805C Transport a Very Small Aperture Terminal (VSAT) Status: Approved

Size: px
Start display at page:

Download "805C Transport a Very Small Aperture Terminal (VSAT) Status: Approved"

Transcription

1 Report Date: 12 Apr C Transport a Very Small Aperture Terminal (VSAT) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne Foreign Disclosure: FD1 - This training product has been reviewed by the training developers in coordination with the USASSI Fort Jackson foreign disclosure officer. This training product can be used to instruct international military students from all approved countries without restrictions. Page 1

2 Conditions: As a member of a 3 or 4-Soldier team, given a Combat Service Support (CSS) Very Small Aperture Terminal (VSAT) portable satellite system, ~80 pounds of uniform / personal protective equipment, and Technical Manual (TM) Some iterations of this task should be performed in MOPP 4. Standards: As a member of a 4-Soldier team, lift / lower 4 vertical feet and transport 50 horizontal feet the Antenna Pedestal case, Reflector case, and Radio Frequency (RF) Equipment case without personal injury or damage to equipment. As a member of a 3-Soldier team, lift / lower 4 vertical feet and transport 50 horizontal feet the Indoor Equipment Case without personal injury or damage to equipment. There is no time standard for this task. Special Conditions: This activity is conducted in association with setting up a VSAT which is a portable satellite used to provide connectivity to enabling / information systems via the internet. The VSAT is used in all phases of an operation in a deployed and garrison environment, in training and contingency operations. Weight of each of the four transport cases are: (1) Indoor Equipment case (modem tray, laptop, and antenna control unit with reusable fan filters) weight = 81 pounds; (2) Reflector Case (1.2m antenna reflector antenna feed boom, and antenna feed support struts) = 136 pounds; (3) Antenna Pedestal Case (antenna pedestal, hand crank, two outriggers) = 160 pounds; (4) Radio Frequency (RF) equipment case (low noise block down converter, compass/inclinometer, ground fault interrupter, AC power cord, antenna feed horn w/4w Block up converter and LBNs, cable reel, binder with software CDs and satellite reference card, and operational reference guide) weight = 117 pounds. Safety Risk: Low MOPP 4: Sometimes Task Statements Cue: You are required to transport VSAT cases to the operational location or assembly area. ne DANGER WARNING Injury may occur if proper lifting / lowering / transporting techniques are not followed. Do not attempt to lift by bending forward. Bend your hips and knees to squat down to your load, keep it close to your body, and straighten your legs to lift. Never lift a heavy object above shoulder level. Avoid turning or twisting your body while lifting or holding a heavy object. CAUTION The CSS VSAT System has an approximate weight of 494 pounds. Use safe lift and carry procedures when handling the cases. Each case requires a 3 or 4-Soldier lift and carry based on the weight of the equipment. Keep cases closed and latched when not accessing equipment to minimize the probability of injury or snagging clothing. Page 2

3 Remarks: If VSAT or personal protective equipment are not available, this task may be simulated with ~80 pounds of weights attached to the Soldier to simulate 80 pounds of uniform/personal protective equipment and then have Soldier lift/lower 80 pounds of weights 4 vertical feet and carry up to 50 horizontal feet. In a garrison environment, this task may be performed in a gym or other indoor/outdoor facility that allows the Soldier to safely lift/lower and transport simulated equipment. tes: Inventory and inspect all cases. Page 3

4 1. Secure VSAT Equipment Cases. Performance Steps a. Indoor Equipment Case. b. Antenna Pedestal Case. c. Reflector Case. d. RF Equipment Case. VSAT Transport Cases 2. Determine VSAT assembly area / operational location. CAUTION Indoor Equipment case weighs 81 pounds. RF Equipment case weighs 117 pounds. Reflector case weighs 136 pounds. Antenna Pedestal case weighs 160 pounds. Use 4-Soldier team safe lift and carry procedures to transport Antenna Pedestal Case, Reflector Case, and RF Equipment Case. Use 3-Soldier team safe lift and carry procedures to transport Indoor Equipment Case. 3. Transport VSAT Equipment Cases to assembly area / operational location. Page 4

