1 PRE FEASIBILITY REPORT of RAMA IRON ORE MINE (ML-2621) 1.28 MTPA IRON ORE PRODUCTION MINING LEASE AREA: Ha (FOREST LAND) at RAMGAD RESERVED FOREST, RAMGAD VILLAGE, SANDUR MANDAL, BALLARI DISTRICT, KARNATAKA STATE. Of JSW STEEL LIMITED 1 P a g e

2 Table of Contents 1. Executive summary 2. Introduction of the project/ Background information 3 Project Description 4 Site Analysis 5. Planning Brief 6 Proposed Infrastructure 7. Rehabilitation and Resettlement (R & R) Plan 8. Project Schedule & Cost Estimates 9. Analysis of Proposal (Final Recommendations) 2 P a g e

3 CHAPTER 1 EXECUTIVE SUMMARY 1. Executive Summary JSW Steel Limited (JSW) proposes to produce 1.28 MTPA Iron Ore production from its new mine i.e., RAMA IRON ORE MINE ML No spreading over an area of Ha located at Ramgad Reserved Forest, Ramgad Village, Sandur Mandal, Ballari District, Karnataka State. Rama Iron Ore Mine; Mining Lease was granted to JSW through Letter of Intent by Govt. of Karnataka through e-auction process The mine has about Million Tonnes of mineable reserves (approx.) which will last for about 20 years with proposed production capacity of 1.28 Million Tonnes Per Annum (MTPA). About Ha will be mined for production of Iron ore The mine operation will be by Fully mechanized open cast method of mining by drilling and blasting and by deploying HEMM equipments like hydraulic drills and excavators, wheel loaders and dumpers. The waste mainly consists of shale/phylite. The waste generated will be dumped in the proposed temporary dump, located towards the north-western side of the lease as per R & R plan. The area demarcated for the temporary waste dump in this plan period is 3.7 Ha, which can hold Million Cum. The quantity of generation of waste will be 4.06 MTPA during conceptual period. Backfilling of the mined out area of Ha will be carried out, to dispose the waste generated during the conceptual period. There is no mineral reject generation during plan period as all the +45% Fe material produced will be sent to JSW Steel plant. Approximately 205 m 3 /day water is required for dust suppression, afforestation purpose, canteen and other general requirements for this mine. Water will be drawn from company bore wells dug in nearby mining areas. 3 P a g e Crushing & Screening process does not have any water requirement as C&S units will be fitted with dust suction system. Mine working is expected to reach 875m above MSL, which is 315 m above water table at the end of the life of the mine.

4 Daroji Bear Sanctuary is at 16.1 km from the ML area JSW will employ102 manpower in the mine All infrastructure facilities such as education, health facilities and other social facilities are adequate at nearest populated area. The estimated project cost for the iron ore production will be approximately Rs crores JSW will implement R & R Plan prepared by ICFRE which is duly concurred by Central Empowered Committee. The indicative cost estimate for the implementation of engineering and biological measures for reclamation and rehabilitation plan is Lakh Rs. (Approx.). 4 P a g e

5 5 P a g e CHAPTER 2 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION 2.0 Introduction of the Project / Background information i. Identification of project and project proponent. In case of mining project, a copy of mining lease / letter of intent should be given. Rama Iron Ore Mine, ML No. 2621, located in Ramgad village, Sandur Taluka, Ballari District, over an extent of Ha area of Forest Land of Ramgad range is an iron ore mining lease area proposed to be granted to JSW Steel Limited as per the Letter of Intent of Govt. of Karnataka after e-auction (Annexure-I). Pursuant to the Hon ble Supreme Court(SC) order dated 29th July 2011 and 26th August 2011, the mining operations and transportation of the iron ore from mining leases in the districts of Ballari, Tumkur and Chitradurga had been suspended except, in the case of two mining leases M/s NMDC namely, ML no and ML no Central Empowered Committee (CEC) was constituted by SC, in order to unravel the violations carried out by mining companies in Karnataka. As per the CEC s joint team survey, ML No. 2621, previously held by M/s Rama Rao Paol has a total encroachment area of Ha (entirely under others category). Based on their findings, the lease has been categorized under C category. Further, the Hon ble Supreme Court by its orders dated 5th August 2011 and 26th August 2011 had directed the Government of Karnataka to submit the Reclamation and Rehabilitation Plan(s) for the districts of Ballari, Tumkur and Chitradurga within three months. Subsequently, the Government of Karnataka vide letter dated 29th September, 2011 has assigned the work of preparation of R & R Plan to the Indian Council for Forest Research and Education (ICFRE). As per letter No.1-26/CEC/SC/2013-Pt XXXXXIV dated ; the CEC of the view that before finalizing the R & R plans of any of the Category C mining leases, it may be appropriate that the details of mineral reserves to be available based on the exploration data undertaken by the State Govt. Accordingly the Govt. of Karnataka has provided the exploration work to M/s. Mineral Exploration Corporation Limited (MECL), a Government of India Enterprise, Nagpur, to assess the mineral reserves in all C category mines in Ballari, Chitradurga and Tumkur Districts of Karnataka State. M/s. MECL has conducted Exploration in the Mining Lease area of Rama Iron Ore Mine, ML No. 2621, by Geological mapping, core drilling and RC drilling etc. The reserves have been estimated by MECL. Total mineable reserves of Million tonnes have been estimated based on the exploration data. Hon ble Supreme Court had directed Government of Karnataka to commence the auction of and / or Pig Iron and/or Steel and/or Pellets will be eligible to take part in the auction. The end users will include Public Sector Undertakings.

6 The Department of Mines & Geology, in its LOI dated , had directed M/s JSW Steel Limited to obtain all consents, approvals, permits, no objections and the like as may be required under applicable law before signing the MDPA. The Hon ble Supreme court vide its judgment dated ordered to transfer the existing statutory clearances of previous lessees in favor of new lessees, who have obtained the blocks in the auction. Accordingly, the Environmental clearance (Annexure II) of previous lessee (0.5 MTPA) has been transferred. The R & R Plan prepared by ICFRE and also duly concurred by Central Empowered Committee. Monitoring committee has also issued a letter vide letter No.MC/R&R/CCA/ /103/376 (Annexure III) dated 18th April 2017, prescribing the annual production limit of 0.5 MT of iron ore, however, the mining plan is being prepared for 1.28 MTPA and would be seeking the fresh environment clearance in this behalf. Project proponent The JSW Group s foray into steel manufacturing began in 1982, when it set up the Jindal Iron and Steel Company with its first steel plant at Vasind near Mumbai. The next two decades saw significant expansion and several acquisitions, following the merger of Jindal Iron and Steel Co (JISCO) and Jindal Vijayanagar Steel Ltd (JVSL) in Today JSW Steel has plants in six locations in India Vijayanagar in Karnataka, Salem in Tamil Nadu, and Tarapur, Vasind, Kalmeshwar and Dolvi in Maharashtra. Our global operations include a plate and pipe mill in the US. In order to securitise resources, the company has acquired mining assets in Chile, USA and Mozambique. ii. Brief description of nature of the project Rama Iron Ore Mine is spread over an extent of Ha area of Forest Land of Ramgad range, in Ramgad village, Sandur Taluka, Ballari District. LOI was granted on 26/10/2016 and expiry is 50 years as per MMDR (Amendment) Act It is proposed to produce 1.28 MTPA of iron ore from subject mine Fully mechanized open cast method of mining by drilling and blasting and by deploying HEMM equipments like hydraulic drills and excavators, wheel loaders, dumpers, will be undertaken. To make optimum exploitation of the mineral deposit, the mine will be developed by making benches with a height of 8m and width of 15m will be maintained with keeping the necessary berm width. The bench slope angle will be maintained at with an overall pit slope angle of The working of benches will be commenced from top and extended to bottom benches while the direction of advancement will be towards western as well as eastern side of the proposed working area. The ROM excavated is proposed 6 P a g e

