2060 FOLSOM APARTMENTS

Size: px
Start display at page:

Download "2060 FOLSOM APARTMENTS"

Transcription

1 REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTOR SERVICES 2060 FOLSOM APARTMENTS Chinatown Community Development Center and Mission Economic Development Agency ( Chinatown CDC and MEDA ; together, Sponsors ) are requesting evidence of qualifications from applicants interested in providing pre-construction and general contracting services through the design and construction phases of the 2060 Folsom Apartments (the Project ), a new construction, approximately 110 unit, multi-family and transitional age youth (TAY) affordable apartment development with ground floor child development center and nonprofit uses, in San Francisco. Qualified applicants must demonstrate completion of at least one new construction project with a construction contract amount of $30 million or more, and bonding capacity of $45 million or more. For any possible amendments to this RFQ during the posting period, please refer to the City & County of San Francisco s Bids & Contracts website ( PROJECT DESCRIPTION The Project is an affordable housing development financed in part by the San Francisco Mayor s Office of Housing and Community Development ( MOHCD ). The location of the Project is a 126,651 sf vacant site at 2060 Folsom, between Shotwell and Folsom Streets (Block 3571, Lot 18). Total construction cost is estimated to be $43 million. The project is proposed to contain approximately 110 residential units (studios, 1BRs, 2BRs, and 3BRs), a variety of ground floor commercial uses including a child development center and other nonprofit services offices, management offices, a community room, and central courtyard. The project will total approximately 127,000 gross square feet, be a mixture of Type I and Type III construction, and be approximately 75 feet tall at its highest point. An alternative design under consideration has a building height of 85 feet, which may involve all Type I construction. The housing development is adjacent to a new neighborhood park that the San Francisco Recreation and Parks Department will begin constructing in March Please see Attachment A for project design. Chinatown CDC and MEDA were chosen by MOHCD to be the developers for this currently city-owned site. The architects selected for the project are Mithun Solomon with Y.A. Studio (the Architect ). Sponsors and Architect are currently in the process of completing schematic design. Sponsors and Architect are committed to green building and to exploring green elements in the design and construction of the Project. The building will be designed to meet Green Communities or other green criteria, to be determined at a green charrette after schematic design completion. MOHCD requires that the Sponsors institute a community planning process, which is now underway. Sponsors and Architect recognize the value of involving a general contractor early in a project's design. We believe in cultivating an effective design/construction team early in development, and that a general contractor's input and involvement throughout a project makes for a better design and a smoother construction period. We believe that, even at preliminary stages in a project s development, a general contractor can provide valuable services including plan review, cost estimating, and value engineering that can help to reduce a project s cost and increase overall quality. We therefore intend to conditionally select a qualified applicant to join the design/construction team prior to initiating the 2060 Folsom Apartments - General Contractor RFQ Page 1 of 6

2 design development phase of this Project. Sponsors will enter into a Memorandum of Understanding (the MOU ) with the selected applicant (the Contractor ) establishing that the Contractor will provide pre-construction services and aid in meeting the construction program within the fixed limit of construction cost. After completing schematic design and before the start of design development, Sponsors, Architect and Contractor will establish this fixed limit of construction cost for the Project. At or near the completion of Construction Documents, Contractor will furnish a construction cost estimate that will serve as the basis for a construction contract (modified AIA A111 Cost Plus Fee with a Guaranteed Maximum Price, and a modified AIA A201 General Conditions). If Contractor and Sponsors are unable to negotiate, in good faith, a contract amount within the previously established fixed limit of construction cost, the Sponsors reserves the right publicly bid the Project with no obligation to the Contractor. If the Sponsors and Contractor are able to negotiate a construction amount within the fixed limit of construction cost, the Sponsors may either execute the contract or choose not to enter into the contract and duly compensate the Contractor for all services provided to that point, per the terms of the MOU. SCHEDULE Schematic design is currently underway and the Sponsors are conducting a community outreach process. Design development will be complete by early fall 2016 and construction documents around spring Sponsors expect construction to start in late 2017 and to take 18 months. The selected general contractor must be available starting immediately after selection to participate on the design/construction team for cost estimating, plan review, and value engineering services. The Contractor is expected to play an important role throughout the pre-construction period, including development of schedule and scope to meet project timeline and budget while maximizing value. PROJECT SPONSORS AND TEAM Chinatown CDC is a nonprofit organization with a 38-year history of serving low income San Franciscans. We have played a role in the development of over 2,500 units of housing serving a wide variety of residents of all ages and ethnicities. Chinatown CDC manages most of the buildings it has developed and owns, and takes pride in providing appropriate supportive services to the ethnically, culturally, and linguistically diverse residents of our community. We currently own and/or manage 25 buildings throughout San Francisco that are home to more than 2,000 resident households. Chinatown CDC has received numerous awards for its activities, including the Fannie Mae Foundation's Sustained Excellence Award awarded to ten community development corporations in the nation which are "the best examples of organizations who are building and sustaining communities through their work in housing." MEDA is a nonprofit organization with over 42 years of experience serving San Francisco s low- and moderate-income, Latino, and Spanish-speaking immigrant communities through services that build assets and create family economic success. In 2013, MEDA launched its Community Real Estate Program, and in 2014 began co-developing 400 units of public housing through the RAD program. Mithun Solomon, the lead architect, is a firm with a long history of designing award-winning residential projects and extensive experience in affordable housing. Mithun has been a national leader in sustainable design and urbanism since 1949, and seeks to blend design, technology and nature to create places that excel in beauty, spirit and performance Folsom Apartments - General Contractor RFQ Page 2 of 6

