1 ERTMS the right investment for the future EU Railway Conference Lille, 8 May 2014 Pio GUIDO, Head of ERTMS Unit
2 ERTMS - European determination ERTMS is a major European industrial project EU Political support: nomination of the European Coordinator for ERTMS EU Financial support: Different programmes for initial development; 500 M in the TEN ; Horizontal Priority in CEF EU Legal Framework: HS railway system: mandatory when new/renew/upgrade CR system: obligations in the European Deployment Plan
3 A sustained joint effort EC launch analysis of signalling ERTMS required in legal text 1 st MoU ERTMS Coordinator Version 2.3.0d EU Deployment Plan MoU Baseline 3 Connecting Europe Facility Interop Directive (HS) Interop Directive (CR) European Railway Agency MoU Deployment Plan High Speed in Italy, Spain Conventional Rail ETCS Baseline 3 World wide
4 ETCS Baseline 2 Released in 2008 Stable reference proven in revenue service High Speed Dedicated Freight (Betuwe line) Alpine tunnels (Loetschberg) Suburban network (Cercanias Madrid) More ERTMS km and trains than comparable legacy systems! 4
5 ETCS Baseline 3 Released in evolution, not revolution Based on B2 return of experience All Designer Choices incorporated Harmonized Human Interface (DMI) Standard Braking Curves (freight and high-speed) Upgraded interface legacy systems (STM) Limited Supervision functionality Trains backward compatible with B2 tracks Integrates System Version Management enabling evolution 5
6 2012 ERTMS MoU EC, ERA and Sector agree that: Baseline 2 investment to be protected Baseline 3 is the stable basis for the future Maintenance of specifications is necessary: Error corrections Compatible enhancements Release Planning is the tool to manage it..with the discipline necessary in a shared system 6
7 How the future will look like Standards for TEN-T railway Comprehensive network (by 2050) ERTMS equipment Electrification Core network (by 2030) full electrification freight lines: at least 22.5 t axle load, 100 km/h line speed and train length of 740 m; full deployment of ERTMS; nominal track gauge for new railway lines: 1435 mm
8 Software based system Sustainable system Error correction and maintenance of the specifications based on return of experience Software allows flexibility, enables positive evolution Safety critical system needs adequate culture, know-how techniques and tools to manage software maintenance in an efficient, cost effective manner Shared system Uneven sharing of benefits and costs between RU and IM Trackside implementations drives interoperability Divergent implementations are not acceptable 8
9 ERTMS/ETCS System Version Management Baseline - a stable kernel in terms of system functionality, performance and other non-functional characteristics. Baseline release - a specific version of each of the ERTMS documents that are listed in the TSI annex A System lifetime Baseline n 1 st Dr. Cons. 1 st Leg. Maint. Maint. Maint. X.Y Baseline n+1 1 st Dr. Cons. 1 st Leg. Maint. X+1.0 Baseline n+2 1 st Dr. 1 st Leg. X+1.1 ETCS System version 9
10 ETCS B3 MR1 Content 26 Change Requests (CR), 16 different documents updated All CRs are closed with agreed solutions, except LS, which has different plan (1 week more) RBC-RBC interface (subset-039) Test Cases (subset ) traced to SRS
11 ETCS B3 MR1 Train Interface Subset-119 and -120 delivered by UNISIG: referenced in the Application Guide; available for use in contract - > market opening. interface between two subsystems in the same vehicle -> no interoperability issues. Baseline Compatibility Analysis Required by the MoU Extensive assessment of all the changes from 2.3.0d to Baseline 3 by the best experts available (ERTMS Users Group and UNISIG) started in 2012, supported by TEN-T program. No final report delivered. ERA satisfied that preliminary results confirm robust and correct B3 specifications: only a few issues discovered (and corrected) in more than 400 B3 CRs analyzed. Additional measures recommended for Baseline 2 implementations. 11
12 ETCS B3 MR2 Content Error correction and feedback from first implementations Standardisation of additional interfaces (ATO, DMI-EVC) Enabling technological development (GPRS, Satellite Positioning) Improvement in the testing approach Delivery of MR2 to be managed as a project: - detailed planning - identified resources - management mechanisms 12
13 Making the right investments ERA cooperation with DG-MOVE and INEA on TEN-T funded projects. Technical input to: Call text External evaluation Financing decision Follow-up of funded actions Level of understanding and application of Interoperability Directive and TSI not satisfactory 13
14 What is ERTMS ERTMS is ERTMS is not a shared, new and harmonized system a product or a technical solution ERTMS is based on open source shared requirements for interoperability - ERA web site ERTMS requires discipline and transparency ERTMS means less autonomy 14
15
Memorandum of Understanding (MoU)
EUROPEAN COMMISSION Memorandum of Understanding (MoU) Between the European Commission and the European Railway Associations (CER UIC UNIFE EIM GSM-R Industry Group ERFA) concerning the strengthening of
More informationERTMS/ETCS UIC Platform RFI contribution
ERTMS/ETCS UIC Platform RFI contribution Paris, 10 May 2006 RFI - Technical Direction The relationship between UIC Platform and the other bodies (simplified( simplified) UNIFE UNISIG EEIG UIC Art. 21 Committ.
