1 BID TABULATION SUMMARY JOB PAGE 1 STATE PROJECT NO BIDS RECEIVED UNTIL 11:00 A.M. ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BETWEEN 2ND STREET NORTH AND 15 STREET NORTH IN ST. CLOUD COUNTY: 6TH AVENUE NORTH LENGTH: MILES GRADE, AGGREGATE BASE, STORM SEWER, SANITARY SEWER, WATER CONTRACT NO. L94042 MAIN, BIT. SURFACE, CONC CURB & GUTTER AND LANDSCAPING START DATE: 05/09/94 COMPLETION DATE: - TYPE OF WORK: RECOMMENDATION: AWARD TO LANDWEHR CONSTRUCTION INC DATE OF AWARD I, THE UNDERSIGNED CERTIFY THAT THIS ABSTRACT IS A CORRECT TABULATION OF ALL BIDS RECEIVED ON THIS (THESE) PROJECT(S): THAT THE LEGAL REQUIREMENTS RELATING TO COMPETITIVE BIDDING ON PUBLIC PROJECTS HAVE BEEN COMPLIED WITH: THAT SAID BIDS WERE OPENED IN PUBLIC AND AWARD HAS BEEN MADE TO THE LOWEST RESPONSIBLE BIDDER. APPROVED: STATE AID OR CONSTRUCTION ENGR ASST. DIV. DIRECTOR, OPERATIONS RANK VENDOR NO. VENDOR NAME TOTAL BID AMOUNT % OVER LOW % OVER EST * ENGINEER'S ESTIMATE $1,186, L240 LANDWEHR CONSTRUCTION INC $1,178, B070 BARBAROSSA AND SONS INC $1,258, L259 R L LARSON EXC INC $1,296,
2 FOR JOB NO S.P. NUMBER PAGE 1 SECTION 001 MOBILIZATION 1.00 LINE 001 ITEM /00001 LUMP SUM CLEARING 3.00 LINE 002 ITEM /00010 TREE GRUBBING 3.00 LINE 003 ITEM /00010 TREE REMOVE WATER MAIN LINE 004 ITEM /00013 LIN FT REMOVE SEWER PIPE (STORM) LINE 005 ITEM /00016 LIN FT REMOVE SEWER PIPE (SANITARY) LINE 006 ITEM /00017 LIN FT REMOVE CURB AND GUTTER LINE 007 ITEM /00022 LIN FT REMOVE CONCRETE CURB LINE 008 ITEM /00024 LIN FT REMOVE CONCRETE WALK LINE 009 ITEM /00021 SQ YD REMOVE CONCRETE DRIVEWAY PAVEMENT SQ YD LINE 010 ITEM / REMOVE BITUMINOUS PAVEMENT LINE 011 ITEM /00120 SQ YD REMOVE POST LINE 012 ITEM /00045 EACH
3 FOR JOB NO S.P. NUMBER PAGE 2 REMOVE MANHOLE LINE 013 ITEM /00101 EACH REMOVE CATCH BASIN LINE 014 ITEM /00102 EACH SAWING CONCRETE PAVEMENT LINE 015 ITEM /00010 LIN FT SAWING BITUMINOUS PAVEMENT LINE 016 ITEM /00010 LIN FT SALVAGE CASTING LINE 017 ITEM /00004 EACH SALVAGE GATE VALVE & BOX LINE 018 ITEM /00014 EACH SALVAGE HYDRANT LINE 019 ITEM /00020 EACH COMMON EXCAVATION LINE 020 ITEM /00010 CU YD SUBGRADE EXCAVATION LINE 021 ITEM /00010 CU YD SELECT GRANULAR BORROW (CV) LINE 022 ITEM /00030 CU YD TOPSOIL BORROW (LV) LINE 023 ITEM /00010 CU YD CU YD SHOVEL LINE 024 ITEM /00500 HOUR WATER LINE 025 ITEM /00010 M GAL
4 FOR JOB NO S.P. NUMBER PAGE 3 AGGREGATE BASE CLASS LINE 026 ITEM /00050 CU YD AGGREGATE BASE PLACED CLASS LINE 027 ITEM /00050 CU YD MILL BITUMINOUS SURFACE LINE 028 ITEM /00010 SQ YD TYPE 41 WEARING COURSE MIXTURE TON LINE 029 ITEM / TYPE 41 BINDER COURSE MIXTURE LINE 030 ITEM /00040 TON TYPE 31 BASE COURSE MIXTURE LINE 031 ITEM /00030 TON BITUMINOUS MATERIAL FOR TACK COAT GALLON LINE 032 ITEM / PARKING METER POST LINE 033 ITEM /00052 EACH COARSE FILTER AGGREGATE (CV) LINE 034 ITEM /00030 CU YD " PE CORR PERF PIPE DRAIN LINE 035 ITEM /05041 LIN FT " RC PIPE SEWER DESIGN CL V LIN FT LINE 036 ITEM / " RC PIPE SEWER DESIGN CL IV LIN FT LINE 037 ITEM /
5 FOR JOB NO S.P. NUMBER PAGE 4 18" RC PIPE SEWER DESIGN CL III LIN FT LINE 038 ITEM / " RC PIPE SEWER DESIGN CL III LIN FT LINE 039 ITEM / " RC PIPE SEWER DESIGN CL III LIN FT LINE 040 ITEM / " RC PIPE SEWER DESIGN CL III LIN FT LINE 041 ITEM / MAINTENANCE OF SAN SEWER 1.00 SERVICE LUMP SUM LINE 042 ITEM / "X4" PVC WYE 7.00 LINE 043 ITEM /13402 EACH "X6" PVC WYE 7.00 LINE 044 ITEM /13403 EACH "X4" PVC WYE LINE 045 ITEM /13702 EACH "X6" PVC WYE LINE 046 ITEM /13703 EACH " PVC PIPE SEWER LINE 047 ITEM /00104 LIN FT " PVC PIPE SEWER LINE 048 ITEM /00106 LIN FT
