The ADKAR Model: Change Management that Drives Exceptional Project Results. Susie Patterson, Director of Research and Development

Size: px
Start display at page:

Download "The ADKAR Model: Change Management that Drives Exceptional Project Results. Susie Patterson, Director of Research and Development"

Transcription

1 The ADKAR Model: Change Management that Drives Exceptional Project Results Susie Patterson, Director of Research and Development

2 Change management correlates directly with project success 100% Met or exceeded objectives On schedule On budget 48% 15% 62% 42% 32% 76% 70% 52% 94% 81% 71% 6x Increase in likelihood of meeting objectives with excellent change management 0% 14% Poor Fair Good Excellent Change Management Effectiveness Prosci. All Rights Reserved. 2

3 What percent of your project objectives depend on people changing how they work? Prosci. All Rights Reserved. 3

4 Change Management Activities Individual Change Outcomes Overall Project Goals Prosci. All Rights Reserved. 4

5 The achievements of an organization are the results of the combined effort of each individual. Vince Lombardi Prosci. All Rights Reserved. 5

6 Organizations are Made Up of Individuals Current Transition Future C C C C C T T T T T F F F F F C C C C C T T T T T F F F F F C C C C C T T T T T F F F F F C C C C C T T T T T F F F F F C C C C C T T T T T F F F F F Prosci. All Rights Reserved. 6

7 If we do not support and equip individual transitions then our future state looks nothing like the future state we expected F F F F F F F F F F F F F F F F F F F Instead of F F F F F F F F F F F F F F F F F F Prosci. All Rights Reserved. 7

8 Change is not a switch Prosci. All Rights Reserved. 8

9 Building Your ADKAR Map Identify who has to do their jobs differently and define how Apply a model of how individuals change successfully Plot individual change journeys Your ADKAR Map for success Prosci. All Rights Reserved. 9

10 Prosci ADKAR Map: Timeline ADKAR Your Change Effort to Capture People-Dependent ROI Project/Initiative: ADKAR Milestone Date Targets Groups: Example Group 3/18 4/19 5/26 7/12 10/15 Example Group 3/18 4/19 5/26 7/12 10/15 Example Group 3/18 4/19 5/26 7/12 10/15 Project Phases: Initiate Plan Design/Develop Deploy Sustain Timescale (weeks, months, quarters): Ocg Nov Dec Jan Feb March April May June July Aug Sept Example Group 3/18 4/19 5/26 7/12 10/15 Example Group 3/18 4/19 5/26 7/12 10/15 ADKAR Milestone Date Targets Project Phases: Initiate Plan Design/Develop Deploy Sustain Timescale (weeks, months, quarters): Groups: J F M A M J J A S O N D Example Group 1 3/18 4/19 5/26 7/12 10/15 Copyright Prosci All rights reserved. Prosci Inc All rights reserved. Prosci. All Rights Reserved. 10

11 Building Your ADKAR Map Identify who has to do their jobs differently and define how Apply a model of how individuals change successfully Plot individual change journeys Your ADKAR Map for success Prosci. All Rights Reserved. 11

12 Location Processes Compensation Systems Performance Reviews Reporting Structure Aspects of a Person s Job You Can Impact Tools Job Roles Mindset/Attitudes/Beliefs Critical Behaviors Equipping and supporting these individual changes is how results are realized Prosci. All Rights Reserved. 12

13 I understand why I have decided to ADKAR-ing Change Effort to Capture People-Dep Group name: Group name: Impact: Project/Initiative: Individual change definition: Awareness I understand why Awareness Group name: one of your groups I understand why Group name: Individual change definition: change definition your project name Desire I have decided to Score: Desire I have decided to Sco Kn I k Individual change definition: Score: Group name: Group name: Target date: Groups experiencing Score: Target Score: similar impacts date: Score: Score: Sco Impact: Group name: Individual change definition: another group Individual change definition: change definition Score: Sco Group name: Score: Target date: Score: Score: Target date: Score: Group name: Group name: Individual change definition: Individual change definition: Impact: Prosci. All Rights Reserved. 13 Score: Sco

14 Building Your ADKAR Map Identify who has to do their jobs differently and define how Apply a model of how individuals change successfully Plot individual change journeys Your ADKAR Map for success Prosci. All Rights Reserved. 14

15 Awareness The Five Building Blocks for Successful Change Desire Knowledge Ability Reinforcement Prosci. All Rights Reserved. 15

16 Awareness Desire Knowledge Ability Reinforcement Change begins with understanding why Communication Sponsorship Coaching Training Resistance management What is the nature of the change? Why is the change needed? What is the risk of not changing? Prosci. All Rights Reserved. 16

17 Your ADKAR Map Awareness I understand why notes Score: 1-5 Why? Why now? What if we don t? Prosci. All Rights Reserved. 17

18 Awareness Desire Knowledge Ability Reinforcement Change involves personal decisions Communication Sponsorship Coaching Training Resistance management What s in it for me (WIIFM)? A personal choice A decision to engage and participate Prosci. All Rights Reserved. 18

19 Your ADKAR Map Desire I have decided to notes Score: 1-5 Personal and Organizational Motivators Prosci. All Rights Reserved. 19

20 Awareness Desire Knowledge Ability Reinforcement Change Communication requires knowing how Sponsorship Coaching Training Resistance management Understanding how to change Training on new processes and tools Learning new skills Prosci. All Rights Reserved. 20

21 Your ADKAR Map Knowledge I know how to notes Score: 1-5 Following A&D During and After Prosci. All Rights Reserved. 21

22 Awareness Desire Knowledge Ability Change requires Communication action in the right direction Sponsorship Coaching Training Resistance management Reinforcement Demonstrated ability to implement change Change in the performance or behavior Prosci. All Rights Reserved. 22

23 Your ADKAR Map Ability I am able to notes Score: 1-5 K-A Gap Barriers Capacity Prosci. All Rights Reserved. 23

24 Awareness Desire Knowledge Ability Change must Communication be reinforced to be sustained Sponsorship Coaching Training Resistance management Reinforcement Actions that ensure a change will continue Recognition and rewards to sustain change Prosci. All Rights Reserved. 24

25 Your ADKAR Map Reinforcement I will continue to notes Score: 1-5 Mechanisms Measurement Sustainment Prosci. All Rights Reserved. 25

26 Individual Change Management Outcomes When you create: You hear: A Awareness I understand why D Desire I have decided to K Knowledge I know how to A Ability I am able to R Reinforcement I will continue to Prosci. All Rights Reserved. 26

27 Awareness The Five Building Blocks for Successful Change Desire Knowledge Ability Reinforcement Prosci. All Rights Reserved. 27