More informationGuide for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and On-board
CCS TSI Application Making the railway system work better for society. European Union Agency for Railways for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and
More informationRECOMMENDATION FOR USE RFU-CCS-077
Page 1 of 9 TITLE CERTIFICATES WITH RESTRICTIONS AND CONDITIONS FOR USE ORIGINATOR ALTRAN, CERTIFER, SINTEF, VŮŽ SUBJECT RELATED TO SUBSYSTEM CCO AND CCT DESCRIPTION AND BACKGROUND EXPLANATION Introduction
More informationMAY This report represents the opinion of the European Coordinator and does not prejudice the official position of the European Commission.
ERTMS Work Plan of the European Coordinator Karel Vinck Transport MAY 2015 This report represents the opinion of the European Coordinator and does not prejudice the official position of the European Commission.
More informationRailways. CEF Blending Info Day 27 February Francesco Buscaglia INEA Frederic Versini DG MOVE
Railways CEF Blending Info Day 27 February 2017 Francesco Buscaglia INEA Frederic Versini DG MOVE Railways Funding Objective FO1 Bridging missing links, removing bottlenecks, enhancing rail interoperability,
More informationfrom other domains than the usual actors from the rail business e.g. start-ups or small or medium companies
SHIFT²RAIL: The Future Advanced Traffic Management And Control Systems For All Rail Applications Jacques Poré, HonFIRSE, IRSE Past President 2005-2006, Alstom SUMMARY Shift²Rail is a European Commission
More informationETCS Migration and the Impacts on Railway Transport Markets
ETCS Migration and the Impacts on Railway Transport Markets Dipl.-Wirtsch.-Ing. Miroslav Obrenovic ETCS Migration > 06 October 2006 > 1 Content Railway research at the German Aerospace Center (DLR) Initial
More information3: ETCS Specifications: SRS Catalog of requirements. ERTMS Platform, 14th March 2007; UIC HQ Paris
3: ETCS Specifications: SRS 3.0.0 Catalog of requirements PREAMBLE & CONSIDERATIONS The aim of the ERTMS Platform is to share information from running processes The list of functional changes following
More informationThe vision from European Rail Industry. Peter Gurník UNIFE Technical Affairs Manager
The vision from European Rail Industry Peter Gurník UNIFE Technical Affairs Manager Who we are UNIFE represents the European Rail Supply Industry Based in Brussels since 1992 The trusted partner of European
More information3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES:
3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES: 3.1.3. Rail interoperability including interoperability of the Rail Freight Corridors Priority open only to the Cohesion Member
More information3. OBJECTIVES AND PRIORITIES:
3. OBJECTIVES AND PRIORITIES: 3.1. Priorities related to bridging missing links, removing bottlenecks, enhancing rail interoperability, and, in particular, improving cross-border sections 3.1.4. European
More information18C044-0C WHITE PAPER REFERENCE CCS ARCHITECTURE BASED ON ERTMS. Date: Introduction
18C044-0C WHITE PAPER REFERENCE CCS ARCHITECTURE BASED ON ERTMS Date: 12-07-2018 Introduction In 1989, the European Union, together with the railway organisations, decided to develop a standard European
More informationThe European Framework for Vehicle Authorisation
The European Framework for Vehicle Authorisation Torben Holvad 13th Annual Fire Protection of Rolling Stock Conference, 1-2 nd March 2017, Berlin, Germany Content of presentation Brief background about
