New York State Code Rule 56
|
|
- Brooke Lewis
- 6 years ago
- Views:
Transcription
1 New York State Code Rule 56 Requirements & Changes in the Asbestos Code Rule Presented by Peter DeLucia AAC Contracting, Inc. 8/3/2012 AAC Contracting, Inc. 1
2 8/3/2012 AAC Contracting, Inc. 2
3 What is Asbestos? Commercial designation for mineral products that possess: High tensile strength Flexibility Chemical and thermal resistance High electrical resistance And can be woven 8/3/2012 AAC Contracting, Inc. 3
4 Uses-Ancient 8/3/2012 AAC Contracting, Inc. 4
5 Uses-Everyday 80% cotton and 20% asbestos 8/3/2012 AAC Contracting, Inc. 5
6 Uses-bizarre 8/3/2012 AAC Contracting, Inc. 6
7 Uses-Pop Culture 8/3/2012 AAC Contracting, Inc. 7
8 Uses-Why? Last updated November 27, :41 p.m. PT 8/3/2012 AAC Contracting, Inc. 8
9 8/3/2012 AAC Contracting, Inc. 9
10 Outline Multi-employer responsibilities Project Records Cleanup of Uncontrolled Disturbances Surveys Proposed Changes 8/3/2012 AAC Contracting, Inc. 10
11 Revised 2006 To comply with OSHA & EPA Clarification Include existing AVs User Friendly Continual Corrections in State Register 3/21/07 Guidance Documents New revision 8/3/2012 AAC Contracting, Inc. 11
12 Guidance Document 8/3/2012 AAC Contracting, Inc. 12
13 Multi-employer Worksites: Demolition Renovation, Remodeling and Repair Asbestos Abatement Contractor Shall inform all employers on site Nature of work PACM & ACM Disturbance prohibited by non-licensed contractor Elevated air samples Work stoppage Barrier inspections 8/3/2012 AAC Contracting, Inc. 13
14 Multi-employer Worksites: Demolition Renovation, Remodeling and Repair Non-Asbestos Contractors Notify building owner or representative Upon discovery of PACM Within 24 hours Quantity and location Activities cease Until assessed/handled by licensed contractor 8/3/2012 AAC Contracting, Inc. 14
15 Multi-employer Worksites: Demolition Renovation, Remodeling and Repair Building owner or representative Prior to commencement Inform all employers of PACM and ACM within their portion of building impacted by project Presence Location Quantity 8/3/2012 AAC Contracting, Inc. 15
16 Multi-employer Worksites: Demolition Renovation, Remodeling and Repair General Contractors Shall prohibit Disturbance of PACM and ACM Shall require Asbestos contractors under their control and supervision to be in compliance 8/3/2012 AAC Contracting, Inc. 16
17 Multi-employer - OSHA (d)(5) All general contractors on a construction project which includes work covered by this standard shall be deemed to exercise general supervisory authority over the work covered by this standard, even though the general contractor is not qualified to serve as the asbestos "competent person" as defined by paragraph (b) of this section. As supervisor of the entire project, the general contractor shall ascertain whether the asbestos contractor is in compliance with this standard, and shall require such contractor to come into compliance with this standard when necessary. 8/3/2012 AAC Contracting, Inc. 17
18 8/3/2012 AAC Contracting, Inc. 18
19 Project Record- Owner Responsibility Required on-site with the owner for active projects Copies of: Licenses for all involved entities Supervisor and handler certificates Notifications and variances Including amendments and re-openings 8/3/2012 AAC Contracting, Inc. 19
20 Project Record- Owner Responsibility Required on-site with the owner for active projects Copies of: Air sample log Air sample results Project Monitor s daily log 8/3/2012 AAC Contracting, Inc. 20
21 Project Record- Owner Responsibility Required on-site with the owner for active projects Copies of: Supervisor s daily log Entry/exit logs Inspection, surveys and bulk sample data The building/structure owner can rely upon his authorized representative(s) during the active portion of the asbestos project to maintain these required records. PROJECT NUMBER: PROJECT NAME : PROJECT ADDRESS : ENTRY/EXIT LOG SHEET page DATE: DAY: PLEASE READ BEFORE SIGNING ALL PERSONS WHO ENTER THE WORK AREA / ENCLOSURE SHALL SIGN IN. BY SIGNING THE ENTRY / EXIT LOG SUCH PERSONS HAVE ACKNOWLEDGED THAT THEY HAVE REVIEWED AND UNDERSTAND ALL REGULATIONS, PERSONAL PROTECTIVE REQUIREMENTS, WORK AREA ENTRY / EXIT PROCEDURES AND EMERGENCY PROCEDURES. SIGNATURE IN OUT IN OUT IN OUT INT. of 8/3/2012 AAC Contracting, Inc. 21
22 8/3/2012 AAC Contracting, Inc. 22
23 Responsibility for Cleanup of Uncontrolled Disturbances Upon discovery Property Owner must Contract with licensed asbestos contractor For immediate isolation and cleanup Prior to cleanup Must be assessed by Inspector Incidental Disturbance- Quantity not determined by the amount of asbestos disturbed, but the square feet of contaminated surfaces. 8/3/2012 AAC Contracting, Inc. 23
24 Responsibility for Cleanup of Uncontrolled Disturbances Incidental vs. Historic Incidental Disturbance considered an emergency project, regardless of quantity. More than a Minor requires a SSV. 8/3/2012 AAC Contracting, Inc. 24
25 SURVEYS are ALWAYS REQUIRED 8/3/2012 AAC Contracting, Inc. 25
26 Asbestos Survey Owner must have an Asbestos survey in the affected portion of the building prior to Before Demolition Remodeling Renovation Repair 8/3/2012 AAC Contracting, Inc. 26
27 Inspection & Survey AHERA Basis OSHA must inspect those materials or areas that will be disturbed AHERA protocols/accreditation for compliance EPA-NESHAPS Prior to demolition or renovation activities Accredited inspectors May involve destructive sampling 8/3/2012 AAC Contracting, Inc. 27
28 Survey Pitfalls Scope not communicated to inspector Lack of experience Insufficient samples Not compliant with all regulations Outdated Done during phase IAplanning & design 8/3/2012 AAC Contracting, Inc. 28
