STRUCTURAL LOAD BEARING STRUCTURES INSTALLATION GUIDE YOUR FRAMEWORK FOR BUILDING A BETTER FUTURE.

Size: px
Start display at page:

Download "STRUCTURAL LOAD BEARING STRUCTURES INSTALLATION GUIDE YOUR FRAMEWORK FOR BUILDING A BETTER FUTURE."

Transcription

1 LOAD BEARING STRUCTURES INSTALLATION GUIDE YOUR FRAMEWORK FOR BUILDING A BETTER FUTURE

2 Welcome to the EOS Structural Load Bearing Structures Installation Guide A successful project requires every trade in the design and construction journey to deliver with the highest standards and precision. As part of our drive to deliver sustainable light gauge steel materials and energy efficient buildings, we have endeavoured to share best practice and provide a complete set of Load bearing structures standard details for use primarily by installers. Good projects start with good designs, and a good design is one that is matched to the client s expectations, both in terms of cost and performance. This Guide presents best practice site checks to deliver optimum build quality for LBS [load bearing structure] schemes. The Guide is aimed to assist: Project Managers LBS Erectors Site Managers Site Inspectors Trade Trainers 2

3 Installation Guide Page System Overview & Scope of Supply 4 to 5 Considerations, Safety & Installation Method 5 to 11 Typical base fixing detail Typical base corner fixing detail Typical wall frame fixing detail Typical wall frame to wall frame connection detail Typical wall frame corner fixing detail Typical wall frame intersection fixing detail (at perpendicular junction) Typical load bearing wall to non-load bearing partition detail Typical twin leaf load bearing wall to non-load bearing partitions detail Typical separating wall frame intersection fixing detail (at perpendicular junction) Typical party wall to floor connection (Pre-fixed Zed Plate) Typical party wall to floor connection (Zed Plate supplied loose) Typical hot rolled beam support grid interface Typical integral K bracing base fixing detail Typical integral K bracing corner base fixing detail Typical flat strap bracing to load bearing walls detail Typical lattice lintel detail External wall to pre-assembled C-section floor cassette (Pre-fixed Zed Plate) 28 External wall to pre-assembled lattice floor cassette (Pre-fixed Zed Plate) 29 Internal load bearing wall to pre-assembled floor cassette (Pre-fixed Zed Plate) 30 Typical boarding detail (Pre-fixed Zed Plate) 31 External wall to pre-assembled C-section floor cassette (Loose Zed Plate) 32 External wall to lattice floor (individually installed lattices) (Loose Zed Plate) 33 Internal load bearing wall to pre-assembled floor cassette (Loose Zed Plate) 34 Typical boarding detail (Loose Zed Plate) 35 Perpendicular wall to C-section cassette restraint 36 Perpendicular wall to Lattice beam restraint 37 Intermediate load bearing wall support to oversailing lattice floor Lattice floor cassette plate connection Typical corner service riser detail External wall to pre-assembled C-section roof cassette (Pre-fixed Zed Plate) External wall to pre-assembled lattice roof cassette (Pre-fixed Zed Plate) 42 External wall to lattice roof (individually installed lattices) (Loose Zed Plate) 43 External wall to roof lattice (overhanging eaves) 44 Typical wall plate fixing at roof 45 Typical flat strap bracing to floors / roofs 46 Diaphragm Action 47 Standard Fixings Table 3

4 SYSTEM OVERVIEW LGSF OR TIMBER ROOF TO SPECIALIST DESIGN EXTERNAL WALLS PANELS INTERNAL WALL PANELS INSULATION BRACING WEATHER DEFENCE SHEATHING BOARD C-SECTION FLOOR CASSETTES WITH (OPTIONAL) 22mm OSB FLOORING OPENINGS PRE-FORMED IN PANEL PACKING WHERE NECESSARY SYSTEM OVERVIEW EOS Facades Load bearing structures [LBS], are a total EOS load bearing structures [LBS], are a total building frame supplied in pre-assembled off-site panels building frame supplied in pre-assembled offsite and cassettes for erection on-site. panelised cassettes for erection on-site. Loading factors including: overall stability; imposed, dead dead & wind loads; and disproportionate collapse are are all all taken taken into consideration during the design & engineering phase, as well as as co-ordination with with MEP MEP services, fenestration and access requirements. The system is commonly used for side and roof-top extensions The system of existing commonly buildings, used but for equally side suited and roof-top full multi-storey extensions of new existing build. buildings, This system but offers equally a truly suited robust to full and multi-storey lightweight new alternative build. This to traditional system offers build a methods. truly robust and lightweight alternative to traditional build methods. All load All load bearing bearing external external / / internal walls walls can be supplied can be as lightweight supplied as panels. lightweight panels. All floors / roofs are either supplied in All floors C-Section / roofs or are lattice either beam supplied cassette in form, C-Section or lattice or as individual beam cassette lattice beams form, for site as individual lattice installation. beams for site installation. All ancillary components, such as bracing, All ancillary packing components, and fixings are such included as bracing, within packing the and scope fixings of are supply. included within the scope of supply. 4

5 SCOPE OF SUPPLY DELIVERY All EOS wall panels and floor elements are sent to site after All EOS pre-assembly wall panels in and the floor EOS elements factory to are highly sent accurate to site tolerances after pre-assembly of +0mm in / the -2mm. EOS factory to highly accurate tolerances of +0mm / -2mm. Delivered Delivered frames frames include: include: Individual labels labels with with section section size size and and part part marking marking Inkjet Inkjet marked with with panel panel number and and phase phase Colour-coded Colour-coded by by floor floor or or to to suit suit agreed agreed phasing phasing Safely laid flat and strapped securely Safely laid flat and strapped securely Options for safety handrails, blue ropes to aid Options slinging, for and safety Moffett handrails, / Hi-Ab blue off-loading. ropes to aid slinging, and Moffett / Hi-Ab off-loading. Frames should be off-loaded via crane, or suitable Frames should be off-loaded via crane, or suitable powered lifting machine with 2m extended forks. powered lifting machine with 2m extended forks. DOCUMENTATION With With every every delivery, delivery, the the frames frames will will include include stillage stillage sheets sheets and and delivery delivery notes notes as as a record record copy copy for for site site and and also also to to assist with logistics and frame allocation. assist with logistics and frame allocation. TECHNICAL EXPERTISE With every project, EOS Facades operatives are available With every to attend project, site EOS to operatives offer technical are available advice, to design assistance attend site and to installation offer technical training. advice, design assistance and installation training. With the first delivery, site will be issued with a full set of With project the drawings, first delivery, including: site will be issued with a full set of project drawings, including: Plan drawings for each floor in order to set out walls Plan drawings for each floor in order to set out walls Plan Plan drawings drawings of of all all floor floor frames frames and and roof roof frames frames Elevations showing showing wall wall orientation orientation and framing and framing requirements. Marking plans showing frame numbers / / positions. Installer Installer teams teams can can benefit from from day day one one Tool box talks, as talks, well as well phased phased site visits site to visits offer to offer independent independent quality checks quality checks on the on installation. the installation. Our Our team team of of dedicated technical managers are available as direct points of contact contact for for site site installation teams, teams, with with project project designers designers also also on on hand to to discuss any any aspect without hesitation. EOS prides itself in having a fully inclusive service from EOS conception Facades to prides completion, itself in having ensuring a fully simple inclusive and rapid service from construction conception of our to load completion, bearing structures. ensuring simple and rapid construction of our load bearing structures. 5

