1 Florida Department of Environmental Protection Marjory Stoneman Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida Rick Scott Governor Carlos Lopez-Cantera Lt. Governor Noah Valenstein Secretary July 26, 2017 NOTICE TO APPLICANTS ADDENDUM NO. ONE (1) Paynes Prairie Preserve State Park DEP Bid NO. BDC69-16/17 TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE WITH YOUR BID SUBMISSION. NOTICE It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Mae Roth, Government Operations Consultant II, Bureau of Design and Construction, 3800 Commonwealth Blvd. MS520, Tallahassee, Florida Failure to do so may be grounds for rejection of the Bid. Signature of Contractor and Date The Following statements supersede & supplement the corresponding items in the specifications & drawings: 1. Question: Is replacing the top at the dump station part of the base bid? Response: Yes 2. Question: Will dump station have a replacement lid that is traffic rated with cast iron rings and covers or non-traffic rated lid and plastic risers and lids? Response: Dump Station lid shall be traffic rated with cast iron rings. 3. Question: Are there gopher tortoises at the ranger residence? Is the contractor responsible for permits/fees related to gopher tortoises? Response: There are a couple of burrows in the drain field at the campground, but it will not be the contractor s responsibility to relocate the gopher tortoises. DEP Bid No. BDC69-16/17, Addendum #1, Page 1 of
2 4. Question: Will the bathhouses be closed down while the work is going on? Response: The objective is to leave the campground open with either the septic tank or the lift station to collect effluent, and to be pumped out by truck as needed. Contractor should include the estimate for pump-outs in their bids. 5. Question: What are the pump specifications for bath house #2 and ranger residence pump systems for flow rate and head pressure? Response: Bathhouse #2 pump design operating point is ft total dynamic head (TDH). Pump motor is to be single phase, 230 VAC. The two (2) pumps that are called for in the plans for this tank shall be configured for automatic pump alternation, to equalize run time. The control panel shall provide for alternating lead-lag operation, with the lag pump-on setpoint set 0.20 feet (2.4 inches) above the lead pumpon setpoint, which is specified in the pump data table on sheet C 302. An example of an acceptable equal/alternate pump would be a Liberty Pumps FL62 6/10 hp, single phase, 230 VAC pump, provided the pumps are controlled using automatic pump alternation, as described above. Park Staff Residence pump design operating point is ft TDH. Pump motor is to be single phase, 115 VAC. An example of an acceptable equal/alternate pump would be a Liberty Pumps FL51A 1/2 hp, single phase, 115 VAC pump. Proposed equal/alternate equipment must be approved prior to installation. Submittal of cut sheets for proposed equal/alternate pumps will be required for review prior to approval. 6. Question: Is there a way to turn the waterline off during work? Response: Contractor shall coordinate with the park manager as needed to protect water supply and maintain service to as much of the campground as reasonably possible. Water service not to be cut off to both bathhouses simultaneously. 7. Question: Will the sidewalk at Bathhouse 1 need to be replaced? Existing asphalt sidewalk is 3/4 thick. Can we replace the sidewalk that is disturbed with the same thickness asphalt sidewalk? Response: Replace whatever is torn up, like for like. Same goes for ground disturbance of vegetation. 8. Question: Is the road running behind the campground drainfield within the park? Can it only be accessed by the main gate? Response: All roads are within the park and all access will be through the main park gate. DEP Bid No. BDC69-16/17, Addendum #1 Page 2 of 6
3 9. Question: What type of grass is approved for restoring ground over drain field mound and disturbed areas? Response: Brown top millet 10. Question: When will the gopher tortoises be moved? Response: Park staff will relocate gopher tortoises prior to the project start as to not impact construction. 11. Question: Is there a staging area at the campground/drain field that can be fenced off? Response: Coordinate with the park manager. 12. Question: What is the size of the septic tank at Bathhouse 1? Response: Size of the existing septic tank at Bathhouse 1 is unknown. See also question #16 and response, below. 