7 to be processed in the crushing and screening plants to obtain the lump and fine ore as product mix iii. Need for the project and its importance to the country and or region. To ensure raw material self-sufficiency, JSW Steel Limited, having its integrated steel plant with an installed capacity of 18 Million Tons (i,e 12 Million Tons at Vijayanagar, Karnataka, 5 Million Tons at Dolvi, Maharashtra & 1 Million Ton at Salem, Tamilnadu), has participated in aforesaid auction. JSW Steel Limited had been awarded this mining block vide LOI no. DMG/MLS/CCA/12/2621/ (Annexure-I). So far JSW steel does not possess any mining lease or prospecting licenses neither in the state of Karnataka nor in the other part of the country. Importance to the country Steel is traditionally considered the backbone of national economic development. It is a major input into sectors which support economic growth such as infrastructure, machinery, power and railways, as well as being important for fast growing sectors, in particular automobiles and consumer durables. India is the fourth (4th) largest steel producer in the world, presently producing about 90 Million Tonnes of saleable finished steel products in the ratio of about 40-60% in the category of Flat Products and Long Products. Per capita consumption of steel in India is only about 60 Kg as compared to a world average of 217 Kg and China s 510 Kg. Being a developing country, the consumption in the country shall increase every year creating a good demand over the coming years. The country s steel production and consumption is likely to remain higher in from MT of crude steel during backed by an increase in infrastructure allocation in the budget. In , steel production is expected to remain higher. This will be backed by an expected revival in consumption. An increase in infrastructure allocation by the government in the Union Budget is expected to drive the pace of construction and infrastructure in the country. Steel production in the world is dominated by China followed by Japan. During , crude steel output of China stood at MT and for Japan it stood at MT. In , production of these steel producing countries (excluding India) remained subdued even during April-December 2016 on a y-o-y basis. While crude steel output in China, Japan and Russia grew by mere 0.5-3%, output in US remained flat and that in South Korea declined by 1.3%. In contrast, crude steel production in India rose by 8.8% to MT during this period. This was on account of higher output by the major Indian steel 7 P a g e

8 companies. The imposition of Minimum Import Price (MIP) encouraged the producers to increase their output. Post-demonetisation, steel consumption is expected to remain under pressure in the coming few months to a certain extent. This is because it is likely that the demand for steel from the user industries like construction, real estate will take some time to strengthen. However, government push towards infrastructure will compensate for this reduction in demand, it added. Source : Live Mint E paper iv. Demand supply Gap The National Steel Policy 2017, released by the government, also aims to increase steel production. Thus, both production and consumption of steel is expected to remain buoyant in future. The country has gained the position of third largest crude steel producer in the world and is largely focusing on increasing production. However, focus at the same time should be on increasing consumption of steel and reducing the dependence on cheap imports. v. Imports Vs Indigenous production. Since this is a captive mine to JSW Steel Limited, entire production will be utilized for the JSW Steel Plant. vi. Export possibility At present, the material produced is proposed to be transported to M/s JSW Steel Plant for its own captive use. Hence no export possibility exists. vii. Domestic / export markets The Iron Ore produced from the subject mine will be used for captive consumption in the steel plants of JSW. viii. Employment generation (direct and indirect) due to the project. Vice president, Mines (JSW Steel Limited) heads the central mine organization followed by senior mining professionals (GM, DGM) and Mines Manager holding 1st class Certificate of competency. This mine will provide employment to 102 people and proposes to generate indirect employment to around 100 people. Most of the work force employed by the lessee are for mine supervision. 8 P a g e

9 CHAPTER 3 PROJECT DESCRIPTION 3.0 Project Description i. Type of project including interlinked and interdependent projects, if any. The mine is spread over 33.8 Ha of Forest Land of Ramgad range located in Ramgad village, Sandur Taluka, Ballari District, Karnataka State. Mineable iron ore reserves are about Million Tonnes of mineable iron ore reserves. It is proposed to produce 1.28 MTPA of iron ore from subject mine located at Ramgad village, Sandur Taluka, Ballari District, Karnataka State It is categorized as Category B Project. Since, the State Committee (SEAC & SEIAA) at Karnataka is being reconstituted, it has necessitated obtaining Environment Clearance from Ministry of Environment, Forest & Climate Change (MoEF&CC). ii. Location (map showing general location, specific location, and project boundary & project site layout) with coordinates. RAMA IRON ORE MINE is located in Ramgad village, Sandur Taluka, Ballari District, Karnataka. The Mining lease areaarea is a part of the Survey of India Toposheet No.57/A/8 The site falls A) 15 7'3.11"N- 15 7'37.12"N B) 76 27'55.94"E '21.40"E with an average altitude of 962 m above MSL. The location map of the Mining lease area is shown in Fig 1. Nearest railway line connecting Hospet Swamihalli of South Western Railway line is at a distance of 1.8 km in WSW direction to the Mining lease area. Nearest railway line connecting Hospet Ballari of South Western Railway line is at a distance of 11.7 km in Northern direction to the Mining lease area. Key map showing the location of various features around the Mining lease area is shown in Fig 2. The National Highway (NH- 13 Change NH-50) connecting Hospet Kudligi is at a distance of 11.7 km in WSW direction to the Mining lease area. The National Highway (NH- 63 Change NH-67) connecting Hospet Ballari is at a distance of 12.1 km in N direction to the Mining lease area. The nearest railway station is Ramgad RS which is 2.0 km in Western direction. The nearest city from the Mining lease area is Bengaluru which is about km in SSE direction. Nearest Settlements from the Mining lease area Ramgad 0.3 km W, Bhavihalli 2.3 km E Nearest Forests from the Mining lease area Sandur RF 2.9 km ENE Bandri RF 1.3 km SE Mine in Ramgad RF 9 P a g e

