E-00 POWER, LOW TENSION AND LIGHT SYMBOL SCHEDULE DRAWING LIST BUILDING SITE INFORMATION: DESIGN INTENT:

Size: px
Start display at page:

Download "E-00 POWER, LOW TENSION AND LIGHT SYMBOL SCHEDULE DRAWING LIST BUILDING SITE INFORMATION: DESIGN INTENT:"

Transcription

1 POWER, LOW TENION AND LIGHT YMBOL CHEDULE DRAWING LIT DUPLEX RECEPTACLE OUTLET DUPLEX G.F.C.I. RECEPTACLE OUTLET INGLE PHAE JUNCTION BOX DOUBLE OR THREE PHAE JUNCTION BOX - KEY PLAN, YMBOL CHEDULE AND DRAWING LIT E-0 - LEVEL PARTIAL POWER FLOOR PLAN E-0 - LEVEL PARTIAL POWER FLOOR PLAN - ELECTRICAL PECIFICATION TOTAL DRAWING: 4 PULLBOX DIRECT HARD WIRE CONNECTION TO DEVICE ELECTRIC MOTOR NON FUABLE DICONNECT WITCH ELECTRICAL PANEL BOARD CONTROL PANEL FIRE ALARM MOKE DETECTOR P.A. PEAKER LINE VOLTAGE LIGHT WITCH BUILDING ITE INFORMATION: CIVIC ADDRE: 555 COLUMBIA TREET, NEW WETMINTER, BC LEGAL DECRIPTION: PID , PLAN NUMBER LMP5080, BLOCK 4 LINE VOLTAGE LIGHT MATER TATION EXITING RECEED FLUORECENT LIGHT FIXTURE EXITING RECEED FLUORECENT LIGHT FIXTURE ON EMERGENCY CIRCUIT DEIGN INTENT: PROVIDE ELECTRICAL ENGINEERING FOR COMPLIMENTARY POWER FOR MECHANICAL EQUIPMENT. LEVEL FLOOR PLAN CALE: :00 Police ervices Building KEY PLAN, YMBOL CHEDULE AND DRAWING LIT 75 A HOWN LEVEL FLOOR PLAN CALE: :00

2 GENERAL NOTE FOR DRAWING - :. THE INFORMATION HOWN ON THE DRAWING I THE REULT OF INFORMATION OBTAINED FROM RECORD DRAWING AND FIELD URVEY. THE CONTRACTOR MUT INCLUDE IN THEIR TENDER FOR THE DICONNECTION AND REMOVAL OF ALL ELECTRICAL DEVICE, REQUIRED TO FACILITATE THE DEMOLITION WORK A DECRIBED ON ALL OF THE DRAWING (MECHANICAL AND ELECTRICAL) WHETHER HOWN HERE OR NOT. CLAIM FOR EXTRA COT RELATED TO THI DEMOLITION WORK WILL NOT BE ACCEPTED. ALL REMOVED EQUIPMENT NOT REQUETED BY THE OWNER HALL BE DIPOED OF BY THE CONTRACTOR.. UNLE REQUIRED TO BE REMOVED BY THE DEMOLITION WORK, ALL EXITING DEVICE HOWN ARE TO BE RETAINED AND PROTECTED FROM DAMAGE. 3. DICONNECT AND REMOVE COMPLETELY, TO THE OURCE, ALL REDUNDANT POWER WIRING. TAG ALL EMPTY CONDUIT RACEWAY WITH THEIR "OURCE" AND "DETINATION" FOR FUTURE UE. HPL-6 NP9-37,39 HPL-9 NEW NP0-??,?? HPL-. NP?? HPL-. NP?? HPL-9 NP0-,4 4. CONTRACTOR MUT TRACE EXITING CIRCUIT FOR EXITING HEAT PUMP IN PROJECT, RECORD CIRCUIT NUMBER AND AOCIATED PANEL ON THE RECORD DRAWING IN RED INK. REFER TO MECHANICAL CHEDULE FOR TOTAL QUANTITY OF REQUIRED HEAT PUMP CIRCUIT. 5. PROVIDE UPDATED TYPEWRITTEN DIRECTORIE IN PROJECT PANEL A DIRECTORY MUT HAVE HEAT PUMP NUMBER A PER DRAWING, ROOM NUMBER WHERE INTALLED AND BREAKER RATING (IZE). 6. EXITING DEVICE HOWN IN GREY COLOUR. HPL-3 NP9-8,30 7. CIRCUIT NUMBER ARE HOWN TO INDICATE THE INTENT OF THE POWER CONNECTION. ACTUAL CIRCUIT NUMBER MAY CHANGE DUE TO ITE CONDITION. CONTRACTOR TO CONFIRM ON ITE. HPL-7 NP9-36,38 HPL-4 NP9-3,34 'NP' 8. COORDINATE LOCATION OF ALL POWER RECEPTACLE AND COMMUNICATION ROUGH-IN INTALLATION WITH THE OWNER PRIOR COMMENCE 9. CONTRACTOR HALL IDENTIFY ANY DICREPANCIE WITH ELECTRICAL DEIGN AND NOTIFY THE CONULTANT IMMEDIATELY. HPL-30 NEW NP0-??,?? 'EP' 'NP9' FOR MECH. EQUIPMENT 'NP0' 'NP3' 'NP' 'NP4' HPL-08 NP9-5,7 Police ervices Building REMOVED AND DIPOED OF A AOCIATED WIRING AND MAKE AFE. LEVEL PARTIAL POWER FLOOR PLAN REMOVED AND RELOCATED A HOWN UPON COMPLETION OF NEW CEILING OR WALL FINIH. REWIRE OR EXTEND WIRING A EXITING ELECTRICAL EQUIPMENT TO REMAIN IN IT' PREENT LOCATION. REWIRE OR EXTEND WIRING A 75 A HOWN LEVEL PARTIAL POWER FLOOR PLAN E-0 CALE: :00 KEY NOTE: EPARATE PRICE #. EPARATE PRICE #3. REMOVED AND RE-INTALLED IN AME LOCATION ONCE ALL OTHER WORK I REMOVED. RE-INTALL ALL NEW EQUIPMENT A HOWN. REWIRE OR EXTEND WIRING A CONTRACTOR I REPONIBLE FOR REMOVING, EQUIPMENT TO UIT THE NEW INTALLATION. NO EXTRA WILL BE ALLOWED FOR FAILURE TO DO O. E-0

3 HPL-30 NEW NP-??,?? HPL-0 NP-9,3 HPL- NP-6,8 XHPL-7 NP-33,35 HPL- NP-,3 HPL-9 NP-30,3 HPL-9 NEW NP-??,?? 'NP' 'EP4' HPL-04 NP-,4 HPL-0 NP-8,0 HPL-5 NP-8,0 HPL-06 NP-,4 HPL-07 NP-5,7 Police ervices Building REMOVED AND DIPOED OF A AOCIATED WIRING AND MAKE AFE. LEVEL PARTIAL POWER PLAN REMOVED AND RELOCATED A HOWN UPON COMPLETION OF NEW CEILING OR WALL FINIH. REWIRE OR EXTEND WIRING A EXITING ELECTRICAL EQUIPMENT TO REMAIN IN IT' PREENT LOCATION. REWIRE OR EXTEND WIRING A 75 A HOWN LEVEL PARTIAL POWER FLOOR PLAN E-0 CALE: :00 KEY NOTE: EPARATE PRICE #. EPARATE PRICE #4. REMOVED AND RE-INTALLED IN AME LOCATION ONCE ALL OTHER WORK I REMOVED. RE-INTALL ALL NEW EQUIPMENT A HOWN. REWIRE OR EXTEND WIRING A CONTRACTOR I REPONIBLE FOR REMOVING, EQUIPMENT TO UIT THE NEW INTALLATION. NO EXTRA WILL BE ALLOWED FOR FAILURE TO DO O. E-0

