NOT FOR CONSTRUCTION Preliminary plan sheets are for information purposes only. The preliminary plans should not be used as a basis for bid.

Size: px
Start display at page:

Download "NOT FOR CONSTRUCTION Preliminary plan sheets are for information purposes only. The preliminary plans should not be used as a basis for bid."

Transcription

1

2 SPECIFICATIONS: ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE SPECIAL PROVISIONS. Preliminary VERIFICATION plan OF sheets EXISTING CONDITIONS:, 2010 STANDARD SPECIFICATIONS FOR TURNPIKE CONSTRUCTION. EXCEPT AS MODIFIED PLAN NOTES AND PRIOR TO SUBMITTING HIS BID, THE CONTRACTOR SHALL FULLY INFORM HIMSELF OF THE NATURE OF THE WORK AND CONDITIONS UNDER WHICH IT WILL BE PERFORMED. THE CONTRACTOR SHALL ADOPT METHODS CONSISTENT WITH GOOD CONSTRUCTION PRACTICE AND SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE EXISTING BRIDGE OR ATTACHMENTS. ANY DAMAGE TO THE EXISTING BRIDGE OR ROADWAY DUE TO THE CONTRACTOR'S NEGLIGENCE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE, TO THE SATISFACTION OF THE ENGINEER. should EXISTING order PLANS: the official plans from THIS BRIDGE WAS CONSTRUCTED THE. PLANS FOR THE ORIGINAL CONSTRUCTION ARE AVAILABLE ON OTA WEB SITE; FTP://FTP.PIKEPASS.COM OR FROM: 3500 MARTIN LUTHER KING BOULEVARD OKLAHOMA CITY, OKLAHOMA ASK FOR: 5 GENERAL CONSTRUCTION NOTES: (G-48) CONTRACTORS SHALL NOT UTILIZE EMERGENCY VEHICLE TURNAROUNDS ON THE TURNPIKE. (G-51) THE CONTRACTOR SHALL SUBMIT A FINAL TRAFFIC CONTROL AND CONSTRUCTION PHASING PLAN TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO BEGINNING CONSTRUCTION DESCRIBING ALL WORK PHASES FOR CONSTRUCTION OF THE BRIDGES AND ROADWAYS AFFECTED. (G-52) LANE LINES,AT MINIMUM,SHALL BE ESTABLISHED AT ALL TIMES DURING CONSTRUCTION. (G-53) CONTRACTOR SHALL DOCUMENT PRE-CONSTRUCTION SITE CONDITIONS MEANS OF PHOTOGRAPHS AND VIDEO WITH A DESIGNATED O.T.A. REPRESENTATIVE, BEFORE THE START OF CONSTRUCTION. COST SHALL BE CONSIDERED AS INCIDENTAL AND NO SEPARATE PAYMENT SHALL BE MADE. THE CONTRACTOR SHALL PROVIDE THE ENGINEER A DIGITAL COPY OF THE PHOTOGRAPHS AND VIDEO AT THE PRE-WORK MEETING. (G-54) CONTRACTOR SHALL PERFORM ALL CONSTRUCTION STAKING REQUIRED FOR THE PROJECT. COST TO BE INCLUDED IN OTHER ITEMS OF WORK. DESCRIPTION OF WORK: THE WORK TO BE PERFORMED UNDER THIS CONTRACT CONSISTS OF REPAIRING THE DAMAGE TO (HIAWASSEE ROAD) OVER IN OKLAHOMA COUNTY. THE BRIDGE SHALL HAVE ONE LANE CLOSED TO TRAFFIC DURING REPAIR OPERATIONS. HEAT STRAIGHTEN THE DAMAGED AREA OF THE WEB AND FLANGE OF THE WEST EXTERIOR OF SPAN NO. 3 OVER THE EASTBOUND LANES OF TO REASONABLY CLOSE CONFORMITY TO THE S ORIGINAL SHAPE. REMOVE AND REPLACE A DAMAGED PORTION OF THE, HEAT STRAIGHTEN AND PROVIDE A NEW CONNECTION TO THE DAMAGED INTERMEDIATE DIAPHRAGM AS INDICATED ON THE PLANS. HEAT STRAIGHTEN THE DAMAGED AREA OF THE WEB AND FLANGE OF THE EAST EXTERIOR OF SPAN NO. 3 OVER THE EASTBOUND LANES OF TURNER TURNPIKE TO REASONABLY CLOSE CONFORMITY TO THE S ORIGINAL SHAPE. PRIOR TO STARTING REPAIR OPERATIONS OF THE DAMAGED WEST EXTERIOR, JACK UP THE AT THE POINTS AND THE AMOUNTS SPECIFIED ON THE PLANS TO ENSURE CAMBER, REMOVE DAMAGED AREA THEN HEAT STRAIGHTEN THE REMAINING PORTIONS OF THE TO REASONABLY CLOSE CONFORMITY TO THE 'S ORIGINAL SHAPE AS DIRECTED THE ENGINEER AND IN ACCORDANCE WITH E(7) OF THE STANDARD SPECIFICATIONS, THEN ATTACH THE NEW. UNLESS DIRECTED OTHERWISE THE ENGINEER, THE CONTRACTOR SHALL REMOVE, STRAIGHTEN AND STORE THE EXISTING VERTICAL CLEARANCE SIGN AND ATTACH THE SIGN TO THE ORIGINAL LOCATION AFTER ALL REPAIRS AND PAINTING ARE COMPLETE. THE CONTRACTOR SHALL MEASURE VERTICAL CLEARANCE PRIOR TO PLACEMENT OF VERTICAL CLEARANCE SIGN, IF MEASURED CLEARANCE IS DIFFERENT THAN SIGN, THE SIGN WILL BE CORRECTED AS DIRECTED THE ENGINEER. COST TO BE INCLUDED IN OTHER ITEMS OF WORK. IF CONTRACTOR ELECTS TO USE REPAIR METHODS OTHER THAN THOSE SHOWN ON THE PLANS, HE SHALL FURNISH COMPLETE CONSTRUCTION DOCUMENTS, INCLUDING DESIGN DRAWINGS, FALSEWORK AND JACKING DETAILS, AND DESIGN CALCULATIONS TO THE OTA FOR APPROVAL. ALL COSTS OF DESIGN ENGINEERING, CONSTRUCTION, AND MATERIALS SHALL BE PAID FOR AT THE UNIT BID PRICE FOR "REPAIR BRIDGE ITEMS". STRUCTURAL STEEL FOR REPAIR: ALL STRUCTURAL STEEL SHALL CONFORM TO AASHTO M 183 (ASTM A-36). WHERE NEW MATERIAL IS TO BE CONNECTED TO EXISTING MATERIAL, THE EXISTING MATERIAL SHALL BE HEAT STRAIGHTENED, AS NECESSARY, TO MAKE THE CONNECTION. ALL WELDING OF STRUCTURAL STEEL SHALL CONFORM TO "THE STRUCTURAL WELDING CODE" AWS D1.5, INCLUDING ALL CURRENT REVISIONS, AND THE MODIFICATIONS TO THIS CODE INCLUDED IN AASHTO STANDARD SPECIFICATIONS FOR WELDING OF STRUCTURAL STEEL HIGHWAY BRIDGES. NO FIELD WELDING TO THE S WILL BE ALLOWED EXCEPT AS SHOWN ON THE PLANS OR APPROVED THE ENGINEER. METAL USED IN THE FIELD WELDS WILL NOT BE MEASURED FOR PAYMENT. HEAT STRAIGHTENING SPECIFICATIONS: SUGGESTED CONSTRUCTION SEQUENCE: A SUGGESTED SEQUENCE OF CONSTRUCTION IS SHOWN ON THIS. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING FINAL CONSTRUCTION SEQUENCE, AND SHALL SUBMIT FOR APPROVAL A PROPOSED CONSTRUCTION SEQUENCE SIGNED AND SEALED A PROFESSIONAL ENGINEER WHO IS CURRENTLY REGISTERED WITH THE STATE OF OKLAHOMA STATE BOARD OF LICENSURE FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS. 1. INSTALL TRAFFIC CONTROL OVER THE WEST EXTERIOR ON HIAWASSEE ROAD OVER THE EASTBOUND LANES OF. 2. ERECT STEEL SUPPORT OVER WEST EXTERIOR LINE OVER THE EASTBOUND LANES OF. 3. INSTALL PHASE 1 TRAFFIC CONTROL ON MOVING TRAFFIC TO THE INSIDE LANE. 4. DISCONNECT AND HEAT STRAIGHTEN THE INTERMEDIATE DIAPHRAGM ATTACHED TO THE WEST EXTERIOR OF SPAN NO. 3 AS SHOWN ON THE PLANS. 5. RAISE EQUAL TO THE AMOUNT OF DEFLECTION AS SHOWN IN THE PLANS USING DYWIDAG RODS AND JACKING ASSEMBLIES. 6. REMOVE AND STORE EXISTING VERTICAL CLEARANCE SIGN. REMOVE DAMAGED PORTION OF TO THE EXTENTS SHOWN ON THE PLANS. 7. HEAT STRAIGHTEN DAMAGED PORTIONS OF THE EXISTING AND DIAPHRAGM CONNECTORS TO REASONABLY CLOSE CONFORMITY TO THE ORIGINAL SHAPES. 8. WELD NEW TO EXISTING WEST EXTERIOR. 9. RELEASE FORCES IN THE RODS. REMOVE SUPPORT RODS AND FILL HOLES IN DECK CREATED FOR RODS WITH NON-SHRINK GROUT AND REMOVE. 10. ATTACH REPAIRED DIAPHRAGM. (G-55) CONTRACTOR SHALL PAY ALL TURNPIKE FEES. TOLL COST SHALL BE INCLUDED IN OTHER ITEMS OF WORK. HEAT STRAIGHTENING OF THE DAMAGED STEEL BRIDGE MEMBERS SHALL BE PERFORMED THE CAREFULLY PLANNED AND SUPERVISED APPLICATION OF A LIMITED AMOUNT OF LOCALIZED HEAT 11. INSTALL TRAFFIC CONTROL OVER THE EAST EXTERIOR ON HIAWASSEE ROAD OVER THE EASTBOUND LANES OF. (G-56) ALL WORK AND/OR MATERIALS NOT CLASSIFIED AS A "CONTRACT PAY ITEM" SHALL BE CONSIDERED INCIDENTAL AND THE COST THEREOF SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ITEMS WHICH ARE CLASSIFIED FOR PAYMENT. TO THE DAMAGED MEMBERS. MECHANICAL MEANS MAY BE USED TO STRAIGHTEN THE MATERIAL ONLY IN CONJUNCTION WITH THE APPLICATION OF HEAT. ONLY CONTRACTORS THAT CAN DOCUMENT EXPERIENCE IN HEAT STRAIGHTENING OF DAMAGED STEEL HIGHWAY OR RAILROAD BRIDGE MEMBERS WILL BE ALLOWED TO BID ON THIS HEAT 12. HEAT STRAIGHTEN DAMAGED PORTIONS OF THE EAST EXTERIOR AND DIAPHRAGM CONNECTORS TO REASONABLY CLOSE CONFORMITY TO THE ORIGINAL SHAPES. (G-58a) WORK IS NOT ALLOWED BEFORE SUNRISE NOR AFTER SUNSET. CONSTRUCTION ACTIVITIES ARE NOT PERMITTED ON FRIDAYS. STRAIGHTENING PROJECT. ALL GAS FUELED HEATING EQUIPMENT, AS WELL AS MECHANICAL STRAIGHTENING EQUIPMENT, SHALL BE SUPPLIED THE CONTRACTOR AS NECESSARY TO PERFORM ALL HEAT STRAIGHTENING. 13. INSTALL PHASE II TRAFFIC CONTROL OF MOVING TRAFFIC TO THE OUTSIDE LANE. (G-60) THE PRIME CONTRACTOR SHALL BE REPRESENTED ON SITE AT ALL TIMES. HE MUST BE PRESENT WHEN WORK IS BEING PERFORMED HIS SUBCONTRACTORS. IN GENERAL, THE METHODS OF CONSTRUCTION WILL RELY ON THE EXPERIENCE OF THE CONTRACTOR. "NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM" (NCHRP) REPORT NO. 271 CONTAINS BROAD GUIDES TO THIS TYPE OF REPAIR. 14. HEAT STRAIGHTEN REMAINING PORTIONS OF THE EAST EXTERIOR OVER THE INSIDE LANE OF EASTBOUND. F:\Projects\ \_TRNS\DGN\Turner Turnpike\Turner-7.2_\GENNOTES_01.dgn (G-61) ALL FIELD MEASUREMENTS SHALL PREVAIL ON INSTALLATION AND REMOVAL. (G-62) CONTRACTOR SHALL BE ALLOWED TO USE OTA RIGHT-OF-WAY AT APPROVED LOCATIONS FOR STORAGE ONE WEEK PRIOR TO BEGINNING OF WORK UNTIL THE ISSUANCE OF THE FINAL ACCEPTANCE OF ALL PUNCH LIST ITEMS. THE SITE MUST BE RESTORED TO ITS ORIGINAL CONDITION INCLUDING ALL DISASSEMBLY, REMOVAL AND SITE CLEAN UP, OF OFFICES, BUILDINGS AND OTHER FACILITIES ASSEMBLED IN THE SITE SPECIFICALLY FOR THIS CONTRACT. FAILURE TO COMPLY SHALL RESULT IN TIME CHARGES BEING RESTARTED AND ASSESSED. (G-71) ALL DIMENSIONS OF THE EXISTING BRIDGE AND ROADWAYS SHOWN ON THE PLANS ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, BOTH SURVEYED AND AS-BUILT, NECESSARY TO CONNECT THE NEW MATERIAL AND SHALL BE SOLELY RESPONSIBLE FOR THE ACCURACY THEREOF. REFER TO THE AS-BUILT PLANS FOR DIMENSIONS AND DETAILS NOT SHOWN IN THE PLANS. (G-72) THE ENGINEER SHALL BE NOTIFIED THE CONTRACTOR TWO (2) WEEKS PRIOR TO ALL CONSTRUCTION ACTIVITIES THAT REQUIRES A LANE/RAMP/TOLL FACILITY CLOSURE. FAILURE TO ADEQUATELY NOTIFY THE ENGINEER WILL RESULT IN A SHUTDOWN NOTICE BEING ISSUED FOR THE WORK REQUIRING THE LANE/RAMP/TOLL FACILITY CLOSURE. IF THE CONTRACTOR FAILS TO GIVE THE PROPER NOTIFICATION, A LANE RENTAL PENALTY OF $10,000 PER HOUR PER LANE PER MILE WILL BE APPLIED UNTIL SUCH TIME AS THE CAPACITY IS RESTORED. (G-73) ANY DEVIATION FROM THE PLANS WITHOUT PRIOR WRITTEN NOTICE WILL RESULT IN A SHUTDOWN NOTICE. (G-75) ALL TRASH, DEBRIS, SPOILS, ETC. SHALL BE REMOVED DAILY. CONSTRUCTION SITE SHALL SHALL BE KEPT IN A CLEAN, WORKMANLIKE MANNER DAILY AS DIRECTED THE ENGINEER. THE STRAIGHTENING HEAT SHOULD BE APPLIED AS RAPIDLY AS POSSIBLE TO OBTAIN THE BEST STRAIGHTENING EFFECT. HEAT SHOULD BE APPLIED TO SMALL AREAS, USUALLY TRIANGULAR IN SHAPE; THE SMALL AREAS TO WHICH HEAT IS APPLIED AND THE SEQUENCE OF HEATING DIFFERENT SMALL AREAS SHALL BE DETERMINED THE CONTRACTOR TO PRODUCE THE MOST EFFICIENT STRAIGHTENING. IT IS NOT RECOMMENDED TO HEAT THE SAME SMALL AREA MORE THAN ONCE. THE MAXIMUM TEMPERATURE TO WHICH THE STEEL SHALL BE HEATED IS 1200 DEGREES FAHRENHEIT (~0 DEG. C.). THE CONTRACTOR MAY VISUALLY DETERMINE THAT THIS TEMPERATURE HAS BEEN REACHED WHEN THE COLOR OF THE STEEL BECOMES A DULL RED. THE ENGINEER MAY PERIODICALLY MONITOR THE TEMPERATURE OF THE STEEL TO VERIFY THE VISUAL TEMPERATURE DETERMINATION. THE EQUIPMENT FOR CHECKING THE TEMPERATURE SHALL BE PROVIDED THE CONTRACTOR AND MEET THE APPROVAL OF THE ENGINEER. A HIGH TEMPERATURE PYROMETER IS PREFERRED FOR THE MEASUREMENT OF THE TEMPERATURE, BUT TEMPERATURE INDICATING CRAYONS OR OTHER MEANS APPROVED THE ENGINEER MAY BE USED. NO ACCELERATED OR ARTIFICIAL COOLING WILL BE PERMITTED. THE FINAL ACCEPTABLE LOCAL TOLERANCES FOR STRAIGHTNESS IN THE AREA OF THE DAMAGE SHALL BE: 1. HORIZONTAL SWEEP-- 1/4 INCH PER 10 FEET (3 M.) OF DAMAGED LENGTH OF. 2. VERTICAL DEFLECTION (WAVES)-- 1/4 INCH IN FLANGES 3. DEFLECTION OF WEB (OUT OF PLANE OF WEB)-- 1/4 INCH * * MEASURED A STRAIGHTEDGE HELD VERTICALLY AND HORIZONTALLY IN THE DAMAGED AREAS. CUTTING, WELDING OR APPLYING HEAT TO STEEL: BEFORE CUTTING, WELDING OR APPLYING HEAT TO STEEL COATED WITH A LEAD-BASED PAINT, REMOVE ALL PAINT ON ALL SIDES WITHIN 3 INCHES OF THE CUT, WELD OR HEATED AREA. CLEAN THE SURFACES TO SSPC-SP2, HAND TOOL CLEANING, OR TO SSPC-SP3, CONVENTIONAL POWER TOOL CLEANING, IN ACCORDANCE WITH CFR ALL COSTS FOR THIS CLEANING WILL BE INCLUDED IN OTHER ITEMS OF WORK. ANY REMOVED MATERIALS SHALL BE DISPOSED AS DIRECTED THE ENGINEER. 14. PAINT NEW STRUCTURAL STEEL AND EXTERIOR FACE AND BOTTOM FLANGE OF REPAIRED S. 15. REINSTALL OVERHEAD CLEARANCE SIGN TO THE ORIGINAL LOCATION. 16. REMOVE TRAFFIC CONTROL ON. 17. REMOVE TRAFFIC CONTROL ON HIAWASSEE ROAD AND OPEN TO TRAFFIC. GENERAL CONSTRUCTION NOTES ( 1 OF 2) 2

