2 7/ 1/2017 SPECIFICATIONS: PROTECTION OF TRAFFIC UNDER BRIDGE: ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE OKLAHOMA THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING THE TRAFFIC UNDER TURNPIKE AUTHORITY, 2010 STANDARD SPECIFICATIONS FOR TURNPIKE CONSTRUCTION, THE BRIDGE DURING BRIDGE REPAIR WORK. A PROPOSED METHOD OF PREVENTING EXCEPT AS MODIFIED BY PLAN NOTES AND SPECIAL PROVISIONS. DEBRIS FROM FALLING ON TRAFFIC BELOW THE BRIDGE SHALL BE SUBMITTED TO THE FOR APPROVAL. ALL MATERIALS REMOVED FROM THE BRIDGE SHALL BE REMOVED FROM THE WORK AREA PROMPTLY. THE AREA SHALL BE CLEARED DESCRIPTION OF WORK: AT THE CLOSE OF ANY WORK PERIOD. ALL COST FOR TRAFFIC PROTECTION AS THE WORK TO BE PERFORMED UNDER THIS CONTRACT CONSISTS OF REPAIRING THE STATED SHALL BE INCLUDED IN THE PRICE BID FOR OTHER ITEMS OF WORK. DAMAGE TO BRIDGE NO (LUTHER ) OVER IN OKLAHOMA COUNTY. THE BRIDGE SHALL HAVE ONE LANE CLOSED TO TRAFFIC DURING REPAIR OPERATIONS. TRAFFIC SURVEILLANCE, POLICE: HEAT STRAIGHTEN THE DAMAGED AREA OF THE WEB AND FLANGE OF THE EAST EXTERIOR BEAM OF SPAN NO. 3 OVER THE WESTBOUND LANES OF TO REASONABLY TRAFFIC SURVEILLANCE, POLICE WILL NOT BE A PART OF THIS CONTRACT. CLOSE CONFORMITY TO THE BEAM'S ORIGINAL SHAPE. REPAIR A DAMAGED INTERMEDIATE THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING HIS ANTICIPATED STEEL DIAPHRAGM AND REPAIR THE DAMAGED END CONCRETE DIAPHRAGM AT PIER NO. 3. WEEKLY SCHEDULE TO THE OTA ON-SITE REPRESENTATIVE ONE (1) WEEK IN THE CONTRACTOR SHALL MEASURE THE VERTICAL CLEARANCE PRIOR TO PLACEMENT OF ADVANCE OF THE WORK. THE WORK SCHEDULE WILL INCLUDE THE DAYS IN THE VERTICAL CLEARANCE SIGN. THE COST WILL BE INCLUDED IN OTHER ITEMS OF WHICH TRAFFIC SURVEILLANCE, POLICE IS REQUESTED AND WILL BE SUBJECT WORK. TO THE APPROVAL OF THE. OTA WILL COORDINATE WITH THE ALL COSTS OF TO COMPLETE THE WORK AS DESCRIBED SHALL BE PAID FOR IN THE UNIT OKLAHOMA HIGHWAY PATROL TO DETERMINE THE OF OFFICERS AND BID PRICE FOR "(PL) REPAIR BRIDGE ITEMS". SCHEDULE REQUIRED FOR THE PROJECT. CONTRACT NO. MAINTENANCE OF TRAFFIC: SHALL BE PHASED TO HAVE ONE LANE WESTBOUND OPEN AT ALL TIMES DURING REPAIR OPERATIONS. THE BRIDGE CARRYING LUTHER SHALL HAVE ONE LANE OPEN AT ALL TIMES DURING REPAIR OPERATIONS. THE CONTRACTOR SHALL HAVE THE OPTION OF WORKING DURING NON-DAYLIGHT HOURS. IF THE CONTRACTOR ELECTS TO WORK DURING NON-DAYLIGHT HOURS, THE CONTRACTOR SHALL SUBMIT TO THE FOR REVIEW AND APPROVAL PRIOR TO BEGINNING CONSTRUCTION A METHOD TO PROTECT TRAFFIC FROM THE LIGHT EMITTED BY THE FLAME. THE CONTRACTOR SHALL MAINTAIN THE TURNPIKE AND LUTHER TRAFFIC CONTROL AT ALL TIMES (24 HOURS/DAY) DURING THE CONTRACT. S 2:46:12 PM VERIFICATION OF EXISTING CONDITIONS: THE DIMENSIONS OF THE EXISTING BRIDGE COMPONENTS SHOWN ON THESE PLANS AND THE ORIGINAL PLANS ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS NECESSARY AND SHALL BE SOLELY RESPONSIBLE FOR THE ACCURACY THEREOF. PRIOR TO SUBMITTING HIS BID, THE CONTRACTOR SHALL FULLY INFORM HIMSELF OF THE NATURE OF THE WORK AND CONDITIONS UNDER WHICH IT WILL BE PERFORMED. THE CONTRACTOR SHALL ADOPT METHODS CONSISTENT WITH GOOD CONSTRUCTION HEAT STRAIGHTENING SPECIFICATIONS: HEAT STRAIGHTENING OF THE DAMAGED STEEL BRIDGE MEMBERS SHALL BE PERFORMED BY THE CAREFULLY PLANNED AND SUPERVISED APPLICATION OF A LIMITED AMOUNT OF LOCALIZED HEAT TO THE DAMAGED MEMBERS. MECHANICAL MEANS MAY BE USED TO STRAIGHTEN THE MATERIAL ONLY IN CONJUNCTION WITH THE APPLICATION OF HEAT. SUGGESTED CONSTRUCTION SEQUENCE: A SUGGESTED SEQUENCE OF CONSTRUCTION IS SHOWN ON THIS. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE FINAL CONSTRUCTION SEQUENCE AND SHALL SUBMIT A PROPOSED CONSTRUCTION SEQUENCE FOR APPROVAL, SIGNED AND SEALED BY A PROFESSIONAL WHO IS CURRENTLY REGISTERED WITH THE STATE OF OKLAHOMA STATE BOARD OF LICENSURE FOR PROFESSIONAL S AND LAND SURVEYORS. PRACTICE AND SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE EXISTING BRIDGE OR ATTACHMENTS. ANY DAMAGE TO THE EXISTING BRIDGE OR WAY DUE TO THE CONTRACTOR'S NEGLIGENCE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE AND TO THE SATISFACTION OF THE. ONLY CONTRACTORS THAT CAN DOCUMENT EXPERIENCE IN HEAT STRAIGHTENING OF DAMAGED STEEL HIGHWAY OR RAIL BRIDGE MEMBERS WILL BE ALLOWED TO BID ON THIS HEAT STRAIGHTENING PROJECT INSTALL TRAFFIC CONTROL ON LUTHER OVER THE EAST EXTERIOR BEAM OVER THE WESTBOUND LANES OF. INSTALL TRAFFIC CONTROL ON MOVING TRAFFIC TO THE INSIDE LANE. EXISTING PLANS: THIS BRIDGE WAS CONSTRUCTED BY THE. PLANS FOR THE ORIGINAL CONSTRUCTION AND REHABILITATION ARE AVAILABLE ON OTA WEB SITE; FTP://FTP.PIKEPASS.COM/ORIGINAL/CONSTRUCTION/CONTRACTS/TURNER/CONT03OABC: OR FROM: 3500 NORTH MARTIN LUTHER KING AVENUE OKLAHOMA CITY, OKLAHOMA ASK FOR: CONTRACT NO. 03O. ALL GAS FUELED HEATING EQUIPMENT, AS WELL AS MECHANICAL STRAIGHTENING EQUIPMENT,SHALL BE SUPPLIED BY THE CONTRACTOR AS NECESSARY TO PERFORM ALL HEAT STRAIGHTENING. IN GENERAL, THE METHODS OF CONSTRUCTION WILL RELY ON THE EXPERIENCE OF THE CONTRACTOR. "NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM" (NCHRP) REPORT NO. 271 CONTAINS B GUIDES TO THIS TYPE OF REPAIR. THE STRAIGHTENING HEAT SHOULD BE APPLIED AS RAPIDLY AS POSSIBLE TO OBTAIN THE BEST STRAIGHTENING EFFECT. HEAT SHOULD BE APPLIED TO SMALL AREAS, USUALLY TRIANGULAR IN SHAPE; THE SMALL AREAS TO WHICH HEAT IS APPLIED AND THE SEQUENCE OF HEATING DIFFERENT SMALL AREAS SHALL BE DETERMINED BY THE HEAT STRAIGHTEN THE DAMAGED PORTIONS OF THE EXISTING BEAM AND INTERMEDIATE DIAPHRAGM TO REASONABLY CLOSE CONFORMITY TO THEIR ORIGINAL SHAPES, REPAIR THE CONCRETE END DIAPHRAGM AT PIER NO. 3. PAINT THE NEW STRUCTURAL STEEL AND THE EXTERIOR FACE AND BOTTOM FLANGE OF THE REPAIRED BEAM. INSTALL THE VERTICAL CLEARANCE SIGN AT THE ORIGINAL LOCATION. REMOVE TRAFFIC CONTROL ON THE. REMOVE TRAFFIC CONTROL ON LUTHER AND OPEN TO TRAFFIC. A RECENT REPAIR PROJECT WAS PERFORMED ON THIS STRUCTURE: CONTRACTOR TO PRODUCE THE MOST EFFICIENT STRAIGHTENING. IT IS NOT RECOMMENDED TO HEAT THE SAME SMALL AREA MORE THAN ONCE. ASK FOR: EMERGENCY REPAIR PROJECT T-ER-022 THE MAXIMUM TEMPERATURE TO WHICH THE STEEL SHALL BE HEATED IS 1200 F:\2017\ \ \40-Design\Microstation\ _OTA (second hit)\dgn\s\1076_gennotes_01.dgn PAINTING - CATEGORY 'R': THE CONTRACTOR SHALL PAINT INTERIOR AND EXTERIOR FACES OF THE DAMAGED BEAM INCLUDING TOP AND BOTTOM FLANGES A MINIMUM OF 1'-0" BEYOND THE EXTENTS OF BEAM REPAIR AREAS AND ALL AREAS WHERE EXISTING PAINT HAS BEEN DAMAGED, EITHER BY THE CONTRACTOR OR AS A RESULT OF DAMAGES TO THE BEAM. BEFORE APPLYING NEW PAINT, ALL LOOSE PAINT SHALL BE REMOVED BY HAND SCRAPING AND WITH BRUSHING LEAVING A FEATHERED EDGE ON THE REMAINING SOUND PAINT. PAINTING SHALL CONSIST OF TWO COATS OF INORGANIC ZINC PRIMER AND ONE FINISHED COAT OF PAINT USING HIS COATINGS MASTERTHANE OTA GREEN IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS. HIS COATINGS MASTERTHANE OTA GREEN PRODUCT S ARE: #T816-5 M.E.K. THINNER #98G05KIT-1.25 EPOXY GRAY PRIMER KIT INCLUDES: 1. #98G05-1 LIFE-COAT SP EPOXY PRIMER GRAY 2. #98Z05-QT EPOXY ACTIVATOR #71D06KIT-1 MASTERTHANE OTA GREEN KIT INCLUDES: 1. #71D06-3/4 MASTERTHANE OTA GREEN 2. #H8002-PT ACRYLIC URETHANE CATALYST PAINT SHEEN TO BE REDUCED TO SEMI GLOSS. CAUTION: THE EXISTING BRIDGE MAY CONTAIN A LEAD BASED PAINT SYSTEM. ALL REMOVAL AND DISPOSAL OF ANY LEAD BASED PAINT WITHIN THE LIMITS OF THE REPAIR SHALL BE IN ACCORDANCE WITH 512 OF THE SPECIFICATIONS. COST TO BE INCLUDED IN THE LUMP SUM PRICE BID FOR "REPAIR BRIDGE ITEMS". DEGREES FAHRENHEIT (~650 DEG. C.). THE CONTRACTOR MAY VISUALLY DETERMINE THAT THIS TEMPERATURE HAS BEEN REACHED WHEN THE COLOR OF THE STEEL BECOMES A DULL RED. THE MAY PERIODICALLY MONITOR THE TEMPERATURE OF THE STEEL TO VERIFY THE VISUAL TEMPERATURE DETERMINATION. THE EQUIPMENT FOR CHECKING THE TEMPERATURE SHALL BE PROVIDED BY THE CONTRACTOR. A HIGH TEMPERATURE PYROMETER IS PREFERRED FOR THE MEASUREMENT OF THE TEMPERATURE, BUT TEMPERATURE INDICATING CRAYONS OR OTHER MEANS APPROVED BY THE MAY BE USED. NO ACCELERATED OR ARTIFICIAL COOLING WILL BE PERMITTED. THE FINAL ACCEPTABLE LOCAL TOLERANCES FOR STRAIGHTNESS IN THE AREA OF THE DAMAGE SHALL BE AS SHOWN BELOW: 1. HORIZONTAL SWEEP-- 1/4 INCH PER 10 FEET (3 M.) OF DAMAGED LENGTH OF BEAM. 2. VERTICAL DEFLECTION (WAVES)-- 1/4 INCH IN FLANGES 3. DEFLECTION OF WEB (OUT OF PLANE OF WEB)-- 1/4 INCH * * MEASURED BY A STRAIGHTEDGE HELD VERTICALLY AND HORIZONTALLY IN THE DAMAGED AREAS. APPLYING HEAT TO STEEL: BEFORE APPLYING HEAT TO STEEL COATED WITH A LEAD-BASED PAINT, REMOVE ALL PAINT ON ALL SIDES WITHIN 3 INCHES OF THE HEATED AREA. CLEAN THE SURFACES TO SSPC-SP2, HAND TOOL CLEANING, OR TO SSPC-SP3, CONVENTIONAL POWER TOOL CLEANING, IN ACCORDANCE WITH CFR ALL COSTS FOR THIS CLEANING WILL BE INCLUDED IN OTHER ITEMS OF WORK. ANY REMOVED MATERIALS SHALL BE DISPOSED AS DIRECTED BY THE. GENERAL CONSTRUCTION NOTES ( 1 OF 2) 2 CONTRACT NO. T-ER-023 NO. DATE