More informationBenefits of harmonized regulations for placing in service of railway equipment - European experiences. Peter Mihm Head of Technical Cooperation
Benefits of harmonized regulations for placing in service of railway equipment - European experiences Peter Mihm Head of Technical Cooperation General presentation Railway Safety Interoperability ERTMS
More informationImplications of the proposed interoperability measures for Railway Undertakings and Infrastructure Managers
European University Institute Florence School of Regulation 6th European Rail Transport Regulation Forum Florence, 27 th May 2013 The technical pillar of the 4th Railway Package: Challenges for Standardisation
More informationERTMS UNIT TRANS-EUROPEAN RAIL SYSTEM SUBSYSTEM CONTROL-COMMAND AND SIGNALLING
EUROPEAN RAILWAY AGENCY ERTMS UNIT Reference: ERA/ERTMS/034171 Document type: Technical Specification for Interoperability Version : final draft 1.1 Date : 13/01/2011 Edited by Quality review Approved
More informationANNUAL ACTIVITY REPORT OF COORDINATOR KAREL VINCK ERTMS PROJECT. Brussels. August 2008
ANNUAL ACTIVITY REPORT OF COORDINATOR KAREL VINCK ERTMS PROJECT Brussels August 2008 This report only represents the opinion of the European coordinator and does not prejudge the official position of the
More informationUncovering the technical specifications for interoperability as determined by the ERA to harmonise European safety standards
Uncovering the technical specifications for interoperability as determined by the ERA to harmonise European safety standards München, 12.09.2012, 4 th annual Fire Protection and Safety in Tunnels Content
More informationEUROPEAN RAIL TRAFFIC MANAGEMENT SYSTEM. Deployment Action Plan THE TRANS-EUROPEAN TRANSPORT NETWORK. Mobility and Transport
EUROPEAN RAIL TRAFFIC MANAGEMENT SYSTEM Deployment Action Plan THE TRANS-EUROPEAN TRANSPORT NETWORK Mobility and Transport This paper is a preparatory document elaborated by DG MOVE for the purpose of
More informationRolling stock approval process
Rolling stock approval process Presentation to SEETO Working Group by Frank Walenberg Skopje 9 November 2010 1 Overview Need for the approval process RST approval process in the past Interoperability:
More informationERTMS: EXPERIENCE WITH DIGITAL SYSTEMINTEGRATION A FRONTRUNNER S EXPERIENCE
ERTMS: EXPERIENCE WITH DIGITAL SYSTEMINTEGRATION A FRONTRUNNER S EXPERIENCE RAMBOLL IN BRIEF Independent engineering and design consultancy and provider of management consultancy Founded 1945 in Denmark
More informationRail Interoperability
Rail Interoperability Gerhard Troche DG MOVE B2 Single European Rail Area 2014 CEF Transport Calls Info Days Brussels, 10 October 2014 Indicative budget and specific objectives 50 million (general envelope)
More informationAchieving a Single European Railway Area and reinforcing the attractiveness of the rail sector: The vision of the European Rail Supply Industry
Achieving a Single European Railway Area and reinforcing the attractiveness of the rail sector: The vision of the European Rail Supply Industry Philippe Citroën, UNIFE Director General APTA Rail Conference,
More informationSimulation of the railways control and protection ERTMS / ETCS; levels 0,l and 2
Simulation of the railways control and protection ERTMS / ETCS; levels 0,l and 2 J.M. Mera', L.M. GutiCrrez', A. G6mez-Rey', S. Tapia', A. Arribas', C. Vera', J.M. Cabanellas2, G. Romero2, J. Maroto2,
More informationTSI OPERATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS
INTEROPERABILITY UNIT RATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS Reference: ERA/CON/2011-02/INT Document type: Final report Version : 0.8 Date :
More informationERTMS/ETCS DMI National Requirements
ERTMS/ETCS DMI National Synopsis This document mandates requirements for ERTMS/ETCS Driver Machine Interface (DMI) equipment if a speed display in miles per hour is required and/or alphanumeric train running
More informationRailways in Europe quo vadis? TRAKO Gdańsk, 27 September Andrzej Harassek Head of Fixed Installations Sector, Interoperability Unit
Railways in Europe quo vadis? TRAKO Gdańsk, 27 September 2017 Andrzej Harassek Head of Fixed Installations Sector, Interoperability Unit The European railway industry is under threat Outside world (automotive,
More informationSymposium Competition & Regulation in the Rail Sector
Symposium Competition & Regulation in the Rail Sector Deutsche Bahn AG Herald Ruijters, Director European Commission, DG MOVE Berlin, 25 January 2018 Mobility and Transport The trans-european transport
More information4 th Railway Package Implementation of the Technical Pillar
4 th Railway Package Implementation of the Technical Pillar 10 th PRIME Plenary Meeting, Sopron, 12 June 2017 Josef Doppelbauer, ERA Executive Director Is There a Future for Rail? 2 Key Elements of the
More informationRailway interoperability. Academic perspective
Railway interoperability. Academic perspective Ernesto García Vadillo (Prof) Department of Mechanical Engineering University of The Basque Country (UPV/EHU) Brussels, 7th May 2013 1 Contents 1. Directive
More informationEuropean Rail Traffic Management System An Overview
Proc. 1st International Conf. Energy, Power and Control Basrah University, Basrah, Iraq 30 Nov. to 2 Dec. 2010 European Rail Traffic Management System An Overview Dr Sajed K Abed DeltaRail Group Limited
More informationManaging The Evolution Of Railway Radio Communication SUMMARY 1 A BIT OF HISTORY. Chiel Spaans, ERA
Managing The Evolution Of Railway Radio Communication Chiel Spaans, ERA SUMMARY In the last decade of the previous century, railways have adopted the GSM technology to create a railway specific radio system,
More informationMember State Ireland. Account of the Planned Implementation. Command and Control Systems for the Irish Rail (Iarnród Éireann) Network
Member State Ireland Account of the Planned Implementation Command and Control Systems for the Irish Rail (Iarnród Éireann) Network 22 December 2017 Account of the Planned Implementation of the Command
More informationAn EU coordinated approach to R&I in the rail sector under H2020
An EU coordinated approach to R&I in the rail sector under H2020 EC DG MOVE Open Stakeholder Hearing Brussels, 12 September 2013 Agenda State of play General context Objectives of the initiative General
More informationERTMS/ETCS National Values
ERTMS/ETCS National Values Synopsis This document mandates requirements for a process to determine or revise a set of values of ERTMS/ETCS National Values. Copyright in the s is owned by Rail Safety and
More informationINTEROPERABILITY UNIT
EUROPEAN RAILWAY AGENCY INTEROPERABILITY UNIT TAF TSI - ANNEX D.2 : APPENDIX B - WAGON AND INTERMODAL UNIT OPERATING DATABASE (WIMO) REFERENCE: ERA-TD-102 DOCUMENT TYPE: TECHNICAL DOCUMENT VERSION: 2.0
More informationImpact of interoperability on the global railway network. L. Tordai, UIC, Paris, France
Impact of interoperability on the global railway network L. Tordai, UIC, Paris, France Introduction There are big changes happening in Europe s railways. Interoperability is already becoming a reality.
