1 TransGas Customer Connections Presented by: Tyler Danielson Manager, Pipeline Engineering

2 Outline Your final quote Who creates your final quote What we need from you What s in the quote Accuracy and price commitment Typical Receipt Facilities Custody Transfer Point (CTP) Measurement Buy Back Meters H2S Sites Measurement Signals Tie-ins What we do once you sign a Contract for New Service Planning Survey and Land Engineering and Materials 3 rd Party Approvals Construction and Commissioning Customer Builds Process

3 Customer Connects (Receipts) Final quote requested through TransGas Customer Service Final quote is assigned to a Project Leader with in Pipeline Engineering Department Project Leader scopes the project, completes field assessments, obtains current pricing and creates a detailed final quote Project Leader coordinates with all other TransGas departments (Measurement, Purchasing, Automation, Electrical, etc.) to obtain preliminary design information as well as current costs

4 What do we need from you? Customer Services Expected volumes Gas composition Land location Requested service date More info required with delivery requests Project Leader for accuracy/lowest price quote Plot plans Road access locations Requested location for custody transfer riser Field contact if site is existing or at construction phase

5 What your quote includes Quoted for design, fabrication, installation and commissioning required for your receipt All receipts require Measurement Canada approved metering, remote read, CTP, and a tie-in to the TransGas system

6 What your quote includes If requested by the customer your quote can include a buy back meter Allows you to take unodorized, unregulated gas back through your CTP to purge or start your facilities If your site is sour or is expected to turn sour your final quote will include costs for the installation of H2S monitoring and shut-in equipment

7 Accuracy and Commitment to Cost Quoted based on preliminary design, field routing current market prices TransGas uses both internal staff and external contractors to obtain lowest pricing for you the customer Projects quoted at cost with no profit in estimate Endeavor to be plus/minus 10% on all quotes TransGas assumes the risk associated with projects and the price is fixed once you sign

8 A Typical Project C Customer s Compressor New TransGas Pipeline M Existing TransGas Pipeline New TransGas Meter Station New TransGas Tap-Off Custody Transfer Point

9 Custody Transfer Point Only one CTP per service Receipt and buy back gas through same CTP CTP placed at lease boundary CTP is above ground connection, Class 600 raised face flange Cathodic isolation is provided

10 Measurement Daniels Orifice Meters Flow Computers Measurement Canada Approved Remote Read on receipt meters Meter is placed 500 meters to 5 km from your site Physical meter is part of TransGas meter pool and not charged to the customer

11 Buy Back Meters Typically 2 Turbine Meters Flow Computer Measurement Canada Approved Not odorized or regulated Buy Back meters are meant to provide temporary supply used for system startup or purging

12 H2S Monitoring and Shut-in Required if site is sour or is expected to turn sour TransGas places H2S analyzer and remote shut-in valve at the CTP Customer responsible to meet H2S spec of 4 ppm or valve will trip TransGas staff must be called out to site to reset the valve once operations are spec Remote opening is a potential quote option

13 Measurement Signals Daily flow in GJ/d available on TransGas web site TransGas can quote to supply a measurement signal to your site This signal is a contact closure where each contact is equal to a specified volume of flow Hard wired or wireless signal setup as metering can be up to 5 km away You are responsible to process the signal and perform any calculations needed The signal is not for critical control as it is interruptible

14 Tie-in to the TransGas System Tie-in location based on system capacity and lowest cost option TransGas will tie-in to existing block valves where possible Hot taps are used to reduce system outage

15 Once You ve Signed a Contract Planning (completed during final quote) Survey and Land Engineering Materials 3 rd Party Approvals Construction Commissioning In-Service Timing / Project Schedule

16 Planning Prior to customer commitment 95% of the planning is complete Project Leader fully scopes project at quote stage to get you an accurate quote at the lowest cost Pipeline route, meter location and tie-in locations are all planned at the final quote stage Preliminary design sketches are created at final quote Land is usually the largest remaining variable Start implementing plan upon customer commitment Final quotes typically take 2 to 4 weeks

17 Survey and Land TransGas Land Department obtains survey permission and easements for Right of Way Permission to survey typically takes 1 to 2 weeks depending on the length of the pipeline TransGas tenders survey contracts throughout the province on an annual basis competitive pricing short notice availability of survey crews Preliminary survey is based upon routing identified in the final quote Survey and receipt of the survey drawings typically takes 3 to 5 weeks

18 Engineering Majority of design is handled in house by 1 of 4 Pipeline Engineers Consultants are used to add capacity when needed TransGas maintains standard drawings for meters, buildings, block valves, CTPs reduces design time reduces drafting time increase accuracy of quotes Most new receipts designed to 8,619 kpa (1250 Psi) MAOP Typically allow 1 to 2 weeks of design and drafting upon receiving survey information

19 Materials TransGas stocks fittings commonly associated with customer receipts up to NPS 12 TransGas maintains a quantity of meters and buildings based on expected customer demand TransGas stocks commonly used pipe in sizes up to NPS 8 Pipe price is negotiated on larger orders to minimize customer cost Pipe is available immediately for shorter length jobs Projects requiring specialized components or large amounts of pipe are ordered upon customer commitment to avoid schedule impacts

20 3 rd Party Approvals TransGas Environment Department completes required field studies and obtains regulatory permits TransGas Engineering handles all crossing approvals and Ministry of Energy licensing TransGas Aboriginal Relations handles aboriginal engagement and consultation if required Approval taking longer due to stakeholder concerns and regulator requirements Approvals take 6 to 8 weeks