6 CONSIDERATIONS PRE-START REQUIREMENTS The following information may be taken as useful The following information may be taken as useful guidance guidance on pre-start requirements for installers and main on pre-start requirements for installers and main contractors. [Source: SCI technical Information Sheet ED028] contractors. [Source: SCI technical Information Sheet ED028] The The main main contractor contractor must must be aware be aware that the that surface the surface of the of foundation the foundation slab, or slab, support support grid, must grid, be must be constructed to accurate to accurate levels for levels the for EOS the load EOS load bearing bearing structure structure [LBS]. [LBS]. The The foundation foundation slab slab must must be provided be provided with with gridlines gridlines to correct to correct datum, datum, as agreed as between agreed between the site the site manager manager and and the the installer installer of the of the LBS. LBS. There should be no high-spots in the level of the There should be no high-spots in the level of the slab/transfer structure and should be checked by an slab/transfer structure and should be checked by an engineer. Minimal low-spots are overcome by the engineer. Minimal low-spots are overcome by the use of EOS supplied packing and shimming systems. use of EOS supplied packing and shimming systems. The foundation slab or transfer structure and The perimeter foundation must slab or be transfer provided structure clear and of materials, perimeter standing must water be and provided debris. clear of materials, standing water and debris. Arrangements for for site site access, access, unloading unloading and site and site egress egress should should be be agreed agreed in advance in advance between between the the main main contractor, contractor, LBS LBS installer, installer, and EOS. and EOS Any Facades. information Any information regarding regarding these elements these elements must be must be provided provided to EOS to EOS prior Facades to start prior on site. to Typical start on site. Typical information requirements consist of but information requirements consist of but not restricted to: not restricted to: - Are there any delivery systems to book on to? - Are there any delivery systems to book on to? - Are - Are there there any any delivery delivery time time restrictions? restrictions? - Can - Can the the site site handle articulated wagons? - What lifting facilities are on site? - What lifting facilities are on site? - Precise address for wagon ingress. - Precise address for wagon ingress. The delivery schedule and sequence of works The delivery schedule and sequence of works should be agreed in advance by all parties. should be agreed in advance by all parties. 6 The contractor should ensure that that there there is a is a hard- hardstanding area area available for for storage of of EOS Facades materials during erection. Typically two two lifts lifts of scaffolding of scaffolding should should be installed be installed around the the perimeter of of the the foundation slab slab or or trans- transfer structure, structure, to enable to enable safe safe installation installation / levelling / levelling of of initial initial walls. walls. Scaffolding should be set back the correct distance Scaffolding should be set back the correct distance from the edge of the slab, completed to the agreed from the edge of the slab, completed to the agreed level and signed-off as ready for use. level and signed-off as ready for use.

7 SAFETY LIFTING Installation of of EOS load Facades bearing load frames bearing may require frames use may of require a crane. use Responsibility of a crane. for Responsibility provision of for craneage provision should of be craneage agreed should in advance be agreed and form in advance part of the and contract. form part of the contract. Taller multi-storey structures will require more extensive use of a crane. Best practice is to utilise the crane to lift, position, Taller multi-storey and hold the structures wall or will floor require element more whilst extensive it is propped use of a crane. or fixed Best into practice position. is to utilise the crane to lift, position, and hold the wall or floor element whilst it is The propped lifting or plan, fixed including into position. crane set area, should be agreed in advance. The main contractor should ensure the crane set area is free from materials and debris. The lifting plan, including crane set area, should be EOS will work with the installers and main contractor to agreed in advance. The main contractor should ensure accommodate lifting provision where possible. the crane set area is free from materials and debris. EOS Facades will work with the installers and main contractor to accommodate lifting provision where possible. SAFETY & RISK The The Safety Safety Plan Plan should should be be prepared prepared by by the the main main contractor with input from the frame installer. contractor with input from the frame installer. A risk risk assessment assessment and and method method statement statement should should be produced be produced that that satisfies satisfies the requirements the requirements of the of Construction the Health Construction & Safety Health Plan, & as Safety well as Plan, the as Construction well as the (Design & Management) Construction (Design Regulations & Management) [CDM2015]. Regulations These should be site [CDM2015]. and design These specific should and therefore be site and should design be specific developed for and each therefore individual should project. be developed for each individual project. EOS endeavour to to eliminate hazards throughout the design process, design process, and will and highlight will highlight risks where risks appropriate. where appropriate. EDGE PROTECTION In most cases, cases, [external] edge edge protection protection should should be be provided by by scaffolding around around the the perimeter perimeter of theof the building. If scaffolding is not present, or part of the installation scope, If scaffolding then an is alternative not present, form or of edge part protection of the installation or installation scope, then methodology an alternative should form be of used. edge protection or installation methodology should be used. IMPORTANT: No edge protection should be fixed off IMPORTANT: No edge protection should be the EOS Facades wall or floor frames. fixed off the EOS wall or floor frames. 7

8 INSTALLATION METHOD WALL INSTALLATION 1) 1) Ensure that the substrate is is positioned correctly correctly and provides full bearing support to all wall panels. IMPORTANT: EOS wall panels must have 100% bearing, with with no no overhang. 2) Make an assessment of slab tolerance and identify 2) Make an assessment of slab tolerance and identify areas where packing may be required. areas where packing may be required. INITIAL WALL ERECTED AND PROPPED 3) Offer up the first corner wall panel and fix to the 3) Offer substrate up the in accordance first corner with wall the panel standard fix details to the substrate and project in specific accordance drawings. with the standard details and project specific drawings. 4) Align the panel and temporarily prop. Spare EOS sections or timber may be used. Temporary 4) Align props the should panel be and installed temporarily at max. prop. 3m centres Spare EOS sections along the or walls. timber may be used. Temporary props should be installed at max. 3m centres along the walls. 5) Keep any factory installed door / window temporary 5) Keep braces any in factory place until installed structure door / is window fully erected temporary as this braces aids with in place panel until alignment structure at key is fully areas, erected i.e. openings. as this aids with panel alignment at key areas, i.e. openings. 6) 6) The next panel to to be be erected must be be perpendicular in order to to assist with with initial initial stability stability and and alignment. Proceed at at either a corner or to an internal junction. 7) Offer up the next panel and fix to the substrate in 7) accordance Offer up the with next the panel standard and details fix to and the project substrate in specific accordance drawings. with the standard details and project specific drawings. 8) Fix the two panels at the intersecting ladder frame 8) using Fix the the two horizontal panels noggins at the built intersecting into the ladder panel. frame using the horizontal noggins built into the panel. 9) Keep temporary props in place until at least 3 sides of the local room and the floor have been erected. 9) Keep temporary props in place until at least 3 sides of the local room and the floor have been erected. PERPENDICULAR WALL INSTALLED 10) Continue to to erect erect the the wall wall frames frames ensuring ensuring that that adequate props are are used as as progression is is made. TFLS PACKING SYSTEM AT STUD (Internal view) 11) Floors may be begin to be installed once a room 11) has Floors had a may minimum be begin of 2 to end be walls installed and once 1 side a wall room installed, has had giving a minimum flexibility of to 2 end sequencing walls and of 1 works, side wall installed, giving flexibility to sequencing of works, i.e. multiple storeys may be erected before an i.e. multiple storeys may be erected before an entire floor is completed. entire floor is completed. 8