3 7/ 1/2017 CONTRACT NO. S GENERAL CONSTRUCTION NOTES: ALL LANES OF SHALL BE OPEN 6:00 A.M. FRIDAY OR A LANE RENTAL PENALTY OF $10,000 PER HOUR PER LANE WILL BE APPLIED UNTIL SUCH TIME AS THE CAPACITY IS RESTORED. (G-48) CONTRACTOR SHALL NOT UTILIZE EMERGENCY VEHICLE TURNAROUNDS ON THE TURNPIKE. (G-51) THE CONTRACTOR SHALL SUBMIT A FINAL TRAFFIC CONTROL AND CONSTRUCTION PHASING PLAN TO THE FOR REVIEW AND APPROVAL PRIOR TO BEGINNING CONSTRUCTION DESCRIBING ALL WORK PHASES FOR THE CONSTRUCTION OF THE BRIDGES AND WAYS AFFECTED. (G-52) LANE LINES, AT A MINIMUM, SHALL BE ESTABLISHED AT ALL TIMES DURING CONSTRUCTION. (G-53) CONTRACTOR SHALL DOCUMENT PRE-CONSTRUCTION SITE CONDITIONS BY MEANS OF PHOTOGRAPHS AND VIDEO WITH A DESIGNATED OTA REPRESENTATIVE, BEFORE THE START OF CONSTRUCTION. COST SHALL BE CONSIDERED AS INCIDENTAL AND NO SEPARATE PAYMENT SHALL BE MADE. CONTRACTOR SHALL PROVIDE THE A DIGITAL COPY OF THE PHOTOGRAPHS AND VIDEO AT THE PRE-WORK MEETING. (G-55) CONTRACTOR SHALL PAY ALL TURNPIKE FEES. TOLL COST SHALL BE INCLUDED IN OTHER ITEMS OF WORK. 2:46:13 PM (G-56) ALL WORK AND/OR MATERIALS NOT CLASSIFIED AS A "CONTRACT PAY ITEM" SHALL BE CONSIDERED INCIDENTAL AND THE COST THEREOF SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ITEMS WHICH ARE CLASSIFIED FOR PAYMENT. (G-58b) THE ALLOWABLE WORKING PERIODS FOR THIS PROJECT SHALL BE AS FOLLOWS: 12:00 A.M. MONDAY THROUGH 6:00 A.M. FRIDAY. NO WORK WILL BE ALLOWED OUTSIDE THE ABOVE REFERENCED TIMES, ALL DRIVING LANES MUST BE OPENED TO FULL CAPACITY OUTSIDE THE ALLOWABLE WORKING PERIODS. ALL WORKERS, EQUIPMENT, MATERIALS, ETC MUST BE OFF THE WAY AND OUTSIDE THE CLEAR ZONE DURING NON-ALLOWABLE WORKING PERIODS. FAILURE TO COMPLY WILL RESULT IN THE APPLICATION OF A LANE RENTAL FEE AS OUTLINED IN SP (G-60) THE PRIME CONTRACTOR SHALL BE REPRESENTED ON SITE AT ALL TIMES. HE MUST BE PRESENT WHEN WORK IS BEING PERFORMED BY HIS SUBCONTRACTORS. (G-61) ALL FIELD MEASUREMENTS SHALL PREVAIL ON INSTALLATION AND REMOVAL. (G-62) CONTRACTOR SHALL BE ALLOWED TO USE OTA RIGHT-OF-WAY AT APPROVED LOCATIONS FOR STORAGE ONE WEEK PRIOR TO BEGINNING OF WORK UNTIL THE ISSUANCE OF THE FINAL ACCEPTANCE OF ALL PUNCH LIST ITEMS. THE SITE MUST BE RESTORED TO ITS ORIGINAL CONDITION INCLUDING ALL DISASSEMBLY, REMOVAL AND SITE CLEAN UP, OF OFFICES, BUILDINGS AND OTHER FACILITIES ASSEMBLED IN THE SITE SPECIFICALLY FOR THIS CONTRACT. FAILURE TO COMPLY SHALL RESULT IN TIME CHARGES BEING RESTARTED AND ASSESSED. (G-71) ALL DIMENSIONS OF THE EXISTING BRIDGE AND WAYS SHOWN ON THE PLANS ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, BOTH SURVEYED AND AS-BUILT, NECESSARY TO CONNECT THE NEW MATERIAL AND SHALL BE SOLELY RESPONSIBLE FOR THE ACCURACY THEREOF. REFER TO THE AS-BUILT PLANS FOR DIMENSIONS AND DETAILS NOT SHOWN IN THE PLANS. (G-72) THE SHALL BE NOTIFIED BY THE CONTRACTOR TWO (2) WEEKS PRIOR TO ALL CONSTRUCTION ACTIVITIES THAT REQUIRES A LANE/RAMP/TOLL FACILITY CLOSURE. FAILURE TO ADEQUATELY NOTIFY THE WILL RESULT IN A SHUTDOWN NOTICE BEING ISSUED FOR THE WORK REQUIRING THE LANE/RAMP/TOLL FACILITY CLOSURE. IF THE CONTRACTOR FAILS TO GIVE THE PROPER NOTIFICATION, A LANE RENTAL FEE OF $10,000 PER HOUR PER LANE PER MILE WILL BE APPLIED UNTIL SUCH TIME AS THE F:\2017\ \ \40-Design\Microstation\ _OTA (second hit)\dgn\s\1076_gennotes_02.dgn (G-73) (G-75) (G-76) (O-10) (O-11) (O-15) CAPACITY IS RESTORED. ANY DEVIATION FROM THE PLANS WITHOUT PRIOR WRITTEN NOTICE WILL RESULT IN A SHUTDOWN NOTICE. ALL TRASH, DEBRIS, SPOILS, ETC. SHALL BE REMOVED DAILY. CONSTRUCTION SITE SHALL BE KEPT IN A CLEAN, WORKMANLIKE MANNER DAILY AS DIRECTED BY THE. REMOVAL OF EXISTING PAVEMENT MARKINGS ON THE PROJECT WILL NOT BE MEASURED FOR PAYMENT. ALL COSTS ASSOCIATED WITH REMOVAL OF ANY AND ALL EXISTING PAVEMENT MARKINGS REQUIRED FOR COMPLETION OF THE PROJECT, INCLUDING REMOVAL OF EXISTING TRAFFIC STRIPE WHICH CONFLICTS WITH INSTALLATION OF CONSTRUCTION STRIPE OR PERMANENT TRAFFIC STRIPE SHALL BE INCLUDED IN OTHER ITEMS OF WORK. PRIOR TO PAVEMENT MARKING REMOVAL, CONTRACTOR SHALL SUBMIT TO THE FOR APPROVAL THE MEANS AND METHODS FOR THE PAVEMENT MARKING REMOVAL. THIS ITEM IS TO BE USED AS APPROVED BY THE TO DIRECT TRAFFIC DURING THE VARIOUS STAGES OF CONSTRUCTION. CONTRACTOR SHALL USE FLEX TABS. CONTRACTOR SHALL USE FLEX-TABS TABS OR CLASS A PAVEMENT MARKERS FOR TEMPORARY MARKINGS AS SHOWN ON THE PLANS AND ON ALL FINISHED SURFACES. PAYMENT WILL BE BY THE LINEAR FOOT OF PAINT REGARDLESS OF THE ITEM USED. INCLUDED IN THE COST OF THIS ITEM SHALL BE INSTALLATION, MAINTENANCE, AND REMOVAL. THIS ITEM SHALL BE BID ACCORDINGLY. PLAN QUANTITIES ARE BASED ON THE PLAN SEQUENCE OF CONSTRUCTION. FINAL PAYMENT WILL BE BASED ON THE ACTUAL AMOUNT USED IN ACCORDANCE WITH THE APPROVED TRAFFIC CONTROL PLAN. ALL TEMPORARY TRAFFIC CONTROL DEVICES SHALL MEET ODOT'S "QUALITY STANDARDS FOR TEMPORARY TRAFFIC CONTROL DEVICES". CHANNELIZING DEVICES SHALL HAVE A MINIMUM HEIGHT OF 42". THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF THE TEMPORARY TRAFFIC CONTROL DEVICES AND SHALL BE RESPONSIBLE FOR REPAIRING OR REPLACING ANY DEVICE DURING CONSTRUCTION. GENERAL CONSTRUCTION NOTES ( 2 OF 2) CONTRACT NO. T-ER-023 NO. 3 DATE