13. Question: Is there a pump tank at the septic tank at Bathhouse 1? Response: No. 14. Question: Will the tank at bathhouse 1 continue to discharge into the existing gravity main? Response: Yes 15. Question: Is the well house more than 200 feet from Bathhouse 2? Response: Yes 16. Question: What are the septic tank specifications in Alternate #2, bath house #1 tank size, wall thickness, traffic rated lid, category tank? Response: For the purposes of Bid Alternate #2, a replacement tank would need to be a single compartment, Florida Septic, Inc. 6 1,500 gallon tank, Category 4, H20, State Approval No S-C4, or approved equal. 17. Question: What size tank at the dump station for Alternate #3? Response: Size of the existing tank at the RV dump station is unknown. For the purposes of Bid Alternate #3, a replacement tank would need to be a single compartment, Florida Septic, Inc. 6 2,300 gallon tank, Category 4, H20, State Approval No S-C4, or approved equal. 18. Question: What route does the water take down through the woods the to pump tank? Response: See attached design plans for the campground, no as-builts available. (NOTE, due to size restrictions on the Vendor Bid System, only the camping area water and sanitary piping plot plan sheet is attached to this pdf. The full set of plans are available and posted on the bid s ftp site where the rest of the project plans can be found. Please contact Mae Roth at mae.roth@dep.state.fl.us with any questions) DEP Bid No. BDC69-16/17, Addendum #1 Page 3 of 6
4 19. Question: The plans show a 525 gallon pump tank, what location is this for? Response: The 525 gallon and 1350 gallon tank details on sheet C 302 were shown in error and are associated with portions of the project that have been removed from the scope of this bid. 20. Question: No outlet filters are shown for the septic tanks. What system sizing flow rate is for bath house #1 and bath house #2, so we can properly size the outlet filters? Response: Attention is called to FDOH Rule 64E-6.008(2), F.A.C., which says in part, Outlet filters shall be installed within or following the last septic tank or septic tank compartment before distribution to the drainfield. For sizing purposes, an estimated flow of 3,375 gallons/day was used for the septic tank at Bathhouse 2 (base bid), which will receive combined gravity flows from the entire campground, including Bathhouse 1 and the RV dump station. 21. Question: What are the requirements in terms of capacity for the Bathhouse 2 tank? Response: A tank schedule for Bathhouse 2 is provided on sheet C201, details on sheet C 301 and C Question: Bathhouse #2 shows a 6 thick high wall septic tank and 4 thick wall pump tank. Can we use a 4 thick 4,300 gallon septic tank instead of the 6 thick one shown? Response: No, use the tanks specified on the plans or approved alternate. Any proposed alternate for the Bathhouse #2 septic tank would need to be Category 4, same category as the 4,300 gallon tank shown on plan sheet C 301. See also Additional Information below regarding tanks T-1 and T Question: Why is a pump tank necessary for the drain field at the Hickory Ranch location? What s the purpose of the pump? Response: The system as designed with the pump in place is to be followed without changes. 24. Question: Should an alarm be added to the grinder pump at the Hickory Ranch location? Response: The scope of this project does not include any changes to the grinder pump. 25. Question: Is there flexibility with the point at which the low pressure force main is intercepted and rerouted to the septic tank? Response: Yes, but any changes to the design must be submitted in writing or approved by the engineer in the field and reflected on the red-line mark-ups. DEP Bid No. BDC69-16/17, Addendum #1 Page 4 of 6
5 26. Question: Is the Hickory Ranch area all one property, or does the fence line delineate another property? Response: The entire area is owned by the State of Florida. 27. Question: At the Hickory Ranch area, what are the soil conditions at the proposed drainfield? Response: Refer to the geotech report for all boring location and soil conditions. 28. Question: It s a 90 day start after the contract is signed? Response: From the notice to proceed, 90 days to substantial and 30 days to final. 29. Question: What county approval process for bid alternate #3 at the dump station? Is it included in the permit for Bathhouse 2? Response: No permit is expected to be required to replace the dump station lid as part of the base bid. Alternate #3 is not included in the approved permit. Contractor is responsible for obtaining necessary approvals from Alachua County, if any, required for this alternate. 