6 FOR JOB NO S.P. NUMBER PAGE 5 8" PVC PIPE SEWER LINE 049 ITEM /00108 LIN FT " PVC PIPE SEWER LINE 050 ITEM /00115 LIN FT " FORCE MAIN DUCTILE IRON CL LIN FT LINE 051 ITEM / " FORCE MAIN DUCTILE IRON CL LIN FT LINE 052 ITEM / " FORCE MAIN DUCTILE IRON CL 50 LIN FT LINE 053 ITEM / DUCTILE IRON FITTINGS LINE 054 ITEM /00011 POUND TEMPORARY WATER SERVICE 1.00 LINE 055 ITEM /00040 LUMP SUM CONNECT TO EXISTING WATER 8.00 MAIN EACH LINE 056 ITEM / HYDRANT LINE 057 ITEM /00020 EACH ADJUST VALVE BOX 9.00 LINE 058 ITEM /00024 EACH " BUTTERFLY GATE VALVE AND 1.00 BOX EACH LINE 059 ITEM /
7 FOR JOB NO S.P. NUMBER PAGE 6 18" BUTTERFLY GATE VALVE AND 2.00 BOX EACH LINE 060 ITEM / " BUTTERFLY GATE VALVE AND 3.00 BOX EACH LINE 061 ITEM / " BUTTERFLY GATE VALVE AND 1.00 BOX EACH LINE 062 ITEM / " GATE VALVE AND BOX LINE 063 ITEM /00803 EACH " GATE VALVE AND BOX 8.00 LINE 064 ITEM /00804 EACH " GATE VALVE AND BOX 6.00 LINE 065 ITEM /00806 EACH " CURB STOP & BOX LINE 066 ITEM /03100 EACH " CURB STOP & BOX 1.00 LINE 067 ITEM /03150 EACH " CURB STOP & BOX 1.00 LINE 068 ITEM /03200 EACH " TYPE K COPPER PIPE LINE 069 ITEM /00710 LIN FT " TYPE K COPPER PIPE LINE 070 ITEM /00715 LIN FT " TYPE K COPPER PIPE LINE 071 ITEM /00720 LIN FT
8 FOR JOB NO S.P. NUMBER PAGE 7 6" WATER MAIN-DUCT IRON CL LINE 072 ITEM /01065 LIN FT " WATER MAIN-DUCT IRON CL LINE 073 ITEM /01082 LIN FT " WATER MAIN-DUCT IRON CL LIN FT LINE 074 ITEM / " WATER MAIN DUCT IRON CL LIN FT LINE 075 ITEM / " WATER MAIN DUCT IRON CL LIN FT LINE 076 ITEM / " WATER MAIN-DUCTILE IRON CL 50 LIN FT LINE 077 ITEM / " WATER MAIN-DUCTILE IRON CL 50 LIN FT LINE 078 ITEM / " INSULATION LINE 079 ITEM /00031 SQ YD DUCTILE IRON FITTINGS LINE 080 ITEM /00020 POUND CONST DRAINAGE STRUCTURE DES C G OR H LIN FT LINE 081 ITEM / CONST DRAINAGE STRUCTURE DESIGN F LIN FT LINE 082 ITEM /
9 FOR JOB NO S.P. NUMBER PAGE 8 CONST DRAINAGE STRUCTURE DESIGN SPEC 1 LIN FT LINE 083 ITEM / CONST DRAINAGE STRUCTURE DESIGN SPEC 2 LIN FT LINE 084 ITEM / CONST DRAINAGE STRUCTURE 9.00 DESIGN SPEC 3 LIN FT LINE 085 ITEM / CONST DRAINAGE STRUCTURE 9.70 DESIGN LP 4-4 LIN FT LINE 086 ITEM / CONST DRAINAGE STRUCTURE DES LIN FT LINE 087 ITEM / CONST DRAINAGE STRUCTURE DES LIN FT LINE 088 ITEM / CONST DRAINAGE STRUCTURE DES LIN FT LINE 089 ITEM / RECONSTRUCT MANHOLES 0.20 LINE 090 ITEM /00010 LIN FT CASTING ASSEMBLY LINE 091 ITEM /00010 EACH ADJUST FRAME & RING CASTING (SPEC) EACH LINE 092 ITEM /
10 FOR JOB NO S.P. NUMBER PAGE 9 CONSTRUCT 8" OUTSIDE DROP 6.20 LINE 093 ITEM /00208 LIN FT CONSTRUCT 12" OUTSIDE DROP 4.00 LINE 094 ITEM /00212 LIN FT CONSTRUCT 15" OUTSIDE DROP 4.70 LINE 095 ITEM /00215 LIN FT CONSTRUCT 18" OUTSIDE DROP 5.70 LINE 096 ITEM /00218 LIN FT " CONCRETE WALK LINE 097 ITEM /00040 SQ FT CONCRETE CURB & GUTTER DESIGN B618 LIN FT LINE 098 ITEM / " CONCRETE DRIVEWAY PAVEMENT LINE 099 ITEM /00006 SQ YD " CONCRETE DRIVEWAY PAVEMENT LINE 100 ITEM /00008 SQ YD TEMPORARY FENCE LINE 101 ITEM /00010 LIN FT TRAFFIC CONTROL 1.00 LINE 102 ITEM /00010 LUMP SUM FURNISH SIGN PANELS TYPE C LINE 103 ITEM /00130 SQ FT ASH,PATMORE 3" CAL B&B LINE 104 ITEM /17064 TREE LINDEN,REDMOND 3" CAL B&B LINE 105 ITEM /43064 TREE
11 FOR JOB NO S.P. NUMBER PAGE 10 MAPLE,SUGAR 3" CAL B&B LINE 106 ITEM /56064 TREE BALE CHECK LINE 106A ITEM /00001 EACH SILT FENCE,HEAVY DUTY LINE 107 ITEM /00002 LIN FT SODDING TYPE LAWN LINE 108 ITEM /00030 SQ YD TEMPORARY LANE MARKING LINE 109 ITEM /00010 ROAD STA ** SECTION TOTALS ** $1,186, $1,178, $1,258, ** JOB TOTALS ** $1,186, $1,178, $1,258,866.10