4 GENERAL NOTE FOR DRAWING - :. THE INFORMATION HOWN ON THE DRAWING I THE REULT OF INFORMATION OBTAINED FROM RECORD DRAWING AND FIELD URVEY. THE CONTRACTOR MUT INCLUDE IN THEIR TENDER FOR THE DICONNECTION AND REMOVAL OF ALL ELECTRICAL DEVICE, REQUIRED TO FACILITATE THE DEMOLITION WORK A DECRIBED ON ALL OF THE DRAWING (MECHANICAL AND ELECTRICAL) WHETHER HOWN HERE OR NOT. CLAIM FOR EXTRA COT RELATED TO THI DEMOLITION WORK WILL NOT BE ACCEPTED. ALL REMOVED EQUIPMENT NOT REQUETED BY THE OWNER HALL BE DIPOED OF BY THE CONTRACTOR.. UNLE REQUIRED TO BE REMOVED BY THE DEMOLITION WORK, ALL EXITING DEVICE HOWN ARE TO BE RETAINED AND PROTECTED FROM DAMAGE. NOTE: " (7mm) CONDUIT MINIMUM TUBBED-UP ABOVE T-BAR CEILING. C/W PULL TRING AND PLATIC BUHING. (BY DIV.6) 4" X 4" X -/8" QUARE DEEP BOX c/w INGLE-GANG MUD-RING (BY DIV. 6) NOTE: ROUGH-IN BY DIV. 6 CABLING AND TERMINATION BY DIV. 7 Typical Wall Mounted Telecom Rough-in Detail NT 3. DICONNECT AND REMOVE COMPLETELY, TO THE OURCE, ALL REDUNDANT POWER WIRING. TAG ALL EMPTY CONDUIT RACEWAY WITH THEIR "OURCE" AND "DETINATION" FOR FUTURE UE. NP-6 4 NP CONTRACTOR MUT TRACE EXITING CIRCUIT FOR EXITING HEAT PUMP IN PROJECT, RECORD CIRCUIT NUMBER AND AOCIATED PANEL ON THE RECORD DRAWING IN RED INK. REFER TO MECHANICAL CHEDULE FOR TOTAL QUANTITY OF REQUIRED HEAT PUMP CIRCUIT. 5. PROVIDE UPDATED TYPEWRITTEN DIRECTORIE IN PROJECT PANEL A DIRECTORY MUT HAVE HEAT PUMP NUMBER A PER DRAWING, ROOM NUMBER WHERE INTALLED AND BREAKER RATING (IZE). 6. EXITING DEVICE HOWN IN GREY COLOUR. UP-3 UP-30 EP-?? EP-?? CIRCUIT NUMBER ARE HOWN TO INDICATE THE INTENT OF THE POWER CONNECTION. ACTUAL CIRCUIT NUMBER MAY CHANGE DUE TO ITE CONDITION. CONTRACTOR TO CONFIRM ON ITE. 8. COORDINATE LOCATION OF ALL POWER RECEPTACLE AND COMMUNICATION ROUGH-IN INTALLATION WITH THE OWNER PRIOR COMMENCE 9. CONTRACTOR HALL IDENTIFY ANY DICREPANCIE WITH ELECTRICAL DEIGN AND NOTIFY THE CONULTANT IMMEDIATELY. 3 3 LEVEL PARTIAL POWER DEMO PLAN CALE: :00 LEVEL PARTIAL POWER FLOOR PLAN CALE: :00 REMOVED AND DIPOED OF A AOCIATED WIRING AND MAKE AFE. REMOVED AND RELOCATED A HOWN UPON COMPLETION OF NEW CEILING OR WALL FINIH. REWIRE OR EXTEND WIRING A EXITING ELECTRICAL EQUIPMENT TO REMAIN IN IT' PREENT LOCATION. REWIRE OR EXTEND WIRING A REMOVED AND RE-INTALLED IN AME LOCATION ONCE ALL OTHER WORK I REMOVED. RE-INTALL ALL NEW EQUIPMENT A HOWN. REWIRE OR EXTEND WIRING A NP- CONTRACTOR I REPONIBLE FOR REMOVING, EQUIPMENT TO UIT THE NEW INTALLATION. NO EXTRA WILL BE ALLOWED FOR FAILURE TO DO O. NP- NP- NP-c NP-d NP-3d NP-6 NP-3d NP-6 NP-c NP-3d NP-3d NP-4e NP-c NP-d NP-3d NP-3d NP-c NP-3d NP-3d NP-6 NP-6 NP-4 NP-4 NOTE: THI DRAWING LEVEL RECORD OFFICE FLOOR AND CEILING PLAN FOR INFORMATION ONLY (NOT IN CONTRACT) Police ervices Building LEVEL RECORD OFFICE FLOOR AND CEILING PLAN FOR INFORMATION ONLY (NOT IN CONTRACT) NP-3d NP-3d NP-3d NP-3d NP-c NP-3d NP-3d NP-4e 3 LEVEL PARTIAL EXITING REFLECTED CEILING PLAN CALE: :00 NP-c NP-3d NP-3d NP-4e 4 LEVEL PARTIAL NEW REFLECTED CEILING PLAN CALE: :00 75 A HOWN