3 SHALL BE ACCOMPLISHED AT THE CONTRACTOR'S EXPENSE. INSPECTION AND TESTING OF REPAIR: ALL WELDING CONNECTING THE TO THE EXISTING SHALL HAVE AN ULTRASONIC INSPECTION. THIS INSPECTION SHALL BE PERFORMED AN INDEPENDENT TESTING LABORATORY, SUITABLE TO THE ENGINEER, AND UPON ACCEPTANCE OF THE ULTRASONIC INSPECTION RESULTS THE ENGINEER, ALL BACKING PLATES SHALL BE REMOVED FLUSH WITH THE BASE METAL. FLAME CUTTING MAY BE USED FOR THE REMOVAL OF THE MAJOR PART OF THE BACKING PLATES, PROVIDED THAT AT LEAST " OF THEIR THICKNESS IS LEFT TO BE REMOVED GRINDING. ALL WELDS, EXPOSED TO VIEW FROM THE EXTERIOR OF THE BRIDGE AND ALL WELDS WITH PROJECTIONS THAT WILL INTERFERE WITH THE DIAPHRAGM CONNECTION, SHALL BE GROUND SMOOTH IN THE DIRECTION OF THE STRESS. ULTRASONIC INSPECTION WILL NOT BE REQUIRED FOR WELDING OF THE DIAPHRAGM CONNECTIONS. THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS CONCERNING CHARPY any Addendums V-NOTCH TECH TESTS WILL are BE properly WAIVED. distributed. PAINTING - CATEGORY 'R': THE CONTRACTOR SHALL PAINT ALL NEW STRUCTURAL STEEL AND ALL AREAS WHERE EXISTING PAINT HAS BEEN DAMAGED, EITHER THE CONTRACTOR OR AS A RESULT OF DAMAGES TO THE S. BEFORE APPLYING NEW PAINT, ALL LOOSE PAINT SHALL BE REMOVED HAND SCRAPING AND WITH BRUSHING LEAVING A FEATHERED EDGE ON THE REMAINING SOUND PAINT. PAINTING SHALL CONSIST OF TWO COATS OF INORGANIC ZINC PRIMER AND ONE FINISHED COAT OF PAINT TO MATCH, AS NEARLY AS PRACTICAL, THE EXISTING PAINT. CAUTION: EXISTING BRIDGE MAY CONTAIN A LEAD BASED PAINT SYSTEM. CLEANING AND PAINTING OF STRUCTURAL STEEL SHALL BE IN ACCORDANCE WITH OF THE STANDARD SPECIFICATIONS. ALL COSTS OF CLEANING AND PAINTING THE NEW STEEL AND AREAS OF THE EXISTING EAST AND WEST EXTERIOR S AT SPAN NO. 3 WHERE PAINT HAS BEEN DAMAGED EITHER THE CONTRACTOR OR AS A RESULT OF DAMAGE TO THE SHALL BE INCLUDED IN THE LUMP SUM PRICE BID FOR "REPAIR BRIDGE ITEMS". PROTECTION OF TRAFFIC UNDER BRIDGE: THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING THE TRAFFIC UNDER THE BRIDGE DURING BRIDGE REPAIR WORK. A PROPOSED METHOD OF PREVENTING DEBRIS FROM FALLING ON TRAFFIC BELOW THE BRIDGE SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL. ALL MATERIALS REMOVED FROM THE BRIDGE SHALL BE REMOVED FROM THE WORK AREA PROMPTLY. THE AREA SHALL BE CLEARED AT THE CLOSE OF ANY WORK PERIOD. ALL COST FOR TRAFFIC PROTECTION AS STATED SHALL BE INCLUDED IN THE PRICE BID FOR OTHER ITEMS OF WORK. F:\Projects\ \_TRNS\DGN\Turner Turnpike\Turner-7.2_\GENNOTES_02.dgn MAINTENANCE OF TRAFFIC: TRAFFIC SHALL BE PHASED TO HAVE ONE LANE EASTBOUND OPENED AT ALL TIMES DURING REPAIR OPERATIONS, THE BRIDGE CARRYING HIAWASSEE ROAD SHALL BE PHASED TO HAVE ONE LANE OPENED AT ALL TIMES DURING REPAIR OPERATIONS. THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL AT ALL TIMES (24 HOURS/DAY) DURING THE CONTRACT. GENERAL CONSTRUCTION NOTES ( 2 OF 2) 3

