FOR THE REQUEST FOR STATEMENTS OF QUALIFICATION FOR RIGHT OF WAY SURVEYING SERVICES INTERNATIONAL BRIDE TRADE CORRIDOR TABLE OF CONTENTS FOR THE REQUEST FOR STATEMENTS OF QUALIFICATION FOR RIGHT OF WAY SURVEYING SERVICES INTERNATIONAL BRIDE TRADE CORRIDOR 2013 Page 1 Request for SOQ s Page 2-4 SOQ ROW Surveying Service

More information

Request for Qualifications (RFQ) #HM-R6-RFQ1 2018/2019 Highway Maintenance Agreements Prequalification RESPONSES TO RESPONDENT QUESTIONS SUMMARY #1

Request for Qualifications (RFQ) #HM-R6-RFQ1 2018/2019 Highway Maintenance Agreements Prequalification RESPONSES TO RESPONDENT QUESTIONS SUMMARY #1 RESPONSES TO RESPONDENT QUESTIONS SUMMARY #1 NOMINATED WORK EXAMPLES Question 1.01: When providing Nominated Work Examples, is it permitted for the Respondent Team to use Nominated Work Examples specific

More information

Downtown Estes Loop Project Frequently Asked Questions

Downtown Estes Loop Project Frequently Asked Questions May 15 th, 2015 Project Status 1) Has Alternative 1 already been selected? Is it a done deal? Response: The NEPA process will proceed with environmental analysis of both the No Action and Alternative 1.

More information

Support Material for Agenda Item No. 24

Support Material for Agenda Item No. 24 San Bernardino Associated Governments 1170 W. 3rd Street, 2nd Fl, San Bernardino, CA 92410 Phone: (909) 884-8276 Fax: (909) 885-4407 Web: www.sanbag.ca.gov San Bernardino County Transportation Commission

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)

More information

REQUEST FOR PROPOSALS (RFP) MUNICIPAL TRAFFIC ENGINEERING SERVICES. Borough of Phoenixville. May 17, 2016

REQUEST FOR PROPOSALS (RFP) MUNICIPAL TRAFFIC ENGINEERING SERVICES. Borough of Phoenixville. May 17, 2016 REQUEST FOR PROPOSALS (RFP) MUNICIPAL TRAFFIC ENGINEERING SERVICES Borough of Phoenixville 351 Bridge Street Second Floor Phoenixville, PA 19460 Chester County, Pennsylvania May 17, 2016 Borough of Phoenixville

More information

Chapter 4: Forecasting Growth and Land Use CHARLOTTE COUNTY PUNTA GORDA MPO 2035 LONG RANGE TRANSPORTATION PLAN

Chapter 4: Forecasting Growth and Land Use CHARLOTTE COUNTY PUNTA GORDA MPO 2035 LONG RANGE TRANSPORTATION PLAN Chapter 4: Forecasting Growth and Land Use CHARLOTTE COUNTY PUNTA GORDA MPO 2035 LONG RANGE TRANSPORTATION PLAN CHARLOTTE COUNTY PUNTA GORDA MPO 2035 LONG RANGE TRANSPORTATION PLAN Forecasting Growth

More information

Regional Mobility Authorities in Texas

Regional Mobility Authorities in Texas Regional Mobility Authorities in Texas Testimony of Ginger Goodin, P.E., Senior Research Engineer and Director, TTI Transportation Policy Research Center John Overman, Research Scientist for Transit Mobility

More information

District of North Vancouver Construction Traffic Management Plan Guidelines

District of North Vancouver Construction Traffic Management Plan Guidelines District of North Vancouver Construction Traffic Management Plan Guidelines The District of North Vancouver is committed to ensuring that the disruptions to the community and traffic associated with construction

More information