3 CONTRACTOR SELECTION PROCESS The selection process will take place in two phases: 1) Phase I: A review panel determined by the Sponsors and approved by MOHCD and the Contract Monitoring Division ( CMD ) will evaluate all submissions of qualifications using the Phase I Scoring Criteria (see Attachment B). After MOHCD and CMD verification of scoring, a short list will be announced naming four or fewer applicants who will proceed to Phase II of the selection process. Sponsors may perform reference calls to help inform its selection of firms for the short list. 2) Phase II: Short-listed contractors will be interviewed by the selection panel. Short-listed firms will be provided with the interview questions and interview scoring criteria prior to interviews. Shortlisted contractors will also be required to submit for evaluation a proposed fee including itemized general conditions costs, and documentation supporting their experience with plan review and cost estimating (see Phase II Requirements for Short Listed Applicants below). The selected Contractor will be the highest scoring applicant based on qualifications submitted, reference calls, and interviews. Scoring will take into account the firm s experience and the experience of individual staff assigned to the Project. Short-listed applicants will be scored using the following criteria: A) Construction experience and qualifications with projects of similar size, type, and contract amount (45 percent) B) Value engineering, cost estimating, and negotiated contracting experience; including quality of submitted work samples (20 percent) C) Proposed contractor team for the Project (20 percent) D) Green building experience (5 percent) E) Proposed Fee and General Conditions (5 percent) F) Experience and success with meeting Section 3/Local Hire and LBE/SBE subcontracting goals (5 percent) The applicant with the highest score from Phase II will be selected to join the design/construction team for the Project, provide pre-construction services, and conditionally enter into a negotiated construction contract. PHASE I REQUIREMENTS FOR RFQ RESPONSES Applicants responding to this RFQ must submit the following: AIA Document A305 - Contractor's Qualifications Statement: All interested applicants must complete AIA Document A305 - Contractor's Qualifications Statement. All questions must be answered completely. Incomplete or missing information will constitute grounds for rejection of your proposal. The AIA A305 does not need to be notarized. In Section 3.5 of the AIA A305, major projects shall include all projects with a construction cost of $20,000,000 or greater completed in the last five years. Applicants shall provide current phone numbers for owners and architect of all projects listed. Please use Attachment C of this RFQ to respond to Section 3.5 of the AIA A305. Evidence of Qualifications: In addition to the information requested on Document A305, please be aware of and provide 2060 Folsom Apartments - General Contractor RFQ Page 3 of 6

4 documentation substantiating the following requirements: 1) Contractor shall have been in business for a minimum of three years without any official unresolved record of complaints registered or filed with the Contractor's State License Board of the California Department of Consumer Affairs. 2) During the past three years, Contractor shall have successfully completed, on time and within budget, a minimum of two new construction projects of building and construction type (Type I and/or Type III) and cost similar to the proposed project. 3) Contractor shall indicate its current capacity to complete the proposed Project by providing a summary of its current workforce and staffing, and a complete list of projects i) currently under construction, ii) under contract, and iii) in negotiation. 4) Contractor shall identify an individual who will be responsible for providing project management for the duration of the project and a full-time site superintendent who will communicate with the Sponsors or their designated representative(s). These individuals shall be authorized to act on behalf of the Contractor. The work experience of these individuals shall be provided. Contractor shall not change or substitute these individuals without Sponsors prior approval. The Sponsors reserve the right to determine the acceptability of these individuals. 5) The Contractor shall provide evidence of its experience with residential green building, including a minimum of one project with significant green elements or green certification. 6) The Contractor shall provide evidence of its ability to meet requirements of public funding agencies, including SBE contracting requirements, and Section 3/Local Hire requirements. Sponsors, MOHCD, and CMD desire a high level of participation by Small Business Enterprises (SBE) in all contracting efforts. We strongly encourage SBEs to submit qualifications to serve as the general contractor individually, as part of a Joint Ventures, or as subcontractors. To promote SBE participation, the Sponsors and CMD will establish SBE participation goals at a later date. The Contractor will be required to meet the SBE participation program requirement. Sponsor will evaluate all applicants using the Scoring Criteria provided (see Attachment B). For information regarding SBE certification or requirements, please contact Romulus Asenloo of the San Francisco Contract Monitoring Division (CMD) at (415) or romulus.asenloo@sfgov.org or Seth Benkle at seth.benkle@sfgov.org. PHASE II REQUIREMENTS FOR SHORT LISTED APPLICANTS Applicants proceeding to Phase II of the selection process shall submit the following only applicants proceeding to Phase II are required to submit the following: 1) Proposed fee for an assumed construction contract of $43 million in current dollars, which includes overhead, profit, bonds, and itemized general conditions. For the purposes of calculating the general condition costs, applicants should propose a construction term in which they believe they can successfully complete construction of the Project. 2) A sample prepared by the proposed project manager/superintendent from a recent, comparable project of each of the following: 2060 Folsom Apartments - General Contractor RFQ Page 4 of 6