30. Question: For the lid on the base bid, does that include the manhole rings? Response: The base bid includes replacement of the existing RV dump station tank lid, with rings and covers. Begin questions: 31. Question: Will the same contractor who wins the base bid complete the other Alternate bids if such Alternates are funded by DEP? Response: If the bids are such that the Department is able to fund all alternates concurrently, then the base bid contractor will complete the alternates. If the funding is not available, then other parts of the project may be bid out separately in future solicitations. 32. Question: Will the existing control panel be used with the new pump in bath house #2? Response: The dosing tank pump control panel is to be vendor-supplied, see sheet E 001. See also response to question 5, regarding design operating points. 33. Question: What is the residual pressure squirt height for LPD drainfield in bath house #2 and ranger residence? Response: Minimum squirt height at the distal orifice = 2.5 feet for both locations. DEP Bid No. BDC69-16/17, Addendum #1 Page 5 of 6
6 Additional Information: 34. The following information is provided to clarify installation requirements for tanks shown on the construction drawings: a. On sheets C 201 and C 204, the TOP EL. data given in the TANK SCHEDULE tables are for the design top of hatch elevations, which should match finish grade above each tank. b. Risers must be provided for all new tanks as needed to connect top of tank to hatches set at finish grade, including new tanks that may be needed for Bid Alternates 2 or 3, as applicable. c. As stated by the Park Manager during the pre-bid meeting, all of the septic tank locations at the campground are expected to be subject to occasional vehicular traffic associated with maintenance. The lids for tanks T-1 and T-2 should therefore be 8 thick, not 5 as previously shown on the plan details. d. With 8-inch lids, key design elevations for the affected tanks are modified as follows: T-1 top of hatch el. (flush w/grade) = ft. T-1 top-of-lid el. = ft. T-1 rim el. = ft. T-1 inlet invert el. = ft. T-1 outlet invert el. = ft. T-2 top of hatch el. (flush w/grade) = ft. T-2 top-of-lid el. = ft. T-2 rim el. = ft. T-2 inlet invert el. = ft. T-2 outlet invert (LPFM*) as needed to pass through riser at desired elevation. e. Pump tank T-6 is not expected to be subject to vehicular traffic. Key design elevations will be as follows: T-6 top of hatch el. (flush w/grade) = ft. T-6 top-of-lid el. = ft. T-6 rim el. = ft. T-6 inlet invert el. = ft. T-6 outlet invert (LPFM) as needed to pass through riser at desired elevation. * LPFM = low pressure force main In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect. DEP Bid No. BDC69-16/17, Addendum #1 Page 6 of 6
7
8
SPECIAL SPECIFICATION 3504 Septic Tank System
1993 Specifications CSJ s 3136-01-126, etc. & 0683-01-070, etc. SPECIAL SPECIFICATION 3504 Septic Tank System 1. Description. This Item shall govern for all materials, equipment and labor necessary for
More informationSanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:
Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Sanitary Sewer
More informationExisting System Evaluation Report for Onsite Wastewater Systems
Existing System Evaluation Report for Onsite Wastewater Systems State of Oregon Department of Environmental Quality Onsite Program 165 East 7 th Avenue, Suite 100 Eugene, Oregon 97401 For more information,
More informationNORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL HEALTH ON-SITE WASTEWATER SECTION
NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL HEALTH ON-SITE WASTEWATER SECTION INNOVATIVE WASTEWATER SYSTEM APPROVAL, Attachment INNOVATIVE WASTEWATER SYSTEM
More informationSUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1
DATE: May 18, 2016 TO: FROM: All Bidders/Proposers Willie Velez, CPPB Procurement Administrator City of Casselberry Purchasing Division SUBJECT: ITB-2016-0023, Oxford Road Complete Street Improvements
More informationOn-Site Septic System Property Transfer Report
4/30/2017 2:19:40 PM On-Site Septic System Property Transfer Report Application Summary: Submitted: 4/30/2017 2:19:06 PM Completed: 4/30/2017 2:19:06 PM Addresses Applicant's Address neil drawbridge p.o.box
More informationSeptic System Management Plan for Below Grade Systems
The goal of a septic system is to protect human health and the environment by properly treating wastewater before returning it to the environment. Your septic system is designed to kill harmful organisms
More informationSEPTIC TANK CONSTRUCTION GUIDELINES
SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic
More informationCHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 February 27, 2014 ITB NO. 14-33 WAKEFIELD PUMPING STATION UPGRADE ADDENDUM NUMBER
More informationOn-lot System Component Requirements
On-lot System Component Requirements All system components used with an on-lot system employing an Eljen GSF System must meet either the requirements of Title 25, Chapter 73 or the Eljen GSF Listing. The
More informationPUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR
EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL)
More informationTYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps:
Effluent Pumps: Effluent pumps are the pumps most often used in small on-site systems. They are designed to pump effluent, the effluent flowing out of a septic tank. This effluent is relatively clear liquid
More informationSECTION IV. PIPELINE EXCAVATION AND BACKFILL
SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include
More informationVILLAGE OF ORLAND PARK, ILLINOIS ADDENDUM NO. 1 REBID # STELLWAGEN FARMHOUSE RESTORATION: PHASE 1 EXTERIOR FOUNDATION
VILLAGE OF ORLAND PARK, ILLINOIS ADDENDUM NO. 1 REBID #15-019 STELLWAGEN FARMHOUSE RESTORATION: PHASE 1 EXTERIOR FOUNDATION Date: Wednesday, April 13, 2016 To: From: RE: All Potential Bidders Village of
More informationADDENDUM # 3 DATE: February 16, 2018
ADDENDUM # 3 DATE: February 16, 2018 REFERENCE: Invitation for Bid No.: S-LB-18607 IFB Issue Date: January 25, 2018 Title: Stonewall Middle School Addition and Renovations Architect/Engineer: Architecture
More information1 Exam Prep Chapter 64E -6 Questions and Answers
1 Exam Prep Chapter 64E -6 Questions and Answers Part One 1. According to Florida Rules: Chapter 64E-6, if building construction has commenced, for how many additional days past the eighteen month expiration
More informationCommonwealth of Massachusetts Title 5 Official Inspection Form Subsurface Sewage Disposal System Form - Not for Voluntary Assessments
Inspection results must be submitted on this form. Inspection forms may not be altered in any way. Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use
More informationCommonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Point and Non-Point Source Management Harrisburg, PA
Commonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Point and Non-Point Source Management Harrisburg, PA Issued to: Technology: American Manufacturing Co, Inc. PO Box 97
More informationForsyth County Procurement
August 1, 2017 Forsyth County Procurement Donna Kukarola, CPPO, CPPB, Procurement Director ADDENDUM #2 Bid 17-72-3340 For: Providing all materials, equipment and labor for the Jot em Down Road Water Tank
More informationBUREAU Joe Iuviene, AIA January 20, 2017
architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends
More informationHAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016
HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. THIS ADDENDUM IS ISSUED
More informationFigure 1. Report of Inspection Process Flowchart.
INSTRUCTIONS FOR A REPORT OF INSPECTION FOR AN ON-SITE WASTEWATER TREATMENT FACILITY INSTRUCTIONS Within six months before the date of a property transfer, the person who is transferring a property served
More informationTHIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE.
(f) The minimum requirements for construction, materials and foundations of grease traps shall be the same as those required for septic tanks, as prescribed in N.J.A.C. 7:9A-8.2. (g) The inlet and outlet
More informationCommonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Water Standards and Facility Regulation Harrisburg, PA
Commonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Water Standards and Facility Regulation Harrisburg, PA Issued to: Technology: American Manufacturing Co, Inc. PO Box
More informationSECTION CONSTRUCTION SERVICES
SECTION 01100 CONSTRUCTION SERVICES PART 1 GENERAL 1.01 - Section Includes A. Mobilization. B. Construction Surveys. C. Record Documents. 1.02 Description Of Work A. Mobilization: includes the preparatory
More informationAlternate Systems Guidance
Alternate Systems Guidance COMMONWEALTH OF PENNSYLVANIA Department of Environmental Protection For more information, visit us through the PA PowerPort at www.state.pa.us or visit DEP directly at www.dep.state.pa.us
More informationARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS
ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS Section 1201 Applicability For the purpose of this Article, recreation vehicles and recreational vehicle
More informationCommonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Water Standards and Facility Regulation Harrisburg, PA
Commonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Water Standards and Facility Regulation Harrisburg, PA Issued to: Eljen Corporation 125 McKee Street East Hartford, CT
More informationVillage of Arlington Heights. Sewer Back-up Rebate Program
Village of Arlington Heights Sewer Back-up Rebate Program (Including Enhanced Program Information) Updated: October 1, 2017 Village of Arlington Heights Building & Life Safety Department 33 S. Arlington