5 te: There is no time limit to transport equipment cases. te: Equipment does NOT have to be held up or carried continuously at a 4 feet vertical distance. To receive a GO the 3 or 4-Soldier team must lift / lower the equipment 4 feet vertically a minimum of one time. te: Equipment does NOT have to be carried or pulled 50 feet horizontally without stopping. The 3 or 4-Soldier team may stop and lower the equipment to the ground or stop pulling as many times as necessary. When ready, the 3 or 4-Soldier team may continue carrying or pulling the equipment the remaining distance. a. Lift / lower Antenna Pedestal Case (160 pounds) 4 feet when loading / unloading and carry 50 feet, when transporting, as part of a 4-Soldier team. te: Prorated 40 pounds per Soldier. b. Lift / lower Reflector Case (136 pounds) 4 feet when loading / unloading and carry 50 feet, when transporting, as part of a 4-Soldier team. te: Prorated 34 pounds per Soldier. c. Lift / lower RF Equipment Case (117 pounds) 4 feet when loading / unloading and carry 50 feet, when transporting, as part of a 4-Soldier team. te: Prorated pounds per Soldier. d. Lift / lower Indoor Equipment Case (81 pounds) 4 feet when loading / unloading and carry 50 feet, when transporting, as part of a 3-Soldier team. te: Prorated 27 pounds per Soldier. (Asterisks indicates a leader performance step.) Evaluation Guidance: IMPORTANT NOTE: When evaluating this individual task in an institutional training environment, use the Antenna Pedestal case ONLY in order to facilitate evaluating a large number of Soldiers within a limited period of time. A 4-Soldier team is required to transport the case. In an operational environment, 3 or 4-Soldier teams are required to transport all four VSAT cases and execute the individual task to standard as they would under actual field conditions. Score the Soldier GO if all applicable performance measures are passed (P). Score the Soldier NO GO if any performance measure is failed (F). If the Soldier fails any performance measure, show what was done wrong and how to do it correctly. Evaluation Preparation: Setup: 1. Provide the Soldier with the equipment described in the conditions statement and ensure the Soldier is wearing the proper personnel protective equipment. 2. Establish the 50 horizontal feet start/stop point for carrying the equipment and ensure it is clearly marked. Brief Soldier: 1. Tell the Soldier what is expected by reviewing the task standards. Stress to the Soldier the importance of observing all cautions, warnings, and dangers to avoid injury to personnel and damage to equipment. 2. Tell the Soldier there is no time standard for this task. 3. Tell the Soldier where the start/stop point is for this task. 4. Tell the Soldier the equipment does NOT have to be held up or carried continuously at a 4 feet vertical distance. To receive a GO the 3 or 4-Soldier team must lift/lower the equipment 4 feet vertically a minimum of one time. 5. Tell the Soldier the equipment does NOT have to be carried or pulled 50 feet horizontally without stopping. The 3 or 4-Soldier team may stop and lower the equipment to the ground or stop pulling as many times as necessary. When ready, the 3 or 4-Soldier team may continue carrying or pulling the equipment the remaining distance. PERFORMANCE MEASURES GO NO-GO N/A 1. Secured VSAT Equipment Cases. 2. Determined VSAT assembly area / operational location. 3. Transported VSAT Equipment Cases to assembly area / operational location. a. Lifted / lowered Antenna Pedestal Case (160 pounds) 4 feet when loading / unloading and carried 50 feet, when transporting, as part of a 4-Soldier team. b. Lifted / lowered Reflector Case (136 pounds) 4 feet when loading / unloading and carried 50 feet, when transporting, as part of a 4-Soldier team. c. Lifted / lowered RF Equipment Case (117 pounds) 4 feet when loading / unloading and carried 50 feet, when transporting, as part of a 4-Soldier team. d. Lifted / lowered Indoor Equipment Case (81 pounds) 4 feet when loading / unloading and carried 50 feet, when transporting, as part of a 3-Soldier team. Page 5

6 Supporting Reference(s): Step Number Reference ID Reference Name Required Primary ATP G-1/AG and S-1 Operations ATP Theater-Level Human Resources Support FM 1-0 FM 1-06 TM Human Resources Support pdf/fm1_0.pdf Financial Management Operations pdf/fm1_06.pdf OPERATOR MANUAL FOR COMBAT SERVICE SUPPORT(CSS), VERY SMALL APERTURE TERMINAL(VSAT): TERMINAL, SATELLITE COMMUNICATIONS Yes Yes TADSS : ne Equipment Items (LIN): LIN J97857 Name AN/TSC-183, AN/TSC-183A CSS VSAT Materiel Items (NSN) : Step ID NSN LIN Title Qty materiel items specified Environment: Environmental protection is not just the law but the right thing to do. It is a continual process and starts with deliberate planning. Always be alert to ways to protect our environment during training and missions. In doing so, you will contribute to the sustainment of our training resources while protecting people and the environment from harmful effects. Refer to the current Environmental Considerations manual and the current GTA Environmental-related Risk Assessment card. Safety: In a training environment, leaders must perform a risk assessment in accordance with ATP 5-19, Risk Management. Leaders will complete the current Deliberate Risk Assessment Worksheet in accordance with the TRADOC Safety Officer during the planning and completion of each task and sub-task by assessing mission, enemy, terrain and weather, troops and support available-time available and civil considerations, (METT-TC). te: During MOPP training, leaders must ensure personnel are monitored for potential heat injury. Local policies and procedures must be followed during times of increased heat category in order to avoid heat related injury. Consider the MOPP work/rest cycles and water replacement guidelines IAW FM , Multiservice Tactics, Techniques, and Procedures for Nuclear, Biological, and Chemical (NBC) Protection, FM , Multiservice Tactics, Techniques, and Procedures for Chemical, Biological, Radiological, and Nuclear Decontamination. Prerequisite Individual Tasks : ne Supporting Individual Tasks : ne Supported Individual Tasks : ne Supported Collective Tasks : Task Number Title Proponent Status 14-EAC-8011(Step: Perform Disbursing Operations (Financial 14 - Finance (Collective) Proposed 1.) Management Support Detachment (FMSD)) Knowledges : Knowledge ID Knowledge Name K Know How to Use Personal Protective Equipment (PPE) 081-TI-CMN-0005 K0851 K22199 K0856 Know signs/symptoms of neck or back injury. Know the hazard associated with the equipment to prevent injury Knowledge of VSAT networks Know the supporting reference for equipment Page 6

7 K Equipment Skills : Skill ID S0917 S4670 S4598 S S Skill Name Proper wearing of personal protective equipment Be able to position unit equipment in accordance with command guidance Be able to conduct equipment inventories Recognize injury prevention measures Load and unload equipment Page 7

805C-42A-1315 Process Personnel Strength Accountability Updates Status: Approved

805C-42A-1315 Process Personnel Strength Accountability Updates Status: Approved Report Date: 19 Jul 2016 805C-42A-1315 Process Personnel Strength Accountability Updates Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice:

More information

805C-42A-3008 Process Strength Reports Status: Approved

805C-42A-3008 Process Strength Reports Status: Approved Report Date: 06 May 2016 805C-42A-3008 Process Strength Reports Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None Foreign Disclosure:

More information

Summary Report for Individual Task 805C-42B-6120 Administer an HR Metrics Program Status: Approved