29 NEW YORK STATE ASBESTOS / FIBERS FREQUENTLY ASKED QUESTIONS Listed below are the most frequently asked questions (FAQs) regarding asbestos /fibers that are commonly received by the New York State Department of Health s (NYS DOH) Environmental Laboratory Approval Program (ELAP) and Bureau of Occupational Health (BOH), as well as, the NYS Department of Labor (DOL). FAQ # 5: Which types of samples does my laboratory need to gravimetrically reduce? In March 2011, the ELAP Certification Manual was updated to include more detail regarding which types of materials must be gravimetrically reduced. Manual Item describes the laboratory-approved method for Friable bulk samples that may not require gravimetric reduction, while Manual Item describes the approved method for Non-Friable Organically Bound (NOB) bulk samples that must be gravimetrically reduced. It is recommended that friable samples, which contain matrices that interfere with optical properties (e.g., large percentage of aggregate glass or "milky way effect"), or when asbestos concentrations are near the one percent level, be gravimetrically reduced (Item 198.1, Section 4.3). Meanwhile, NOB building materials embedded in flexible-to-rigid organic matrices including asphalt or vinyl must be gravimetrically reduced according to either Item or (Section 4). Refer to Table 1 below, which is also included in Items 198.1, 198.4, and /3/2012 AAC Contracting, Inc. 29
30 8/3/2012 AAC Contracting, Inc. 30
31 Vermiculite 70% Of Vermiculite from Libby, MT 8/3/2012 AAC Contracting, Inc. 31
32 Vermiculite-Loose Fill EPA & NYS No approved method to determine if asbestos present Treated as ACM 8/3/2012 AAC Contracting, Inc. 32
33 Vermiculite-as a component Per NYSDOH If < 10 % Vermiculite may be tested by PLM If > or = 10 % Vermiculite considered ACM 8/3/2012 AAC Contracting, Inc. 33
34 Asbestos Survey Survey to assess Locations Quantities Friability Condition To include visual inspections All suspect materials considered asbestos Unless bulk sample proves otherwise GD- Regardless of construction date Survey Contents.pptx 8/3/2012 AAC Contracting, Inc. 34
35 Asbestos Survey Survey shall be kept on-site throughout Abatement and Renovation, repair, remodeling, demolition 8/3/2012 AAC Contracting, Inc. 35
36 Asbestos Survey Pre-demolition surveys Submitted to ACB Submit all asbestos surveys To local government office in charge of permit issuance Demolition: The wrecking or removal of any loadsupporting structural member of a building or structure 8/3/2012 AAC Contracting, Inc. 36
37 Asbestos Still in Use 80+% of US imports from Canada Last US mine closed in 2002 Partial ban TSI Spray- 1973/78 No new products after 1989 Chrysotile cement pipes-manufactured in Pakistan 8/3/2012 AAC Contracting, Inc. 37
38 US Asbestos Consumption 8/3/2012 AAC Contracting, Inc. 38
39 8/3/2012 AAC Contracting, Inc. 39
40 8/3/2012 AAC Contracting, Inc. 40
41 8/3/2012 AAC Contracting, Inc. 41
42 Mineral Forms Serpentine Amphiboles Chrysotile Amosite Crocidolite Actinolite Anthophyllite Tremolite 8/3/2012 AAC Contracting, Inc. 42
43 8/3/2012 AAC Contracting, Inc. 43
44 GD Question 121: Regardless of Code Rule 56 requirements regarding surveys/inspections, as per Section (d) "No exemption to this requirement to conduct an asbestos survey shall exempt any person, asbestos contractor, property owner or business entity from the inspection or asbestos survey requirements of EPA, OSHA ". Thus, if federal regulations mandate various materials installed on January 1, 1974 or after to be treated as ACM, Code Rule 56 does not grant relief from that requirement. Regardless of construction date, Building Owner due diligence is always required for identification and assessment of ACM, as per OSHA requirements 8/3/2012 AAC Contracting, Inc. 44
45 (k)(1) If the employer/building owner has actual knowledge, or should have known through the exercise of due diligence, that other materials are asbestos-containing, they too must be treated as such. 8/3/2012 AAC Contracting, Inc. 45
46 EPA-Inspections (a) Prior to commencement of the demolition or renovation, thoroughly inspect the affected facility or part of the facility where the demolition or renovation operation will occur for the presence of asbestos Regardless of construction date Exemption Residential 4 or fewer dwellings 8/3/2012 AAC Contracting, Inc. 46
47 OSHA: Materials <1% asbestos (a)Scope and application. This section regulates asbestos exposure in all work as defined in 29 CFR (b) Competent person Exposure assessments Recordkeeping If < PELs Wet methods Prompt cleanup No prohibited methods 8/3/2012 AAC Contracting, Inc. 47
48 Cementitious Products 8/3/2012 AAC Contracting, Inc. 48
49 Cementitious Products Transite Acoustical Panels (music rooms, auditoriums) Transite Roofing Panels 8/3/2012 AAC Contracting, Inc. 49
50 Cementitious Products 8/3/2012 AAC Contracting, Inc. 50
51 Asbestos Electrical Insulation "AF wire (asbestos fiber) 8/3/2012 AAC Contracting, Inc. 51
52 Fire Door Asbestos Textiles Asbestos Insulation 8/3/2012 AAC Contracting, Inc. 52
53 ACM plaster topcoat Mastic hockey pucks 8/3/2012 AAC Contracting, Inc. 53
54 Flooring and flooring mastics & backing 8/3/2012 AAC Contracting, Inc. 54
55 Spray Applied Acoustical Plaster Surfacing Materials Spray Applied Fireproofing 8/3/2012 AAC Contracting, Inc. 55
56 Thermal System Insulation 8/3/2012 AAC Contracting, Inc. 56
57 Thermal System Insulation 8/3/2012 AAC Contracting, Inc. 57
58 Mastics and Glues 8/3/2012 AAC Contracting, Inc. 58
59 Asbestos Gaskets & Ropes 8/3/2012 AAC Contracting, Inc. 59
60 Roofing Products 8/3/2012 AAC Contracting, Inc. 60
61 Asbestos Tape and Expansion Cloth 8/3/2012 AAC Contracting, Inc. 61
62 Flooring Topcoat Finishing Materials Joint Compound Asbestos Paint 8/3/2012 AAC Contracting, Inc. 62
63 Caulking & Glazing Compounds Fire-stopping 8/3/2012 AAC Contracting, Inc. 63
64 TSI Refractory Brick Oven Insulation 8/3/2012 AAC Contracting, Inc. 64