10 10 P a g e Pre Feasibility Report

11 11 P a g e Pre Feasibility Report

12 Salient features of Mining lease area are given in Table 1 and Fig - 3 shows the study area of 10 km radius around the Mining lease area. iii. Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted. No alternate sites were considered as the project is mineral specific. iv. Size or magnitude of operation. Mine lease area is Ha. The proposed rate of production of Iron ore is 1.28 MTPA. v. Project description with process details (a schematic diagram/ flow chart showing the project layout, components of the project etc. should be given) Fully mechanized open cast method of mining by drilling and blasting and by deploying HEMM equipments like hydraulic drills and excavators, wheel loaders, dumpers, will be undertaken. To make optimum exploitation of the mineral deposit, the mine will be developed by making benches with a height of 8m and width of 15m will be maintained with keeping the necessary berm width. The bench slope angle will be maintained at with an overall pit slope angle of 450. The working of benches will be commenced from top and extended to bottom benches while the direction of advancement will be towards western as well as eastern side of the proposed working area. The ROM excavated is proposed to be processed in the crushing and screening plants to obtain the lump and fine ore as product mix. In order to achieve the targeted production, the different mining activities in this mine will be done in daylight hours. The operation involves excavation of the ore and waste by drilling and blasting. Ore excavated from the mine will be taken to the crushing and screening plant in the ML area for screening and sizing. Further ancillary machinery like Water sprinklers, Road Graders, Dozers, weighing machines etc., will also be deployed.the finished products, i.e. lump ore (10-40 mm) and fine ore (0-10 mm) will be loaded in to dumpers and will be stocked at the stockyard. As this mine will be used for captive purpose only, entire quantity of finished product from stockyards will be dispatched to JSW Steel Plant by rail and/or road. In future pipe conveyor may also be used after carrying out necessary feasibility studies. The total Mining lease area will be covered by single major pit having the dimension given below: Pit Dimension Top RL Bottom RL No. of benches Number LXWX D X 180 X P a g e

13 Drilling Manufacturing process Flowchart Blasting to loosen the soil Excavation & loading to Tippers Overburden dumped as waste dump Tippers carry the Overburden to the waste dump within the mine lease Tippers carry the ROM to the Crushing & screening plant ROM is crushed and separated into stacks of different sizes (0-10),(10-40) & (40-100) 13 P a g e

14 TABLE 1.1 SALIENT FEATURES OF THE MINE SITE Feature Details Altitude 962 m above msl Longitude & A) 15 7'3.11"N- 15 7'37.12"N Latitude B) 76 27'55.94"E '21.40"E Village, Tehsil, Ramgad village, Sandur Taluka, Ballari District, Karnataka. District, State District head quarters Ballari km E IMD STATION Bengaluru km SSE Max. Temp. 0 C 38.3 Min. Temp. 0 C 9.2 Relative Humidity % Annual rainfall mm Topography Plain Nearest Water Bodies Nearest Highway Nearest City Nearest Railway station Nearest Industries Inter State Boundary Nearest National Park Nearest Villages Nearest Air port Nearest Forest Historical places Dhanayakana Kere 8.0 km WSW Nari Halla 8.9 km SE Tungabhadra Reservoir 11.5 km - NW National Highway (NH- 13 Change NH-50) - f 11.7 km -WSW National Highway (NH- 63 Change NH-67) km - N Ballary km E Ramgad RS 2.0 km - W Other WORKING mines in the vicinity are A ZTC (ML -2239,ML-2488,ML- 2309) B VESCO (ML -2160,ML-2296) C SRI VNK MENON( ML -2543) Karnataka Andhra Pradesh 32.0 km - ESE Daroji Sloth Bear Sanctuary 16.1 km - NE Ramgad 0.3 km W Bhavihalli 2.3 km E Bengaluru International Airport 250 km - NNW Koppal Airport 37.0 km NW Jindal Vidyanagar Airport 18.5 km - ENE Sandur RF 2.9 km ENE Bandri RF 1.3 km SE Hospet RF 9.2 km NNE Mine in Ramgad RF None within 10km Radius *All distances mentioned in the above table are aerial distances 14 P a g e

15 15 P a g e Pre Feasibility Report

16 a) Raw material required along with estimated quantity, likely source, marketing area of final product/s, mode of transport of raw material and finished product. No raw material is required. b) Resource optimization / recycling and reuse envisaged in the Project, if any, should be briefly outlined. The waste mainly consists of shale/phylite. The waste generated will be dumped in the proposed temporary dump, located towards the north-western side of the lease as per R & R plan. The area demarcated for the temporary waste dump in this plan period is 3.7 Ha, which can hold Million Cum. The quantity of generation of waste will be 4.06 MTPA during conceptual period. Backfilling of the mined out area of Ha will be carried out, to dispose the waste generated during the conceptual period. There is no mineral reject generation during plan period as all the +45% Fe material produced will be sent to JSW Steel plant. c) Availability of water its source, energy /power requirement The requirement of water supply, both for drinking and mine will be drawn from the company bore wells dug in the vicinity of the mining area. There are 6 nalas existing in and around the ML area. Out of which, one is from western side and emptying into a tank near Byalakundi and another one originates from northern side is flowing towards NW direction and emptying into Raya Channel. The remaining 4 nalals are originating from eastern side of ML area and flowing towards eastern direction and emptying into Narihalla Reservoir. Total water requirement is 205 KLD. This includes domestic requirement of 5 KLD, 150 KLD towards dust suppression and 50 KLD towards Plantations and green belt development. The power required for illumination & crusher will be taken from grid. vi. Quantity of wastes to be generated (liquid and solid) and scheme for their management / disposal. The waste mainly consists of shale/phylite. The waste generated will be dumped in the proposed temporary dump, located towards the north-western side of the lease as per R & R plan. The area demarcated for the temporary waste dump in this plan period is 3.7 Ha, which can hold Million Cum. The quantity of generation of waste will be 4.06 MTPA during conceptual period. Backfilling of the mined out area of Ha will be carried out, to dispose the waste generated during the conceptual period. 16 P a g e

17 vii. Schematic representations of the feasibility drawing which give information of EIA purpose. 17 P a g e

18 4.0 Site Analysis CHAPTER 4 SITE ANALYSIS i. Connectivity. Nearest railway line connecting Hospet Swamihalli of South Western Railway line is at a distance of 1.8 km in WSW direction to the Mining lease area. Nearest railway line connecting Hospet Ballari of South Western Railway line is at a distance of 11.7 km in Northern direction to the Mining lease area. Ballari is major city town at a distance of 48 km The National Highway (NH-7 name change) NH-44 connecting Hyderabad Armoor at a distance of about 10.1 km in NE direction, The nearest railway station is Kamareddy at 13.8 km in Eastern direction. National Highway (NH- 13 Changed to NH-50) is at 11.7 km and National Highway (NH- 63 Changed to NH-67) is at 12.1 km The nearest airports are Bengaluru International Airport at 250 km, Koppal Airport at 37.0 km and Jindal Vidyanagar Airport at 18.5 km. ii. Land form, land use and land ownership. 18 P a g e Land use: The total Mining lease area is 33.8 Ha is a Forest Land Falling in Ramgad Reserved Forest range. Topography (along with map) The lease area of Rama Iron Ore Mine, ML No is covered in Survey of India Topo-sheet No. 57 A/8 and bound by Longitudes 76º27 56 to 76º28 21 and Latitudes 15º07 03 to 15º Buffer zone- the buffer zone area characteristically comprises of valleys and altitude varying between 600 to 1023 m above MSL, surrounded by rugged hills, marked by discrete, NW-SE trending ridges, separated by flat or gently sloping land. The area has got sub-dendritic pattern of drainage. The terrain is hilly with alternate valleys. The hill contain erosion resistant rocks like banded hematite quartzite (BHQ), banded hematite jasper (BHJ), granite, argillites etc. some steep escarpments are encountered in these hill ranges. Core zone- the mining lease area forms part of fairly high range of hill trending NNW to SSE, occurs between village Deogiri and Hospet town. The lease area occupies the crest and slopes of this range for about 1170m. the crest of lease hold comprises a narrow plateau of about 40 to 60 m. wide, with steep slopes