5 A) Cost estimate B) Plan review comments from either DD or CD phase set of documents C) Construction schedule 3) Brief constructability comments on conceptual drawings for 2060 Folsom (to be provided to shortlisted applicants). TERMS AND CONDITIONS OF CONSTRUCTION CONTRACT The purpose of this section is to briefly describe some of the terms and conditions that will be set forth in the contract for construction. In submitting a response to this RFQ, applicants acknowledge that they have read and understand these requirements. The Sponsor reserves the right to revise and/or add any terms and/or conditions beyond those set forth below. 1) Insurance. The Contractor shall maintain insurance in accordance with the requirements of MOHCD (see Attachment D). In addition, the Contractor will be required to post payment and performance bonds in an amount equal to 100% of the construction contract. The bond issuer shall be listed in U.S. Treasury Department Circular No The Contractor shall obtain and maintain Worker's Compensation Insurance to the extent required by law. 2) Chapters 12B and 12C. To be eligible for the award of the contract, the Contractor must agree to comply with the requirements of Chapters 12B and 12C of the San Francisco Administrative Code. For information regarding Chapters 12B and 12C, please contact Romulus Asenloo of CMD at (415) or romulus.asenloo@sfgov.org. 3) Small Business Enterprise (SBE) Participation. A subcontracting goal for SBE participation is required and will be established at a later date. This project will be monitored by MOHCD and CMD. Only CMD-validated SBEs can be used to meet SBE contracting goals (see Attachment E for more information). Other CMD requirements will also apply to this project. For information regarding CMD certification or requirements, please contact Romulus Asenloo of CMD at (415) or romulus.asenloo@sfgov.org. 4) Section 3 Plus and Local Hire. This Project is subject to the SFHA Section 3 Requirements, and to the First Source Hiring Program under Chapter 83 of the Administrative Code of San Francisco. See Attachment F for more information. 5) Davis Bacon Prevailing Wage Requirements. The Project shall be subject to Federal Prevailing Wage requirements. The appropriate Federal wage determination shall be provided by MOHCD and incorporated in the Project Manual to become a part of the Contract Documents. See Attachment F for more information. GROUNDS FOR REJECTION Sponsors or its representative may reject any and all qualification submittals for the following reasons: 1) The submitted qualification package does not contain all the information requested in this document. 2) The submitted qualifications package was received after the designated deadline. 3) Sponsors decide to withdraw acceptance of the qualifications. 4) Acceptance of qualifications or proposals that would entail a violation of law or City codes. 5) Applicant is suspended or disqualified from projects funded by HUD or MOHCD Folsom Apartments - General Contractor RFQ Page 5 of 6

6 RESERVATION OF RIGHTS The Sponsors reserves the right to postpone or withdraw this request at any time and for any reason; postpone the project for convenience; reject any and all; submittals; and/or negotiate with any or none of the applicants. This RFQ does not commit the Sponsors to enter into a contract for construction of the Project. Sponsors reserve the right to waive any defects as to form or content of the RFQ or any other step in the selection process. CLAIMS PROCEDURES Applicants wishing to contest the selection process or results will have five (5) business days from the date of notice of the final selection to submit written complaints to the Contract Monitoring Division, in accordance with its prevailing guidelines. PROPOSED SELECTION SCHEDULE* Request for Qualifications available Friday, January 29, 2016 Phase I Qualifications Due Friday, February 12, by 12 noon Short-listed contractors notified for interviews Thursday, February 18 Phase II Proposals Due Wednesday, February 24 by 5pm Interviews (tentative) Monday, February 29 Final Selection/CMD Approval (tentative) Wednesday, March 2 *subject to change SUBMISSION DEADLINE FIVE copies of qualifications must be received by FRIDAY, FEBRUARY 12 BY 12 NOON. Please submit proposals via AND in hard copies (5 copies) to: Shannon Dodge Project Manager Chinatown CDC Sdodge@chinatowncdc.org 1515 Vallejo Street, 4th Floor San Francisco, CA QUESTIONS/CLARIFICATIONS Potential respondents should address any questions regarding this RFQ to Shannon Dodge at sdodge@chinatowncdc.org or ATTACHMENTS A Architect s Project Concept Narrative and Drawings B - Phase I Scoring Criteria C AIA Document A305: Additional Information Form D City & County of San Francisco Insurance Requirements E SBE Program Requirements F - Applicable Governmental Regulations 2060 Folsom Apartments - General Contractor RFQ Page 6 of 6

REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTOR SERVICES 1296 SHOTWELL SENIOR APARTMENTS

REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTOR SERVICES 1296 SHOTWELL SENIOR APARTMENTS REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTOR SERVICES 1296 SHOTWELL SENIOR APARTMENTS Chinatown Community Development Center and Mission Economic Development Agency ( Chinatown CDC and MEDA ; together,

More information

PING YUEN & PING YUEN NORTH REHABILITATION

PING YUEN & PING YUEN NORTH REHABILITATION REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES PING YUEN & PING YUEN NORTH REHABILITATION On behalf of Ping Yuen, L.P. and North Ping Yuen, L.P. ( Owner ), Chinatown Community Development Center

More information

The Bid Date has changed to 03/16/2010 at 2:30 PM.

The Bid Date has changed to 03/16/2010 at 2:30 PM. , Chinatown / North Beach Campus Main Building & Annex Building Curbs Gutters and Sidewalk CCSF Project No. 107 A 1. Summary DOCUMENT 00900 Bid Package 7.20 Curbs Gutters and Sidewalk ADDENDUM NO. 4 (02/22/2009)

More information

REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES CITY OF PERRIS

REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES CITY OF PERRIS REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES BY CITY OF PERRIS Perris, California December 4 th, 2018 City of Perris is requesting Competitive Proposals from licensed architectural firms

More information

Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011)

Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011) Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011) Sec. 153.65. As used in sections 153.65 to 153.73 of the Revised Code: (A)(1)

More information

LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION

LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION Project No. 4863/A4L-396 LEVEL I PREQUALIFICATION DOCUMENTS for COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North

More information

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016 REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES For the renovation of existing apartment buildings August 15, 2016 INVITATION Bath Housing Development Corporation is soliciting proposals for

More information

REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR CITY OF NANTICOKE

REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR CITY OF NANTICOKE REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR CITY OF NANTICOKE Proposals Solicited by: City of Nanticoke 15 East Ridge Street Nanticoke, PA 18634 C:\Users\jim\Desktop\Nanticoke City\07222013professionalengservices\Engineer

