1 Information Technology Enterprise Data Management August 2, 2012 Marvin Santerfeit / Justin Lofquist
2 Agenda Agenda ERO PMO Project management process Data Management Business Needs, ERO PMO Objectives and ERO PMO Solutions Universal Data Repository ERO Data Management Solution Example Summary Question and Answers 2 RELIABILITY ACCOUNTABILITY
3 ERO Project Management Office Introduction The purpose of the ERO PMO is to manage the delivery of software solutions that support the business objectives outlined by the Electric Reliability Organization. This is achieved through: h The implementation of industry validated project management best practices A thorough understanding of the business landscape, focused on needs, objectives and constraints. 3 RELIABILITY ACCOUNTABILITY
4 ERO Project Management Office The ERO PMO will manage, coordinate and execute Missioni projects that enable effective and efficient business operations through the use of technology. Project Management A discipline that promotes project management best practices and standards for a consistent approach to execute projects Defined project management methodology Promotion of stakeholder khld communication i Centralized project tracking and reporting Consistent project oversight 4 RELIABILITY ACCOUNTABILITY
5 Project Life Cycle Initiating Planning Executing Closing Project Management Process Progression of defined phases within a project that connect the beginning of a project with it s end. Project management processes support the ability to successfully complete each phase and provide needed input for subsequent phases. 5 RELIABILITY ACCOUNTABILITY
6 Project Initiation Initiating Collectively, the stakeholders and the ERO PMO will act under the authorization of the ERO EMG to collaboratively define the project. Key Actions and Deliverables Develop the Project Charter Explicitly states project authority, funding and commitment for resources Outlines the project objectives, constraints and critical success factors Defines tentative project timeline and milestones Identifies project scope Initiating Planning Executing Closing 6 RELIABILITY ACCOUNTABILITY
7 Project Planning Planning The project team will define the best courses of action to take to obtain the project objectives. Key Actions and Deliverables Develop project requirements Identify resources (vendor or ERO sourced) Kick off meeting Create management plans Plans not specifically associated to project tasks Quality, change control, communications, risk management Initiating Planning Executing Closing 7 RELIABILITY ACCOUNTABILITY
8 Project Executing Execution The project team will take action on the project activities and maintain alignment with the project plan, ERO and objectives. Execute Key Actions and Deliverables Perform actual work (develop application) Carry out quality assurance on work items Manage ageand report progress pogess Risk, change and issues management Manage external resources Initiating Planning Executing Closing 8 RELIABILITY ACCOUNTABILITY
9 Project Closing Closing The project team delivers a solution, accepted by the business, and all outstanding efforts are brought to a close. Project Closure Key Actions and Deliverables Delivery of solution, including training and documentation Lessons Learned for future projects Input into further projects in the program Dissolution of the project team Initiating Planning Executing Closing 9 RELIABILITY ACCOUNTABILITY
10 Project Success Top 3 Project Success Factors User Involvement Defined roles, availability, ownership Executive Management Support Active project sponsor, effective status reporting Clear Business Objectives Used to measure project success 10 RELIABILITY ACCOUNTABILITY
11 Current Business Needs 11 RELIABILITY ACCOUNTABILITY
12 Business Objectives Risk Based Standards Enterprise Data Management Convert data into information that can be leveraged in risk cluster identification Operational Efficiency Reduce workload by reducing input of duplicate data Aggregation and presentation of data in appropriate formats Transparency Dissemination of data across industry in order to foster a culture of learning and collaboration 12 RELIABILITY ACCOUNTABILITY