28 Prosci ADKAR Map: Analysis ADKAR Your Change Effort to Capture People-Dependent ROI blog.prosci.com Project/Initiative: Awareness I understand why Desire I have decided to Knowledge I know how to Ability I am able to Reinforcement I will continue to Profile graph Barrier point Group name: Individual change definition: Group name: Score: Score: Score: Score: Score: K A R Barrier point: Individual change definition: Group name: Score: Score: Score: Score: Score: Barrier point: Individual change definition: barrier point first <=3 Group name: Individual change definition: Score: Score: Score: Score: Score: Barrier point: Group name: Individual change definition: Copyright Prosci All rights reserved. Score: Score: Score: Score: Score: Score: Score: Score: Score: Score: Barrier point: Barrier point: Prosci Inc All rights reserved. Prosci. All Rights Reserved. 28

29 ROI predictions assume high levels of ability and proficiency at or soon after go-live Prosci. All Rights Reserved

30 Aligning CM to Project Lifecycle General Project Lifecycle Kick off Major events Go Live Initiate Plan Design Develop Deploy Individual Change Journey Milestones Prosci ADKAR Model Organizational Change Mgmt Activities Prosci 3-Phase Process Phase 1: Preparing for Change Phase 2: Managing Change Phase 3: Reinforcing Change Strategy Plans Measures Prosci. All Rights Reserved. 30

31 Aligning CM to Project Lifecycle General Project Lifecycle Kick off Major events Go Live Initiate Plan Design Develop Deploy Individual Change Journey Milestones Prosci ADKAR Model ADKA R Organizational Change Mgmt Activities Prosci 3-Phase Process Phase 2: Plans Prosci. All Rights Reserved. 31

32 Building Your ADKAR Map Identify who has to do their jobs differently and define how Apply a model of how individuals change successfully Plot individual change journeys Your ADKAR Map for success Prosci. All Rights Reserved. 32

33 We are going to define our success milestones by the achievement of the outcomes defined by ADKAR Prosci ADKAR Map: Timeline ADKAR Your Change Effort to Capture People-Dependent ROI Project/Initiative: ADKAR Milestone Date Targets Groups: Example Group 3/18 4/19 5/26 7/12 10/15 Project Phases: Initiate Plan Design/Develop Deploy Sustain Timescale (weeks, months, quarters): Ocg Nov Dec Jan Feb March April May June July Aug Sept Example Group 3/18 4/19 5/26 7/12 10/15 Example Group 3/18 4/19 5/26 7/12 10/15 Example Group 3/18 4/19 5/26 7/12 10/15 Example Group 3/18 4/19 5/26 7/12 10/15 Prosci. All Rights Reserved. 33

34 Prosci ADKAR Map: Timeline ADKAR Your Change Effort to Capture People-Dependent ROI Project/Initiative: ADKAR Milestone Date Targets Project Phases: Timescale (weeks, months, quarters): Groups: Building Your ADKAR Map 1. Define 2. Sketch 3. Label 4. Specify Project Phases: ADKAR Milestone Initiate Plan Design/Develop Deploy Sustain Date Targets Timescale (weeks, months, quarters): 5. Plot your ADKAR Milestones on the timeline Groups: J F M A M J J A S O N D 5. Plot Example Group 1 3/18 4/19 5/26 7/12 10/15 1. Define your timescale 2. Sketch your high-level project phases 3. Label groups from ADKAR Map: Analysis 4. Specify Milestone Date Targets Copyright Prosci All rights reserved. Prosci Inc All rights reserved. Prosci. All Rights Reserved. 34

35 Prosci ADKAR Map: Timeline ADKAR Your Change Effort to Capture People-Dependent ROI blog.prosci.com Project/Initiative: ADKAR Milestone Date Targets Groups: Project Phases: Initiate Plan Design/Develop Deploy Sustain Timescale (weeks, months, quarters): Ocg Nov Dec Janc Feb March April May June July Aug Sept rosci ADKAR Map: Timeline KAR Your Change Effort to Capture People-Dependent ROI Translating your ADKAR Map Analysis into an ADKAR Map Timeline 1. Define and label your timescale (weeks, months, quarters). Project/Initiative: 1. Define 2. Sketch your high-level project phases (e.g. Initiate, Plan, Design/Develop, Deploy, Sustain). 3. Label the five groups you used for your ADKAR Map: Analysis. ADKAR Milestone Date Targets 4. Specify Milestone Date Targets for each ADKAR element for each group. 2. Sketch Project Phases: 5. Sketch your ADKAR Milestones on the timeline. Organizational Prosci Change Mgmt 3-Phase 6. Next steps: create the action plans that will support Ability at Go Live Timescale (weeks, Activities months, quarters): Process and attainment of each of the ADKAR Milestones you have defined. 3. Label 4. Specify ADKAR Milestone Date Targets Copyright Prosci All rights reserved. General Project Lifecycle Individual Change Journey Kick off Initiate Plan Design Develop Deploy Prosci ADKAR Milestones Sponsor roadmap Model Initiate Plan Design/Develop Phase 1: Preparing for Change Major events Phase 2: Managing Change Go Live Phase 3: Reinforcing Change Strategy Plans Measures Ocg Nov Dec Janc Feb March April Ma Project Phases: Timescale (weeks, months, quarters): Groups: J F M A M J J A S O N D Example Group 1 3/18 4/19 5/26 7/12 10/15 5. Plot Individual: Awareness Desire Knowledge Ability Reinforcement Organizational: Communication plan Resistance Mgmt Coaching plan Initiate Plan Design/Develop Deploy Sustain Training plan Prosci Inc All rights reserved. Prosci. All Rights Reserved. 35

36 Prosci ADKAR Map: Timeline ADKAR Your Change Effort to Capture People-Dependent ROI blog.prosci.com Project/Initiative: ADKAR Milestone Date Targets Groups: Project Phases: Initiate Plan Design/Develop Deploy Sustain Timescale (weeks, months, quarters): Ocg Nov Dec Janc Feb March April May June July Aug Sept Example Group Translating your ADKAR Map Analysis into an ADKAR Map Timeline 1. Define and label your timescale (weeks, months, quarters). 1. Define 2. Sketch your high-level project phases (e.g. Initiate, Plan, Design/Develop, Deploy, Sustain). 3. Label the five groups you used for your ADKAR Map: Analysis. 4. Specify Milestone Date Targets for each ADKAR element for each group. 2. Sketch 5. Sketch your ADKAR Milestones on the timeline. 6. Next steps: create the action plans that will support Ability at Go Live and attainment of each of the ADKAR Milestones you have defined. 3. Label 4. Specify ADKAR Milestone Date Targets Copyright Prosci All rights reserved. Project Phases: General Project Lifecycle Individual Change Journey Milestones Organizational Change Mgmt Activities Timescale (weeks, months, quarters): Kick off Go Live Initiate Plan Design Develop Deploy Prosci ADKAR Model Prosci 3-Phase Process Phase 1: Preparing for Change Major events Phase 2: Managing Change Phase 3: Reinforcing Change Strategy Plans Measures Groups: J F M A M J J A S O N D Example Group 1 3/18 4/19 5/26 7/12 10/15 5. Plot Individual: Awareness Desire Knowledge Ability Reinforcement Organizational: Communication plan Sponsor roadmap Resistance Mgmt Coaching plan Initiate Plan Design/Develop Deploy Sustain Training plan Prosci Inc All rights reserved. Prosci. All Rights Reserved. 36