9 INSTALLATION METHOD ADDITIONAL WALL FRAMES ERECTED AND PROPPED DESIGN TOLERANCES DESIGN TOLERANCES A +2mm tolerance gap between all EOS wall panels A +2mm is included tolerance in the design. gap between all EOS wall panels is included in the design. A A +10mm tolerance tolerance gap gap (both (both ends) ends) between between EOS EOS floors floors and and walls walls is included is included the in design the design to to allow allow for for zed zed plate plate thickness, thickness, fixing heads fixing and heads and general alignment. Refer to the standard details for guidance. Refer to the standard details for guidance. INSTALLATION TOLERANCES Straightness of of walls walls +/- +/- 5mm 5mm (over (over any any given given 3m 3m length) length) Verticality (plumbness) of wall +/- 5mm up to 3m Verticality height. H/600 (plumbness) for walls of wall >3m. +/- 5mm up to 3m height. H/600 for walls >3m. 3 SIDE WALLS INSTALLED READY FOR FLOORS INITIAL FLOOR INSTALLED SAFETY SAFETY: 5 Point PPE is recommend (Hi-Vis, Safety Boots, 5 Point PPE is recommend (Hi-Vis, Safety Boots, Hard Hat, Gloves and Glasses). Hard Hat, Gloves and Glasses). As As panels panels are pre-assembled, are pre-assembled, cutting will cutting be will be restricted to to an an absolute absolute minimum minimum (cross (cross bracing, bracing, temporary temporary props), props), however however cutting cutting should should be be conducted conducted in in a a cordoned cordoned off off area area with with appropriate appropriate cutting cutting station. station. 9

10 INSTALLATION METHOD FLOOR INSTALLATION 1) Ensure that that at at least 33 sides of of local walls have been installed before before lifting lifting and and offering offering up any up floor any floor elements. 2) Ensure that walls are aligned within tolerance and 2) Ensure that walls are aligned within tolerance and that sufficient propping is in place. Offer up the first that sufficient propping is in place. Offer up the first floor element according to the agreed lifting floor element according to the agreed lifting procedure. procedure. INITIAL FLOORS INSTALLED 3) Ensure that the floor is fixed to a minimum of 3) three Ensure 3 sides that (at the both floor ends is fixed and along to a the minimum side wall, of in three order 3 to sides ensure (at both local ends stability). and along the side wall, in order to ensure local stability). 4) Propping may be removed locally, although it is recommended to keep in place until a few 4) cassettes Propping are may in place. be removed locally, although it is recommended to keep in place until a few cassettes are in place. 5) Continue to erect walls and install floor elements 5) Continue to erect walls and install floor elements according to the sequence of works. according to the sequence of works. 6) IMPORTANT: Safe Safe working-at-height working-at-height practices practices should should be be employed employed such such as: fall as: arrest fall arrest man-safe man-safe systems; crash crash decking decking / air bags; / air working bags; working from from below; working off off scaffold / podiums. / 7) Optional pre-boarded EOS Floor cassettes offer a 7) safe Optional working pre-boarded platform (in conjunction EOS Floor with cassettes suitable offer a edge safe protection) working platform eliminating (in need conjunction to install with flooring suitable after edge the protection) frame is erected. eliminating need to install flooring after the frame is erected. 8) Once a suitable amount of ground floor progress 8) has been made, the first floor walls may begin to be Once a suitable amount of ground floor progress has erected. been made, the first floor walls may begin to be erected. SECOND STOREY WALLS BEING INSTALLED 10 COMPLETED FRAMING PRIOR TO SHEATHING RECOMMENDED SITE PRACTICE: Erect Erect scaffold scaffold around around perimeter of building of building to act to act as as edge edge protection. Use crane to lift EOS wall panels and floor Use crane to lift EOS wall panels and floor cassettes - working from below in all conditions. cassettes - working from below in all conditions. Use pre-boarded floors and fall arrest systems to Use avoid pre-boarded unsafe operations floors and whilst fall arrest floors systems are installed. to avoid unsafe operations whilst floors are installed.

11 INSTALLATION METHOD ANCILLARY INSTALLATION 1) BRACING: Prior to boarding ensure that all cross 1) BRACING: Prior to boarding ensure that all cross bracing elements are installed as indicated on the bracing elements are installed as indicated on the design design specific specific drawings. drawings. Bracing Bracing may may be be formed formed by by integral integral K K bracing bracing panels, panels, therefore therefore will will be be installed installed during during wall wall frame frame construction. FLAT STRAP CROSS BRACING (External view) 2) HEAVY DUTY ANCHORS: Along with the 2) concrete HEAVY DUTY base fixings ANCHORS: at stud positions, Along with areas the of concrete cross or base K bracing fixings at should stud be positions, fixed down areas to of the cross substrate or K using bracing EOS should supplied be fixed heavy down duty anchor to the brackets. substrate using These EOS supplied must be placed heavy at duty the studs anchor which brackets. intersect These with must the be ends placed of the at the bracing. studs Refer which to intersect standard with the details ends of for the more bracing. information. Refer to standard details for more information. NOTE: IN ALL CONDITIONS REFER TO THE PROJECT SPECIFIC DRAWINGS AND STANDARD NOTE: IN ALL CONDITIONS REFER TO THE PROJECT DETAILS FOR DETAILS ON FULL FRAMING SPECIFIC DRAWINGS AND FOR REQUIREMENTS. DETAILS ON FULL FRAMING REQUIREMENTS. FOLLOW ON TRADES When the EOS frame has been sufficiently erected and the When required the EOS bracing, frame anchors has been and sufficiently any additional erected requirements the required have been bracing, installed, anchors then and the any external additional sheathing and board, requirements insulation have and been cladding installed, systems then can the be external installed. sheathing board, insulation and cladding systems can be installed. EOS Facades are part of ETEX Building Performance, a EOS division are part of the of ETEX Group. Building We Performance, combine the a division solutions of of the three ETEX prominent Group. We manufacturers combine the and solutions are of uniquely three placed prominent to manufacturers develop opportunities and are uniquely for placed innovative to specifications develop opportunities to meet today s for innovative challenging specifications projects. to meet today s challenging projects. Drywall products to created systems SINIAT for partitions, Drywall ceilings, products wall to created linings systems and external for partitions, sheathing ceilings, purposes. wall Including linings and the external award-winning sheathing Weather purposes. Defence Including board. the award-winning Weather Defence board. PROMAT Passive Passive fire protection fire protection specialists specialists with a complete portfolio of boards, sprays, with a complete portfolio of boards, sprays, sealants and adhesives to protect structural steel, sealants and adhesives to protect structural steel, concrete structures, partitions, wall linings, floors, concrete structures, partitions, wall linings, floors, ceilings and roofs. ceilings and roofs. HEAVY DUTY ANCHOR AT BRACING POINT (Internal view) Leading innovators in light EOS Leading innovators in light gauge steel gauge steel construction, EOS specialise in the construction, EOS specialise in the design, manufacture design, manufacture and supply of a wide range of and bespoke supply of steel a wide solutions range of for bespoke the SFS, steel Load-bearing, solutions for the modular SFS, Load-bearing, and offsite industry. modular and offsite industry. 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 1. All EOS floor lattices are manufactured with 10mm tolerance each end between the floor / wall frames to allow for zed plate thickness, fixing heads and general alignment tolerances. Plasterboard finishes, insulation & external cladding omitted for clarity. 2. Z Plate size fixed to wall. Individual lattices installed, not contained in a cassette. 3. If difficulties are experienced drilling fixings through multiple layers of material use Hilti S-MD05GZ 5.5x40mm hex head (EOS-1020) in lieu of EOS-1002/1004 and Hilti S-MD05WZ 5.5x40mm wafer head in lieu of EOS