4 7/ 1/2017 CONTRACT NO. S 2:46:13 PM F:\2017\ \ \40-Design\Microstation\ _OTA (second hit)\dgn\s\1076_pqnotes_01.dgn Preliminary plan sheets are for information (PL) REPAIR purposes BRIDGE ITEMS: only. HEAT STRAIGHTEN THE DAMAGED AREA OF THE WEB AND FLANGE AND THE DAMAGED PAY QUANTITIES INTERMEDIATE STEEL DIAPHRAGM OF THE EAST EXTERIOR BEAM OF SPAN NO. 3 OVER THE The preliminary plans shall not be used WESTBOUND as a LANES basis OF for bid. TO REASONABLY CLOSE CONFORMITY TO THE BEAM'S ITEM DESCRIPTION UNIT QUANTITY ORIGINAL SHAPE. REPAIR INTERIOR DIAPHRAGM CONNECTION, REPAIR THE DAMAGED CONCRETE 106 QUALITY CONTROL AND ACCEPTANCE LSUM 1.00 END DIAPHRAGM AT PIER NO. 3 AS SHOWN IN THE PLANS. 641 MOBILIZATION LSUM 1.00 ALL DAMAGED MATERIALS REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND DISPOSED OF IN ACCORDANCE WITH B(2) OF THE STANDARD SPECIFICATIONS AND SPEC (PL) REPAIR BRIDGE ITEMS LSUM 1.00 IN A MANNER APPROVED BY THE. ITEM 645(A) ITEM 856(A) PART B - PROJECT SITE RENTAL DESCRIPTION UNIT QUANTITY PROJECT SITE RENTAL $/PSRD DESCRIPTION UNIT QUANTITY 876(A) TRUCK MOUNTED ATTENUATOR (1)(TC-70,76,77,84) SD (A) 880(A) (J) (SP) CONSTRUCTION TRAFFIC CONTROL (1)(3)(O-15)(TC-25,33,75) LSUM (K) ITEM 880(B) 880(B) 880(B) 880(C) 880(C) 880(E) 880(F) TRAFFIC STRIPE (MULTI-POLYMER)(6" WIDE) (SP) ARROW DISPLAY (TYPE C) CONSTRUCTION SIGNS 0 TO 6.25 SF CONSTRUCTION SIGNS 6.26 TO SF CONSTRUCTION SIGNS TO SF CONSTRUCTION BARRICADES (TYPE III) WING BARRICADES WARNING LIGHTS (TYPE A) DRUMS TRAFFIC PAY QUANTITIES 854(A) TRAFFIC STRIPE PAINT (4)(0-10)(TC-13,17) LF (SP) SURVEILLANCE OF TRAFFIC CONTROL DESCRIPTION (TS-25) 871 (SP) CONSTRUCTION ZONE IMPACT ATTENUATOR (SP-1)(TC-84) 880(I) DELIVER PORTABLE LONGITUDINAL BARRIER (SP) FLAGGER (O-11) (TC-1,2) (TC-84) (TC-58) (TC-39,84) 882(A) (SP) CHANGEABLE MESSAGE SIGNS (1)(2)(TC-70,84,85) SD LUMP SUM TRAFFIC PAY ITEMS (3)(4) 857(A) CONSTRUCTION TRAFFIC STRIPE (PAINT) (O-10) LF LF SD SD (TC-84) SD SD PAY ITEM "(PL) REPAIR BRIDGE ITEMS" CONSISTS OF THE FOLLOWING: A) HEAT STRAIGHTEN THE DAMAGED AREA OF THE EAST EXTERIOR BEAM TO REASONABLY B) REPAIR DAMAGED INTERMEDIATE STEEL DIAPHRAGM AND DIAPHRAGM CONNECTION. C) REMOVE LOOSE AND DAMAGED CONCRETE AND REPAIR DAMAGED CONCRETE END DIAPHRAGM D) PAINT ANY NEW STRUCTURAL STEEL AND THE ENTIRE EXTERIOR FACES OF THE REPAIRED E) REPLACE VERTICAL CLEARANCE SIGN AND ATTACH THE SIGN TO THE ORIGINAL LOCATION TRAFFIC PAY ITEM NOTES: (TC-1) THE CONTRACTOR SHALL FURNISH AND INSTALL SUCH LIGHTS, SIGNS, BARRICADES, (TC-25) CONSTRUCTION TRAFFIC CONTROL WILL BE INSTALLED IN A MANNER AND PROVIDE FLAGGERS NECESSARY FOR THE CONTROL, SAFETY, AND MAINTENANCE OF TRAFFIC WHEN INSTALLING, RELOCATING OR DELIVERING PORTABLE LONGITUDINAL BARRIER. (TC-2) QUANTITY INCLUDES SUFFICIENT LENGTH OF PORTABLE LONGITUDINAL BARRIER TO (TC-13) (TC-17) (TC-39) (TC-58) CLOSE CONFORMITY TO THE BEAM'S ORIGINAL SHAPE. AT PIER NO. 3. BEAMS INCLUDING THE BOTTOM FLANGES. ON THE BEAM. INCLUDE ALL INCIDENTALS NECESSARY TO COMPLETE THE REPAIR WORK AS SPECIFIED AND SHOWN IN THE PLANS, INCLUDING WELDING, LABOR, PAINT, ETC. PROVIDE FOR THE LONGEST SHOWN ON THE PLANS. THIS SAME BARRIER WILL BE USED ON OTHER DETOUR PHASES. A PART, OR ALL, OF THIS ITEM IS INTENDED FOR REPLACEMENT OF REMOVED EXISTING CONFLICTING STRIPING. INCLUDES AN ESTIMATED 450 L.F. (PAINT)(4" WIDE) WHITE 1,800 L.F. (PAINT)(4" WIDE) YELLOW STRIPE. APPROVED BY THE, IN ACCORDANCE WITH CHAPTER VI OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, CURRENT EDITION, AND APPLICABLE O.D.O.T. STANDARD DRAWINGS. PRICE BID FOR THIS ITEM SHALL BE PAYMENT IN FULL FOR THE INSTALLATION, MAINTENANCE AND SUBSEQUENT REMOVAL OF ALL NECESSARY CONSTRUCTION TRAFFIC CONTROL DEVICES AND PAVEMENT MARKINGS REQUIRED FOR COMPLETION OF THE PROJECT. ALL SIGNS AND BARRICADES,WHICH ARE SHOWN WITH S IN THE STANDARD DRAWINGS SHALL HAVE THE CORRESPONDING LIGHT ATTACHED DURING NON-DAYLIGHT HOURS. ALL CONSTRUCTION WORK ZONE SIGNS SHALL HAVE FLUORESCENT ING. THE FLUORESCENT ING SHALL MEET THE REQUIREMENTS OF ASTM D4956 (LATEST REVISION). THE MANUFACTURER SHALL FURNISH A TYPE 'D' CERTIFICATION IN ACCORDANCE WITH O.T.A. STANDARD SPECIFICATIONS (CURRENT EDITION) SUB THE CERTIFICATION SHALL INCLUDE TEST RESULTS ON MATERIALS SUBMITTED FOR APPROVAL. THE CONTRACTOR SHALL PROVIDE A PERSON, 24 HOURS A DAY, SEVEN DAYS A WEEK, AT THE CONSTRUCTION SITE TO MAINTAIN AND KEEP ALL TRAFFIC CONTROL DEVICES IN POSITION ANYTIME TRAFFIC IS DIRECTED AWAY FROM THE NORMAL TRAFFIC LANES OR ANYTIME THE DEEMS IT NECESSARY. THIS PERSON SHALL HOLD A CURRENT CERTIFICATION FROM THE AMERICAN TRAFFIC SAFETY SERVICES ASSOCIATION (ATSSA) OR THE OKLAHOMA TRAFFIC ING ASSOCIATION (OTEA) AS A TRAFFIC CONTROL TECHNICIAN OR TRAFFIC CONTROL SUPERVISOR. INCLUDED IN THIS ITEM IS THE COST OF PROVIDING TWO (2) FLAGGERS FOR A 24 HOUR PERIOD OF TIME. DURING NON-DAYLIGHT HOURS THE FLAGGER STATIONS SHALL BE ADEQUATELY LIGHTED TO PROVIDE A SAFE WORK AREA FOR FLAGGERS. COST OF THIS LIGHTING WILL BE INCLUDED IN THE PRICE BID FOR FLAGGER. TRAFFIC PAY ITEM NOTES CONT'D: (TC-70) THIS ITEM IS AN ESTIMATED QUANTITY TO BE USED AS DEEMED NECESSARY BY THE. (TC-75) TEMPORARY PAVEMENT MARKINGS SHALL BE IN PLACE THE SAME DAY THAT EXISTING PAVEMENT MARKINGS ARE REMOVED FROM ANY WAY OPEN TO TRAFFIC. ALSO, ALL TEMPORARY PAVEMENT MARKINGS SHALL BE REMOVED PRIOR TO THE INSTALLATION OF FINAL STRIPING. (TC-76) ANY TRUCK MOUNTED ATTENUATOR USED ON THIS PROJECT SHALL HAVE PASSED ALL MANDATORY AND OPTIONAL TESTS LISTED IN NCHRP 350, TL-3 CRITERIA, THIS ITEM IS TO BE USED WHERE SHOWN IN THE STANDARD DRAWINGS OR AT THE DISCRETION OF THE ON SHADOW VEHICLES PROTECTING THE WORK AREAS AND TEMPORARY SIDE HAZARDS. (TC-77) TRUCK MOUNTED ATTENUATORS ARE TO BE INSTALLED ON NON STATE OWNED TRUCKS HAVING A MINIMUM GROSS WEIGHT RATING OF 15,000 POUNDS. EACH OF THESE TRUCKS SHALL ALSO BE EQUIPPED WITH AN ARROW DISPLAY (TYPE B). (TC-84) 10 CONSTRUCTION CALENDAR DAYS WERE USED TO COMPUTE THE SIGN DAY PAY ITEMS. THE AMOUNT OF CALENDAR DAYS USED TO COMPUTE THE SIGN DAY PAY ITEMS IS AN ESTIMATED QUANTITY ONLY, BASED ON THE CURRENT O.D.O.T. STANDARDS AND SUGGESTED CONSTRUCTION SEQUENCE FOR THIS PROJECT. THESE ESTIMATED SIGN DAY QUANTITIES MAY CHANGE AS THE PROJECT'S CONSTRUCTION TRAFFIC CONTROL IS MODIFIED DURING CONSTRUCTION. (TC-85) THESE SIGNS MUST BE ON THE OKLAHOMA DEPARTMENT OF TRANSPORTATION LIST OF APPROVED CHANGEABLE MESSAGE SIGNS. FOR A LIST OF THE APPROVED SIGNS GO TO THE OKLAHOMA DEPARTMENT OF TRANSPORTATION WEBSITE AT: (TS-25) QUANTITY SHOWN INCLUDES 700 L.F. TRAFFIC STRIPE (MULTI-POLYMER)(WHITE) AND 450 L.F. TRAFFIC STRIPE (MULTI-POLYMER)(YELLOW) AND WILL BE MEASURED BY THE LINEAR FOOT OF SIX INCH (6") WIDE TRAFFIC STRIPE. (SP-1) ATTENUATORS SHALL BE QUADGUARD ELITE, SCE-100 GM (SMART CUSHION), OR APPROVED EQUAL WITHIN THE SAME CATEGORY OF THE OKLAHOMA DEPARTMENT OF TRANSPORTATION'S IMPACT ATTENUATOR GUIDELINE MATRIX. THE IMPACT ATTENUATOR GUIDELINE MATRIX CAN BE FOUND AT: http// (1) ANY USED TRUCK MOUNTED ATTENUATOR, CHANGEABLE MESSAGE SIGN, OR SAND FILLED IMPACT ATTENUATION MODULE TO BE PLACED ON THIS PROJECT SHALL BE SUBJECT TO INSPECTION AND APPROVAL, BY THE OKLAHOMA TURNPIKE AUTHORITY, TO ASSURE THAT THEY ARE IN GOOD WORKING CONDITION, PRIOR TO PLACEMENT ON THE PROJECT. THESE DEVICES SHALL MEET ALL NCHRP-350, TL-3 CRITERIA. (2) THIS ITEM SHALL BE FURNISHED, INSTALLED AND MAINTAINED BY THE CONTRACTOR AND PLACED SEVEN (7) DAYS PRIOR TO BEGINNING WORK. (3) THE ITEMS LISTED IN THE TABLE FOR "LUMP SUM TRAFFIC PAY ITEMS" ARE INCLUDED IN THE THE PAY ITEM "CONSTRUCTION TRAFFIC CONTROL". (4) COST OF REMOVAL OF PAVEMENT MARKINGS SHALL BE INCLUDED IN THE LUMP SUM FOR TRAFFIC CONTROL. (0-10) THIS ITEM IS TO BE USED AS APPROVED BY THE TO DIRECT TRAFFIC DURING THE VARIOUS STAGES OF CONSTRUCTION. CONTACTOR MAY USE FLEX-TABS OR CLASS 'A' PAVEMENT MARKERS AT HIS OPTION. CONTRACTOR SHALL USE FLEX-TABS OR CLASS 'A' PAVEMENT MARKERS FOR TEMPORARY MARKINGS AS SHOWN ON THE PLANS AND ON ALL FINISHED SURFACES. PAYMENT WILL BE BY THE LINEAR FOOT OF PAINT REGARDLESS OF THE ITEM USED. INCLUDED IN THE COST OF THIS ITEM SHALL BE INSTALLATION, MAINTENANCE, AND REMOVAL. THIS ITEM SHALL BE BID ACCORDINGLY. (0-11) PLAN QUANTITIES ARE BASED ON THE PLAN SEQUENCE OF CONSTRUCTION. FINAL PAYMENT WILL BE BASED ON THE ACTUAL AMOUNT USED IN ACCORDANCE WITH THE APPROVED TRAFFIC CONTROL PLAN. (0-15) ALL TEMPORARY TRAFFIC CONTROL DEVICES SHALL MEET ODOT'S "QUALITY STANDARDS FOR TEMPORARY TRAFFIC CONTROL DEVICES". CHANNELLIZING DEVICES SHALL HAVE A MINIMUM HEIGHT OF 42". THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF THE TEMPORARY TRAFFIC CONTROL DEVICES AND SHALL BE RESPONSIBLE FOR REPAIRING OR REPLACING ANY DEVICE DURING CONSTRUCTION. PAY QUANTITIES AND PAY ITEM NOTES CONTRACT NO. T-ER-023 NO. 4 DATE