More information

WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES

WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES 1. Introduction WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES The Town of West Yellowstone (Town) is seeking a qualified

More information

LEVEL I PREQUALIFICATION DOCUMENTS GEISEL RESTROOM RENOVATIONS

LEVEL I PREQUALIFICATION DOCUMENTS GEISEL RESTROOM RENOVATIONS Project No. 5005/A4L-424/ 962520 LEVEL I PREQUALIFICATION DOCUMENTS for GEISEL RESTROOM RENOVATIONS University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La

More information

LEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA

LEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA Project No. 4484/A4L-379/964840 LEVEL I PREQUALIFICATION DOCUMENTS for OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North

More information

LEVEL I PREQUALIFICATION DOCUMENTS

LEVEL I PREQUALIFICATION DOCUMENTS Project No. LEVEL I PREQUALIFICATION DOCUMENTS for MUIR BIOLOGY BUILDING 3RD FLOOR RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La Jolla,

More information

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build

More information

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA 95132 408-923-1871 OFC 408-926-8329 FAX PREQUALIFICATION PACKAGE INSTRUCTIONS FOR PROSPECTIVE MEP SUBCONTRACTORS FEBRUARY

More information

PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT)

PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT) PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT) The Greenville City School District (the "District") invites interested parties to submit

More information

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT RISK SERVICES SUPPLEMENTAL INFORMATION PACKAGE

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT RISK SERVICES SUPPLEMENTAL INFORMATION PACKAGE MASSACHUSETTS PORT AUTHORITY CAPITAL PROGRAMS DEPARTMENT SUITE 209S - LOGAN OFFICE CENTER ONE HARBORSIDE DRIVE EAST BOSTON, MASSACHUSETTS 02128-2909 REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT

More information

APPLICATION INFORMATION: 1. All five sections of the application must be completed.

APPLICATION INFORMATION: 1. All five sections of the application must be completed. HELP ME GROW SUSTAINABILITY PLANNING CONSULTANT REQUEST FOR QUALIFICATIONS Application Deadline: 5:00 pm on MONDAY, SEPTEMBER 25, 2017 APPLICATION INFORMATION: 1. All five sections of the application must

More information

MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK

MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK DATE ISSUED: January 10, 2018 DEADLINE FOR WRITTEN

More information

Chapter 4 State Requirements for Educational Facilities Section 4.1

Chapter 4 State Requirements for Educational Facilities Section 4.1 providential cause, other impending danger to life safety, or pursuant to Section 1013.46(1)(b), F.S., the board can declare an emergency, can negotiate a contract with a design-build firm, design professional,

More information

January 22, Table of Contents

January 22, Table of Contents January 22, 2014 PROCEDURES SINGLE SELECTION PROCUREMENT OF DESIGN AND CONSTRUCTION MANAGEMENT SERVICES (Section 30 of Chapter 193 of the Acts of 2004) Table of Contents 1.0 Introduction...3 1.1 Purpose

More information

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) (BUILDING 590 Deep Foundations)

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) (BUILDING 590 Deep Foundations) ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) (BUILDING 590 Deep Foundations) PROJECT NOTICE Skanska USA Inc. hereinafter called SKANSKA, intends to award

More information

RFQ for General Contractor-Construction Manager Page 1 of 11

RFQ for General Contractor-Construction Manager Page 1 of 11 REQUEST FOR GENERAL CONTRACTOR QUALIFICIATIONS PROJECT #2017-23 Baker Heights 3.6 Acre Re-development August 30, 2017 The Everett Housing Legacy, LLLP ( Owner ) and the Everett Housing Authority as the

More information

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build

More information

TRANSBAY BLOCK 4 SAN FRANCISCO, CA REQUEST FOR QUALIFICATIONS ( RFQ ) FOR PROFESSIONAL SERVICES

TRANSBAY BLOCK 4 SAN FRANCISCO, CA REQUEST FOR QUALIFICATIONS ( RFQ ) FOR PROFESSIONAL SERVICES TRANSBAY BLOCK 4 SAN FRANCISCO, CA REQUEST FOR QUALIFICATIONS ( RFQ ) FOR PROFESSIONAL SERVICES Issued by: F4 Transbay Partners, LLC (The Owner ) Issuance of RFQ: Thursday, February 23, 2017 Submittal

More information

REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA

REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA GENERAL INFORMATION Greenwood School District 50 is

More information

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN/BUILD TRADE PARTNERS

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN/BUILD TRADE PARTNERS ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN/BUILD TRADE PARTNERS PROJECT NOTICE Skanska USA Inc. hereinafter called SKANSKA, intends to award design-build subcontracts to HVAC, Electrical,

More information

CONSTRUCTION DOCUMENTS Part 1

CONSTRUCTION DOCUMENTS Part 1 Audio Presentation Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org

More information

NOTICE TO BIDDERS FOR

NOTICE TO BIDDERS FOR CITY OF SAN LEANDRO STATE OF CALIFORNIA ENGINEERING AND TRANSPORTATION DEPARTMENT NOTICE TO BIDDERS FOR MONARCH BAY DRIVE BRIDGE REPAIR PROJECT NO. 12-144-38-324 BID NO. 12-13.013 1. BID OPENING: The bidder

More information

NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION

NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION University of California, Irvine 2016-17 State Funded Reroof Multiple Buildings Project No. 5110248 NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION The University of California, Irvine (UCI) requests

More information

Invitation for Bids for Armed and Unarmed Security Guard Services ADDENDUM NO. 1 ACKNOWLEDGEMENT NOTICE