37 Prosci ADKAR Map: Timeline ADKAR Your Change Effort to Capture People-Dependent ROI blog.prosci.com Project/Initiative: ADKAR Milestone Date Targets Groups: Project Phases: Initiate Plan Design/Develop Deploy Sustain Timescale (weeks, months, quarters): Ocg Nov Dec Janc Feb March April May June July Aug Sept Example Group 1/5 2/5 3/20 5/1 8/1 Map: Timeline rt to Capture People-Dependent ROI Translating your ADKAR Map Analysis into an ADKAR Map Timeline 1. Define and label your timescale (weeks, months, quarters). 1. Define 2. Sketch your high-level project phases (e.g. Initiate, Plan, Design/Develop, Deploy, Sustain). 3. Label the five Project groups Phases: you used for your ADKAR Map: Analysis. 4. Specify Milestone Date Targets for each ADKAR element for each group. 2. Sketch 5. Sketch your ADKAR Milestones on the timeline. 6. Next steps: Timescale create the (weeks, action plans months, that quarters): will support Ability at Go Live and attainment of each of the ADKAR Milestones you have defined. R 3. Label 4. Specify ADKAR Milestone Date Targets Copyright Prosci All rights reserved. Project Phases: General Project Lifecycle Individual Change Journey Milestones Organizational Change Mgmt Activities Timescale (weeks, months, quarters): Kick off Go Live Initiate Plan Design Develop Deploy Prosci ADKAR Model Prosci 3-Phase Process Phase 1: Preparing for Change Major events Phase 2: Managing Change Phase 3: Reinforcing Change Strategy Plans Measures Groups: J F M A M J J A S O N D Example Group 1 3/18 4/19 5/26 7/12 10/15 5. Plot Individual: Awareness Desire Knowledge Ability Reinforcement Organizational: Communication plan Sponsor roadmap Resistance Mgmt Coaching plan Initiate Plan Design/Develop Deploy Sustain Training plan changemanageme blog.pros Initiate Plan Design/Develop Deploy Su Ocg Nov Dec Janc Feb March April May June July Aug 10/15 Prosci Inc All rights reserved. Prosci. All Rights Reserved. 37

38 Prosci ADKAR Map: Timeline ADKAR Your Change Effort to Capture People-Dependent ROI Project/Initiative: ADKAR Milestone Date Targets Groups: Project Phases: Initiate Plan Design/Develop Deploy Sustain Timescale (weeks, months, quarters): Oct Nov Dec Jan Feb March April May June July Aug Sept Example Group Example Group Example Group 1/5 2/5 3/20 5/1 8/1 1/5 2/5 3/20 5/1 8/1 10/25 11/30 12/20 1/5 5/1 Example Group Example Group 12/21 1/21 2/15 3/2 7/1 12/5 1/10 3/7 4/19 7/15 ADKAR Milestone Date Targets Project Phases: Initiate Plan Design/Develop Deploy Sustain Timescale (weeks, months, quarters): Groups: J F M A M J J A S O N D Example Group 1 3/18 4/19 5/26 7/12 10/15 Copyright Prosci All rights reserved. Prosci Inc All rights reserved. Prosci. All Rights Reserved. 38

39 Aligning Project Deliverables to Individual Milestones Individual: Awareness Desire Knowledge Ability Reinforcement Organizational: Communication plan Sponsor roadmap Coaching plan Training plan Resistance mgmt plan Prosci. All Rights Reserved. 39

40 The right tool for the right job Prosci. All Rights Reserved. 40

41 For Practitioners What are we trying to achieve? Communications plan because we should have a communications plan Communications that build awareness of the need for change 41 Prosci. All Rights Reserved. 41

42 For Leaders and Managers What are you trying to achieve right now? Build awareness of the need for the new ERP system Speak at this town hall meeting by sharing details of our profitability forecasts at this town hall meeting. Prosci. All Rights Reserved

43 Building Your ADKAR Map Identify who has to do their jobs differently and define how Apply a model of how individuals change successfully Plot individual change journeys Your ADKAR Map for success Prosci. All Rights Reserved. 43

44 To Change summarize management activities are intended to drive individual change outcomes ADKAR provides clear individual change outcomes and milestones Plotting ADKAR milestones by group guides change management activities Don t throw spaghetti at the wall Change is a process, not a switch Right tool for the right job Prosci. All Rights Reserved. 44

45 Susie Patterson Director of Research and Development

How a project approach will build change management capability across your organization

How a project approach will build change management capability across your organization capability across your How a project approach will build change management capability across your Prosci Webinar How a project approach will build change management Enterprise Change Management Organizational

More information

The Prosci ADKAR Model. Presented by Catherine Curtis Change Management Practitioner Co-Chair Baywork

The Prosci ADKAR Model. Presented by Catherine Curtis Change Management Practitioner Co-Chair Baywork The Prosci ADKAR Model Presented by Catherine Curtis Change Management Practitioner Co-Chair Baywork Agenda for presentation Defining change management Individual change management Organizational change

More information

17/06/ ,348 students 11,000 staff approx 44 Colleges and Halls 300 Departments/units 5 Museums 100 Libraries. 800 years old So used to change..