19 towards East. The slopes are traversed by a few seasonal nallahs draining into the valley. These nallahs are small and narrow and act only as flood channels during rainy season and none of them are perennial. The lease area termed as core zone, is steeply sloping revenue land having thick iron ore float and iron ore reef. The maximum and minimum elevation is 988 m. & 956m above MSL respectively Fig - 4 shows the surface plan of mining lease area. iii. Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ), shortest distances from the periphery of the project to periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ, in case of notified industrial area, a copy of the Gazette notification should be given. Rama Iron Ore Mine of Ha area is Forest Land falling in Ramgad range, Ramgad village, Sandur Taluka, Ballari District, Karnataka State Sl. No. Existing land use pattern Particulars Land use pattern at the beginning of Plan Period (Area in Ha) 1. Area for mining Area for waste dump 3. Roads Green Belt/ 7.5m safety zone ROM Stock Virgin/ Unbroken area Total There are no rivers or perennial water courses in the mine lease area. However, the area is traversed by numerous seasonal water courses which are usually active during monsoon season and draining into the nearby water bodies (Narihalla Reservoir). Normally, no rain water accumulates in the lease area. The rain water flows from hill slopes and it does not accumulate till it reaches the lower valleys. Hence, the drainage pattern is sub-dendritic in nature and is typical of the hilly area. There are 6 nalas existing in and around the ML area. Out of which, one is from western side and emptying into a tank near Byalakundi and another one originates from northern side is flowing towards NW direction and emptying into Raya Channel. The remaining 4 nalals are originating from eastern side of ML area and flowing towards eastern direction and emptying into Narihalla Reservoir. There are no wild life sanctuaries, national parks, elephant/tiger reserves within 10km radius of the study area.. 19 P a g e

20 Nearest Settlements from the Mining Lease Area Ramgad 0.3 km W Bhavihalli 2.3 km E Nearest Reserved Forests from the Mining Lease Area o Sandur RF 2.9 km ENE o Bandri RF 1.3 km SE o Mine in Ramgad RF iv. Existing infrastructure None within the mining lease. v. Soil classification Since the mine has been in operation for several decades before falling into C category, area is already considered as broken up. There is no likelihood of generation of topsoil. However, if, some quantity is generated during the mining operations from lease area, at the same time it will be used for afforestation purpose. vi. Climatic data from secondary sources The Sandur Schist Belt area of Ballari district experience dry semi-arid climate with mean annual rainfall varying from 40cm to 80cm. The monsoon begins in June first week and continues up to September and winter from the month of October to January. Summer continues from the month of February to May is extreme. The annual rainfall in Sandur varies from 40cm to 80cm. The rainfall is mostly (60.22%) confined to the period from June to September. During south west monsoon (October to November) 22.21% of the annual rainfall is received, and another 17.57% of rainfall occurs as sporadic in other months of the year. vii. Social infrastructure available Sandur is one of the important taluks in the district where industrialization is taking place rapidly. This is because of the establishment of Jindal Steel Factory at Toranagallu. In this taluk there are 857 industrial units with an investment of Rs lakh. These units provide employment to 3084 persons. Sandur taluk is well developed with education and medical facilities available. 20 P a g e

21 Fig - 4 surface plan of mining lease area. 21 P a g e

22 5.0 Planning Brief CHAPTER 5 PLANINIG BRIEF i. Planning concept (type of industries, facilities, transportation etc.) Town and country planning / development authority classification The Iron Ore mine is spread over Ha with Million Tonne of Mineable Iron Ore Reserves. It is proposed to produce 1.28 MTPA of Iron Ore from subject mine. Presently the plan proposed for the transportation of ore from the Rama Iron Ore Mines (ML No. 2621) to JSW Steel Plant is completely by road. This transportation will involve use of trucks/dumpers. The roadways connecting the mines and JSW Steel Ltd., is divided into 3 stretches. 1. Stretch R-1: From Mine head to Mine Stock Yard Length Length km Width m This is Two lane, mud road with low curvature. The terrain is hilly. The road is exclusively used by this mining lease. Condition of road is good. 2. Stretch R-2: Mine Gate to Tri-junction Point Length km Width m It is a wo lane, mud road with low curvature. The terrain is hilly and condition is good. This is common road with VESCO ML No 2296 and ZTC ML No Stretch R-3: Tri-junction Point to Sandur, SH-40 Length 7.00 Km, Width 9.0 m. Metalled/Cement Road with low curvature in Plain Terrain Common road (Shared by ZTC-2547,2309, 2239 & 2488) At later stages, JSW Steel Ltd. intends to transport the iron ore/ ROM using the pipe conveyor. ii. Population projection Total employment potential in the mine is 102 covering the Mining Engineer, Geologist, Skilled, semiskilled and unskilled etc. iii. Land use planning (breakup along with greenbelt etc.,) Post Mining Land use pattern: The post mining land use pattern is furnished in the following table based on the anticipated excavation of total mineable reserves. 22 P a g e

23 Sl. No. Particulars Land use pattern Land use plan at the conceptual period (Area in Ha) 1. Area for mining Area for waste dump - 3. Roads Green Belt/ 7.5m 2.20 safety 5. Infrastructure Backfilled area ROM Stock - 8. Virgin/ Unbroken 0.36 area Total Mining will be carried out in Ha. Greenbelt will be developed in an area of 2.2 Ha and on the backfilled area of Ha. iv. Assessment of infrastructure demand (physical & social) Infrastructure- Infrastructures like machinery, man power, and statutory buildings will be provided as mentioned in the plan, to meet the production requirements. The mine is well connected to main road. The mine will give employment to about 102 people in addition there will be indirect employment to many more people, in the form of contractual jobs, business opportunities, service facilities etc. This will enhance the economic status. Apart from the jobs, the company will provide medical and educational facilities to the employees which can also be availed by the people around the plant. Adequate recreational facilities for the staff of the company will be provided. v. Amenities / Facilities. Infrastructural facilities like Telephone and Occupational Health Centre etc. will be provided at mine site. The mine office with first aid room, rest shelters, toilets, tool/store room etc., will be provided at site. 23 P a g e