More informationCHAPTER 6. Sanitary Sewer
CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide
More informationCommonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Point and Non-Point Source Management Harrisburg, PA
Commonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Point and Non-Point Source Management Harrisburg, PA Issued to: Technology: American Manufacturing Co, Inc. PO Box 97
More informationDRIP EMITTER SYSTEM STUDY GUIDE
DRIP EMITTER SYSTEM STUDY GUIDE Minimum Criteria for Pressurized Subsurface Absorption Fields Utilizing Emitters. Subsurface systems utilizing emitters may be used in lieu of conventional or other alternative
More informationPrivate Sewage Systems Standard of Practice Proposed Revisions
Private Sewage Systems Standard of Practice Proposed Revisions The Government of Alberta is currently reviewing the Standard of Practice (SOP) for Private Sewage Systems. To this end, the Alberta government
More informationINTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS
INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS INTERIM GUIDE CRITERIA FOR AEROBIC BACTERIAL GENERATOR FOR INSERT INTO SEPTIC TANKS, GREASE INTERCEPTORS AND GREASE TRAPS IAPMO IGC 180-20023
More informationMILTON TOWNSHIP ORDINANCE ANNUAL REPORT DEC 2013 THROUGH DEC 2014
MILTON TOWNSHIP ORDINANCE ANNUAL REPORT DEC 2013 THROUGH DEC 2014 Introduction: Milton Township lies in Antrim County, bordered by Lake Michigan, Elk Lake, Lake Skegemog and Torch Lake. These surface water
More informationP U B L I C H E A L T H P R O T E C T I O N. Ministry of Health and Ministry Responsible for Seniors
P U B L I C H E A L T H P R O T E C T I O N Ministry of Health and Ministry Responsible for Seniors Canadian Cataloguing in Publication Data Main entry under title: Proper sewage disposal Rev. 1994 ISBA
More informationSECTION STORM DRAIN
PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract
More informationFencing, locks on access manholes, and other necessary precautions shall be provided to prevent trespassing, vandalism, and sabotage.
previous start next FINISHED WATER STORAGE 7.0 GENERAL 7.1 TREATMENT PLANT STORAGE 7.2 HYDROPNEUMATIC TANK SYSTEMS 7.3 DISTRIBUTION SYSTEM STORAGE 7.0 GENERAL The materials and designs used for finished
More informationIvins City Standard Specifications for Design and Construction Part 2 Engineering and Design Standards
2.9. WATER SYSTEM DESIGN Ivins City Standard Specifications for Design and Construction All culinary water mains and appurtenances shall be designed to provide for adequate future service for all contiguous
More informationPermit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System
Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System INSTRUCTIONS: This form shall be completed and submitted (in duplicate)
More informationHOLDING TANK PLANNING & INSTALLATION GUIDELINES
HOLDING TANK PLANNING & INSTALLATION GUIDELINES Under no circumstances is sewage from a holding tank to be discharged onto the surface of the ground or into groundwater or surface waters. TABLE OF CONTENTS
More informationResidential Sewer Backup Prevention Program
City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES
Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle
More informationSTANDARD SPECIFICATION STORMWATER QUALITY MEMBRANE FILTRATION TREATMENT DEVICE
STANDARD SPECIFICATION STORMWATER QUALITY MEMBRANE FILTRATION TREATMENT DEVICE PART 1 GENERAL 1.1 WORK INCLUDED Specifies requirements for construction and performance of an underground stormwater quality
More informationEnvironmental Products. Designed to Protect and Improve Our Environment. Delivering Reliability
Delivering Reliability A Designed to Protect and Improve Our Environment Environmental Products Sales & Service 888-9Oldcastle (888-965-3227) A Environmentally Responsible COVER & FRAME Oldcastle Precast
More informationSPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S
SPECIFICATIONS - DETAILED PROVISIONS Section 11241 - Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S PART 1 - GENERAL... 1 1.01 Scope... 1 1.02 Scope of Work... 1 1.03
More informationRidgely Plaines. Florida Fish and Wildlife Conservation Commission DATE: OCTOBER 12, 2016 ADDENDUM NO.: 3 BID NO.: FWC 16/17-04
DATE: OCTOBER 12, 2016 ADDENDUM NO.: 3 Florida Fish and Wildlife Conservation Commission Commissioners Brian Yablonski Chairman Tallahassee Aliese P. Liesa Priddy Vice Chairman Immokalee Ronald M. Bergeron
More informationRESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA
RESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA Project Funding Provided by: Pennsylvania Dept. of Environmental Protection Thomas J.