More informationPolicy context & Projects on the comprehensive network
10.05-10.30 Policy context & Projects on the comprehensive network 2019 CEF Transport call Virtual Information Day 17 January 2019 João Ferreira Policy officer in the Unit for 'Transport 'investment' Directorate-General
More informationStrategic Direction for revised Infrastructure TSI. Issue 1.0
Strategic Direction for revised Infrastructure TSI Issue 1.0 Approved by the Industry Standards Coordination Committee 22 July 2011 ISCC/012 Copyright 2011 Rail Safety and Standards Board Limited Issue
More informationEuropean Railway Agency SIAFI
European Railway Agency SIAFI 2007 23.04.2007 At the beginning Establishment of the Agency The first proposal for establishment of the European Railway Agency was made by the Commission on 23 January 2002
More informationGetting new trains on track
Fourth railway package Getting new trains on track Dr. Josef Doppelbauer, Executive Director, European Union Agency for Railways (ERA), Valenciennes, France At the end of the three-year implementation
More informationChange Control Management process for non-it related products/services 2.1. Specific definitions and abbreviations
process for non-it related products/services 2.1. Specific definitions and abbreviations 2.1.1. BASELINE 2.1.1.1. A baseline is defined by a stable kernel in terms of system functionality, performance
More informationHow should national and EU rail market legislation evolve to safeguard better performance Alice Polo Senior Manager
How should national and EU rail market legislation evolve to safeguard better performance Alice Polo Senior Manager 2 Mai 2016, Florence Overview UNIFE in brief How to achieve better performances by the
More informationGuide for the application of the INF TSI
European Railway Agency According to Framework Mandate C(2010)2576 final of 29/04/2010 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 3.00 Date: 14 December 2015 Document elaborated by Document
More information1 Introduction. 2 Abbreviations and Definitions
1 Introduction This Guideline is intended to give guidance and explanation on the related European legal provisions for the Certification of ECMs. It cannot replace additional self study of the applicable
More informationFurther information on the legislation can be found in all EU languages on EUR-LEX website:
Making the railway system work better for society. 4 th Railway Package What is the 4 th Railway Package and its technical pillar? The 4 th Railway Package is a set of legislative texts designed to complete
More informationTSI OPERATION AND TRAFFIC MANAGEMENT, CONVENTIONAL RAIL SYSTEM FINAL REPORT ON THE REVISION
INTEROPERABILITY UNIT TSI OPERATION AND TRAFFIC MANAGEMENT, CONVENTIONAL RAIL SYSTEM FINAL REPORT ON THE REVISION Reference: IU-OPE_final report Document type: Final report Version : 1.5 Date : 06.05.2010
More informationStrategic Direction for revised Locomotive and Passenger Rolling Stock (LOC&PAS) TSI. Issue 1.0
Strategic Direction for revised Locomotive and Passenger Rolling Stock (LOC&PAS) TSI Issue 1.0 Approved by the Industry Standards Coordination Committee 22 July 2011 ISCC/010 Copyright 2011 Rail Safety
More informationEE UNIT IMPACT ASSESSMENT REGISTER OF INFRASTRUCTURE
EUROPEAN RAILWAY AGENCY EE UNIT IMPACT ASSESSMENT REGISTER OF INFRASTRUCTURE Reference: EE-IA-RINF-V10 Document Type: Draft Report Version : 1.0 Date : 31/03/2010 Edited by Reviewed by Approved by Name
More informationA holistic approach for analysing the interoperability of a railway system
Sustainable Development and Planning VII 399 A holistic approach for analysing the interoperability of a railway system M. Jacyna & J. Szkopiński Faculty of Transport, Warsaw University of Technology,
More informationEurailspeed Parallel Session D.1. Carlo Carganico Director Approval and Certification, RFI
Eurailspeed Parallel Session D.1 Carlo Carganico Director Approval and Certification, RFI 1 Approval process of the Italian High Speed Railway System Eurailspeed, November 8th 2005 Carlo Carganico Issues
More informationEuropean Rail Traffic Management System ERTMS Overview
Overview, Part C A Scope, background, legal and normative base B GSM-R railway communication system C ETCS (1): Objective, project history, functionality and system architecture D ETCS (2): Subsystems,
More informationUIC ERTMS Conference 2004 ERTMS Planning for the Future. M. Pottendorfer Alcatel TSD Austria December 2004
UIC ERTMS Conference 2004 ERTMS Planning for the Future M. Pottendorfer Alcatel TSD Austria December 2004 > Business Aspects > ERTMS General aspects > Migration Presentation Outline > ERTMS benefits Railways
More informationPlatforms, track & trains