65 Proposed Changes to CR56 8/3/2012 AAC Contracting, Inc. 65
66 Proposed Changes to CR 56 Fire & Life Safety enforceable now as part of NYS UFBC State register Summer 2012????? Effective end of 2012????? Clarify disturbance cleanup requirements Include existing AV s Other Mechanical fastening Buried NF piping Commercial re-usable tents 8/3/2012 AAC Contracting, Inc. 66
67 Demolition Change definition Load bearing & nonload bearing members and/or components Done by abatement contractor as part of project 8/3/2012 AAC Contracting, Inc. 67
68 Survey or Certificate of Survey Submitted to local entity (CEO) To obtain permits (demo, reno, etc.) If no permit required To town/city clerk 8/3/2012 AAC Contracting, Inc. 68
69 Project Completion Certificate Submitted to local entity (CEO) To obtain permits for continuation of work If no permit required To town/city clerk 8/3/2012 AAC Contracting, Inc. 69
70 Accessible Means of Egress Marked inside and out maintained throughout the project No alterations will be allowed to the existing means of egress in occupied buildings Including exit signage and illumination 8/3/2012 AAC Contracting, Inc. 70
71 Unoccupied buildings Construction or preparation for demolition > 50 ft. or 4 or more stories must have At least one lighted stairway with adequate exit signage, including directionality 8/3/2012 AAC Contracting, Inc. 71
72 Pre-demolition asbestos projects at a vacant building Existing standpipes maintained in an operational condition one floor below the project 8/3/2012 AAC Contracting, Inc. 72
73 Exits from abatement work areas shall be Maintained Have appropriate signage prominently displayed clearly indicate the direction of the exits Inspected daily by the supervisor for blockage or impediments. 8/3/2012 AAC Contracting, Inc. 73
74 Hardwall Barriers Fire-retardant No OSB or wallboard ASTM D-2898 UL 723 ASTM E84 NFPA 255 8/3/2012 AAC Contracting, Inc. 74
75 Existing fire protection systems Maintained throughout asbestos project Per the NYS Uniform Fire Prevention and Building Code (UFPBC) requirements These systems cannot be removed or modified Without the approval of the Code Enforcement Official (CEO) 8/3/2012 AAC Contracting, Inc. 75
76 8/3/2012 AAC Contracting, Inc. 76
77 Active system components Smoke heads, alarms, sensors, sprinkler heads, etc. Not considered fixed objects and shall not be covered with plastic. In lieu of plasticizing these components subject to cleaning by wet methods and/or HEPA-vacuuming. 8/3/2012 AAC Contracting, Inc. 77
78 Pre-fire plans (for the asbestos project) On site Copies provided to Fire Chief Code Enforcement Official The owner shall designate a person to be the Fire Prevention Program Superintendent. The fire prevention program superintendent shall develop and maintain an approved prefire plan in cooperation with the fire chief Fire safety and evacuation plans shall be reviewed or updated annually or as necessitated by changes in staff assignments, occupancy, or the physical arrangement of the building 8/3/2012 AAC Contracting, Inc. 78
79 Emergency evacuation maps Posted Decontamination unit The ground floor lobby or comparable location At all exits from each work area 8/3/2012 AAC Contracting, Inc. 79
80 8/3/2012 AAC Contracting, Inc. 80
81 If variation from NYS UFPBC or local regulations is required due to the asbestos project, Permits obtained by a NYS registered design professional. If not required, the written approval of the variation must be obtained from the pertinent agency and made part of the project record. Documentation on-site Copies of approved variations Fire Chief & CEO, prior to implementing Variance from ICR 56 Relief from section /3/2012 AAC Contracting, Inc. 81
82 If an asbestos project covers the entire floor or is greater than 15,000 SF on any floor A negative air ventilation system disconnect switch Located on the floor below Or a secure location in the ground floor lobby Location coordinated with the Fire Chief Notice of the location of the switch posted in the ground floor lobby or similar location 8/3/2012 AAC Contracting, Inc. 82
83 A Code Enforcement Official or Registered Design Professional Review the project documents & provide a written acceptance Compliance with ALL federal, state and local building and fire codes. Part of the Project Record. DOL notification - individual providing written acceptance Name NYS certification/professional license and registration number Phone number Design Professional= Architect or Engineer 8/3/2012 AAC Contracting, Inc. 83
84 Variance petition submissions seeking relief from ICR 56 Include a written statement by NYS Registered Design Professional Or CEO Compliant with NYS UFPBC and local regulations for fire or life safety issues in regards to the asbestos project. 8/3/2012 AAC Contracting, Inc. 84
85 Information required for submission to the design professional to obtain written acceptance of the work plan as required for NYS notifications or variance from CR 56. Written detailed work plan Copy of the variance petition (if needed) Plans/Drawings for the floor or building depicting Regulated work areas Decon and neg air locations Fire extinguisher locations Hard wall locations Means of egress Must be unobstructed (vertical and horizontal) & without alteration Exit locations marked (signage and illumination required) Evacuation routes marked Location and means to maintain existing fire protection systems 8/3/2012 AAC Contracting, Inc. 85
86 In Summary Protect Health Prohibit disturbance Asbestos contractor oversight Surveys NO safe date OSHA & NYS Due diligence EPA- Identify Cross reference prior to work Inform all of presence, location and quantity Controls for <1% asbestos Recordkeeping Fire and Life Safety Considerations 8/3/2012 AAC Contracting, Inc. 86
87 Health Effects 8/3/2012 AAC Contracting, Inc. 87
88 Mesothelioma 8/3/2012 AAC Contracting, Inc. 88