Invitation for Bids for Armed and Unarmed Security Guard Services ADDENDUM NO. 1 ACKNOWLEDGEMENT NOTICE Dear Firm Representative: Invitation for Bids for Armed and Unarmed Security Guard Services ADDENDUM NO. 1 ACKNOWLEDGEMENT NOTICE Included with this cover page please find Addendum No. 1 Modification to

More information

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services REQUEST FOR PROPOSALS Construction Manager CM Services Pre-Construction and Construction Services Big Sky Fire Department Station 1 Project Big Sky Fire District OWNER Big Sky, Montana November 2016 Request

More information

PUBLIC CONTRACT CODE SECTION

PUBLIC CONTRACT CODE SECTION PUBLIC CONTRACT CODE SECTION 22160 22169 22160. (a) The Legislature finds and declares that the design build method of project delivery, using a best value procurement methodology, has been authorized

More information

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES REQUEST FOR QUALIFICATIONS GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES MUSEUM OF THE ROCKIES COLLECTIONS AND STORAGE FACILITY MONTANA STATE UNIVERSITY Bozeman, Montana MSU PPA NO. 13-0093 Campus

More information

STATEMENTS OF QUALIFICATIONS ARE DUE NO LATER THAN 5:00 P.M. FRIDAY, JUNE 23, 2017

STATEMENTS OF QUALIFICATIONS ARE DUE NO LATER THAN 5:00 P.M. FRIDAY, JUNE 23, 2017 RFQ 13-2017-01 REQUEST FOR QUALIFICATIONS FOR A CRITERIA ENGINEER TO PERFORM CERTAIN PROFESSIONAL SERVICES IN THE REPAIR AND/OR REPLACEMENT OF THE LOWER LAKE DAM AND POTENTIAL REPAIRS TO THE UPPER LAKE

More information

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR February 5, 2018 SUMMARY OF CM/GC SELECTION PROCESS FOR DIMMIT II APARTMENT BUILDING The Town of Winter Park requests proposals from qualified Construction Manager / General Contractor (CM/GC) firms for

More information

REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES

REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES SEDA-COUNCIL OF GOVERNMENTS REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES ENGINEERING, DESIGN, AND BIDDING 119 SOUTH LOCUST STREET DEMOLITION BOROUGH OF MOUNT CARMEL NORTHUMBERLAND COUNTY,

More information

Complying with Ohio s. Qualifications-Based Selection Law. (Ohio Revised Code ) A Guide for Public Authorities

Complying with Ohio s. Qualifications-Based Selection Law. (Ohio Revised Code ) A Guide for Public Authorities Complying with Ohio s Qualifications-Based Selection Law for Professional Engineers, Architects & Surveyors (Ohio Revised Code 153.65-.73) A Guide for Public Authorities American Council of Engineering

More information

REQUEST FOR QUALIFICATIONS AND PROPOSALS

REQUEST FOR QUALIFICATIONS AND PROPOSALS REQUEST FOR QUALIFICATIONS AND PROPOSALS CONSTRUCTION MANAGER AT RISK SERVICES Preconstruction Phase Services and Construction Phase Services Sheridan Economic and Educational Development Authority Sheridan

More information

If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal

If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal may cause your submittal to be considered non-responsive.

More information

REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS

REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS 1. REQUEST FOR PROPOSALS. Clearwater Public Schools, Ewing Public Schools,

More information

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower DOCUMENT 001153 - REQUEST FOR QUALIFICATIONS 1.1 PURPOSE, LAWS, AND REGULATIONS A. The purpose of the Prequalification Procedure described in this Document is to provide Owner with a mechanism to evaluate

More information

RFQ. Request for Qualifications Phase One. Renovation of City Owned Homes CITY OF BEREA, OHIO. Mayor Cyril Kleem

RFQ. Request for Qualifications Phase One. Renovation of City Owned Homes CITY OF BEREA, OHIO. Mayor Cyril Kleem RFQ Request for Qualifications Phase One Renovation of City Owned Homes CITY OF BEREA, OHIO Mayor Cyril Kleem City of Berea, Ohio Project: Renovation of City Owned Homes Criteria Engineer: Antonio C. Armagno,

More information

REQUEST FOR QUOTES (RFQ) Arbor E & T, LLC. Workforce Contractor for Workforce Solutions for South Texas

REQUEST FOR QUOTES (RFQ) Arbor E & T, LLC. Workforce Contractor for Workforce Solutions for South Texas REQUEST FOR QUOTES (RFQ) for Arbor E & T, LLC. Workforce Contractor for Workforce Solutions for South Texas Description Personnel Services for Subsidized Employment for Workforce Customers Arbor E & T,

More information

Olympic and Paralympic Games Tokyo. Overlay Work (1) Ariake Arena, and Ariake Tennis Park. Tender Briefing

Olympic and Paralympic Games Tokyo. Overlay Work (1) Ariake Arena, and Ariake Tennis Park. Tender Briefing B-Ⅰ Olympic and Paralympic Games Tokyo Overlay Work (1) Ariake Arena, and Ariake Tennis Park Tender Briefing April 2018 The Tokyo Organising Committee of the Olympic and Paralympic Games Contents 1. Provisions

More information

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature:

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature: SUBMISSION INFORMATION Kenton County Fiscal Court P.O. Box 792 303 Court Street, Room 207 Covington, Kentucky 41012-0792 QUALIFICATION: Radio Project Phase II RFQ OPENING DATE: December 7, 2015 TIME: 2:00

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE Memphis Cook Convention Center Renovation City of Memphis, Department of Housing and Community Development

More information

CITY AND COUNTY OF SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY INVITATION FOR BIDS. Presidio Trolley Coach Facility - Presidio Bus Lifts