17/06/ ,348 students 11,000 staff approx 44 Colleges and Halls 300 Departments/units 5 Museums 100 Libraries. 800 years old So used to change.. It will all be fine when we go live, won t it? Why business change management is vital. Sara Passmore Jackie Boyer Information about Oxford University 22,348 students 11,000 staff approx 44 Colleges and

More information

Prosci PCT Analyzer. Prosci Learning Guide. Project performance diagnostic based on the Prosci Project Change Triangle (PCT) Model

Prosci PCT Analyzer. Prosci Learning Guide. Project performance diagnostic based on the Prosci Project Change Triangle (PCT) Model Prosci PCT Analyzer Prosci Learning Guide PCT Analyzer In Brief: This Learning Guide will provide context and discussion points for the PCT Analyzer. What is the PCT Analyzer? Prosci s (PCT) Project Change

More information

ADKAR Foundation. Prosci ADKAR Dashboard. Prosci Webinar: ADKAR Dashboard. Copyright 2016 Prosci. All rights reserved. 1

ADKAR Foundation. Prosci ADKAR Dashboard. Prosci Webinar: ADKAR Dashboard. Copyright 2016 Prosci. All rights reserved. 1 Prosci ADKAR Dashboard 1 ADKAR Foundation 2 Copyright 2016 Prosci. All rights reserved. 1 Prosci ADKAR Model Awareness Of the need for change Desire To participate and support the change Knowledge On how

More information

Prosci PCT Analyzer. Prosci Learning Guide. Project performance diagnostic based on the Prosci Project Change Triangle (PCT) Model

Prosci PCT Analyzer. Prosci Learning Guide. Project performance diagnostic based on the Prosci Project Change Triangle (PCT) Model Prosci PCT Analyzer Prosci Learning Guide PCT Analyzer In Brief: This Learning Guide will provide context and discussion points for the PCT Analyzer. What is the PCT Analyzer? Prosci s (PCT) Project Change

More information

Overview. Genesys confidential and proprietary information. Unauthorized disclosure is prohibited. 2

Overview. Genesys confidential and proprietary information. Unauthorized disclosure is prohibited. 2 Overview Change Happens When Change Doesn t Happen Making Change Happen Organizational Change Management Organizational Readiness Assessment Case Study Summary Questions Genesys confidential and proprietary

More information

Panorama WRHA Public Health Staff Development December 10 & 11,

Panorama WRHA Public Health Staff Development December 10 & 11, Panorama WRHA Public Health Staff Development December 10 & 11, 2013 --------------------------------------------- Presentation Overview Panorama Overview Change Management Principles Change Readiness

More information

Outcomes Achieved on a Must-Win Project Prosci Webinar Slides

Outcomes Achieved on a Must-Win Project Prosci Webinar Slides Outcomes Achieved on a Must-Win Project Part 2: Outcomes Achieved through Success on a Must-Win Project Prosci Webinar What does a new change management journey look like for other organizations? Prosci.

More information

ADKAR Exercise Copyright Prosci

ADKAR Exercise Copyright Prosci Personal Change Worksheet (15 minutes) Overview ADKAR Exercise ADKAR is a goal-oriented change management model that allows change management teams to focus their activities on specific business results.

More information

Prosci Change Management For Managers. learn and Change

Prosci Change Management For Managers. learn and Change Prosci Change Management For Managers and Change A few words about the Prosci methodology We would like to introduce the benefits of applying the Prosci methodology for Change Management, supported by

More information

PASSPORT TO PERFORMANCE Your Year-End. Empowering you to do your best work every day

PASSPORT TO PERFORMANCE Your Year-End. Empowering you to do your best work every day Your Journey @ Year-End Empowering you to do your best work every day YOUR JOURNEY We know that our success as a business depends on the success of the people within it. When we help everyone continue

More information

Best Practices for Technology Change Management. Dave Schneider Jennifer Vaughan-Gibson

Best Practices for Technology Change Management. Dave Schneider Jennifer Vaughan-Gibson Best Practices for Technology Change Management Dave Schneider Jennifer Vaughan-Gibson Agenda 1. Technology Change Management Process Overview 2. Implementing Technology Change 3. Next Steps Change verb

More information

Workday Project Kickoff

Workday Project Kickoff BRANDEIS INBOUND TO WORKDAY Workday Project Kickoff Oct 26, 2017 Agenda 1. Welcome and Opening Remarks 2. Project Benefits and Guiding Principles 3. Collaborative Solutions Overview 4. Project Overview

More information

WyoCloud Change Agent Network Refresh. December 13 th, 2017

WyoCloud Change Agent Network Refresh. December 13 th, 2017 WyoCloud Change Agent Network Refresh December 13 th, 2017 1 AGENDA 1 Leadership Networks 2 Campus Communication 3 The Importance of Sponsorship 4 Change Agent Network 5 WyoCloud Team Support 6 What s

More information

NHS Improvement Overview Change Management the Systems and Tools for Managing Change October 2011

NHS Improvement Overview Change Management the Systems and Tools for Managing Change October 2011 NHS Improvement Overview Change Management the Systems and Tools for Managing Change October 2011 Change management - the Systems and Tools for Managing Change Scope of change management Change management

More information

Best Practices in managing change. Prosci

Best Practices in managing change. Prosci Best Practices in managing change Prosci www.change-management.com 2007 Copyright Prosci and Bill Cigliano What we will talk about Frameworks for change management Best practice findings 426 organizations,

More information

Prosci. All Rights Reserved. ADKAR and ADKAR terms are a registered trademark of Prosci. Used with Permission.

Prosci. All Rights Reserved. ADKAR and ADKAR terms are a registered trademark of Prosci. Used with Permission. Can t Do It Without You: Your Role in Creating Change That Your Lab Needs Barbara R. Swanson, M.Ed., MT(ASCP), CQA(ASQ) Objectives To summarize the basic research-based concepts of change management. To

More information

Transformation Services. Maximize the value of your investments

Transformation Services. Maximize the value of your investments Transformation Services Maximize the value of your investments The true realization of business value Making significant investments in software systems to improve your organization s business operations

More information

Overview This tutorial presents an overview of the ADKAR model for change management.

Overview This tutorial presents an overview of the ADKAR model for change management. Overview This tutorial presents an overview of the ADKAR model for change management. ADKAR is a goal-oriented change management model that allows change management teams to focus their activities on specific

More information

ERO Enterprise Compliance Auditor Manual & Handbook Florida Reliability Coordinating Council, Inc. Spring Workshop April 8-10, 2014

ERO Enterprise Compliance Auditor Manual & Handbook Florida Reliability Coordinating Council, Inc. Spring Workshop April 8-10, 2014 ERO Enterprise Compliance Auditor Manual & Handbook Florida Reliability Coordinating Council, Inc. Spring Workshop April 8-10, 2014 1 Presentation Team Andrew Williamson, FRCC Adina Mineo, NERC Agenda

More information

Making the Performance Evaluation Process Meaningful. Human Resources

Making the Performance Evaluation Process Meaningful. Human Resources Making the Performance Evaluation Process Meaningful Human Resources Objectives Designing a Meaningful Performance Management Process 90 Day Probationary Evaluation Annual Performance Evaluation & Policy

More information

University of Wollongong Deployment of BI and Analytics. Robert Sim Business Analyst Performance Indicators Unit University of Wollongong

University of Wollongong Deployment of BI and Analytics. Robert Sim Business Analyst Performance Indicators Unit University of Wollongong University of Wollongong Deployment of BI and Analytics Robert Sim Business Analyst Performance Indicators Unit University of Wollongong Agenda Overview of UOW UOW BI Implementation Change Management Processes

More information

SESSION 405 Tuesday, November 3, 10:00am - 11:00am Track: Industry Insights

SESSION 405 Tuesday, November 3, 10:00am - 11:00am Track: Industry Insights SESSION 405 Tuesday, November 3, 10:00am - 11:00am Track: Industry Insights Major Incident Management: From Inhibitor to Enabler Nicole Skibinski Manager, Service Assurance, Spectrum Health nicole.skibinski@spectrumhealth.org

More information

Using ADKAR to Implement Change. Organizational Development Winnipeg Regional Health Authority

Using ADKAR to Implement Change. Organizational Development Winnipeg Regional Health Authority Using ADKAR to Implement Change Organizational Development Winnipeg Regional Health Authority Session Goals To promote and support large organizational change while minimizing the impact on the daily operations.