5 ! TURNER TURNPIKE! EASTBOUND! WESTBOUND 7/ 1/2017 CONTRACT NO. S! PIER #2! PIER #3! PIER #1! BRG. AT SOUTH ABUT. CONC. END DIAPHRAGMS OUTSIDE INSIDE LANE LANE MEDIAN INSIDE OUTSIDE LANE LANE! BRG. AT NORTH ABUT. 2:46:14 PM INTERMEDIATE DIAPHRAGMS REPAIR CONCRETE END DIAPHRAGM (INTERIOR BEAM FACE) AT PIER NO. 3 SEE INTERMEDIATE DIAPHRAGM REPAIR DETAIL APPROX. LIMITS OF HEAT STRAIGHTENING! BRG. STIFFENER FRAMING PLAN EXISTING BRIDGE DECK EXISTING DIAPHRAGM PLATE NEW L3X3XŠ 7" 6'-6" 5'-4" 7" F:\2017\ \ \40-Design\Microstation\ _OTA (second hit)\dgn\s\1076_13.3_gp&e.dgn EXISTING L3X3XŠ (TO REMAIN IN PLACE) EXIST. W24x110 (( A 7'-4" BEAM SPACING EXISTING REPAIR WELD LINE NEW L3X3XŠ (EA. FACE) 3-9! DAMAGED BEAM INTERMEDIATE DIAPHRAGM REPAIR DETAIL NEW L3X3XŠ DAMAGED BEAM A-A 1'-9" 4 " 1'-0" 4 " 1 " BORDER TYPICAL XX FTXXIN VERTICAL CLEARANCE SIGN DETAIL NOTE: LEGEND AND BORDER: REFLECTIVE BLACK BACKGROUND: REFLECTIVE YELLOW CONTRACTOR TO VERIFY CLEARANCE PRIOR TO SIGN PRODUCTION. ƒ" BORDER INSET TYPICAL BRIDGE REPAIR DETAIL CONTRACT NO. T-ER " 8" 8 " NO. 5 DATE