5 DIV. 6 PECIFICATION.0 GENERAL PROVIION.0 THE GENERAL CONDITION OF THE CONTRACT HALL FORM AN INTEGRAL PART OF THE PECIFICATION..0 PROVIDE ALL LABOUR AND MATERIAL NECEARY FOR A COMPLETE AND OPERATING YTEM A INDICATED ON THE DRAWING AND/OR PECIFIED HEREIN. ANY WORK AND MATERIAL, EVEN IF NOT HOWN OR PECIFIED THAT I OBVIOULY NECEARY OR REAONABLY IMPLIED TO COMPLETE THE WORK TO BE PROVIDED A IF IT WA BOTH HOWN AND PECIFIED..03 ALL ELECTRICAL WORK AND MATERIAL HALL CONFORM WITH THE CURRENT RELEVANT AND/OR APPLICABLE BUILDING CODE, ELECTRICAL AFETY ACT OF THE JURIDICTION, CURRENT PURUANT REGULATION (ELECTRICAL CODE REGULATION, ELECTRICAL AFETY BULLETIN, ETC) AND TO THE ATIFACTION OF THE AUTHORITY HAVING JURIDICTION AND THE DEIGN PROFEIONAL. FOR THE PURPOE OF THI PECIFICATION INTERPRETATION OF THE WORD "CODE" HALL MEAN ALL CODE, REGULATION AND REQUIREMENT A TATED ABOVE..04 VIIT THE ITE AND ACERTAIN CONDITION AFFECTING THE WORK BEFORE UBMITTING A TENDER QUOTE..05 APPLY FOR ALL PERMIT, ERVICE, FEE AND INPECTION AND PAY FOR ALL FEE TO THE AUTHORITIE HAVING JURIDICTION. INCLUDE ALL COT IN TENDER QUOTE..06 OBTAIN APPROVAL FROM THE ELECTRICAL INPECTION AUTHORITY AND NOTIFY THE ENGINEER OF ANY CHANGE REQUETED BY THE INPECTION AUTHORITY..07 WHERE DOUBT EXIT A TO THE MEANING OF THE DRAWING OR PECIFICATION, OBTAIN CLARIFICATION PRIOR TO TENDER..08 HOP DRAWING FOR ELECTRICAL EQUIPMENT/ MATERIAL HALL BE UBMITTED FOR REVIEW BY ENGINEER BEFORE MANUFACTURING AND INTALLATION CAN PROCEED..09 INCLUDE ALL FEDERAL, PROVINCIAL AND MUNICIPAL TAXE FOR THE WORK IN THE TENDER PRICE..0 ALL MATERIAL UED HALL BE NEW, OF THE TYPE PECIFIED, AND APPROVED BY CERTIFICATION AGENCY RECOGNIZED BY AUTHORITY BARING JURIDICTION, AND FREE FROM DEFECT.. ALL ELECTRICAL EQUIPMENT INTALLED OR CONNECTED HALL BE IDENTIFIED BY MEAN OF BLACK LAMICOID LABEL c/w MINIMUM 3/8" WHITE LETTERING.. CLEAN ALL EQUIPMENT DURING CONTRUCTION AND AGAIN ON COMPLETION OF THE CONTRACT..3 REMOVE ALL URPLU MATERIAL, CUTTING, PACKAGING AND DEBRI FROM THE ITE DURING THE PROGRE AND AT FINAL COMPLETION OF THE.4 THE OWNER REERVE THE RIGHT OF TRIAL OR TEMPORARY UAGE PRIOR TO ACCEPTING THE INTALLATION..5 EXECUTE ALL WORK IN A WORKMANLIKE MANNER, TO PREENT A NEAT MECHANICAL APPEARANCE..6 COORDINATE WITH ALL TRADE AND ARRANGE EQUIPMENT IN PROPER RELATION WITH OTHER APPARATU, DUCT, PIPE, ETC. AND WITH BUILDING CONTRUCTION AND ARCHITECTURAL FINIHE..7 ALL RECEPTACLE COVER PLATE, WITCH COVER AND EXHAUT FAN WITCH COVER TO BE c/w DYMOTAPE LABEL INDICATING PANEL NAME AND CIRCUIT NUMBER..8 BUILDING ENVELOPE PENETRATION OF ANY ELECTRICAL COMPONENT (i.e. CONDUIT, BOXE, CABLE, ETC.) HALL BE EXECUTED O INTEGRITY OF AEMBLY I NOT COMPROMIED. PROVIDE FOR ADEQUATE EALING, COVER, GAKET, CAP, ETC. COORDINATE WORK AND REQUIREMENT WITH ALL OTHER RELEVANT CONTRACTOR, ARCHITECT, ENVELOPE CONULTANT AND OTHER RELEVANT CONULTANT AND CONTRACTOR..9 LIABILITY AND EXCLUION. DRAWING, PECIFICATION AND OTHER DOCUMENT PERTAIN TO ELECTRICAL COPE OF WORK ONLY.. TAK WHICH ARE NOT PART OF ELECTRICAL COPE OF WORK EVEN IF MENTIONED IN THEE DOCUMENT ARE INDICATED ONLY FOR REFERENCE AND COORDINATION PURPOE ONLY..3 WORK PERFORMED BY CONTRACTOR NOT PECIFICALLY IDENTIFIED A PART OF THE COPE OF WORK HALL BE PERFORMED WITH A CLEAR UNDERTANDING THAT, AND ANY AGENT OR EMPLOYEE OF ACUMEN ENGINEERING LTD. ARE NOT IN ANY WAY LIABLE NOR REPONIBLE FOR THI.4 GENERALLY THE COPE OF WORK I LIMITED TO DIV. 6 OF NATIONAL MATER PECIFICATION..5 PECIFICALLY, DOE NOT PROVIDE ANY ENGINEERING/CONULTING ERVICE RELATED TO BUILDING ENVELOPE, WATERPROOFING AND ANY OTHER NON-ELECTRICAL COMPONENT. THI APPLIE TO BUT I NOT LIMITED TO ALL AND ANY ELECTRICAL PENETRATION AND INTALLATION THROUGHOUT OR WITHIN BUILDING ENVELOPE..0 CONDUIT, WIRE AND CONNECTION.0 DRAWING ARE CHEMATIC ONLY. CONDUIT RUN HOWN INDICATE POINT TO BE JOINED. RUN MAY BE ALTERED BY THE CONTRACTOR TO UIT ACTUAL FIELD CONDITION. ELECTRICAL DRAWING ONLY GIVE INDICATION OF FEATURE OF OTHER TRADE. ARCHITECTURAL, TRUCTURAL AND MECHANICAL DRAWING GOVERN WHERE THEE ARE INVOLVED..0 WIRING DEVICE IN FINIHED AREA HALL BE RECEED MOUNTED AND FOR ALL UNFINIHED AREA MAY BE URFACE MOUNTED..03 A WARNING IGN HALL BE PLACED NEAR ALL MOTOR WITH THE FOLLOWING WORDING: "DO NOT ERVICE UNTIL DICONNECT ARE LOCKED OFF"..04 FINAL CONNECTION TO MOTOR HALL BE WITH MIN. 8" LONG FLEX CONDUIT, PROVIDE DICONNECT A PER CODE REQUIREMENT..05 TET YTEM AND RECORD AME FOR THE ENGINEER' APPROVAL:. VOLTAGE DROP. PHAE BALANCE.3 INULATION REITANCE.4 GROUND REITANCE.06 ALL WIRE AND CABLE HALL BE COPPER, 98% CONDUCTIVITY, COLOUR CODED, NEW AND MARKED A PER CODE REQUIREMENT AND INTALLED IN RACEWAY. WIRE HALL BE RATED MIN. 600V TYPE TWH OR R90X-LINK..07 ALL WIRING HALL BE IZED A PER CODE. MINIMUM ALLOWABLE WIRE IZE I # AWG. CONDUCTOR #8 AND LARGER TO BE TRANDED. ALL WIRE INTALLED IN CONDUIT HALL BE PULLED IN AT THE AME TIME. ONLY APPROVED PULLING LUBRICANT HALL BE UED. COLOUR CODE CONDUCTOR WITH DIFFERENT COLOUR FOR EACH PHAE, NEUTRAL, GROUND AND BOND WIRE A REQUIRED BY CODE..09 MAXIMUM VOLTAGE DROP HALL BE A PER CODE REQUIREMENT..0 ALL CONDUIT, CABLE AND WIRE, ETC., TO BE RATED FT4 FOR NON COMBUTIBLE BUILDING AND FT6 FOR PLENUM AND A REQUIRED BY THE CODE.. ALL WIRE CONNECTION TO BE ECURELY FATENED BY MEAN OF APPROVED CONNECTOR.. ALL NON-CURRENT CARRYING METAL PART HALL BE GROUNDED AND/OR BONDED IN ACCORDANCE WITH THE CODE..3 THE BUILDING TRUCTURAL TEEL HALL BE BONDED TO THE GROUND YTEM..4 OPENING IN ALL ELECTRICAL METAL BOXE HALL BE PUNCHED OR CUT. BURNING OF HOLE I NOT PERMITTED..5 INTALL ALL CONDUIT, ETC. TO ACCOUNT FOR EXPANION AND INTALL APPROVED EXPANION JOINT WHERE.6 RACEWAY HALL BE RIGID METAL CONDUIT, EMT OR FLEXIBLE CONDUIT A HOWN ON THE DRAWING, ALL CONDUIT INTALLED IN CONCRETE FLOOR HALL BE RIGID P.V.C. OR RIGID GALVANIZED TEEL CONDUIT c/w BOND CONDUCTOR..7 EMT COUPLING AND CONNECTOR TO BE T & B TEEL, TAPE ALL JOINT FOR ALL IN-LAB INTALLATION. TEEL HALL BE UED ABOVE GRADE..8 UE OF RUNNING THREAD I NOT PERMITTED..9 ALL CONDUIT MUT BE ECURELY FATENED WITH APPROVED CLIP AND CREW IN PARTITION AND CADDY CLIP IN CEILING. NAIL ARE NOT ACCEPTED..0 EXPOED CONDUIT HALL RUN PARALLEL TO BUILDING LINE AND BE PAINTED OUT TO MATCH WALL FINIH. WHERE CONDUIT ARE RUN EXPOED ON EXITING URFACE PAINT TO MATCH WALL FINIH.. PROVIDE OUTLET BOXE FOR CONNECTING TO DEVICE AND EQUIPMENT A REQUIRED OR A INDICATED ON DRAWING. LOCATION OF OUTLET MAY BE CHANGED UP TO 5'-0" WITHOUT EXTRA CHARGE PROVIDED THAT INTRUCTION FOR CHANGE ARE IUED BEFORE INTALLATION OF THE OUTLET..3 ALL CONDUIT, CONDUCTOR, WIRE, ETC. TO BE LABELED IN INDELIBLE INK AT PANEL AND JUNCTION BOXE INDICATING DEVICE FED, PANEL NAME AND CIRCUIT NUMBER.4 ALL EMPTY CONDUIT HALL BE C/W APPROVED FOR APPLICATION PULL TRING. 