89 Need a Trunk Monkey? 8/3/2012 AAC Contracting, Inc. 89
90 8/3/2012 AAC Contracting, Inc. 90
91 8/3/2012 AAC Contracting, Inc. 91
92 Resources NYSDOL Transition Web Site DOSH_CODE_RULE_56_TRANSITION.shtm AAC Contracting, Inc. Kevin Cannan: , ext. 119 Peter DeLucia: , ext 129 8/3/2012 AAC Contracting, Inc. 92
93 Disclaimer: This information should be used as a resource and is not a substitute for an individual or an entity from pursuing their own due diligence with regards to regulatory and legal compliance. The author has merely collected information and is not responsible for the compliance or non-compliance of the readers in regards to the information provided.
Asbestos Management Program April 27, 2017
Asbestos Management Program April 27, 2017 1. INTRODUCTION 1.1. Purpose Indiana University Environmental Health and Safety (IUEHS) has developed this Program to identify practices and procedures for the
More informationProject Monitoring & Air Sampling
Project Monitoring & Air Sampling 1. Qualifications of Air Sampling Personnel. The project air sampling shall be conducted by an asbestos project air sampling technician who has been trained in the selected
More informationAsbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22
Page 1 of 22 Asbestos Survey Project Summary Pursuant to your request; Environmental, Inc., has performed an Asbestos Building Survey on 8/13/2014 and limited to the above referenced location. The Interior/Exterior/Roof
More informationBRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02
BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 Department Title: Safety Department Page: 2 Department Title: Safety Department Page:
More informationAsbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and
Asbestos What is asbestos? Asbestos is a naturally occurring fibrous mineral that is mined from the earth and found in many parts of the world. Its composition is such that it can be separated into smaller
More informationWashington University Asbestos Operations and Maintenance Plan
1. Purpose 2. Asbestos Washington University Asbestos Operations and Maintenance Plan 1.1. The purpose of this Asbestos Operations and Maintenance (O&M) Plan is to minimize the potential for exposure to
More informationHERRON Enterprises USA, Inc.
Phone (303) 763 9639 To: City of Montrose / Mr. Mark Armstrong HERRON Project No.: 1120145 Job No.: Verbal Location: Multiple Buildings, 950 and 970 Chipeta Rd., Montrose, CO 81403 Dates of Service: November
More informationAsbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager
Asbestos Management Plan Program originated: 02/2000 Last updated: 6/2015 Wendel Reece University Safety Manager TABLE OF CONTENTS I. Introduction II. Purpose III. Operations and Maintenance Asbestos Related
More informationAsbestos Awareness OSHA Class IV
Asbestos Awareness OSHA Class IV Stacy Kahatapitiya, CHMM, LEED GA & Peter Nketia-Akonnor Characteristics Naturally occurring mineral found in rock formations Most ACM mined/produced in Canada Comes from
More informationDUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM
DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM Revised January 2017 Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Introduction 1 Scope 1 Policy Statement
More informationWILLIAM PATERSON UNIVERSITY ASBESTOS MANAGEMENT PLAN
WILLIAM PATERSON UNIVERSITY ASBESTOS MANAGEMENT PLAN 1. INTRODUCTION 1.1 OBJECTIVES Asbestos-containing materials (ACM) have been used widely in the construction industry. Although use of ACM in buildings
More informationLimited Asbestos Demolition Survey
Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Former Fire Station Facility 25 to 45 S. Orlando Avenue Cocoa Beach, Florida Client: City of Cocoa Beach Public Works Department 1600
More informationASBESTOS AWARENESS. What is Asbestos? Asbestos
ASBESTOS AWARENESS 1of 63 What is Asbestos? Asbestos is the name for a group of naturally occurring minerals that separate into very fine fibers that are very durable and extremely heat resistant. Because
More informationOffice of Design & Construction State University Plaza Albany, New York
Instructions: Consultant should meet with the Campus and Fund at the work area(s) prior to completing this Checklist. At least two (2) meetings are required, one prior to Schematic Phase submission and
More informationUI Procedures for Asbestos Management
UI Procedures for Asbestos Management The University of Iowa Rev.10/22/08, 10/15/09 These procedures apply to employees and contractors involving the identification, work on, removal, or repair of asbestos-containing
More informationASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL
Project #: 13916 ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Prepared for: Sheila Miller Director, Department of Health and Safety Memorial University of Newfoundland
More informationNovember 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California
November 12, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Renovation Asbestos Survey Report 5862 Rupert Avenue, Marysville, California
More informationADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps)
Los Rios Community College District Sacramento City College ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps) GENERAL This addendum forms a part
More informationNAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control
NAVSEA STANDARD ITEM ITEM NO: 009-10 DATE: 18 NOV 2016 CATEGORY: I 1. SCOPE: 1.1 Title: Asbestos-Containing Material (ACM); control 2. REFERENCES: 2.1 29 CFR 1915.1001, Occupational Safety and Health Standards
More informationGuide for Asbestos Management
Guide for Asbestos Management May 2017 TABLE OF CONTENTS Introduction...2 Regulatory Information...5 Asbestos Management...7 1. Asbestos Inventory...8 2. Asbestos Control Plan...16 3. Training...24 4.