24 6.0 Proposed infrastructure i. Industrial area (processing area) CHAPTER 6 PROPOSED INFRASTRUCTURE Fully mechanized open cast method of mining by drilling and blasting and by deploying HEMM equipments like hydraulic drills and excavators, wheel loaders, dumpers, will be undertaken. To make optimum exploitation of the mineral deposit, the mine will be developed by making benches with a height of 8m and width of 15m will be maintained with keeping the necessary berm width. The bench slope angle will be maintained at with an overall pit slope angle of The working of benches will be commenced from top and extended to bottom benches while the direction of advancement will be towards western as well as eastern side of the proposed working area. The ROM excavated is proposed to be processed in the crushing and screening plants to obtain the lump and fine ore as product mix. In order to achieve the targeted production, the different mining activities in this mine will be done in daylight hours Extent of Mechanization As proposed above, fully mechanized method of working will be adopted for this mine. For the plan period, production of Iron ore of 1.28 MTPA has been planned. This envisages handling of 0.21 million tonnes (maximum during the plan period) of waste per year. In order to achieve the targeted production, the different mining activities will be planned during the daylight hours (from 6 AM to 6 PM). The effective working hours will be nine and that is used to calculate the fleet of mining machineries. The recovery of ore involves removal of over burden/side burden removal and processing of ROM. By adopting, a combination of Drilling, Excavation, Hauling, Crushing & Screening, Loading and Transporting machinery will be used. Further ancillary machinery like water sprinklers, road graders, dozers, weighing machine etc., will also be deployed. 24 P a g e R&R Measures for Area proposed (1) Measures for the management of OB dumps (Dump Management Plan) In order to stabilize waste dumps, toe wall at its toe and catch water drains (garland drains) and silt arresting structures should be constructed as per design. The height of the dumps and their terraces would be strictly maintained as per the design permitted for the purpose in the statutory clearances such as E.C., Mining Plan, Scheme of Mining, etc. Fresh dumping of waste would be carried out by

25 adopting retreating method starting from bottom and reaching up to the top by creating terraces at every 10 m height with a top width of 6-8 m. Berms would be provided at the toe of each terrace to avoid water flow over the dump slopes. Wherever necessary, garland drains should be provided and connected to the vertical drains and finally to the check dams followed by Silt Settling Tanks (SSTs) to control run-off from the slopes. Haul road and mine approach road would also be provided with stone pitched drains. Inactive dumps would be vegetated with suitable plantation immediately after the terraces are made. All the plantation activities would preferably be taken up during monsoon seasons to enjoy the benefit of rainwater for the same. Geo-textile/coir mat may be opted for the dumps which are having adverse conditions like steep slopes, poor soil fertility and instability and lack of moisture content. This will also enable to achieve good growth of vegetation cover over the dump slopes. Enriched plantation may also be adopted on top flat area and sloping area depending upon the condition. i) Existing Waste/ Over Burden Dumps There are three OB dumps i.e. ROM-1, ROM-2 and inactive dump (ID) mixed with waste OB material ROM boulders, located within the ML area. ROM-1 is on eastern side and ROM-2 is on western side of the ML area. The dump height varies from 5 to 10 m and slope angle is 45 to 50 degrees. The dumps are partially covered with natural vegetation of Chromolaena odorata, Lantana camara, Tecoma stans, Calotropis gigantea and other herbs. ID is a very small dump lying within the pit and need to be re-handled during mining operation. The waste dumps should be rehabilitated by adopting suitable measures. However, a toe wall and garland for ROM-1 has been proposed to protect its further erosion to outside the lease area. ii) Engineering measures for waste dumps (as per R&R plan prepared by ICFRE) Engineering measures for waste dump management for existing as well as proposed temporary dump are listed in Table - 2. (2) Surface Water Management Plan Naturally, no rain water accumulates in the lease area. The rain water flows from hill slopes usually does not accumulate till it reaches the lower valleys. Hence, the drainage pattern is sub- dendritic in nature and is typical of the hilly areas of this region. There are 6 nalas exists in and around the ML area. Out of which, one is from western side and emptying into a tank near Byalakundi and another one originates from northern side is flowing towards NW direction and emptying into Raya Channel. The remaining 4 nalals are originating from eastern side of ML area and flowing towards eastern direction and emptying into Narihalla Reservoir. 25 P a g e

26 The proposed engineering measures for the surface water management of the ML area are given in Table 3. Check Dams: i.) Loose Boulder Check Dam (LBCD): The LBCDs are Random Rubble Dry Stone. Masonry in nature and are usually proposed for gullies having a width of about 5-10 m and bed slope of less than 10%. A total number of 12 LBCDs are proposed for the nalas. ii.) Gabion (Wire crate) Check Dam (GCD): This structure is usually proposed for gullies having a bed slope of more than 10% and a high discharge rate. Gabion check dams are very useful in the areas where sediment load is very high and are very cost effective for the reclamation of mine areas and waste lands. Altogether, 7 GCDs are proposed for the nalas in the ML area. Table 2 Proposed engineering measures for management of waste dumps (ML No. 2621) Location Items Particulars of No Dimension in m works Length Width Height Qty. Unit Temporary Dump TD- 1 TW-1: Toe wall at the toe of waste dump Foundation in hard soil mixed with boulders including hard rock Top Bottom cum Plain cement concrete (1:4:8) in foundation cum GD-1 RR Stone masonry Dry Garland drain below the toe wall cum cum ROM Stock-1 26 P a g e TW-2: Toe wall at the toe of waste dump GD-2 GD-3 Foundation in 2.00 hard soil mixed with boulders including hard rock cum Plain cement 1.70 concrete (1:4:8) cum in foundation RR Stone masonry Dry cum Garland drain cum below the toe wall Garland Drain along approach Drain along cum approach road

27 Table 3: Proposed bio-engineering measures for surface water management (ML No. 2621) Location Items No Dimension in m Length Width Height Qty Units Top Bottom N-1 LBCD Cum LBCD Cum GCD Cum RWHP * No. SMCD m N-2 LBCD Cum LBCD Cum GCD Cum GCD Cum RWHP * No. SMCD m N-3 LBCD Cum LBCD Cum GCD Cum RWHP * No. SMCD m N-4 LBCD Cum LBCD Cum GCD Cum RWHP * No. SMCD m N-5 LBCD Cum LBCD Cum GCD Cum RWHP * No. SMCD m N-6 LBCD Cum LBCD Cum GCD Cum RWHP * No. SMCD m TD-1 SST No. For Proposed Temporary Dump BWCD m BWCD m BWCD m BWCD m LWCD m LWCD m LWCD m LWCD m LBCD cum LBCD cum LBCD cum LBCD cum 27 P a g e

28 iii.) Stone Masonry Check Dam (SMCD) - cement sand mortar (1:6): This is usually considered as a key structure constructed at the end of all the gully control structures like LBCD, GCD, etc. A total number of 6 SMCDs are proposed for the nalas in the lease area. iv.) Brush Wood Check Dam (BWCD): A total number of 110 BWCDs are proposed. These structures are to be implemented at the conceptual stage in the ML area v.) Log Wood Check Dam (LWCD): A total number of 150 LWCDs are proposed. These structures are to be implemented at the conceptual stage in the ML area. Water harvesting structures: i) Rain Water Harvesting Pit (RWHP): The function of the RWHP is to recharge ground water by harvesting runoff along the nalas. A total number of 6 RWHPs are proposed for the nalas in the lease area. ii) Silt Settling Tank (SST): The function of SST is to protect the runoff of the mine from carrying silted water outside the ML area as it enables settling of silt in the runoff water. One SST is proposed in the nala to which connect the runoff from the proposed temporary dump (TD-1) at the plan period. AFFORESTATION After excluding the area finally classified under green belt (2.20 ha), the area to be afforested in ML-2621 at the conceptual stage of the mine has been worked out to be ha (i.e., ). The afforestation covering 1000 trees and 2500 shrubs per ha, inclusive of maintenance for five years has been worked out as per the norms of State Forest Department, Karnataka. Work of afforestation will be carried out in close coordination with the State Forest Department, Karnataka, utilizing local people and the periodical monitoring will also be carried out, in co-ordination with state agencies. Afforestation shall be made through: Propagules (seeds, tubers, corms, bulbs, rhizomes and roots) stored in the topsoil; and sowing seed; Planting nursery-raised seedlings By seed dibbling Silt accumulated in silt settling tanks/check dams etc. can be removed and could be used after mixing with FYM and sand in the ratio 2:1:1. This mixture could be used for plantation. 28 P a g e