More informationSECTION SANITARY WASTE INTERCEPTORS
SECTION 22 13 23 SANITARY WASTE INTERCEPTORS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable
More informationSECTION FACILITY SANITARY SEWERS
SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More information400 Gal. Grease Interceptor
400 Gal. Grease Interceptor PC-000-331 Secondary chamber volume equal to 1/2 total capacity. Verify compliance with local regulations. STM-C-478 specifications for water and wastewater structures. utyl
More informationPROJECT NAME: NAVAJO TRIBAL UTILITY AUTHORITY WASTEWATER TREATMENT PLANT UPGRADES
Solutions for Today Vision for Tomorrow ADDENDUM 5 DATE: June 16, 2016 PROJECT NAME: NAVAJO TRIBAL UTILITY AUTHORITY WASTEWATER TREATMENT PLANT UPGRADES PROJECT NO. 115111 TO: ALL PLAN HOLDERS OF RECORD
More informationPART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS
PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm
More informationSECTION 501 GRAVITY SEWERS. U. No pipe length used shall be less than 5 feet.
SECTION 501 GRAVITY S PART 2 MATERIALS 2.1 PIPE SIZE, TYPE, AND STRENGTH D. Only concrete or polyvinyl chloride sewer pipe shall be used for sewer line construction unless otherwise approved by the City
More informationBID FORM (LUMP SUM CONTRACT)
BID FORM (LUMP SUM CONTRACT) Place County of El Paso Purchasing Department Date Project No. 11-016 Proposal of (hereinafter called Bidder), a corporation organized under the laws of the State of /a partnership/an
More informationFACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES
FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES 1. COVERAGE UNDER THIS GENERAL PERMIT Area of Coverage: This permit covers all areas of the Commonwealth
More informationThornton Sewer Plant Operations Manual -DRAFT-
Thornton Sewer Plant Operations Manual -DRAFT- February 2014 Prepared for: HOUSING AUTHORITY OF THE COUNTY OF SAN JOAQUIN P.O. BOX 447 421 S. EL DORADO STREET STOCKTON, CA 95203 Prepared by: BLACK WATER
More informationTOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK
TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,
More informationAppendix J: Storm Conveyance Design Parameters
Appendix J: Storm Conveyance Design Parameters Drain Commissioner 39 February 2005 STORM DRAINAGE DESIGN CRITERIA A. STORM SEWERS 1. The required discharge capacity shall be determined by the Rational
More informationThe exam is enclosed with this correspondence. This test emphasizes standard requirements for installing gravity-fed septic systems.
Harrison County Health Department Environmental Health Division 241 Atwood Street, Suite 200 Corydon, Indiana 47112 Phone (812) 738-3237 Fax (812) 738-4292 www. HarrisonCountyHealth.com To: Septic Installers
More informationSEPTIC VS. SEWER: A COST COMPARISON FOR COMMUNITIES IN SARASOTA COUNTY, FLORIDA
ABSTRACT SEPTIC VS. SEWER: A COST COMPARISON FOR COMMUNITIES IN SARASOTA COUNTY, FLORIDA Daniel G. Burden, Ph.D., P.E., and Damann L. Anderson, P.E. Hazen and Sawyer, P.C. Patrick Zoeller, P.E. Sarasota
More informationCITY OF ATLANTIC BEACH BID NUMBER PURCHASING DEPARTMENT 800 SEMINOLE ROAD ATLANTIC BEACH, FLORIDA (904)
CITY OF ATLANTIC BEACH BID NUMBER 1314-08 PURCHASING DEPARTMENT 800 SEMINOLE ROAD ATLANTIC BEACH, FLORIDA 32233 (904) 247-5880 REQUEST FOR BID CONTRACT - CONCRETE REPAIRS FOR THE PUBLIC WORKS/UTILITIES
More informationGUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS
UTAH COUNTY HEALTH DEPARTMENT Div. of Environmental Health 151 South University Avenue, Provo 84601 (801) 851-7525 FAX 851-7521 GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS This is intended to
More informationInvitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $
Addendum No. 1 TOWNSHIP ROAD 510 RECONSTRUCTION Invitation to Tender No. T170523EN Amendment 1. Bidders shall note the following: a) Revised Section 3.3.2 Unit Price Table : REVISED Schedule A : Invitation
More informationDIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1
DIVISION 3: SEWER 3.1 DESIGN CRITERIA A. APPLICABILITY 1. These Design Standards shall govern all construction and upgrading of public sanitary sewer facilities in the City of Dundee and applicable work
More informationWest Virginia Department of Health & Human Resources Department of Health
SS-182A Rev 6/07 West Virginia Department of Health & Human Resources Department of Health Application for a Permit to Install or Modify an Onsite Sewage Disposal System Property Owner Phone (H) (W) Address