More information

Introduction to Change Management. Tom Honey Kinetic Consulting PAVRO LIVE2017

Introduction to Change Management. Tom Honey Kinetic Consulting PAVRO LIVE2017 Introduction to Change Management Tom Honey Kinetic Consulting thoney@kineticconsulting.ca PAVRO LIVE2017 CH-CH-CH-CH CHANGES, TURN AND FACE THE CHANGE Change is part of our daily lives at work, at home

More information

SAP Enterprise Support Advisory Council Program Overview 2018

SAP Enterprise Support Advisory Council Program Overview 2018 SAP Enterprise Support Advisory Council Program Overview 2018 SAP SE April 2018 Agenda: Introduction to SAP Enterprise Support Advisory Council SAP Enterprise Support Advisory Council Focus Topics 2018

More information

Best Practices and Tools for Managing Organizational Change. Presenter: Stacy Aaron

Best Practices and Tools for Managing Organizational Change. Presenter: Stacy Aaron Best Practices and Tools for Managing Organizational Change Presenter: Stacy Aaron Learning Objectives To understand how a People Strategy can mitigate risks To understand how a People Strategy can Improve

More information

Teamcenter Page 1. Siemens PLM Software Siemens Product Lifecycle Management Software Inc. All rights reserved

Teamcenter Page 1. Siemens PLM Software Siemens Product Lifecycle Management Software Inc. All rights reserved Teamcenter 2007 Page 1 Teamcenter 2007 Launch Sammy Sit Marketing Director Teamcenter Marketing Asia Pacific Announcing Teamcenter 2007 Delivering as promised Fully Integrated PLM suite End-to-End, Collaborative

More information

Prosci Canada Coach the Trainer Program

Prosci Canada Coach the Trainer Program Prosci Canada Coach the Trainer Program Introduction Building an organizational competency in change management involves more than just training. Additional key elements include standards of practice to

More information

Building blocks of successful change

Building blocks of successful change Building blocks of successful change Tim Creasey Prosci, irector of & www.change-management.com Prosci 2009. eproduction or distribution prohibited. 1 Building blocks agenda Individual Project Organization

More information

SUPPLY CHAIN EXCELLENCE IN WIDEX. June 2016

SUPPLY CHAIN EXCELLENCE IN WIDEX. June 2016 SUPPLY CHAIN EXCELLENCE IN WIDEX June 2016 AGENDA 1. Presentation of Widex 2. The first year Creating a solid base 3. The second year Stabilizing the performance 4. The next steps Unleashing the competitive

More information

Prosci Orientation To Change Management For Employees. learn and Change

Prosci Orientation To Change Management For Employees. learn and Change Prosci Orientation To Change Management For Employees and Change A few words about the Prosci methodology We would like to introduce the benefits of applying the Prosci methodology for Change Management,

More information

Aligning Process Redesign and Change Management with Project Management (System Implementation Projects)

Aligning Process Redesign and Change Management with Project Management (System Implementation Projects) Aligning Redesign and Change Management with Project Management (System Implementation Projects) Kim Brant-Lucich Director of Redesign St. Joseph Health System Information Services HIMSS 2009: Project

More information

Roles in change management

Roles in change management Page 1 of 7 Welcome to the Change Management Tutorial Series Home Bookstore Training Tutorials Benchmarking Webinars Email this page to a friend Roles in change management Change management cannot be done

More information

MESA unconference: ROI & Justification for Manufacturing IT Solutions

MESA unconference: ROI & Justification for Manufacturing IT Solutions MESA unconference: ROI & Justification for Manufacturing IT Solutions (Original presentation available on MESA site library) Co-Hosts Darren Riley Solution Consultant Apriso Chair, MESA ROI WG Scott Daugherty

More information

SharePoint Implementation & Adoption Challenges

SharePoint Implementation & Adoption Challenges SharePoint Implementation & Adoption Challenges July 2014 2014 Expressworks Change is inevitable. Results are intentional. www.expressworks.com Overview SharePoint adoption is no different from any other

More information

Laura Barnard, PMP Founder, PMO Strategies

Laura Barnard, PMP Founder, PMO Strategies Laura Barnard, PMP Founder, PMO Strategies Bringing a vast array of PMO capability building solutions to organizations eager to create sustainable change since 1999 Nonprofit Service Executive Director,

More information

Financial Intelligence NCIA 2016 National Training Conference Pittsburg April 18 th & 19 th

Financial Intelligence NCIA 2016 National Training Conference Pittsburg April 18 th & 19 th Financial Intelligence NCIA 2016 National Training Conference Pittsburg April 18 th & 19 th What is financial intelligence? Financial Intelligence Overview of Training Topics Process for developing key

More information

Prosci Best Practices in Change Management, 2016 Edition

Prosci Best Practices in Change Management, 2016 Edition 1000 500 0 Prosci Webinar: New areas of research Prosci Best Practices in Change Management, 2016 Edition New areas of research 1 Prosci Research Foundation 9 studies 17 years 4500 participants What works?