6 panelstyle:construction_warning.ssi constructpanels: constructpanelmode:0 panelroundcorners:0 panelheightlock:0 panelwidthlock:0 panelname:name panelstation:none panelmounting:0 legendmaterial:0 panelquantity:1 panelmaterial:0 marginalign:9 panelsizes: panelstyle:construction_warning.ssi constructpanels: constructpanelmode:0 panelroundcorners:0 panelheightlock:0 panelwidthlock:0 panelstation:none panelname:name panelmounting:0 legendmaterial:0 panelquantity:1 panelmaterial:0 marginalign:9 panelsizes: panelstyle:construction_warning.ssi constructpanels: constructpanelmode:0 panelroundcorners:0 panelheightlock:0 panelwidthlock:0 panelname:name panelstation:none panelmounting:0 legendmaterial:0 panelquantity:1 panelmaterial:0 marginalign:9 panelsizes: panelstyle:construction_warning.ssi constructpanels: constructpanelmode:0 panelroundcorners:0 panelheightlock:0 panelwidthlock:0 panelname:name panelstation:none panelmounting:0 legendmaterial:0 panelquantity:1 panelmaterial:0 marginalign:9 panelsizes: 7/ 1/2017 CONTRACT NO. S W ORK NEXT X MILES 2:46:15 PM END G20-2A W ORK W ' 110' 100' I-44 W20-7 W20-4(1,000 FT) 1000 FT W ORK 1500 FT W ORK 1/2 MILE W20-1(1) W20-1(1/2 MILE) 1,140' W ORK NEXT X MILES (2) WING BARRICADES (2) G20-1(X MILES) 20' C/C 10' C/C 20' C/C N. LUTHER 1,140' F:\2017\ \ \40-Design\Microstation\ _OTA (second hit)\dgn\s\1076_13.3_trafcon_01.dgn (2) G20-1(X MILES) (2) WING BARRICADES WORK NEXT X MILES WORK NEXT X MILES W20-1(1/2 MILE) 1/2 MILE WORK W20-1(1) 1500 FT WORK 1000 FT W20-4(1,000 FT) W20-7 KEY: SIGN FLAGGER WORK AREA DRUM GENERAL CONSTRUCTION NOTES: (G-58b) THE ALLOWABLE WORKING PERIODS FOR THIS PROJECT SHALL BE AS FOLLOWS: 12:00 A.M. MONDAY THROUGH 6:00 A.M. FRIDAY. NO WORK WILL BE ALLOWED OUTSIDE THE ABOVE REFERENCED TIMES, ALL DRIVING LANES MUST BE OPENED TO FULL CAPACITY OUTSIDE THE ALLOWABLE WORKING PERIODS. ALL WORKERS, EQUIPMENT, MATERIALS, ETC MUST BE OFF THE WAY AND OUTSIDE THE CLEAR ZONE DURING NON-ALLOWABLE WORKING PERIODS. FAILURE TO COMPLY WILL RESULT IN THE APPLICATION OF A LANE RENTAL FEE AS OUTLINED IN SP (G-72) THE SHALL BE NOTIFIED BY THE CONTRACTOR FOURTEEN (14) DAYS PRIOR TO ALL CONSTRUCTION ACTIVITIES THAT REQUIRES A LANE/RAMP/TOLL FACILITY CLOSURE. FAILURE TO ADEQUATELY NOTIFY THE WILL RESULT IN A SHUTDOWN NOTICE BEING ISSUED FOR THE WORK REQUIRING THE LANE/RAMP/TOLL FACILITY CLOSURE. IF THE CONTRACTOR FAILS TO GIVE THE PROPER NOTIFICATION, A LANE RENTAL FEE OF $10,000 PER HOUR PER LANE PER MILE WILL BE APPLIED UNTIL SUCH TIME AS THE CAPACITY IS RESTORED. (G-73) ANY DEVIATION FROM THE PLANS WITHOUT PRIOR WRITTEN NOTICE WILL RESULT IN A SHUTDOWN NOTICE. W6-3 G20-2A END WORK DRAWING NOT TO SCALE LUTHER CONSTRUCTION TRAFFIC CONTROL CONTRACT NO. T-ER NO. DATE

7 7/ 1/2017 2:46:16 PM F:\2017\ \ \40-Design\Microstation\ _OTA (second hit)\dgn\s\1076_13.3_trafcon_02.dgn MATCHLINE 100' SHIFTING TAPER B WB I-44 (5) 50' C/C B REMOVE CONFLICTING PAVEMENT MARKINGS (3) TYPE III BARRICADES (6) S SOLID YELLOW EDGE LINE (2) R11-2 (1) R ' MERGING TAPER SOLID WHITE EDGE LINE (FLEX-TABS) (19) 50' C/C REMOVE CONFLICTING (19) W1-8 (ON EACH DRUM) PAVEMENT MARKINGS MEDIAN PIER SOLID YELLOW EDGE LINE (FLEX-TABS) N. LUTHER 200' TANGENT THRU 150' SHIFTING TAPER 450' TANGENT LANE WORK AREA 2'-0" PORTABLE LONGITUDINAL BARRIER 14'-0" CLEAR WORK AREA THRU LANE SOLID WHITE EDGE LINE (FLEX-TABS) (1) CZ-ATTENUATOR SOLID WHITE EDGE LINE (9) 50' C/C (8) 50' C/C (3) W1-8 (WHERE SHOWN) (4) R4-7A(R) (EVERY OTHER DRUM) 325 L.F. PORTABLE LONGITUDINAL BARRIER (225' TAPER, 100' TANGENT) (16 TO 1 TAPER) ARROW DISPLAY (3) TYPE III BARRICADES (TYPE 'C') (6) S (3) W1-6 (THRU TAPER) B-B CONTRACT NO. S GENERAL CONSTRUCTION NOTES: (G-58b) THE ALLOWABLE WORKING PERIODS FOR THIS PROJECT SHALL BE AS FOLLOWS: 12:00 A.M. MONDAY THROUGH 6:00 A.M. FRIDAY. NO WORK WILL BE ALLOWED OUTSIDE THE ABOVE REFERENCED TIMES, ALL DRIVING LANES MUST BE OPENED TO FULL CAPACITY OUTSIDE THE ALLOWABLE WORKING PERIODS. ALL WORKERS, EQUIPMENT, MATERIALS, ETC MUST BE OFF THE WAY AND OUTSIDE THE CLEAR ZONE DURING NON-ALLOWABLE WORKING PERIODS. FAILURE TO COMPLY WILL RESULT IN THE APPLICATION OF A LANE RENTAL FEE AS OUTLINED IN SP (G-72) THE SHALL BE NOTIFIED BY THE CONTRACTOR TWO (2) WEEKS PRIOR TO ALL CONSTRUCTION ACTIVITIES THAT REQUIRES A LANE/RAMP/TOLL FACILITY CLOSURE. FAILURE TO ADEQUATELY NOTIFY THE WILL RESULT IN A SHUTDOWN NOTICE BEING ISSUED FOR THE WORK REQUIRING THE LANE/RAMP/TOLL FACILITY CLOSURE. IF THE CONTRACTOR FAILS TO GIVE THE PROPER NOTIFICATION, A LANE RENTAL FEE OF $10,000 PER HOUR PER LANE PER MILE WILL BE APPLIED UNTIL SUCH TIME AS THE CAPACITY IS RESTORED. (G-73) ANY DEVIATION FROM THE PLANS WITHOUT PRIOR WRITTEN NOTICE WILL RESULT IN A SHUTDOWN NOTICE. (2) TYPE III BARRICADES (3) TYPE III BARRICADES (4) S (6) S (2) R11-2 (3) R11-2(LANE) (THRU TANGENT) OUTSIDE PIER BEGIN W ORK ZONE SPEED LIMIT (2) CS-13F (2) CS-14F (2) R2-1F(55) 65 1,000' 300' SHOULDER TAPER WB I-44 (6) 50' C/C STATE LAW MERGE NOW 1, (MINIMUM) MATCHLINE TRAFFIC CONTROL SHOWN ON THIS APPLIES TO BRIDGE NO ONLY DRAWING NOT TO SCALE CONTRACT NO. T-ER NO. DATE ADVANCE SIGNING MATCHLINE I-44 CONSTRUCTION TRAFFIC CONTROL