More informationa) Biological Oxygen Demand b) Biology Oxygen Demand c) Biochemical Oxygen Demand d) Biomicrobics Oxygen Demand
Onsite Domestic Wastewater Treatment, Dispersal and Reuse Biosystems Engineering 532 Final Exam Fall 2008 Due by 4:00 p.m. Monday December 8, 2008 (either by email or hardcopy) Name Instructions: This
More informationSEWAGE TREATMENT SYSTEM RULES February 1, 2015
REGULATIONS OF THE BOARD OF HEALTH OF THE CLERMONT COUNTY GENERAL HEALTH DISTRICT Regulation 415 SEWAGE TREATMENT SYSTEM RULES February 1, 2015 Clermont County General Health District Sewage Treatment
More informationLast Updated March 15, 2016
CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT 30508 S. West Outer Road, Harrisonville, MO 64701 P- (816) 380-8134 F- (816) 380-8130 Last Updated March 15, 2016 Information
More informationINSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION
Permits will be processed only when ALL required information is provided Application MUST be accompanied by the following: Property address or road location with distance from nearest intersection. IT
More informationDOCUMENT ADDENDUM No. 2
DOCUMENT ADDENDUM No. 2 PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Clarifications 1.2 CONSTRUCTION CONTRACT A. The Construction Contract is known as SU095 9 th Street and SU096 Downs Drive Storm Drain Projects.
More informationOtter Tail Water Management District Septic System Use and Maintenance Evaluation October 23, 2017
Otter Tail Water Management District Septic System Use and Maintenance Evaluation October 23, 2017 Dr. Sara Heger sheger@umn.edu septic.umn.edu 1. Professional Training Designers, Inspectors, Maintainers,
More informationWATERWORKS SERVICES WORKER I WATERWORKS SERVICES WORKER II WATERWORKS SERVICES WORKER III
WATERWORKS SERVICES WORKER I WATERWORKS SERVICES WORKER II WATERWORKS SERVICES WORKER III Class specifications are intended to present a descriptive list of the range of duties performed by employees in
More informationCommonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Point and Non-Point Source Management Harrisburg, PA
Commonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Point and Non-Point Source Management Harrisburg, PA Issued to: Technology: Premier Tech Aqua 1160, rue Levis, bureau
More informationVortex Filters. Conservation Technology
Vortex Filters Vortex Filters are high-rate mechanical filters designed to extract organic debris and particulates from either rooftop or surface rainwater. They can be installed underground using an that
More informationSECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES
SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.
More informationTHM Removal by Water Spray Aeration- Tank Top Results. Thomas F. Clark, P.E. Production Engineer Monroe County Water Authority Rochester, New York
THM Removal by Water Spray Aeration- Tank Top Results Thomas F. Clark, P.E. Production Engineer Monroe County Water Authority Rochester, New York Monroe County s Primary Water Supply Lake Ontario Shoremont
More informationSeptic System Basics. Today s Presentation:
Septic System Basics Kitt Farrell-Poe Extension Water Quality Specialist Ag & Biosystems Engineering Dept. Today s Presentation: What is an onsite wastewater treatment system? Components of a septic system
More informationINVITATION TO BID FAILURE TO SIGN WILL DISQUALIFY BID Bid No.: EXT-RESTORE-2015 ADDENDUM NO. 1
INVITATION TO BID FAILURE TO SIGN WILL DISQUALIFY BID Bid No.: EXT-RESTORE-2015 ADDENDUM NO. 1 Due Date: 11/19/15 at 3:00 P.M. Signature City Zip Show bid opening and bid invitation number in lower left
More informationLifetime Guaranteed Construction with unique built-in installation and maintenance features
Lifetime Guaranteed Construction with unique built-in installation and maintenance features Great Basin grease interceptors provide the best in quality materials and engineered craftsmanship. Units are
More informationSECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.
SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete
More informationREQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St.
531 N. Nash Street Hortonville, WI 54944-0099 Phone: 920-779-6011 Fax: 920-779-6552 www.hortonvillewi.org REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St. Date Issued: February 5, 2016 Date Due: March
More informationThe Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.