4 REPAIR BRIDGE ITEMS - : HEAT STRAIGHTEN THE DAMAGED AREA OF THE WEB AND FLANGE OF THE WEST EXTERIOR OF SPAN NO. 3 OVER THE EASTBOUND LANES OF TRAFFIC PAY NOTES (CONT.) TO REASONABLY CLOSE CONFORMITY TO THE S ORIGINAL HEAT STRAIGHTEN THE DAMAGED AREA OF THE WEB AND FLANGE OF THE THE the CONTRACTOR engineer SHALL of HEAT Record STRAIGHTEN THE to DAMAGED ensure DIAPHRAGM that AND SHAPE. REMOVE AND REPLACE A DAMAGED PORTION OF THE, HEAT STRAIGHTEN AND PROVIDE A NEW CONNECTION TO THE DAMAGED INTERMEDIATE DIAPHRAGM AS INDICATED ON THE PLANS. EAST EXTERIOR OF SPAN NO. 3 OVER THE EASTBOUND LANES OF TURNER TURNPIKE TO REASONABLY CLOSE CONFORMITY TO THE S ORIGINAL SHAPE. PRIOR TO CUTTING THE DAMAGED OF THE WEST EXTERIOR, JACK UP THE AT THE POINTS SPECIFIED ON THE PLANS TO ENSURE CAMBER. HEAT STRAIGHTEN THE REMAINING DAMAGED PORTIONS OF THE WEB AND FLANGE IN ACCORDANCE WITH E(7) OF THE STANDARD SPECIFICATIONS BEFORE THE NEW IS INSTALLED. THE DIMENSIONS OF THE NEW ARE APPROXIMATE, FINAL DIMENSIONS SHALL BE DETERMINED IN THE FIELD. ALL DAMAGED MATERIALS REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND DISPOSED OF IN ACCORDANCE WITH B(2) OF THE STANDARD SPECIFICATIONS AND IN A MANNER APPROVED THE ENGINEER. REPLACE THE DAMAGED CONNECTION BRACKETS CONNECTED TO THE IN THE DAMAGED AREA. NEW BOLT HOLES SHALL BE PROVIDED IN THE NEW WEB TO BOLT THE CONNECTION BRACKETS. THE CONTRACTOR WILL NOT BE PERMITTED TO CUT THE DAMAGED OF THE S UNTIL THE NEW IS AT THE SITE AND IS AVAILABLE FOR IMMEDIATE INSTALLATION. THE CONTRACTOR SHALL REMOVE AND STORE THE EXISTING VERTICAL CLEARANCE SIGN AND ATTACH THE SIGN TO THE ORIGINAL LOCATION AFTER ALL REPAIRS AND PAINTING ARE COMPLETE. PAY ITEM "(PL) REPAIR BRIDGE ITEMS" CONSISTS OF THE FOLLOWING: A) HEAT STRAIGHTEN THE DAMAGED AREA OF THE WEST EXTERIOR (TC3) (TC7) (TC-20) (TC-21) (TC-22) (TC-25) A PART, OR ALL, OF THIS ITEM IS INTENDED FOR REPLACEMENT OF REMOVED EXISTING CONFLICTING STRIPING. INCLUDES AN ESTIMATED 2,300 L.F. (PAINT)(4" WIDE) WHITE 4,700 L.F. (PAINT)(4" WIDE) YELLOW STRIPE. ALL STRIPING TO BE PLACED ON TEMPORARY SURFACES OR ON SURFACES SCHEDULED TO BE REMOVED SHALL BE DONE WITH PAINT UNLESS OTHERWISE NOTED ON THE PLANS OR STANDARD DRAWINGS. INCLUDED IN THE COST OF THIS ITEM SHALL BE INSTALLATION, MAINTENANCE, AND REMOVAL. THIS ITEM SHALL BE BID ACCORDINGLY. AMOUNT SHOWN IS AN APPROXIMATION AND THE ACTUAL AMOUNT OF REMOVAL, IF NECESSARY, SHALL BE DETERMINED THE ENGINEER. PRICE BID FOR PAVEMENT MARKING REMOVAL SHALL INCLUDE THE COST OF REMOVING STRIPE, ARROWS, WORDS AND SYMBOLS, AS SHOWN IN THE PLANS. THESE ITEMS MAY CONSIST OF PLASTIC, PAINT OR NON REMOVABLE MARKING TAPE. ALL CONSTRUCTION TRAFFIC CONTROL WILL BE IMPLEMENTED ACCORDING TO CONSTRUCTION PLANS, AND INSTALLED IN A MANNER APPROVED THE ENGINEER, IN ACCORDANCE WITH CHAPTER VI OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, (CURRENT EDITION), AND COMPLIANT WITH APPLICABLE O.D.O.T. STANDARD DRAWINGS. PRICE BID FOR THIS ITEM SHALL BE PAYMENT IN FULL FOR THE INSTALLATION, MAINTENANCE AND SUBSEQUENT REMOVAL OF ALL NECESSARY CONSTRUCTION TRAFFIC CONTROL DEVICES AND PAVEMENT MARKINGS REQUIRED FOR COMPLETION OF THE PROJECT. ALL SIGNS AND BARRICADES WHICH ARE SHOWN WITH TYPE 'A' LIGHTS IN THE STANDARD DRAWINGS SHALL HAVE ITEM 502(C) TRAFFIC PAY NOTES (CONT.) (TC-85) (SP) (SP-2) THESE SIGNS MUST BE ON THE OKLAHOMA DEPARTMENT OF TRANSPORTATION LIST OF APPROVED CHANGEABLE MESSAGE SIGNS. FOR A LIST OF THE APPROVED SIGNS GO TO THE OKLAHOMA DEPARTMENT OF TRANSPORTATION WEBSITE AT: AT THE CONTRACTORS OPTION AND WITH APPROVAL OF THE ENGINEER THIS ITEM MAY BE REPLACED WITH FLEX-TAB MARKERS OR REMOVABLE TRAFFIC STRIPING TAPE. ATTENUATORS SHALL BE QUADGUARD ELITE, SCI00 GM (SMART CUSHION), OR APPROVED EQUAL WITHIN THE SAME CATEGORY OF THE OKLAHOMA DEPARTMENT OF TRANSPORTATION'S IMPACT ATTENUATOR GUIDELINE MATRIX. THE IMPACT ATTENUATOR GUIDELINE MATRIX CAN BE FOUND AT (PL) FALSEWORK AND JACKING PAY QUANTITIES - BRIDGE 7.2 DESCRIPTION UNIT QUANTITY 106 QUALITY CONTROL AND ACCEPTANCE LSUM MOBILIZATION LSUM 1.00 SPEC (PL) REPAIR BRIDGE ITEMS LSUM 1.00 LSUM 1.00 TO REASONABLY CLOSE CONFORMITY TO THE ORIGINAL SHAPE, REMOVE AND REPLACE A DAMAGED PORTION OF THE, HEAT STRAIGHTEN AND PROVIDE A NEW CONNECTION TO THE DAMAGED INTERMEDIATE DIAPHRAGM. THERE IS APPROX. 190 LBS. OF STRUCTURAL STEEL FOR NEW AND DAMAGED DIAPHRAGM CONNECTION REPLACEMENT. B) HEAT STRAIGHTEN THE DAMAGED AREA OF THE WEB AND FLANGE OF THE EAST EXTERIOR OVER THE EASTBOUND LANES OF TO REASONABLY CLOSE CONFORMITY TO THE ORIGINAL SHAPE. C) PAINT NEW STRUCTURAL STEEL AND THE ENTIRE EXTERIOR FACES OF THE REPAIRED S INCLUDING THE BOTTOM OF THE FLANGE AND THE REPAIRED AREAS. D) REMOVING AND STORING THE EXISTING VERTICAL CLEARANCE SIGN AND THEN ATTACHING THE SIGN TO THE ORIGINAL LOCATION ON THE AND ALL INCIDENTALS NECESSARY TO COMPLETE THE REPAIR WORK AS SPECIFIED AND SHOWN ON THE PLANS, INCLUDING WELDING, LABOR, PAINT, ETC. (TC-33) (TC-39) (TC-52) ALL CONSTRUCTION WORK ZONE SIGNS SHALL HAVE FLUORESCENT ING. THE FLUORESCENT ING SHALL MEET THE REQUIREMENTS OF ASTM D4956 (LATEST REVISION). THE MANUFACTURER SHALL FURNISH A TYPE 'D' CERITFICATION IN ACCORDANCE WITH O.T.A. STANDARD SPECIFICATIONS (CURRENT EDITION) SUB THE CERTIFICATION SHALL INCLUDE TEST RESULTS ON MATERIAL SUBMITTED FOR APPROVAL. THE CONTRACTOR SHALL PROVIDE A PERSON, 24 HOURS A DAY, SEVEN DAYS A WEEK, AT THE CONSTRUCTION SITE TO MAINTAIN AND KEEP ALL TRAFFIC CONTROL DEVICES IN POSITION ANYTIME TRAFFIC IS DIRECTED AWAY FROM THE NORMAL TRAFFIC LANES OR ANYTIME THE ENGINEER DEEMS IT NECESSARY. ANY USED * TO BE PLACED ON THIS PROJECT SHALL ITEM 855(A) 857(A) 857(F) (A) 877(A) 880(A) TRAFFIC PAY QUANTITIES - BRIDGE 7.2 TRAFFIC STRIPE (PLASTIC)(6" WIDE) PAVEMENT MARKING REMOVAL (TRAFFIC STRIPE) DELIVER PORTABLE DESCRIPTION UNIT QUANTITY 823 (SP) PORTABLE TRAFFIC SIGNAL SYSTEM (TC-80) (TC3) CONSTRUCTION TRAFFIC STRIPE (PAINT)(4" WIDE) (SP)(TC7,20,21,61,75) LF (SP) CONSTRUCTION ZONE IMPACT ATTENUATOR TRUCK MOUNTED ATTENUATOR (SP) ARROW DISPLAY (TYPE C) LF (TC-22,70) LF (SP-2)(TC-52) (TC,2) LF (TC-76,77) (B) RELOCATION OF PORT. (TC) LF THE CONTRACTOR SHALL UTILIZE FALSEWORK AND JACKING TO MAINTAIN THE CAMBER OF THE WEST EXTERIOR DURING REPAIR OPERATIONS. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE ADEQUACY OF THE FALSEWORK AND THE SAFETY OF THE BRIDGE AND TRAVELING PUBLIC DURING THIS WORK. DAMAGE TO THE STRUCTURE DUE TO JACKING OPERATIONS, SETTLEMENT OR FAILURE OF THE SHALL BE REPAIRED TO SERVICEABLE CONDITION THE CONTRACTOR, AT HIS EXPENSE, TO THE SATISFACTION OF THE ENGINEER. THE NEW SHALL BE COMPLETELY INSTALLED BEFORE REMOVING FALSEWORK OR JACKING. TRAFFIC CONTROL FOR THE WEST EXTERIOR ON HIAWASSEE ROAD SHALL BE MAINTAINED AS LONG AS FALSEWORK REMAINS IN PLACE. ALL COSTS OF HILTI ANCHORS AND GROUTING HOLES IN BRIDGE DECK FOR THE (TC-61) BE SUBJECT TO INSPECTION AND APPROVAL, THE OKLAHOMA TURNPIKE AUTHORITY, TO ASSURE THAT THEY ARE IN GOOD WORKING CONDITION, PRIOR TO PLACEMENT ON THE PROJECT. THESE DEVICES SHALL MEET ALL NCHRP-350, TL-3 CRITERIA. * CHANGEABLE MESSAGE SIGN (EXEMPT FROM NCHRP-350 REQUIREMENT) CONST. ZONE IMPACT ATTENUATOR ANY DAMAGE TO A FINISHED OR EXISTING SURFACE RESULTING FROM THE CONTRACTORS NEGLIGENCE IN THE REMOVAL OF CONSTRUCTION ZONE PAVEMENT MARKERS OR CHANNELIZING DEVICES AND THE BITUMINOUS ADHESIVE USED IN THEIR INSTALLATION, SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE AND TO THE SATISFACTION OF THE ENGINEER 880(J) 880(K) 882(A) ITEM 880(B)) 880(B) (SP) CONSTRUCTION TRAFFIC CONTROL (SP) SURVEILLANCE OF TRAFFIC CONTROL (SP) CHANGEABLE MESSAGE SIGNS LUMP SUM TRAFFIC PAY ITEMS - BRIDGE 7.2 DESCRIPTION CONSTRUCTION SIGNS 0 TO 6.25 SF CONSTRUCTION SIGNS 6.26 TO SF (TC-33) (TC-33) (TC-25)(G-72) LS UNIT (TC-39) (TC-52,85) F:\Projects\ \_TRNS\DGN\Turner Turnpike\Turner-7.2_\PQ_NOTES_01.dgn DYWIDAG RODS SHALL BE INCLUDED IN THE LUMP SUM PRICE BID FOR FALSEWORK AND JACKING. IF THE CONTRACTOR ELECTS NOT TO UTILIZE FALSEWORK AND JACKING, HE MUST PROVIDE TO THE ENGINEER DOCUMENTATION, SIGNED AND SEALED A PROFESSIONAL ENGINEER CURRENTLY REGISTERED WITH THE STATE OF OKLAHOMA BOARD OF LICENSURE FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS, VALIDATING ALTERNATE METHODS OF SUPPORT OF DECK LOADS DURING PROPOSED REPAIR OPERATIONS OR, IF SUPPORT IS NOT TO BE USED, VERIFYING THE FEASIBILITY OF THE REPAIRS UNDER CONCRETE DEAD LOADS. THIS DOCUMENTATION SHOULD STATE THAT THE CONTRACTOR ASSUMES RESPONSIBILITY FOR THE SUPPORT METHOD CHOSEN, IF ANY, AND ANY DAMAGE TO THE STRUCTURE DUE TO THE IMPLEMENTATION OF THE CONTRACTOR'S REPAIR METHODS. CHANGES IN FALSEWORK AND JACKING WILL NOT RESULT IN CONSIDERATION OF SAVINGS AS DESCRIBED IN E.2, VALUE ENGINEERING PROPOSAL THE CONTRACTOR. TRAFFIC SURVEILLANCE,POLICE TRAFFIC SURVEILLANCE, POLICE WILL NOT BE A PART OF THIS CONTRACT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING HIS ANTICIPATED WEEKLY SCHEDULE TO THE OTA ON-SITE REPRESENTATIVE ONE (1) WEEK IN ADVANCE OF THE WORK. THE WORK SCHEDULE WILL INCLUDE THE DAYS IN WHICH TRAFFIC SURVEILLANCE, POLICE IS REQUESTED AND WILL BE SUBJECT TO THE APPROVAL OF THE ENGINEER. THE OTA WILL COORDINATE WITH THE OKLAHOMA HIGHWAY PATROL TO DETERMINE THE OF OFFICERS AND SCHEDULE REQUIRED FOR THE PROJECT. TRAFFIC PAY NOTES (TC) THE CONTRACTOR SHALL FURNISH AND INSTALL SUCH LIGHTS, SIGNS, BARRICADES, AND PROVIDE FLAGGERS NECESSARY FOR THE CONTROL, SAFETY, AND MAINTENANCE OF TRAFFIC WHEN INSTALLING, RELOCATING OR DELIVERING PRECAST CONCRETE MEDIAN BARRIER. (TC-2) QUANTITY INCLUDES SUFFICIENT LENGTH OF MEDIAN BARRIER TO PROVIDE FOR THE LONGEST SHOWN ON THE PLANS. THIS SAME BARRIER WILL BE USED ON OTHER DETOUR PHASES. (TC-70) THIS ITEM IS AN ESTIMATED QUANTITY TO BE USED AS DEEMED NECESSARY THE ENGINEER. (TC-75) TEMPORARY PAVEMENT MARKINGS SHALL BE IN PLACE THE SAME DAY THAT EXISTING PAVEMENT MARKINGS ARE REMOVED FROM ANY ROADWAY OPEN TO TRAFFIC. ALSO, ALL TEMPORARY PAVEMENT MARKINGS SHALL BE REMOVED PRIOR TO THE INSTALLATION OF FINAL STRIPING. (TC-76) ANY TRUCK MOUNTED ATTENUATOR USED ON THIS PROJECT SHALL HAVE PASSED ALL MANDATORY AND OPTIONAL TESTS LISTED IN NCHRP 350, TL-3 CRITERIA. THIS ITEM IS TO BE USED WHERE SHOWN IN THE STANDARD DRAWINGS OR AT THE DISCRETION OF THE ENGINEER ON SHADOW VEHICLES PROTECTING THE WORK AREAS AND TEMPORARY ROADSIDE HAZARDS. (TC-77) TRUCK MOUNTED ATTENUATORS ARE TO BE INSTALLED ON NON-STATE OWNED TRUCKS HAVING A MINIMUM GROSS WEIGHT RATING OF 15,000 POUNDS. EACH OF THESE TRUCKS SHALL ALSO BE EQUIPPED WITH AN ARROW DISPLAY (TYPE B). STAND- OR REPLACEMENT. THIS STAND- UNIT SHALL BE IMMEDIATELY ACCESSIBLE TO REPLACE A DAMAGED, STOLEN OR MALFUNCTIONING UNIT. THE AMOUNT OF TIME BETWEEN THE REMOVAL OF THE DAMAGED UNIT AND THE INSTALLATION OF THE STAND- UNIT SHALL BE NO MORE THAN TWENTY-FOUR (24) HOURS. (TC-84) 15 CONSTRUCTION CALENDAR DAYS WERE USED TO COMPUTE THE SIGN DAY PAY ITEMS. THE AMOUNT OF CALENDAR DAYS USED TO COMPUTE THE SIGN DAY PAY ITEMS IS AN ESTIMATED QUANTITY ONLY, BASED ON THE CURRENT O.D.O.T. STANDARDS AND SUGGESTED CONSTRUCTION SEQUENCE FOR THIS PROJECT. THESE ESTIMATED SIGN DAY QUANTITIES MAY CHANGE AS THE PROJECT'S CONSTRUCTION TRAFFIC CONTROL IS MODIFIED DURING CONSTRUCTION. 880(B) 880(C) 880(C) 880(E) 880(F) ITEM 645(A) CONSTRUCTION SIGNS TO SF CONSTRUCTION BARRICADES (TYPE III) WING BARRICADES WARNING LIGHTS (TYPE A) DRUMS (TC-33) (TC-84) (TC-33) PART B - PROJECT SITE RENTAL DESCRIPTION UNIT QUANTITY PROJECT SITE RENTAL $/PSRD PAY QUANTITIES AND PAY ITEM NOTES 4

5 ! HIAWASSEE ROAD AND any BRIDGE Addendums are properly distributed. 12'-0" LANE! WESTBOUND 12'-0" LANE EXIST. EXIST. 7'-4" 7'-4" 12'-0" LANE APPROX. LIMITS OF HEAT STRAIGHTENING! EASTBOUND 12'-0" LANE END EXIST. EXIST. 7'-4" HEAT STRAIGHTEN EXIST. W14x30 DIAPHRAGM AND REPAIR CONNECTIONS 1'-6" 3'-0"! PIER NO. 1! PIER NO. 2 REPLACEMENT! PIER NO. 3 ** APPROX. LIMITS OF HEAT STRAIGHTENING FR. FACE BKWALL. 22'ž" SPAN NO. 1 39'-5 " SPAN NO. 2 39'-7 " SPAN NO. 3 22'ž" SPAN NO. 4 FR. FACE BKWALL. ABUT. NO. 1 ABUT. NO. 2 FRAMING PLAN NOTE: ALL DIMENSIONS SHOWN ABOVE ARE TAKEN FROM AS BUILT PLANS MEASURED ALONG LINES. 2'-5 " 6'-9" 6'-9" 6'-9" 6'-9" 6'-9" 2'-5 " JACKING POINTS THE CONTRACTOR SHALL USE JACKING POINTS TO MAINTAIN CAMBER DURING REPAIRS. ** DIMENSION OF REPLACEMENT SUPPORT A B C D E F IS APPROXIMATE. FINAL ATTACHMENT DIMENSION TO BE DETERMINED IN ASSEMBLY SPA. THE FIELD, BUT SHOULD ENCOMPASS ENTIRE AREA OF PUNCTURE AND ANY OTHER CRACKED OR TORN S OF THE WEB AND BOTTOM FLANGE. AS SHOWN A FALSEWORK JACKING POINTS A JACKING AMOUNT, IN F:\Projects\ \_TRNS\DGN\Turner Turnpike\Turner-7.2_\FRAM.dgn! PIER NO. 2 1'-3" BRACE HEAT STRAIGHTEN EXIST. WEST ASSEMBLY 1'-6" EXIST. W14x30 (BEYOND) EXTERIOR SPA. AS AND REPAIR DIAPHRAGM 3'-0" SHOWN CONNECTIONS 5 " 5 "! BRG. REPLACEMENT! BRG. ** APPROX. LIMITS OF HEAT STRAIGHTENING 39'-7 " SPAN NO. 3 SPAN NO. 3 WEST ELEVATION - LOOKING EAST A! PIER NO. 3 B C D E F FRAMING PLAN & REPAIR DETAIL 5