8 7/ 1/2017 CONTRACT NO. S 2:46:17 PM F:\2017\ \ \40-Design\Microstation\ _OTA (second hit)\dgn\s\1076_13.3_trafcon_04.dgn ADVANCE SIGNING MATCHLINE GENERAL CONSTRUCTION NOTES: (G-58b) (G-72) (G-73) 1,000' STATE LAW MERGE NOW 1, THE ALLOWABLE WORKING PERIODS FOR THIS PROJECT SHALL BE AS FOLLOWS: 12:00 A.M. MONDAY THROUGH 6:00 A.M. FRIDAY. DO NOT (2) R4-1F PASS 550' 1 NO WORK WILL BE ALLOWED OUTSIDE THE ABOVE REFERENCED TIMES, ALL DRIVING LANES MUST BE OPENED TO FULL CAPACITY OUTSIDE THE ALLOWABLE WORKING PERIODS. ALL WORKERS, EQUIPMENT, MATERIALS, ETC MUST BE OFF THE WAY AND OUTSIDE THE CLEAR ZONE DURING NON-ALLOWABLE WORKING PERIODS. FAILURE TO COMPLY WILL RESULT IN THE APPLICATION OF A LANE RENTAL FEE AS OUTLINED IN SP THE SHALL BE NOTIFIED BY THE CONTRACTOR FOURTEEN (14) DAYS PRIOR TO ALL CONSTRUCTION ACTIVITIES THAT REQUIRES A LANE/RAMP/TOLL FACILITY CLOSURE. FAILURE TO ADEQUATELY NOTIFY THE WILL RESULT IN A SHUTDOWN NOTICE BEING ISSUED FOR THE WORK REQUIRING THE LANE/RAMP/TOLL FACILITY CLOSURE. IF THE CONTRACTOR FAILS TO GIVE THE PROPER NOTIFICATION, A LANE RENTAL FEE OF $10,000 PER HOUR PER LANE PER MILE WILL BE APPLIED UNTIL SUCH TIME AS THE CAPACITY IS RESTORED. ANY DEVIATION FROM THE PLANS WITHOUT PRIOR WRITTEN NOTICE WILL RESULT IN A SHUTDOWN NOTICE. (2) W 4-2(R) RIGHT LANE (2) W 20-5R(1/2 MILE) CLOSED 1/2 MILE 650' SPEED LIMIT 65 (2) R2-1F(65) ADVANCE SIGNING WESTBOUND I ' SPEED LIMIT (2) W 3-5(65) 65 1,300' (2) W 20-1(1MILE) W ORK AHEAD STA Y A LER T 1,000' PLEASE (2) "NO CELL PHONE" SIGN IN W ORK ZONE W ORK W ORK NEXT XX MILES NEXT XX MILES 1,000' (2) G20-1A LEFT RIGHT W ORK ZONE FINES HIGHER W HEN W ORKERS ARE PRESENT (2) CS-16E (2) CS-17E (2) CS-18E WESTBOUND I-44 I-44 CONSTRUCTION TRAFFIC CONTROL CONTRACT NO. T-ER-023 NO. 8 DATE

NOT FOR CONSTRUCTION Preliminary plan sheets are for information purposes only. The preliminary plans should not be used as a basis for bid.

NOT FOR CONSTRUCTION Preliminary plan sheets are for information purposes only. The preliminary plans should not be used as a basis for bid. SPECIFICATIONS: ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE SPECIAL PROVISIONS. Preliminary VERIFICATION plan OF sheets EXISTING CONDITIONS:, 2010 STANDARD SPECIFICATIONS FOR TURNPIKE

More information

NOT FOR CONSTRUCTION AND BIDDING Preliminary plan sheets are for information purposes only. The preliminary plans shall not be used as a basis for

NOT FOR CONSTRUCTION AND BIDDING Preliminary plan sheets are for information purposes only. The preliminary plans shall not be used as a basis for NOT FOR CONSTRUCTION AND BIDDING SHEET NO. OKLAHOMA TURNPIKE AUTHORITY 4/17/2017 NOT FOR CONSTRUCTION AND BIDDING OLSSON ASSOCIATES PROJECT ENGINEERS SHEET ENGINEER CONTRACT NO. NUMBER OLSSON T-ER-021

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes

More information

SECTION 616 TEMPORARY TRAFFIC CONTROL

SECTION 616 TEMPORARY TRAFFIC CONTROL SECTION 616 TEMPORARY TRAFFIC CONTROL 616.1 Description. This work shall consist of furnishing, installing, operating, maintaining, cleaning, relocating and removing temporary traffic control devices and

More information

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS Delete this Section in its entirety and replace with the following: SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS 905-1 DESCRIPTION: This

More information

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY 805.1 DESCRIPTION Provide, erect, maintain and remove traffic control devices as shown in the Contract Documents. On roadways that carry traffic through

More information

GENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE

GENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE FORWARD It shall be the responsibility of the person in charge to institute the placing of all appropriate cautionary devices and controls as may be required for the particular job. Traffic protection

More information

Table of Contents. List of Appendices

Table of Contents. List of Appendices Table of Contents Page Executive Summary 3 Description of Project 3 TMP Roles and Responsibilities 3 Area Engineer 3 Communications Office 4 TMP Monitoring 4 Existing and Future Conditions 4 Traffic Counts

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/21/2014 Project 140560 Addendum No. 2 PID No. 82972 HAM IR 275

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT MAINE TURNPIKE AUTHORITY ADDENDUM NO. CONTRACT 08.09 BRIDGE REPAIRS RUNNING HILL ROAD UNDERPASS (MILE 5.) BLACKSTRAP ROAD UNDERPASS (MILE 58.3) WEYMOUTH ROAD UNDERPASS (MILE 66.) SUPERSTRUCTURE REPLACEMENT

More information

ODOT District MOT General Notes M401: ITEM PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER PLAN

ODOT District MOT General Notes M401: ITEM PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER PLAN M401: ITEM 615 - PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER PLAN M402: DELETED M403: DETOUR NOTIFICATION [ODOT] M404: DETOUR NOTIFICATION [CITY/COUNTY] M405: DELETED M406: DELETED M407: DELETED

More information

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application Good for 90 days from the Date Issued This permit is only required if the work location is owned or controlled by the City of Homestead and

More information

53.20 PAINTED ROADWAY LINES

53.20 PAINTED ROADWAY LINES 53.20 PAINTED ROADWAY LINES 53.20.1 GENERAL The Work consists of supplying paint and painting roadway lines on pavement surfaces. The various configurations of roadway lines are shown in the Department

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 9 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION SECTION STRUCTURAL STEEL CONSTRUCTION Page 392, subsection.01. Add the following bid items:

More information

Town of Wascott Advertisement for Bids ROAD MAINTENANCE PROJECTS

Town of Wascott Advertisement for Bids ROAD MAINTENANCE PROJECTS Advertisement for Bids ROAD MAINTENANCE PROJECTS Notice is hereby given by the Town of Wascott, Douglas County, WI, that it will receive sealed bids for crack routing and sealing, chip seal coating, and

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson

More information

REQUEST FOR PROPOSAL Asphalt & Concrete Repair

REQUEST FOR PROPOSAL Asphalt & Concrete Repair REQUEST FOR PROPOSAL 2017 Asphalt & Concrete Repair English Landing Elementary School Union Chapel Elementary School Lakeview Middle School Park Hill High School Prairie Point Elementary School Congress

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier 2.11 HIGH TENSION CABLE BARRIER 2.11.1 GENERAL This Work consists of the supply, installation, removal, disposal and reinstallation of High Tension Cable Barrier (HTCB) system. 2.11.2 DEFINITIONS AND INTERPRETATION

More information

Ohio Department of Transportation

Ohio Department of Transportation Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 Ted Strickland, Governor Jolene M. Molitoris, Director THE DEPARTMENT UTILIZES BID EXPRESS (http://www.bidx.com)

More information

JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106.

JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106. JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106. There are notes in the plans regarding driving the test pile without the use of a follower. The

More information

CITY OF SANTA ANA PROPOSAL PROJECT NO.: CHESTNUT AVE & BUSH/CYPRESS BIKE LANES FAID#: U58DP005861

CITY OF SANTA ANA PROPOSAL PROJECT NO.: CHESTNUT AVE & BUSH/CYPRESS BIKE LANES FAID#: U58DP005861 PROPOSAL BID PROPOSAL TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: REQUIREMENT: The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:

More information

DuPage County Division of Transportation 421 N. County Farm Road Wheaton, IL / (Fax) 630/

DuPage County Division of Transportation 421 N. County Farm Road Wheaton, IL / (Fax) 630/ Within DuPage County Highway Rights-of-Way NOTE: All construction shall be performed and materials specified/installed according to IDOT S Standard Specifications for Road and Bridge Construction (latest

More information

BID # REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER

BID # REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER BID # 14-47 REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER Board of Trustees Middlesex County College 2600 Woodbridge Avenue P.O. Box 3050 Edison, New Jersey

More information

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building May 8, 2017 ADDENDUM #1 IFB 17-082 Resin Floor System For Highway Department Central District Building Addendum #1 is being issued to offer an alternate resin flooring system. 096700 FLUID-APPLIED FLOORING

More information

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. General Conditions Scope: It is the intent of these specifications

More information

Implementation of this Special Provision requires a complete understanding of the following documents:

Implementation of this Special Provision requires a complete understanding of the following documents: VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR Quality Assurance/Quality Control (QA/QC) for the Construction of Deep Foundation Systems for Design-Build and PPTA Contracts November 10, 2009

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS PAGE : 133-1 CONTRACT TIME : 12/20/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-080-5(094) ROUTE 80 BRIDGE OVER ROUTE 287 NORTHBOUND AND SMITH ROAD GRADING, PAVING & STRUCTURRS CONTRACT

More information

All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford

All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford Seymour Road Replacement Bridge Addendum #1 April 27, 2015 To: From: Cc: All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford RE: Construction Bid Information

More information

CITY OF FARGO SPECIFICATIONS SIGNING

CITY OF FARGO SPECIFICATIONS SIGNING SIGNING PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of furnishing all labor, material and accessories necessary to complete

More information

February Page 1

February Page 1 February 2017 - Page 1 CHAPTER 1 LOCATED ON. This section is revised as shown in the highlight below The description of the project location should reflect the beginning and ending location of the project.

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

.2 The scales and automated system for each of the three (3) scales shall be supplied from a single manufacturer.

.2 The scales and automated system for each of the three (3) scales shall be supplied from a single manufacturer. New Entrance and Scale Facility Page 1 of 6 1. GENERAL 1.1 Work Included.1 The intent of the work under this section is to supply and install three (3) complete low profile platform (pitless) truck scales

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

DALLAS/FORT WORTH INTERNATIONAL AIRPORT DESIGN, CODE AND CONSTRUCTION DEPARTMENT ADDENDUM NO. 2 FOR

DALLAS/FORT WORTH INTERNATIONAL AIRPORT DESIGN, CODE AND CONSTRUCTION DEPARTMENT ADDENDUM NO. 2 FOR DALLAS/FORT WORTH INTERNATIONAL AIRPORT DESIGN, CODE AND CONSTRUCTION DEPARTMENT ADDENDUM NO. 2 FOR TAXIWAY Y BRIDGE REINFORCEMENT FOR GROUP VI AIRCRAFT CONTRACT NO. 9500498 November 30, 2017 The Request

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

Chapter 8 WORK ZONE TRAFFIC CONTROLS

Chapter 8 WORK ZONE TRAFFIC CONTROLS October 31, 2009 Chapter 8 WORK ZONE TRAFFIC CONTROLS TABLE OF CONTENTS Page 8-1.00 INTRODUCTION..........................................................8-3 1.01 Purpose 1.02 Scope 1.03 Relation to Other

More information

2016 MUTCD CONCEPT TTC COMMENTS. Michael A. Chacon Traffic Operations Division

2016 MUTCD CONCEPT TTC COMMENTS. Michael A. Chacon Traffic Operations Division 2016 MUTCD CONCEPT TTC COMMENTS Michael A. Chacon Traffic Operations Division MUTCD 4 Ballot items were discussed at the June 2014 meeting in TTC, as well as additional topics. TTC No. 1 Pedestrian and

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

BITUMINOUS MIXTURE # 13A BID SHEET

BITUMINOUS MIXTURE # 13A BID SHEET BITUMINOUS MIXTURE # 13A BID SHEET Sealed bids will be received at the office of the Clinton County Road Commission at 3536 S. US Highway 27, St. Johns, Michigan, until 1:00 P.M. Tuesday, January 31 st,

More information

SECTION High Performance Coatings Field Applied Acrylic Urethanes (Solid Color, Pearl and Metallic Finishes)

SECTION High Performance Coatings Field Applied Acrylic Urethanes (Solid Color, Pearl and Metallic Finishes) - 1 - SECTION 099600 High Performance Coatings Field Applied Acrylic Urethanes (Solid Color, Pearl and Metallic Finishes) PART 1 GENERAL 1.1 SECTION INCLUDES A. Systems for field applied acrylic urethane

More information

SPECIFICATION FOR THE ERECTION AND MAINTENANCE OF TRAFFIC SIGNS, CHEVRONS, MARKERS AND SIGHT RAILS

SPECIFICATION FOR THE ERECTION AND MAINTENANCE OF TRAFFIC SIGNS, CHEVRONS, MARKERS AND SIGHT RAILS SPECIFICATION FOR THE ERECTION AND MAINTENANCE OF TRAFFIC SIGNS, CHEVRONS, MARKERS AND SIGHT RAILS 1. SCOPE This specification covers the erection, maintenance of traffic signs, chevron boards, sight rails,

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

DRAFT TECHNICAL SPECIFICATIONS FOR

DRAFT TECHNICAL SPECIFICATIONS FOR DRAFT TECHNICAL SPECIFICATIONS FOR DETROIT RIVER AOC STONY ISLAND HABITAT RESTORATION PROJECT THE DETROIT RIVER, WAYNE COUNTY, MICHIGAN FOR INFORMATION JANUARY, 2016 Prepared for: FRIENDS OF THE DETROIT

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

THE GOLD STAR MEMORIAL HIGHWAY

THE GOLD STAR MEMORIAL HIGHWAY ESTIMATED QUANTITIES ITEM NO. DESCRIPTION UNIT Beech Ridge Road Cider Hill Road Route 36 York Interchange Captain Thomas Road Two Rod Road North Street Tatnic Road Route On-Ramp Quantity Total Filenam

More information

MUTCD Part 6F: Temporary Traffic Control Zone Devices

MUTCD Part 6F: Temporary Traffic Control Zone Devices MUTCD Part 6F: Temporary Traffic Control Zone Devices 6F.01 Types of Devices FHWA policy requires that all roadside appurtenances such as traffic barriers, barrier terminals and crash cushions, bridge

More information

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING 507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL 489 DELETE: SECTION 507 SLURRY SEAL in its entirety. INSERT: The following. SECTION 507 SLURRY SEAL AND MICRO-SURFACING

More information

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

Section 13. Guidelines for the Design of Ground Mounted Sign Supports Section 13 BDC11MR-04 13.1 Introduction Highway signs fall into two main categories, which are subdivided as follows: 1. Overhead Signs a. Sign Bridge Structures (GO) b. Sign Cantilever Structures (GO)

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/20/2017

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/20/2017 NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/20/2017 Control 6316-00-001 Project RMC - 631600001 Highway US0059 County HARRISON Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. THIS ADDENDUM IS ISSUED

More information

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # 2016-04 PROJECT SPECIFICATIONS TABLE OF CONTENTS SECTION 100 GENERAL... 1 SECTION 200 MATERIALS... 1 CONSTRUCTION METHODS... 1 SECTION

More information

SECTION CONSTRUCTION OPERATIONS AND SITE UTILIZATION PLAN

SECTION CONSTRUCTION OPERATIONS AND SITE UTILIZATION PLAN SECTION 01 14 11 CONSTRUCTION OPERATIONS PART 1 - GENERAL 1.1 SUMMARY A. The Construction Operations Plan provides a coordinated construction environment to ensure an orderly, secure and safe operation