13 ERO PMO Objectives Effectiveness Enterprise Data Management Collection of data that avoids duplication and contradiction Applications that enables quick and accurate presentation Adaptability Ability to quickly react to changing business requirements with minimal cost Confidentiality Access levels applied to all data elements within the enterprise 13 RELIABILITY ACCOUNTABILITY
14 ERO PMO Solutions Enterprise Data Management Enterprise Application Development Standardization of application platforms and methodologies Service Oriented Architecture (SOA) and SharePoint Event Information Data Store (EIDS) Application Centralize functionality of isolated applications sprinkled throughout the landscape into an enterprise level solution capable of supporting collaborationand and changing business needs. Data Warehouse Repository of historical information 14 RELIABILITY ACCOUNTABILITY
15 Universal Data Repository Business Intelligence Tools Executive Dashboard Data Analysis Modeling - Reporting Regions NERC Data Warehouse Historical data Multiple source data Consistent reporting Trending/Analysis Data Extract Process CRATS TADS GADS DADS EA Industry Secure Access Operational Data 15 RELIABILITY ACCOUNTABILITY
16 Enterprise Data Management ERO PMO Solution Example EIDS Application Centralize functionality of isolated applications sprinkled throughout the landscape into an enterprise level solution capable of supporting collaboration and changing business needs. Event Analysis Support Reliability Assessment and Performance Analysis Collaboration with Cyber Security Input and Access by Regions and Registered Entities 16 RELIABILITY ACCOUNTABILITY
17 Information Technology Summary Summary Utilize consistent methodology (PMO) Create standardized Enterprise class applications Build applications based upon requirements Foster transparency by providing access (secure) acrosseroand and Industry Reduce cost and workload by improving efficiency 17 RELIABILITY ACCOUNTABILITY
18 Questions and Answers Questions? 18 RELIABILITY ACCOUNTABILITY
Establishing a Program Management Office
Establishing a Program Management Office Agenda Why companies need Program Management 3 Objectives of Program Management 4 Program and Project Management definitions 5 Program Management infrastructure
More informationSummary of 2016 Board of Trustees Standards Oversight and Technology Committee Survey
Summary of 2016 Board of Trustees Standards Oversight and Technology Committee Survey Overview NERC engaged TalentQuest to conduct its annual Board of Trustees Standards Oversight and Technology Committee
More informationMonthly Independent Verification and Validation Assessment Report
Monthly Independent Verification and Validation Assessment Report Florida Planning, Accounting, and Ledger Management (PALM) Project October 2017 Date: 11/13/2017 Version 1.0 Table of Contents Executive
More information5 DIMENSIONS OF CHANGE MANAGEMENT AND PROJECT MANAGEMENT INTEGRATION
THOUGHT LEADERSHIP ARTICLE 5 DIMENSIONS OF CHANGE MANAGEMENT AND PROJECT MANAGEMENT INTEGRATION The disciplines of change management and project management understandably cross paths throughout the execution
More informationStep 1: Perform Blueprint Project Management
Step 1: Perform Blueprint Project Management Version 1.5, December 2006 1. Step Description and Purpose The Perform Blueprint Project Management step is intended to establish the key supporting project
More informationPROJECT MANAGEMENT. By Pompeyo Rios
PROJECT MANAGEMENT By Pompeyo Rios PROJECT A project is a temporary endeavor undertaken to create a unique product, service, or result. Por example, constructing a building or plant, or implementing, improving,
More informationPROCESS TRAINING. DIR PM Lite 2.0 Process Training v2.0 1
PROCESS TRAINING 1 PM Lite (Project Management Lite) is a project management process made up of tools, templates, and best practices that empowers its users to be more efficient and effective in project
More informationTusla Programme Management (PMO) Design and Establishment. Fergal Collins 20 th September 2018
Tusla Programme Management (PMO) Design and Establishment Fergal Collins 20 th September 2018 1 Contents Tusla Overview Executive Summary. Choosing an operating model for the PMO. 3 PMO Models to choose
More informationPMO Services Checklist
PMO Services Checklist by IMPACTbyLaura.com Services Checklist This resource is a list of possible services and categories that you can consider when determining how you will drive IMPACT with your PMO.