12 FOR JOB NO S.P. NUMBER PAGE 11 ( 3) L259 R L LARSON EXC INC SECTION 001 LINE LUMP SUM LINE TREE LINE TREE LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE SQ YD LINE SQ YD LINE SQ YD LINE EACH LINE EACH LINE EACH LINE LIN FT LINE LIN FT LINE EACH LINE EACH LINE EACH LINE CU YD LINE CU YD LINE CU YD LINE CU YD LINE HOUR LINE M GAL LINE CU YD LINE CU YD LINE SQ YD LINE TON LINE TON LINE TON LINE GALLON LINE EACH LINE CU YD LINE LIN FT
13 FOR JOB NO S.P. NUMBER PAGE 12 ( 3) L259 R L LARSON EXC INC LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE LUMP SUM LINE EACH LINE EACH LINE EACH LINE EACH LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE POUND LINE LUMP SUM LINE EACH LINE EACH LINE EACH LINE EACH LINE EACH LINE EACH LINE EACH LINE EACH LINE EACH LINE EACH LINE EACH LINE EACH LINE EACH LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT
14 FOR JOB NO S.P. NUMBER PAGE 13 ( 3) L259 R L LARSON EXC INC LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE SQ YD LINE POUND LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE EACH LINE EACH LINE LIN FT LINE LIN FT LINE LIN FT LINE LIN FT LINE SQ FT LINE LIN FT LINE SQ YD LINE SQ YD LINE LIN FT LINE LUMP SUM LINE SQ FT LINE TREE LINE TREE LINE TREE LINE 106A EACH LINE LIN FT LINE SQ YD LINE ROAD STA ** SECTION TOTALS ** $1,296, ** JOB TOTALS ** $1,296,305.35
E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17
S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00
More informationTOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK
TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,
More informationPITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008
BT-1 of 7 Clearing and Grubbing L.S. $50,000.00 $50,000.00 $5,335.00 $5,335.00 $14,560.00 $14,560.00 $20,000.00 $20,000.00 $10,600.00 $10,600.00 Class 1 Excavation 4300 C.Y. $20.00 $86,000.00 $15.00 $64,500.00
More informationProject Need and Evaluation
City of Brooklyn Center 2011 Palmer Lake East Street and Utility Reconstruction Project Public Hearings February 14, 2011 Public Improvement Hearing: Special Assessments Local public improvements to the
More informationJANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25
General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO
More informationApril 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS
April 1, 2009 CITY OF PORTSMOUTH Public Works Department Bid #54-09 2009 Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS This Addendum forms part of the original document marked Bid #54-09 2009
More informationFederal Project No.: NONE
Schedule of Items Page: 2 0001 BASE BID- STA. 10+00-23+00 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING (CONSTRUCTION) 0030 301 00110 LUMP SUM LUMP SUM CLRING AND
More informationENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)
EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY
More informationCHAPTER 12: DRAINAGE
CHAPTER 12: DRAINAGE CHINOOK WINDS AND WINTER SNOWS A combination which frequently results in hazardous winter conditions on shaded portions of roadways under bridges. Icing conditions are a danger in
More informationADDENDUM NO. 1 APRIL 24, 2017
DERBY DESTINATION DEVELOPMENT PUBLIC PROJECT NO. 1 EAST FREEDOM STREET PUBLIC PROJECT NO. 2 WEST FREEDOM STREET PUBLIC PROJECT NO. 3 WATERLINE IMPROVEMENTS PUBLIC PROJECT NO. 4 SANITARY SEWER IMPROVEMENTS
More informationCULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix B
CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix B RIVERDALE CITY CAPITAL FACILITIES PLAN CULINARY WATER Engineer's Cost Estimate January 2009 Project Name: Culinary Water Reservoir - Tank
More informationLump Sum L.S. (15") EA
Page of 6 ROADWAY ITEMS 000 000000000-N 800 MOBILIZATION Lump Sum L.S. 000 000000000-N 80 CONSTRUCTION SURVEYING 0003 009000000-N SP REINFORCED BRIDGE APPROACH FILL, STATION ************ (5+6.0) 000 0050000000-E
More informationPlan Unit Description
CHAPTER 2: QUANTITIES and TABULATIONS 2018 SPEC BOOK The effective date for the 2018 Spec Book is the January 26, 2018 letting. All project documents submitted for the January 26, 2018 letting, or later
More informationSPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE
SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE BE IT ORDAINED by the Town Council of the Town of Plainville: SECTION 1. SUBDIVISIONS. All subdivisions hereinafter developed within
More informationSouth Dakota Department of Transportation Average Unit Prices from Low Bids
Unit Prices from Low s January 0, 0 to December, 0 Office of Project Development - Letting 00E00 Blading Hour.00 $,0. $. 00E000 Construction and Maintenance of Detour(s) LS.00 $0,. $,. 00E000 Maintenance
More informationCHAPTER 10: PAVING. Refer to page 548 of the 2016 Spec book or page 573 of the 2018 Spec book for material specifications under G.
CHAPTER 10: PAVING AGGREGATE Aggregate has become more specific on how it is paid for. Therefore, make sure the plan specifies they type of aggregate to use. Spec 2118 Aggregate Surfacing - Aggregate placed
More informationCITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT
CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards
More informationSECTION TRENCHING & BACKFILLING
SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications
More informationHITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:
N 1133521.33 E 1689742.43 STA: 10+53.07 INSTALL: 2-10" 90 BENDS CONNECT TO MIDDLEBUSH HALL INTERIOR PLANT PLUMBING MIDDLEBUSH HALL HW1 HWS HWR 10+00 FREDRICK APARTMENTS FINE ARTS INSTALL 422 LF 10" HWS
More informationPROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018
STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING March 9, 2018 This pamphlet is issued solely for the purpose of circulating advance information
More informationCITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS
CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August
More informationBids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)
General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER
More informationBID FORM - LUMP SUM BID
BID FORM - LUMP SUM BID PROJECT: Livingston Northside Park and Soccer Fields Phase 1 Construction LOCATION: Livingston, Montana Ladies & Gentlemen: Pursuant to and in compliance with the Advertisement
More informationD-1 THE CITY OF HARRISBURG 1 1/2" MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2" MIN. ID-2 BINDER COARSE
EXISTING STREET SURFACE 1 1/2" MIN. ID-2 BINDER COARSE 1 1/2" MIN. ID-2 WEARING COARSE AC-20 SEALER (ALL AROUND) 8" CLASS A P.C. CONCRETE SAW CUT TOP OF CONCRETE SHALL MEET SURFACE OF EXISTING CONCRETE.
More informationThis is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.