More information

MAKE IT STICK! A Change Management Journey

MAKE IT STICK! A Change Management Journey MAKE IT STICK! A Change Management Journey A story of covert organizational transformation and overt project management interventions. Stacey Ferguson, Mark Alt, Paul Burke, Dan Olson 04.12.11: PMI-MN

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDA NEW AND REVISED IIM

VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDA NEW AND REVISED IIM VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDA JULY 2015 MAY 2018 May 21, 2018 IIM-LD-195.10 Virginia Stormwater Management Program May 21,

More information

2017 Training Programmes

2017 Training Programmes 2017 Training Programmes Job Analysis & Job Evaluation Job Analysis This programme will enable you to translate strategic, tactical and operational organisational goals into clear accountabilities and

More information

Nexus Recruitment Bell Canada Case Study

Nexus Recruitment Bell Canada Case Study Nexus Recruitment Bell Canada Case Study Maureen Bell Consultant Careers Practice CASS Conference April 2003 Bell Canada 43,700 employees 25 million customer connections IP/broadband Wireline and wireless

More information

Dynamic Reallocation of Portfolio Funds

Dynamic Reallocation of Portfolio Funds Complete Perspective. Smart Decisions. #StrategicPMO Dynamic Reallocation of Portfolio Funds Ben Chamberlain Chief Product & Marketing Officer Ben.Chamberlain@umt360.com Agenda What s wrong with traditional

More information

When Project Focused BPM is All You Have A Process Centric Approach Applied on a Successful Business Transformation

When Project Focused BPM is All You Have A Process Centric Approach Applied on a Successful Business Transformation When Project Focused BPM is All You Have A Process Centric Approach Applied on a Successful Business Transformation BBC 2014 November 06, 2014 Laura Thompson Practice Lead, Business Transformation Capstone

More information

Change Management: You re Doing it Wrong

Change Management: You re Doing it Wrong Change Management: You re Doing it Wrong A White Paper 2017, Inc. All Rights Reserved. All product names and/or slogans mentioned herein may be trademarks or registered trademarks of their respective companies.

More information

Total. Innovation Networking Professional Development

Total.  Innovation Networking Professional Development 2016 2017 February February 9 & 10, 10, 2017 2016 San San Francisco Francisco, CA Total User Customer Experience Experience Customer Experience Planning Customer Experience Planning Aligning CX, UX and

More information

Module 3: How to measure and maximize your Investment in the Addressable Platforms. Peter Vandre

Module 3: How to measure and maximize your Investment in the Addressable Platforms. Peter Vandre Module 3: How to measure and maximize your Investment in the Addressable Platforms Peter Vandre 1 Agenda Platform tracking innovation and impact on measurement Our integrated measurement framework How

More information

Workday Implementation Update

Workday Implementation Update Workday Implementation Update Feb. 2017 Human Resources Contents Project Background Project Background Why Workday? Project Objectives Project Overview Approach Scope Timelines What s next? Q&A Project

More information

Total Quality Human Resources Management

Total Quality Human Resources Management Total Quality Human Resources Management By: Tiona VanDevender Introduction Total quality human resources management (TQHRM) is an approach to human resources management that involves many of the concepts

More information

PEPS PRECERTIFICATION PROGRAM UPDATE. February 2018

PEPS PRECERTIFICATION PROGRAM UPDATE. February 2018 PEPS PRECERTIFICATION PROGRAM UPDATE February 2018 Discussion Topics A B C D E F G H What is the precertification program? What has been done on this project? What is the ideal outcome? How will this benefit

More information

Programme Manager - Strategic Initiatives

Programme Manager - Strategic Initiatives Programme Manager - Strategic Initiatives Location: [Global] Category: Project Management *Position location to be determined by home country of successful candidate in a jurisdiction (country of US state)

More information

Oracle Cloud Blueprint and Roadmap Service. 1 Copyright 2012, Oracle and/or its affiliates. All rights reserved.

Oracle Cloud Blueprint and Roadmap Service. 1 Copyright 2012, Oracle and/or its affiliates. All rights reserved. Oracle Cloud Blueprint and Roadmap Service 1 Copyright 2012, Oracle and/or its affiliates. All rights reserved. Cloud Computing: Addressing Today s Business Challenges Business Flexibility & Agility Cost

More information

Entry Plan. Deirdre Hargrove-Krieghoff 9/25/14

Entry Plan. Deirdre Hargrove-Krieghoff 9/25/14 Entry Plan Deirdre Hargrove-Krieghoff 9/25/14 Entry Plan Table of Contents Introduction 3 Guiding Principles 4 Goals 6 Entry Plan Phase I 7 Entry Plan Phase II 8 Entry Plan Phase III 9 Conclusion 10 Introduction

More information

Creating an IWMS Implementation Plan

Creating an IWMS Implementation Plan Creating an IWMS Implementation Plan Overview The increased information available through an Integrated Workplace Management System (IWMS) impacts every part of an organization and can dramatically increase

More information

Kronos Workforce Ready Implementation Methodology and Customer Responsibilities for WFR Time Keeping Implementations

Kronos Workforce Ready Implementation Methodology and Customer Responsibilities for WFR Time Keeping Implementations DATASHEET WORKFORCE READY DEPLOYMENT GUIDE Kronos Workforce Ready Implementation Methodology and Customer Responsibilities for WFR Time Keeping Implementations As you begin your Kronos Workforce Ready

More information

MODERNIZE PORTFOLIO & PROJECT MANAGEMENT. Erika K. Kemp, PMP MPPM Project Director

MODERNIZE PORTFOLIO & PROJECT MANAGEMENT. Erika K. Kemp, PMP MPPM Project Director MODERNIZE PORTFOLIO & PROJECT MANAGEMENT Erika K. Kemp, PMP MPPM Project Director 1 MPPM Business Case Vision of the Future State System capabilities Organizational capabilities Process design Decision

More information

Leading Practice: Approaches to Organizational Change Management

Leading Practice: Approaches to Organizational Change Management Leading Practice: Approaches to Organizational Change Management Abstract This document provides recommended approaches to organizational change management (OCM) when implementing CA Project and Portfolio

More information

Digital Transformation Blueprint. The Dawn of the Digital Industrial

Digital Transformation Blueprint. The Dawn of the Digital Industrial Digital Transformation Blueprint The Dawn of the Digital Industrial The age of the Industrial Internet of Things is upon us Let GE Digital help get you get started. Build your Digital Transformation Blueprint

More information

Executive Programmes 2017

Executive Programmes 2017 Executive Programmes 2017 INTRODUCTION The executive programme serves to provide individuals and groups the opportunity to share in the knowledge base developed and maintained by the academics of the School

More information

OTA. BT has expanded the staff and managers who look after LLU at the Chester Service Centre and are implementing a parallel Service Centre in Leeds.

OTA. BT has expanded the staff and managers who look after LLU at the Chester Service Centre and are implementing a parallel Service Centre in Leeds. 7th February 25 Progress Update on Adjudication Scheme - 3 I wish to update you further on the progress Adjudication Scheme as applied to LLU. Since my last letter 23 rd November 24 we have achieved some

More information

MEETING THE CHALLENGE OF TRANSFORMATIONAL CHANGE:

MEETING THE CHALLENGE OF TRANSFORMATIONAL CHANGE: MEETING THE CHALLENGE OF TRANSFORMATIONAL CHANGE: Do You Have the Transformational Change Leadership to Cross the Abyss? Implementation Management Associates, Inc. Corporate Headquarters 1658 Cole Blvd.

More information

2/14/2013. Software Engineering. Session 3 Sub-Topic. 1 Strategy Alignment Elicitation Methodology. Dr. Jean-Claude Franchitti

2/14/2013. Software Engineering. Session 3 Sub-Topic. 1 Strategy Alignment Elicitation Methodology. Dr. Jean-Claude Franchitti Software Engineering Session 3 Sub-Topic Strategy Alignment Elicitation Methodology Dr. Jean-Claude Franchitti New York University Computer Science Department Courant Institute of Mathematical Sciences

More information

Measuring the ROI of Online Learning. Patti Phillips, Ph.D.

Measuring the ROI of Online Learning. Patti Phillips, Ph.D. Measuring the ROI of Online Learning Patti Phillips, Ph.D. patti@roiinstitute.net Objectives Describe the difference between the benefits and the costs of online learning Calculate the ROI for online learning

More information

The Coaching Playbook. Your Must-Have Game Plan for Maximizing Employee Performance

The Coaching Playbook. Your Must-Have Game Plan for Maximizing Employee Performance The Coaching Playbook Your Must-Have Game Plan for Maximizing Employee Performance CONTENTS Coaching Overview What is Coaching? Coaching Categories Coaching Relationships Who Can Be a Coach? Coaching Personas

More information

Career Planning 8 Stages of Success Carolinas PGA Big Week

Career Planning 8 Stages of Success Carolinas PGA Big Week Career Planning 8 Stages of Success 2018 Carolinas PGA Big Week Why Are We Here? Career > Job What is Your Career? Goals Experience Career = Skills Values Education Why Your Career Is Important The average

More information

Alacer Gold Corporation Project ATOM. May 15, 2013 Session 4662: Learn How to Implement SAP Business Suite in Only Four Months

Alacer Gold Corporation Project ATOM. May 15, 2013 Session 4662: Learn How to Implement SAP Business Suite in Only Four Months Alacer Gold Corporation Project ATOM May 15, 2013 Session 4662: Learn How to Implement SAP Business Suite in Only Four Months Alacer Gold Background Alacer Gold Corporation is a 400K oz gold producer with

More information

Michigan Integrated Food and Farming Systems 2005 Marketing & Communications Plan

Michigan Integrated Food and Farming Systems 2005 Marketing & Communications Plan Michigan Integrated Food and Farming Systems 2005 Marketing & Communications Plan Table of Contents 1. MIFFS Organization Background Vision Purpose Principles 2. MIFFS Marketing Communications Objectives

More information

Building a Change Capable Organization: The Blueprint (PART 1 OF 2) LAMARSH.COM

Building a Change Capable Organization: The Blueprint (PART 1 OF 2) LAMARSH.COM Building a Change Capable Organization: The Blueprint (PART 1 OF 2) LAMARSH.COM 332 S MICHIGAN AVE, 9TH FLOOR CHICAGO, ILLINOIS 60604 USA P. 312.464.1349 F. 413.751.3704 A BLUEPRINT FOR BUILDING A CHANGE

More information

Sponsor/CRO Partnership Optimization

Sponsor/CRO Partnership Optimization Insight Brief Sponsor/CRO Partnership Optimization Developing a CRO Governance Model Geoff Garabedian, Vice President and Managing Director, Consulting at Quintiles Josh Samon, Principal Life Sciences

More information

From Both Sides: TSP from Within & Beyond

From Both Sides: TSP from Within & Beyond H-1 Weapons System Support Activity (WSSA) From Both Sides: TSP from Within & Beyond Presenter: Susan Weaver AH-1W Block Manager susan.weaver@navy.mil 1 Background Two years ago my presentation was on

More information

The Ultimate Guide to Performance Check-Ins

The Ultimate Guide to Performance Check-Ins The Ultimate Guide to Performance Check-Ins The Ultimate Guide to Performance Check-Ins January 2017 1 Table of Contents 03 Introduction 03 Definition of the Performance Check-In 04 05 Rise of Check- Ins

More information

Top 10 HR Risks for Businesses and How to Avoid Them

Top 10 HR Risks for Businesses and How to Avoid Them Top 10 HR Risks for Businesses and How to Avoid Them The Executive's Roadmap to Best-in-Class HR Strategy 2014 TriNet Group, Inc. All rights reserved. Reproduction or distribution in whole or part without

More information

ITIL in the Workplace The Practical Application of a Best Practice Framework Susan Ryan April 3, 2009 Agenda Hello! Why IT Service Management? ITIL 101 Maturity Assessment and Roadmaps Project Foundation

More information

CY2017 Objective Setting. Feb 2017

CY2017 Objective Setting. Feb 2017 CY2017 Objective Setting Feb 2017 1 CY2017 Objective Setting 1 6 Feb Finalize CY17 BU/Regional/Functional Objectives 6 10 Feb HR communication sessions 6 28 Feb Employee can start to create their objectives

More information

Debra J. Perry Harris Corporation. How Do We Get On The Road To Maturity?

Debra J. Perry Harris Corporation. How Do We Get On The Road To Maturity? How Do We Get On The Road To Maturity? Debra J. Perry Harris Corporation NDIA Conference - 1 What do we want? From this To this But how? NDIA Conference - 2 Where Do We Start? NDIA Conference - 3 Government

More information

CMP286. Mod Title: Improving TNUoS Predictability Through Increased Notice of the Target Revenue used in the TNUoS Tariff Setting Process.

CMP286. Mod Title: Improving TNUoS Predictability Through Increased Notice of the Target Revenue used in the TNUoS Tariff Setting Process. CUSC Modification Proposal Form CMP286 Mod Title: Improving TNUoS Predictability Through Increased Notice of the Target Revenue used in the TNUoS Tariff Setting Process. At what stage is this document

More information

ABB ServicePro 4.0 Service Management System

ABB ServicePro 4.0 Service Management System ABB ServicePro 4.0 Service Management System Presented by Paul Radcliffe PS Service June 6, 2014 Slide 1 Questions customers ask How successful is my maintenance program? - Am I performing the right PM

More information

IIA 2015 Worldwide survey of 15,000 internal auditors

IIA 2015 Worldwide survey of 15,000 internal auditors IIA 2015 Worldwide survey of 15,000 internal auditors Michael P. Cangemi CPA, retired CISA, CGMA retired Former CFO, CEO & Director; Audit Com Chair Senior Fellow Rutgers CA Lab Senior Advisor/Investor

More information

Engaging Staff in Change Management: HR Transformation Process in the School of Medicine and Public Health

Engaging Staff in Change Management: HR Transformation Process in the School of Medicine and Public Health Engaging Staff in Change Management: HR Transformation Process in the School of Medicine and Public Health Brian Gittens, EdD, SPHR, SCP-HR Associate Dean of HR, Equity, and Inclusion Session Agenda Overview

More information

Employee Performance Management Process. Management Training Participant Workbook

Employee Performance Management Process. Management Training Participant Workbook Employee Performance Management Process Management Training Participant Workbook Welcome to Training on EPMP Today s course is focused on preparing managers for the immediate implementation of the DPS

More information

The Enterprise SOA Implementation Lifecycle Explained

The Enterprise SOA Implementation Lifecycle Explained The Enterprise SOA Implementation Lifecycle Explained Applies to: Enterprise Architects, Business Process Experts Summary Enterprise SOA implementation has been mysterious to many. It can be demystified

More information

Prosci Change Managers Program

Prosci Change Managers Program Prosci Change Managers Program Introduction Managers & supervisors play a key role in managing the people side of change. However, they often lack an awareness of the importance of their role in the change

More information

Business Case for Value Realization During Implementation Delivering Projects on Time, on Budget, and on Value

Business Case for Value Realization During Implementation Delivering Projects on Time, on Budget, and on Value SAP Thought Leadership Value Realization Business Case for Value Realization During Implementation Delivering Projects on Time, on Budget, and on Value The Business Transformation Services group of SAP

More information

PROFESSIONAL DEVELOPMENT COURSES Institute for Professional Excellence

PROFESSIONAL DEVELOPMENT COURSES Institute for Professional Excellence PROFESSIONAL DEVELOPMENT COURSES 2018 Institute for Professional Excellence INSTITUTE FOR PROFESSIONAL EXCELLENCE (IPEx) Training to Advance Your Career Davenport University s IPEx offers results-oriented,

More information

Okaloosa RESTORE Advisory Committee (ORAC) January 8, :30 PM 4:30 PM Emerald Coast Convention Center

Okaloosa RESTORE Advisory Committee (ORAC) January 8, :30 PM 4:30 PM Emerald Coast Convention Center Okaloosa RESTORE Advisory Committee (ORAC) January 8, 2014 2:30 PM 4:30 PM Emerald Coast Convention Center Agenda Minutes Approval Consultant s Administrative Report Scheduled Presentations - None Regional

More information

IT-28 Risk Mitigation Policy and Peer Review Process

IT-28 Risk Mitigation Policy and Peer Review Process IT-28 Risk Mitigation Policy and Peer Review Process Indiana University University Information Security Office September 12, 2017 Agenda For Today What is Policy IT-28? Policy Goals & Past Successes Leveraging

More information

Embedding High-Performance Culture through New Approaches to Performance Management and Behavior Change

Embedding High-Performance Culture through New Approaches to Performance Management and Behavior Change Embedding High-Performance Culture through New Approaches to Performance Management and Behavior Change Elaine D. Pulakos, PDRI a CEB Company Alan Colquitt, Eli Lilly and Company Sharon Arad, Cargill Session

More information

ON-THE-JOB TRAINING BLUEPRINT

ON-THE-JOB TRAINING BLUEPRINT ON-THE-JOB TRAINING BLUEPRINT SUPERVISOR MODULE BUILDING EFFECTIVE CALL CENTRE WORK TEAMS Developed in collaboration with Customer Service Transformation Pte Ltd Copyright Singapore Productivity and Standards

More information

PPM Assessment. Analyze Your PPM Practices In-Depth for Systematic Improvement

PPM Assessment. Analyze Your PPM Practices In-Depth for Systematic Improvement Assessment Analyze Your Practices In-Depth for Systematic Improvement Your Journey Starts Here. Understand Your Strengths & Weaknesses Evaluate Performance and Required Next Steps by Area Build a Improvement

More information

CHANGE MANAGEMENT IN PROCUREMENT TRANSFORMATION. Bloomberg. Page 1

CHANGE MANAGEMENT IN PROCUREMENT TRANSFORMATION. Bloomberg. Page 1 CHANGE MANAGEMENT IN PROCUREMENT TRANSFORMATION Bloomberg Page 1 Agenda and Objective Defining the challenges we faced Creating the business case Building the change management playbook Setting the strategy

More information

Program Management Professional (PgMP)

Program Management Professional (PgMP) Program Management Professional (PgMP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published

More information

CSULB Innovation Challenge. How to Write a Business Plan

CSULB Innovation Challenge. How to Write a Business Plan CSULB Innovation Challenge How to Write a Business Plan Purpose of a Business Plan A business plan for a potential venture reveals the business ability to Create or add significant value to a customer

More information

Short-Medium Term Marketing Plan template Voluntary Sector Organisation

Short-Medium Term Marketing Plan template Voluntary Sector Organisation Short-Medium Term Marketing Plan template Voluntary Sector Organisation Contents 1.0 Executive summary 2.0 Current situation Where are we now? 2.1 The Marketing audit 2.1.1 Financial summary current funding

More information

Minnesota District Freight Plans - Work Plan

Minnesota District Freight Plans - Work Plan Minnesota District Freight Plans - Work Plan Overview of Tasks and Deliverables The work will be completed in six tasks. Each of these tasks is described in detail in the following section. The District

More information

Predictive Safety s Fatigue Management System: Benefits Realization Report

Predictive Safety s Fatigue Management System: Benefits Realization Report Predictive Safety s Fatigue Management System: Benefits Realization Report 1. Scope This document contains the benefits realization information as required for a follow up on FMS Implementation project.

More information

Next Meeting: Senate Appreciation Luncheon! July 20, 2017 Harrison/Small Auditorium

Next Meeting: Senate Appreciation Luncheon! July 20, 2017 Harrison/Small Auditorium Staff Senate Meeting Agenda South Meeting Room, Newcomb Hall June 15, 2017 11:00 AM 1 PM 11:00 Welcome & Announcements Maggie Stein and Jess Wenger 11:05 Senate Business: Bylaws Revision Senate Business:

More information

SESSION 608 Tuesday, November 3, 2:45pm - 3:45pm Track: Service Support and Operations

SESSION 608 Tuesday, November 3, 2:45pm - 3:45pm Track: Service Support and Operations SESSION 608 Tuesday, November 3, 2:45pm - 3:45pm Track: Service Support and Operations Measuring Operational Efficiency and Value Rae Ann Bruno President, Business Solutions Training Inc. rbruno@businesssolutionstraining.com

More information

Health and Wellbeing Strategy : Making Newnham a great place to work

Health and Wellbeing Strategy : Making Newnham a great place to work 2016-2018: Making Newnham a great place to work 1. Introduction Newnham College is committed to providing a working environment which actively promotes the positive health and wellbeing of all Staff and

More information