More informationAsbestos Elevator Industry Workshop November 25, 2015
Asbestos Elevator Industry Workshop November 25, 2015 BOB SWING CONTACT INFO EMAIL: Bob.Swing@ThyssenKrupp.com Phone: 604-499-5714 SOME ASBESTOS-CONTAINING MATERIALS Cement Pipes Cement Wallboard Cement
More informationFACILITY ASBESTOS MANAGEMENT PLAN
WASHINGTON ADVENTIST UNIVERSITY DEPARTMENT OF PUBLIC SAFETY DIVISION FACILITY ASBESTOS MANAGEMENT PLAN TAKOMA PARK CAMPUS REVIEWED and APPROVED BY: Patrick Farley WAU- V.P. of Finance Steven Lapham WAU-Executive
More informationAsbestos Awareness Program
Safety Manual 1 of 9 Safety Manual Sect: 1.0 Purpose 2.0 Scope Rel. Date: Last Review: This program covers Ardent policy related to asbestos, either discovered or suspected in the workplace. Ardent recognizes
More informationTSI SAMPLE. Asbestos Producing Countries. Asbestos Uses. Asbestos Consuming Countries. Asbestos Uses. Training Services International, Inc
www.training.com Operations & Maintenance (OSHA Class III) Asbestos Training Course What questions will be answered? What is? Serpentine Chrysotile Where is found? How is used? Is banned? P.1 www.training.com
More informationAsbestos Management. Asbestos Health and Safety Training Environmental. (and other dutyholder responsibilities)
Asbestos Health and Safety Training Environmental Asbestos Management (and other dutyholder responsibilities) Presentation No.: BECL A058 Birmingham Wakefield Blackpool St Asaph (N. Wales) Matt Dawes CoCA
More informationAsbestos Management Program and Procedures
Asbestos Management Program and Procedures Department of Environmental Health and Safety Northern Illinois University 11/23/15 Review and Updates Date Reviewed by Changes Made 11/23/15 Mary Schlagel Annual
More informationAsbestos Management Policy University of Wisconsin-Platteville Reviewed 4/2016
Asbestos Management Policy University of Wisconsin-Platteville Reviewed 4/2016 1.0 Purpose This written program is intended to comply with both state and federal asbestos regulations. Asbestos containing
More informationAsbestos is the generic name that refers to six unique minerals: Chrysotile Amosite Crocidolite Anthophyllite Tremolite Actinolite PPT-SM-A 2018
Asbestos Asbestos is the generic name that refers to six unique minerals: Chrysotile Amosite Crocidolite Anthophyllite Tremolite Actinolite 2 These naturally occurring mineral fibers were widely used in
More informationAUBURN UNIVERSITY RISK MANAGEMENT & SAFETY
AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY ASBESTOS CONTROL PROGRAM September 22, 2006 Table of Contents 1.0 Introduction... 4 2.0 Purpose and Applicability... 4 3.0 Roles and Responsibilities... 5 3.1
More informationUNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN
UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision Prepared by Approved by 1 July 2014 Approved Plan Jon Fahie This, the University
More informationASBESTOS OPERATIONS & MAINTENANCE PROGRAM
NEW MEXICO MILITARY INSTITUTE 101 WEST COLLEGE BOULEVARD ROSWELL, NM 88201 ASBESTOS OPERATIONS & MAINTENANCE PROGRAM Pursuant to Asbestos standards OSHA: 29CFR1926.1101 Construction; & 1910.1001 General
More informationCLASS I AND II ABATEMENT PROJECT SUBMITTALS
5.1 Pre-Work Submittals CLASS I AND II ABATEMENT PROJECT SUBMITTALS Abatement contractors shall submit the following in a bound notebook to AU or our designated representative at the mandatory pre-construction
More informationPRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA. Prepared for
ENVIRONMENTAL SERVICES, LLC PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA Prepared for CITY OF OCALA REVITILIZATION STRATEGIES-CODE ENFORCEMENT DIVISION
More informationNARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION
NARRATIVE REPORT 1.0 BUILDING INFORMATION Bentson Bunker Fieldhouse was originally constructed in 1931; the building has had several renovations, notably, a 1976-1980 multi-phase renovation throughout
More informationASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, and (a)(4)
ASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, 763.86 and 763.85(a)(4) Assessment Completed for Clint Moore, ASLA Planning, Research and Development City of Florence 324 West Evans Street
More informationFINAL Asbestos Management Program University of Windsor 401 Sunset Avenue, Windsor, Ontario
FINAL Asbestos Management Program University of Windsor 401 Sunset Avenue, Windsor, Ontario Prepared for: University of Windsor 401 Sunset Avenue Windsor, Ontario, N9B 3P4 Attn: Danny A. Castellan, P.Eng.