Summary Report for Individual Task 805C-42B-6120 Administer an HR Metrics Program Status: Approved Report Date: 19 v 2015 Summary Report for Individual Task 805C-42B-6120 Administer an HR Metrics Program Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

805A-36A-7009 Inactivate a Disbursing Activity Status: Approved

805A-36A-7009 Inactivate a Disbursing Activity Status: Approved Report Date: 13 Apr 2018 805A-36A-7009 Inactivate a Disbursing Activity Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign Disclosure:

More information

805A-36A-8003 Develop a Cost Structure Status: Approved

805A-36A-8003 Develop a Cost Structure Status: Approved Report Date: 13 Apr 2018 805A-36A-8003 Develop a Cost Structure Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign Disclosure:

More information

805A-36A-6136 Supervise Cashier Operations Status: Approved

805A-36A-6136 Supervise Cashier Operations Status: Approved Report Date: 13 Apr 2018 805A-36A-6136 Supervise Cashier Operations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne Foreign Disclosure:

More information

805A-36B-5001 Establish an Internal Control Program Status: Approved

805A-36B-5001 Establish an Internal Control Program Status: Approved Report Date: 13 Apr 2018 805A-36B-5001 Establish an Internal Control Program Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None

More information

805A-36B-3037 Create a Reimbursable Sales Order Status: Approved

805A-36B-3037 Create a Reimbursable Sales Order Status: Approved Report Date: 13 Apr 2018 805A-36B-3037 Create a Reimbursable Sales Order Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign Disclosure:

More information

805C-42A-3300 Apply the Human Resources (HR) Military Decision Making Process (MDMP) Status: Approved

805C-42A-3300 Apply the Human Resources (HR) Military Decision Making Process (MDMP) Status: Approved Report Date: 17 Jul 2018 805C-42A-3300 Apply the Human Resources (HR) Military Decision Making Process (MDMP) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

805A-36A-7008 Process Purchase Orders and Contracts Status: Approved

805A-36A-7008 Process Purchase Orders and Contracts Status: Approved Report Date: 13 Apr 2018 805A-36A-7008 Process Purchase Orders and Contracts Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign

More information

805A-36A-7024 Manage Commercial Vendor Service Operations Status: Approved

805A-36A-7024 Manage Commercial Vendor Service Operations Status: Approved Report Date: 13 Apr 2018 805A-36A-7024 Manage Commercial Vendor Service Operations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice:

More information

Summary Report for Individual Task 805K-79R-4106 Implement a Recruiting Center Training Program (Health Care) Status: Approved

Summary Report for Individual Task 805K-79R-4106 Implement a Recruiting Center Training Program (Health Care) Status: Approved Summary Report for Individual Task 805K-79R-4106 Implement a Recruiting Center Training Program (Health Care) Status: Approved Report Date: 06 Mar 2015 Distribution Restriction: Approved for public release;

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 04 Jun 2012 Effective Date: 22 May 2017 Task Number: 12-EAC-1218 Task Title: Evaluate Current Human Resources Force Requirements (HROB) Distribution

More information

Summary Report for Individual Task A-3400 Manage the Inventory Status: Approved

Summary Report for Individual Task A-3400 Manage the Inventory Status: Approved Report Date: 12 Jun 2014 Summary Report for Individual Task 101-92A-3400 Manage the Inventory Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

CRM LESSON PLAN REPORT

CRM LESSON PLAN REPORT CRM LESSON PLAN REPORT TRANSPORT A VERY SMALL APERTURE TERMINAL (VSAT) 805C-CAB2A101 / 1.0 Approved 12 Jul 2018 Effective Date: 12 Jul 2018 SCOPE: Distribution Restriction: Approved for public release;

More information

805C-42A-3300 Apply the Human Resources (HR) Military Decision Making Process (MDMP) Status: Approved

805C-42A-3300 Apply the Human Resources (HR) Military Decision Making Process (MDMP) Status: Approved Report Date: 12 Feb 2018 805C-42A-3300 Apply the Human Resources (HR) Military Decision Making Process (MDMP) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

Summary Report for Individual Task Perform Layout of a Construction Project Status: Approved

Summary Report for Individual Task Perform Layout of a Construction Project Status: Approved Report Date: 30 Oct 2013 Summary Report for Individual Task 052-243-1513 Perform Layout of a Construction Project Status: Approved DISTRIBUTION RESTRICTION: Approved for public release; distribution is

More information

Summary Report for Individual Task M-1384 Perform as Wheeled Vehicle Ground Guide Day or Night Status: Approved

Summary Report for Individual Task M-1384 Perform as Wheeled Vehicle Ground Guide Day or Night Status: Approved Report Date: 05 Dec 2014 Summary Report for Individual Task 551-88M-1384 Perform as Wheeled Vehicle Ground Guide Day or Night Status: Approved Distribution Restriction: Approved for public release; distribution

More information

805A-36A-7024 Manage Commercial Vendor Service Operations Status: Approved

805A-36A-7024 Manage Commercial Vendor Service Operations Status: Approved Report Date: 02 May 2017 805A-36A-7024 Manage Commercial Vendor Service Operations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice:

More information

805A-36A-6021 Interpret Master Data Elements Status: Approved

805A-36A-6021 Interpret Master Data Elements Status: Approved Report Date: 13 Apr 2018 805A-36A-6021 Interpret Master Data Elements Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign Disclosure:

More information

052-12W-2116 Construct a Concrete Footing Form Status: Approved

052-12W-2116 Construct a Concrete Footing Form Status: Approved Report Date: 07 Apr 2017 052-12W-2116 Construct a Concrete Footing Form Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None Foreign

More information

Summary Report for Individual Task Install Survey Stakes for Vertical Projects Status: Approved