21 Construction All construction per TransGas construction specifications no ploughed lines, 100% x-ray, full inspection Small jobs constructed by TransGas crews minimize cost Larger jobs tendered to obtain competitive pricing

22 Construction Meters, CTPs and tie-ins are completed by TransGas crews Electrical/Inst is completed by contractor under TransGas direction Mobilization, construction and testing typically 3 to 8 weeks depending on project size

23 Commissioning Most projects have a small amount of commissioning to get your gas flowing flow computers and their remote reads must be commissioned pipeline is purged by Operations and gas is brought up to the CTP Operations will coordinate with you to open the CTP valve once you are ready to flow gas 1 day allocated to commission standard receipt Note: 1 week is allocated for H2S facilities as they require more electrical and controls checking

24 Typical Schedule Final Quote 2 4 weeks Customer Commitment (Receipts) Land Owner Consent 1 2 wks Survey & Survey Drawings 3 5 wks Engineering & Drawings 1-2 wks 3 rd Party Approvals 6 8 wks Construction & Commissioning 3 8 wks Typically budget 120 to 180 days per project Goal is to have your service ready when you need it Contact us about delivery service schedules as they have other considerations

25 Customer Builds Process What is the Customer Builds Process Customer Builds Process is an option that is available on some project where you can take on construct of the pipeline TGL involved with project guidance, review and final acceptance Last 19 yrs, 475 new receipts with 3.5% as Customer Builds Process Each project is reviewed by TransGas based on its specifics to determine if customer builds would be acceptable

26 Customer Builds Process The Details The customer will build the pipeline portion of the Customer Specific Facility on TransGas behalf at the Customer s sole cost, risk and expense Customer builds pipeline portion of project from their plant to TransGas transmission line in accordance with all applicable legislation, and TransGas procedures, specifications and inspection requirements TransGas retains ownership of pipeline

27 Customer Builds Process The Details (Continued) TransGas provides and installs a meter station at a location along the pipeline route determined by TransGas. TransGas provides a tap-off and riser at the TransGas transmission line and a Custody Transfer Riser at the Producer s compressor site. TransGas will inspect and reserves the right to reject the construction of the pipeline to ensure all standards are met. A Completion Certificate will be issued by TransGas once the Customer has fulfilled its obligations.

28 Customer Builds Process Customer s Compressor M Existing TransGas Pipeline Tie-in by TransGas C Pipeline by Customer Meter by TransGas Custody Transfer Point

29 Customer Builds Process Customer Creating drawings in TGL Standard Survey Plans Easements in TGL Name Crossing Agreement in TGL name and format Construction of pipeline per TGL Standard Supply all materials for pipeline per TGL specs TransGas Review and accept drawings Approve pipeline route Witness all land agreements Execute crossing agreements Provide project monitor to ensure installation per TGL requirements

30 Questions??? Tyler Danielson Manager Pipeline Engineering PH

TransGas Customer Connections

TransGas Customer Connections TransGas Customer Connections April 18, 2012 www.transgas.com TransGas Facilities TransGas 2012 Facilities Map LEGEND 6" AND LARGER TRANSMISSION 4 AND SMALLER TRANSMISSION STORAGE FACILITY COMPRESSOR STATION

More information

Developer s Guide To Turnkey Subdivisions The Saskatchewan Turnkey Program

Developer s Guide To Turnkey Subdivisions The Saskatchewan Turnkey Program Developer s Guide To Turnkey Subdivisions The Saskatchewan Turnkey Program Contents 1.0 Program Overview...3 2.0 Eligibility Criteria...3 3.0 Cable Companies...3 4.0 Developer Responsibilities...3 5.0

More information

WEC Energy Group Gas Standardization Program. Gas Standardization Approach MEA Gas Operations Summit Thursday, August 13, 2015

WEC Energy Group Gas Standardization Program. Gas Standardization Approach MEA Gas Operations Summit Thursday, August 13, 2015 WEC Energy Group Gas Standardization Program Gas Standardization Approach MEA Gas Operations Summit Thursday, August 13, 2015 Agenda Introduction Gas Standardization Team Development Process to Standardize

More information

CONTENTS. Foreword... Committee Roster Introduction Summary of Changes

CONTENTS. Foreword... Committee Roster Introduction Summary of Changes CONTENTS Foreword.............................................................................. Committee Roster Introduction Summary of Changes General Provisions and Definitions 801 General... 1 802

More information

CHAPTER IX RULES AND REGULATIONS FOR GRINDER PUMPS. A. "Department" means Concord Township Sewer Department.