More informationAsbestos Management Plan
Asbestos Management Plan Management Plan Statement The following management plan has been produced and will be implemented so that the risks associated with known or presumed asbestos containing materials
More informationAsbestos Code of Practice
Revised date: 2010-06-26 Asbestos Code of Practice Issued date: 2009-07-21 Version: 1.0 Creator: Occupational Health 1.0 Purpose Custodian: H&S Programs & Projects The purpose of the Asbestos Code of Practice
More informationAsbestos-Containing Material and Hazardous Material Survey Summary Report
Asbestos-Containing Material and Hazardous Material Survey Summary Report Site: Haas Park Fieldhouse PS1757 2404 North Washtenaw Street Chicago, Illinois 60647 Survey Date: January 15, 2010 PBCC Project
More informationASBESTOS PROGRAM. C. Asbestos Containing Materials (ACM) are defined as any material or product which contains more than 1% (by weight) asbestos.
PAGE: 1 OF 14 I. PURPOSE ASBESTOS PROGRAM The Lake Charles Asbestos Program has been developed to establish work practices, engineering controls, training programs, industrial hygiene monitoring, and medical
More informationAsbestos / Lead Paint Management Plan
Asbestos / Lead Paint Management Plan 2017 http://www.dshs.state.tx.us/asbestos/rules.shtm http://www.dshs.state.tx.us/elp/rules.shtm Prepared by the Environmental, Health and Safety Department 6300 Ocean
More informationASBESTOS BUILDING INSPECTION
ASBESTOS BUILDING INSPECTION LOCATION: BURT HALL 2651 SW ORCHARD AVENUE CORVALLIS, OREGON 97331 NOVEMBER 28, 2008 FORENSIC ANALYTICAL PROJECT NO. PJ6263 PREPARED FOR: OREGON STATE UNIVERSITY 127 OAK CREEK
More informationTest Report: Asbestos Analysis of Bulk Materials by PLM via the NY State ELAP Method
031214474 Phone: (518) 453-0146 Received: 05/11/12 9:59 AM Analysis Date: Project: Test Report: Analysis of Bulk Materials by PLM via the NY State ELAP 198.1 Method Non- Sample Description Appearance %
More informationAsbestos Awareness Training Handout For Custodial/Housekeeping Workers and Class IV Asbestos Workers
This handout is provided to meet the requirements of the OSHA asbestos awareness refresher training for custodial and housekeeping workers and Class IV asbestos workers. This training allows you to: HEPA
More informationAsbestos Inspection Cover Letter
Asbestos Inspection Cover Letter Date Issued: January 27, 2016 Site Name/Location Residential Structure 4 Cauthen Street Rock Hill, South Carolina Asbestos Inspection Performed For Hank Williams Right
More informationAPPROACH FOR IMPLEMENTION OF HUD S LEAD SAFE HOUSING RULE REGULATIONS (24 CFR Part 35, Subpart H, )
January 16, 2008 Mississippi Development Authority Homeowner Elevation Grant Program and Small Rental Assistance Program in Hancock, Harrison, Jackson, and Pearl River Counties, Mississippi APPROACH FOR
More informationAsbestos Management Plan. Approved by TRCA Strategy Committee: May 19, 2016
Asbestos Management Plan Approved by TRCA Strategy Committee: May 19, 2016 Table of Contents 1.Objectives... 3 1.1 Purpose and Scope... 3 1.2 Elements of the Asbestos Management Plan... 4 1.3 Roles and
More informationRECYCLING CONSTRUCTION AND DEMOLITION MATERIAL
1st Edition January 2007 RECYCLING CONSTRUCTION AND DEMOLITION MATERIAL GUIDANCE ON COMPLYING WITH THE OCCUPATIONAL HEALTH AND SAFETY (ASBESTOS) REGULATIONS 2003 The information presented in Recycling
More informationOSHA s Enforcement of Asbestos Standards in the Construction Industry
Open Journal of Safety Science and Technology, 2014, 4, 157-165 Published Online December 2014 in SciRes. http://www.scirp.org/journal/ojsst http://dx.doi.org/10.4236/ojsst.2014.44017 OSHA s Enforcement
More informationOAK GROVE SCHOOL DISTRICT ASBESTOS PLAN
Authority and Scope Regulation: 29 CFR 1910.1001 Asbestos OAK GROVE SCHOOL DISTRICT ASBESTOS PLAN Scope: This Plan establishes the requirements for handling, maintenance, use, removal, and disposal by
More informationAHERA ASBESTOS INSPECTION & MANAGEMENT PLAN. for. Grounds Building 3644 Lee Road Shaker Heights, Ohio
AHERA ASBESTOS INSPECTION & MANAGEMENT PLAN for Grounds Building 3644 Lee Road Shaker Heights, Ohio March 2017 CONTENTS OF INSPECTION REPORT AND MANAGEMENT PLAN PART I BUILDING INSPECTION/REINSPECTION
More informationASBESTOS REMOVAL CONTROL PLAN
APPROVED CODE OF PRACTICE // MANAGEMENT AND REMOVAL OF ASBESTOS ASBESTOS REMOVAL CONTROL PLAN This Appendix is a template of an asbestos removal control plan. It is designed to incorporate the elements
More informationAsbestos Survey Report
Asbestos Survey Report Downtown Duluth Old City Hall Block Buildings for renovation 3087 Main Street, 3097 Main Street, New Dawn Theater, 3530 W. Lawrenceville Street, Old City Hall/Church Duluth, Georgia
More informationHERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW
HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com
More informationAsbestos/Lead Paint Survey
Asbestos/ Survey At: Camp Lejeune Bldg. 500 Repair Indoor Physical Fitness Center Prepared for: The Walker Group Architecture Inc. PO Box 541 New Bern, NC 28563 PEI Project No.: Walker Group Project No.:
More informationCSBP Asbestos Management Plan
A printed or saved copy is an UNCONTROLLED copy. Check that it is the latest available version before use. Title: Number: CSBP ASBESTOS MANAGEMENT PLAN CSBP-GM-11-031-20 Version Number: 12.0.0 Date Revised:
More informationUNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011
UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 CONTENTS A. PURPOSE B. DESIGNATED RESPONSIBILITIES C. DEFINITIONS D. PROJECT SUBMITTAL PROCEDURE E. REQUIREMENTS
More informationPIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278
PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278 PREPARED FOR: Mr. Roberto Aguirre City of San Francisco DPW, SAR, BCM 1680 Mission Street San Francisco, California PREPARED
More informationWhat is Asbestos? Asbestos was also used in household items, such as: oven gloves ironing board pads simmer mats for stoves fire blankets.