CITY AND COUNTY OF SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY INVITATION FOR BIDS. Presidio Trolley Coach Facility - Presidio Bus Lifts CITY AND COUNTY OF SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY INVITATION FOR BIDS This is an Invitation for Bids (IFB) for the following public work: Presidio Trolley Coach Facility - Presidio Bus Lifts

More information

CALLEGUAS MUNICIPAL WATER DISTRICT THOUSAND OAKS, CALIFORNIA NOTICE INVITING BIDS

CALLEGUAS MUNICIPAL WATER DISTRICT THOUSAND OAKS, CALIFORNIA NOTICE INVITING BIDS CALLEGUAS MUNICIPAL WATER DISTRICT THOUSAND OAKS, CALIFORNIA NOTICE INVITING BIDS For the construction of the CCNB Broken Back Rehabilitation, Phase 3 located at 8 sites in the City of Simi Valley in the

More information

City of Eagle Point 2017 Paving Instruction to Bidders

City of Eagle Point 2017 Paving Instruction to Bidders City of Eagle Point 2017 Paving Instruction to Bidders Issued: August 2, 2017 Closing Date and Time: Wednesday August 16, 2016 at 2:00 pm Project Summary The City of Eagle Point is requesting bids for

More information

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue Bidding Conditions March 22, 2018 (Project# 0192) at the Fresno Chaffee Zoo Project : Warthog Exhibit Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS Addendum - A document issued

More information

If you need any assistance or help regarding Section 3, feel free to contact us. We look forward to assisting you with Section 3 implementation.

If you need any assistance or help regarding Section 3, feel free to contact us. We look forward to assisting you with Section 3 implementation. CMHA Prospective Business Vendor: Enclosed, you will find a variety of forms regarding Section 3 (Housing & Urban Development Opportunities Act of 1968, as amended). Please complete and attach the Section

More information

PREQUALIFICATION OF CONSTRUCTION CONTRACTORS QUESTIONNAIRE PACKET

PREQUALIFICATION OF CONSTRUCTION CONTRACTORS QUESTIONNAIRE PACKET Exhibit A PREQUALIFICATION OF CONSTRUCTION CONTRACTORS QUESTIONNAIRE PACKET Submission of Pre-Qualification Packet Deadline: TBD Newcomb Academy AB300 New Construction Project Place of Pre-Qualification

More information

Town of York, Maine Request for Qualifications

Town of York, Maine Request for Qualifications Town of York, Maine Request for Qualifications Historic Restoration Contractor The Town of York is accepting Statement of Qualifications from General contractors experienced in historic restoration, for

More information

Purchasing and Procurement Policy

Purchasing and Procurement Policy Purchasing and Procurement Policy Purpose The purpose of this document is to implement the requirements of state law with regard to procurement and bidding on public contracts for public works, goods,

More information

Bidding Conditions Attachment C

Bidding Conditions Attachment C Bidding Conditions Attachment C REV Date: November 9, 2018 Project Name (Permit Nos. xxx) at the Fresno Chaffee Zoo Project No. xxxx Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS

More information

REQUEST FOR PROPOSAL EXECUTIVE SEARCH FIRM

REQUEST FOR PROPOSAL EXECUTIVE SEARCH FIRM Town of Holly Springs REQUEST FOR PROPOSAL EXECUTIVE SEARCH FIRM 128 South Main Street Holly Springs, North Carolina 27540 Proposals due March 9, 2018 February 21, 2018 REQUEST FOR PROPOSAL FOR RECRUITING

More information

As a state agency, the College administration is required to develop procedures for Construction Manager selection.

As a state agency, the College administration is required to develop procedures for Construction Manager selection. COLLEGE of CENTRAL FLORIDA ADMINISTRATIVE PROCEDURE Title: Construction Management Selection Process Page 1 of 2 Implementing Procedure For F.S. 1013.45 Date Approved: 09/11/02 Division: Administration

More information

REQUEST FOR PROPOSALS MECHANICAL/PLUMBING & ELECTRICAL ENGINEERING RFP # JUNE 28, 2010 PROPOSALS DUE: JULY 12, 2010

REQUEST FOR PROPOSALS MECHANICAL/PLUMBING & ELECTRICAL ENGINEERING RFP # JUNE 28, 2010 PROPOSALS DUE: JULY 12, 2010 4800 N. Broadway, Boulder, CO 80304 REQUEST FOR PROPOSALS MECHANICAL/PLUMBING & ELECTRICAL ENGINEERING RFP #12-2010 JUNE 28, 2010 PROPOSALS DUE: JULY 12, 2010 TO: FROM: RE: Mechanical/Plumbing and Electrical

More information

CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS

CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS I. INTRODUCTION The East Rutherford School District is planning to hold a referendum on December 12, 2017 that incorporates facility

More information

CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE

CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE AZUSA UNIFIED SCHOOL DISTRICT 1 TABLE OF CONTENTS Filing of PreQualifications Submittals 3 PREQUALIFICATION QUESTIONNAIRE 6 Page Part I:

More information

LOWER MANHATTAN DEVELOPMENT CORPORATION

LOWER MANHATTAN DEVELOPMENT CORPORATION LOWER MANHATTAN DEVELOPMENT CORPORATION REQUEST FOR QUALIFICATIONS for PHOTOCOPYING AND RELATED SERVICES The Lower Manhattan Development Corporation, a subsidiary of the New York State Urban Development

More information

AVIATION AUTHORITY POLICY

AVIATION AUTHORITY POLICY PURPOSE: To establish a policy for the selection of development related professional services firms, including design-build firms for professional services and the Consulting Engineer, pursuant to the

More information

City and County of San Francisco

City and County of San Francisco City and County of San Francisco Office of the Controller CITY SERVICES AUDITOR REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION CONTRACT AUDIT AND PROJECT CONSULTING SERVICES RFQ#CON2013-11 CONTACT: Mary Hom,