44 44

45 45

46 46

47 47

48 FIXINGS EOS-1001 FACTORY FIXING FRAME-TO-FRAME 5.5x19mm PAN HEAD #2 LOX DRIVE GRABBER CFP101875LYZ 1000 EOS-1002 SITE FIXING FRAME-TO-FRAME 5.5x25mm HEX HEAD SELF DRILL S-MD03Z HILTI EOS-1003 SITE FIXING FRAME-TO-SLOTTED CONNECTION 5.5x25mm HEX HEAD (LARGE WASHER) SELF DRILL S-MD23Z HILTI EOS-1004 SITE FIXING FRAME THROUGH FLOOR 5.5x50mm HEX HEAD SELF DRILL S-MD03Z HILTI EOS-1005 SITE FIXING FRAME-TO-FRAME (LOW PROFILE) 5.5x25mm PAN HEAD SELF DRILL S-MD03ZW HILTI EOS-1006 SITE FIXING WIND POST-TO- CONCRETE 10x100mm HEX HEAD SCREW ANCHOR HUS3-H (10mm Ø) HILTI EOS-1007 SITE FIXING SIMPSON BRACKETS- TO-CONCRETE 6.4x45mm HEX HEAD SIMPSON TITEN CONCRETE SCREW SIMPSON TTN25134H 100 EOS-1008 SITE FIXING FRAME-TO- BLOCKWORK 7.5x72mm CYLINDER HEAD R-WHO RAWL R-WHO EOS-1020 SITE FIXING FRAME-TO-HOT ROLLED 5.5x40mm HEX HEAD SELF DRILL S-MD05GZ HILTI EOS-1021 SITE FIXING FRAME-TO-CONCRETE 6.0x60mm HEX HEAD SCREW ANCHOR HUS3-H (6mm Ø) HILTI EOS-1022 APPLICATOR DRIVE BIT FOR EOS mm SOCKET S-NS 13 C 50/2 NUT SETTER HILTI EOS-1023 DRILL BIT FOR EOS mm Ø 6mm DRILL BIT HILTI EOS-1025 APPLICATOR DRIVE BIT FOR EOS mm SOCKET S-NS 15 C 95/3 3/4 NUT SETTER HILTI EOS-1026 DRILL BIT FOR EOS mm Ø 10mm DRILL BIT HILTI NOTES 1) USE 8mm HEX SOCKET FOR EOS-1002, 1003, 1004, 1007 & ) USE TX35 BIT FOR EOS ) USE 4.8mm DRILL BIT DIA. FOR EOS ) REFER TO PROJECT SPECIFIC DRAWINGS FOR DETAILS OF NON-STANDARD FIXINGS. ALWAYS FOLLOW THE MANUFACTURER S TECHNICAL GUIDANCE. 48

49 49

50 50

51 51

52 IF IN DOUBT STOP AND CONSULT! For detailed up to date information, to book a CPD session or to arrange a meeting please contact: EOS Ltd Heighington Lane Aycliffe Industrial Park Newton Aycliffe County Durham DL5 6QG T: E: enquiries@eosuk.org W: eos-structural.co.uk EOS_Facades EOS DISCLAIMER Whilst EOS Structural has prepared this document in good faith, it is designed to provide guidance on LBS construction. EOS Structural accepts no liability and offers no warranties in relation to its contents. Users are therefore required to satisfy themselves as to the suitability of the contents of this guidance for their specific intended purpose. EOS 2019

Guideline for the erection of Supaloc Steel Trusses Pre- Delivery preparation by the supplier Installing Supaloc Steel roof trusses...

Guideline for the erection of Supaloc Steel Trusses Pre- Delivery preparation by the supplier Installing Supaloc Steel roof trusses... Guidelines for the Safe Erection of Supaloc roof trusses October 2012 CONTENTS Guideline for the erection of Supaloc Steel Trusses... 4 Pre- Delivery preparation by the supplier... 5 Main Roof Truss Bracing

More information

Metal Web Floor System

Metal Web Floor System Metal Web Floor System Contents Contents Introduction and benefits 3 easi-joist definitions 4 easi-joist webs 5-6 Mechanical services 7 Loading and design 8 Floor stiffness 9 Internal non-loadbearing wall

More information

Knauf C-Form Suspended Ceilings

Knauf C-Form Suspended Ceilings Knauf C-Form Suspended Ceilings The Knauf C-Form Suspended Ceiling system uses the minimum number of different components and is extremely easy and quick to install. The system is very strong and perfect

More information

SFS - A Framework For Building A Better Future

SFS - A Framework For Building A Better Future EOS Facades Ltd SFS - A Framework For Building A Better Future Presented by John Bainbridge Technical Support Manager EOS Facades Ltd CONTENTS OF THE EOS FACADES PRESENTATION About EOS Facades Our unique

More information

Knauf MF Suspended Ceilings

Knauf MF Suspended Ceilings Suspended Ceilings The Suspended Ceiling system is versatile and easy to install. Deep voids are easily created to hide services and the ceiling can be used to provide fire protection. Metal Components

More information

Hi-Point TM off-site roof system

Hi-Point TM off-site roof system CI/SfB (27) Xh September 2006 Kalzip Ltd Hi-Point TM off-site roof system Benefits Hi-Point... off-site roof system with the benefits built-in A superior, simple and safer method of roof construction Health

More information

ThermaSteel Corporation ASSEMBLY MANUAL

ThermaSteel Corporation ASSEMBLY MANUAL ThermaSteel Corporation ASSEMBLY MANUAL TABLE OF CONTENTS 1- INTRODUCTION 1.1 THERMASTEEL TM WALL PANELS 1.2 Drawing and Element Numbers 2- ASSEMBLY 2.1 Sequence of Assembly 2.2 Preparation of Foundation

More information

Dry construction solutions for the offsite sector

Dry construction solutions for the offsite sector Dry construction solutions for the offsite sector TM TM INTRODUCTION Contents Introduction Solutions for the offsite sector Technical support when you need it Why work with us Introducing Etex Building

More information

Method Statement - Installation Guide KX05 (Trespa TS300)

Method Statement - Installation Guide KX05 (Trespa TS300) 1 Method Statement - Installation Guide KX05 (Trespa TS300) General Description Kladfix Systems Profiles and Components are designed to provide a vertical support framework to support Trespa Meteon Panels