Platforms, track & trains Neil Gofton March 2018 Image: Extract from 'Requirements for Passenger Lines and Recommendations for Goods Lines, Ministry of Transport, 1950 Topics to cover Platform X&Y Context
More informationCEF Transport Info day 2016 Greece
Calls for proposal CEF-T 2016 CEF Transport Info day 2016 Greece Athens- 02 December 2016 Gaspare L'Episcopia- Innovation and Networks Executive Agency (INEA) Summary - - - - CEF Transport Priorities CEF
More informationRail Freight Noise CEF Transport call Virtual Information Day 17 January 2019
10.30-10.55 Rail Freight Noise 2019 CEF Transport call Virtual Information Day 17 January 2019 Julie Buy, Policy Officer, Transport Investment Unit, Directorate-General Mobility & Transport (DG MOVE) Piotr
More informationAssurance provided by a second pair eyes (RASBO) of the correct Safe integration by the proposer of a new or modified Rolling Stock
Quality & Safety for Systems & Software Railway Engineering Assurance provided by a second pair eyes (RASBO) of the correct Safe integration by the proposer of a new or modified Rolling Stock Ir. Marc
More informationIRSE INTERNATIONAL TECHNICAL COMMITTEE
IRSE INTERNATIONAL TECHNICAL COMMITTEE ERTMS/ETCS VIEWS AND EXPERIENCES Written and edited by Jacques PORÉ, IRSE-ITC on behalf of the International Technical Committee of the IRSE SUMMARY ERTMS/ETCS is
More informationGuide for the application of the CR INF TSI
European Railway Agency According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 1. 00 Date: 26 August 2011 Document elaborated by Document Type:
More informationThe Future of Rail Regulation Perspective. Järnvägsdagen, Stockholm, 12 November 2018 Josef Doppelbauer, Executive Director
The Future of Rail Regulation Perspective Järnvägsdagen, Stockholm, 12 November 2018 Josef Doppelbauer, Executive Director Will the Rail World Come to an End on 16 June 2019? 2 ERA, please take over! 3
More informationKick-off meeting on TAF/TAP Master Plans
Kick-off meeting on TAF/TAP Master Plans Obligations related to the implementation of Commission Regulation (EC) no 62/2006 and Commission Regulation (EU) no 454/2011 Content The Interop Directive and
More informationKick-off meeting on TAF/TAP Master Plans
Kick-off meeting on TAF/TAP Master Plans Obligations related to the implementation of Commission Regulation (EC) no 62/2006 and Commission Regulation (EU) no 454/2011 Content The Interop Directive and
More informationRECOMMENDATION FOR USE
Page 1 of 5 TITLE Scope of Assessment Requirements for Conformity Assessment by NoBos ORIGINATOR Luxcontrol Nederland B.V 2008/57/EC 2010/713/EU 765/2008 768/2008 SUBJECT RELATED TO DESCRIPTION AND BACKGROUND
More informationEuropean Mobility Network EU TEN-T Policy & CEF Pawel Stelmaszczyk European Commission DG MOVE
European Mobility Network EU TEN-T Policy & CEF Pawel Stelmaszczyk European Commission DG MOVE Key elements of the new TEN-T policy Support implementation of White Paper through new infrastructure policy,
More informationThe TAP TSI Legal Framework and implementation strategy
Twelfth UIC ebusiness Conference - Passenger Workshop The TAP TSI Legal Framework and implementation strategy by Ugo Dell Arciprete Paris, 23 October 2008 TAP TECHNICAL STANDARDS INTEROPERABILITY COMPETITION
More informationA Digital Single European Railway Area. Kathrin Obst Unit B2-Single European Rail Area European Commission Directorate General Transport and Mobility
A Digital Single European Railway Area Kathrin Obst Unit B2-Single European Rail Area European Commission Directorate General Transport and Mobility Florence, 27 November 2015 Digital Single Market Digital
More informationUITP EU Committee Position on the ERA Draft Final Report. IU-ExtScope FinalReport. on the Extension of field of application of TSIs
Brussels, 22 April 2009 UITP EU Committee Position on the ERA Draft Final Report IU-ExtScope-20090320-FinalReport dated 20th March 2009 on the Extension of field of application of TSIs The UITP European
More informationChallenges of future train. environment. BaneBranchen Conference 2011 Siemens
Challenges of future train operations in an ERTMS environment BaneBranchen Conference 2011 Introduction ti Today ERTMS is a reality from a technical point of view. Products are available and many lines
More informationSupport to the ERTMS Deployment action plan as baseline for Shift2Rail (IP2)
Call for tenders Support to the ERTMS Deployment action plan as baseline for Shift2Rail (IP2) Open Procedure Ref: S2R.17.OP.04 Tender Specifications SINGLE FRAMEWORK SERVICE CONTRACT Page 1 of 30 TABLE
More informationThe rail sector associations have jointly reflected upon the current framework within which safety and interoperability legislation is produced.