COACHELLA VALLEY WATER DISTRICT DOMESTIC WATER CHECKLIST Tract/Parcel No: Project Common Name: Developer: Engineer: Engineer Signature: Date: Phone: Phone: Print: This is only a general checklist; please
More informationWASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO
WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO 42 380 68 coddington ave ledbetter road shawnee creek s patton street ledbetter road wesley ave 68 starr drive 42 twist run 85 35
More informationDo the column headings match the SEQ? 24" RC 24" RC SAFETY APRON PIPE CULVERT CL III APRON CENTERLINE CROSS CULVERTS DRAINAGE TABULATION
DRAINAGE TAB - 2501 Do the column headings match the SEQ? S CATCH BASIN 15" GS 15" CS CL III SAFETY RANDOM RIP RAP CLASS II GEOTEXT -TILE FABRIC TYPE III GUIDE POSTS TYPE B CONN TO EXIST. STORM SEWER STRUCTURE
More informationAttachment D-1: Civil/Structural Scope of Work
Attachment D-1: Civil/Structural Scope of Work Project: Location: Targa Sound Renewable Fuels Project Tacoma, WA Prepared by: NORWEST ENGINEERING Consulting Engineers 4110 N.E. 122 nd Avenue, Portland,
More informationVIRGINIA UTILITY PROTECTION SERVICE, INC. Title: Ticket Entry - Work Type List Working Document
Printed copies are for reference only. Please refer to the electronic copy for the latest version. Purpose: To provide instructions for editing the work type list through Newtin administrator accounts
More informationNOTICE TO BIDDERS. May 31, Dorothy E. Maxwell Chair
May 31, 2016 Dorothy E. Maxwell Chair Duane A. Eldred Vice Chair Timothy J Lamoreaux Member Benjamin S. Lyons Member Darrell R. Tennis Member Blair E. Ballou, P.E. Engineer-Manager Lori N. Friedlis, CPA
More informationSPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project
RES. NO. PROPOSAL FOR THE COMPLETION OF 2015-28 TO THE SATISFACTION OF THE BUTLER COUNTY COMMISSIONERS AND THE COUNTY ENGINEER: SAID WORK CONSISTING OF TYLERSVILLE ROAD IMPROVEMENTS, PHASE I TO THE COUNTY
More informationRICHFIELD CITY CONSTRUCTION STANDARDS
CONSTRUCTION STANDARDS REVISED OCTOBER 2015 Jones & DeMille Engineering, Inc. [0711-211] 1535 South 100 West Richfield, UT 84701 Ph. 435-896-8266 Fax 435-896-8268 1675 South Highway 10 Price, UT 84501
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 10/16/2014 Project 140522 Addendum No. 1 PID No. 76282 FRA USR 40
More informationSTATE AID GUIDE FOR: Updated: December 16, 2005
STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk,
More informationDESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General
DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and
More informationCity of Grenora, ND Municipal Infrastructure Needs Assessment August 2012
City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and Impact
More informationSECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION
820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing
More informationADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.
ADDENDUM #2 JUNE 30, 2017 APRON REHABILITATION PHASE 3 HENRY E. ROHLSEN AIRPORT ST. CROIX, U.S. VIRGIN ISLANDS FAA AIP No.: 3-78-0002-037-2017 This addendum modifies or interprets the proposal documents
More informationبسم هللا الرحمن الرحيم
بسم هللا الرحمن الرحيم )ملحقات شبكة الصرف الصحي( Class Sewer Appurtenances- 3 rd Dr. Sataa Al-Bayati (10-11) 1. Manholes They are used for inspection & cleaning. They placed when: 1. Intervals between
More informationENGINEERING DESIGN & IMPROVEMENT STANDARDS
ENGINEERING DESIGN & IMPROVEMENT STANDARDS 2016 Prepared by: Engineering Division For latest edition of these Improvement Standards, refer to City of Visalia website at: www.visalia.city/engineeringdocuments
More informationLI STATIONS N-03 & N-06 PLACEMENT BID # B May 18, 2016 Addendum 2
revard Central Services Florida's Coast CENTRAL SERVICES GROUP Telephone (321) 617 7390 PURCHASING SERVICES Fax (321) 617-7391 Brevard County Government Center 2725 Judge Fran Jamieson Way, Bldg. C, Suite
More informationCATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE
3.33' 3.0' 2.0' 4.33' 4.0' 3.0' 1.00' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3067-V OR AS NOTED ON PLANS. "INFA-SHIELD" SEAL OR EQUAL. RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR).
More informationDESIGN SCENE SUBJECT INDEX
DESIGN SCENE SUBJECT INDEX CHAPTER 1: () TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY BRIDGE & APPROACH PLANS CONSTRUCTION PLAN FOR EXCEPTIONS EXCEPTION CLARIFICATION GOVERNING SPECIFICATIONS
More informationSECTION WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA
SECTION 6900 - WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA 6901 DESIGN CRITERIA A. General 1. The design standards presented in the City of Lee's Summit Design Criteria are the minimum standards
More informationTransportation, Engineering and Development Business Group Standard Construction Plan Notes for Development Projects January 2013
Transportation, Engineering and Development Business Group Standard Construction Plan Notes for Development Projects January 0 The City of Naperville Transportation, Engineering and Development (TED) Business
More informationSPECIFICATIONS FOR SAND SEAL
SPECIFICATIONS FOR SAND SEAL 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee shall mean an employee of the
More informationContact the Jurisdictional Engineer for materials allowed by each jurisdiction.
Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the
More informationConstruction Documents (CDs) Required Signature Blocks and Standard Notes
Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Project Manager 720-733-3582 Construction Documents (CDs) Required Signature Blocks and Standard Notes Revised July 17, 2017 INDEMNIFICATION
More informationAddendum No. 1 Page 1 of 2
Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT
More information2018 Downtown Revitalization
Tender For 2018 Downtown Revitalization 2018-Tender-01 Date Issued: January 15, 2018 Master Municipal Construction Documents 2009 Edition Unit Price Contract City of Penticton Engineering Department 616
More informationADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA
ADDENDUM NO. 1 FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA Bids to be received until 2:00 p.m., local time, July 9, 2012 SPECIFICATIONS Delete Section 00 41 53 Bid Unit Price in
More informationCITY OF EAU CLAIRE WISCONSIN STANDARD GENERAL CONDITIONS AND SPECIFICATIONS FOR STREET AND UTILITY CONSTRUCTION
CITY OF EAU CLAIRE WISCONSIN STANDARD GENERAL CONDITIONS AND SPECIFICATIONS FOR STREET AND UTILITY CONSTRUCTION ISSUED MARCH, 2016 CITY OF EAU CLAIRE TABLE OF CONTENTS FOR SPECIFICATIONS DIVISION DESCRIPTION
More informationRequest for Bids Sewer Department City of Portsmouth, New Hampshire Sewer Inventory Bid #48-15
Bid #48-15 Request for Bids Sewer Department City of Portsmouth, New Hampshire Sewer Inventory Bid #48-15 City of Portsmouth Public Works Department Sewer Inventory INVITATION TO BID Sealed bid proposals,
More informationCONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:
CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project
More informationSECTION CONSTRUCTION SERVICES
SECTION 01100 CONSTRUCTION SERVICES PART 1 GENERAL 1.01 - Section Includes A. Mobilization. B. Construction Surveys. C. Record Documents. 1.02 Description Of Work A. Mobilization: includes the preparatory
More informationBASE CONSTRUCTION MATERIALS A Aggregate
BASE CONSTRUCTION 2211 AGGREGATE BASE 2211.1 DESCRIPTION This work consists of placing aggregate base. 2211.2 MATERIALS A Aggregate... 3138 Provide the class of aggregate as required by the contract. 2211.3
More informationCurrent Standard Plates including Transmittal Letters are available on the web at:
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (6-03) MANUAL: Standard
More informationMANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems
SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.
More informationSunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014
Sunnyside Valley Irrigation District Addendum No. 1 Enclosed Lateral Improvements Projects 2010-2011 Issued: 8/30/2010 Contract 10-003: Regions 011, 013 & 014 Page 1 of 7 Sunnyside Valley Irrigation District
More informationDGR PROJECT NUMBER:
P:\08\010\25\DWG\PIPELINE\TITLE.DWG Plot Date: 8/18/2014 1:52 PM 220TH ST. 210TH ST. 200TH ST. 190TH ST. IRONWOOD AVE. JACKSON AVE. 180TH ST. HWY 75 170TH ST. STANDPIPE "S" ROCK RAPIDS CITY OF HWY 9 DRAWINGS
More informationFox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS
Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # 2016-04 PROJECT SPECIFICATIONS TABLE OF CONTENTS SECTION 100 GENERAL... 1 SECTION 200 MATERIALS... 1 CONSTRUCTION METHODS... 1 SECTION
More informationBIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83
Item No. BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83 DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL PRICE GENERAL BID ITEMS 1 Per Plans and Specifications
More informationTYPE "A" CATCH BASIN
27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain
More informationSECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS
SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3
More informationINSPECTION AND ACCEPTANCE FOR MAINTENANCE
Inspection and Acceptance For Maintenance Page 1 (Last revised 6/29/10) INSPECTION AND ACCEPTANCE FOR MAINTENANCE SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Acceptance Sewer As Built Drwg Example
More information901 - PIPE SEWERS COMPLETE IN PLACE
901 - PIPE SEWERS COMPLETE IN PLACE 901.01 Description 901.02 Materials and Material Handling 901.03 Excavation 901.04 Limits as to Width of Trench 901.05 Unauthorized Excavation 901.06 Subgrade 901.07
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS IMPROVEMENTS
STANDARD SPECIFICATIONS FOR PUBLIC WORKS IMPROVEMENTS FEBRUARY 2018 TABLE OF CONTENTS Part 1 General Requirements (Page 1-9) Part 2 Earthwork Specifications (Page 10 33) Part 3 Concrete and Concrete Structures
More informationPerpetual Pavement Demonstration
Perpetual Pavement Demonstration September 12, 2007 Cedar Road from Brainard Rd. to Lander Rd. Cuyahoga County Engineer s Presenters: Brian Brian Driscoll, P.E. Chief Highway Design Engineer Thomas Thomas
More informationClassifications of Improvements and Definitions
Design Manual Chapter 1 - General Provisions Table of Contents TOC Table of Contents Chapter 1 - General Provisions 1A General Conditions 1A-1---------------------------------General Conditions A. Purpose.....