More informationCloudy skies. How to bring clarity to your cloud platform in order to optimize your investment. September 2016
Cloudy skies How to bring clarity to your cloud platform in order to optimize your investment September 2016 The benefits of the cloud are clear Flexibility Scalability Accessibility Decreased initial
More informationProject Charter. A. General Information
A. General Information Project Title: Brief Project Description: Prepared By: Date: Version: B. Project Objective: Explain the specific objectives of the project. For example: What value does this project
More informationRAI Compliance Activities Overview
RAI Compliance Activities Overview Updated on July 10, 2014 NERC Report Title Report Date I 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com 1. The End State Vision
More informationNPCC 2018 Corporate Goals
NPCC 2018 Corporate Goals Approved by the NPCC Board at its January 31, 2018 Meeting On November 9, 2017 the NERC Board of Trustees approved an ERO Enterprise Operating Plan that identifies the ERO Enterprise
More information21 st Century Manufacturing Excellence:
21 st Century Manufacturing Excellence: Securing a Sustainable Future through an Enterprise Architecture Presented by Lance Fountaine Alcoa GPM Manufacturing Solutions Manager Alcoa at a Glance Ø Founded
More informationWho Should be on Your Project Team: The Importance of Project Roles and Responsibilities
Who Should be on Your Project Team: The Importance of Project s and One significant factor contributing to the success of projects is having the right people engaged in the process. Who are the right stakeholders
More informationMonthly Independent Verification and Validation Assessment Report
Monthly Independent Verification and Validation Assessment Report Florida Planning, Accounting, and Ledger Management (PALM) Project February 2018 Date: 3/12/2018 Version 1.0 Table of Contents Executive
More informationTHE STANDARD FOR PROGRAM MANAGEMENT
THE STANDARD FOR PROGRAM MANAGEMENT COURSE STRUCTURE INTRODUCTION Module 1 PROGRAM MANAGEMENT PERFORMANCE DOMAINS Module 2 PROGRAM STRATEGY ALIGNMENT Module 3 PROGRAM BENEFITS MANAGEMENT Module 4 COURSE
More informationEnterprise Risk Management
Enterprise Risk Management A Roadmap For Implementation June 12, 2018 Presented by: Speaker Name Marianne Turnbull CohnReznick LLP 4 Becker Farm Road Roseland, NJ 07068 P: 973-228-3500 E:marianne.turnbull@cohnreznick.com
More informationISACA Systems Implementation Assurance February 2009
ISACA Pressures Today Pressure to increase realization of value from IT spending Pressure to deliver on IT projects at a time when resources/budgets are constrained Pressure from risk of technology-based
More informationContents Introduction... 1 Choosing between Portal and Team Site... 1 Finding Information is Key... 2 Initiating Development...
AMIRI SETTLES Contents Introduction... 1 Choosing between Portal and Team Site... 1 Finding Information is Key... 2 Initiating Development... 2 Measure, Build, Test and Deploy... 2 Managing the Steady
More informationPD Re-engineering Program Charter
PD Re-engineering Program Charter Version:.0 Date: May 0, 0 Page Table of Contents INTRODUCTION... PROGRAM PURPOSE... PROGRAM OBJECTIVES... PROGRAM SCOPE DEFINITIONS... PD Re-engineering Program Scope
More information2015 Project Execution Training December 1, 2015
2015 Project Execution Training December 1, 2015 Project Management Office Overview Vision Statement The University of Lethbridge IT PMO Will: Enable Project Teams to be successful through providing a
More informationProgram Management Effectiveness
Program Management Effectiveness The Lost Art May 19, 2016 Keynote Speaker Robert Bragg Director, Management Consulting Xerox HR Services Robert.Bragg@xerox.com Robert Bragg is responsible for developing,
More informationQUICK FACTS. Delivering Business Intelligence to a Large Software Company TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES.