Mr Siim Kallas Vice President of the European Commission European Commission B 1049 Brussels Belgium Brussels, 11 March 2010 Dear Mr Vice President, The rail sector associations have jointly reflected
More informationQuick wins: improving capacity and operations with small means
Quick wins: improving capacity and operations with small means ERFA highlight a list of quick wins for the Rail Freight Corridors relatively SMALL investments in quality than can result in BIG improvements
More informationUnderstanding the railway system ERTMS European Rail Traffic Management System Michiel Tom
Understanding the railway system ERTMS European Rail Traffic Management System Michiel Tom 1 Contents 1 What ERTMS is... 3 2 ERTMS principles... 4 3 ERTMS levels... 6 4 ERTMS technology... 8 5 ERTMS in
More informationTrainguard Futur 2500
siemens.com/mobility Trainguard Futur 2500 Level 2 ERTMS solution Trainguard Futur 2500 Trainguard Futur 2500 is the complete solution from Siemens for the European Rail Traffic Management System (ERTMS).
More informationINEA Corridor report: state of play of CEF funding for Rhine-Alpine CNC. Peter Van Bockland Rhine-Alpine Corridor Technical Advisor, INEA
INEA Corridor report: state of play of CEF funding for Rhine-Alpine CNC Peter Van Bockland Rhine-Alpine Corridor Technical Advisor, INEA Outline CEF support to the Coordinator's Work Plan CEF Action Portfolio:
More informationERSA PRODUCTS AND SERVICES THE BENCHMARK FOR ERTMS & ETCS ERTMS & ETCS PRODUCTS AND SERVICES
ERSA THE BENCHMARK FOR ERTMS & ETCS ERTMS & ETCS CONTACT.ERSA@CLEARSY.COM ABOUT US Based in the heart of Europe, ERSA has been in the vanguard of ERTMS test specification and system consolidation, and
More informationDraft. Commission Implementing [ACT]
Draft Commission Implementing [ACT] on the common specifications of the register of railway infrastructure referred to in Article 49 of Directive (EU) 2016/797 and repealing Decision 2014/880/EU (Text
More informationAnnex 14 Case study on ERTMS
Annex 14 Case study on ERTMS 1 2 Table of contents 1. Executive summary... 4 2. Introduction... 5 Technical characteristics of ERTMS 7 ERTMS Signalling Levels 8 2.2.1. ETCS/ERTMS LEVEL 1... 8 2.2.2. ETCS/ERTMS
More informationDR MARC ANTONI - UIC
DR MARC ANTONI - UIC 1. Why this question? 2. Current evidences 3. How to move forward? 4. First step 5. Summary Why should a railway need open and formal FRS to define ETCS in Europe? 1. ETCS is a sub-system
More informationTelematic Applications for Freight (TAF TSI)
Telematic Applications for Freight (TAF TSI) OSJD UNESCAP Regional Meeting on Harmonization of Rules and Regulations for Facilitation of International Railway Transport Astana (Kazakhstan), 20 21 December
More informationThe Trans European Transport Network TEN-T and its role for Austria. Workshop Vienna
1 TEN-V für Oberösterreich Spiegel / Infra 5 The Trans European Transport Network TEN-T and its role for Austria Dipl.-Ing. Dr. Thomas Spiegel Workshop Vienna 6.11.2013 2 TEN-T Spiegel, Infra 5 - Importance
More informationSatellite services for a modern EU railway system. Roma, April 18 th 2013 Angelo Chiappini
Satellite services for a modern EU railway system Roma, April 18 th 2013 Angelo Chiappini Overview What is the European Railway Agency Main objectives for a modern railway system Opportunities for space
More informationCLEARSY PRODUCTS AND SERVICES SAFETY SYSTEMS SAFETY SOFTWARE CLEARSY OFFER RAILWAY PRODUCTS AND SERVICES
CLEARSY SAFETY SYSTEMS SAFETY SOFTWARE CLEARSY OFFER RAILWAY CONTACT@CLEARSY.COM COMPANY PROFILE French SME created in 2001 Independent from any customer and privately owned About 110 employees (mainly
More informationANNEX ANNEX. to the. Commission implementing Decision
EUROPEAN COMMISSION Brussels, 12.10.2018 C(2018) 6599 final ANNEX ANNEX to the Commission implementing Decision on the financing of the Connecting Europe Facility - Transport sector and the adoption of
More informationBoosting International Rail Freight. Sector Statement on Rail Freight Corridors
Boosting International Rail Freight Sector Statement on Rail Freight Corridors Brussels, 20 May 2016 1 Sector Statement on Rail Freight Corridors: Boosting International Rail Freight 20 May 2016 - final
More informationJuly 2015 Product Certification Body under BDS EN ISO/IEC 17065:2012. January 2010 Registration of the company
January 2010 Registration of the company November 2011 Starting aproval and registartion in NANDO September 2013 Designated Body for conformity assessment of the rail subsystems or a part thereof with
More informationGuide for the application of Technical Specifications for Interoperability (TSIs)
European Railway Agency Guide for the application of Technical Specifications for Interoperability (TSIs) According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT
More informationLight Impact Assessment
EUROPEAN UNION AGENCY FOR RAILWAYS O11REC1O28 V1.O Making the railway system work better for society. Light Impact Assessment 4th Railway Package Revision of CCS TSI 120 Rue Marc Lefrancq I BP 20392 ER-59307
More informationERTMS Benchmark Study
ERTMS Benchmark Study AGREED COST TABLES TO COLLECT ERTMS IMPLEMENTATION COST ITEMS ON: ERTMS/ETCS LEVEL 1 - Trackside ERTMS/ETCS LEVEL 2 - Trackside ERTMS on-board This cost model has been used for collecting
More informationAction Plan RFC North Sea - Mediterranean
Action Plan RFC North Sea - Mediterranean G Confais Morieux 16 April 2018 Agenda 1. Reminder The 10 priorities of the Sector 2. Action Plan RFC North Sea - Med 2/20 2/23 Opening RFC Strategy Sessions -
More informationInfrastructure Based Train Detection Interface Requirements
Uncontrolled When Printed Railway Group Standard Infrastructure Based Train Detection Interface Synopsis This document specifies the interface requirements for infrastructure based train detection systems
More informationTowards an integrated European Railway Area
Towards an integrated European Railway Area Anders Lundström Oslo, 17 October 2007 Organisation chart of the Agency n 2 The legal basis for the Agency s work The Agency s tasks and, hence, its organisational
More informationDirective 96/48/EC - Interoperability of the trans- European high speed rail system
EN Directive 96/48/EC - Interoperability of the trans- European high speed rail system Technical Specification for Interoperability "Operations and traffic management" Sub-System - 1 / 155 - 1. INTRODUCTION
More informationThe Content of TAF TSI: RU/IM Communication and Legal Obligations
7th ERA TAF TSI Regional Workshop (Romania, Bulgaria, Greece) The Content of TAF TSI: RU/IM Communication and Legal Obligations ERA Telematics Team Bucharest, 7-8 March 2018 TAF TSI Regulation - Communication
More informationTelematics Applications for Freight Technical Specification for Interoperability
Telematics Applications for Freight Technical Specification for Interoperability Why is the TAF TSI important? What are the prospects for implementing in the SE EU? 23rd June 2006 Jeremy Acklam Strategic
More informationDraft delegated act for the TSI revision
Brussels, 07 October 2016 Draft delegated act for the TSI revision 1 CER aisbl - COMMUNITY OF EUROPEAN RAILWAY AND INFRASTRUCTURE COMPANIES Avenue des Arts, 53-1000 Bruxelles T: +32 (0)2 213 08 70 F: +32
More informationINTEROPERABILITY UNIT
INTEROPERABILITY UNIT STUDIES: 1) MERGING OF HS AND CR TSIS AND 2) SPLITTING OF THE Reference: ERA/REP/13-2011/INT Document type: Report Annex 3 Version of Annex 3: Date of Annex 3: 0.2 24 November 2010
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DECISION
Ref. Ares(2018)4510586-03/09/2018 EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT Director-General DECISION authorising the use of unit costs for the retrofitting of noisy wagons under
More informationVienna Declaration Progress on boosting rail freight
Vienna Declaration Progress on boosting rail freight Statement of the Austrian Presidency as follow-up of the Ministerial Rotterdam Declaration 6 December 2018 Seizing the opportunity of the Presidency
More information