3.0 DITRIBUTION EQUIPMENT 3.0 LIGHTING AND POWER PANEL TO BE CIRCUIT BREAKER TYPE AND A HOWN ON DRAWING: PANEL TO BE OF DEAD FRONT TYPE, CODE GAUGE TEEL ENCLOURE. FINIHED FACTORY PAINT AA GRAY 6 ENAMEL. FIT WITH PLATIC COVERED TYPED DIRECTORY IN FRAME ON INIDE OF DOOR COVER. DIRECTORY TO INDICATE CIRCUIT ERVED A PER FINAL WIRING CONNECTION. PANEL TO BE WITH BOLT-ON BREAKER, MULTI-POLE BREAKER TO HAVE COMMON TRIP (NO TIE HANDLE WILL BE ACCEPTED) MAIN DITRIBUTION CENTRE HALL BE A DETAILED ON THE DRAWING ALL ELEMENT OF ELECTRIC POWER DITRIBUTION YTEM HALL BE RATED FOR PROPER VOLTAGE AND AVAILABLE FAULT LEVEL. OVER CURRENT PROTECTION DEVICE HALL BE APPROVED AND MARKED A BREAKER OR BREAKER/FUE COMBINATION IN ERIE. HOP DRAWING HALL CLEARLY IDENTIFY THE COMPLIANCE WITH THI REQUIREMENT PROVIDE DRIP HIELD TO ADEQUATELY DEFLECT WATER FROM ALL ELECTRICAL EQUIPMENT DICONNECT WITCHE HALL BE WITCHMATIC HEAVY-DUTY ENCLOED AFETY WITCHE OR EQUAL. DICONNECT WITCHE HALL HAVE THE OPERATING HANDLE INTERLOCKED WITH THE WITCH COVER, TEEL REINFORCED FUE CLIP, A QUICK-MAKE, QUICK-BREAK MECHANIM AND HALL BE HOREPOWER RATED FOR 00% LOADING LABEL METER CENTER FUIBLE DICONNECT AND INDICATE THE MAXIMUM PERMIIBLE RATING OF THE FUE IN EACH REPECTIVE DICONNECT CONTRACTOR TO PROVIDE HOCK/FLAH PROTECTION MARKING ON ALL ELECTRICAL EQUIPMENT A PER C.E.C. RULE FIRE TOPPING OF ERVICE PENETRATION AND FIRE REITANT AEMBLIE 6.0 ALL ELECTRICAL WIRE, CABLE, NONCOMBUTIBLE RACEWAY, OUTLET BOXE AND OTHER IMILAR ERVICE THAT PENETRATE FIRE WALL, FIRE EPARATION OR AEMBLY REQUIRED TO HAVE A FIRE REITANCE RATING OR FIRE EPARATION, HALL BE EALED BY FIRE TOP YTEM WHICH HA AN "F" AND/OR "FT" RATING NOT LE THAN REQUIRED FIRE PROTECTION RATING OF FIRE EPARATION. 6.0 "F" AND "FT" RATING HALL BE DETERMINED BY FIRE TET METHOD CAN4-5-M "TANDARD METHOD OF FIRE TET OF FIRE TOP YTEM". EE CURRENT BUILDING CODE, FIRE TOPPING OF ERVICE PENETRATION CONTRACTOR HALL ONLY UE LITED MATERIAL AND METHOD A LITED AND INDICATED IN "ULC LIT OF EQUIPMENT AND MATERIAL VOLUME, BUILDING CONTRUCTION" (NO. 40U8 FIRE EPARATION) ERVICE PENETRATION AND FIRE TOPPING OF ERVICE PENETRATION IN FIRE EPARATION AND FIRE RATED AEMBLIE HALL COMPLY WITH THE CURRENT BUILDING CODE PROVIDE FOR FIRE TOP IN CONCEALED PACE A REQUIRED BY THE CURRENT BUILDING CODE ALL FIRE REITANCE RATED AEMBLIE (i.e. WALL CEILING, ETC.) WHICH CONTAIN PANEL BOARD, BACK BOXE, ETC. HALL BE c/w FIRE RATED BACKING TO MAINTAIN THE INTEGRITY OF THE FIRE REITANCE CONTRACTOR HALL EMPLOY QUALIFIED FIRETOP PROFEIONAL ENGINEER TO PROVIDE THE DEIGN OF AND REVIEW FOR FIRETOP INTALLATION.. CONTRACTOR HALL PROVIDE FIRETOP PROFEIONAL ENGINEER LETTER; AURANCE OF PROFEIONAL DEIGN AND COMMITMENT OF FIELD REVIEW (CHEDULE B-), UMMARY OF DEIGN AND FIELD REVIEW REQUIREMENT (CHEDULE B-), AT THE INTALL TAGE OF THE CONTRUCTION..3 BEFORE UBTANTIAL PERFORMANCE CAN BE GRANTED CONTRACTOR HALL PROVIDE FIRETOP PROFEIONAL ENGINEER LETTER OF AURANCE OF PROFEIONAL FIELD REVIEW AND COMPLIANCE (CHEDULE C-B)..4 ALL COT RELATED TO THE ABOVE REQUIREMENT HALL BE INCLUDED IN THE CONTRACTOR BAE BID. 8.0 FINAL ACCEPTANCE 8.0 UBMIT TO THE ENGINEER UPON COMPLETION OF THE CONTRACT, ONE MARKED UP ET OF RECORD DRAWING AND ONE ET OF MAINTENANCE MANUAL FOR DITRIBUTION EQUIPMENT. 8.0 DELIVER TO THE ENGINEER CERTIFICATE OF APPROVAL AND FINAL INPECTION FROM AUTHORITIE HAVING JURIDICTION PRIOR TO FINAL OCCUPANCY. THEE MUT BE PROVIDED THREE WORKING DAY BEFORE ENGINEER FINAL OCCUPANCY REVIEW AFTER WORK I COMPLETED, FURNIH TO OWNER A WRITTEN GUARANTEE THAT FOR ONE YEAR FROM DATE OF ACCEPTANCE, ANY DEFECT IN MATERIAL OR WORKMANHIP WILL BE CORRECTED AT NO COT TO THE OWNER. UBMIT COPY OF GUARANTEE TO ENGINEER..0 EIMIC RETRAINT.0. PROVIDE ALL MATERIAL AND LABOUR NECEARY TO UPPLY AND INTALL EIMIC RETRAINT FOR ALL ELECTRICAL EQUIPMENT, CONDUIT, RACEWAY, ETC. TO CONFORM WITH BUILDING CODE AND ALL OTHER APPLICABLE REGULATION.. CONTRACTOR HALL RETAIN AND PAY FOR EIMIC ENGINEER TO DEIGN AND INPECT THE EIMIC RETRAINT OF THE ELECTRICAL YTEM COMPONENT COVERED UNDER DIVIION 6 FOR THI CONTRACT..3 THE EIMIC ENGINEER RETAINED BY CONTRACTOR HALL PROVIDE FOR THE FOLLOWING: - IGNED AND EALED LETTER OF AURANCE OF PROFEIONAL DEIGN AND COMMITMENT FOR FIELD REVIEW AND UMMARY OF DEIGN AND FIELD REVIEW A REQUIRED BY THE BRITIH COLUMBIA BUILDING CODE (CHEDULE B AND B, POINT 6.5). - CERTIFIED DETAILED DRAWING OF EIMIC RETRAINT. - DETAILED PECIFICATION FOR EIMIC RETRAINT. - WRITTEN REPORT OF ITE REVIEW. - IGNED AND EALED LETTER OF AURANCE OF PROFEIONAL FIELD REVIEW AND COMPLIANCE. (CHEDULE C-B).4 UBTANTIAL COMPLETION WILL NOT BE CONIDERED WITHOUT THE UBMIION OF THE ABOVE DOCUMENT..5 ALL THE ABOVE DOCUMENT HALL BE UBMITTED TO THE ELECTRICAL ENGINEER FOR FURTHER DITRIBUTION AND FILE..6 IMMEDIATELY AFTER CONTRACT AWARD, CONTRACTOR HALL END A LETTER TO THE ELECTRICAL ENGINEER CONFIRMING RETAINMENT OF EIMIC ENGINEER FOR THE ERVICE A DECRIBED IN THI PECIFICATION..7 EIMIC ENGINEER HALL BE A REGITERED PROFEIONAL ENGINEER IN THE AOCIATION OF PROFEIONAL ENGINEER AND GEOCIENTIT OF BRITIH COLUMBIA, AND HALL HAVE A MINIMUM OF YEAR EXPERIENCE IN THI FIELD..8 EIMIC ENGINEER HALL HAVE ENGINEER' PROFEIONAL LIABILITY INURANCE, MINIMUM A FOLLOW: $,000, EACH LO $,000, PER POLICY PERMIT..9 THE CONTRACTOR HALL COOPERATE WITH THE EIMIC ENGINEER AND HALL PROMPTLY UPPLY UCH INFORMATION, INCLUDING WEIGHT OF EQUIPMENT AND BAE FRAME OR MOUNTING PLATE LAYOUT, A REQUETED BY THE EIMIC ENGINEER NECEARY TO UPPORT THE DEIGN AND DETAIL FOR EIMIC RETRAINT..0. THE FOLLOWING REQUIREMENT ARE MINIMUM BUT ARE NOT EXHAUTIVE. CONTRACTOR HALL OBTAIN AND MEET DETAIL PECIFICATION AND REQUIREMENT FROM EIMIC ENGINEER. IN NO CIRCUMTANCE HALL EIMIC RETRAINT BE LE TRINGENT THAN A REQUIRED BY THE FOLLOWING PECIFICATION AND EIMIC ENGINEER.. ACCEPTABLE ANCHOR BOLT MANUFACTURER ARE HILTI, RAMET, AND UCAN. OTHER MANUFACTURER MAY BE UED UBJECT TO THE APPROVAL BY THE EIMIC ENGINEER..3 LACK CABLE RETRAINT HALL UTILIZE EITHER GALVANIZED OR TAINLE TEEL TRANDED CABLE. THE INTALLATION HALL UE CLAMP, THIMBLE, HACKLE AND OTHER AOCIATED HARDWARE CORRECTLY IZED FOR THE DIAMETER OF THE CABLE PECIFIED BY THE EIMIC ENGINEER..4 ELECT VIBRATION IOLATOR TO PROVIDE A NATURAL FREQUENCY NOT GREATER THAN ONE THIRD OF THE EQUIPMENT' LOWET FORCING FREQUENCY..5 UE "LION" CHAIN, GALVANIZED TEEL WIRE OR AIRCRAFT CABLE FOR LUMINAIRE HANGER..6 ALL EIMIC RETRAINT COMPONENT EXPOED TO THE WEATHER HALL BE TAINLE TEEL CONTRUCTION OR PROTECTED AGAINT CORROION EITHER BY HOT-DIPPED GALVANIZING, TWO-COAT EPOXY PAINT YTEM, OR OTHER COATING ACCEPTABLE TO THE EIMIC ENGINEER..7 NOTWITHTANDING THE ABOVE, GAUGE OR IZE MALLER THAN INDICATED BELOW WILL NOT BE ACCEPTED FOR EIMIC RETRAINT: - #4 AWG WIRE - /6" DIA AIRCRAFT CABLE - #3 LION CHAIN.03. PROVIDE