1700 East Iron Ave. Salina, KS 67401 785-827-0433 phone 785-827-5949 fax 6 March 2018 Arizona California Colorado Kansas Louisiana Missouri Nebraska New Mexico Texas Utah ADDENDUM NO. 2 RE: City of Kingman,
More information6 Preliminary Assessment of Construction Method and Constructability Issues
6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual
More informationADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1
ADDENDUM No. 6 ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 Due: June 9, 2016 at 2:00 p.m. (local time) The following changes, additions, and/or deletions
More informationBIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83
Item No. BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83 DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL PRICE GENERAL BID ITEMS 1 Per Plans and Specifications
More informationFire Protection Underground Piping. ASCE Meeting 12/17/14 Columbia, SC
Fire Protection Underground Piping Columbia, SC What We ll Cover Today 2 Applicable NFPA standards Shop Drawing Requirements State Fire Marshal s Review Sprinkler Act Fire Sprinkler System Specification
More informationLAWS AND RULES FOR SEWAGE TREATMENT, AND DISPOSAL SYSTEMS
LAWS AND RULES FOR SEWAGE TREATMENT, AND DISPOSAL SYSTEMS 15A NCAC 18A.1900 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL HEALTH ON-SITE WASTEWATER SECTION Law
More informationCITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE. FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6
CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6 2545 Guy N Verger Boulevard, Tampa, FL 33605 www.tampagov.net TECHNICAL STANDARDS
More informationCITY OF THREE RIVERS, MICHIGAN Specifications for Bids. Tree and/or Stump Removal Performance Bids
CITY OF THREE RIVERS, MICHIGAN Specifications for Bids Tree and/or Stump Removal Performance Bids The City of Three Rivers is committed to the concept of performance bids. All vendors are encouraged to
More informationADDENDUM No. 1. FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Procurement Section 3800 Commonwealth Boulevard, MS#93 Tallahassee, Florida
ADDENDUM No. 1 FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Procurement Section 3800 Commonwealth Boulevard, MS#93 Tallahassee, Florida 32399-3000 April 11, 2016 Addendum To: DEP Solicitation No. 2016036C,
More informationSECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION
820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing
More informationrecycle water reuse it save up to from showers & baths for flushing toilets 30% of water use
Residential recycle - Water reuse Recovery - save recycle water from showers & baths reuse it for flushing toilets save up to 30% of water use www.recoverwater.com How it works Greywater is lightly soiled
More informationSMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY
SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY Phong Vo, Manager - Engineering/Gypsum, Mosaic Fertilizer, LLC. 13830 Circa Crossing Drive Lithia, Florida 33547, USA and Ashraf H. Riad, Ph.D., P.E.,
More informationPLAN CHECK CORRECTION SHEET FOR METHANE MITIGATION SYSTEMS 2014 LAPC
PLAN CHECK CORRECTION SHEET FOR METHANE MITIGATION SYSTEMS 2014 LAPC This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.
More informationONE PIPE LENGTH MAX (REFER TO 1/4"/FT SLOPE (MIN) 5'-0" (MIN) OR 4" LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4"x6" REFER TO TYPICAL EXCAVATION,
VENT CAP (MUSHROOM TYPE) SOLID CAP EXIST GRADE MIN BUILDING REFER TO NOTE #4 MIN CONCRETE SIDEWALK CURB OR EDGE OF SIDEWALK STREET CLEANOUT (REFER TO NOTE #3) VENT PIPE 4" PVC 6" PVC CLEANOUT CONCRETE
More informationUTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES
GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: UTILITY NOTES PROPOSED LEGEND 66.50 66.50 GROUND SPOT ELEVATION GROUND SPOT ELEVATION (MATCH EXISTING GRADE) MATCH EXISTING GRADE MITERED END SECTION
More informationA PUMPED SEPTIC TANK IS A HAPPY SEPTIC TANK!!
A PUMPED SEPTIC TANK IS A HAPPY SEPTIC TANK!! Homeowners of Septic Systems Chatham County Environmental Health Pittsboro, North Carolina March 24, 2016 Topics to be reviewed Why do we use septic systems?
More informationFS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)
Wastewater Flow Distributor Technical Data Submittal Special Precautions Specifications Installation 24½" (62.2 cm) 12½" (31.8 cm) 24½" (62.2 cm) (30.5 cm) SUBMITTAL STANDARD: 4" plain end inlet/outlet
More information*Note: Please contact the Soil Erosion Specialist at with questions regarding application requirements
APPLICATION FOR RAZE PERMIT COVER SHEET Page 1 of 2 Project Address The following items must be completed and submitted as a packet: Razing permit application (this item is all that is needed for residential
More information