More information

SECTION 3 PARTICIPATION PLAN. (Owner/Developer and General Contractor)

SECTION 3 PARTICIPATION PLAN. (Owner/Developer and General Contractor) SECTION 3 PARTICIPATION PLAN (Owner/Developer and General Contractor) For (Name and Address of Construction Project) Submitted by: Name of Owner/Developer: Address: Primary Contact: Phone number: Email:

More information

YAKIMA VALLEY CONFERENCE OF GOVERNMENTS

YAKIMA VALLEY CONFERENCE OF GOVERNMENTS YAKIMA VALLEY CONFERENCE OF GOVERNMENTS REQUEST FOR PROPOSAL (RFP) From interested developers for the Purchase and Development of Property Located in Metropolitan Area City of Yakima August 2017 Yakima

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

OAKLAND UNIFIED SCHOOL DISTRICT FOR NON-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL

OAKLAND UNIFIED SCHOOL DISTRICT FOR NON-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL OAKLAND UNIFIED SCHOOL DISTRICT FOR N-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL OAKLAND UNIFIED SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY

More information

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN Introduction Becker County is issuing a RFQ for Construction Management at Risk Services

More information

ADVERTISEMENT FOR BIDDERS

ADVERTISEMENT FOR BIDDERS Sealed Bids for the Owensville Wastewater Inflow/Infiltration Reduction Project for the Town of Owensville, Indiana (herein called the "OWNER") will be received by the Owner at the Owensville Town Hall,

More information

First Source Hiring Program. Toolkit for Cannabis Businesses in San Francisco

First Source Hiring Program. Toolkit for Cannabis Businesses in San Francisco First Source Hiring Program Toolkit for Cannabis Businesses in San Francisco Office of Economic & Workforce Development The Mission of the Office of Economic and Workforce Development (OEWD) is to support

More information

Lincoln City Visitor and Convention Bureau. City of Lincoln City REQUEST FOR QUALIFICATIONS

Lincoln City Visitor and Convention Bureau. City of Lincoln City REQUEST FOR QUALIFICATIONS Lincoln City Visitor and Convention Bureau City of Lincoln City REQUEST FOR QUALIFICATIONS Visitor Center Concept Development and Designs Architectural Services Lincoln City, Oregon April 20, 2018 RFQ

More information

SAN MATEO COUNTY FAIR REQUEST FOR PROPOSALS ADVERTISING, MARKETING & PUBLIC RELATION SERVICES RFP #

SAN MATEO COUNTY FAIR REQUEST FOR PROPOSALS ADVERTISING, MARKETING & PUBLIC RELATION SERVICES RFP # SAN MATEO COUNTY FAIR REQUEST FOR PROPOSALS ADVERTISING, MARKETING & PUBLIC RELATION SERVICES RFP #101-2011 August 29, 2011 The San Mateo County Event Center is accepting proposals for Advertising, Marketing

More information

Quick Guide Contract Compliance Requirements

Quick Guide Contract Compliance Requirements Contract Compliance, within the Department of Procurement and Contracts, is responsible for monitoring the Minority/Women/Disadvantaged Business Enterprises (M/W/DBE) and Section 3 policies and the Davis-Bacon

More information

NOTICE INVITING BIDS

NOTICE INVITING BIDS NOTICE INVITING BIDS NOTICE IS HEREBY GIVEN that the City of Long Beach, California, acting by and through the City s Board of Harbor Commissioners ( City ) will receive, before the Bid Deadline established

More information

REQUEST FOR PROPOSAL Audit and Tax Services ISSUED April 24, 2015 RFP No

REQUEST FOR PROPOSAL Audit and Tax Services ISSUED April 24, 2015 RFP No REQUEST FOR PROPOSAL Audit and Tax Services ISSUED April 24, 2015 RFP No. 15-1474 Tampa Bay Workforce Alliance, Inc. is accepting proposals from qualified CPA firms to provide audit and tax services. Parties

More information

Request for Quotes (RFQ) HR Hotline and Workshops

Request for Quotes (RFQ) HR Hotline and Workshops Date: Thursday, June 08, 2017 Subject: Request for Quotes (RFQ) HR Hotline and Workshops The San Diego Workforce Partnership (SDWP) seeks a contractor to provide and maintain an HR hotline for San Diego

More information

1. PROJECT INFORMATION

1. PROJECT INFORMATION Request for Proposal (RFP) Tribune Building Project Incourage Community Foundation, Inc. ( Incourage ) located in rural central Wisconsin, invites proposals from interested firms for Construction Management

More information

Albany Unified School District Contractor Prequalification

Albany Unified School District Contractor Prequalification Albany Unified School District Contractor Prequalification The Albany Unified School District ( District ) has determined that contractors providing construction services ( Contractor(s) or Firm(s) ) must

More information

PLEASANT GROVE CITY FIRE STATION AND POLICE AND COURTSBUILDINGS

PLEASANT GROVE CITY FIRE STATION AND POLICE AND COURTSBUILDINGS REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES FOR DESIGN AND CONSTRUCTION OF THE PLEASANT GROVE CITY FIRE STATION AND POLICE AND COURTSBUILDINGS Mandatory Pre-Proposal Conference January 11, 2017 4:00

More information

NEW YORK LIQUIDATION BUREAU REQUEST FOR PROPOSAL

NEW YORK LIQUIDATION BUREAU REQUEST FOR PROPOSAL NEW YORK LIQUIDATION BUREAU REQUEST FOR PROPOSAL June 1, 2009 I. BACKGROUND The New York Liquidation Bureau (the Bureau ) carries out the responsibilities of the New York State Superintendent of Insurance