All About Asbestos Read this booklet to learn more about: identifying asbestos-containing material in your home the health risks of asbestos what you can do about asbestos. What is Asbestos? Asbestos is
More informationAsbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina
Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina Prepared for: Northside Development Group 410 Magnolia Street Spartanburg, South Carolina Prepared by: Apex Environmental
More informationATTACHMENT A RFP # BH ASBESTOS ABATEMENT REQUIREMENTS
1. DESCRIPTION OF WORK: ATTACHMENT A RFP # 024-0-2016BH ASBESTOS ABATEMENT REQUIREMENTS The work includes pre-cleaning, repair and/or removal and disposal of friable and non-friable asbestos containing
More informationASBESTOS MANAGEMENT PLAN PROCEDURE
ADMINISTRATIVE PROCEDURE Approval Date January 2011 Review Date 2016 Contact Person/Department Superintendent of Business Replacing All Previous Procedures Page 1 of 6 Identification BU-3565 ASBESTOS MANAGEMENT
More informationINTRODUCTION TO THE PROGRAM
INTRODUCTION TO THE PROGRAM Structure and Organization Information in this program is presented in a definite order, so that employees will see the relationships between the various groups of information
More informationVERTEX Corporate Headquarters 400 Libbey Parkway Weymouth, MA p: f:
VERTEX Corporate Headquarters 400 Libbey Parkway Weymouth, MA 02189 www.vertexeng.com p: 781.952.6000 f: 781.335.3543 EZRA BAKER ELEMENTARY SCHOOL/GYMNASIUM ASBESTOS ABATEMENT WORK PLAN ASBESTOS CONTAINING
More informationReport of. Asbestos Survey
Report of Asbestos Survey of Curtis Block and Marlowe Buildings 14501, 14505, 14509, 14511 & 14515 Detroit Avenue and 1412 Marlowe Avenue Lakewood, Ohio 44107 Prepared for City of Lakewood 12650 Detroit
More informationASBESTOS MANAGEMENT PROGRAM
California Institute of Technology ASBESTOS MANAGEMENT PROGRAM Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028
More informationCommon Household Contaminants: The Hazards and the Laws
The National Center for Healthy Housing (NCHH) developed this summary to serve as a short guide for health and housing professionals on common household contaminants. It is not comprehensive. As a guide,
More informationTim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall
July 3, 2007 REPORT: Full Building Survey TO: Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall FROM: Bryan
More informationComparison of the life safety elements of the 1997 UBC and the IBC 2000.
Comparison of the life safety elements of the 1997 UBC and the IBC 2000. Introduction The Building Performance Research Institute s mission is primarily one of education on building safety and performance.
More informationPRE-DEMOLITION ASBESTOS SURVEY Curtis Park Ballpark and Pool 1901 NW 24 Avenue Miami, FL 33125
PRE-DEMOLITION ASBESTOS SURVEY Curtis Park Ballpark and Pool 1901 NW 24 Avenue Miami, FL 33125 Prepared For: City of Miami Capital Improvements & Transportation Program 444 SW 2 nd Avenue, 8 th Floor Miami,
More informationThe Building Codes A.R.E. Building Design and Construction Exam Prep
Know Thy Codes! The Building Codes Building Codes The Code of Hammurabi 4000bc Developed 19 th and 20 th c. Codes define what you can and can t do Allowable area and height based on degree of danger Fire
More informationCHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION
CHAPTER 26 PLASTIC SECTION BC 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic
More informationBioscience Research Building
Bioscience Research College Park, Maryland Presentation Agenda and Construction Features Analysis Analysis Research Features Presentation Agenda Construction Features: CM at Risk 2 year schedule (July
More informationAssessment Completed by: Asbestos Inspections, LLC 4686 Pee Dee Highway Conway, South Carolina (843)
ASBESTOS INSPECTION REPORT 1814 PRINCE STREET 2-STORY Georgetown, South Carolina Asbestos Inspections, LLC Project # 2017-48 Performed in general accordance with SCDHEC regulation 61-86.1 along with OSHA
More information780 CMR CHAPTER 34 EXISTING BUILDINGS STRUCTURES
780 CMR CHAPTER 34 EXISTING BUILDINGS STRUCTURES SECTION 3401 GENERAL 3401.1 Scope. Chapter 34 of the International Building Code 2009 is deleted in its entirety. The provisions of the International Existing
More informationAsbestos in the Home
Asbestos in the Home This document will help you understand asbestos: what it is, its health effects, where it is in your home, and what to do about it. What Is Asbestos? Asbestos is a mineral fiber. It
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2270
More informationINTERIOR FINISHES CHAPTER 8
CHAPTER 8 INTERIOR FINISHES SECTION 801 GENERAL 801.1 Scope. Provisions of this chapter shall govern the use of materials used as interior finishes, trim and decorative materials. 801.2 Interior wall and
More informationInternational Proficiency Module Syllabus. IP405 - Management of Asbestos in Buildings
International Proficiency Module Syllabus IP405 - Management of Asbestos in Buildings Aim To provide candidates with practical knowledge and skills to manage asbestos in buildings and to provide a basic
More informationBuilding Codes and Ordinances ARC 227
Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive
More informationAsbestos Survey. Site: Prepared for: Edmundson Elementary School Grayland Avenue, Norwalk, CA 90650
Asbestos Survey Site: Edmundson Elementary School 15121 Grayland Avenue, Norwalk, CA 90650 Prepared for: Norwalk-La Mirada Unified School District 12820 Pioneer Boulevard, Norwalk, CA 90650 October 24th,
More informationASBESTOS, PCB CAULKING & UNIVERSAL WASTE SURVEY REPORT
ASBESTOS, PCB CAULKING & UNIVERSAL WASTE SURVEY REPORT HUNTER COLLEGE - Hunter High School and Hunter Elementary School (The Campus Schools) HVAC UPGRADE 71 EAST 94 th STREET NEW YORK, N.Y. 10128 PREPARED
More informationPre-Renovation Asbestos Survey
Pre-Renovation Asbestos Survey L640 Level 2 Remodel College Complex Los Medanos College Pittsburg, California November 23, 2016 Terracon Project No. R1167D98 Prepared for: Contra Costa Community College
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationHERRON Enterprises USA, Inc.