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT
MAINE TURNPIKE AUTHORITY ADDENDUM NO. CONTRACT 08.09 BRIDGE REPAIRS RUNNING HILL ROAD UNDERPASS (MILE 5.) BLACKSTRAP ROAD UNDERPASS (MILE 58.3) WEYMOUTH ROAD UNDERPASS (MILE 66.) SUPERSTRUCTURE REPLACEMENT
More informationEDENTON (252) GREENVILLE (252) CASTLE HAYNE (910) WILSON (252) DURHAM (919) FAYETTEVILLE (910)
DIV NO. DIVISION ENGINEER 00001 Jerry Jennings, PE 00002 John W Rouse, PE 00003 Karen Eason Collette, PE 00004 Timothy M Little, PE 00005 Joseph R Hopkins, PE 00006 Gregory W Burns, PE 00007 James M Mills,
More informationTown of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects
2.0 ROADWAYS 2.1 Road Classification 2.1.1 Standard Drawing Classification All Road Widths and Road Allowances shall be designed in accordance with the most recent Town of New Tecumseth Standards: TNT.SD
More informationWarm Mix Asphalt (WMA) Guide Specification for Highway Construction
Warm Mix Asphalt (WMA) Guide Specification for Highway Construction Division 400 - Asphalt Pavements and Surface Treatments SECTION 4XX - WARM MIX ASPHALT (WMA) PAVEMENT Warm mix asphalt (WMA) is the generic
More informationCITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587
CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 JANUARY 2010 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 APPENDIX ROADWAY DESIGN DRAINAGE
More information2018 YEARLY BID FORMS SUPPLIER BID FORM. ITEM # 1: Fire Hydrants: 3 and 4 Bury, 3 ways, 5 ¼ valve opening, 6 mechanical joint shoe.
2018 YEARLY BID FORMS SUPPLIER BID FORM ITEM # 1: Fire Hydrants: 3 and 4 Bury, 3 ways, 5 ¼ valve opening, 6 mechanical joint shoe. PHONE # OF BIDDER MAKE OF UNIT BID MODEL OF UNIT BID_ ITEM 3 BURY FIRE
More informationVirginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR
Page 1 of 14 0010 00100 MOBILIZATION 0020 00101 CONSTRUCTION SURVEYING (CONSTRUCTION) 0030 00110 CLEARING AND GRUBBING 0040 00120 REGULAR EXCAVATION 0050 00126 EARTHWORK 0060 00140 BORROW EXCAVATION ACRE
More informationNOTICE OF ADDENDUM ADDENDUM 2 CONTRACT NO PROJECT NO UNIT WELL 31 WATER TREATMENT PLANT
February 20, 2017 NOTICE OF ADDENDUM ADDENDUM 2 CONTRACT NO. 7500 PROJECT NO. 10434 UNIT WELL 31 WATER TREATMENT PLANT Revise and amend the contract document(s) for the above project as stated in this
More informationDIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012
2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include
More informationIndependent Consulting Engineers NV Zaegersgut Rd #13 tel +(599) Date: 25 januari 2008 Project: Troy Hill Saba Projectnr:
(Na) (Na) (Na) 1 Preparational works 1.1 Survey roads 1 sum 25,000.00 25,000.00 1.2 Clearing terrain roads 1 sum 45,000.00 45,000.00 Main 2 Earth work 2.1 Earth work 2.11 Excavate terrain 8900 m3 30.00
More informationTOWN OF PARKER, COUNTY OF DOUGLAS, STATE OF COLORADO N.T.S.
8" W 8" SAN 8" SAN STM E E E PROPOSED WATER LINE EXISTING WATER LINE PROPOSED FIRE HYDRANT PROPOSED VALVE EXISTING WATER WELL PROPOSED WATER METER EXISTING WATER METER EXISTING CLEANOUT PROPOSED SANITARY
More informationSpringville City Public Works. April 2013 This Manual May Be Updated at Any Time
Standard Specifications and Drawings Springville City Public Works April 2013 This Manual May Be Updated at Any Time STANDARD SPECIFICATIONS TABLE OF CONTENTS CHAPTER 1 - GENERAL REQUIREMENTS... 2 1.1
More informationARCHITECT: GENERAL NOTES 1. THE CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS AND ADVISE THE ENGINEER OF ANY CONFLICTS OF REPRESENTATION BETWEEN DRAWINGS AND/OR SPECIFICATIONS PRIOR TO COMMENCING
More informationSECTION BITUMINOUS CONCRETE PAVEMENT
SECTION 321216 BITUMINOUS CONCRETE PAVEMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationANNE ARUNDEL COUNTY Department of Public Works DATE: 01/25/2017 FROM: Rich Osborn, P.E., Prof.L.S., Project Manager, Bureau of Engineering SUBJECT: Minutes for Pre-Bid Meeting January 19, 2017 South Shore
More informationSECTION 8 WATER SUPPLY SYSTEMS
SECTION 8 WATER SUPPLY SYSTEMS Contents Page 8-1 INTRODUCTION... 1 8-2 INTENT OF WATER SYSTEM IMPROVEMENT STANDARDS... 1 8-3 DEFINITIONS... 1 8-4 APPLICABLE STANDARDS... 1 8-5 IMPROVEMENT AND LANDSCAPE
More informationEnclosed is Addendum No. 1 to the above reference contract documents. Please execute and attach this Addendum No. 1 to your Project Manual.