More information

The difference is Guidance for the preparation of Deck Manufacturing Schedules

The difference is Guidance for the preparation of Deck Manufacturing Schedules The difference is Guidance for the preparation of Deck Manufacturing Schedules innovation, commitment, support. 2 Guidance for the preparation of Deck Manufacturing Schedules Minimum Requirements for Schedule

More information

Installation guidelines System: Cofraplus 220

Installation guidelines System: Cofraplus 220 Edition: February 2012 Installation guidelines System: Cofraplus 220 ArcelorMittal Construction International Industriestrasse 19 8112 Otelfingen / Zürich Switzerland www.arcelormittal.com/arval Summary

More information

SAFETY SYSTEM. G-Deck Consideration. Manual Handling

SAFETY SYSTEM. G-Deck Consideration. Manual Handling INTRODUCTION The G-Deck load deck system is a high strength, low cost access platform which is quick to erect, durable and flexible enough to meet your site access needs. Safety is a priority and G-Deck

More information

NATIONAL GYPSUM COMPANY 2-Hour Area Separation Wall System

NATIONAL GYPSUM COMPANY 2-Hour Area Separation Wall System 0 00/NGC NATIONAL GYPSUM COMPANY -Hour Wall System The -Hour is a -hour fire wall consisting of in. (0. mm) light-gauge steel H-Studs that secure two layers of in. (. mm) shaftliner panels friction-fit

More information

WILLIAM HARE LIMITED CELLSHIELD LIMITED HEALTH AND SAFETY DEPARTMENT

WILLIAM HARE LIMITED CELLSHIELD LIMITED HEALTH AND SAFETY DEPARTMENT WILLIAM HARE LIMITED CELLSHIELD LIMITED HEALTH AND SAFETY DEPARTMENT BASIC INSTRUCTION MANUAL FOR CELLSHIELD 2 SAFETY BARRIER SYSTEM WI 72 Written by Approved by Signature Date B Hughes B Hughes 17 04

More information

KINGSPAN FRAME SYSTEMS KINGSPAN STEEL FRAMING SYSTEM

KINGSPAN FRAME SYSTEMS KINGSPAN STEEL FRAMING SYSTEM Kingspan Steel Building Solutions Manor Works Pleck Road Walsall WS2 9ES Tel: 01944712000 Fax: 01922644460 e-mail: enquiries@kingspansbs.com website: www.kingspanpanels.co.uk/kip/steel-building-solutions

More information

HOW TO: CREATE METAL PARTITIONS WALL LININGS AND CEILINGS GTEC FRAMES

HOW TO: CREATE METAL PARTITIONS WALL LININGS AND CEILINGS GTEC FRAMES HOW TO: CREATE METAL PARTITIONS WALL LININGS AND CEILINGS GTEC FRAMES 1 METAL OR TIMBER? When creating stud partitions, wall linings and suspended ceilings the traditional method of installation has been

More information

TECHNICAL GUIDANCE XXXX 2015 EXXON QUESTION ANSWER. page 1 of 9

TECHNICAL GUIDANCE XXXX 2015 EXXON QUESTION ANSWER. page 1 of 9 MARKINGWALLING OF SAFETY GLASS SPANDREL CURTAIN PANELS FORMED TO COLDFROM ROOFS STACKED WINDOW 7.2 /25 January ARRANGEMENTS (First Issue) XXXX EXXON QUESTION Which factors should be taken into account

More information

Generation Hop up brackets to be removed and boards moved to lift above.

Generation Hop up brackets to be removed and boards moved to lift above. Denotes Ladder for Access from 2nd Lift to Extenda Bracket Generation Hop up brackets to be installed to manufacturer's instructions. Installed at 1200mm c/c max & 1050mm down from top of wall section.

More information

Cantilever Loading Platform Erection Procedures and Guidance Notes

Cantilever Loading Platform Erection Procedures and Guidance Notes Cantilever Loading Platform Erection Procedures and Guidance Notes Please note this is a six page document. 1 Introduction 1 Issue Date: January 2007 It is essential that the procedures are read and fully

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

INSTALLATION. General. Important Note. Design. Transport

INSTALLATION. General. Important Note. Design. Transport General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected

More information

GypWall QUIET Acoustic separating wall system

GypWall QUIET Acoustic separating wall system Acoustic separating wall system 90 Al Mafraq Hospital, Abu Dhabi 0 R w db 90 0 mins is a lightweight, non-loadbearing, twin framed acoustic separating wall, primarily used as a sound resisting wall in

More information

External Steel Stud and Top Hat Walls. Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185

External Steel Stud and Top Hat Walls. Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185 Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185 GENERAL REQUIREMENTS 185 FRAMING 185 PLASTERBOARD LAYOUT 189 PLASTERBOARD FIXING 190 EXTERIOR

More information

NATIONAL GYPSUM COMPANY 3-Hour Area Separation Wall System

NATIONAL GYPSUM COMPANY 3-Hour Area Separation Wall System -Hour Wall System The -hour Wall System is a -hour fire wall consisting of two layers of in. (. mm) shaftliner panels friction-fit between in. (0. mm) light-gauge steel H-Studs and a layer of /" Fire-Shield

More information

Steel Framing Systems

Steel Framing Systems INDUSTRIES making steelwork Steel Framing Systems TECHNOLOGY BW Framing 2 TEL 01262 400088 EMAIL sales@bw-industries.co.uk WEB www.bw-industries.co.uk Fire Restraint Wall System Contents Introduction...

More information

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1 16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

"Turnkey" design & build framing systems

Turnkey design & build framing systems "Turnkey" design & build framing systems Cairnhill specialise in bespoke design and construction of lightweight steel framed projects, fast track building solutions for commercial and domestic contracts

More information

Patent Application No :

Patent Application No : Patent No : 201741018271 SpecSure All of the Gyproc proprietary systems in this literature are covered by the SpecSure Performance Warranty. Our guarantee is that they will perform to the parameters published

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 092216 - COLD FORMED STEEL FRAMING - NON-STRUCTURAL (CFSF-NS) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 ACTION

More information

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers version 2.5 updated as of 08.04.2017 2 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers 2.0 ASSEMBLY 2.1 Sequence of Assembly 2.2 Preparation

More information

Proposed National Occupational Standards for Wood Occupations Timber Frame Erection (Construction)

Proposed National Occupational Standards for Wood Occupations Timber Frame Erection (Construction) @15/05/13 Proposed National Occupational Standards for Wood Occupations Timber Frame Erection (Construction) Project 2013 (VR289, 290, 295) Contents Page no. Revised NOS: VR289 v4 Erect timber walls and

More information

Wall Linings. As well as complete dry lining solutions we also provide fast-drying parge coat to ensure airtightness,

Wall Linings. As well as complete dry lining solutions we also provide fast-drying parge coat to ensure airtightness, Wall Linings Our versatile range of wall lining systems makes it easy to produce a high-quality, high-performance finished wall regardless of the background. Whether your priority is acoustic control,

More information

Installation Guide and Safety Manual Resilient Sound Isolation Clips (SIC Clips)

Installation Guide and Safety Manual Resilient Sound Isolation Clips (SIC Clips) Installation Guide and Safety Manual Resilient Sound Isolation Clips (SIC Clips) SOUND ISOLATION CLIP SPECIFICATIONS Width...1.00 inch Height...1.06 inch Length...3.86 inch Weight....025 lbs Max Spacing...48

More information

TYPICAL SCHEDULE OF COMPONENTS

TYPICAL SCHEDULE OF COMPONENTS TYPICAL SCHEDULE OF COMPONENTS ~ Site name ~ Detached 2 storey, 4 bedroom house with integral garage. Fully hipped roof, bedroom 1 to have a raised collar profile and hipped end. ~ 142 m2 gross Timber

More information

Generic HEIGHT SAFETY IN FORMWORK 16/11/2012. Built from basic generic components like planks, beams, and posts of timber, steel etc.

Generic HEIGHT SAFETY IN FORMWORK 16/11/2012. Built from basic generic components like planks, beams, and posts of timber, steel etc. Traditional using scaffold material HEIGHT SAFETY IN FORMWORK By James Tay System formwork TOKA FORMWORK Table form Generic Built from basic generic components like planks, beams, and posts of timber,

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 092216 - NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

DRY CONSTRUCTION SYSTEMS

DRY CONSTRUCTION SYSTEMS DRY CONSTRUCTION SYSTEMS Adrienn LEPEL BUTE Dry construction systems Prefabricated elements assembly on site Minimal use of water dry construction systems Assembled partitions Suspended ceilings Raised

More information

FIRE PROTECTION. GTEC Shaftwall systems 244 GTEC Shaftwall Stairwell systems 248 GTEC Horizontal Shaftwall systems 249 GTEC Encasement systems 250

FIRE PROTECTION. GTEC Shaftwall systems 244 GTEC Shaftwall Stairwell systems 248 GTEC Horizontal Shaftwall systems 249 GTEC Encasement systems 250 FIRE PROTECTION GTEC Shaftwall range uses a specially designed system to protect voids and shafts in buildings. It resists pressure changes and enables installation from one side of the shaft only. GTEC

More information

SUPRAFRAME BOX STUD SITE REFERENCE. Construction of a SUPRAFRAME Boxed Stud Wall Framing System. 600 mm stud spacing. Tile Roof.

SUPRAFRAME BOX STUD SITE REFERENCE. Construction of a SUPRAFRAME Boxed Stud Wall Framing System. 600 mm stud spacing. Tile Roof. SUPRAFRAME BOX STUD SUPRAFRAME BOX STUD SITE REFERENCE House Framing Solutions Construction of a SUPRAFRAME Boxed Stud Wall Framing System Roofing & Walling Solutions 600 mm stud spacing Tile Roof Rainwater

More information

GypLyner IWL Independent wall lining system

GypLyner IWL Independent wall lining system Independent wall lining system Photograph courtesy of Philip Brier 0 Independent wall lining system independent wall lining is a lightweight, nonloadbearing drylining which is erected independently of

More information

SECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES

SECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES SECTION 05440- PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section includes pre-engineered, pre-fabricated cold formed steel framing elements. Work includes:

More information

CHAPTER 3: Modern Methods of Construction (MMC)

CHAPTER 3: Modern Methods of Construction (MMC) CONTENTS 3.1.1 INTRODUCTION 3.1.2 SUITABILITY OF SYSTEMS AND COMPONENTS 3.1.3 TYPES OF MODERN METHODS OF CONSTRUCTION (MMC) 3.1.4 SUITABILITY OF SYSTEMS TO MEET WARRANTY REQUIREMENTS 3.1.5 INSULATED CONCRETE

More information

Drawings shown within this brochure is the Preston CarPark Innovation Concept and patents filed in August 2018.

Drawings shown within this brochure is the Preston CarPark Innovation Concept and patents filed in August 2018. CARPARK This brochure is designed specifically for the CarPark concept, but it can also be applied to apartments, commercial buildings, precast concrete buildings, low rise and high rise buildings. Any

More information

PERI PD 8 The cost-effective shoring for slab tables and high loads

PERI PD 8 The cost-effective shoring for slab tables and high loads PERI PD 8 The cost-effective shoring for slab tables and high loads Edition 06/2010 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax +49 (0)7309.951-0

More information

Level 2 NVQ Diploma in Innovative/Modern Methods of Construction (Construction)

Level 2 NVQ Diploma in Innovative/Modern Methods of Construction (Construction) Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 4 Qualification structure 5 Centre requirements 10 Support for candidates 11 Links to National Standards / NOS

More information

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017 For the highest requirements on concrete surfaces and edge formation Product Brochure Issue 10/2017 Content System advantages 5 For the highest requirements on concrete surfaces and edge formation 8 For

More information

(Old examination format for reference only)

(Old examination format for reference only) The Institution of Structural Engineers Associate-Membership Examination 11 APRIL 2003 INSTRUCTIONS TO CANDIDATE 1. The examination comprises two sessions separated by a lunch break of 1 2 hour, during

More information

Single frame acoustic separating wall system

Single frame acoustic separating wall system GypWall QUIET SF GypWall QUIET SF Single frame acoustic separating wall system GypWall QUIET SF metal stud partition is a lightweight, non-loadbearing, single frame wall system. Subject to Local Authority

More information

THE. Unitized Advantage

THE. Unitized Advantage THE Unitized Advantage The BCi Unitized Advantage Packaging & Delivery 1. Identification Prior to packaging, each panel or item is marked with a unique alphanumeric identifier corresponding to a unique

More information

Residential Wall Panel Installation

Residential Wall Panel Installation Residential Wall Panel Installation Planning & System Parameters 1. Health & Safety Act 1992 The principle objects of the Health & Safety Employment Act 1992 (HSE Act) are to prevent harm to employees

More information

FEDDERLITE PANEL SYSTEM Prefabricated, Lightweight, Outsulation Exterior Wall Panels with Integrated Reinforcing Channels

FEDDERLITE PANEL SYSTEM Prefabricated, Lightweight, Outsulation Exterior Wall Panels with Integrated Reinforcing Channels FEDDERLITE PANEL SYSTEM Prefabricated, Lightweight, Outsulation Exterior Wall Panels with Integrated Reinforcing Channels Fedderlite Panel System Fabrication and Installation Instructions FABRICATION Materials

More information

GypLyner (walls) Metal framed wall lining system. GypLyner.

GypLyner (walls) Metal framed wall lining system. GypLyner. GypLyner GypLyner (walls) Metal framed wall lining system GypLyner is a cost-effective, virtually independent metal frame drylining system for lining walls. General purpose and suitable for all internal

More information

COST COMPARISON DINCEL vs AAC WALLS

COST COMPARISON DINCEL vs AAC WALLS COST COMPARISON DINCEL vs AAC WALLS DISCLAIMER The information contained in this document is intended for the use of suitably qualified and experienced building professionals. This information is not intended

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES SECTION 09 21 16 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Metal stud wall and ceiling framing, 20 gauge. B. Metal channel suspended ceiling framing. C. Gypsum board. D. Gypsum sheathing.