Phone (33) 763 9639 HERRON Enterprises USA, Inc. Fax (33) 763 9686 E-Mail Lennie.Herron@comcast.net Hazardous Materials*Mold*Asbestos*Lead Paint www.herron-enterprises.com Environmental Services*Industrial
More informationCrothers Environmental Group, LLC
, LLC Morrisville, Vermont 05661 Phone 802-888-1936 info@crothersiaq.com June 26, 2009 Mr. Joe Aja, Project Engineer State of Vermont - Department of Buildings & General Services 5 Perry Street, Suite
More informationInfrastructure. Asbestos Management Plan
Infrastructure Asbestos Management Plan Contents... 1 Introduction... 3 Identification... 3 Asbestos Registers... 4 Risk management... 4 Training... 5 Removal or Disturbance... 5 Records Management...
More informationPermit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:
Permit Requirements: Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,
More informationLearn Charter School Excel Campus
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationAsbestos Survey Report
> This report was produced in 5 seconds with PocketSurvey How long does it take you? Handheld Systems Ltd Your Address Your Town County, Post Code Email: youremail@yourdomain.com
More informationLimited Hazardous Materials Survey Report
Limited Hazardous Materials Survey Report Contra Costa Community College Applied Arts Building Chiller Replacement Project 2600 Mission Bell San Pablo, California RGA Project No: R1167404 June 29, 2016
More informationTRB Summer Conference June 15-18, 2008 Baltimore, Maryland DOT Practices for the Identification and Abatement of Asbestos in Bridges - TxDOT
TRB Summer Conference June 15-18, 2008 Baltimore, Maryland DOT Practices for the Identification and Abatement of Asbestos in Bridges - TxDOT Rodney Concienne, P.G. Terry Dempsey, P.G. Pollution Prevention
More informationHOW TO SAFELY REMOVE ASBESTOS
HOW TO SAFELY REMOVE ASBESTOS Code of Practice DECEMBER 2011 Safe Work Australia is an Australian Government statutory agency established in 2009. Safe Work Australia consists of representatives of the
More informationLIMITED ASBESTOS-CONTAINING BUILDING MATERIALS SURVEY. Wal-Mart # Highway 51 North Ripley, TN ATC Project Number
LIMITED ASBESTOS-CONTAINING BUILDING MATERIALS SURVEY Wal-Mart #0097 628 Highway 51 North Ripley, TN 38063 ATC Project Number 30.75300.0612 Prepared for: Wal-Mart Stores, Inc. Ms. Vicki Ingram Store Planning
More information1. Sign-in sheet from the Pre-Proposal Conference on April 19, 2017 at Atherton Elementary.
DATE: April 20, 2017 ARLINGTON INDEPENDENT SCHOOL DISTRICT 1203 W. Pioneer Parkway Arlington, Texas 76013 ADDENDUM II FROM: Tammy Craig Director Purchasing RE: CSP 17-79 Amos & Atherton Elementary Renovations
More informationMinimum Standards for Building Occupancy. Safety Resources
Minimum Standards for Building Occupancy 2017 Safety Resources Contents 1 Purpose... 1 2 Applicable To... 1 3 Scope... 1 4 Definitions... 1 5 Training... 2 6 Safety... 2 7 Equipment and Materials... 2
More informationLevel 3 Award in Asbestos Air Monitoring and Clearance Procedures (HSG248 Sampling, Analysis and Clearance Procedures)
Level 3 Award in Asbestos Air Monitoring and Clearance Procedures (HSG248 Sampling, Analysis and Clearance Procedures) January 2016 Guided Learning Hours 30 Total Qualification Time 91 Ofqual Qualification
More informationUNIVERSITY COLLEGE LONDON STANDARD ASBESTOS MANAGEMENT PLAN
UNIVERSITY COLLEGE LONDON STANDARD ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision Prepared by Approved by 1 15-02-05 First Issue Ian Oram HSMT 2 02-03-09 Revised to incorporate Control of Asbestos
More informationTABLE OF CONTENTS 4. PREPARATION, COMMUNICATIONS, AND CONTROLS
TABLE OF CONTENTS SECTION PAGE NO. 1. INTRODUCTION... 1-1 1.1 Background... 1-1 1.2 Conceptual Site Model... 1-1 1.3 Plan Organization... 1-2 1.4 Certification... 1-3 2. SAMPLE COLLECTION, ANALYSIS, AND
More informationDP ASBESTOS MANAGEMENT
DP 057 1997-12-03 ASBESTOS MANAGEMENT Table of Contents 1. Background 2. Policy 3. Scope 4. Definitions 5. Roles and Responsibilities 6. Guidelines 1. Implementation 2. Monitoring 7. Procedures 8. Compliance
More information