6 1 " DIA. HOLES 1 " TYP. 1 " TYP. 2'-4 " 3" 1 " 7" 1 " 1"x6"x11" PLATE 1 " DIA. used as a basis for bid. HOLES The Contractor 5" any Addendums are properly 2 " distributed. 2 " 1'-0" STIFFENER PLATE 5" 6" 7" TOP OF CURB GUTTER LINE! 3 " 3 " 7 " 7 " 1'1" HP 10x42 1" DIA. DYWIDAG ALL THREAD WITH HEAVY HEX NUTS (6-NUTS EA. ALL THREAD) 1x6x0'1" { 2 " 1 " 8 " 8" 1 " 5" " DIA. HOLES L3x3x BOTT. SIDE TOP \ L3x3x CENTER OVER DAMAGED 1"x7"x1'-0" PLATE JACKING ASSEMBLY PLAN 4ƒ" 1 " 1 " 5" 1 " 8" HP 10x42 STIFFENER PLATE BRACE { CONNECTION TOP \ CONNECTION 4" DIA. DYWIDAG ALL THREADS 2" TYP. 2-HP10x42x1'1" 3 " 3 " 1 " COPE WASHERS 16 2x4ƒx8 " STIFFENER {'S )) 2 " (( STIFFENER {'s HP 10x42x1'-4"! BRACE { 3'-7 "! FALSEWORK 2 2x6x0'0" { HYDRAULIC JACK HYDRAULIC JACK 2 4x4ƒx8 " STIFFENER {'S 4x6x0'1" { STIFFENER {'S 1'-4" 10 x1'-4" BEARING SHIM { BRACE { AT BEARING x8x0'-8" L3x3x F:\Projects\ \_TRNS\DGN\Turner Turnpike\Turner-7.2_\JACKING_ASSEM.DGN STIFFENER {'S )) )) 2x7x1'-0" {'S 7 " 7 "! DAMAGED 3'0" (FROM EXIST. PLANS) TYPICAL JACKING ASSEMBLY 1x7x1'-0" {'S 2 2x5x2'-4" STIFFENER JACKING POINTS &! BEARINGS JACKING ASSEMBLY ELEVATION 2 4x4ƒx8 " STIFFENER {'S " 10 " BEARING ELEVATION 1'-4" STIFFENER {'s HP 10x42x1'-4" 10 x1'-4" BEARING SHIM { BEARING SHIM PLATE DETAIL ƒ " 4 2" DIA. HILTI HVA ANCHOR BOLTS EMBED 4 " W/HVU ADHESIVE CAPSULES. (OR OWNER APPROVED EQUIV) WITH DECK. ELEVATION! DAMAGED NOTE: UPON COMPLETION OF REPAIR, DYWIDAG RODS SHALL BE REMOVED AND HOLES IN DECK FILLED WITH NON-SHRINK GROUT. HILTI ANCHORS USED FOR BRACE { SHALL BE CUT FLUSH BRACING ASSEMBLY DETAIL DETAIL OF JACKING AND BRACING ASSEMBLIES 6

7 EXIST. SLAB FALSEWORK 2'0" EXIST. CURB & RAIL NEW ST6x20.4x0'-7 " HEAT STRAIGHTEN EXISTING W14x30 DIAPHRAGM AND WELD TO NEW ST6x20.4 CONNECTION NOTE: PLATE. ALL NEW BOLTED CONNECTIONS SHALL BE " DIA. HIGH STRENGTH BOLTS. FIELD DRILL HOLES IN NEW WEB FOR BOLTED DIAPHRAGM CONNECTION B-B HEAT STRAIGHTEN EXISTING DIAPHRAGM CUT LINE NOTE: ALL NEW BOLTED CONNECTIONS B B 1'-3" NEW EXISTING EXISTING SHALL BE " DIA. HIGH STRENGTH BOLTS. FIELD DRILL HOLES IN NEW WEB FOR EXISTING BOLTED DIAPHRAGM NEW ST6x20.4x0'-7 " CONNECTION 7'-4" EXIST. SPACING A-A 3'0" SEE WEB SPLICE DETAIL CUT LINE 1'-3" ** NEW 3-8 { "x3" NEW 60 " MAX. G CUT LINE " MAX. 60 NEW 60 G G CUT LINE ALTERNATE I ALTERNATE WEB SPLICE DETAILS ** DIMENSIONS OF NEW ARE F:\Projects\ \_TRNS\DGN\Turner Turnpike\Turner-7.2_\STLDET.DGN ** 1'-3" (( R 5" NEW (( 2 R5" SEE DETAIL 'A' WEB CUTTING DETAIL 1Š " 1Š " 30 6 " 1ƒ " MAX. 45 " 3ƒ" " MAX. R= " NEW EXISTING DETAIL 'A' APPROXIMATE. FINAL DIMENSIONS TO BE DETERMINED IN THE FIELD, BUT SHOULD ENCOMPASS ENTIRE AREA OF PUNCTURE AND ANY OTHER CRACKED OR TORN S OF WEB AND BOTTOM FLANGE. REPAIR DETAIL 7

8 panelsizes:min.:24x24,std.:30x30,exp.:36x36,fwy.:48x48 panelname:w4 panelsizes:min.:18x24,std.:24x30,exp:36x48,fwy.:48x60 panelstyle:regulatory.ssi panelname:r2 levels:gscolorfill GSBWFILL GSOUTLINE constructpanels:0 0 0 panelstyle:merge.ssi panelstandard:1 panelsizes: version:1 panelsizes:min.:30x30,std.:36x36,exp.:36x36,fwy.:48x48 panelname:w4-2 panelsizes:min.:12x18,std.:18x24,spcl.:24x30,exp.:30x36,fwy.:36x48 panelname:w1-8 (2) CS8E (2) CS7E (2) CS6E 1,000' 1000' (2) CG20A (2) WING BARRICADES IN WORK ZONE PHONES" SIGNS (2) "NO CELL PLEASE STAY ALERT (2) W3-5() 1 MILE (2) W20(1 MILE) 1,320' (2) R2F() LIMIT SPEED 1,320' RIGHT LANE (2) W20-5(R)(1/2 MILE) CLOSED 1/2 MILE 1000' MATCHLINE 'A' N.T.S. (3) TYPE III BARRICADES (6) TYPE 'A' LIGHTS MATCHLINE 'A' 1000' REMOVE AND REPLACE ANY CONFLICTING PAVEMENT MARKINGS 300' SHLDR. TAPER (4) DRUMS (3) W1-6 ARROW DISPLAY (TYPE C) 900' MERGING TAPER I-44 WESTBOUND SOLID WHITE EDGE LINE MATCHLINE 'B' SIGN NO. 11 CONSTRUCTION (2) W4-2(R) PASS NOT (2) R4F DO (2) R2F(XX) (2) CS4F (2) CS3F (18) 50' C/C (18) W1-8 F:\Projects\ \_TRNS\DGN\Turner Turnpike\Turner-7.2_\TRAFDET_01.dgn MATCHLINE 'B' REMOVE AND REPLACE ANY CONFLICTING PAVEMENT MARKINGS I-44 WESTBOUND SOLID WHITE EDGE LINE 900' MERGING TAPER (2) TYPE III BARRICADES LANE (4) TYPE 'A' LIGHTS CLOSED (2) R11-2(LANE) (1) CZ ATTENUATOR 450' TANGENT (BUFFER) (8) 50' C/C KEEP (4) R4-7A(L) (EVERY OTHER DRUM) LEFT 350 L.F. PORTABLE LONGITUDINAL BARRIER (150' TANGENT, 200' TAPER) HIWASSEE ROAD 100' SHLDR. TAPER (5) DRUMS 50' WORK AREA SOUTHBOUND LANE CLOSED LANE CLOSURE / RAMP CLOSURE NOTES PHASE ONE (G-72) THE ENGINEER SHALL BE NOTIFIED THE CONTRACTOR TWO (2) WEEKS PRIOR TO ALL CONSTRUCTION ACTIVITIES THAT REQUIRES A LANE/RAMP/TOLL FACILITY CLOSURE. FAILURE TO ADEQUATELY NOTIFY THE ENGINEER WILL RESULT IN A SHUTDOWN NOTICE BEING ISSUED FOR THE WORK REQUIRING THE LANE/RAMP/TOLL FACILITY CLOSURE. IF THE CONTRACTOR FAILS TO GIVE THE PROPER NOTIFICATION, A LANE RENTAL PENALTY OF $10,000 PER HOUR PER LANE PER MILE WILL BE APPLIED UNTIL SUCH TIME AS THE CAPACITY IS RESTORED. (G-73) ANY DEVIATION FROM THE PLANS WITHOUT PRIOR WRITTEN NOTICE WILL RESULT IN A SHUTDOWN NOTICE. (2) G20-2A CONTROL DETAIL 8 LIMIT 75 I-44 CONSTRUCTION TRAFFIC (2) R2F(75) SPEED

9 panelsizes:min.:24x24,std.:30x30,exp.:36x36,fwy.:48x48 panelname:w4 panelsizes:min.:18x24,std.:24x30,exp:36x48,fwy.:48x60 panelstyle:regulatory.ssi panelname:r2 levels:gscolorfill GSBWFILL GSOUTLINE constructpanels:0 0 0 panelstyle:merge.ssi panelstandard:1 panelsizes: version:1 panelsizes:min.:30x30,std.:36x36,exp.:36x36,fwy.:48x48 panelname:w4-2 panelsizes:min.:12x18,std.:18x24,spcl.:24x30,exp.:30x36,fwy.:36x48 panelname:w1-8 (2) CS8E (2) CS7E (2) CS6E 1,000' 1000' 1,320' 1,320' 1000' (2) CG20A (2) WING BARRICADES IN WORK ZONE PHONES" SIGNS (2) "NO CELL PLEASE STAY ALERT (2) W3-5() 1 MILE (2) W20(1 MILE) (2) R2F() LIMIT SPEED 1/2 MILE CLOSED (2) W20-5(L)(1/2 MILE) LEFT LANE MATCHLINE 'A' N.T.S. (3) TYPE III BARRICADES (6) TYPE 'A' LIGHTS MATCHLINE 'A' 1000' REMOVE AND REPLACE ANY CONFLICTING PAVEMENT MARKINGS 300' SHLDR. TAPER (4) DRUMS (3) W1-6 ARROW DISPLAY (TYPE C) 900' MERGING TAPER I-44 WESTBOUND SOLID YELLOW EDGE LINE MATCHLINE 'B' SIGN NO. 10 CONSTRUCTION (2) W4-2(L) PASS NOT (2) R4F DO (2) R2F() (2) CS4F (2) CS3F (18) 50' C/C (18) W1-8 F:\Projects\ \_TRNS\DGN\Turner Turnpike\Turner-7.2_\TRAFDET_02.dgn MATCHLINE 'B' REMOVE AND REPLACE ANY CONFLICTING PAVEMENT MARKINGS I-44 WESTBOUND SOLID YELLOW EDGE LINE 900' MERGING TAPER (2) TYPE III BARRICADES LANE (4) TYPE 'A' LIGHTS CLOSED (2) R11-2(LANE) (1) CZ ATTENUATOR 450' TANGENT (BUFFER) (8) 50' C/C KEEP (4) R4-7A(R) (EVERY OTHER DRUM) RIGHT 350 L.F. PORTABLE LONGITUDINAL BARRIER (150' TANGENT, 200' TAPER) 100' SHLDR. TAPER (5) DRUMS HIWASSEE ROAD SOUTHBOUND LANE CLOSED 50' WORK AREA PHASE TWO LANE CLOSURE / RAMP CLOSURE NOTES (G-72) THE ENGINEER SHALL BE NOTIFIED THE CONTRACTOR TWO (2) WEEKS PRIOR TO ALL CONSTRUCTION ACTIVITIES THAT REQUIRES A LANE/RAMP/TOLL FACILITY CLOSURE. FAILURE TO ADEQUATELY NOTIFY THE ENGINEER WILL RESULT IN A SHUTDOWN NOTICE BEING ISSUED FOR THE WORK REQUIRING THE LANE/RAMP/TOLL FACILITY CLOSURE. IF THE CONTRACTOR FAILS TO GIVE THE PROPER NOTIFICATION, A LANE RENTAL PENALTY OF $10,000 PER HOUR PER LANE PER MILE WILL BE APPLIED UNTIL SUCH TIME AS THE CAPACITY IS RESTORED. (G-73) ANY DEVIATION FROM THE PLANS WITHOUT PRIOR WRITTEN NOTICE WILL RESULT IN A SHUTDOWN NOTICE. (2) G20-2A CONTROL DETAIL 9 LIMIT 75 I-44 CONSTRUCTION TRAFFIC (2) R2F(75) SPEED

10 panelstyle:regulatory.ssi panelname:r10-6 panelmounting:1 RED YELLOW GREEN 1000 FT 1/2 MILE 1 MILE panelstyle:regulatory.ssi panelname:r10-6 panelmounting:1 1,000 L.F. SOLID DOUBLE YELLOW BARRIER LINE the engineer of HIWASSEE Record to ensure ROAD that (1) W3-3 24" SOLID WHITE PORTABLE SIGNAL TRAILER 200 L.F. PORTABLE EASTBOUND I-44 WESTBOUND I-44 CLOSED LANE 200' TANGENT (7) 25' C/C 750 L.F. PORTABLE 200 L.F. PORTABLE STOP LINE TRUCK MOUNTED ATTENUATOR (14 TO 1 TAPER) (14 TO 1 TAPER) 2,640' 1,640' 200' TANGENT (7) 25' C/C (2) WING BARRICADES 1 MILE (1) W20(1 MILE) 1/2 MILE (1) W20(1/2 MILE) 1000 FT (1) W20-4(1,000') GREEN YELLOW (1) W3-3 RED (IN PLACE) (1) R ' SHOULDER TAPER (5) 25' C/C 100' SHIFTING TAPER (4) 25' C/C 350 L.F. PORTABLE (TANGENT ) FOR TRAFFIC CONTROL ON EASTBOUND LANES DURING OVERHEAD BRIDGE REPAIRS, SEE NO. 7 & 8. WESTBOUND I ' SHIFTING TAPER (4) 25' C/C 100' SHOULDER TAPER (5) 25' C/C (1) R10-6 (IN PLACE) (1) W3-3 (1) W20-4(1,000') (1) W20(1/2 MILE) (1) W20(1 MILE) (2) WING BARRICADES (7) 25' C/C 200 L.F. PORTABLE (14 TO 1 TAPER) 200' TANGENT (7) 25' C/C 350 L.F. PORTABLE (TANGENT ) EASTBOUND I ' TANGENT 1,640' 2,640' F:\Projects\ \_TRNS\DGN\Turner Turnpike\Turner-7.2_\TRAFDET_03.dgn WORK AREA 750 L.F. PORTABLE 24" SOLID WHITE STOP LINE 200 L.F. PORTABLE (14 TO 1 TAPER) TRUCK MOUNTED ATTENUATOR PORTABLE SIGNAL TRAILER FOR TRAFFIC CONTROL ON EASTBOUND LANES DURING OVERHEAD BRIDGE REPAIRS, SEE NO. 7 & 8. LANE CLOSURE / RAMP CLOSURE NOTES (G-72) THE ENGINEER SHALL BE NOTIFIED THE CONTRACTOR TWO (2) WEEKS PRIOR TO ALL CONSTRUCTION ACTIVITIES THAT REQUIRES A LANE/RAMP/TOLL FACILITY CLOSURE. FAILURE TO ADEQUATELY NOTIFY THE ENGINEER WILL RESULT IN A SHUTDOWN NOTICE BEING ISSUED FOR THE WORK REQUIRING THE LANE/RAMP/TOLL FACILITY CLOSURE. IF THE CONTRACTOR FAILS TO GIVE THE PROPER NOTIFICATION, A LANE RENTAL PENALTY OF $10,000 PER HOUR PER LANE PER MILE WILL BE APPLIED UNTIL SUCH TIME AS THE CAPACITY IS RESTORED. (G-73) ANY DEVIATION FROM THE PLANS WITHOUT PRIOR WRITTEN NOTICE WILL RESULT IN A SHUTDOWN NOTICE. (1) W3-3 HIWASSEE ROAD 1,000 L.F. SOLID DOUBLE YELLOW BARRIER LINE HIAWASSEE ROAD CONSTRUCTION TRAFFIC CONTROL DETAIL 10