More information

0...- Los Angeles W orld Airports

0...- Los Angeles W orld Airports _...4 0...- Los Angeles W orld Airports Report to the BOARD OF AIRPORT COMMISSIONERS 0 i A AI A I Approved7: Denise, : wr, 7 Executive Assistant Airports R 'e y: D.. 1).,:owers, Deputy Executive Director

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS 1.0. Invitation Capital Region Water (CRW) owns and operates the drinking water, wastewater and stormwater facilities and infrastructure for the city of Harrisburg, PA and portions of surrounding communities

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: Longfellow ES Exit Balcony Addition DATE: March 4, 2019 755 Morse Street, SF, CA 94112 SFUSD Project No.12059

More information

REQUEST FOR QUOTATIONS (RFQ)

REQUEST FOR QUOTATIONS (RFQ) REQUEST FOR QUOTATIONS (RFQ) Phase 1 Environmental Site Assessment (ESA) 1216 Martin Luther King Jr Way, Tacoma WA Page 1 RFQ AT A GLANCE: ADDRESS: PROJECT DESCRIPTION: 1214 Martin Luther King Jr. Way,

More information

Frequently Asked Questions / Items You Should Know about Section 3

Frequently Asked Questions / Items You Should Know about Section 3 Frequently Asked Questions / Items You Should Know about Section 3 1. What is Section 3? Section 3 is a part of the U.S. Department of Housing and Urban Development (HUD) Act of 1968. This Act and HUD

More information

Subcontractor Pre-Qualification Form

Subcontractor Pre-Qualification Form Subcontractor Pre-Qualification Form Page 1 of 3 Today s Date (MO/DAY/YEAR): / / Person Completing Form: Company Information Company Name: Company Website: President/Owner/Partner Name: Other Contact Name/Title:

More information

GOODWILL SITE SAN FRANCISCO, CA REQUEST FOR QUALIFICATIONS ( RFQ ) FOR PROFESSIONAL SERVICES

GOODWILL SITE SAN FRANCISCO, CA REQUEST FOR QUALIFICATIONS ( RFQ ) FOR PROFESSIONAL SERVICES GOODWILL SITE SAN FRANCISCO, CA REQUEST FOR QUALIFICATIONS ( RFQ ) FOR PROFESSIONAL SERVICES Issued by: Goodwill SF Urban Development LLC Related California Issuance of RFQ: Submittal Deadline for Qualifications:

More information

City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders

City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders Issued: November 15, 2017 Closing Date and Time: January 16, 2018, at 2:00 pm Project Summary The City of Eagle Point is requesting

More information

Attic Insulation at Gibbs Village East & West IFB Number Invitation for Bids (IFB) for Attic Insulation at Gibbs Village East & West

Attic Insulation at Gibbs Village East & West IFB Number Invitation for Bids (IFB) for Attic Insulation at Gibbs Village East & West 525 South Lawrence Street Montgomery, Alabama 36104 Attic Insulation at Gibbs Village East & West IFB Number 2019-03 TYPE OF PROJECT: Invitation for Bids (IFB) for Attic Insulation at Gibbs Village East

More information

PREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR

PREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR 1. PROJECT TICE PREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR York Hall Biology/Chemistry Renovation UNIVERSITY OF CALIFORNIA SAN DIEGO a) BNBuilders, Inc. (BNB) intends to award lump sum contracts

More information

DOCUMENT INVITATION TO BID

DOCUMENT INVITATION TO BID DOCUMENT 00 11 16 INVITATION TO BID 1. Notice is hereby given that the governing board ( Board ) of the Oakland School District ( District or Owner ) will receive sealed bids for the following: Project

More information

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY Request for Proposals for Smart Grid Implementation Services RFP Date: October 22, 2014 Response Deadline: November 21, 2014 I. Introduction The Southern California

More information

TRANSBAY BLOCK 8 SAN FRANCISCO, CA REQUEST FOR QUALIFICATIONS ( RFQ ) FOR PROFESSIONAL SERVICES

TRANSBAY BLOCK 8 SAN FRANCISCO, CA REQUEST FOR QUALIFICATIONS ( RFQ ) FOR PROFESSIONAL SERVICES TRANSBAY BLOCK 8 SAN FRANCISCO, CA REQUEST FOR QUALIFICATIONS ( RFQ ) FOR PROFESSIONAL SERVICES Issued by: Related California Tenderloin Neighborhood Development Corporation Issuance of RFQ: Submittal

More information

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Harshman Demolition Response Deadline 3/28/18

More information

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Agency Project Name Stadium Project Response Deadline 1/9/14 12 pm local time

More information

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017 REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES Issuance Date November 27, 2017 Submittal Deadline January 8, 2018 Page Is Blank For Photocopying MARIN LAFCO 2 TABLE OF CONTENTS Section Page Number I.

More information

Document Synopses by Series

Document Synopses by Series Document Synopses by Series AIA Contract Documents are divided into six alphanumeric series by document use or purpose: A Series: Owner/Contractor Agreements B Series: Owner/Architect Agreements (p. 13)

More information

Commonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary FOR

Commonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary FOR 1 23 Commonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary REQUEST FOR RESPONSES (RFR) FOR WEB-BASED BID DOCUMENT DISTRIBUTION

More information

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Bishop Woods Landscape Restoration Response

More information

City of Santaquin REQUEST FOR PROPOSALS For Engineering Services for the East Side Booster Pump Station

City of Santaquin REQUEST FOR PROPOSALS For Engineering Services for the East Side Booster Pump Station City of Santaquin REQUEST FOR PROPOSALS For Engineering Services for the East Side Booster Pump Station The City of Santaquin (the City ) hereby requests competitive proposals from qualified consultants

More information