CHAPTER IX RULES AND REGULATIONS FOR GRINDER PUMPS. A. Department means Concord Township Sewer Department. CHAPTER IX RULES AND REGULATIONS FOR GRINDER PUMPS SECTION 1. DEFINITIONS OF TERMS USED IN THIS CHAPTER IX A. "Department" means Concord Township Sewer Department. B. "Engineer" means a licensed professional

More information

Exhibit D Measurement & Regulation Facilities Records Required for DETI Operational Responsibilities

Exhibit D Measurement & Regulation Facilities Records Required for DETI Operational Responsibilities PRE-CONSTRUCTION As the proposed operator of a portion(s) of the Customer owned facilities, Dominion Energy Transmission, Inc. (DETI) shall require the following documentation for review and approval prior

More information

CONSTRUCTION DRAWINGS

CONSTRUCTION DRAWINGS CONSTRUCTION DRAWINGS LANDFILL GAS COLLECTION AND CONTROL SYSTEM (GCCS) CONSTRUCTION REQUEST FOR BID NO. 18-0197 ORTH WILMINGTON, NORTH CAROLINA 28401 (704) 504-3107 TITLE SHEET SCS JOB NO. MARCH 2018

More information

Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines

Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines February 2017 Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Pipeline Application Audit Submissions (Technical) March 2016 This document clarifies and supports the submission of audit documentation for the technical requirements of Directive

More information

Gas Transmission and Distribution Piping Systems

Gas Transmission and Distribution Piping Systems ASME B31.8-2007 (Revision of ASME B31.8-2003) Gas Transmission and Distribution Piping Systems ASME Code for Pressure Piping, B31 AN AMERICAN NATIONAL STANDARD Three Park Avenue New York, NY 10016 CONTENTS

More information

Port Arthur, TX. Reviewed: 04/18 Effective: 04/18 (Rev. 04) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

Port Arthur, TX. Reviewed: 04/18 Effective: 04/18 (Rev. 04) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager Procedure No.: PA-020-0050 Page: 1 of 6 Port Arthur, TX. Reviewed: 04/18 Effective: 04/18 (Rev. 04) Supersedes: Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager 12/16 (Rev 03) Document

More information

People Are Asking Us About Our Rover Pipeline Project

People Are Asking Us About Our Rover Pipeline Project People Are Asking Us About Our Rover Pipeline Project As we begin work on our Rover Pipeline Project, we know you may have a number of questions about our project and how the plans could potentially affect

More information

Legionella Procedure. Document Control. Date of next Review. Revision No. Publication on Web Site. Date Document Reviewed. Summary of main changes

Legionella Procedure. Document Control. Date of next Review. Revision No. Publication on Web Site. Date Document Reviewed. Summary of main changes Document Control Revision No. Date Document Reviewed Publication on Web Site Date of next Review Summary of main changes Draft May 2017 New version of document 1 May 2017 May 2017 May 2018 Update of document

More information

Gas Transmission and Distribution Piping Systems

Gas Transmission and Distribution Piping Systems ASME B31.8-2010 (Revision of ASME B31.8-2007) Gas Transmission and Distribution Piping Systems ASME Code for Pressure Piping, B31 A N A M E R I C A N N A T I O N A L S T A N D A R D ASME B31.8-2010 (Revision

More information

Company Name: Click here to enter text. Contractor Contact (Name & Ph #): Click here to enter text. OpQual & DER USE ONLY

Company Name: Click here to enter text. Contractor Contact (Name & Ph #): Click here to enter text. OpQual & DER USE ONLY Company Name: Click here to enter text. Contractor Contact (Name & Ph #): Click here to enter text. OQ Tasks? Y N CMV Guidelines for Completion of the DOT Covered Function Checklist OpQual & DER USE ONLY

More information

Pipeline Application

Pipeline Application Pipeline Application Sales Gas Pipeline From 11-30-001-25 W1M to 14-19-001-25 W1M Southwestern Manitoba Manitoba Innovation, Energy and Mines Petroleum Branch Date: June 5, 2013 Table of Contents 1. Introduction...

More information

Thermal Mass Flow Meters Help Reduce Energy Costs and Enhance Emissions Monitoring Systems

Thermal Mass Flow Meters Help Reduce Energy Costs and Enhance Emissions Monitoring Systems Thermal Mass Flow Meters Help Reduce Energy Costs and Enhance Emissions Monitoring Systems Fox Thermal Instruments, Inc. Rich Cada 399 Reservation Rd. Vice President of Sales & Marketing Marina, CA 93933

More information

THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16 ( the Act ) and

THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16 ( the Act ) and TECHNICAL STANDARDS & SAFETY AUTHORITY 14 th Floor, Centre Tower 3300 Bloor Street West Toronto, Ontario Canada M8X 2X4 IN THE MATTER OF: THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16

More information

Gas Transmission and Distribution Piping Systems

Gas Transmission and Distribution Piping Systems ASME B31.8-2014 (Revision of ASME B31.8-2012) Gas Transmission and Distribution Piping Systems ASME Code for Pressure Piping, B31 AN INTERNATIONAL PIPING CODE ASME B31.8-2014 (Revision of ASME B31.8-2012)

More information

Woodenhouse Compressor Station C3 Unit Addition. Province:

Woodenhouse Compressor Station C3 Unit Addition. Province: Application Pursuant to Section 58 of NEB Act Printed On (dd/mm/yyyy): 07/11/2016 NOVA Gas Transmission Ltd. Submission Information Submission Title: Woodenhouse Compressor Station Submission Date: 07/11/2016

More information

APPROVAL PROCESS FOR NEW SEWER SYSTEMS & LINE EXTENSIONS

APPROVAL PROCESS FOR NEW SEWER SYSTEMS & LINE EXTENSIONS APPROVAL PROCESS FOR NEW SEWER SYSTEMS & LINE EXTENSIONS Preliminary Plan Approval Owner/Developer Submits the Preliminary Maps to County/Town to identify the location of the nearest sewer line to the

More information

ALASKA PIPELINE PROJECT

ALASKA PIPELINE PROJECT Black & Veatch Holding Company 2011. All rights reserved. FINAL ALASKA PIPELINE PROJECT Gas Off-take Study B&V PROJECT NO. 174126 PREPARED FOR Alaska Gas Pipeline Project Office 4 NOVEMBER 2011 Alaska

More information

University of Edinburgh. Engineering Services. Guidelines

University of Edinburgh. Engineering Services. Guidelines University of Edinburgh Engineering Services Guidelines Section 1: General Introduction and Application. Estates and Buildings Works Division Issue: 3 Date: January 2008 Engineering Services Guidelines

More information

SemCAMS Area Project Description

SemCAMS Area Project Description REGULATORY The Redwillow Pipeline Project involves crossing a provincial boundary, and therefore, approval for it will require the preparation of an application to the NEB. plans to proceed with the regulatory

More information

From the desk of G. A. Aaker, Jr., PE.