NOT FOR CONSTRUCTION AND BIDDING Preliminary plan sheets are for information purposes only. The preliminary plans shall not be used as a basis for

NOT FOR CONSTRUCTION AND BIDDING Preliminary plan sheets are for information purposes only. The preliminary plans shall not be used as a basis for NOT FOR CONSTRUCTION AND BIDDING SHEET NO. OKLAHOMA TURNPIKE AUTHORITY 4/17/2017 NOT FOR CONSTRUCTION AND BIDDING OLSSON ASSOCIATES PROJECT ENGINEERS SHEET ENGINEER CONTRACT NO. NUMBER OLSSON T-ER-021

More information

SECTION 616 TEMPORARY TRAFFIC CONTROL

SECTION 616 TEMPORARY TRAFFIC CONTROL SECTION 616 TEMPORARY TRAFFIC CONTROL 616.1 Description. This work shall consist of furnishing, installing, operating, maintaining, cleaning, relocating and removing temporary traffic control devices and

More information

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4 x 4 x 3/8 Brace. C8 x 4.25 Strut. WT9 x 17.5. Sign length minus Adjust to avoid interference with sign legend A Deck fascia A 6" Equal Equal 6" Sign length (L) varies 6 to 12 PLAN 0 CONNECTION (DECK FASCIA) Angle connection assembly F Face of concrete

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) 686.1. Description. This Item shall govern for designing, fabricating, furnishing and erecting steel traffic signal pole assemblies of the various types

More information

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS Delete this Section in its entirety and replace with the following: SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS 905-1 DESCRIPTION: This

More information

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY 805.1 DESCRIPTION Provide, erect, maintain and remove traffic control devices as shown in the Contract Documents. On roadways that carry traffic through

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT MAINE TURNPIKE AUTHORITY ADDENDUM NO. CONTRACT 08.09 BRIDGE REPAIRS RUNNING HILL ROAD UNDERPASS (MILE 5.) BLACKSTRAP ROAD UNDERPASS (MILE 58.3) WEYMOUTH ROAD UNDERPASS (MILE 66.) SUPERSTRUCTURE REPLACEMENT

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

SPECIFICATIONS FOR ERECTION OF PRECAST PRESTRESSED CONCRETE GIRDERS

SPECIFICATIONS FOR ERECTION OF PRECAST PRESTRESSED CONCRETE GIRDERS SPECIFICATIONS FOR ERECTION OF PRECAST PRESTRESSED CONCRETE GIRDERS 1.0 DESCRIPTION The Work shall consist of:.1 Transportation, unloading, and erection of precast prestressed concrete girders;.2 Supply

More information

CITY OF SANTA ANA PROPOSAL PROJECT NO.: CHESTNUT AVE & BUSH/CYPRESS BIKE LANES FAID#: U58DP005861

CITY OF SANTA ANA PROPOSAL PROJECT NO.: CHESTNUT AVE & BUSH/CYPRESS BIKE LANES FAID#: U58DP005861 PROPOSAL BID PROPOSAL TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: REQUIREMENT: The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined

More information

PREFABRICATED STEEL TRUSS SPECIFICATIONS

PREFABRICATED STEEL TRUSS SPECIFICATIONS PREFABRICATED STEEL TRUSS SPECIFICATIONS 1. GENERAL 1.1 Scope All engineering design and related detailing of the bridge(s) shall be provided by the supplier. The design and detailing shall conform to

More information

CITY OF FARGO SPECIFICATIONS SIGNING

CITY OF FARGO SPECIFICATIONS SIGNING SIGNING PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of furnishing all labor, material and accessories necessary to complete

More information

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2) Installation Manual Orion TL-3 Steel Barrier VHD (v2) 300914 Table of Contents Orion Introduction.......... 3 Limitations & Warnings. 4 Before Installation..... 3 System Design & Design Considerations

More information

Table of Contents. List of Appendices

Table of Contents. List of Appendices Table of Contents Page Executive Summary 3 Description of Project 3 TMP Roles and Responsibilities 3 Area Engineer 3 Communications Office 4 TMP Monitoring 4 Existing and Future Conditions 4 Traffic Counts

More information

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier 2.11 HIGH TENSION CABLE BARRIER 2.11.1 GENERAL This Work consists of the supply, installation, removal, disposal and reinstallation of High Tension Cable Barrier (HTCB) system. 2.11.2 DEFINITIONS AND INTERPRETATION

More information

REQUEST FOR PROPOSAL Asphalt & Concrete Repair

REQUEST FOR PROPOSAL Asphalt & Concrete Repair REQUEST FOR PROPOSAL 2017 Asphalt & Concrete Repair English Landing Elementary School Union Chapel Elementary School Lakeview Middle School Park Hill High School Prairie Point Elementary School Congress

More information

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION PLATE CONNECTED WOOD TRUSSES SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson

More information

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017 SECTION 055213 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

DETAILS OF LAMINATED NEOPRENE BEARING PAD ASSEMBLY

DETAILS OF LAMINATED NEOPRENE BEARING PAD ASSEMBLY BR8_neo_stl_fix Effective: Dec. 03 Supercedes: Oct. 03 EP 75. Bearings Use current standard sheet found in ProjectWise under Bridge/A Bridge Standard Drawings/Bearings/Current/ to BENT NO. A Surface of

More information

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS SECTION 11000 MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section contains general information required to install mechanical equipment as shown on the plans and

More information

SECTION PREFABRICATED PIPE BRIDGE(s)

SECTION PREFABRICATED PIPE BRIDGE(s) SECTION 13135 - PREFABRICATED PIPE BRIDGE(s) PART 1 - GENERAL 1.01 Scope A. The Contractor is responsible for all engineering design, detailing, fabricating, installation including foundations for the

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

SECTION ALUMINUM GATES

SECTION ALUMINUM GATES P.O. Box 1058 370 South Athol Rd. Athol, Massachusetts 01331 Phone: (978) 249-7924 Fax: (978) 249-3072 SECTION ALUMINUM GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The CONTRACTOR shall furnish all labor,

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/21/2014 Project 140560 Addendum No. 2 PID No. 82972 HAM IR 275

More information

THE GOLD STAR MEMORIAL HIGHWAY

THE GOLD STAR MEMORIAL HIGHWAY ESTIMATED QUANTITIES ITEM NO. DESCRIPTION UNIT Beech Ridge Road Cider Hill Road Route 36 York Interchange Captain Thomas Road Two Rod Road North Street Tatnic Road Route On-Ramp Quantity Total Filenam

More information

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 9 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION SECTION STRUCTURAL STEEL CONSTRUCTION Page 392, subsection.01. Add the following bid items:

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK The professional services to be provided by the Consultant under this Agreement shall be as necessary to complete the required analyses, layouts,

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

Bridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE

Bridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE Bridge Manual - Part I - June 2007 5-1 CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE 5.1 GENERAL This chapter is intended to instruct the Designer in the preparation and submission of Special Provisions and

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

Aluminum Component Pipe Railings

Aluminum Component Pipe Railings 1 SECTION 05 7360 ALUMINUM COMPONENT PIPE RAILINGS PART 1 GENERAL 1.01 SECTION INCLUDES A. Aluminum component pipe handrails and railings. 1.02 RELATED REQUIREMENTS A. Section 02 9000: Landscaping: Installation

More information

SERIES G1A, G1B & G1C SLIDE GATES

SERIES G1A, G1B & G1C SLIDE GATES SERIES G1A, G1B & G1C SLIDE GATES T AB L E O F CONTENTS V e n d o r D a t a Ap p l i cation and Sp e ci f i cation Installation and Maintenance Instructions Limited Warranty 1 VENDOR DATA H ALLIDAY PRODUCTS,

More information

Table of Contents. List of Drawings

Table of Contents. List of Drawings SCOPE OF WORK Hastings Stadium Exhibition Park, 81 London Road, Guelph, Ontario Structural and Maintenance Remedial Work Prepared For City of Guelph City Hall, 1 Carden Street, Guelph, ON N1H 3A1 Prepared

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

I-94/I-69 Interchange Bridge Construction

I-94/I-69 Interchange Bridge Construction I-94/I-69 Interchange Bridge Construction General Project Information Let in August 2013 Cost of $76 million Prime Contractor Walter Toebe Construction Company Reconstruction of I-94 from Griswold to Lapeer

More information

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES PART 1 GENERAL 1.01 SCOPE A. This work shall consist of the underground construction of a pipeline across the state right-ofway, or other facility as indicated on the plans and as

More information

DuPage County Division of Transportation 421 N. County Farm Road Wheaton, IL / (Fax) 630/

DuPage County Division of Transportation 421 N. County Farm Road Wheaton, IL / (Fax) 630/ Within DuPage County Highway Rights-of-Way NOTE: All construction shall be performed and materials specified/installed according to IDOT S Standard Specifications for Road and Bridge Construction (latest

More information

Chapter 4 Bridge Program Drawings

Chapter 4 Bridge Program Drawings Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles

More information

SPECIFICATION : BORING AND JACKING

SPECIFICATION : BORING AND JACKING SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in

More information

MUTCD Part 6F: Temporary Traffic Control Zone Devices

MUTCD Part 6F: Temporary Traffic Control Zone Devices MUTCD Part 6F: Temporary Traffic Control Zone Devices 6F.01 Types of Devices FHWA policy requires that all roadside appurtenances such as traffic barriers, barrier terminals and crash cushions, bridge

More information

GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM

GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM - --- -- ----..-------~------------------------------------ GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION 07415 REROOFING ADJUSTABLE FRAMING SYSTEM PART 1 - GENERAL 1.01 SCOPE A.