More information

Kingframe Steel Framing System ("SFS") Infill & Oversail - CDM Design Risk Assessment

Kingframe Steel Framing System (SFS) Infill & Oversail - CDM Design Risk Assessment , Likely () Major Injury () 0 (High) Unacceptable.0 Persons Prob' Exposed Rating Control Measures Required by Designer to Reduce Action Rating 1 Introduction

More information

Installation Guide for Floor Truss Systems

Installation Guide for Floor Truss Systems Installation Guide for Floor Truss Systems June 2016 TABLE OF CONTENTS FLOOR TRUSS SYSTEMS Correct SITE DOCUMENTATION...3 TRUSS IDENTIFICATION AND ORIENTATION...3 SUPPORTING STRUCTURE...3 CONSTRUCTION

More information

DIVISION 5 METALS SECTION COLD-FORMED METAL FRAMING

DIVISION 5 METALS SECTION COLD-FORMED METAL FRAMING DIVISION 5 METALS SECTION 05 40 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6 DECEMBER, 2016 Page 1 of 6 1 GENERAL 1.01 RELATED SECTIONS.1 Section 01 33 00 - Submittal Procedures..2 Section 07 21 16 - Batt and Blanket Insulation..3 Section 07 92 10 - Sealants..4 Section 09 91 00

More information

CHAPTER 3: Modern Methods of Construction (MMC)

CHAPTER 3: Modern Methods of Construction (MMC) CONTENTS 3.1.1 INTRODUCTION 3.1.2 SUITABILITY OF SYSTEMS AND COMPONENTS 3.1.3 TYPES OF MODERN METHODS OF CONSTRUCTION (MMC) 3.1.4 SUITABILITY OF SYSTEMS TO MEET WARRANTY REQUIREMENTS FUNCTIONAL REQUIREMENTS

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

Reinforced concrete double walls

Reinforced concrete double walls Reinforced concrete double walls Build faster, pay less. Strength in building technology Uses The Kerkstoel reinforced double walls consist of two slabs of reinforced concrete joined to each other by lattice

More information

Typical detail: New roof with breathable underlay

Typical detail: New roof with breathable underlay New roof with breathable underlay 6. WALLTITE CL00 insulation to achieve target U-value. Vapour control layer. Plasterboard and skim. Unventilated air space 5. WALLTITE returned to insulated cavity stop

More information

INSTALLATION CHECKLIST 2 ND EDITION. Fox Blocks Abbott Drive Omaha, NE

INSTALLATION CHECKLIST 2 ND EDITION. Fox Blocks Abbott Drive Omaha, NE Fox Blocks INSTALLATION CHECKLIST ND EDITION Fox Blocks Installation Checklist: ND Edition 6110 Abbott Drive Omaha, NE 6110-69-6 WWW.FOXBLOCKS.COM INSTALLATION CHECKLISTS The Checklists on the following

More information

Home Depot Page 1 of 5 HDPB Humacao, PR 10/19/09

Home Depot Page 1 of 5 HDPB Humacao, PR 10/19/09 PART 1 - GENERAL 1.01 SUMMARY A. Types of cold-formed metal framing units include the following: 1. C-shaped steel studs B. Related work specified elsewhere includes but may not be limited to: 1. Section

More information

BILL ROBINSON TIMBER DESIGN SERVICES SPECIALISING IN TIMBER AND TIMBER FRAME CONSTRUCTION SITE INSPECTIONS

BILL ROBINSON TIMBER DESIGN SERVICES SPECIALISING IN TIMBER AND TIMBER FRAME CONSTRUCTION SITE INSPECTIONS BILL ROBINSON TIMBER DESIGN SERVICES SPECIALISING IN TIMBER AND TIMBER FRAME CONSTRUCTION DESIGN SPECIFICATIONS SITE INSPECTIONS TRAINING NSAI CONSULTANT STANDARDS: EC5, IS 440, IS 444, IS 193 TIMBER SCHEMES:

More information

Intertenancy Barrier Systems for Terrace Homes

Intertenancy Barrier Systems for Terrace Homes Intertenancy Barrier Systems for Terrace Homes Specification & Installation Manual CBI5113 NATIONAL SUPPORT VISIT: POST: Winstone Wallboards Limited 37 Felix Street, Penrose, Auckland 1061, New Zealand

More information

HIGH QUALITY, FAST CONSTRUCTION WITH THE FAMILIARITY OF TRADITIONAL BUILD

HIGH QUALITY, FAST CONSTRUCTION WITH THE FAMILIARITY OF TRADITIONAL BUILD SIG I-House System incorporating Celcon Elements from H+H UK HIGH QUALITY, FAST CONSTRUCTION WITH THE FAMILIARITY OF TRADITIONAL BUILD Sharing knowledge and expertise to build better HELPING TO MEET HOUSING

More information

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. SECTION 06110 WOOD FRAMING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But Not Supplied

More information

How to fill in your Timber Frame Order Form

How to fill in your Timber Frame Order Form How to fill in your Timber Frame Order Form 1 General Would you like us to check slab or design the building to Architects drawings? Check Slab: Is the Slab in place already, if so has your architect checked

More information

Reinforced concrete double walls

Reinforced concrete double walls Reinforced concrete double walls HOW YOUR BUILDING WORKS TAKES PLACE FASTER WHILE YOUR COSTS REMAIN LOW DOUBLE WALLS Strength in building technology The Kerkstoel reinforced double walls consist of two

More information

Planning and installation instructions

Planning and installation instructions Planning and installation instructions Stofix Oy Ahlmaninkatu 2 E 40100 Jyväskylä Finland stofixgroup@stofix.com www.stofix.com 2 PLANNING AND INSTALLATION INSTRUCTIONS... 1 1 General... 3 2 Project Design...

More information

Insulation Fastener Guide IKO Ener-Air & IKO Enerfoil Wall Insulation

Insulation Fastener Guide IKO Ener-Air & IKO Enerfoil Wall Insulation Insulation Fastener Guide IKO Ener-Air & IKO Enerfoil Design Considerations The type and frequency of a fastener system is typically decided by a structural engineer or in collaboration with a design professional.

More information

GypWall AUDIO The ultimate cinema wall system

GypWall AUDIO The ultimate cinema wall system The ultimate cinema wall system 9 Vox Cinemas, Muscat City Centre - Sultanate of Oman 7 0 R w db 0 0 mins is a non-loadbearing, twin frame high performance wall system that provides exceptionally high

More information

The SoundBar System HIGH PERFORMANCE ACOUSTIC FLOORING SOLUTION

The SoundBar System HIGH PERFORMANCE ACOUSTIC FLOORING SOLUTION The SoundBar System HIGH PERFORMANCE ACOUSTIC FLOORING SOLUTION THE SOUNDBAR SYSTEM TECHNICAL GUIDE The SoundBar System is a unique, total screeded flooring solution which is the only system of its kind

More information

Installation Guide and Safety Manual Resilmount A237R (Resilient Sound Isolation Clips)

Installation Guide and Safety Manual Resilmount A237R (Resilient Sound Isolation Clips) Installation Guide and Safety Manual Resilmount A237R (Resilient Sound Isolation Clips) 3" RESILMOUNT A237R SPECIFICATIONS 1d " f" Width...1.375 inch Height...3.25 inch Depth...1.125 inch Weight....025