EIMIC RETRAINT INCLUDING ANCHOR BOLT, LACK CABLE BRACE AND MICELLANEOU FRAMING AND CONNECTION.. EIMIC RETRAINT MAY BE OMITTED FROM THE FOLLOWING INTALLATION: A) CONDUIT LE THAN /4" DIAMETER..3 EQUIPMENT MANUFACTURER HALL BE REPONIBLE FOR ENURING THAT THE EQUIPMENT HA ADEQUATE TRENGTH FOR EIMIC RETRAINT AND ANCHORAGE OF THE EQUIPMENT FRAMING. MANUFACTURER REPORT CONFIRMING THE ABOVE HALL BE UBMITTED TO THE ELECTRICAL ENGINEER..4 PROVIDE TRANVERE AND LONGITUDINAL EIMIC RETRAINT ANCHORAGE OR BRACING TO CABLE TRAY, CONDUIT AND BUWAY. ON VERTICAL BU WAY PROVIDE FOR LATERAL RETRAINT GUIDE AT EACH FLOOR PENETRATION AND PACED NOT MORE THAN 0' (REFER TO EIMIC ENGINEER FOR DIRECTION)..5 EIMIC RETRAINT HALL BE INTALLED AT LEAT 3" CLEAR FROM OTHER EQUIPMENT, PIPING, DUCT OR OTHER INTALLATION..6 INTALL EIMIC RETRAINT CABLE BRACE O THAT THEY ARE NOT VIIBLY LACK. AT TEEL TRUE, CONNECT BRACE TO TOP CHORD AT PANEL POINT..7 FOR TRANFORMER, PROVIDE FOR VIBRATION IOLATOR, AND EIMICALLY RATED PRING IOLATOR, OR UE NUBBER WITH REILIENT BUHING OR OTHER PROVIION, UCH A TO MAINTAIN VIBRATION IOLATION TOGETHER WITH EIMIC RETRAINT..8 FOR UPENDED EQUIPMENT, UCH A TRANFORMER, PROVIDE CABLE OR RIGID BRACE TO RETRAIN EQUIPMENT AGAINT EIMIC LOAD..9 PROVIDE UB-FRAME WHERE REQUIRED FOR ADEQUATE UPPORT OF THE EQUIPMENT FOR EIMIC RETRAINT AND ANCHORAGE TO THE BUILDING TRUCTURE..0 FOR LUMINAIRE INTALLED IN UPENDED ACOUTICAL, METAL PAN OR COFFER CEILING YTEM, INDEPENDENTLY UPPORT LIGHT FIXTURE FROM TRUCTURE UING CABLE, WIRE OR CHAIN.. FOR POWER GENERATION YTEM, EIMIC RETRAINT HALL BE INTALLED ON GENERATOR ET, FUEL DAY TANK, BATTERY BANK, BATTERY CHARGER, MUFFLER, CONTROL PANEL AND CABINET, AND ANY OTHER COMPONENT WHICH FORM PART OF THE POWER GENERATION INTALLATION.. CO-ORDINATE WITH OTHER RELEVANT TRADE OR DIVIION FOR THE INTALLATION OF HOUEKEEPING PAD A PECIFIED OR HOWN ON THE DRAWING..3 WHERE DRILLING OF THE TRUCTURE I REQUIRED FOR ANCHORAGE DETAIL, THE DRILLING HALL BE UBJECT TO THE APPROVAL OF THE TRUCTURAL ENGINEER..00 DIV. 6 EXCLUION.0 THE FOLLOWING WORK I EXCLUDED FROM DIV. 6 COPE OF WORK BUT HA TO BE DONE BY GENERAL CONTRACTOR TO FACILITATE THE INTALLATION OF ELECTRICAL YTEM AND/OR I AFFECTED BY ELECTRICAL INTALLATION. THI WORK HA TO BE PERFORMED UNDER THE DIRECTION OF OTHER RELEVANT PROFEIONAL UCH A AN ARCHITECT, MECHANICAL, CIVIL, BUILDING ENVELOPE, ETC. THI WORK HALL BE PERFORMED UNDER OTHER RELEVANT PECIFICATION ECTION (OTHER THAN DIV. 6). CONTRACTOR HALL COORDINATE DIV. 6 WORK WITH ALL OTHER RELEVANT FOR DIRECTION, GUIDANCE, PECIFICATION REGARDING THI WORK, GENERAL CONTRACTOR HALL CONTACT RELEVANT PROFEIONAL (NOT ELECTRICAL). GENERAL CONTRACTOR MUT INCLUDE THI WORK IN BAE BID..0 NON-EXHAUTIVE LIT OF EXCLUION:. WATERPROOFING OF NON-ELECTRICAL COMPONENT LIKE BUILDING ENVELOPE, WALL, ROOF, ETC.. X-RAY FOR CUTTING, CORING, PATCHING..3 CONTROL WIRING UNLE PECIFIED IN THI ECTION..4 ALL CIVIL CONCRETE, EXCAVATION OR BACKFILL WORK INCLUDING HORING AND BEDDING..5 COVER FOR PULL PIT..6 PRECAT AND/OR CAT IN PLACE CONCRETE PRODUCT UCH A PULLBOXE, LIGHT POLE BAE, TRANFORMER CONCRETE PAD, ETC..7 DUCT DRAINAGE AND AOCIATED BACKWATER VALVE..8 BACKING..9 PAINTING UNLE PECIFIED IN THI ECTION..0 FIRE RATED DRYWALL ENCLOURE FOR PANELBOARD AND LIGHT FIXTURE.. CUTTING, PATCHING OR CORING.. TEMPORARY LIGHTING UNLE PECIFICALLY DETAILED A PART OF DIV RENOVATION AREA PECIFICATION.0 CONTRACTOR I TO ENURE THAT A MINIMUM OF DIRUPTION OCCUR TO THE OWNER PRIMARY BUINE DURING THEIR NORMAL HOUR OF OPERATION. THI MAY INVOLVE THE CONTRACTOR WORK BEING PERFORMED ON EVENING, WEEKEND, AND/OR HOLIDAY. THE CONTRACTOR HALL INCLUDE ALL COT OF THI PROVIION IN THEIR BAE TENDER QUOTE. NO ALLOWANCE WILL BE UBEQUENTLY BE MADE FOR FAILURE TO INCLUDE THEE COT IN BAE TENDER QUOTE..0 CONTRACTOR HALL REWIRE, EXTEND WIRE, CONDUIT, ETC. OR INTALL NEW FOR ANY RELOCATED ELECTRICAL DEVICE A HOWN ON THE DRAWING AND/OR A.03 ALL ELECTRICAL DEVICE HOWN ON THE DRAWING AND/OR A REQUIRED HALL BE NEW UNLE OTHERWIE NOTED..04 ALL MODIFIED/NEW ELECTRICAL YTEM HALL BE FULLY OPERATIONAL AFTER RENOVATION I COMPLETE AND BE ACCEPTED BY THE CONULTANT AND OWNER..05 ALL REMOVED AND UNUED ELECTRICAL DEVICE FROM THE RENOVATED AREA HALL BE TURNED OVER TO OWNER UNLE OTHERWIE NOTED. INTERM TORAGE LOCATION OF THEE DEVICE HALL BE COORDINATED WITH THE OWNER AND TORED ECURELY TO PREVENT DAMAGE..06 CONTRACTOR HALL RELOCATE, REWIRE, OR REROUTE ALL WIRING WHICH PAE THROUGH RENOVATED AREA TO ENURE PROPER OPERATION OF ALL ELECTRICAL YTEM OUTIDE OF RENOVATED AREA..07 ANY FIXTURE, WIRING DEVICE, ETC. DAMAGED DURING AND AFTER REMOVAL HALL BE REPLACED WITH NEW APPROVED EQUIPMENT AT CONTRACTOR' COT..08 CONTRACTOR I REPONIBLE FOR ADEQUATE PROTECTION OF EQUIPMENT, FURNITURE, ETC. (PLATIC COVER, MOVEMENT OF OWNER FURNITURE, ETC.) DURING THE EXECUTION OF THE.09 CONTRACTOR I REPONIBLE FOR CLEANING UP THE WORK AREA EACH DAY BEFORE LEAVING THE JOB ITE..0 ALL MATERIAL HALL BE UPPLIED AND INTALLED A PECIFIED AND/OR HOWN ON THE DRAWING.. CONTRACTOR TO CONFIRM ALL LOCATION OF EXITING EQUIPMENT, WIRING, CIRCUIT NUMBER, ETC FIELD REVIEW DEFINITION.0 FIELD REVIEW ARE : - CONDUCTED PECIFICALLY AND ONLY FOR THE COPE OF WORK FOR WHICH THE CONULTANT I REPONIBLE; - A REVIEW CONDUCTED AT THE ITE OF THE IMPLEMENTATION OR CONTRUCTION OF THE ENGINEERING WORK; - CONDUCTED AT INTERVAL APPROPRIATE TO THE TAGE OF THE CONTRUCTION/IMPLEMENTATION; - PERFORMED BY THE CONULTANT WHEN CONIDERED AT THE CONULTANT' PROFEIONAL DICRETION TO BE NECEARY TO BECOME FAMILIAR WITH THE PROGRE AND QUALITY OF THE WORK; - TO DETERMINE THAT THE WORK I IN GENERAL CONFORMITY WITH THE CONTRUCTION CONTRACT DOCUMENT; AND - RECORDED IN WRITING AND COMMUNICATED TO THE CLIENT, AND CONTRACTOR..0 FIELD REVIEW DO NOT: PROVIDE UPERVIION OF THE IMPLEMENTATION OR CONTRUCTION WORK; DIRECT OR HAVE CONTROL OVER THE CONTRACTOR' WORK; HAVE ANY REPONIBILITY FOR THE CONTRUCTION MEAN, METHOD, TECHNIQUE, EQUENCE OR PROCEDURE ELECTED BY THE CONTRACTOR NOR FOR THE CONTRACTOR' AFETY PRECAUTION OR PROGRAM IN CONNECTION WITH THE (THEE RIGHT AND REPONIBILITIE ARE OLELY THOE OF THE CONTRACTOR IN ACCORDANCE WITH THE CONTRACT DOCUMENT); GUARANTEE THAT THE PERFORMANCE OF THE CONTRACTOR I IN ACCORDANCE WITH THE CONTRACT DOCUMENT OR ANY APPLICABLE LAW, CODE, RULE OR REGULATION; GUARANTEE THAT ALL DEFICIENT WORK WILL BE IDENTIFIED BY THE FIELD REVIEWER (THE REVIEWER MAY REJECT NON-CONFORMING WORK, BUT WILL LEAVE THE MEAN AND METHOD FOR ACHIEVING WHAT I REQUIRED TO THE CONTRACTOR OR OTHER WHO ARE TAKED WITH IMPLEMENTING OR CONTRUCTING THE WORK); AND, INPECT THE WORK OR AFETY AT A CONTRACTOR-CONTROLLED ITE OR A ITE MANAGED BY OTHER, AND DOE NOT REVIEW THE AFETY PROGRAM. Police ervices Building 75 ELECTRICAL PECIFICATION A HOWN E-04

DEMOLITION AND REMOVALS THE EXISTING FACILITY WILL BE OCCUPIED AND IN OPERATION DURING THE PERFORMANCE OF THE WORK.

DEMOLITION AND REMOVALS THE EXISTING FACILITY WILL BE OCCUPIED AND IN OPERATION DURING THE PERFORMANCE OF THE WORK. TE EXITING FACILITY WILL BE OCCUPIED AND IN OPATION DURING TE PFORMANCE OF TE WORK.. WEN NECEARY TO TEMPORARILY DICONNECT ANY EXITING FEED OR BRANC CIRCUIT UPPLYING OCCUPIED FACILITIE, CONF WIT TE OWN,

More information

CITY OF LAGUNA BEACH, PUBLIC WORKS DEPARTMENT

CITY OF LAGUNA BEACH, PUBLIC WORKS DEPARTMENT DATE: October 23, 20 TO: FROM: ALL BIDDER UBMITTING PROPOAL FOR CIP 5 - CITY HALL RETROOM RENOVATION CITY OF LAGUNA BEACH, PUBLIC WORK DEPARTMENT UBJECT: A D D E N D U M #2 (5 PAGE) Please address the

More information

CONSTRUCTION SPECIFICATION FOR COMPACTING

CONSTRUCTION SPECIFICATION FOR COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 501 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR COMPACTING TABLE OF CONTENTS 501.01 SCOPE 501.02 REFERENCES 501.03 DEFINITIONS 501.0 DESIGN AND SUBMISSION

More information

NOVADYNE 365 Lansdowne St. E., Unit 1, Peterborough, ON K9L 2A3

NOVADYNE 365 Lansdowne St. E., Unit 1, Peterborough, ON K9L 2A3 SYMBOL MODEL NUMBER LIGHTING CONTROLS SCHEDULE MANUFACTURER DESCRIPTION EMERGENCY LIGHTING & EXIT SCHEDULE SYMBOL MODEL NUMBER MANUFACTURER DESCRIPTION RECEPTACLE LEGEND LIGHTING LEGEND 15 Lansdowne Street

More information

Vertical Platform Lift to the Stage at Enka Middle School

Vertical Platform Lift to the Stage at Enka Middle School Vertical Platform Lift to the tage at Enka Middle chool to the TAGE at 90 Asbury Road, Candler, NC 5 PROJECT DECRIPTION: WORK INVOLVE RENOVATION WORK TO THE TAGE AREA FOR A PROPOED. NO NEW CONDITIONED

More information

KEY PLAN N.T.S. MAIN FLOOR PLAN NEW MEZZANINE FLOOR PLAN FIREHALL #1 MEZZANINE 1 EAST 6TH AVENUE NEW WESTMINSTER, B.C.

KEY PLAN N.T.S. MAIN FLOOR PLAN NEW MEZZANINE FLOOR PLAN FIREHALL #1 MEZZANINE 1 EAST 6TH AVENUE NEW WESTMINSTER, B.C. P P EXIST. STEEL STAIR AREA OF WORK EXIST. COLUMN KEY PLAN N.T.S. NEW W0 BEAM GUARDRAIL TO BE REMOVED SHOWN DOTTED. D. D. NEW HSS POST 6m CHECKERPLATE LANDING INFILL. NEW HANDRAIL TO MATCH EXISTING. T

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or

More information

Exterior Door & PA System Replacement, Domestic Water Piping System and B/F Access Upgrades

Exterior Door & PA System Replacement, Domestic Water Piping System and B/F Access Upgrades Addendum 1 Page 1 ADDENDUM NO. 1 Domestic Water Piping System and B/F Access Upgrades Sundridge Centennial Public School Sundridge, Ontario The following Addendum shall be part of the Tendering Documents

More information

Palm Beach County Building Officials and Construction Industry. Palm Beach County Building Code Advisory Board (BCAB) Technical Interpretation

Palm Beach County Building Officials and Construction Industry. Palm Beach County Building Code Advisory Board (BCAB) Technical Interpretation BCAB Buiklng Code Adviory Board c:ipam Beach County TO: FROM: DAT: R: Palm Beach County Building Official and Contruction Indutry Palm Beach County Building Code Adviory Board (BCAB) Technical Interpretation

More information

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC). SECTION 16111 CONDUITS PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide conduits, complete, as shown, specified or required per Contract Documents. Principal items include: 1. Rigid aluminum conduit.

More information

THE LINWOOD 8680 MAGNOLIA AVENUE PERRY HALL, MD

THE LINWOOD 8680 MAGNOLIA AVENUE PERRY HALL, MD JENKIN BUILDER LLC 20IECC CODE COMPLIANCE 301.1 CLIMATE CODE 4A 402.4.5 RECEED LIGHTING: 401.2 COMPLIANCE METHOD: MANDATORY AND PRECRIPTIVE PROVIION. RECEED LUMINAIRE INTALLED IN THE BUILDING THERMAL ENVELOPE

More information

PROJECT NO. CWA A May 24, 2017 ADDENDUM NO. 1 LEGION FIELD STADIUM RENOVATIONS DEPT. OF PLANNING, ENG. & PERMITS

PROJECT NO. CWA A May 24, 2017 ADDENDUM NO. 1 LEGION FIELD STADIUM RENOVATIONS DEPT. OF PLANNING, ENG. & PERMITS PROJECT NO. CWA 2016-11A May 24, 2017 ADDENDUM NO. 1 LEGION FIELD STADIUM RENOVATIONS BIDS RECEIVED: TIME: 2:00pm DATE: June 1, 2017 Room 215 City Hall ARCHITECTURAL DIVISION DEPT. OF PLANNING, ENG. &

More information

REQUEST FOR PROPOSAL RFP No. PS CONSULTANT FOR POND RENEWAL AT DR. SUN YAT-SEN PARK AND CLASSICAL CHINESE GARDEN. AMENDMENT No.

REQUEST FOR PROPOSAL RFP No. PS CONSULTANT FOR POND RENEWAL AT DR. SUN YAT-SEN PARK AND CLASSICAL CHINESE GARDEN. AMENDMENT No. FINANCIAL SERVICES GROUP Supply Management vember 3, 2015 REQUEST FOR PROPOSAL RFP. PS20150769 CONSULTANT FOR POND RENEWAL AT DR. SUN YAT-SEN PARK AND CLASSICAL CHINESE GARDEN AMENDMENT. 2 RE: CLOSING

More information

TREMLOCK SL INSTALLATION MANUAL

TREMLOCK SL INSTALLATION MANUAL TREMLOCK SL INSTALLATION MANUAL TREMLOCK SL TremLock SL i a concealed fatener architectural tanding eam roof panel. The TremLock SL panel are eaily intalled over decking, utilizing metal clip. TremLock

More information

GLENWOOD PLACE 2 MAR 2015

GLENWOOD PLACE 2 MAR 2015 PART 1 - GENERAL 1.01 SUMMARY: SECTION 16110 RACEWAYS A. Description: 1. Provide continuous conduit systems - beginning at the service point, to all distribution equipment and to every outlet and piece

More information

CITY OF CASSELBERRY FLORIDA

CITY OF CASSELBERRY FLORIDA GENERAL NOTE. THE BENCH MARK DATUM I NORTH AMERICAN VERTICAL DATUM OF 988 (NAVD 88). 2. ALL PUBLIC LAND CORNER AND MONUMENT ITHIN THE LIMIT OF CONTRUCTION ARE TO BE PROTECTED BY CONTRACTOR A FOLLO: CORNER

More information

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification

More information

LAFAYETTE PARK APARTMENTS

LAFAYETTE PARK APARTMENTS CONTRUCTION DOCUMENT FOR APARTMENT CHEDULE OF PECIAL INPECTION CHEDULE OF PECIAL INPECTION IT-4 MODULAR (NCBC ECTION 1704 AND 1807.2.5) IT-5 CAT IN PLACE (NCBC ECTION 1704.4 AND CHAPTER 19) ITEM ITEM MATERIAL

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 GROUNDING AND BONDING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

OUR CUSTOMER TERMS CISCO SaaS SERVICE

OUR CUSTOMER TERMS CISCO SaaS SERVICE CONTENTS Click on the ection that you are intereted in. 1 About thi ection 2 Our Cutomer Term 2 Inconitencie 2 No aignment or reupply 2 Requet ubject to approval 2 2 General 2 3 Cico SaaS Service 2 What

More information

The Use of Swimmer Bars as Shear Reinforcement in Reinforced Concrete Beam

The Use of Swimmer Bars as Shear Reinforcement in Reinforced Concrete Beam American Journal of Engineering and Applied Science, 6 (1): 87-94, 2013 ISSN: 1941-7020 2014 M. Al-Nara et al., Thi open acce article i ditributed under a Creative Common Attribution (CC-BY) 3.0 licene

More information

DIVISION 16. Electrical Specifications

DIVISION 16. Electrical Specifications DIVISION 16 Electrical Specifications 16.1 General - Provide all electrical materials and methods as shown on the Drawings, as specified herein, and as needed for a complete and proper installation, including

More information

ISAAC PHYSIOTHERAPY BUILDING CODE REVIEW AS PER ALBERTA BUILDING CODE 2014 SUITE 305 ALLENDALE CENTRE EAST AVE NW EDMONTON, AB

ISAAC PHYSIOTHERAPY BUILDING CODE REVIEW AS PER ALBERTA BUILDING CODE 2014 SUITE 305 ALLENDALE CENTRE EAST AVE NW EDMONTON, AB BUILDING CODE REVIEW A PER ALBERTA BUILDING CODE 2014 UITE 305 LIT OF DRAWING LIT OF CONTACT A0 TENANT: CONTACT: RICH IAAC TELEPHONE: 780-993-6780 EMAIL: rich.isaac@isaaceng.com COVER PAGE A1.0 GENERAL

More information

P _扉_ストレーナー :30 PM ページ 1 Strainer 139 資料-00

P _扉_ストレーナー :30 PM ページ 1 Strainer 139 資料-00 139 Selection 1.0 1.3 2.0 3.0 220 1 220 260 220 220 1 260 260 3 1.0 60 80 152 154 154 156 156 162 1 149 153 153 151 151 162 162 162 163 152 162 158 158 161 161 158 163 160 163 160 157 157 163 1 162 162

More information

1. Hangers and supports for electrical equipment and systems.

1. Hangers and supports for electrical equipment and systems. PART 1 - GENERAL... 1 1.1 RELATED DOCUMENTS... 1 1.2 SUMMARY... 1 1.3 DEFINITIONS... 1 1.4 PERFORMANCE REQUIREMENTS... 1 1.5 SUBMITTALS... 2 1.6 QUALITY ASSURANCE... 2 1.7 COORDINATION... 2 PART 2 - PRODUCTS...

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

TOTAL OCCUPANTS = 28 OCC

TOTAL OCCUPANTS = 28 OCC GENERAL NOTE 1. THE DRAWING AND THE PECIFICATION ARE PREPARED TO HOW THE ARCHITECT' INTENT IN THE DEIGN AND CONTRUCTION OF THE PROJECT. IN ALL MATTER RELATED TO THE UE OR INTERPRETATION OF THEE VARIOU

More information

SECTION OUTLET, PULL, AND JUNCTION BOXES

SECTION OUTLET, PULL, AND JUNCTION BOXES SECTION 16131 OUTLET, PULL, AND JUNCTION BOXES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16112 - Raceways and Conduits. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:

More information

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 05 28 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested. Purpose 355 West Queens Road Single Family New Construction Required Inspection Stages Master Requirement GEN 110 Building Department: 604-990-2480, building@dnv.org, fax: 604-984-9683 The following procedure

More information

Pigments Special Applications SAnODAL, SANODURe. For the dyeing of anodized aluminum

Pigments Special Applications SAnODAL, SANODURe. For the dyeing of anodized aluminum Pigment pecial Application AnODAL, ANODURe AND ANODYE DYE For the dyeing of anodized aluminum PRODUCT NAME Dark hade Light hade ANODYE Yellow 3GL ANODYE Yellow D ANODAL GOLD 4N ANODURE Fat Gold L ANODURE

More information

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS PART 1 - GENERAL 01.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this Section.

More information

3.4 BUTT FUSION WELDING

3.4 BUTT FUSION WELDING 3.4 BUTT FUSION 3.4.1 INTRODUCTION The butt welding proce conit of the joining of two component (pipe and/or fitting) of equal diameter and thickne in which the urface to be welded are heated until melting

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL). 16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

BASIC ELECTRICAL MATERIALS AND METHODS

BASIC ELECTRICAL MATERIALS AND METHODS BASIC ELECTRICAL MATERIALS AND METHODS General Scope Provide raceways for all wiring. All exposed and concealed wiring (including low voltage control, telecommunications, and power limited wiring) shall

More information

SECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes.

SECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes. SECTION 16111 CONDUITS AND BOXES 1.01 DESCRIPTION PART 1- GENERAL A. Work covered by this section includes the furnishing and installation of conduits and boxes. 1.02 SUBMITTALS A. The Contractor shall

More information

[Type text] Heber Light & Power. Developers & Excavators. Electrical Service Requirements Manual

[Type text] Heber Light & Power. Developers & Excavators. Electrical Service Requirements Manual [Type text] Heber Light & Power Developers & Excavators Electrical Service Requirements Manual May 2017 E.1.1 - GENERAL REQUIREMENTS PURPOSE This section was prepared to aid developers, contractors, engineers

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

15. EVERY BRANCH CIRCUIT SHALL BE PROVIDED WITH A SEPARATE, DEDICATED NEUTRAL IN ACCORDANCE WITH NEC, WETHER SHOWN ON DRAWINGS OR NOT.

15. EVERY BRANCH CIRCUIT SHALL BE PROVIDED WITH A SEPARATE, DEDICATED NEUTRAL IN ACCORDANCE WITH NEC, WETHER SHOWN ON DRAWINGS OR NOT. ELECTRICAL LEGEND ELECTRICAL NOTES DEMOLITION NOTES: J NF US E.C. EM T NL WP - 20 AMP, 120 VOLT DUPLEX RECEPTACLE - DUPLEX RECEPTACLE WITH (2) USB PORTS - MANUAL MOTOR STARTER - VOICE/DATA OUTLET WITH

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

SECTION (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS SECTION 26 05 48 (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for

More information

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS SECTION 26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION CONDUIT AND BOXES

SECTION CONDUIT AND BOXES PART 1 - GENERAL 1.01 SUMMARY SECTION 27 05 33 CONDUIT AND BOXES A. This Section includes specific requirements for conduits and boxes within the Communications Pathway System as defined in Division 27

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section

More information

SECTION A. Underwriters Laboratories, Inc., listed and NEC approved

SECTION A. Underwriters Laboratories, Inc., listed and NEC approved PART 1 GENERAL 1.01 DESCRIPTION A. Provide all raceways, fittings, and boxes of specified type required for complete project. Install all systems in raceways unless specifically noted otherwise. Provide

More information

PART - III PRICE BID

PART - III PRICE BID GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDARR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA - 390 007 PART - III PRICE BID Of Tender. GETCO / CE (TR)/11KV Capacitor Bank / Turnkey/ /03 for Supply,

More information

ELECTRICAL SECTION 2

ELECTRICAL SECTION 2 ELECTRICAL SECTION 2 COMMON WORK RESULTS FOR ELECTRICAL PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. This Section includes raceways, conductors and cables, grounding materials, boxes, electrical identification

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES SECTION 262500 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein. 16470 PANELBOARDS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 16 An optional keynote to

More information

ADDENDUM NO. 1. Addendum 1. Page 1. Barrier Free Accessibility Upgrades. F.J. McElligott Secondary School. Mattawa, Ontario

ADDENDUM NO. 1. Addendum 1. Page 1. Barrier Free Accessibility Upgrades. F.J. McElligott Secondary School. Mattawa, Ontario Addendum 1 Page 1 ADDENDUM NO. 1 F.J. McElligott Secondary School Mattawa, Ontario The following Addendum shall be part of the Tendering Documents and shall supersede the drawings and/or Specifications

More information

OVERHEAD SERVICES - SECONDARY

OVERHEAD SERVICES - SECONDARY OVERHEAD SERVICES - SECONDARY Contents - Overhead Services... O-1 General Requirements for Overhead Service... O-2 Names of Parts for Overhead Service... O-3 Service Attachment on an Unguyed Service Mast...

More information

A. The work consists of furnishing a Chiller Noise Reduction System as listed in the specifications.

A. The work consists of furnishing a Chiller Noise Reduction System as listed in the specifications. SECTION 32 31 14 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply

More information

Infor CloudSuite Industrial (SyteLine) for Life Sciences

Infor CloudSuite Industrial (SyteLine) for Life Sciences Life Science Infor CloudSuite Indutrial (SyteLine) for Life Science Stay current with the hifting tandard of FDA compliance For life cience manufacturer, advancing and maintaining information management

More information

Infor CloudSuite Industrial (SyteLine) for Life Sciences

Infor CloudSuite Industrial (SyteLine) for Life Sciences Life Science Infor CloudSuite Indutrial (SyteLine) for Life Science Stay current with the hifting tandard of FDA compliance For life cience manufacturer, advancing and maintaining information management

More information

FIRE RESISTANCE RATINGS OF CONCRETE MASONRY ASSEMBLIES. TEK 7-1C Fire Resistance (2009) Related TEK: 2-6, 5-8B, 7-6A

FIRE RESISTANCE RATINGS OF CONCRETE MASONRY ASSEMBLIES. TEK 7-1C Fire Resistance (2009) Related TEK: 2-6, 5-8B, 7-6A n information erie from the national authority on concrete maonry technology FIRE RESISTNCE RTINGS OF CONCRETE MSONRY SSEMBLIES TEK 7-C Fire Reitance (009) INTRODUCTION Concrete maonry i widely pecifi

More information

13'-3" 2'-6" 10'-0" 12'-6" 11'-9" Kitchen 8'-3" 1'-2 3/8" 3'-0" 1'-4" 3'-0" 2'-8 7/8" 3'-0" Entry. 2' O/C (Engineered Design) Stoop 5'-7"

13'-3 2'-6 10'-0 12'-6 11'-9 Kitchen 8'-3 1'-2 3/8 3'-0 1'-4 3'-0 2'-8 7/8 3'-0 Entry. 2' O/C (Engineered Design) Stoop 5'-7 A4 A A Plan View '-" '- 0'-0" '- '-9" 6'- /" 4'-0 /" 4'-7" 4'-9 /" '-0" W W W W A '-" '- 6'-0" 0'-" 5'- /" 5'-9" W W W Roof Layout cale: /=' '-" 5'-0 /4" 4'-8 /4" D # Bed Dining Room Bathroom Master Bed

More information

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS 669.7403.001 West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS Page C-111 Advertisement for Bids 1-2 C-200 Instruction to Bidders 1-10 C-410 Bid Form for Construction Projects

More information

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST Village of Vernon Hills Community Development Department - Building Division 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http://www.vernonhills.org INSPECTION TIMING

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS. 1. Hangers and supports for electrical equipment and systems.

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS. 1. Hangers and supports for electrical equipment and systems. SECTION 26 05 29 HANGERS AND SUPPORTS FOR PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Hangers and supports for electrical equipment and systems. 1.2 DEFINITIONS A. EMT: Electrical

More information

SECTION LIGHTNING PROTECTION SYSTEM

SECTION LIGHTNING PROTECTION SYSTEM SECTION 16670 - LIGHTNING PROTECTION SYSTEM PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

CHANGES TO THE CONTRACT DOCUMENTS

CHANGES TO THE CONTRACT DOCUMENTS ADDENDUM NO. TWO (2) Date: 2/18/19 Architect s Project No. A18-221 Project: Client: Contract for: IFB 19-002 ugar Hill Veterans Memorial Plaza City of ugar Hill General Contracting This Addendum forms

More information

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification. SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

TENDER DOCUMENTS FURNITURE FOR PMO NUTECH/SCM/PMO Furniture-2018/TD-019

TENDER DOCUMENTS FURNITURE FOR PMO NUTECH/SCM/PMO Furniture-2018/TD-019 TENDER DOCUMENTS FURNITURE FOR PMO NUTECH/SCM/PMO Furniture-2018/TD-019 NATIONAL UNIVERSITY OF TECHNOLOGY TENDER NOTICE National Univerity of Technology (NUTECH) NUTECH/SCM/PMO Furniture-2018/TD-019 Sealed

More information

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS SECTION 16711-27 05 28.33 PART 1 - GENERAL 1.01 SUMMARY A. This section includes Labor, materials and equipment necessary to complete the installation required for the items specified under this Section,

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:

More information

Section 70 Airport Transformer Vault and Vault Equipment (FAA L-109)

Section 70 Airport Transformer Vault and Vault Equipment (FAA L-109) Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION 1. This item

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

B. Sections and all references contained therein form a part of this Section of the Specifications.

B. Sections and all references contained therein form a part of this Section of the Specifications. KARGES-FAULCONBRIDGE, INC. KFI: 14-044.00 SEWARD MONTESSORI SCHOOL ADDITION & REMODELING SECTION 260010 - PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including

More information

SEIMIC RETROFIT PROGRAM FOR TAIWAN SCHOOL BUILDINGS AFTER 1999 CHI-CHI EARTHQUAKE

SEIMIC RETROFIT PROGRAM FOR TAIWAN SCHOOL BUILDINGS AFTER 1999 CHI-CHI EARTHQUAKE October 1-17, 008, Beijing, China SEIMIC RETROFIT PROGRAM FOR TAIWAN SCHOOL BUILDINGS AFTER 1999 CHI-CHI EARTHQUAKE Keh-Chyuan Tai 1 and Shyh-Jiann Hwang 1 Profeor, Dept. of vil ENG, National Taiwan Univerity,

More information

April 11, 2017 INVITATION TO TENDER ITT No. PS CONTRACTOR FOR MARPOLE PLACE RESTORATION. ADDENDUM No. 5

April 11, 2017 INVITATION TO TENDER ITT No. PS CONTRACTOR FOR MARPOLE PLACE RESTORATION. ADDENDUM No. 5 FINANCE, RISK AND SUPPLY CHAIN MANAGEMENT Supply Chain Management April 11, 2017 INVITATION TO TENDER ITT No. PS20170312 CONTRACTOR FOR MARPOLE PLACE RESTORATION ADDENDUM No. 5 RE: ADDITION TO APPENDIX

More information

SECTION MOTOR CONTROL CENTER

SECTION MOTOR CONTROL CENTER SECTION 16445 MOTOR CONTROL CENTER PART 1 GENERAL 1.01 DESCRIPTION A. This section covers the contract item Motor Control Center (MCC). The contract item includes demolition and removal of existing MCC;

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. AFC Cable Systems, Inc. Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-MC

More information

VISHWAKARMA Trading Corporation

VISHWAKARMA Trading Corporation VISHWAKARMA Trading Corporation A unit of :VISHAVKARMA MECHANICAL WORKS PVT. LTD. AN ISO 9001-008 CERTIFIED COMPANY FIRST CHOICE OF PROGRESSIVE BUILDERS & CONTRACTORS VISHWAKARMA TRADING CORPORATION Welcome

More information

SCHEDULE OF TERMS AND CONDITIONS OF EMPLOYMENT. Your terms and conditions of employment are in accordance with:-

SCHEDULE OF TERMS AND CONDITIONS OF EMPLOYMENT. Your terms and conditions of employment are in accordance with:- SCHEDULE OF TERMS AND CONDITIONS OF EMPLOYMENT 1. CONDITIONS OF SERVICE Your term and condition of employment are in accordance with:- (a) (b) (c) thoe detailed in the full Condition of Service Handbook

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

SECTION PATIENT BED SERVICE WALLS

SECTION PATIENT BED SERVICE WALLS PART 1 GENERAL 1.1 DESCRIPTION: SECTION 10 25 13 PATIENT BED SERVICE WALLS SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. 2. Due to the very specialized nature of Patient Wall

More information

SECTION PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY

SECTION PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY SECTION 280528 - PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Metal conduits, tubing, and fittings. 2. Nonmetallic conduits, tubing, and fittings. 3.

More information

FINE MEN HAIR SALON TENANT IMPROVEMENT 750 TAHQUITZ

FINE MEN HAIR SALON TENANT IMPROVEMENT 750 TAHQUITZ ABREVIATION AB ABRA AC ACOU ACU ADA ADHE AFF AGG/AGGR AHU ALUM AP AP(H) BD BF BLK BM BOT BRK/BR BRKT BTW CAB CLG COL COMPR CONC CTR CWR CER CF CFM CIP CL CLK CLO CLR CMU CONT(R) CONTR CORR DEPT DIR DR

More information

SECTION CONDUITS AND BOXES

SECTION CONDUITS AND BOXES PART 1 GENERAL 1.01 DESCRIPTION A. Work covered by this section includes the furnishing and installation of conduits and boxes and the testing of the completed electrical systems 1.02 SUBMITTALS A. The

More information

1280 Maryland Avenue, SW, #280 Washington, DC 20024

1280 Maryland Avenue, SW, #280 Washington, DC 20024 TO: FROM: RE: All Contractors Republic Properties Corporation Construction Rules & Regulations The following items need to be addressed if you and/or your sub-contractors will be performing any work in

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

B. Provide a complete conduit system with associated couplings, connectors, and fittings.

B. Provide a complete conduit system with associated couplings, connectors, and fittings. SECTION 26 05 33 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 260500. B. Provide a complete conduit system with associated couplings, connectors, and fittings. 1.02 RELATED

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

RESILIENT INFRASTRUCTURE June 1 4, 2016

RESILIENT INFRASTRUCTURE June 1 4, 2016 RESILIENT INFRASTRUCTURE June 1 4, 2016 EXPERIMENTAL STUDY ON THE CAPACITY OF BARRIER DECK ANCHORAGE IN MTQ PL-3 BARRIER REINFORCED WITH HM-GFRP BARS WITH HEADED ENDS Michael Rotami Department of Civil

More information

TENDER DOCUMENT CONSULTANTS

TENDER DOCUMENT CONSULTANTS PROPOSED INTERIOR, ELECTRICAL, CIVIL. WORKS FOR BANK OF BARODA,G YERRANAPALEM BRANCH, RAJANAGRAM (M ) E G.DIST., AP. TENDER DOCUMENT CONSULTANTS BHASKAR DESIGN TEAM BESIDE BIG BAZAR ROAD DWARAKA NAGAR,

More information

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION E11 : General Electrical Earthing and LIGHTNING Protection PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION 1 2009-05-12 Review of Mechanical / Electrical and Control

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and

More information

CITY OF FATE SINGLE FAMILY BUILDING PERMIT PACKET. Adopted Codes:

CITY OF FATE SINGLE FAMILY BUILDING PERMIT PACKET. Adopted Codes: CITY OF FATE SINGLE FAMILY BUILDING PERMIT PACKET Adopted Codes: 2015 INTERNATIONAL RESIDENTIAL CODE 2015 INTERNATIONAL FUEL GAS CODE 2015 INTERNATIONAL PLUMBING CODE 2015 INTERNATIONAL ENERGY CONSERVATION

More information

PRECIPITATION CALIBRATION TESTS August 12, 2009

PRECIPITATION CALIBRATION TESTS August 12, 2009 BISHOP PAIUTE TRIBE ENVIRONMENTAL MANAGEMENT OFFICE PRECIPITATION CALIBRATION TESTS Augut 12, 2009 Thi report decribe the reult of everal precipitation calibration tet carried out in July 2009, following

More information

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

Pocatello High School Gym New Steam Line February 2015 Table of Contents 1 Division 26

Pocatello High School Gym New Steam Line February 2015 Table of Contents 1 Division 26 DIVISION 26: ELECTRICAL 26 0000 ELECTRICAL 26 0501 COMMON ELECTRICAL REQUIREMENTS 26 0502 ELECTRICAL DEMOLITION REQUIREMENTS 26 0519 LINE-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 0533 RACEWAY

More information

Nassau County Building Department

Nassau County Building Department July 6, 2018 Nassau County Building Department Inspection Types ALL INSPECTION REQUESTS ARE REQUIRED TO BE INITIATED BY THE PERMIT HOLDER, ALL INSPECTION REQUESTS SHALL SUPPLY THE PERMIT NUMBER FOR EACH

More information