January 5, 2005 Traffic Signal Installation NE Lakewood Blvd. and NE Anderson Dr. Bid No. 06-075 ADDENDUM NO. 1 Contract Bidders: Enclosed is Addendum No. 1 to the above reference contract documents. Please
More informationCOUNTY OF ALAMEDA. ADDENDUM No. 5. RFP No for. Cherryland Fire Station
COUNTY OF ALAMEDA ADDENDUM No. 5 to RFP No. 13024 for Cherryland Fire Station This County of Alameda, General Services Agency (GSA), RFP/Q Addendum has been electronically issued to potential bidders via
More informationOttawa County Road Commission. Standards and Specifications. For PLAT CONDOMINIUM. And PUBLIC ROAD DEVELOPMENT
Ottawa County Road Commission Standards and Specifications For PLAT CONDOMINIUM And PUBLIC ROAD DEVELOPMENT BOARD OF COUNTY ROAD COMMISSIONERS COUNTY OF OTTAWA 1 Regulations pertain to the subdivision
More informationOhio Department of Transportation
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 Ted Strickland, Governor Jolene M. Molitoris, Director THE DEPARTMENT UTILIZES BID EXPRESS (http://www.bidx.com)
More informationCITY OF BURLINGTON REGENT STREET ALLEY SEWER AND STREET IMPROVEMENTS
SKAGIT COUNTY WASHINGTON SCHEDULE A - SANITARY SEWER MAINLINE REPLACEMENT SCHEDULE B - GRADING AND STORM DRAIN IMPROVEMENTS CITY OFFICIALS STEVE SEXTON Mayor TED MONTGOMERY TONYA BIECHE City Council RICK
More informationItem Name Description Unit of Measure Mobilization Per WSDOT Lump Sum
Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of
More informationCHESSIE BIKE-PED TRAIL - PHASE I TRUESDELL AVENUE TO KIAWANIS TELEDYNE PARK
------ TRAFFIC DATA A.A.D.T. (2010) A.A.D.T. (ED 2022) D.H.V. (2022) DIRECTIONAL DISTRIBUTION TRUCKS N/A N/A N/A N/A N/A CHESSIE BIKE-PED TRAIL - PHASE I TRUESDELL AVENUE TO KIAWANIS TELEDYNE PARK DES.
More informationAll Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford
Seymour Road Replacement Bridge Addendum #1 April 27, 2015 To: From: Cc: All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford RE: Construction Bid Information
More informationENGINEERING DESIGN STANDARDS
CITY OF SOUTHFIELD DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS APPROVED BY: Gary M. Mekjian, P.E. City of Southfield Director of Public Works Dated: Oct. 1, 2007 Revised:
More informationSITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013
WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown
More informationEXCAVATION PERMIT CHECKLIST
EXCAVATION PERMIT CHECKLIST Complete These Forms ST. LOUIS COUNTY/MUNICIPAL ZONING APPROVAL FOR PERMIT APPLICATION EXCAVATION PERMIT APPLICATION Present These Documents Drawing showing location of excavation
More informationPreliminary Engineering Study. Richland Avenue Pedestrian Crossing. Volume I: Preliminary Report
Preliminary Engineering Study Richland Avenue Pedestrian Crossing Volume I: Preliminary Report SUBMITTED TO: City of Athens Engineering and Public Works Athens, Ohio SUBMITTED BY: January 12, 2016 Prepared
More informationENGINEERING DESIGN STANDARDS
OCEOLA TOWNSHIP 1577 N. LATSON ROAD HOWELL, MICHIGAN ENGINEERING DESIGN STANDARDS Prepared by: TETRA TECH Brighton, Michigan February 2010 ODESIGN.DOC CONTENTS Page PART I. ENGINEERING DESIGN STANDARDS
More informationTRENCH EXCAVATION AND BACKFILL
SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section 300 - Trench Excavation and Backfill TRENCH EXCAVATION AND BACKFILL PART - GENERAL.0 SECTION INCLUDES A. Trench Excavation
More information