More information

GENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE

GENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE FORWARD It shall be the responsibility of the person in charge to institute the placing of all appropriate cautionary devices and controls as may be required for the particular job. Traffic protection

More information

SPECIFICATIONS: Architectural Aluminum Railings

SPECIFICATIONS: Architectural Aluminum Railings PART ONE: GENERAL 1.1 SUMMARY SPECIFICATIONS: Architectural Aluminum Railings A. Work in this section includes custom and standard Interior and Exterior aluminum railings and guardrails. 1.2 PERFORMANCE

More information

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9080 - Concrete Steps, Handrails, and Safety Rail CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART - GENERAL.0 SECTION INCLUDES

More information

PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces

PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces TECHNICAL CORRECTION January 2017 Structural PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process

More information

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application Good for 90 days from the Date Issued This permit is only required if the work location is owned or controlled by the City of Homestead and

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options A local utility company issued a Request for Proposal to our university s capstone design class for structural improvements

More information

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals to provide a complete structural precast hollow core slab system as shown on the Contract

More information

Ohio Department of Transportation

Ohio Department of Transportation Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 Ted Strickland, Governor Jolene M. Molitoris, Director THE DEPARTMENT UTILIZES BID EXPRESS (http://www.bidx.com)

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

DALLAS/FORT WORTH INTERNATIONAL AIRPORT DESIGN, CODE AND CONSTRUCTION DEPARTMENT ADDENDUM NO. 2 FOR

DALLAS/FORT WORTH INTERNATIONAL AIRPORT DESIGN, CODE AND CONSTRUCTION DEPARTMENT ADDENDUM NO. 2 FOR DALLAS/FORT WORTH INTERNATIONAL AIRPORT DESIGN, CODE AND CONSTRUCTION DEPARTMENT ADDENDUM NO. 2 FOR TAXIWAY Y BRIDGE REINFORCEMENT FOR GROUP VI AIRCRAFT CONTRACT NO. 9500498 November 30, 2017 The Request

More information

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building May 8, 2017 ADDENDUM #1 IFB 17-082 Resin Floor System For Highway Department Central District Building Addendum #1 is being issued to offer an alternate resin flooring system. 096700 FLUID-APPLIED FLOORING

More information

TILE TILE

TILE TILE 09300 - TILE 09300-1 PART ONE: GENERAL 1.1 Description TILE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the requirements

More information

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT SAMPLE GUIDE FOR RESIDENTIAL DECKS revised 7 16 Call before you dig! 1 800 272 1000 New Jersey One Call. Utility Mark Out. THIS GENERIC GUIDE IS NOT ALL INCLUSIVE

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

Section 13. Guidelines for the Design of Ground Mounted Sign Supports Section 13 BDC11MR-04 13.1 Introduction Highway signs fall into two main categories, which are subdivided as follows: 1. Overhead Signs a. Sign Bridge Structures (GO) b. Sign Cantilever Structures (GO)

More information

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , & TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official record of this Technical Special Provision is the electronic file signed

More information

BEARING METAL STUD FRAMING

BEARING METAL STUD FRAMING L-1 Section 05410 Long Form Specification LOAD BEARING METAL STUD FRAMING This section includes axially loaded steel studs, with unique slotted top channels, usually of 0.91, 1.2 and 1.5 mm (16, 18, or

More information

53.20 PAINTED ROADWAY LINES

53.20 PAINTED ROADWAY LINES 53.20 PAINTED ROADWAY LINES 53.20.1 GENERAL The Work consists of supplying paint and painting roadway lines on pavement surfaces. The various configurations of roadway lines are shown in the Department

More information

SECTION WATERTIGHT GATES & BARRIERS FOR FLOOD & SPILL CONTROL

SECTION WATERTIGHT GATES & BARRIERS FOR FLOOD & SPILL CONTROL HIGHLIGHTED AREAS TO BE INSERTED BY SPECIFYING ENGINEER SECTION 08316 - WATERTIGHT GATES & BARRIERS FOR FLOOD & SPILL CONTROL PART 1 GENERAL 1.1 WORK OF THIS SECTION A. THE WORK OF THIS SECTION INCLUDES

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

LAGUARDIA COMMUNITY COLLEGE - CUNY August 3, 2009

LAGUARDIA COMMUNITY COLLEGE - CUNY August 3, 2009 SECTION 051200 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.01 SUMMARY A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK DIVISION 03 CONCRETE SPECIFICATION 031000: FORMS AND FORMWORK PART 1.0 GENERAL 1.1 DESCRIPTION The work of this specification includes furnishing of all labor, materials, equipment and incidentals to install,

More information

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

1. Vertical reciprocating conveyor, Hydraulic straddle VRC. PART 1: GENERAL 1.01 Section Includes: 1. Vertical reciprocating conveyor, Hydraulic straddle VRC. a. Machine, controller, platform, structural steel hoist frame. b. Wire mesh enclosure and gates. Related

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Steel pipe hangers and supports. 2. Metal framing systems. 3. Thermal-hanger shield inserts. 4. Fastener systems.

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

PIP STF05521 Details for Angle Railings for Walking and Working Surfaces

PIP STF05521 Details for Angle Railings for Walking and Working Surfaces TECHNICAL CORRECTION January 2017 Structural PIP STF05521 Details for Angle Railings for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

BRIDGE GIRDERS TECHNICAL GUIDE

BRIDGE GIRDERS TECHNICAL GUIDE ARMTEC.COM BRIDGE MATERIALS / / TECHNICAL GUIDE REGIONal SPECIFICATIONS / AB / MB / SK PRECAST CONCRETE GIRDERS AND BEAMS DESIGNED TO SUPPORT BRIDGE DECKS AND TRAFFIC LOADS Proven strength In-house engineering

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

Scope of Work Bid Package C-3 - West Precast Concrete

Scope of Work Bid Package C-3 - West Precast Concrete Scope of Work Bid Package C-3 - West Precast Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

PIPE AND TUBE RAILINGS

PIPE AND TUBE RAILINGS SECTION 05521 - PIPE AND TUBE RAILINGS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

BID # REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER

BID # REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER BID # 14-47 REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER Board of Trustees Middlesex County College 2600 Woodbridge Avenue P.O. Box 3050 Edison, New Jersey

More information

STANDARD SPECIFICATIONS SECTION TUNNELING. A. Section includes requirements for constructing tunnels 48-inch and larger diameter.

STANDARD SPECIFICATIONS SECTION TUNNELING. A. Section includes requirements for constructing tunnels 48-inch and larger diameter. STANDARD SPECIFICATIONS SECTION 02420 TUNNELING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for constructing tunnels 48-inch and larger diameter. 1.2 DEFINITIONS A. Carrier Pipe: Sewer

More information

Chapter 8 WORK ZONE TRAFFIC CONTROLS

Chapter 8 WORK ZONE TRAFFIC CONTROLS October 31, 2009 Chapter 8 WORK ZONE TRAFFIC CONTROLS TABLE OF CONTENTS Page 8-1.00 INTRODUCTION..........................................................8-3 1.01 Purpose 1.02 Scope 1.03 Relation to Other

More information

Product Manual Release 05/17

Product Manual Release 05/17 Temporary Safety Barrier (TL-2 MASH) Product Manual VHD (v3) www.valmonthighway.com Table of Contents 1.0 ArmorZone Introduction... 3 2.0 Before Installation... 3 3.0 Limitations & Warnings... 3 4.0 System

More information

JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106.

JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106. JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106. There are notes in the plans regarding driving the test pile without the use of a follower. The

More information

SECTION ROLLER GATES

SECTION ROLLER GATES GENERAL SUMMARY A. The Contractor shall provide all labor, materials, equipment, and incidentals required to furnish and install roller gates, complete and operational with all necessary accessories as

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating

More information

Field Guide on. Safe Maintenance and. Work Zone Operations

Field Guide on. Safe Maintenance and. Work Zone Operations Field Guide on Installation and Removal of Temporary Traffic Control for Safe Maintenance and Work Zone Operations August 2008 Introduction This field guide provides field personnel with introductory guidance

More information

All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford

All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford Seymour Road Replacement Bridge Addendum #1 April 27, 2015 To: From: Cc: All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford RE: Construction Bid Information

More information

Town of Wascott Advertisement for Bids ROAD MAINTENANCE PROJECTS

Town of Wascott Advertisement for Bids ROAD MAINTENANCE PROJECTS Advertisement for Bids ROAD MAINTENANCE PROJECTS Notice is hereby given by the Town of Wascott, Douglas County, WI, that it will receive sealed bids for crack routing and sealing, chip seal coating, and

More information

ArmorZone TL-2 Barrier and End Treatment

ArmorZone TL-2 Barrier and End Treatment ArmorZone TL-2 Barrier and End Treatment Product and Installation Manual ANOTHER AMORFLEX DEVELOPMENT Table of contents Introduction 3 System Overview 3 Before Installation 3 Limitations and Warnings 4

More information

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

HIGH MAST CAMERA POLE ASSEMBLY GENERAL 10-3.24 HIGH MAST CAMERA POLE ASSEMBLY GENERAL The Contractor must furnish and install the following equipment for high mast camera pole assembly as described herein and as shown on the plans: 1. Camera

More information

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

SERIES G1G, G1H & G1I SLIDE GATES

SERIES G1G, G1H & G1I SLIDE GATES SERIES G1G, G1H & G1I SLIDE GATES T AB L E O F C O N T E NT S V e n d o r D a t a Ap p l i cation and S p e cifi cation Installation and Maintenance Instructions Limited Warranty 1 VENDOR DATA H ALLIDAY

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND RAIL-HWY PROJECT DEVELOPMENT GUIDE AND New procedures for Railroad Right-of-Entry Agreements & Bid Documents (SP Item 007) Bridge Division Webinar - July 18, 2013 GUIDE TO RAILROAD PROJECT DEVELOPMENT

More information