29 ii. Residential area (non-processing area) No residential area is proposed at mine. iii. Greenbelt. 7.5 m of mine periphery will be developed under plantation under plantation in an area of 2.2 ha. Conceptually, Ha will be brought under afforestation iv. Social infrastructure 29 P a g e Since the mine working area spread is more, makeshift office in portable cabins have been proposed with necessary amenities. A dispensary/ cum-clinic is maintained at Toranagallu Office, where from all basic medical needs of workers and staff can be fully met. The company has undertaken various health camps and also strengthened the existing primary health centers located in the surrounding villages. And first aid room/stations will be provided with prescribed appliances. A small canteen has been proposed near the mine office to cater the needs of persons employed in mine and ancillary activities. The mining activity will have a positive socio-economic impact upon the nearby human settlement as indirect employment potential is created due to mining and allied activities in the area. Apart from these, the company promotes health and education awareness in the area time to time by organizing health and education camps. In addition various social welfare programmes in the surrounding villages will be taken up by JSW. The focus areas include: Economic development ( Training ) Drinking Water Sanitation Health & Hygiene Relief & Rehabilitation Temples & Religion Related Assistance Education v. Connectivity (traffic and transportation road/ rail/ metro/ water ways etc.,) Nearest railway line connecting Hospet Swamihalli of South Western Railway line is at a distance of 1.8 km in WSW direction to the Mining lease area. Nearest railway line connecting Hospet Ballari of South Western Railway line is at a distance of 11.7 km in Northern direction to the Mining lease area. Ballari is major city at a distance of 48 km

30 The nearest airports are Bengaluru International Airport at 250 km, Koppal Airport at 37.0 km and Jindal Vidyanagar Airport at 18.5 km. vi. Drinking water management (source & supply of water) The requirement of water supply, both for drinking and mine which is about 205 m 3 /day will be drawn from the company bore wells dug in nearby mining area. vii. Sewerage system Domestic waste water from mines office will be treated in septic tank followed by soak pit. viii. Industrial waste management No industrial waste is produced. ix. Solid waste management. The waste mainly consists of shale/phylite. The waste generated will be dumped in the proposed temporary dump, located towards the north-western side of the lease as per R & R plan. The area demarcated for the temporary waste dump in this plan period is 3.7 Ha, which can hold Million Cum. The quantity of generation of waste will be 4.06 MTPA during conceptual period. Backfilling of the mined out area of Ha will be carried out, to dispose the waste generated during the conceptual period. There is no mineral reject generation during plan period as all the +45% Fe material produced will be sent to JSW Steel plant. x. Power requirement & supply / source. Electric power will be tapped from the HT line passing near to the lease area by means of a suitable transformer. Till the time power is made available, DG set will be used. HEMM will be fueled by HSD. Most of the HEMM, C&S plants will be operated by HSD till power supply is provided. 30 P a g e

31 CHAPTER 7 REHABILITATION AND RESETTLEMENT (R & R) PLAN 7.0 Rehabilitation and resettlement (R & R) Plan Pre Feasibility Report i. Policy to be adopted (central / state) in respect of the project affected persons including home oustees, land oustees and landless labourers (a brief out line to be given). The mine area does not cover any habitation. Hence the mining activities do not involve any displacement of human settlement. No public buildings, places, monuments etc., exist within the lease area or in the vicinity. The mining operations will not disturb / relocate any village. 31 P a g e

32 CHAPTER 8 PROJECT SCHEDULE & COST ESTIMATES 8.0 Project schedule & Cost Estimates i. Likely date of start of construction and likely date of completion (time schedule for the project to be given). Mine will be started after getting EC, CTE, CTO and all other regulatory clearances. The mine has mineable reserves of about Million Tonnes of mineable reserves (approx.) which will last for about 20 years with proposed production capacity of 1.28 Million Tonnes Per Annum (MTPA). ii. Estimated project cost along with analysis in terms of economic viability of the project. Estimated cost of production, working capital & Marketing Analysis is discussed below: i) Details of plant and machinery cost: Description As at the beginning of the Year Addition s during the year Sold or discarded during the Depreciatio Net Closing n during the year balance Coll. (2+3) Rs. Lakhs Estimated market value (Rs year lacs) Land Industrial Building Residential Plant and Machinery including Transport Equipment 4 Other Infrastructure Facilities (Road, water supply, bore well, computers, printers, networking, furniture & vehicles) TOTAL P a g e

33 ii) Details of capital cost and working capital details are given below Particulars Amount (Rs. in lakhs) Current Assets Closing Stock Stores Sundry Debtors and other Debits 0.00 Deposits 0.00 Cash and Bank balance 0.50 Total Current Liabilities Sundry Creditors and other payable Total Working Capital Pre Feasibility Report iii) Detailed Break-up of operating cost/tones Sl. No. Particulars Rs./T I. Direct tax Cost a. Exploration/Overburden Removal b. Mining, Drilling, Blasting, Screening, Crushing c. Beneficiation II. Overhead cost/ transport to export III. Stockyard Royalty IV. Taxes NMET (2% of Royalty) 3.6 FDF (12% of Mineral sale 144 DMF (10% of Royalty) 18 V. Surface Rent 0.0 VI. Other (Monthly Payment to State Govt.) Total-operating cost/tones Total cost for 1.28MTPA (Rs. Lakhs) P a g e

34 iv Economic Viability: Cash inflow Particulars Tones (in lakhs) Rs. Amount (in lakhs) Total Cash Outflow Operating Cost Lumps Fines Payment to State Govt , Payment of Royalty & Taxes Transport- Mines to Plant TOTAL OUTFLOW Net Cash outflow Total quantity of iron ore 1.28 MTPA Cost of production Rs./T+ Transportation Cost 2, Market price (Rs./T) 2, Profit/(Loss)/tones Based upon the net present value and internal rate of return cash flow, this mining project is economically viable. 34 P a g e

35 CHAPTER 9 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) 9.0 Analysis of proposal (Final Recommendations) Pre Feasibility Report i. Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area. Economic development of the region depends largely upon the nature of activities undertaken in the surrounding region. Corporate development invariably contributes towards acceleration of the process of socio-economic upliftment of the rural society by means of employment, health & study programme, medical camps etc., Employment: Preference will be given for locals for employment based on qualifications & requirement. Medical facilities: Medical facilities will be provided for employees as well as people of nearby villages. Educational facilities: Basic educational and vocational facilities will be provided for the children of employees as well as nearby villages. Infrastructure facilities: Approach roads will be developed at par with mine roads. 35 P a g e

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

1. PRE-FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT 1. PRE-FEASIBILITY REPORT 1.1 Executive Summary Sri. T. Thimmegowda, has applies quarry lisence for extracting of Building Stone Quarry in Sy No. 33/2, Kurodbore Kaval village, Hassan Taluk, Hassan District,

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU PRE-FEASIBILTY REPORT OF SUNATHAR STONE QUARRY VILLAGE: Sunathar TAHASIL: Purushottampur DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU Vill/Po- Gandala, P.S.- Hinjili, Dist.-Ganjam Odisha. CONTENTS CHAPTER

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT This proposal of Nuagaon Iron ore mines of M/s K.J.S.Ahluwalia is for expansion of Iron ore production capacity from 5.62 MTPA to 7.99MTPA of ROM along with existing beneficiation

More information

The Ramco Cements Limited

The Ramco Cements Limited PRE FEASIBILITY REPORT of KANAKADRIPALLI LIMESTONE MINE Mining lease area: 435.24 Ha (Non-forest land) Petnikota & Itikyala Villages Kolimigundla Mandal, Kurnool District, Andhra Pradesh. for PRODUCTION

More information

S. No Parameter Details 1 Name & Address of the Applicant

S. No Parameter Details 1 Name & Address of the Applicant 1. EXECUTIVE SUMMARY S. No Parameter Details 1 Name & Address of the Applicant M/s AMULYA GRANITES Prop: Smt CH.SARALA H. No. FLAT NO.207 Roja Kishore Residency, Chenchupet, Tenali, AP-522 202 Guntur District,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT GRANITE BUILDING STONE QUARRY MINING PROJECT STATE : KERALA DISTRICT : KANNUR THALUK : THALASSERY VILLAGE : THRIPPANGOTTUR BLOCK NO. : NIL SURVEY NO. : 275/1A MINERAL : GRANITE BUILDING

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent PRE FEASIBILITY REPORT PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent M/s Veet Rag Homes Pvt. Ltd. 267, Ganesh Phadnavis Bhavan,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT EXCUTIVE SUMMARY Project : Mining Lease of Iron Ore (Ari Dongri Iron Ore Mine) Name of Company / Mine Owner : Godawari Power and Ispat Limited Location Village : Tehsil : District

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

[FORM-V] PART-A PART-B

[FORM-V] PART-A PART-B [FORM-V] (See Rule 14) Environment Statement for the financial year ending the 31 st March 2015 PART-A (1) Name and address of the owner - M/s. Serajuddin and Co. / Occupier of the industry, Balda Block

More information

The Ramco Cements Limited

The Ramco Cements Limited PRE FEASIBILITY REPORT of KOLIMIGUNDLA LIMESTONE MINE Mining lease area: 255.00 Ha (Non-forest land) Kolimigundla, Itikyala & Kalvatala Villages Kolimigundla Mandal, Kurnool Dist., Andhra Pradesh. for

More information

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY PRE FEASIBILITY REPORT OF AZHAGAPPAPURAM EARTH FOR OVER AN EXTENT OF 0.61.0HA IN AZHAGAPPAPURAM VILLAGE, AGASTEESWARAM TALUK, KANNIYAKUMARI DISTRICT, TAMIL NADU OF, (Under the Guidelines of Ministry of

More information

(A govt. of Kerala Undertaking)

(A govt. of Kerala Undertaking) Annexure - 1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy

More information

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT The proposal for obtaining Environmental Clearance for Marble Mining Project M. L. No. 56/02, Area 4.0 ha with production capacity 40,000 TPA Near Village:

More information

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA)

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) PRE FEASIBILITY REPORT ON GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) Lease Area: 18.687 acres or 7.562 Ha. of Sri Rama chandra Dash Polasara CHAPTER 1 EXECUTIVE SUMMARY Ghodapalana sand Quarry

More information

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant PRE FEASIBILITY REPORT FOR Silica Sand Beneficiation Plant BY Shree Silicaam Minerals LLP VILLAGE : CHOKI TALUKA : JAGADIA DIST : BHARUCH GUJARAT (INDIA) PRE-FEASIBILITY REPORT: SILICA SAND BENIFICIATION

More information

Grey Granite (Paradiso) Mine

Grey Granite (Paradiso) Mine Grey Granite (Paradiso) Mine PROJECT PROPONENT M/s. Karunai Granites Private Limited., Jagadevipalayam Village & Post, Krishnagiri Taluk, Krishnagiri District 635 203. Extent : 11.59.0 Hectares S.F. No.

More information

EXECUTIVE SUMMARY. 1.1 Executive Summary

EXECUTIVE SUMMARY. 1.1 Executive Summary 1.1 Executive Summary EXECUTIVE SUMMARY Chobe ki Guwari Sand Stone Mining Project (M.L. No- 26-R-01/2001) is situated near village Chobe ki Guwari, Tehsil Sapotra, District Karoli, State Rajasthan over

More information

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND PRE-FEASIBILITY REPORT PREPARED FOR D. SESHA REDDY [Mine Lease Area 3.253 Ha.] Sy. No. 12/D Nagarur Village, Yadiki Mandal, Ananthapur District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified Accredited

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT This is an existing mine, proposal for obtaining Environmental Clearance for Masonry Stone with production capacity 37,300 TPA Near Village: Velangri, Tehsil-Sirohi,

More information

Pramod S. Kambli. Page 1

Pramod S. Kambli. Page 1 PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details:

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details: 2015 PRE-FEASIBILITY REPORT (FOR TOR) OF GADABAVALASA MANGANESE ORE MINES, AT: GADABAVALASA, GARIVIDI MANDAL, DIST: VIZIANAGRAM FOR PRODUCTION OF 12,000TPA OF MANGANESE ORE OVER AN AREA OF 12.691 HA. OF

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVESUMMARY 1.1 Introduction Road Metal of M/s. Venkata Ramana Stone Crusher covering an extent of 0.89 Ac is located at Sy.No.379/1 of Perecherla Village, Medikonduru Mandal, Guntur District,

More information

NOTE COVER PAGE GENERAL

NOTE COVER PAGE GENERAL ANNEXURE-I SCRUNITY COMMENTS ON MINING PLAN OF M/S TUMKUR MINERALS, JANAHAR IRON & MANGANESE APPLIED MINING LEASE AREA OF IRON AND MANGANESE ORE, OVER AN AREA 259 HA.( 178.00 HA IN FOREST AREA, 81.00HA

More information

Riverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8.

Riverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8. PRE-FEASIBILITY EXECUTIVE SUMMARY Shri Vishwas Parmani S/o Shri H. Parmani is the lessee for the RBM (River Betwa) for an area of 22 Acres (8.90 Ha) in Gata No. 747/16,Village- Patharehta, Tehsil- Kalpi,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT BANDOL CRUSHER STONE QUARRY OF SHRI TULSIRAM SAHU AT Khasra No. 15/2,23/2 Village Bandol Tehsil District State Madhya Pradesh Production Capacity 45030 M3/Year Area 3.150 Hectare

More information

GRAVEL & ROUGH STONE QUARRY

GRAVEL & ROUGH STONE QUARRY ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760

More information

PRE-FEASIBILIY REPORT

PRE-FEASIBILIY REPORT BENDRI LIMESTONE QUARRY NO. - 4 3 (Quarry No. 1) (Quarry No. 1)MINERALS - DOLOMITE (LEASE PERIOD 20.05.2002 TO 19. 05.2022) LEASE AREA - 42.754 HECTARES MINING PROJECT - CATEGORY- B PRE-FEASIBILIY REPORT

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

MCDR INSPECTION REPORT S/ No. 1 Name of the Mine Navalutti Iron Ore Mine 2 Total Lease Area (Ha) with breakup of Non-forest & forest land

MCDR INSPECTION REPORT S/ No. 1 Name of the Mine Navalutti Iron Ore Mine 2 Total Lease Area (Ha) with breakup of Non-forest & forest land MCDR INSPECTION REPORT S/ No. Particulars Details 1 Name of the Mine Navalutti Iron Mine 2 Total Lease Area (Ha) with breakup of Non-forest & forest land 32.40Ha (excluding 2.0 Hect. of road). Complete

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR AMJHAR LATERITE DEPOSIT M. L. Area 4.897 ha. In Village - Amjhar Tehsil - Amarpatan, District- Satna State - Madhya Pradesh Proposed Capacity 32256 TPA Lessee - Shri Vikram Singh

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

CENTRAL EMPOWERED COMMITTEE

CENTRAL EMPOWERED COMMITTEE CENTRAL EMPOWERED COMMITTEE REPORT (SUPPLEMENTARY) OF THE CEC REGARDING PREPARATION OF THE RECLAMATION AND REHABILITATION PLANS (R&R PLANS) FOR MINING LEASES IN DISTRICTS BELLARY, CHITRADURGA AND TUMKUR,

More information

M/S. Dain Colour Chem

M/S. Dain Colour Chem PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED 1. SUMMARY Kacari Silica Sand,Khanda,Geeti And Moram Project at Khasra No.-10,11,12,13,101, 102,122, 126, 127,128,129,130,131, 167,568,570,571,572,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For M/s. Shah Shah Mines & Minerals, SY. NO. 206/1, Gangireddipalli Village, Thamballapalli Mandal, Chittoor District, Andhra Pradesh. INDEX ITEM PAGE NO. 1. EXECUTIVE SUMMARY 3

More information

PRE FEASIBILITY REPORT For SILICA SAND MINE. At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh ha.

PRE FEASIBILITY REPORT For SILICA SAND MINE. At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh ha. PRE FEASIBILITY REPORT For SILICA SAND MINE At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh 11.797 ha. Project Proponent Sri Yashpal Mendon 1 st Floor Mineral House, Hampankatta, Mangalore

More information

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given. PROPOSED TERMS OF REFERENCES (A) Suggested by the Applicant 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED 1. SUMMARY Kacari Silica Sand,Khanda,Stone And Moram Project at Khsara No.-144,145,146,147, 148,150, 309, 310, 311,312,313,314,315,316,317,318,320,399,403,404,405,

More information

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal 1.0 EXECUTIVE SUMMARY Hindustan Petroleum Corporation Limited (HPCL) is one of the major Public Sector Navratna Oil Company engaged in refining, marketing and distribution of Petroleum Products in India.

More information

PRE-FEASIBILITY REPORT GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS)

PRE-FEASIBILITY REPORT GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS) 20 PRE-FEASIBILITY REPORT OF GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS) 1. EXECUTIVE SUMMARY: The project is for mining of Ghodach soapstone & Dolomite Mine M.L. No. 69/2010 Near

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project : Siddapur Natural Sand Mining in Patta land Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report [PFR] 3 Environmental

More information

PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF

PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF 0.80.0Ha IN ANAIMALLUR VILLAGE, ARCOT TALUK, VELLORE DISTRICT, TAMILNADU OF THIRU.R.VINOTHKUMAR, (Under

More information

Table 1-1:- Salient Features of the Project

Table 1-1:- Salient Features of the Project PRE FEASIBILITY REPORT OF LAMBA & BHATIA BAUXITE MINE MINERALS - BAUXITE LAMBA SURVEY. NO. 30/P, 415/A, 949, BHATIA-358 (LEASE PERIOD 14.06.2000 TO 13. 06.2020) LEASE AREA 54.0861 HECTARE MINING PROJECT

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT 1 MCDR INSPECTION REPORT General SN Particulars Details Date of Inspection 18.10.2016 1 Name of the Mine Dhobitola Titaniferous Iron Ore Mine 2 Total Lease Area (Ha) 2.61 Ha (Entire Forest Land) with breakup

More information

PRE FEASIBILITY REPORT (PFR)

PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 27 PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 28 INDEX S. No. Contents Page No. 1.0 EXECUTIVE SUMMARY 30 2.0 INTRODUCTION OF THE PROJECT / BACKGROUND

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT This is an existing mine. Proposal for obtaining Environmental Clearance for marble with production capacity 72860 TPA Near Village: Sankotra, Tehsil-Jamwa

More information

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara PROJECT PARTICULARS Name of the project - Sand mining Lease address - Village panchayat - Nara, Tahsil -Kanker, Dist Kanker (C.G.) Khasra No. - 1025 Sand mining area - 5.00 Hectares Name of the mineral

More information

PRESENTATION ON MANGANESE ORE DEPOSITS OF SMIORE FOR THE WORK SHOP ON REVISION OF THRESHOLD VALUES OF MINERALS AT GOA

PRESENTATION ON MANGANESE ORE DEPOSITS OF SMIORE FOR THE WORK SHOP ON REVISION OF THRESHOLD VALUES OF MINERALS AT GOA PRESENTATION ON MANGANESE ORE DEPOSITS OF SMIORE FOR THE WORK SHOP ON REVISION OF THRESHOLD VALUES OF MINERALS AT GOA 21-07-2107 INTRODUCTION The Sandur Manganese & Iron Ores Ltd. (SMIORE) are operating

More information

Annexure-I

Annexure-I Annexure-I Annexure-II NOAMUNDI G TATA IRON OF M/S TATA STEEL LIMITED (Lease area: 1160.060 Ha.) MINING PLAN FROM 01.01.2012 TO 2016-17 (SUBMITTED UNDER RULE 24A OF MeR 1960) (i) Name of the

More information

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P SITUATED AT KAKKUR VILLAGE KOZHIKODE TALUK KOZHIKODE DISTRICT KERALA STATE EXTENT: 2.0437 Ha STANDARD TERMS OF REFERENCE (TOR)

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified

More information

CONTENT LIST 3.0 PROJECT DESCRIPTION 7 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY

CONTENT LIST 3.0 PROJECT DESCRIPTION 7 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY CONTENT LIST S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION OF NATURE

More information

M/s. Bharat Clays Private Limited Pre-Feasibility Report

M/s. Bharat Clays Private Limited Pre-Feasibility Report 1. EXECUTIVE SUMMARY 1.1 Introduction is a private partnership firm. They applied for a mining lease for China Clay over an extent of 2.023 Hectares in Sy. No: 102/3 & 102/4P of Jaggampeta Village, Jaggampeta