[ Information Technology, Application Management Outsourcing ] TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES Client Profile Industry: Software Revenue: $74 billion (enterprise-wide) Employees: Approximately
More informationEnterprise Architecture
Enterprise Architecture The Guide is definitive. Reality is frequently inaccurate. Douglas Adams - The Restaurant at the End of the Universe Webinar Topic Enterprise Architecture (EA) at UC Overview Domains
More informationPROJECT SCOPE STATEMENT
PROJECT SCOPE STATEMENT VERSION: V01 REVISION DATE: [03.22.10] Approval of the Project Scope Statement indicates an understanding of the purpose and content described in this document. By signing this
More informationNERC 2012 Business Plan and Budget Overview. May 3, 2011
NERC 2012 Business Plan and Budget Overview May 3, 2011 NERC 2012 Business Plan and Budget Budget planning background Goals, challenges, and key resource drivers 2012 resource and financial projections
More informationReliability Assurance Initiative (RAI) Progress Report
Reliability Assurance Initiative (RAI) Progress Report Jerry Hedrick, Associate Director of Compliance Operations and Regional Entity Oversight Sonia Mendonca, Assistant General Counsel and Director of
More informationProject Management Framework. ITS Project Advisory Board. Project Advisory Board. DATE: 29/04/2016 RELEASE: Final. Sasenka Abeysooriya VERSION: V 2.
Project Management Framework PROJECT NAME: Project Management Framework DATE: 29/04/2016 RELEASE: Final AUTHOR: OWNER: Sasenka Abeysooriya Project Advisory Board VERSION: V 2.02 Information Technology
More informationILGS & LGSS. Department of General Service on behalf of Department of Revenue PA Lottery
ILGS & LGSS Department of General Service on behalf of Department of Revenue PA Lottery Instant Lottery Game Services and Lottery Gaming System Services (ILGS and LGSS) RFP # 6100042856 Wednesday August
More informationProgram Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
More informationProject Management (BPM1313) Project Charter
Project Management (BPM1313) by Dr. Adekunle Qudus Adeleke Faculty of Industrial Management adekunle@ump.edu.my Aims To further broaden the students knowledge on project charter and elements Expected Outcomes
More informationModernization and Migration Management (M3) Playbook GSA, Unified Shared Services Management
Modernization and Migration Management (M3) Playbook GSA, Unified Shared Services Management Introduction How to Read an Activity Description Objective: Provides the overall objective of the activity :
More informationArizona Strategic Enterprise Technology Arizona
Arizona Strategic Enterprise Technology 2012 Arizona Statewide Strategic IT Plan Table of Contents: p2 p3 p4 p6 From the Desk of the State CIO Executive Summary Deliver Enterprise Business Capabilities
More informationStreamline your business processes for far-reaching results. EY s Business Process Management Services practice
Streamline your business processes for far-reaching results EY s Business Process Management Services practice Introduction Today s financial services organizations are facing a number of pressures: Stressed
More informationFixed Scope Offering for Implementation of Oracle Fusion CRM in Cloud
Fixed Scope Offering for Implementation of Oracle Fusion CRM in Cloud Today s Business Challenges Adopt leading CRM practices and stream line processes Take advantage of CRM to attract new customers, develop
More informationCompliance Monitoring and Enforcement Program Technology Project
Compliance Monitoring and Enforcement Program Technology Project Business Case for ERO Enterprise IT Investment July 31, 2017 Prepared by ERO Project Management Office i Table of Contents Table of Contents...
More informationLeveraging BPM to Realize Supply Chain Value. Deb Boykin, Director, BPM May 4, 2011
Leveraging BPM to Realize Supply Chain Value Deb Boykin, Director, BPM May 4, 2011 Company Profile Pfizer is headquartered in Manhattan, New York Global leader in; Prescription Pharmaceuticals Non-prescription
More informationWhy PMOs Fail: Is Your Organization at Risk?
Why PMOs Fail: Is Your Organization at Risk? June 10, 2010 Presented by Phil Kyle Infinitive 2010 1 Agenda» Defining Our Terms» How PMOs Create Tangible Value» What Are the Common PMO Pitfalls?» Assessing
More informationProject4EU. a unified Work Programme Management solution for European Union Agencies. White Paper April P a g e
Project4EU a unified Work Programme Management solution for European Union Agencies White Paper April 2017 1 P a g e Executive Summary The European institutions and agencies have unique needs and requirements
More informationCA Enterprise Architecture Framework, Version 2.0 (CEAF 2.0) Overview. 10/31/2013 Version 2.0 1
CA Enterprise Architecture Framework, Version 2.0 (CEAF 2.0) Overview 10/31/2013 Version 2.0 1 Topics What is Enterprise Architecture (EA)? Why do we need EA? What is CEAF 2.0? California EA: CEAF 2.0
More informationCaribbean Association of Audit Committee Members Inc. Independent Quality Assurance Assessment of the Internal Audit function
www.pwc.com/bb Caribbean Association of Audit Committee Members Inc. Independent Quality Assurance Assessment of the Internal Audit function Strengthening the Performance and Influence of the Audit Committee
More informationDynamic Interactive Business Systems Inc. - Corporate Profile
Dynamic Interactive Business Systems Inc. 7 Snead Court, Bolingbrook, IL 60490 Phone: +1 (630) 364-1354 Phone: +1 (510) 375 1537 Fax: +1 (312) 873-3883 Email: dsaha@dibsysinc.com Website: www.dibsysinc.com
More informationuottawa.ca Architecture Review Board (ARB)
Architecture Review Board (ARB) Presentation Outline ARB Goals ARB Big Picture ARB Membership ARB 3 Steps Gate 1: Initiation Gate 2: Solution Review Gate 3: Architecture Review ARB - Goals Support Client
More informationReal World Experiences in Achieving "Meaningful Use" Mark D. Sugrue, RN-BC
www.pwc.com Real World Experiences in Achieving "Meaningful Use" Mark D. Sugrue, RN-BC Our Approach: Meaningful Use Transform Methodology Identify Assess Design Construct Implement Operate & review Delivering
More informationFinancial and Cash Management Task Force
Financial and Cash Management Task Force Recommended Enterprise Project Governance 12/1/08 1.1 It is important to address the proper structure for governing projects that will be implementing enterprise
More informationHISD Implementation. 4. Ensure data-driven accountability
HISD Implementation 4. Ensure data-driven accountability What we will do Build robust systems and processes that enable easy access to and use of key data to inform decisions and manage high levels of
More informationWhite Paper. PDC Taxonomy
PDC Taxonomy This White Paper is designed to provide some clarity in the terms used to describe Portfolio, Program and Project management (a PPP Taxonomy) and their key governance, support and oversight
More informationCreating Business Value with ECM at the Region of Niagara
Lead more Creating Business Value with ECM at the Region of Niagara Name: Steve Kopstick Title: President Creating Business Value with ECM The Region of Niagara The Journey The Solution The Future Why?
More informationCOMMUNICATION MANAGEMENT PLAN
COMMUNICATION MANAGEMENT PLAN This Communications Management Plan sets the communications framework for this project between the Sponsors Agents Contractor level. This will serve as a guide for communications
More informationThe Enterprise SOA Implementation Lifecycle Explained
The Enterprise SOA Implementation Lifecycle Explained Applies to: Enterprise Architects, Business Process Experts Summary Enterprise SOA implementation has been mysterious to many. It can be demystified
More informationInformation and Communication Technologies Strategic Plan 2016/ /20
Information and Communication Technologies Strategic Plan 2016/17 2019/20 Foreword Mike Russell Chief Information Officer We must continue providing the infrastructure and vital support systems to keep
More informationCapital project planning, design, delivery and operation process review City of Nanaimo November 20, 2017
Capital project planning, design, delivery and operation process review City of Nanaimo November 20, 2017 Background Deloitte s Scope Conduct a review of the City s project planning, design, delivery and
More informationIntroduction to Project Management
Introduction to Project Management University Business Institute Amir Dabirian Vice President for Information Technology/CIO March 21 st, 2012 2 The Man Month Men and months are interchangeable commodities
More informationMonthly IV&V Assessment Report (December 1 31, 2015)
Monthly IV&V Assessment Report (December 1 31, 2015) Department of Financial Services Date: 01/13/2016 Version 1.0 Table of Contents Department of Financial Services Executive Summary... 4 Project... 4
More informationCHANGE MANAGEMENT IN PROCUREMENT TRANSFORMATION. Bloomberg. Page 1
CHANGE MANAGEMENT IN PROCUREMENT TRANSFORMATION Bloomberg Page 1 Agenda and Objective Defining the challenges we faced Creating the business case Building the change management playbook Setting the strategy
More informationEAG must enable successful projects Champion for future state architecture EA work closely with project teams
Enterprise Architecture t Visioni EAG must enable successful projects Champion for future state architecture EA work closely with project teams Project teams work closely with EA Support the business influence
More informationREPORT 2015/077 INTERNAL AUDIT DIVISION
INTERNAL AUDIT DIVISION REPORT 2015/077 Advisory engagement to assist the International Trade Centre in its efforts to develop a risk management framework 29 July 2015 Assignment No. VE2014/350/01 CONTENTS
More informationAnalytics & Business Intelligence (BI) Enablement (Value Proposition)
Analytics & Business Intelligence (BI) Enablement (Value Proposition) We help Companies orchestrate towards an improved customer experience and increased revenue Narrative Companies are constantly striving
More informationIT Governance Overview
IT Governance Overview Contents Executive Summary... 3 What is IT Governance?... 4 Strategic Vision and IT Guiding Principles... 4 Campus-Wide IT Strategic Vision... 4 IT Guiding Principles... 4 The Scope
More informationNotice is hereby given of the following changes to the above-referenced SOLICITAITON:
FLORIDA DEPARTMENT OF TRANSPORTATION Procurement Office 605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450 Phone: (850) 414-4381 Fax: (850) 414-4951 ADDENDUM NO. 2 DATE: May 10, 2016 RE: BID #:
More informationOverview First Draft of NERC s 2014 Business Plan and Budget
Overview First Draft of NERC s 2014 Business Plan and Budget Michael Walker, Chief Financial and Administrative Officer Finance and Audit Committee Meeting May 3, 2013 Agenda Update on business planning
More informationTitle: Project Director Location: Tallahassee, FL Clearance: none required
Title: Project Director Location: Tallahassee, FL Clearance: none required Position Overview: The Project Director (PD) shall define, establish, and direct the planning and operations of the Project Management
More informationHEALTH PURCHASING VICTORIA STRATEGY. December 2017
HEALTH PURCHASING VICTORIA 2018-2022 STRATEGY December 2017 CONTENTS Contents... 2 Executive Summary... 3 Operating Environment... 5 HPV Vision and Values... 9 HPV Strategy 2018-2022: Framework... 10 HPV
More informationFive Guiding Principles of a Successful Center of Excellence
Five Guiding Principles of a Successful Center of Excellence What is a Center of Excellence? At some point in their life cycle, most companies find it beneficial to develop a Center of Excellence (CoE).
More information<Project Name> Charter
< NOTE: Remove the italicized, bracketed guidance before routing for approvals. > General Information 1. Project Number: 2. Project Name: 3. Executive : 4. Business : 5. IT : 6. Project Manager/Lead: Executive
More informationWhite Paper Describing the BI journey
Describing the BI journey The DXC Technology Business Intelligence (BI) Maturity Model Table of contents A winning formula for BI success Stage 1: Running the business Stage 2: Measuring and monitoring
More informationecap Health Check Evaluation
ecap Health Check Evaluation ECAP utilizes a multi-faceted engagement approach with our clientele to provide more efficient and effective services. There are 3 phases to the engagement: Phase I: Onsite
More informationPerforming a Successful Audit. Fundamentals of Auditing ERO Compliance Audit Process Jim Hughes Manager, Audit Assurance and Oversight
Performing a Successful Audit Fundamentals of Auditing ERO Compliance Audit Process Jim Hughes Manager, Audit Assurance and Oversight Objectives At the end of this session, participants will be able to:
More informationProject Management Knowledge Areas SECTION III
Project Management Knowledge Areas SECTION III 1 Project Integration Management CHAPTER 4 2 The Key to Overall Project Success: Good Project Integration Management Project managers must coordinate all
More informationPgMP Exam Prep Training - 4 Days
PgMP Exam Prep Training - 4 Days Course Length: 4 Days Course ID: PgMP Credits: 21 PDUs Course Duration: 3 or 4 days (Live in person or online class) Course Level: Advanced Day workshop- PgMP Boot Camp
More informationCompetency Area: Business Continuity and Information Assurance
Competency Area: Business Continuity and Information Assurance Area Description: Business Continuity and Information Assurance competency area mainly concerns the continuity, auditing and assurance of
More informationMarket System Evaluation. June 2017
Market System Evaluation June 2017 How do we extend and protect MISO s value proposition? Execution of MISO s strategy is predicated on secure systems with the tools and information required to ensure
More informationEY Center for Board Matters. Leading practices for audit committees
EY Center for Board Matters for audit committees As an audit committee member, your role is increasingly complex and demanding. Regulators, standard-setters and investors are pressing for more transparency
More informationOilpocalypse Now: Weathering the Storm with Integrated Project Management Samarth Jain Andrew Lavinsky
Oilpocalypse Now: Weathering the Storm with Integrated Project Management Samarth Jain Andrew Lavinsky June 2, 2015 Devon Energy Center Oklahoma City, Oklahoma, USA Welcome 3 Agenda Business Context Importance
More informationManitoba Health, Seniors and Active Living Transformation Program Charter. February 16, 2018 Version 1.0
Manitoba Health, Seniors and Active Living Transformation Program Charter February 16, 2018 Version 1.0 Table of Contents 1 Purpose... 3 2 Background... 3 3 Scope of the Transformation Program... 5 3.1
More informationQUEENSLAND URBAN UTILITIES Position Description
QUEENSLAND URBAN UTILITIES Position Description ROLE TITLE: DIVISION: BRANCH: LOCATION: ROLE CLASSIFICATION: MANAGER: Manager Analytics Enablement Planning and Digital & Analytics Enablement Information
More informationHead of Business Strategy
Empower Limited Job Description empower.co.tz info@empower.co.tz +255 758 778 886 9th Floor Tanzanite Park, Victoria, Dar es Salaam, Tanzania Roles and Responsibilities Head of Business Strategy Strategic
More informationData Management Services Service Catalog and Taxonomy 1.0. February 23, 2017
Data Services Service Catalog and Taxonomy 1.0 February 23, 2017 DMS Mission To harness the significant value of Harvard s data assets: We strive to enable improved decision-making and enhance productivity
More informationThose who cannot learn from history are doomed to repeat it. - George Santayana
Summary The following summarizes how I rescued a data warehouse project that was on track for a disastrous failure. Purpose: To provide valuable guidance to assist Project Managers on future and existing
More informationQUICK FACTS. Implementing Business Intelligence and Retail Signal Solutions for Sony PlayStation TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES
[ Manufacturing, Enterprise Applications and Middleware Services ] TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES Client Profile Industry: Video and computer entertainment Global Revenue: $77.58 billion
More informationSEQUENCE Quality Assurance
Quality Assurance A Complete QA and Risk Management Solution within Microsoft SharePoint PNMsoft Ltd. 38 Clarendon Road, Watford, WD17 1JJ UK Tel +44 1923 81 3420 2012 PNMsoft All Rights Reserved Welcome
More informationCompliance 2017: The Year of Regulatory Automation
Compliance 2017: The Year of Regulatory Automation Michael Lamberth Managing Director KPMG LLP Michael Blackshear CCO North America Bridget Phillips Managing VP Hoan Wagner Managing Director Chubb Insurance
More informationProject Governance. Melissa McCall PMO Director
Project Governance Melissa McCall PMO Director In this session we will cover. Project Governance o What is Project Governance o The Steering Committee o An easy approach to establishing a Steering Committee
More informationPMI - Minnesota August 14, Oh no - PMO. Presented by: Michael Vinje - PMP.
PMI - Minnesota August 14, 2007 Oh no - PMO Presented by: Michael Vinje - PMP 1 mvinje@trissential.com 2005 All Rights Reserved. Agenda Presentation Objective PMO Background & Survey What The Experts Said
More informationEnterprise Data Strategy and Governance
Project Charter DATE: 9/20/2017 VERSION 1.0 Prepared By: Melany Leavitt and Paul Given Page 1 Document Revision History Version Number Date Description.01 5/25/2017 Draft Charter.02 9/1/2017 Draft for
More informationMultisource Management in the Cloud Age Keys to MSI and SIAM success in Hybrid IT environments
WHITE PAPER Multisource Management in the Cloud Age Keys to MSI and SIAM success in Hybrid IT environments IT delivery has been evolving from a traditional on-premises model to a hybrid model using diverse
More informationBUSINESS INTELLIGENCE & ANALYTICS
CASE STUDY PART 2 BUSINESS INTELLIGENCE & ANALYTICS INTRODUCTION LOCATION New Jersey WEBSITE www.atlanticare.org SIZE 70 Locations DEPLOYMENT Fall, 2016 EMPLOYED SANTA ROSA SOLUTIONS Business Intelligence
More informationOpenPages Internal Audit Management: Internal audit and its evolving role in GRC
IBM Software Business Analytics OpenPages OpenPages Internal Audit Management: Internal audit and its evolving role in GRC Creating an integrated partnership with the business 2 OpenPages Internal Audit
More informationDEPARTMENT OF ELDER AFFAIRS (DOEA) PROJECT CHARTER. ENTERPRISE CLIENT INFORMATION AND REGISTRATION TRACKING SYSTEM (ecirts) PROJECT FOR
JEFFREY S. BRAGG, SECRETARY DEPARTMENT OF ELDER AFFAIRS (DOEA) PROJECT CHARTER FOR ENTERPRISE CLIENT INFORMATION AND REGISTRATION TRACKING SYSTEM (ecirts) PROJECT JULY 17, 2018 20180622_CIRTS_Project_Charter_v1.05
More informationEnterprise Architecture Consulting for BP R&M DCT Enterprise Architecture Implementation Project by Enterprise Architects
Enterprise Architecture Consulting for BP R&M DCT Enterprise Architecture Implementation Project by Enterprise Architects August 2011 Enterprise Architects provides Enterprise Architecture consultancy
More information7 Key Trends in Enterprise Risk Management
7 Key Trends in Enterprise Risk Management John Verver, CPA CA, CISA, CMC Kevin Legere, ACDA Presenters John Verver Consultant and Advisor to ACL Kevin Legere Director of Product Design Agenda Excellence
More informationWelcome to the postmodern era for public sector ERP
Welcome to the postmodern era for public sector ERP Time to update your public sector enterprise resource planning (ERP)? Consider a postmodern strategy to address your unique requirements. Welcome to
More informationCase Study: United Airlines Transforms Release Management for Its Modern Software Factory
DEVOPS CONTINUOUS DELIVERY Case Study: United Airlines Transforms Release Management for Its Modern Software Factory Suzan Liu Principal Engineer eqrm Strategy & Planning United Airlines Rob Karlin Sr.
More informationIGHealthRate Best Practices
IGHealthRate Best Practices Welcome to IGHealthRate! As your organization begins using the IGHealthRate assessment tool, it is important to follow the AHIMA IGAdvisor s recommended best practices. Following
More informationStrategic Direction Outline
Strategic Direction Outline December 2016 155 North 400 West, Suite 200 Salt Lake City, Utah 84103-1114 Strategic Direction Outline 1 Background This document outlines the Board s strategic direction for
More informationRSA ARCHER INSPIRE EVERYONE TO OWN RISK
RSA ARCHER INSPIRE EVERYONE TO OWN RISK Executive Priorities Growth is the highest priority 54 % 25 % Technology initiatives are second priority Business Growth & Technology Copyright 2016 EMC Corporation.
More informationGUIDING PRINCIPLES OF DATA REPORTING AND DATA SHARING
GUIDING PRINCIPLES OF DATA REPORTING AND DATA SHARING FOR THE GLOBAL MONITORING OF THE 2030 AGENDA FOR SUSTAINABLE DEVELOPMENT VERSION 1 28 SEPTEMBER 2017 Preamble The forty-eighth session of the UN Statistical
More informationSystems Approach for Organizational Change Management
Systems Approach for Organizational Change Management Organizational Change Management (OCM) Goal of OCM: Maximize value and minimize risk in supporting successful business transformations, process and
More information