More information

Installation Guide. PAROC panel solutions

Installation Guide. PAROC panel solutions Installation Guide PAROC panel solutions Panel System 4.00 INT January 2008 THESE INSTRUCTIONS ARE FOR NORMAL APPLICATIONS Work safety Preparation Wear protective gloves and clothing when handling the

More information

Wall Panels. Structural wall panel. Architectural wall panel. Cladding wall panel. Sandwich wall panel

Wall Panels. Structural wall panel. Architectural wall panel. Cladding wall panel. Sandwich wall panel Wall Panels Structural wall panel Architectural wall panel Cladding wall panel Sandwich wall panel Wall Panels Assorted styles and colours Reveals and other patterns Painted finish Bolted, welded and knife

More information

Guidance document January 2015

Guidance document January 2015 Guidance document January 2015 A GUIDE TO SITE INSTALLATION OF INSULATED ROOF PANELS This bulletin introduces the reader to key issues that need to be addressed for the installation of an insulated roof

More information

PASSIVE FIRE PROTECTION SYSTEMS Application & Technical Manual: Cavity & Smoke Barriers, Parapet & Spandrel Walls

PASSIVE FIRE PROTECTION SYSTEMS Application & Technical Manual: Cavity & Smoke Barriers, Parapet & Spandrel Walls PASSIVE FIRE PROTECTION SYSTEMS Application & Technical Manual: Cavity & Smoke Barriers, Parapet & Spandrel Walls For Promat Asia Pacific Organisation February 0 PASSIVE FIRE PROTECTION SYSTEMS Application

More information

COSVR289 Erect timber walls and floors

COSVR289 Erect timber walls and floors Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components and equipment for erecting timber

More information

GypWall AUDIO The ultimate sound insulating wall system

GypWall AUDIO The ultimate sound insulating wall system The ultimate sound insulating wall system Cineworld, Ilford 8 The ultimate sound insulating wall system is a non-loadbearing, twin frame high performance wall system that provides exceptionally high levels

More information

The extra strong, extra durable, sound resistant system that you can direct fix to

The extra strong, extra durable, sound resistant system that you can direct fix to C0 Partitions The extra strong, extra durable, sound resistant system that you can direct fix to All our systems are covered by SpecSure when using genuine Gyproc and Isover products gyproc.ie Utilising

More information

Prospective Construction Systems for Mass Housing

Prospective Construction Systems for Mass Housing Prospective Construction Systems for Mass Housing TECHNOLOGY PROFILE Light Gauge Steel Framed Structures (LGSF) Building Materials & Technology Promotion Council Ministry of Housing & Urban Poverty Alleviation

More information

UL Design System HW-D-1012 continued

UL Design System HW-D-1012 continued UL System No. HW-D-1012 Assembly Ratings 1, 2 and 3 Hr (See Item 2) Nominal Joint Width 3 in. Class II and III Movement Capabilities 100% Compression or Extension Page 1 of 5 1. Floor Assembly The fire-rated

More information

Energy Panel Structures, Inc

Energy Panel Structures, Inc Energy Panel Structures, Inc. 712-859-3219 www.epsbuildings.com 1. General Information The information provided in this manual is to be used as a general guide. Refer to detailed drawings provided by EPS

More information

ARCHITECTURAL WALL PANELS APPLIED OVER A SHEATHED STUDWALL BY MEANS OF A FIELD ASSEMBLED TEN66 SUB-FRAME SYSTEM

ARCHITECTURAL WALL PANELS APPLIED OVER A SHEATHED STUDWALL BY MEANS OF A FIELD ASSEMBLED TEN66 SUB-FRAME SYSTEM SYSTEM TEN66 INSTALLATION DATA & DETAILS Omnis Panels, Inc. Architectural Building Panels 22 East Chicago Avenue Suite 210 Naperville, Illinois 60540 (800) 450-6099 (630) 355-4040 Fax: (630) 355-4995 www.omnis-panels.com

More information

GRIDFLEX The flexible slab formwork with safe accessible grid elements

GRIDFLEX The flexible slab formwork with safe accessible grid elements GRIDFLEX The flexible slab formwork with safe accessible grid elements 07044 Edition 04 2011 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax

More information

HOME SYSTEMS CONSTRUCTION PROCEDURE

HOME SYSTEMS   CONSTRUCTION PROCEDURE HOME SYSTEMS WWW.QUICKBUILTHOMES.COM.AU CONSTRUCTION PROCEDURE INDEX - PARTS LIST PARTS LIST QBRC75(C) QBRM75C) QBSIPS75 QBRFSZ75C QBRFBC75C QBRF3030G QBRGSQC QBRFRC75C QBRFZEC QBRF4040C QBSACC75 QBFR7330WC

More information

PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION

PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION An overview of costing strategies for wood framed construction elements CREATING A PROJECT ENDLESS POSSIBILITIES COMPATORS LIST A FLOOR Cast in Place

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 22 16 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

HEAVY STEEL CONSTRUCTION

HEAVY STEEL CONSTRUCTION HEAVY STEEL CONSTRUCTION PRE-ENGINEERED PRE ENGINEERED STEEL BUILDINGS Prismatic Constructions Work Shops, Storage Buildings etc. Figure 1 Figure 2 Prismatic steel constructions can be manufactured as

More information

Site check The timber frame pocket guide

Site check The timber frame pocket guide PREVIEW PAGES Site check The timber frame pocket guide Sample pages 2 Frame erection ISBN 978-1-909594-65-4 First published in 2018 This is a technical publication for professionals in the built environment

More information

BEARING METAL STUD FRAMING

BEARING METAL STUD FRAMING L-1 Section 05410 Long Form Specification LOAD BEARING METAL STUD FRAMING This section includes axially loaded steel studs, with unique slotted top channels, usually of 0.91, 1.2 and 1.5 mm (16, 18, or

More information

SWAGEBEA/fl BUILDINGS

SWAGEBEA/fl BUILDINGS AYRSHIRE SWAGEBEA/fl BUILDINGS DESIGN Ayrshire Metal Products are Britain s leading manufacturer of cold rolled steel profiles. The award winning Swagebeam Building System is a revolutionary concept in

More information

Instruction and Safety Manual Resilient Sound Isolation Clips (SIC Clips)

Instruction and Safety Manual Resilient Sound Isolation Clips (SIC Clips) SOUND ISOLATION CLIPS Installation Manual Instruction and Safety Manual Resilient Sound Isolation Clips (SIC Clips) SOUND ISOLATION CLIP SPECIFICATIONS Width...1.00 inch Height...1.06 inch Length...3.86

More information

MODUROOF SYSTEM MANUAL

MODUROOF SYSTEM MANUAL MODUROOF SYSTEM MANUAL!!!! Contents System Overview Questions & Answers Typical Details NHBC Chapter 7.2 Client pre-installation checklist Roof Design Tile fixing details Manufacturing Checklist Site Manager

More information

Elite Garments Ind. Ltd.

Elite Garments Ind. Ltd. Elite Garments Ind. Ltd. Bade Kalmeswer, Board Bazar, Gazipur, Bangladesh (23.954199, 90.380240) 5th April 2014 8th April 2015 1 2 Observations Made 3 Building 5 - Steel Portal Frame Main span varies from

More information

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents. SECTION 06 1100 WOOD FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But

More information