Summary Report for Individual Task Install Survey Stakes for Vertical Projects Status: Approved Report Date: 30 Oct 2013 Summary Report for Individual Task 052-243-1606 Install Survey Stakes for Vertical Projects Status: Approved DISTRIBUTION RESTRICTION: Approved for public release; distribution

More information

805C-42H-8107 Implement Human Resources (HR) Planning and Operations Using MDMP Status: Approved

805C-42H-8107 Implement Human Resources (HR) Planning and Operations Using MDMP Status: Approved Report Date: 10 Aug 2017 805C-42H-8107 Implement Human Resources (HR) Planning and Operations Using MDMP Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

Summary Report for Individual Task A-1405 Perform Stock Control Inventory Management Functions Status: Approved

Summary Report for Individual Task A-1405 Perform Stock Control Inventory Management Functions Status: Approved Report Date: 31 Jan 2014 Summary Report for Individual Task 101-92A-1405 Perform Stock Control Inventory Management Functions Status: Approved DISTRIBUTION RESTRICTION: Approved for public release; distribution

More information

805C-LF Maintain Postal Supplies Status: Approved

805C-LF Maintain Postal Supplies Status: Approved Report Date: 13 Feb 2018 805C-LF5-1240 Maintain Postal Supplies Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None Foreign Disclosure:

More information

Summary Report for Individual Task 805K-79R-7305 Train the Recruiting Force on Their Market and Missioning Procedures Status: Approved

Summary Report for Individual Task 805K-79R-7305 Train the Recruiting Force on Their Market and Missioning Procedures Status: Approved Summary Report for Individual Task 805K-79R-7305 Train the Recruiting Force on Their Market and Missioning Procedures Status: Approved Report Date: 01 Apr 2015 Distribution Restriction: Approved for public

More information

Summary Report for Individual Task 805B-79T-4304 Develop Annual State/Territory Marketing Plan Status: Approved

Summary Report for Individual Task 805B-79T-4304 Develop Annual State/Territory Marketing Plan Status: Approved Report Date: 29 Apr 2015 Summary Report for Individual Task 805B-79T-4304 Develop Annual State/Territory Marketing Plan Status: Approved Distribution Restriction: Approved for public release; distribution

More information

Summary Report for Individual Task H-3510 Supervise Material Handling Equipment (MHE) Operations Status: Approved

Summary Report for Individual Task H-3510 Supervise Material Handling Equipment (MHE) Operations Status: Approved Report Date: 25 Mar 2014 Summary Report for Individual Task 551-88H-3510 Supervise Material Handling Equipment (MHE) Operations Status: Approved DISTRIBUTION RESTRICTION: Approved for public release; distribution

More information

805C-42B-6117 Conduct Human Resources (HR) Planning Using Military Decision Making Process (MDMP) Status: Approved

805C-42B-6117 Conduct Human Resources (HR) Planning Using Military Decision Making Process (MDMP) Status: Approved Report Date: 12 Feb 2018 805C-42B-6117 Conduct Human Resources (HR) Planning Using Military Decision Making Process (MDMP) Status: Approved Distribution Restriction: Approved for public release; distribution

More information

805A-36B-3029 Review Detailed Expenditure Reports Status: Approved

805A-36B-3029 Review Detailed Expenditure Reports Status: Approved Report Date: 13 Apr 2018 805A-36B-3029 Review Detailed Expenditure Reports Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None Foreign

More information

805A-36A-6013 Conduct Commercial Vendor Service Operations Status: Approved

805A-36A-6013 Conduct Commercial Vendor Service Operations Status: Approved Report Date: 13 Apr 2018 805A-36A-6013 Conduct Commercial Vendor Service Operations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice:

More information

805A-36B-3024 Certify Commercial Vendor Services (CVS) Vouchers Status: Approved

805A-36B-3024 Certify Commercial Vendor Services (CVS) Vouchers Status: Approved Report Date: 13 Apr 2018 805A-36B-3024 Certify Commercial Vendor Services (CVS) Vouchers Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice:

More information

Summary Report for Individual Task H-1509 Place 463L Pallet System Into Storage Status: Approved

Summary Report for Individual Task H-1509 Place 463L Pallet System Into Storage Status: Approved Report Date: 06 May 2014 Summary Report for Individual Task 551-88H-1509 Place 463L Pallet System Into Storage Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

Summary Report for Individual Task 113-COM-7046 Navigate using the Defense Advanced Global Positioning System (GPS) Receiver (DAGR) Status: Approved

Summary Report for Individual Task 113-COM-7046 Navigate using the Defense Advanced Global Positioning System (GPS) Receiver (DAGR) Status: Approved Report Date: 16 Dec 2013 Summary Report for Individual Task 113-COM-7046 Navigate using the Defense Advanced Global Positioning System (GPS) Receiver (DAGR) Status: Approved DISTRIBUTION RESTRICTION: Approved

More information

Summary Report for Individual Task H-3508 Direct Cargo Operations (RO/RO) Status: Approved

Summary Report for Individual Task H-3508 Direct Cargo Operations (RO/RO) Status: Approved Report Date: 25 Mar 2014 Summary Report for Individual Task 551-88H-3508 Direct Cargo Operations (RO/RO) Status: Approved DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited.

More information

805A-36B-3520 Certify Accounts Payable Vouchers Status: Approved

805A-36B-3520 Certify Accounts Payable Vouchers Status: Approved Report Date: 13 Apr 2018 805A-36B-3520 Certify Accounts Payable Vouchers Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne Foreign

More information

805A-PPB-8001 Apply Commitment and Obligation Rules Status: Approved

805A-PPB-8001 Apply Commitment and Obligation Rules Status: Approved Report Date: 13 Apr 2018 805A-PPB-8001 Apply Commitment and Obligation Rules Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None

More information

Summary Report for Individual Task H-1538 Operate ATLAS Rough Terrain Forklift With a Load Status: Approved

Summary Report for Individual Task H-1538 Operate ATLAS Rough Terrain Forklift With a Load Status: Approved Report Date: 22 May 2014 Summary Report for Individual Task 551-88H-1538 Operate ATLAS Rough Terrain Forklift With a Load Status: Approved Distribution Restriction: Approved for public release; distribution

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: 30 Nov 2017 Effective Date: 30 Nov 2017 Task Number: 12-CORP-0001 Task Title: Coordinate Corps Human Resources Support (G1) Distribution Restriction: for

More information

805C-LF Conduct Money Order Business Status: Approved

805C-LF Conduct Money Order Business Status: Approved Report Date: 13 Feb 2018 805C-LF5-3525 Conduct Money Order Business Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None Foreign Disclosure:

More information

805A-36B-1013 Perform Cashier Functions Status: Approved

805A-36B-1013 Perform Cashier Functions Status: Approved Report Date: 13 Apr 2018 805A-36B-1013 Perform Cashier Functions Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None Foreign Disclosure:

More information

Summary Report for Individual Task N-1112 Prepare Manifest for Selected Mode of Transport Status: Approved

Summary Report for Individual Task N-1112 Prepare Manifest for Selected Mode of Transport Status: Approved Report Date: 24 Jun 2014 Summary Report for Individual Task 551-88N-1112 Prepare Manifest for Selected Mode of Transport Status: Approved Distribution Restriction: Approved for public release; distribution

More information

Summary Report for Individual Task H-2513 Direct Stowage of Wheeled and Tracked Vehicles on RO/RO Deck Status: Approved

Summary Report for Individual Task H-2513 Direct Stowage of Wheeled and Tracked Vehicles on RO/RO Deck Status: Approved Summary Report for Individual Task 551-88H-2513 Direct Stowage of Wheeled and Tracked Vehicles on RO/RO Deck Status: Approved Report Date: 20 Mar 2014 DISTRIBUTION RESTRICTION: Approved for public release;

More information

Summary Report for Individual Task 805B-79T-5114 Review an RRNCO s Time Management Work Plan Status: Approved

Summary Report for Individual Task 805B-79T-5114 Review an RRNCO s Time Management Work Plan Status: Approved Report Date: 29 Apr 2015 Summary Report for Individual Task 805B-79T-5114 Review an RRNCO s Time Management Work Plan Status: Approved Distribution Restriction: Approved for public release; distribution

More information

Summary Report for Individual Task Perform Crater and Shell Fragment Analysis Status: Approved

Summary Report for Individual Task Perform Crater and Shell Fragment Analysis Status: Approved Report Date: 05 Jun 2013 Summary Report for Individual Task 061-306-6004 Perform Crater and Shell Fragment Analysis Status: Approved DISTRIBUTION RESTRICTION: Approved for public release; distribution

More information

Design Concrete Formwork Status: Approved

Design Concrete Formwork Status: Approved Report Date: 04 May 2016 052-256-7102 Design Concrete Formwork Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None Foreign Disclosure:

More information

Summary Report for Individual Task H-3507 Direct Cargo Operations (Breakbulk) Status: Approved

Summary Report for Individual Task H-3507 Direct Cargo Operations (Breakbulk) Status: Approved Report Date: 25 Mar 2014 Summary Report for Individual Task 551-88H-3507 Direct Cargo Operations (Breakbulk) Status: Approved DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited.

More information

Report Date: 06 Jan 2012

Report Date: 06 Jan 2012 Report Date: 06 Jan 2012 Summary Report for Individual Task 081-833-5005 Apply Resilience Skills and Competencies Using the Put It In Perspective (PIIP) Concept Status: Approved DISTRIBUTION RESTRICTION:

More information

Summary Report for Individual Task Apply Resilience Skills and Competencies Using Problem Solving Status: Approved

Summary Report for Individual Task Apply Resilience Skills and Competencies Using Problem Solving Status: Approved Summary Report for Individual Task 081-833-5004 Apply Resilience Skills and Competencies Using Problem Solving Status: Approved Report Date: 06 Jan 2012 DISTRIBUTION RESTRICTION: Approved for public release;

More information

Summary Report for Individual Task Apply Resilience Skills and Competencies Using Real-Time Resilience (RTR) Status: Approved

Summary Report for Individual Task Apply Resilience Skills and Competencies Using Real-Time Resilience (RTR) Status: Approved Summary Report for Individual Task 081-833-5006 Apply Resilience Skills and Competencies Using Real-Time Resilience (RTR) Status: Approved Report Date: 28 Apr 2012 DISTRIBUTION RESTRICTION: Approved for

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 07 Jan 2015 Effective Date: 23 Jun 2017 Task Number: 05-CO-1001 Task Title: Construct a Bailey Bridge Distribution Restriction: Approved for public

More information

Summary Report for Individual Task M-3600 Operate the Movement Tracking System Control Station (MT3) Status: Approved

Summary Report for Individual Task M-3600 Operate the Movement Tracking System Control Station (MT3) Status: Approved Summary Report for Individual Task 551-88M-3600 Operate the Movement Tracking System Control Station (MT3) Status: Approved Report Date: 30 Apr 2012 DISTRIBUTION RESTRICTION: Approved for public release;

More information

Risk Management Quick Reference Booklet (For more detail, see ATP 5-19)

Risk Management Quick Reference Booklet (For more detail, see ATP 5-19) GTA-21-08-001 September 2014 Risk Management Quick Reference Booklet (For more detail, see ATP 5-19) The purpose of this booklet is to provide a quick reference to the Risk Management (RM) process and

More information

FEED INSTALLATION INSTRUCTIONS OMT & FILTER INTERFACE

FEED INSTALLATION INSTRUCTIONS OMT & FILTER INTERFACE REVISION L April 20, 2016 ASSEMBLY MANUAL FEED INSTALLATION INSTRUCTIONS General Dynamics SATCOM Technologies 1700 Cable Drive NE Conover NC 28613 USA Phone 770-689-2040 www.gdsatcom.com FEED INSTALLATION

More information

SUSTAINMENT CHARACTERISTICS

SUSTAINMENT CHARACTERISTICS Adequate logistics support is vital to any combat operation and must continue under all conditions. Sustainment under NBC conditions maybe even more difficult than other aspects of military operations.

More information

Using System Theoretic Process Analysis (STPA) for a Safety Trade Study

Using System Theoretic Process Analysis (STPA) for a Safety Trade Study Using System Theoretic Process Analysis (STPA) for a Safety Trade Study David Horney MIT/U.S. Air Force Distribution Statement A: Approved for public release; distribution unlimited Safety-Guided Design

More information

Family Services Supervisor Risk Management th Street Modesto, California (209)

Family Services Supervisor Risk Management th Street Modesto, California (209) Employer: Occupation: Company Contact: Analysis Provided By: Stanislaus County Family Services Supervisor Risk Management 1010 10 th Street Modesto, California 95354 (209) 525-5710 Date: May 2016 Lyle

More information

24 Portable Saw Mill OWNER S MANUAL

24 Portable Saw Mill OWNER S MANUAL 24 Portable Saw Mill OWNER S MANUAL WARNING: Carefully read and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions

More information

20 Portable Saw Mill OWNER S MANUAL

20 Portable Saw Mill OWNER S MANUAL 20 Portable Saw Mill OWNER S MANUAL WARNING: Carefully read and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions

More information

! CAUTION: Read and follow these instructions.

! CAUTION: Read and follow these instructions. OmniLog SAFETY AND INSTALLATION INSTRUCTIONS! CAUTION: Read and follow these instructions. Avoid Contact with Hazardous Live Parts WARNING: Risk of electrical shock. Refer servicing to qualified personnel.

More information

Trench Box. Important Notes. Introduction. User Guide

Trench Box. Important Notes. Introduction. User Guide User Guide Trench Box Introduction The Conquip 3.5m Trench Box is a simple to assemble, two sided trench lining support system designed to be installed by an excavator using the dig and push technique,

More information

DISTRIBUTION STATEMENT A: Approved for public release; distribution Is unlimited. DIRECT SUPPORT TROUBLESHOOTING 5-4

DISTRIBUTION STATEMENT A: Approved for public release; distribution Is unlimited. DIRECT SUPPORT TROUBLESHOOTING 5-4 TECHNICAL MANUAL INTRODUCTION - OPERATOR S, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL) FOR TRICON CONTAINER MODEL ESETC-0 NSN 845-0-389-984 MODEL

More information

This Manual Supersedes TM dated 9 January APPROVED FOR PUBLIC RELEASE DISTRIBUTION IS UNLIMITED.

This Manual Supersedes TM dated 9 January APPROVED FOR PUBLIC RELEASE DISTRIBUTION IS UNLIMITED. *TM 10-54105-13 TECHNICAL MANUAL OPERATOR S, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL FOR SHELTER, ELECTRICAL EQUIPMENT S-250/G (UNSHIELDED) (NSN 5411-00-999-4935) S-250/G (SHIELDED) (NSN 5411-00-489-6076)

More information

Headquarters, Department of the Army

Headquarters, Department of the Army *FM 1-0 (FM 12-6) Human Resources Support February 2007 DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited. Headquarters, Department of the Army This page intentionally left

More information

TM &P SEMITRAILER, TACTICAL, DUAL PURPOSE, BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON M871A2 (NSN )

TM &P SEMITRAILER, TACTICAL, DUAL PURPOSE, BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON M871A2 (NSN ) TECHNICAL MANUAL OPERATOR S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) TABLE OF CONTENTS INTRODUCTION PAGE i PAGE 1-1 OPERATING

More information

FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH Modular Workshop Container (MWC) BOH FPU Field Pack-up Units

FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH Modular Workshop Container (MWC) BOH FPU Field Pack-up Units FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH Modular Workshop Container (MWC) BOH FPU Field Pack-up Units BOH ENVIRONMENTAL LLC 4520 Avion Parkway, Suite 220 Chantilly,

More information

Autolock Tipping Skip

Autolock Tipping Skip User Guide Autolock Tipping Skip Introduction Conquip Autolock Tipping Skip FA800 is the choice for many sites and leading plant companies. Its primary function is for the transportation of waste material.

More information

APPENDIX I HELICOPTER OPERATIONS

APPENDIX I HELICOPTER OPERATIONS APPENDIX I HELICOPTER OPERATIONS Helicopters can rapidly move mortar squads and ammunition directly to where they are needed. In emergency situations, helicopters can move large amounts of mortar ammunition

More information

FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) SMALL CABINET MODULE (SCM) BOH FPU Field Pack-up Units

FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) SMALL CABINET MODULE (SCM) BOH FPU Field Pack-up Units FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) SMALL CABINET MODULE (SCM) BOH FPU Field Pack-up Units SMALL CABINET MODULE (SCM) BOH FPU Systems BOH ENVIRONMENTAL LLC 14520 Avion

More information

*GTA The Environment and Deployment: Tactical Risk and Spill Response Procedures

*GTA The Environment and Deployment: Tactical Risk and Spill Response Procedures *GTA 05-08-017 The Environment and Deployment: Tactical Risk and Spill Response Procedures A Soldier s Guide to Hazardous Material and Hazardous Waste Spill Prevention and Cleanup Response DISTRIBUTION:

More information

Fall Protection Program For Working on Flat Roofs

Fall Protection Program For Working on Flat Roofs Fall Protection Program For Working on Flat Roofs Policy Sponsor: Responsible Unit: Facilities Management Approval Date: Revisions: January 2016 1. Introduction Facilities Management employees are required

More information

REFERENCES RELATED PUBLICATIONS

REFERENCES RELATED PUBLICATIONS REFERENCES RELATED PUBLICATIONS Related publications are sources of additional information. They are not required in order to understand this publication. ARMY REGULATIONS 12-12 Processing Discrepancy

More information

POWER PINNER BENCH HAND WELDER 7250 OPERATOR S MANUAL

POWER PINNER BENCH HAND WELDER 7250 OPERATOR S MANUAL POWER PINNER BENCH HAND WELDER 7250 OPERATOR S MANUAL Copyright: November 20, 2018 Revised: Serial No. Gripnail Corporation An Employee Owned Company 97 Dexter Road East Providence, Rhode Island 02914-2045

More information

Hazard - Scaffolding and debris netting... 2 Control measure - Assess and monitor stability: Scaffolding... 3 Control measure - Specialist advice:

Hazard - Scaffolding and debris netting... 2 Control measure - Assess and monitor stability: Scaffolding... 3 Control measure - Specialist advice: Hazard - Scaffolding and debris netting... 2 Assess and monitor stability: Scaffolding... 3 Specialist advice: Scaffolding... 3 Assess debris netting... 4 Use scaffolding appropriately... 5 Hazard - Scaffolding

More information

Army Logistics Requirements for the Future

Army Logistics Requirements for the Future Army Logistics Requirements for the Future Adaptive Enterprise Transformation: Sense and Respond Conference 3 December 2003 COL Gracus K. K. Dunn HQDA G-4 G-4 Chief, Transformation Executive Office TOPICS

More information

NEVER REMOVE THE SAFETY GUARDS

NEVER REMOVE THE SAFETY GUARDS Page 1 of 5 Name Recommended Use Designed for cutting stumps up to 200 mm above ground and 120 mm below ground. Maximum Stump diameter 300 mm. NOT suitable for stumps surrounded by rocks, stones, concrete

More information

MODELING OF LOGISTICS IN COMPUTER ASSISTED EXERCISES

MODELING OF LOGISTICS IN COMPUTER ASSISTED EXERCISES Sławomir BYŁEŃ MODELING OF LOGISTICS IN COMPUTER ASSISTED EXERCISES Abstract: A command post exercise, supported by a computer simulation, is one of the primary training tools available to the Polish Armed

More information

BOH FPU Systems BOH ENVIRONMENTAL LLC Avion Parkway, Suite 220 Chantilly, VA POC Jim Stokes (703)

BOH FPU Systems BOH ENVIRONMENTAL LLC Avion Parkway, Suite 220 Chantilly, VA POC Jim Stokes (703) FPU SYSTEMS OPERATION MANUAL BOH QUADCON MODULES, ADAPTERS and RESTRAINT SYSTEM BOH FPU Field Pack/up Units (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH FPU Systems BOH ENVIRONMENTAL LLC 14520 Avion

More information

United States Army Warfighting Center Fort Rucker, Alabama November 2006

United States Army Warfighting Center Fort Rucker, Alabama November 2006 United States Army Warfighting Center Fort Rucker, Alabama November 2006 STUDENT HANDOUT TITLE: CH-47D CARGO HANDLING SYSTEMS FILE NUMBER: 011-2115-3 PROPONENT FOR THIS STUDENT HANDOUT IS: 110 th Aviation

More information

CITY OF OMAHA CLASS SPECIFICATION

CITY OF OMAHA CLASS SPECIFICATION CITY OF OMAHA CLASS SPECIFICATION CLASSIFICATION TITLE: TRAFFIC SIGNAL SUPERVISOR I BARGAINING UNIT: CIV MANAGEMENT CODE NUMBER: 2260 PAY RANGE CODE: 14.1MC REVISION DATE: 7/7/17 NATURE OF WORK: This is

More information

XSTi Standby UPS. 400VA, 600VA, 800VA Models. User & Installation Manual

XSTi Standby UPS. 400VA, 600VA, 800VA Models. User & Installation Manual XSTi Standby UPS 400VA, 600VA, 800VA Models User & Installation Manual www.xpcc.com 2015. All rights reserved. (Rev 12/14/15) Table of Contents Package Contents... 3 Product Introduction... 3 Product Overview...

More information

Vertical Power Stacker

Vertical Power Stacker Shipping & Mailing Inserter Vertical Power Stacker TM for Relay Systems Operator Guide International English Version August 1, 2015 Note: This equipment has been tested and found to comply with the limits

More information

Materials Handling, Storage, and Disposal

Materials Handling, Storage, and Disposal Materials Handling, Storage, and Disposal Material Handling 14.A.01 - Employees shall be trained in and shall use safe lifting techniques. 14.A.03 - Material handling devices shall be available for material

More information

Mark Rzasa & Tom Malerich Peoria Area OSHA Office

Mark Rzasa & Tom Malerich Peoria Area OSHA Office Mark Rzasa & Tom Malerich Peoria Area OSHA Office 309-589-7033 Fall hazards Powered Industrial Vehicles Excavations 1926.501(b)(1) Each employee engaged in residential construction activities 6 feet (1.8

More information

Safety Tips from the WorkSafe People

Safety Tips from the WorkSafe People Location/Department: Date of Review: Reviewed by: The following safety and health checklist is designed to be used in conjunction with the Accident Fund document Developing a Safety Program Begin With

More information

Section 17 TABLE OF CONTENTS Conveyors. 17.A General B Operation C Training

Section 17 TABLE OF CONTENTS Conveyors. 17.A General B Operation C Training Section 17 TABLE OF CONTENTS Conveyors Section: Page 17.A General... 17-1 17.B Operation... 17-5 17.C Training... 17-6 17-ii THIS PAGE INTENTIONALLY LEFT BLANK 17-ii SECTION 17 Conveyors 17.A General.

More information

Pod Lifting Frame. Introduction. Important Notes. Key Benefits. User Guide

Pod Lifting Frame. Introduction. Important Notes. Key Benefits. User Guide User Guide Pod Lifting Frame Introduction The Conquip Pod Lifting Frame enables the transportation of prefabricated modular pods to the required structure level. The Pod Lifting Frame fits flush against

More information

Appendix B. NBC Considerations

Appendix B. NBC Considerations CONTENTS Appendix B NBC Considerations PAGE THREAT................................................................... B-1 NUCLEAR, BIOLOGICAL, AND CHEMICAL DEFENSE............................ B-1 NBC PLANNING............................................................

More information

Maquoketa Valley Electric Cooperative Employee Job Description NRECA Job Code

Maquoketa Valley Electric Cooperative Employee Job Description NRECA Job Code Maquoketa Valley Electric Cooperative Employee Job Description NRECA Job Code 55-6434 Job Title: Apprentice Lineman Prepared by: Human Resources SUMMARY This position becomes proficient in the construction,

More information

SLAVERY & TRAFFICKING RISK TEMPLATE (STRT)

SLAVERY & TRAFFICKING RISK TEMPLATE (STRT) SLAVERY & TRAFFICKING RISK TEMPLATE () VERSION 1.2 HUMAN TRAFFICKING & SLAVERY RISK SCORING ALGORITHM: WORKSHEET Organizations can use this worksheet to document their algorithm for generating a human

More information

Building 17 Roof Safety Assessment. Not Applicable - No fall restraint system. Within handrailed and marked painted areas NA

Building 17 Roof Safety Assessment. Not Applicable - No fall restraint system. Within handrailed and marked painted areas NA Roof Safety Survey GENERAL INFORMATION CAMPUS: Wollongong Campus BUILDING: I.T. Resource Centre (17) DESCRIPTION: Concrete roof surrounded by handrail and parapets. 2 x large pyramid shaped glass skylights.

More information

1.2M Ku-BAND Rx/Tx SERIES 1135 FEED SYSTEM

1.2M Ku-BAND Rx/Tx SERIES 1135 FEED SYSTEM May 24, 2016 ASSEMBLY MANUAL Revision E 1.2M Ku-BAND Rx/Tx SERIES 1135 FEED SYSTEM General Dynamics SATCOM Technologies 1700 Cable Drive NE Conover NC 28613 USA Phone 770-689-2040 www.gdsatcom.com 1.2M

More information

CARGO SPECIALISTS' HANDBOOK

CARGO SPECIALISTS' HANDBOOK CARGO SPECIALISTS' HANDBOOK DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited. HEADQUARTERS, DEPARTMENT OF THE ARMY *FM 55-17 FIELD MANUAL NO 55-17 Headquarters Department

More information

Maquoketa Valley Electric Cooperative

Maquoketa Valley Electric Cooperative Maquoketa Valley Electric Cooperative Job Title: Lead Lineman-Maintenance Prepared by: Human Resources Department: Operations Preparation Date: 2014 Reports to: Line Foreman or Operations Mgr. Approved

More information

2200-Lb. Semi-Electric Stacker OWNER S MANUAL

2200-Lb. Semi-Electric Stacker OWNER S MANUAL 2200-Lb. Semi-Electric Stacker OWNER S MANUAL WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety

More information

U.S. Army Evaluation Center. Mission Based T&E. NDIA 26 th T&E Conference. 4 March 10

U.S. Army Evaluation Center. Mission Based T&E. NDIA 26 th T&E Conference. 4 March 10 U.S. Army Evaluation Center Mission Based T&E NDIA 26 th T&E Conference 4 March 10 2 Purpose To provide a refresher of the MBT&E methodology. To show how ATEC is moving forward with implementation of the

More information

GENERATOR SET, GASOLINE ENGINE DRIVEN, SKID MOUNTED, TUBULAR FRAME, 1.5 KW, SINGLE PHASE, AC, 120/240 V, 28 V DC (LESS ENGINE)

GENERATOR SET, GASOLINE ENGINE DRIVEN, SKID MOUNTED, TUBULAR FRAME, 1.5 KW, SINGLE PHASE, AC, 120/240 V, 28 V DC (LESS ENGINE) DEPARTMENT OF THE ARMY TECHNICAL MANUAL TO 35C2-3-385-1 DEPARTMENT OF THE AIR FORCE TECHNICAL ORDER TECHNICAL MANUAL OPERATOR/CREW, ORGANIZATIONAL, INTERMEDIATE (FIELD) (DIRECT SUPPORT AND GENERAL SUPPORT)

More information

Operation & Service Manual METTLER TOLEDO PFA220. Operation & Service Manual

Operation & Service Manual METTLER TOLEDO PFA220. Operation & Service Manual Operation & Service Manual METTLER TOLEDO PFA220 Series Floor Scale Operation & Service Manual Contents 1 Safety notice... 1 2 Introduction... 2 2.1 General... 2 2.2 Standard Sizes and Capacities...

More information

Scaffolding Procedures

Scaffolding Procedures Procedures Purpose It is the purpose of this company in issuing these procedures to further ensure a safe workplace based on the following formal, written procedures for scaffold work. Application This

More information

Supply Support Activity Operations. June 2014

Supply Support Activity Operations. June 2014 ATP 4-42.2 Supply Support Activity Operations June 2014 DISTRIBUTION RESTRICTION. Approved for public release; distribution is unlimited. Headquarters, Department of the Army This publication is available

More information