From the desk of G. A. Aaker, Jr., PE. SAMPLE CALCULATIONS TO DETERMINE THE REQUIRED MINIMUM WALL THICKNESS PER DOT 192 / ASME B31.8 FOR GAS TRANSMISSION AND DISTRIBUTION PIPING SYSTEMS 192.103 GENERAL Pipe must be designed with sufficient

More information

The Pipelines Regulations, 2000

The Pipelines Regulations, 2000 PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21; and by Saskatchewan Regulations

More information

Northern Gas Pipeline Community and Business Information

Northern Gas Pipeline Community and Business Information Northern Gas Pipeline Community and Business Information December 2015 About Jemena One of Australia s leading, experienced & innovative energy infrastructure companies $8.5B of Australian infrastructure

More information

192GasCatalog.

192GasCatalog. 192GasCatalog www.energyu.org www.midwestenergy.org 192-Abnormal Operating Conditions... 4 192-0101 Characteristics and Hazards of Natural Gas... 4 192-0201 Gas Detection and Alarm System Maintenance...

More information

Financial Benefits of Mobile Natural Gas

Financial Benefits of Mobile Natural Gas Financial Benefits of Mobile Natural Gas CenterPoint Energy Mobile Energy Solutions 1-844-Mobile-4 1-844-662-4534 June 26, 2017 CenterPoint Energy: Electric transmission and distribution utility in Houston

More information

NGN/PM/AV1 - APPENDIX G EXTRACT

NGN/PM/AV1 - APPENDIX G EXTRACT NGN/PM/AV1 - APPENDIX G EXTRACT DETAILED ASSESSMENT UIP SUBMISSION CHECK LIST SERVICE ALTERATIONS / DISCONNECTIONS DETAILED ASSESSMENT OF UIP SUBMISSION PAGE 1 OF 3 CHECK LIST Site Site Reference No. TASK

More information

Customer-Side Distributed Generation. Net Metering and Small Power Producers

Customer-Side Distributed Generation. Net Metering and Small Power Producers Customer-Side Distributed Generation Net Metering and Small Power Producers Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs Email: iloughran@saskpower.com phone: 306-566-6108 Illustration

More information

NGN/PM/AV/1 MANAGEMENT PROCEDURE FOR

NGN/PM/AV/1 MANAGEMENT PROCEDURE FOR MANAGEMENT PROCEDURE FOR THE ASSESSMENT AND VALIDATION OF DATA PROVIDED BY UIPs FOR NEW MAINS, NEW SERVICES, SERVICE ALTERATIONS AND DISCONNECTIONS (BELOW 7 BAR) TO BE ADOPTED BY NGN NOVEMBER 2017 CONTENTS

More information

TransCanada s Proposed North Montney Mainline Project Aitken Creek Section and Kahta Section

TransCanada s Proposed North Montney Mainline Project Aitken Creek Section and Kahta Section TransCanada s Proposed North Montney Mainline Project Aitken Creek Section and Kahta Section Peace River Regional District Council Presentation July 25 th, 2013 TransCanada Corporation (TSX/NYSE: TRP)

More information

Walk-through Checklist

Walk-through Checklist Walk-through Checklist Use this walk-through checklist to help collect information to determine the suitability of CHP at your facility. The results can then either be sent to your U.S. D.O.E. Regional

More information

CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE

CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 932 NOVEMBER 2009 CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE TABLE OF CONTENTS 932.01 SCOPE 932.02 REFERENCES 932.03 DEFINITIONS 932.04

More information

ACCESS PRINCIPLES QUEENSLAND GAS PIPELINE. 18 August Revision 1.1

ACCESS PRINCIPLES QUEENSLAND GAS PIPELINE. 18 August Revision 1.1 ACCESS PRINCIPLES QUEENSLAND GAS PIPELINE 18 August 2008 Revision 1.1 20160923 POL QGP - Rev 1.2 (New Branding) 20160923 POL QGP - Rev 1.2 (New Branding) ACCESS PRINCIPLES FOR THE QUEENSLAND GAS PIPELINE

More information

Pipeline Operational Status. API Recommended Practice 1181 First Edition

Pipeline Operational Status. API Recommended Practice 1181 First Edition Pipeline Operational Status API Recommended Practice 1181 First Edition Special Notes Classified areas may vary depending on the location, conditions, equipment, and substances involved in any given situation.

More information

D-3 7/6/2018 Enbridge Activity Update Peace River Regional District July 12, 2018 Jay Morrison Community and Indigenous Engagement Enbridge & Spectra

D-3 7/6/2018 Enbridge Activity Update Peace River Regional District July 12, 2018 Jay Morrison Community and Indigenous Engagement Enbridge & Spectra Enbridge Activity Update Peace River Regional District Jay Morrison Community and Indigenous Engagement Enbridge & Spectra Energy Merger On Monday, February 27, 2017, Spectra Energy completed its merger

More information

LIQUID PIPELINE FIELD OPERATIONS

LIQUID PIPELINE FIELD OPERATIONS NCCER 13614 Progress Blvd, Alachua, Florida 32615 Phone: (888) 622-3720 E-mail: info@nccer.org LIQUID PIPELINE FIELD OPERATIONS Competencies / Objectives MODULE 66101-02 INTRODUCTION TO THE PIPELINE INDUSTRY

More information

Deliverables list for Projects in the fertilizer industry

Deliverables list for Projects in the fertilizer industry Deliverables list for s in the fertilizer industry Document Development Guidance Department: s / Engineering Revision 1 August 2018 Doc. No: AKH01-GUI-ENG-LST-001 Contents 1. Synopsis... 2 2. Why develop

More information

SHARED SERVICES - ASSET MANAGEMENT

SHARED SERVICES - ASSET MANAGEMENT Filed: September 0, 00 EB-00-0 Exhibit C Tab Page of 0 0 SHARED SERVICES - ASSET MANAGEMENT.0 OVERVIEW The Transmission and Distribution businesses are operated using the Asset Management model, which

More information

Foothills Pipe Lines Ltd.

Foothills Pipe Lines Ltd. Page 1 SERVICE AGREEMENT SHORT TERM FIRM TRANSPORTATION SERVICE FOR TRANSPORTATION OF GAS This AGREEMENT made, 20 BETWEEN: AND: FOOTHILLS PIPE LINES LTD., a body corporate having an office and carrying

More information

REGULATION OF THE MINISTER OF COMMUNITY, ABORIGINAL AND WOMEN S SERVICES. Safety Standards Act M 62

REGULATION OF THE MINISTER OF COMMUNITY, ABORIGINAL AND WOMEN S SERVICES. Safety Standards Act M 62 PROVINCE OF BRITISH COLUMBIA REGULATION OF THE MINISTER OF COMMUNITY, ABORIGINAL AND WOMEN S SERVICES Safety Standards Act M 62 I, Murray Coell, Minister of Community, Aboriginal and Women s Services,

More information

SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN

SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN 3.1 GENERAL SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN 3.1.1 The following specifications cover the general design, review of plans and specifications, and acceptance of

More information

New Natural Gas Service Informational Packet

New Natural Gas Service Informational Packet New Natural Gas Service Informational Packet Important Documents Included Customer Letter Natural Gas Application Customer Load Profile House Line Pressure Test Form Meter Installation Specifications Customer

More information

Distribution Integrity Management. Record Requirements

Distribution Integrity Management. Record Requirements Distribution Integrity Management Record Requirements CONTACT INFORMATION John West Transportation Specialist U.S. Department of Transportation PHMSA Office of Training and Qualifications Main: (405) 954-7219

More information

ArcGIS for Utility Network Management for Gas. Tom DeWitte Matt Baber

ArcGIS for Utility Network Management for Gas. Tom DeWitte Matt Baber ArcGIS for Utility Network Management for Gas Tom DeWitte Matt Baber Utility Network for Gas Who s It For Who s It For Gas Organizations with Distribution pipe systems Transmission pipelines Gathering

More information

Section I - Introduction

Section I - Introduction Section I - Introduction A. Purpose The purpose of this document is to present information to Professional Services Firms that will allow them to design projects, prepare construction documents and provide

More information

Improve pipeline safety and optimize its capacity

Improve pipeline safety and optimize its capacity Improve pipeline safety and optimize its capacity Surge Relief Systems Proven solutions to help you overcome your toughest challenges for pipeline integrity Petroleum commodity releases can have catastrophic

More information

Note: Eastern Shore Natural Gas Company is referred to as ESNG thoughout this form. PART 1: CUSTOMER PROFILE PART 2: CUSTOMERS FACILITY DESCRIPTION

Note: Eastern Shore Natural Gas Company is referred to as ESNG thoughout this form. PART 1: CUSTOMER PROFILE PART 2: CUSTOMERS FACILITY DESCRIPTION Note: Eastern Shore Natural Gas Company is referred to as thoughout this form. Return completed form by mail, fax or e-mail to: Eastern Shore Natural Gas Company 1110 Forrest Avenue Dover, DE 19904 Attn:

More information

SECTION NATURAL GAS DISTRIBUTION

SECTION NATURAL GAS DISTRIBUTION SECTION 33 51 00 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

Foothills Pipe Lines Ltd.

Foothills Pipe Lines Ltd. Page 1 SERVICE AGREEMENT FIRM TRANSPORTATION SERVICE FOR TRANSPORTATION OF GAS This AGREEMENT made, 20 BETWEEN: AND: FOOTHILLS PIPE LINES LTD., a body corporate having an office and carrying on business

More information

Chapter 5 Embedded Generation Information Pack

Chapter 5 Embedded Generation Information Pack Chapter 5 Embedded Generation Information Pack 27.04.18 27.04.18 1 Table of Contents 1. Connection Framework... 3 2. Negotiated Standards Chapter 5... 5 3. Connection Process... 6 4. Key Documents... 7

More information

The Water Connections Code for Scotland

The Water Connections Code for Scotland The Water Connections Code for Scotland Prepared by Authors: Issued Date: 21 st July 2014 Version: 1.3 1 Contents 1 Glossary of Terms...4 2 Foreword...6 2.1 Background...6 3 The Accreditation Scheme...8

More information

ON THERMAL ENERGY. Based on Article 65 (1) of the Constitution of the Republic of Kosovo, LAW ON THERMAL ENERGY CHAPTER I GENERAL PROVISIONS

ON THERMAL ENERGY. Based on Article 65 (1) of the Constitution of the Republic of Kosovo, LAW ON THERMAL ENERGY CHAPTER I GENERAL PROVISIONS LAW No. No. 05/L 05/L -058-052 ON ON INDUSTRIAL THERMAL ENERGY DESIGN LAW No. 05/L -052 ON THERMAL ENERGY Assembly of the Republic of Kosovo, Based on Article 65 (1) of the Constitution of the Republic

More information

QUALIFICATIONS NEEDED TO DESIGN, CONSTRUCT AND MANUFACTURE NUCLEAR SYSTEMS AND EQUIPMENT. Cosmos M. Voutsinos, P.Eng.

QUALIFICATIONS NEEDED TO DESIGN, CONSTRUCT AND MANUFACTURE NUCLEAR SYSTEMS AND EQUIPMENT. Cosmos M. Voutsinos, P.Eng. QUALIFICATIONS NEEDED TO DESIGN, CONSTRUCT AND MANUFACTURE NUCLEAR SYSTEMS AND EQUIPMENT Cosmos M. Voutsinos, P.Eng. 1638 Scenic Heights South, Lethbridge, Alberta, Canada 403-331-2212,

More information

Pipeline Records - - Lessons Learned. The Changing Industry Landscape and Transmission Records Implications NGA Operations Conference April 3, 2012

Pipeline Records - - Lessons Learned. The Changing Industry Landscape and Transmission Records Implications NGA Operations Conference April 3, 2012 Pipeline Records - - Lessons Learned The Changing Industry Landscape and Transmission Records Implications NGA Operations Conference April 3, 2012 Who Are We? CHA Consulting, Inc. CHA is a highly diversified,

More information

Description [in natural gas volume] Emissions estimated from size of breach / pressure / duration calculation

Description [in natural gas volume] Emissions estimated from size of breach / pressure / duration calculation SoCalGas Rulemaking (R.) 15-01-008 to Adopt Rules and Procedures Governing Commission Regulated Natural Gas Pipelines and Facilities to Reduce Natural Gas Leaks Consistent with Senate Bill 1371, Leno.

More information

Multi-level individual metering guide. Version 3: December 2013

Multi-level individual metering guide. Version 3: December 2013 Version 3: December 2013 Contents 1 Introduction 4 2 Approach to introducing individual metering 5 2.1 Stage 1: Preparing the building for individual metering 5 2.2 Stage 2: Requirement for individual

More information

go to every house or business equipped with a natural gas furnace or water heater. They also

go to every house or business equipped with a natural gas furnace or water heater. They also C) SaskEnergy Engineering Integrity &Construction 600-1777 Victoria Avenue Regina.SK S4P 4K5 T: (306)535-4215 F: (306)525-1088 Railway Safety Act Review 2017-2018 255 Albert Street Ottawa, Ontario KIP

More information

Superior Pipeline Solutions

Superior Pipeline Solutions Superior Pipeline Solutions Sagebrush Superior Pipeline Solutions 9 Sagebrush Pipeline Equipment History Since 1961, Sagebrush has provided world class shop-fabricated measurement and mechanical systems

More information

EAST-WEST TIE TRANSMISSION PROJECT

EAST-WEST TIE TRANSMISSION PROJECT Connecting Ontario s Northwest What s Inside? Answers to On: NextBridge Infrastructure and the East-West Tie Project Electricity in Northern Ontario Land issues Routing Project approval process Health

More information

Waste Heat Recovery for Power Generation

Waste Heat Recovery for Power Generation www.transgas.com April 2010 Issue 70 Waste Heat Recovery for Power Generation TransGas is a company known for its transportation and storage of natural gas. However in 2009, TransGas embarked on a new

More information

General Water Bid Items Item No.

General Water Bid Items Item No. BID PROPOSAL PROPOSAL OF, a corporation organized and existing under the laws of the State of, a partnership consisting of, an individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

Structural Engineering & Civils Scope of Services

Structural Engineering & Civils Scope of Services Structural Engineering & Civils Scope of Services 1.0 General The scope of services set out below is indicative and are not intended to be exhaustive. This scope of service should be read in conjunction

More information

Making Changes to Boiler Plant

Making Changes to Boiler Plant RCR Energy New Zealand Making Changes to Boiler Plant September 2016 20MW Gas-Fired Boiler 2 Making Changes to Boiler Plant - What You Need To Know The Code of Practice for Boilers ( COPB ) places responsibilities

More information

TAB B. Hot-Tap Tie-in Assembliesat SW W6M. (Secondary Test Sections 2016S-11, 2016S-16, and 2016S-18) Hydrotest Summary Report

TAB B. Hot-Tap Tie-in Assembliesat SW W6M. (Secondary Test Sections 2016S-11, 2016S-16, and 2016S-18) Hydrotest Summary Report TAB B Hot-Tap Tie-in Assembliesat SW 35-080-11 W6M (Secondary Test Sections 2016S-11, 2016S-16, and 2016S-18) Hydrotest Summary Report TransCanada PipeLines Limited Standards, Specifications and Procedures

More information

TURBINE WATER & FIRE HYDRANT METERS. BID OPENING: Monday, March 24, 2014

TURBINE WATER & FIRE HYDRANT METERS. BID OPENING: Monday, March 24, 2014 Department of Finance City Hall Room 105A, 30 Church Street Rochester, New York 14614-1281 www.cityofrochester.gov Bureau of Purchasing PRINTED NAME OF BIDDER TURBINE WATER & FIRE HYDRANT METERS Invitation

More information

Module 8 Its Not Just About the Meter and Regulator

Module 8 Its Not Just About the Meter and Regulator Station Types Point of Delivery (POD) Point of Receipt (POR) Industrial Commercial Residential OGA 2015 Regulator Fundamentals Seminar 2 Station Design Information Upstream pipeline MAOP Inlet pressure

More information

Customer Connection Guide. Document number SOP Issue number 9 Status Approver

Customer Connection Guide. Document number SOP Issue number 9 Status Approver Customer Connection Guide Document number SOP 11-4013 Issue number 9 Status Approver Approved T Hallam Date of approval 4/8/2014 Table of Contents 1 SUMMARY OF RESPONSIBILITIES... 4 1.1 OUR RESPONSIBILITIES...

More information

Residential and Farm Customer Guide

Residential and Farm Customer Guide Residential and Farm Customer Guide CONTENTS 1. Who is this Guide for?... 3 2. What service does FortisAlberta provide to Residential and Farm Customers?... 3 3. What are the Terms and Conditions of Electric

More information

Brown University Updated March 11, 2013 Facilities Design & Construction Standards

Brown University Updated March 11, 2013 Facilities Design & Construction Standards SECTION 01 17 90 UTILITY & CRITICAL SYSTEM CONNECTIONS AND INTERRUPTIONS PART 1 - GENERAL 1.1 SUMMARY: A. Brown University operates and maintains extensive campus and building utilities and distribution

More information

AP 515 PURCHASING. Administrative Procedures Manual AP Purchasing

AP 515 PURCHASING. Administrative Procedures Manual AP Purchasing AP 515 PURCHASING BACKGROUND The purchase of goods and services for Saskatoon Public Schools shall be conducted in accordance with the most current version and amendments of The Education Act, of the Province

More information

NATIONAL ENERGY BOARD ONSHORE PIPELINE REGULATIONS

NATIONAL ENERGY BOARD ONSHORE PIPELINE REGULATIONS PDF Version [Printer-friendly - ideal for printing entire document] NATIONAL ENERGY BOARD ONSHORE PIPELINE REGULATIONS Published by Quickscribe Services Ltd. Updated To: [includes Federal Regulation SOR/2016-134

More information

Appendix 1-A Well Testing

Appendix 1-A Well Testing Appendix 1-A Well Testing FLOW TESTING PURPOSE Flow testing is used to determine the performance of oil and gas wells and their economic potential. Various tests will be done to determine the amount of

More information

Transmission Pipeline Opportunities. Advancing Project Development in India through Public Private Partnerships

Transmission Pipeline Opportunities. Advancing Project Development in India through Public Private Partnerships Transmission Pipeline Opportunities Advancing Project Development in India through Public Private Partnerships 22 23 February, 2007 Pipeline Maintenance and Repair: Agenda Methane Losses from Pipeline

More information

UNDERGROUND FACILITY LOCATOR COMPETENCY PROFILE

UNDERGROUND FACILITY LOCATOR COMPETENCY PROFILE UNDERGROUND FACILITY LOCATOR COMPETENCY PROFILE UNDERGROUND FACILITY LOCATOR COMPETENCY PROFILE The Underground Facility Locator (UFL) Competency Profile (CP) was developed for the Canadian Association

More information

Developer s Packet. Water Construction

Developer s Packet. Water Construction Developer s Packet Water Construction We at White House Utility District understand the importance of helping you to meet your project deadlines. This WHUD developer s packet has been created to help streamline

More information

All service lines shall conform to the following requirements:

All service lines shall conform to the following requirements: 505 WATER SERVICE INSTALLATION 505.1 DEFINITION A service line is comprised of the piping and related appurtenances including the connection installed from the Des Moines Water Works water main to the

More information

Non Registered Embedded Generation Information Pack

Non Registered Embedded Generation Information Pack Non Registered Embedded Generation Information Pack > 30 KW to 5 MW Ergon Energy Network Embedded Generator Information Pack With a focus on energising our diverse QLD communities, we are committed to

More information

Titles and Descriptions of Training Materials

Titles and Descriptions of Training Materials 1 Titles and Descriptions of Training Materials The training materials are designed as a learning resource and career development resource for the individual employee. Training materials should be supplied

More information

Developer s Packet. For Developments Requiring Large Meters

Developer s Packet. For Developments Requiring Large Meters Developer s Packet For Developments Requiring Large Meters We at White House Utility District understand the importance of helping you to meet your project deadlines. This WHUD developer s packet has been

More information

The State of Natural Gas Pipelines in Fort Worth

The State of Natural Gas Pipelines in Fort Worth The State of Natural Gas Pipelines in Fort Worth This Fort Worth League of Neighborhood Associations commissioned this report with a Community Technical Assistance Grant from the federal Pipeline and Hazardous

More information

AEL.NP.001 New Connections and Extensions Policy

AEL.NP.001 New Connections and Extensions Policy AEL.NP.001 New Connections and Extensions Policy 10 February 2014 Version 3 Contents Introduction... 3 Amendment Record... 5 1. Technical Requirements for New Connections to the Network... 6 1.1 Method

More information

Comprehensive approach to the decommissioning of oil pipelines

Comprehensive approach to the decommissioning of oil pipelines Comprehensive approach to the decommissioning of oil pipelines by Aleš Brynych and Aleš Crha CEPS a. s., Jesenice, Czech Republic Pipeline Pigging Conference Tehran, Iran 24-25 October, 2016 Organized

More information

Re: Request for Quotation for Fuel Management Services (the RFQ ), RFQ 17128

Re: Request for Quotation for Fuel Management Services (the RFQ ), RFQ 17128 Date: May 17 th, 2017 Re: Request for Quotation for Fuel Management Services (the RFQ ), RFQ 17128 The Regional Municipality of Wood Buffalo (the Municipality ) invites you to submit a quotation for the

More information

Proposed Enhance CO 2

Proposed Enhance CO 2 Proposed Enhance CO 2 Pipeline Project Enhance Pipeline: Project Overview 1 Project Design 2 Regulatory Considerations 4 Public Consultation Process 5 Health, Safety, and Environmental Programs 6 Project

More information

Our expertise includes: 200E, th Avenue NE Calgary, Alberta. T2E 7P1 Ph (403) Fax

Our expertise includes: 200E, th Avenue NE Calgary, Alberta. T2E 7P1 Ph (403) Fax Based in Calgary Cornerstone Engineering Ltd. is a full service engineering, procurement and construction management company providing professional services to the oil and gas industry. Cornerstone is

More information

Install and Commission Mechanical Services

Install and Commission Mechanical Services Unit 14: Install and Commission Mechanical Services Unit code: Y/504/4363 QCF level: 6 Credit value: 15 Aim This unit enables learners to understand the transformation from a mechanical services design

More information

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

Application of Buy America requirements on utility relocations associated with FHWA-funded highway projects

Application of Buy America requirements on utility relocations associated with FHWA-funded highway projects Electronic Filing www.regulations.gov Docket ID: FHWA-2016-0028 Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 Re: Buy America Nationwide Waiver Notification for Commercially

More information

meters (16 Inches) Transportation (T)

meters (16 Inches) Transportation (T) OFFICE USE ONLY Application # Town of Steady Brook BUILDING AND DEVELOPMENT APPLICATION {All Applications must include copy of Legal Survey, showing all measurements And distances required} {Processing

More information

We will need to keep a minimum of 6-0 wide pathway.

We will need to keep a minimum of 6-0 wide pathway. 2 April 16, 2018 FRESNO CHAFFEE ZOO WARTHOG EXHIBIT 894 West Belmont Avenue Fresno, CA 93728 Architect Project Number: 1616 FCZ Project Number: 0192 To: Prospective Bidders ADDENDUM NO. 2 The following

More information

Contour K5 Technical Information

Contour K5 Technical Information Contour K5 Technical Information 45.00 Y Design Time Line, Flow Test Data and Information Supporting AGA-3 / API 14.3 (2000 Edition) Compliance 22.50 Ø 0.500D Ø 0.850D X FLANGE FACE SERRATED SPIRAL FINISH

More information

SASKENERGY/TRANSGAS FORECAST FOR 2017 AND BEYOND THE SASKATCHEWAN OIL & GAS SUPPLY CHAIN FORUM

SASKENERGY/TRANSGAS FORECAST FOR 2017 AND BEYOND THE SASKATCHEWAN OIL & GAS SUPPLY CHAIN FORUM SASKENERGY/TRANSGAS FORECAST FOR 2017 AND BEYOND THE SASKATCHEWAN OIL & GAS SUPPLY CHAIN FORUM NOVEMBER 15, 2016 Derrick R. Mann, P.Eng. (Acting) Vice President Engineering, Integrity and Construction

More information

Table 9-1: Industry Standards for Pipeline and Meter Station Facilities

Table 9-1: Industry Standards for Pipeline and Meter Station Facilities PDF Page 1 of 60 Section 9 Meter Stations 9.0 METER STATIONS This section provides meter station information for the Project. The information is based on preliminary design and is supported by initial

More information

SECTION GROUND STORAGE TANK

SECTION GROUND STORAGE TANK SECTION 13210 GROUND STORAGE TANK PART 1 GENERAL 1.01 Summary A. Section Includes: Provision for welded steel storage tank design, fabrication, construction and erection, including tank accessories. B.

More information

COMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM PIPELINE AND A STORAGE FACILITY.

COMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM PIPELINE AND A STORAGE FACILITY. Licence Number: PPL.sf.p.F1/225/2015 COMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM PIPELINE AND A STORAGE FACILITY. This licence is issued by the National Energy Regulator, hereinafter referred

More information

FERC approves Transco natural gas pipeline expansion

FERC approves Transco natural gas pipeline expansion FERC approves Transco natural gas pipeline expansion HOUSTON, Nov. 22 11/22/2013 By OGJ editors Williams Partners LP has received approval from the US Federal Energy Regulatory Commission for the $300

More information

COMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM STORAGE FACILITY AND A PETROLEUM PIPELINE

COMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM STORAGE FACILITY AND A PETROLEUM PIPELINE Licence Number: PPL.sf.p.F1/164/2013 COMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM STORAGE FACILITY AND A PETROLEUM PIPELINE This licence is issued by the National Energy Regulator, hereinafter

More information