More information

NOTES ON THE SPECIFICATION FOR ROAD SAFETY BARRIER SYSTEMS

NOTES ON THE SPECIFICATION FOR ROAD SAFETY BARRIER SYSTEMS 1. INTRODUCTION A road safety barrier is considered to be a hazard and should only be used when the consequences of hitting it are less than the hazard/object which it is shielding. The use of a road safety

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, and Repair Project

Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, and Repair Project Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, and Repair Project 2013 Louisiana Transportation Conference Session 13 Durk Krone, P.E., TRC Engineers,

More information

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9080 - Concrete Steps, Handrails, and Safety Rail CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART - GENERAL.0 SECTION INCLUDES

More information

Request for Proposal: Due October 11, :00 pm

Request for Proposal: Due October 11, :00 pm Remove and replace approx. 6000 sq. ft. of asphalt, clean and tack 1200 sq. ft. of low spots, seal coat and stripe parking lot at 1030 Temple Ave Camarillo, CA 93010 Request for Proposal: Due October 11,

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project RES. NO. PROPOSAL FOR THE COMPLETION OF 2015-28 TO THE SATISFACTION OF THE BUTLER COUNTY COMMISSIONERS AND THE COUNTY ENGINEER: SAID WORK CONSISTING OF TYLERSVILLE ROAD IMPROVEMENTS, PHASE I TO THE COUNTY

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

BID INSTRUCTIONS. Montour County Courthouse Retaining Wall Repair Project

BID INSTRUCTIONS. Montour County Courthouse Retaining Wall Repair Project BID INSTRUCTIONS Montour County Courthouse Retaining Wall Repair Project The Montour County Commissioners are receiving bids for the Courthouse Retaining Wall Repair Project. The parking lot is located

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

CONSTRUCTION SPECIFICATION FOR TEMPORARY TRAFFIC CONTROL DEVICES

CONSTRUCTION SPECIFICATION FOR TEMPORARY TRAFFIC CONTROL DEVICES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 706 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR TEMPORARY TRAFFIC CONTROL DEVICES TABLE OF CONTENTS 706.01 SCOPE 706.02 REFERENCES 706.03 DEFINITIONS

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR TRAFFIC STRIPE (MULTI-POLYMER)

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR TRAFFIC STRIPE (MULTI-POLYMER) 856-1(a-g) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR TRAFFIC STRIPE (MULTI-POLYMER) These Special Provisions revise, amend, and where in conflict, supersede applicable sections of

More information

Property Test/Standard Description. US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)

Property Test/Standard Description. US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong) Approved 402;2522 1,2 2522 zinc epoxy ^(ValidationDate) 1 Product description This is a two component polyamide cured zinc rich epoxy coating. It is a high zinc dust containing product. It conforms to

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM. OFS:CRB 1 of 8 APPR:JJG:LWB:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM. OFS:CRB 1 of 8 APPR:JJG:LWB: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM OFS:CRB 1 of 8 APPR:JJG:LWB:10-30-13 a. Description. This work consists of providing, installing, operating,

More information

Pigeon Forge, Tennessee City Hall and Thurman Lift Station Coating Rehabilitation. Contract Documents

Pigeon Forge, Tennessee City Hall and Thurman Lift Station Coating Rehabilitation. Contract Documents Pigeon Forge, Tennessee City Hall and Thurman Lift Station Coating Rehabilitation April 21, 2017 Contract Documents Prepared By: Veolia Water North America For the City of Pigeon Forge, Tennessee P.O.

More information

SPECIFICATION : BORING AND JACKING

SPECIFICATION : BORING AND JACKING SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in

More information

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,

More information

ANNE ARUNDEL COUNTY Department of Public Works DATE: 01/25/2017 FROM: Rich Osborn, P.E., Prof.L.S., Project Manager, Bureau of Engineering SUBJECT: Minutes for Pre-Bid Meeting January 19, 2017 South Shore

More information

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2) Installation Manual Orion TL-3 Steel Barrier VHD (v2) 300914 Table of Contents Orion Introduction.......... 3 Limitations & Warnings. 4 Before Installation..... 3 System Design & Design Considerations

More information

CRACK ROUTING AND SEALING And CHIP SEAL COATING BIDS 2012

CRACK ROUTING AND SEALING And CHIP SEAL COATING BIDS 2012 CRACK ROUTING AND SEALING And CHIP SEAL COATING BIDS General Inmation Bidders Sealed bids must be received by 12:00 Noon, Monday, April 23, at the Wascott Town Hall as stated in the public notice and advertisement

More information

REQUEST FOR CONSTRUCTION BIDS May 23, 2017

REQUEST FOR CONSTRUCTION BIDS May 23, 2017 REQUEST FOR CONSTRUCTION BIDS May 23, 2017 Cambridge Greenway Trail / Railroad Bridge Replacement Flood Mitigation Project 1.0 Project Background A former railroad bridge that currently carries the Cambridge

More information

Interior Painting Artesi II & III Day Care Facilities at 777 & 333 W. Matthews Road

Interior Painting Artesi II & III Day Care Facilities at 777 & 333 W. Matthews Road Interior Painting Artesi II & III Day Care Facilities at 777 & 333 W. Matthews Road Introduction: The HACSJ is seeking quotes from licensed and bonded C-33 Interior/Exterior Painting Contractors to provide

More information

PREFABRICATED STEEL TRUSS SPECIFICATIONS

PREFABRICATED STEEL TRUSS SPECIFICATIONS PREFABRICATED STEEL TRUSS SPECIFICATIONS 1. GENERAL 1.1 Scope All engineering design and related detailing of the bridge(s) shall be provided by the supplier. The design and detailing shall conform to

More information

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT ROADSIDE CLEARING MM 75.3 TO MM 82.9 MM 99.2 TO MM 109.1

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT ROADSIDE CLEARING MM 75.3 TO MM 82.9 MM 99.2 TO MM 109.1 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2015.07 ROADSIDE CLEARING MM 75.3 TO MM 82.9 MM 99.2 TO MM 109.1 The following are questions asked at the pre-bid meeting held on October 29, 2015 at 10:00

More information

IGGA Guide Specification: Conventional Diamond Grinding for Pavement Preservation Introduction

IGGA Guide Specification: Conventional Diamond Grinding for Pavement Preservation Introduction IGGA Guide Specification: Conventional Diamond Grinding for Pavement Preservation Introduction This standard developed, by the International Grooving and Grinding Association (IGGA), specifies the procedures

More information

SECTION ALUMINUM GATES

SECTION ALUMINUM GATES P.O. Box 1058 370 South Athol Rd. Athol, Massachusetts 01331 Phone: (978) 249-7924 Fax: (978) 249-3072 SECTION ALUMINUM GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The CONTRACTOR shall furnish all labor,

More information

KENTUCKY TRANSPORTATION CENTER

KENTUCKY TRANSPORTATION CENTER Research Report KTC-08-20/FR155-06-1F KENTUCKY TRANSPORTATION CENTER EXPERIMENTAL CONCRETE COATING APPLICATION ON THE MEDIAN BARRIER OF I-65 IN LOUISVILLE OUR MISSION We provide services to the transportation

More information

***************************************************************************************************************

*************************************************************************************************************** 03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************

More information

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

RESIDENTIAL CONSTRUCTION New Dwellings and Additions How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:

More information

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA ADDENDUM NO. 1 FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA Bids to be received until 2:00 p.m., local time, July 9, 2012 SPECIFICATIONS Delete Section 00 41 53 Bid Unit Price in

More information

Broadcast Parking Garage System

Broadcast Parking Garage System AIA Specification Part 1 General Broadcast Parking Garage System 1.01 Work Included A. All work to be provided in this section shall include material, labor, and equipment necessary to furnish the complete

More information

SECTION PREFABRICATED PIPE BRIDGE(s)

SECTION PREFABRICATED PIPE BRIDGE(s) SECTION 13135 - PREFABRICATED PIPE BRIDGE(s) PART 1 - GENERAL 1.01 Scope A. The Contractor is responsible for all engineering design, detailing, fabricating, installation including foundations for the

More information

A. Section Metal Decking. (05300 in MF95) B. Section Cold Formed Metal Framing. (05400 in MF95)

A. Section Metal Decking. (05300 in MF95) B. Section Cold Formed Metal Framing. (05400 in MF95) SECTION 05 44 00 - PRE-ENGINEERED PRE-FABRICATED COLD-FORMED STEEL TRUSSES (Section 05425 in MasterFormat 1995) PART 1 GENERAL 1.1 SECTION INCLUDES A. Pre-engineered cold-formed steel trusses. B. Cold-formed

More information

A-Series Aluminum Gantry Crane

A-Series Aluminum Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 A-Series Aluminum Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an A-Series Gantry Crane into a competitive bid project or

More information

Statement of Work Tree Planting Services 202 Parkway, Montgomery County

Statement of Work Tree Planting Services 202 Parkway, Montgomery County Statement of Work Tree Planting Services 202 Parkway, Montgomery County SPECIAL PROVISIONS Governing Specifications Service Requirements Purchase Order Validity Period Option to Renew Option to Extend

More information

Construction Administration Updates

Construction Administration Updates Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Construction Administration Updates Clint Bishop Construction Administration Updates Construction Administration Updates

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING