1 SECTION CERAMIC TILE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Ceramic mosaic tile. 2. Unglazed wall tile. 3. Thin-set tile installations for walls. B. Related Sections include the following: 1. Division 1 Section Alternates 2. Division 3 Section "Cast-in-Place Concrete" for monolithic slab finishes specified for tile substrates. 3. Division 7 Section "Joint Sealants" for sealing of expansion, contraction, control, and isolation joints in tile surfaces. 1.3 SUBMITTALS A. Product Data: For each type of tile, mortar, grout, and other products specified. B. Tile Samples for Initial Selection: Manufacturer's color charts consisting of actual tiles or sections of tiles showing the full range of colors, textures, and patterns available for each type and composition of tile indicated. Include Samples of accessories involving color selection. C. Grout Samples for Initial Selection: Manufacturer's color charts consisting of actual sections of grout showing the full range of colors available for each type of grout indicated. 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced installer who has completed tile installations similar in material, design, and extent to that indicated for this Project and with a record of successful in-service performance. B. Source Limitations for Tile: Obtain each color, grade, finish, type, composition, and variety of tile from one source with resources to provide products from the same production run for each contiguous area of consistent quality in appearance and physical properties without delaying the Work. CERAMIC TILE July 18, 2016

2 C. Source Limitations for Setting and Grouting Materials: Obtain ingredients of a uniform quality for each mortar, adhesive, and grout component from a single manufacturer and each aggregate from one source or producer. D. Source Limitations for Other Products: Obtain each of the following products specified in this Section from one source and by a single manufacturer for each product: 1. Joint sealants. 2. Waterproofing. 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver and store packaged materials in original containers with seals unbroken and labels intact until time of use. Comply with requirement of ANSI A137.1 for labeling sealed tile packages. B. Prevent damage or contamination to materials by water, freezing, foreign matter, and other causes. 1.6 PROJECT CONDITIONS A. Environmental Limitations: Do not install tile until construction in spaces is completed and ambient temperature and humidity conditions are being maintained to comply with referenced standards and manufacturer's written instructions. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, those indicated in the ceramic tile installation schedules at the end of this Section. B. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: 1. Tile Products: a. Dal-Tile Corporation. b. American Marrazzi Tile, Inc. c. American Olean Tile Company. d. Buchtal Corporation USA. b. Florida Tile Industries, Inc. c. Mannington Ceramic Tile. d. Monarch Tile, Inc. e. Summitville Tiles, Inc. 2. Tile-Setting and -Grouting Materials: a. Dal-Tile Corporation. b. American Olean Tile Company. CERAMIC TILE July 18, 2016

3 c. Bonsal: W.R. Bonsal Company. d. C-Cure Corporation. e. Custom Building Products. b. Laticrete International, Inc. c. Mapei Corporation. d. Southern Grouts & Mortars, Inc. e. Summitville Tiles, Inc. 2.2 PRODUCTS, GENERAL A. ANSI Ceramic Tile Standard: Provide tile that complies with ANSI A137.1, "Specifications for Ceramic Tile," for types, compositions, and other characteristics indicated. Provide tile complying with Standard Grade requirements, unless otherwise indicated. B. ANSI Standards for Tile Installation Materials: Provide materials complying with ANSI standards referenced in "Setting Materials" and "Grouting Materials" articles. C. Colors, Textures, and Patterns: Where manufacturer's standard products are indicated for tile, grout, and other products requiring selection of colors, surface textures, patterns, and other appearance characteristics, provide specific products or materials complying with the following requirements: 1. Provide Architect's selections from manufacturer's full range of colors, textures, and patterns for products of type indicated. 2. Provide tile trim and accessories that match color and finish of adjoining flat tile. D. Factory Blending: For tile exhibiting color variations within the ranges selected during Sample submittals, blend tile in the factory and package so tile units taken from one package show the same range in colors as those taken from other packages and match approved Samples. E. Mounting: Where factory-mounted tile is required, provide back- or edge-mounted tile assemblies as standard with manufacturer, unless another mounting method is indicated. 1. Where tile is indicated for installation in wet areas, do not use back- or edge-mounted tile assemblies unless tile manufacturer specifies in writing that this type of mounting is suitable for these kinds of installations and has a record of successful in-service performance. 2.3 TILE PRODUCTS A. Unglazed Ceramic Mosaic Tile: Provide factory-mounted flat tile complying with the following requirements: 1. Composition: Porcelain with abrasive admixture. 2. Module Size: 1 by 1 inches, 1 by 2 inches and 2 by 2 inches 3. Nominal Thickness: 1/4 inch (6.35 mm). 4. Face: Plain with cushion edges. 4. Color: See Drawings for colors and tile pattern layouts CERAMIC TILE July 18, 2016

4 2.4 SETTING MATERIALS A. Portland Cement Mortar Installation Materials: Provide materials complying with ANSI A108.1A and as specified below: 4. Reinforcing Wire Fabric: Galvanized, welded wire fabric, 2 by 2 inches (50.8 by 50.8 mm) by inch (1.57-mm) diameter; comply with ASTM A 185 and ASTM A 82, except for minimum wire size. 5. Latex additive (water emulsion) described below, serving as replacement for part or all of gaging water, of type specifically recommended by latex additive manufacturer for use with job-mixed Portland cement and aggregate mortar bed. a. Latex Additive: Manufacturer's standard. B. Latex-Portland Cement Mortar: ANSI A118.4, composed as follows: 1. Prepackaged Dry-Mortar Mix: Factory-prepared mixture of Portland cement; dry, redispersible, ethylene vinyl acetate additive; and other ingredients to which only water needs to be added at Project site. a. For wall applications, provide nonsagging, latex-portland cement mortar complying with ANSI A118.4 for mortar of this type defined in Section F GROUTING MATERIALS A. Dry-Set Grout: ANSI A118.6, color as indicated. B. Latex-Portland Cement Grout: ANSI A118.6 for materials described in Section H-2.4, composed as follows: 1. Factory-Prepared, Dry-Grout Mixture: Factory-prepared mixture of Portland cement; dry, redispersible, ethylene vinyl acetate additive; and other ingredients to produce the following: a. Unsanded grout mixture for joints 1/8 inch (3.2 mm) and narrower. b. Sanded grout mixture for joints 1/8 inch (3.2 mm) and wider. 2. Mixture of Dry-Grout Mix and Latex Additive: Mixture of factory-prepared, dry-grout mix and latex additive complying with the following requirements: a. Unsanded Dry-Grout Mix: Dry-set grout complying with ANSI A118.6 for materials described in Section H-2.3, for joints 1/8 inch (3.2 mm) and narrower. b. Sanded Dry-Grout Mix: Commercial Portland cement grout complying with ANSI A118.6 for materials described in Section H-2.1, for joints 1/8 inch (3.2 mm) and wider. c. Latex Additive: Styrene butadiene rubber. 2.6 ELASTOMERIC SEALANTS A. General: Provide manufacturer's standard chemically curing, elastomeric sealants of base polymer and characteristics indicated that comply with applicable requirements of Division 7 CERAMIC TILE July 18, 2016

5 Section "Joint Sealants." B. Colors: Provide colors of exposed sealants to match colors of grout in tile adjoining sealed joints, unless otherwise indicated. C. One-Part, Mildew-Resistant Silicone Sealant: ASTM C 920; Type S; Grade NS; Class 25; Uses NT, G, A, and, as applicable to nonporous joint substrates indicated, O; formulated with fungicide, intended for sealing interior ceramic tile joints and other nonporous substrates that are subject to in-service exposures of high humidity and temperature extremes. D. Products: Subject to compliance with requirements, provide one of the following: 1. One-Part, Mildew-Resistant Silicone Sealants: a. Dow Corning 786; Dow Corning Corporation. b. Sanitary 1700; GE Silicones. c. Pecora 898 Sanitary Silicone Sealant; Pecora Corp. d. Rhodorsil 6B White; Rhone-Poulenc, Inc. e. Tremsil 600 White; Tremco, Inc. 2.7 MIXING MORTARS AND GROUT A. Mix mortars and grouts to comply with referenced standards and mortar and grout manufacturers' written instructions. B. Add materials, water, and additives in accurate proportions. C. Obtain and use type of mixing equipment, mixer speeds, mixing containers, mixing time, and other procedures to produce mortars and grouts of uniform quality with optimum performance characteristics for installations indicated. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates, areas, and conditions where tile will be installed, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of installed tile. 1. Verify that substrates for setting tile are firm; dry; clean; free from oil, waxy films, and curing compounds; and within flatness tolerances required by referenced ANSI A108 series of tile installation standards for installations indicated. 2. Verify that installation of grounds, anchors, recessed frames, electrical and mechanical units of work, and similar items located in or behind tile has been completed before installing tile. 3. Verify that joints and cracks in tile substrates are coordinated with tile joint locations; if not coordinated, adjust latter in consultation with Architect. B. Do not proceed with installation until unsatisfactory conditions have been corrected. CERAMIC TILE July 18, 2016

6 3.2 PREPARATION A. Remove coatings, including curing compounds, and other substances that contain soap, wax, oil, or silicone and are incompatible with tile-setting materials by using a terrazzo or concrete grinder, a drum sander, or a polishing machine equipped with a heavy-duty wire brush. B. Provide concrete substrates for tile floors installed with dry-set or latex-portland cement mortars that comply with flatness tolerances specified in referenced ANSI A108 series of tile installation standards for installations indicated. 1. Use trowelable leveling and patching compounds per tile-setting material manufacturer's written instructions to fill cracks, holes, and depressions. 2. Remove protrusions, bumps, and ridges by sanding or grinding. C. Blending: For tile exhibiting color variations within the ranges selected during Sample submittals, verify that tile has been blended in the factory and packaged so tile units taken from one package show the same range in colors as those taken from other packages and match approved Samples. If not factory blended, either return to manufacturer or blend tiles at Project site before installing. 3.3 INSTALLATION, GENERAL A. ANSI Tile Installation Standards: Comply with parts of ANSI A108 series of tile installation standards in "Specifications for Installation of Ceramic Tile" that apply to types of setting and grouting materials and to methods indicated in ceramic tile installation schedules. B. TCA Installation Guidelines: TCA's "Handbook for Ceramic Tile Installation." Comply with TCA installation methods indicated in ceramic tile installation schedules. C. Extend tile work into recesses and under or behind equipment and fixtures to form a complete covering without interruptions, unless otherwise indicated. Terminate work neatly at obstructions, edges, and corners without disrupting pattern or joint alignments. D. Accurately form intersections and returns. Perform cutting and drilling of tile without marring visible surfaces. Carefully grind cut edges of tile abutting trim, finish, or built-in items for straight aligned joints. Fit tile closely to electrical outlets, piping, fixtures, and other penetrations so plates, collars, or covers overlap tile. Fit wall tile with coved internal corners. E. Jointing Pattern: Lay tile in grid pattern, unless otherwise indicated. Align joints when adjoining tiles on floor, base, walls, and trim are the same size. Lay out tile work and center tile fields in both directions in each space or on each wall area. Adjust to minimize tile cutting. Provide uniform joint widths, unless otherwise indicated. 1. For tile mounted in sheets, make joints between tile sheets the same width as joints within tile sheets so joints between sheets are not apparent in finished work. F. Expansion Joints: Locate expansion joints and other sealant-filled joints, including control, contraction, and isolation joints, during installation of setting materials, mortar beds, and tile. Do not saw-cut joints after installing tiles. CERAMIC TILE July 18, 2016

7 1. Locate joints in tile surfaces directly above joints in concrete substrates. 2. Prepare joints and apply sealants to comply with requirements of Division 7 Section "Joint Sealants." G. Grout tile to comply with the requirements of the following tile installation standards: 1. For ceramic tile grouts (dry-set, and latex-portland cement grouts), comply with ANSI A WALL TILE INSTALLATION A. Install types of tile designated for wall installations to comply with requirements in the Ceramic Tile Wall Installation Schedule, including those referencing TCA installation methods and ANSI setting-bed standards. B. Joint Widths: Install tile on walls with the following joint widths 1/16 inch (1.6 mm): 3.5 CLEANING AND PROTECTING A. Cleaning: On completion of placement and grouting, clean all ceramic tile surfaces so they are free of foreign matter. 1. Remove latex-portland cement grout residue from tile as soon as possible. 2. Unglazed tile may be cleaned with acid solutions only when permitted by tile and grout manufacturer's written instructions, but no sooner than 10 days after installation. Protect metal surfaces, cast iron, and vitreous plumbing fixtures from effects of acid cleaning. Flush surface with clean water before and after cleaning. B. Finished Tile Work: Leave finished installation clean and free of cracked, chipped, broken, unbonded, and otherwise defective tile work. C. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and Installer, that ensure tile is without damage or deterioration at the time of Substantial Completion. 1. When recommended by tile manufacturer, apply a protective coat of neutral protective cleaner to completed tile walls and floors. Protect installed tile work with kraft paper or other heavy covering during construction period to prevent staining, damage, and wear. 2. Prohibit foot and wheel traffic from tiled floors for at least 7 days after grouting is completed. D. Before final inspection, remove protective coverings and rinse neutral cleaner from tile surfaces. 3.8 CERAMIC TILE WALL INSTALLATION SCHEDULE A. Ceramic Tile Wall Installation: Where interior wall installations of this designation are indicated, comply with the following: 1. Tile Type/Products: Glazed and unglazed wall tile. Size and Color as scheduled in the Drawings: CERAMIC TILE July 18, 2016

8 a. DalTile Mosaic Design as detailed in the Drawings. Colors: Daltile Keystones D161 Urban Putty, 2 x 2 Daltile Keystones D166 Elemental Tan, 1 x 2 Daltile Keystones D621 Nautical Blue, 1 x 1 Daltile Keystones D017 Red, 1 x 1 Install in pattern selected by Architect. 2. Installation Method: TCA (thinnest grout over solid backing). 3. Setting Bed and Grout: ANSI A108.4 with the following grout: Unsanded latex-portland cement grout. END OF SECTION CERAMIC TILE July 18, 2016

9 SECTION SPECIAL COATINGS PART 1 - GENERAL 1.1 WORK INCLUDED A. Finish coating of interior wall areas scheduled to receive epoxy coatings. B. Finish for exterior painted steel and scheduled field painted aluminum items. 1.2 REFERENCES A. ANSI/ASTM D16 - Definitions of Terms Relating to Paint, Varnish, Lacquer, and Related Products. B. ASTM D Test Method for Moisture Content of Wood. 1.3 DEFINITIONS A. Conform to ANSI/ASTM D16 for interpretation of terms used in this Section. 1.4 QUALITY ASSURANCE A. Product Manufacturer: Company specializing in manufacturing quality paint and finish products with three years experience. B. Applicator: Company specializing in commercial painting and finishing with 3 years experience. 1.5 REGULATORY REQUIREMENTS A. Conform to the 2012 edition of the International Building Code for flame/fuel/smoke rating requirements for finishes. 1.6 SUBMITTALS A. Submit product data under provisions of Section B. Submit samples under provisions of Section FIELD SAMPLES A. Provide samples under provisions of Section B. Provide field sample panel, 12 inches long by 24 inches wide, illustrating each texture and finish. SPECIAL COATINGS July 18, 2016

10 C. Locate where directed. D. Accepted sample may remain as part of the Work. 1.8 DELIVERY, STORAGE, AND HANDLING A. Deliver products to site under provisions of Section B. Store and protect products under provisions of Section C. Deliver products to site in sealed and labeled containers; inspect to verify acceptance. D. Container labeling to include manufacturer's name, type of paint, brand name, brand code, coverage, surface preparation, drying time, cleanup, color designation, and instructions for mixing and reducing. E. Store paint materials at minimum ambient temperature of 45 degrees F (7 degrees C) and a maximum of 90 degrees F (32 degrees C), in well ventilated area, unless required otherwise by manufacturer's instructions. F. Take precautionary measures to prevent fire hazards and spontaneous combustion. 1.9 ENVIRONMENTAL REQUIREMENTS A. Provide continuous ventilation for 24 hours before, during, and 48 hours after application of finishes, unless required otherwise by manufacturer's instructions. B. Provide lighting level of 80 ft candles measured mid-height at substrate surface EXTRA STOCK A. Provide a one gallon container of each color to Owner. Total not to exceed 5 gallons. B. Label each container with color, texture, in addition to the manufacturer's label. PART 2 - PRODUCTS 2.1 ACCEPTABLE MANUFACTURERS A. Tnemec/ICI/Sherwin Williams for cementitious block filler epoxy and alkyd coatings. 2.2 MATERIALS A. Coatings: Ready mixed, except field catalyzed coatings. Process pigments to a soft paste SPECIAL COATINGS July 18, 2016

11 consistency, capable of being readily and uniformly dispersed to a homogeneous coating. B. Coatings: Good flow and brushing properties; capable of drying or curing free of streaks or sags. C. Accessory Materials: Linseed oil, shellac, turpentine, paint thinners and other materials not specifically indicated but required to achieve the finishes specified, of commercial quality. 2.3 FINISHES A. Refer to schedule at end of Section for surface finish schedule. PART 3 - EXECUTION 3.1 INSPECTION A. Verify that surfaces are ready to receive work as instructed by the product manufacturer. B. Examine surfaces scheduled to be finished prior to commencement of work. Report any condition that may potentially affect proper application. C. Measure moisture content of surfaces using an electronic moisture meter. Do not apply finishes unless moisture content of surfaces are below the following maximums: 1. Plaster and Gypsum Wallboard: 12 percent. 2. Masonry, Concrete, and Concrete Unit Masonry: 12 percent. 3. Interior Located Wood: 15 percent, measured in accordance with ASTM D2016. D. Beginning of installation means acceptance of existing substrate. 3.2 PREPARATION A. Remove electrical plates, hardware, light fixture trim, and fittings prior to preparing surfaces or finishing. B. Correct minor defects and clean surfaces which affect work of this Section. C. Shellac and seal marks which may bleed through surface finishes. D. Impervious Surfaces: Remove mildew by scrubbing with solution of tri-sodium phosphate and bleach. Rinse with clean water and allow to dry. E. Aluminum Surfaces Scheduled for Paint Finish: Remove surface contamination by steam or high pressure water. Remove oxidation with acid etch and solvent washing. Apply etching primer immediately following cleaning. F. Asphalt, Creosote, or Bituminous Surfaces Scheduled for Paint Finish: Remove foreign particles to SPECIAL COATINGS July 18, 2016

12 permit adhesive of finishing materials. Apply compatible sealer or primer. G. Insulated Coverings: Remove dirt, grease, and oil from canvas and cotton. H. Concrete Floors: See Division 3. I. Gypsum Board Surfaces: Latex fill minor defects. Spot prime defects after repair. J. Galvanized Surfaces: Remove surface contamination and oils and wash with solvent. Apply coat of etching primer. K. Concrete and Unit Masonry Surfaces Scheduled to Receive Paint Finish: Remove dirt, loose mortar, scale, salt or alkali powder, and other foreign matter. Remove oil and grease with a solution of trisodium phosphate; rinse well and allow to dry. Remove stains caused by weathering of corroding metals with a solution of sodium metasilicate after thoroughly wetting with water. Allow to dry. L. Plaster Surfaces: Fill hairline cracks, small holes, and imperfections with latex patching plaster. Make smooth and flush with adjacent surfaces. Wash and neutralize high alkali surfaces. M. Uncoated Steel and Iron Surfaces: Remove grease, scale, dirt, and rust. Where heavy coatings of scale are evident, remove by wire brushing or sandblasting; clean by washing with solvent. Apply a treatment of phosphoric acid solution, ensuring weld joints, bolts, and nuts are similarly cleaned. Spot prime paint after repairs. N. Shop Primed Steel Surfaces: Sand and scrape to remove loose primer and rust. Feather edges to make touch-up patches inconspicuous. Clean surfaces with solvent. Prime bare steel surfaces. Prime metal items including shop primed items. O. Interior Wood Items Scheduled to Receive Finish: Wipe off dust and grit prior to priming. Seal knots, pitch streaks, and sappy sections with sealer. Fill nail holes and cracks after primer has dried; sand between coats. P. Wood and Metal Doors Scheduled for Painting: Seal top and bottom edges with primer. 3.3 PROTECTION A. Protect elements surrounding the work of this Section from damage or disfiguration. B. Repair damage to other surfaces caused by work of this Section. C. Furnish drop cloths, shields, and protective methods to prevent spray or droppings from disfiguring other surfaces. D. Remove empty paint containers from site. 3.4 APPLICATION A. Apply products in accordance with manufacturer's instructions. SPECIAL COATINGS July 18, 2016

13 B. Do not apply finishes to surfaces that are not dry. C. Apply each coat to uniform finish. D. Apply each coat of paint slightly darker than preceding coat unless otherwise approved. E. Sand lightly between coats to achieve required finish. F. Allow applied coat to dry before next coat is applied. G. Where clear finishes are required, tint fillers to match wood. Work fillers into the grain before set. Wipe excess from surface. H. Prime back surfaces of interior and exterior woodwork with primer paint. I. Prime back surfaces of interior woodwork scheduled to receive stain or varnish finish with gloss varnish reduced 25 percent with mineral spirits. 3.5 FINISHING MECHANICAL AND ELECTRICAL EQUIPMENT A. Paint shop primed equipment. Paint all wall mounted electrical equipment to match new masonry walls. B. Remove unfinished louvers, grilles, covers, and access panels on mechanical and electrical components and paint separately. C. Prime and paint insulated and exposed pipes, conduit boxes, insulated and exposed ducts, hangers, brackets, collars and supports, except where items are pre-finished. D. Replace identification markings on mechanical or electrical equipment when painted accidentally. E. Paint interior surfaces of air ducts, and convector and baseboard heating cabinets that are visible through grilles and louvers with one coat or flat black paint, to limit of sight line. Paint dampers exposed behind louvers, grilles, and convector and baseboard cabinets to match face panels. F. Paint exposed conduit and electrical equipment occurring at finished areas. G. Paint both sides and edges of plywood backboards for electrical and telephone equipment before installing equipment. H. Replace electrical plates, hardware, light fixture trim, and fittings removed prior to finishing. 3.6 CLEANING A. As Work proceeds, promptly remove paint where spilled, splashed, or splattered. SPECIAL COATINGS July 18, 2016

14 B. During progress of Work maintain premises free of unnecessary accumulation of tools, equipment, surplus materials, and debris. C. Collect cotton waste, cloths, and materials which may constitute a fire hazard, place in closed metal containers and remove daily from site. 3.7 SCHEDULE - INTERIOR SURFACES A. Concrete and Concrete Block to receive epoxy coating. 1. Surface Preparation: Allow mortar to cure for 28 days. Level protrusions and mortar spatter. All surfaces must be dry, clean and free of all contaminants. ALL BLOCK FILLER TO BE RUBBER SQUEEGEE APPLIED AT ALL CMU. Primer: B42W00400 Kem Cati-Coat HS Epoxy Filler Sealer Off White First Coat: B58E Macropoxy 646 Fast Cure Epoxy Part A Mill White Second Coat: B58W Macropoxy 646 Fast Cure Epoxy Part A Mill White 3.8 PAINTING SCHEDULE - EXTERIOR SURFACES A. Galvanized Steel: 1. Surface Preparation: Solvent cleaning per SSPC-SP1 to remove soluble contaminants. Remove insoluble contaminants (rust, white rust, etc.). Power Tool Cleaning per SP3 or by Brush-Off Cleaning per SSPC-SP7. Provide uniform abraded surface profile. 2. Coating System: Primer: ICI 4160 Primer 1st Coat: ICI 2516-XXX Ultra-Hide Duras Exterior Alkyd Semi-Gloss Enamel 2nd Coat: ICI 2516-XXX Ultra-Hide Duras Exterior Alkyd Semi-Gloss Enamel TOTAL SYSTEM THICKNESS: mils B. Steel - Shop Primed: 1. Touch up with original primer per Division All surfaces must be dry, clean and free of all contaminants. 2. Coating System: 1st Coat: ICI 2516-XXX Ultra-Hide Duras Exterior Alkyd Semi-Gloss Enamel 2nd Cost: ICI 2516-XXX Ultra-Hide Duras Exterior Alkyd Semi-Gloss Enamel B. Cement Siding (interior and exterior locations) Primer: B42WJ0050 Southwest Builders Summit Exterior Acrylic Primer White First Coat: B13WJ0051 Southwest Builders Summit Exterior Latex Satin Extra White Second Coat: B13WJ0051 Southwest Builders Summit Exterior Latex Satin Extra White END OF SECTION SPECIAL COATINGS July 18, 2016

15 SECTION PAINTING PART 1 - GENERAL 1.1 WORK INCLUDED A. Surface preparation. B. Surface finish schedule. 1.2 REFERENCES A. ANSI/ASTM D16 - Definitions of Terms Relating to Paint, Varnish, Lacquer, and Related Products. B. ASTM D Test Method for Moisture Content of Wood. 1.3 DEFINITIONS A. Conform to ANSI/ASTM D16 for interpretation of terms used in this Section. 1.4 QUALITY ASSURANCE A. Product Manufacturer: Company specializing in manufacturing quality paint and finish products with three years experience. B. Applicator: Company specializing in commercial painting and finishing with 3 years experience. 1.5 REGULATORY REQUIREMENTS A. Conform to the 2006 edition of the International Building Code for flame/fuel/smoke rating requirements for finishes. 1.6 SUBMITTALS A. Submit product data under provisions of Section B. Submit samples under provisions of Section FIELD SAMPLES A. Provide samples under provisions of Section B. Provide field sample panel, 12 inches long by 24 inches wide, illustrating each texture and finish. PAINTING July 18, 2016

16 C. Locate where directed. D. Accepted sample may remain as part of the Work. 1.8 DELIVERY, STORAGE, AND HANDLING A. Deliver products to site under provisions of Section B. Store and protect products under provisions of Section C. Deliver products to site in sealed and labelled containers; inspect to verify acceptance. D. Container labelling to include manufacturer's name, type of paint, brand name, brand code, coverage, surface preparation, drying time, cleanup, color designation, and instructions for mixing and reducing. E. Store paint materials at minimum ambient temperature of 45 degrees F (7 degrees C) and a maximum of 90 degrees F (32 degrees C), in well ventilated area, unless required otherwise by manufacturer's instructions. F. Take precautionary measures to prevent fire hazards and spontaneous combustion. 1.9 ENVIRONMENTAL REQUIREMENTS A. Provide continuous ventilation for 24 hours before, during, and 48 hours after application of finishes, unless required otherwise by manufacturer's instructions. B. Provide lighting level of 80 ft candles measured mid-height at substrate surface EXTRA STOCK A. Provide a one gallon container of each color to Owner. Total not to exceed 5 gallons. B. Label each container with color, texture, in addition to the manufacturer's label. PART 2 - PRODUCTS 2.1 ACCEPTABLE MANUFACTURERS A. Sherwin Williams. B. I.C.I. C. Substitutions: Under provisions of Section PAINTING July 18, 2016

17 2.2 MATERIALS A. Coatings: Ready mixed, except field catalyzed coatings. Process pigments to a soft paste consistency, capable of being readily and uniformly dispersed to a homogeneous coating. B. Coatings: Good flow and brushing properties; capable of drying or curing free of streaks or sags. C. Accessory Materials: Linseed oil, shellac, turpentine, paint thinners and other materials not specifically indicated but required to achieve the finishes specified, of commercial quality. 2.3 FINISHES A. Refer to schedule at end of Section for surface finish schedule. PART 3 - EXECUTION 3.1 INSPECTION A. Verify that surfaces are ready to receive work as instructed by the product manufacturer. B. Examine surfaces scheduled to be finished prior to commencement of work. Report any condition that may potentially affect proper application. C. Measure moisture content of surfaces using an electronic moisture meter. Do not apply finishes unless moisture content of surfaces are below the following maximums: 1. Plaster and Gypsum Wallboard: 12 percent. 2. Masonry, Concrete, and Concrete Unit Masonry: 12 percent. 3. Interior Located Wood: 15 percent, measured in accordance with ASTM D2016. D. Beginning of installation means acceptance of existing substrate. 3.2 PREPARATION A. Remove electrical plates, hardware, light fixture trim, and fittings prior to preparing surfaces or finishing. B. Correct minor defects and clean surfaces which affect work of this Section. C. Shellac and seal marks which may bleed through surface finishes. D. Impervious Surfaces: Remove mildew by scrubbing with solution of tri-sodium phosphate and bleach. Rinse with clean water and allow to dry. PAINTING July 18, 2016

18 E. Aluminum Surfaces Scheduled for Paint Finish: Remove surface contamination by steam or high pressure water. Remove oxidation with acid etch and solvent washing. Apply etching primer immediately following cleaning. F. Asphalt, Creosote, or Bituminous Surfaces Scheduled for Paint Finish: Remove foreign particles to permit adhesive of finishing materials. Apply compatible sealer or primer. G. Insulated Coverings: Remove dirt, grease, and oil from canvas and cotton. H. Concrete Floors: See Division 3. I. Gypsum Board Surfaces: Latex fill minor defects. Spot prime defects after repair. J. Galvanized Surfaces: Remove surface contamination and oils and wash with solvent. Apply coat of etching primer. K. Concrete and Unit Masonry Surfaces Scheduled to Receive Paint Finish: Remove dirt, loose mortar, scale, salt or alkali powder, and other foreign matter. Remove oil and grease with a solution of trisodium phosphate; rinse well and allow to dry. Remove stains caused by weathering of corroding metals with a solution of sodium metasilicate after thoroughly wetting with water. Allow to dry. L. Plaster Surfaces: Fill hairline cracks, small holes, and imperfections with latex patching plaster. Make smooth and flush with adjacent surfaces. Wash and neutralize high alkali surfaces. M. Uncoated Steel and Iron Surfaces: Remove grease, scale, dirt, and rust. Where heavy coatings of scale are evident, remove by wire brushing or sandblasting; clean by washing with solvent. Apply a treatment of phosphoric acid solution, ensuring weld joints, bolts, and nuts are similarly cleaned. Spot prime paint after repairs. N. Shop Primed Steel Surfaces: Sand and scrape to remove loose primer and rust. Feather edges to make touch-up patches inconspicuous. Clean surfaces with solvent. Prime bare steel surfaces. Prime metal items including shop primed items. O. Interior Wood Items Scheduled to Receive Finish: Wipe off dust and grit prior to priming. Seal knots, pitch streaks, and sappy sections with sealer. Fill nail holes and cracks after primer has dried; sand between coats. P. Wood and Metal Doors Scheduled for Painting: Seal top and bottom edges with primer. 3.3 PROTECTION A. Protect elements surrounding the work of this Section from damage or disfiguration. B. Repair damage to other surfaces caused by work of this Section. C. Furnish drop cloths, shields, and protective methods to prevent spray or droppings from disfiguring other surfaces. PAINTING July 18, 2016

19 D. Remove empty paint containers from site. 3.4 APPLICATION A. Apply products in accordance with manufacturer's instructions. B. Do not apply finishes to surfaces that are not dry. C. Apply each coat to uniform finish. D. Apply each coat of paint slightly darker than preceding coat unless otherwise approved. E. Sand lightly between coats to achieve required finish. F. Allow applied coat to dry before next coat is applied. G. Where clear finishes are required, tint fillers to match wood. Work fillers into the grain before set. Wipe excess from surface. H. Prime back surfaces of interior and exterior woodwork with primer paint. I. Prime back surfaces of interior woodwork scheduled to receive stain or varnish finish with gloss varnish reduced 25 percent with mineral spirits. 3.5 FINISHING MECHANICAL AND ELECTRICAL EQUIPMENT A. Paint shop primed equipment and all roof top mounted equipment. B. Remove unfinished louvers, grilles, covers, and access panels on mechanical and electrical components and paint separately. C. Prime and paint insulated and exposed pipes, conduit boxes, insulated and exposed ducts, hangers, brackets, collars and supports, except where items are prefinished. D. Replace identification markings on mechanical or electrical equipment when painted accidentally. E. Paint interior surfaces of air ducts, and convector and baseboard heating cabinets that are visible through grilles and louvers with one coat or flat black paint, to limit of sight line. Paint dampers exposed behind louvers, grilles, and convector and baseboard cabinets to match face panels. F. Paint exposed conduit and electrical equipment occurring at finished areas. G. Paint both sides and edges of plywood backboards for electrical and telephone equipment before installing equipment. H. Replace electrical plates, hardware, light fixture trim, and fittings removed prior to finishing. PAINTING July 18, 2016

20 3.6 CLEANING A. As Work proceeds, promptly remove paint where spilled, splashed, or splattered. B. During progress of Work maintain premises free of unnecessary accumulation of tools, equipment, surplus materials, and debris. C. Collect cotton waste, cloths, and materials which may constitute a fire hazard, place in closed metal containers and remove daily from site. 3.7 SCHEDULE - INTERIOR SURFACES A. Wood - Painted 1. One coat Alkyd Primer Sealer. SW Pro Mar undercoater B49 W200; 2.0 mils DFT. 2. Two coats Alkyd Enamel, Eggshell, SW Pro Mar B33; 2.0 mils DFT per coat. B. Wood - Transparent Finish 1. Filler coat. 2. One coat stain. 3. One coat sealer. 4. Two coats stain finish varnish. 5. Materials to be selected from submitted samples. C. Concrete, Concrete Block 1. One coat block filler: S.W. Loxon block filler. 2. Two coats Semi-Gloss Enamel. SW Pro Mar 200 B31 W200; 2.0 mils DFT. D. Concrete and Concrete Block (epoxy finish) 1. See Section Special Coatings E. Steel - Unprimed 1. One coat zinc chromate primer. 2. Two coats Alkyd Enamel satin finish. SW Pro Mar B34; 2.0 mils DFT per coat. F. Steel - Shop Primed 1. Touch up with original primer. All surfaces must be dry, clean and free of contaminants. 2. Two coats Alkyd Enamel satin finish, SW Pro Mar B34; 2.0 mils DFT per coat. G. Steel Galvanized Metal Primer: B66W00310 Pro Industrial Pro-Cryl Universal Primer Off White PAINTING July 18, 2016

21 First Coat: B54W00151 Industrial Urethane Alkyd Enamel Extra White Second Coat: B54W00151 Industrial Urethane Alkyd Enamel Extra White H. Cement Siding Primer: B42WJ0050 Southwest Builders Summit Exterior Acrylic Primer White First Coat: B13WJ0051 Southwest Builders Summit Exterior Latex Satin Extra White Second Coat: B13WJ0051 Southwest Builders Summit Exterior Latex Satin Extra White 3.8 SCHEDULE - EXTERIOR SURFACES A. See Section END OF SECTION PAINTING July 18, 2016

22

SECTION EPOXY RESIN FLOORING

SECTION EPOXY RESIN FLOORING SECTION 09705 - EPOXY RESIN FLOORING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Furnish all necessary material, labor and equipment required to prepare designated traffic areas and install quartz broadcast

More information

1.6 QUALITY ASSURANCE A. Source Limitations for Tile: Obtain tile of each type and color or finish from one source or producer.

1.6 QUALITY ASSURANCE A. Source Limitations for Tile: Obtain tile of each type and color or finish from one source or producer. SECTION 093000 - TILING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION PAINTING. A. Surface preparation and field application of paints and coatings at interior and exterior surfaces.

SECTION PAINTING. A. Surface preparation and field application of paints and coatings at interior and exterior surfaces. SECTION 09910 PAINTING 1 PART ONE - GENERAL 1.1 COORDINATION A. Drawings and General provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 093000 - TILING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION TILING

SECTION TILING SECTION 093000 TILING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

TILING Lutheran Church of the Holy Spirit

TILING Lutheran Church of the Holy Spirit SECTION 093000 - TILING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Porcelain tile. 2. Tile backing panels. 3. Metal edge strips. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

SECTION PAINTS AND COATINGS. 1.3 REFERENCES A. ASTM D 16 - Standard Terminology for Paint, Related Coatings, Materials, and Applications; 2000.

SECTION PAINTS AND COATINGS. 1.3 REFERENCES A. ASTM D 16 - Standard Terminology for Paint, Related Coatings, Materials, and Applications; 2000. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Surface preparation. B. Field application of paints, stains, varnishes, and other coatings. C. See Schedule - Surfaces to be Finished, at end of Section. 1.2 RELATED

More information

SECTION TILING PART 1 - GENERAL 1.1 SUMMARY. A. Section Includes: 1. Ceramic tile. 2. Waterproof membrane. 3. Metal edge strips.

SECTION TILING PART 1 - GENERAL 1.1 SUMMARY. A. Section Includes: 1. Ceramic tile. 2. Waterproof membrane. 3. Metal edge strips. SECTION 093000 - TILING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Ceramic tile. 2. Waterproof membrane. 3. Metal edge strips. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

A. Product Data: For each type of tile, mortar, grout, and other products specified.

A. Product Data: For each type of tile, mortar, grout, and other products specified. SECTION 09310 - CERAMIC TILE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

TILE TILE

TILE TILE 09300 - TILE 09300-1 PART ONE: GENERAL 1.1 Description TILE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the requirements

More information

A. Module Size: Actual tile size (minor facial dimension as measured per ASTM C 499) plus joint width indicated.

A. Module Size: Actual tile size (minor facial dimension as measured per ASTM C 499) plus joint width indicated. SECTION 093000 - TILING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 01 Specification Sections, apply

More information

SECTION PAINTS AND COATINGS

SECTION PAINTS AND COATINGS McClellan Blakemore Architects New Warehouse Facility for SECTION 09900 PAINTS AND COATINGS PART 1 GENERAL 1.01 SECTION INCLUDES A. Surface preparation. B. Field application of paints and stains. C. Scope:

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 093000 - TILING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Construction Specification

Construction Specification PART 1 - GENERAL 1.01 SUMMARY A. Furnish all labor, materials, tools and equipment required for completing tile work and related items indicated on the drawings and herein specified. B. Related work specified

More information

B. Related Sections: 1. Division 07 Section "Joint Sealants" for sealing of expansion, contraction, control, and isolation joints in tile surfaces.

B. Related Sections: 1. Division 07 Section Joint Sealants for sealing of expansion, contraction, control, and isolation joints in tile surfaces. SECTION 093000 - CERAMIC TILE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

1.3 Work shall include all reinforcement and accessories necessary to complete installation.

1.3 Work shall include all reinforcement and accessories necessary to complete installation. CERAMIC TILING GENERAL INFORMATION 1.1 Ceramic mosaic tile floors and bases, glazed wall tile wainscots and walls, and marble thresholds. 1.2 Installation will typically be with latex-portland cement mortar

More information

Bush Elem. Addition & Alterations QUARRY TILE SECTION QUARRY TILE PART 1 - GENERAL

Bush Elem. Addition & Alterations QUARRY TILE SECTION QUARRY TILE PART 1 - GENERAL 73651.01 QUARRY TILE 093016-1 1.1 RELATED DOCUMENTS: SECTION 093016 - QUARRY TILE PART 1 - GENERAL A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division

More information

SECTION RESILIENT TILE FLOORING. A. Section includes vinyl composition floor tile and accessories indicated and as specified.

SECTION RESILIENT TILE FLOORING. A. Section includes vinyl composition floor tile and accessories indicated and as specified. SECTION 09 65 19 RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 SUMMARY A. Section includes vinyl composition floor tile and accessories indicated and as specified. 1.2 SUBMITTALS A. Product Data: Submit

More information

ZONE 7 WATER AGENCY CWS 5 TURNOUT REPLACEMENT PROJECT # ADDENDUM NO. 3 April 02, 2019

ZONE 7 WATER AGENCY CWS 5 TURNOUT REPLACEMENT PROJECT # ADDENDUM NO. 3 April 02, 2019 ZONE 7 WATER AGENCY CWS 5 TURNOUT REPLACEMENT PROJECT # 275-18 ADDENDUM NO. 3 April 02, 2019 This Addendum No. 3 ( Addendum ) is dated the date set forth above and modifies certain Bidding Documents issued

More information

Division 09 Finishes Section Ohio Utilities Protection Service New Office Building Bid Package B TILING

Division 09 Finishes Section Ohio Utilities Protection Service New Office Building Bid Package B TILING SECTION 09 30 00 TILING PART 1 GENERAL 1.1 SUMMARY A. Section includes: 1. Porcelain Paver Tile. 2. Mortars and Grouts. 3. Floor Preparation Materials. B. Related Sections: Documents relating to the work

More information

A. Section includes surface preparation and application of wood finishes[.]

A. Section includes surface preparation and application of wood finishes[.] SECTION 09 93 00 - STAINING AND TRANSPARENT FINISHING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION TILING

SECTION TILING PART 1 GENERAL 1.01 SECTION INCLUDES A. Ceramic Tile for floor applications. B. Ceramic Tile for wall applications. C. Ceramic accessories. D. Ceramic trim. E. Non-ceramic trim. 1.02 RELATED REQUIREMENTS

More information

DIVISION 9 - FINISHES

DIVISION 9 - FINISHES Part 1 - General 1.01 Work Included: A. All materials, labor services and incidentals necessary for the completion of this section of the work. 1.02 Quality Assurance: A. Standards: 1. Tile Council of

More information

SECTION High Performance Coatings Field Applied Acrylic Urethanes (Solid Color, Pearl and Metallic Finishes)

SECTION High Performance Coatings Field Applied Acrylic Urethanes (Solid Color, Pearl and Metallic Finishes) - 1 - SECTION 099600 High Performance Coatings Field Applied Acrylic Urethanes (Solid Color, Pearl and Metallic Finishes) PART 1 GENERAL 1.1 SECTION INCLUDES A. Systems for field applied acrylic urethane

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES SECTION 09260 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SUMMARY A. Provide gypsum board assemblies. 1.2 SUBMITTALS A. Product Data: Submit manufacturer's product data and installation instructions for

More information

1.1 This Section includes surface preparation and the application of base coats, intermediate and topcoats.

1.1 This Section includes surface preparation and the application of base coats, intermediate and topcoats. PAINTING GENERAL INFORMATION 1.1 This Section includes surface preparation and the application of base coats, intermediate and topcoats. DESIGN REQUIREMENTS 2.1 Material Compatibility: a. Provide materials

More information

SECTION PENETRATION FIRESTOPPING PART 1- GENERAL PART 2- PRODUCTS 1.1 RELATED DOCUMENTS

SECTION PENETRATION FIRESTOPPING PART 1- GENERAL PART 2- PRODUCTS 1.1 RELATED DOCUMENTS SECTION 07 8413- PENETRATION FIRESTOPPING PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. Section includes surface preparation and the application of paint systems on interior substrates.

A. Section includes surface preparation and the application of paint systems on interior substrates. SECTION 09 91 23 - INTERIOR PAINTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION CERAMIC TILE. B. Ceramic tile wall finishes including standard and custom designs.

SECTION CERAMIC TILE. B. Ceramic tile wall finishes including standard and custom designs. SECTION 09 30 13 CERAMIC TILE PART 1 GENERAL 1.1 SECTION INCLUDES A. Ceramic tile floor and base finishes. B. Ceramic tile wall finishes including standard and custom designs. 1.2 REFERENCES A. ANSI/TCNA

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 096519 - RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION JOINT SEALERS 1.03 THIS SECTION INCLUDES JOINT SEALERS FOR THE FOLLOWING LOCATIONS:

SECTION JOINT SEALERS 1.03 THIS SECTION INCLUDES JOINT SEALERS FOR THE FOLLOWING LOCATIONS: PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 07900 - A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 099600 - HIGH PERFORMANCE COATINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION TILING

SECTION TILING SECTION 09 30 00 TILING PART 1 - GENERAL 1.1 SUMMARY A. Section includes tile as indicated on new surfaces and as specified. 1.2 SUBMITTALS A. Samples: 1. Submit samples of colors and sizes of tile. B.

More information

MDC MicroTex Eggshell Micro-Textured Ceramic Coating for Walls

MDC MicroTex Eggshell Micro-Textured Ceramic Coating for Walls MicroTex Eggshell Micro-Textured Ceramic Coating for Walls Specification Guide 95: 9770 Special Wall Finishes 88: 9800 Special Coatings Part 1 General 1.01 SUMMARY A. This section specifies the furnishing

More information

SECTION CERAMIC and QUARRY TILE

SECTION CERAMIC and QUARRY TILE PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 09 30 13 CERAMIC and QUARRY TILE A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 specification

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 096623 - RESINOUS MATRIX TERRAZZO FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION RESILIENT SHEET FLOORING

SECTION RESILIENT SHEET FLOORING SECTION 09665 RESILIENT SHEET FLOORING PART 1 - GENERAL 1.1 DESCRIPTION A. This Section specifies the installation of sheet flooring with backing and integral cove base. 1.2 RELATED WORK A. Color and pattern:

More information

PROJECT NO August 19, 2014 SENATE CHAMBER MEZZANINE RENOVATION MISSOURI STATE CAPITOL BUILDING SECTION JOINT SEALANTS

PROJECT NO August 19, 2014 SENATE CHAMBER MEZZANINE RENOVATION MISSOURI STATE CAPITOL BUILDING SECTION JOINT SEALANTS SECTION 079200 -JOINT SEALANTS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION RESILIENT TILE FLOORING

SECTION RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 65 19 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

SECTION RESILIENT SHEET FLOORING

SECTION RESILIENT SHEET FLOORING SECTION 09 65 16 RESILIENT SHEET FLOORING SPEC WRITER NOTE: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1.

More information

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Concrete Steps B. Handrails C. Safety Rail 1.02 DESCRIPTION OF WORK A. Construction of concrete steps. B. Furnishing

More information

ARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment

ARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment ARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment SECTION 03 01 30 Maintenance of Cast-In-Place Concrete PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings,

More information

B. Store products in dry spaces protected from the weather, with ambient temperatures maintained between 50 and 90 deg F (10 and 32 deg C).

B. Store products in dry spaces protected from the weather, with ambient temperatures maintained between 50 and 90 deg F (10 and 32 deg C). SECTION 09651 - RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Kolorines Glass Mosaic Tiles Project Specification

Kolorines Glass Mosaic Tiles Project Specification Kolorines Glass Mosaic Tiles Project Specification SUGGESTED SPECIFICATION Glass Mosaic Tile Installation for Swimming Pools NOTES TO SPECIFIER: 1. Specify PremiumPlus Thin-Set mixed with CustomFlex Additive

More information

C. Samples: For each door face material, at least 3 by 5 inches (75 by 125 mm) in size, in specified finish.

C. Samples: For each door face material, at least 3 by 5 inches (75 by 125 mm) in size, in specified finish. SECTION 083113 - ACCESS DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION POLYPROPYLENE FABRIC WALL COVERING

SECTION POLYPROPYLENE FABRIC WALL COVERING PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 09 72 31 POLYPROPYLENE FABRIC WALL COVERING SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. Also delete any other item or paragraph not

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 096813 - TILE CARPETING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION QUARRY TILE

SECTION QUARRY TILE SECTION 09 30 16 QUARRY TILE PART 1 GENERAL 1.1 SECTION REQUIREMENTS A. Provide all labor, materials and equipment required for the installation of quarry tile flooring as shown on drawings and schedules

More information

SECTION CONCRETE PAVING SLABS SET IN MORTAR

SECTION CONCRETE PAVING SLABS SET IN MORTAR SECTION 32 14 13.16 CONCRETE PAVING SLABS SET IN MORTAR (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs mortared to a concrete base and grouted joints

More information

CONSULT COLDSPRING FOR ASSISTANCE IN EDITING THIS SPECIFICATION GUIDE FOR SPECIFIC APPLICATIONS.

CONSULT COLDSPRING FOR ASSISTANCE IN EDITING THIS SPECIFICATION GUIDE FOR SPECIFIC APPLICATIONS. SECTION NUMBERS AND TITLES IN THIS SPECIFICATION UTILIZE MASTERFORMAT 2004. THIS SPECIFICATION GUIDE IS WRITTEN ACCORDING TO THE CONSTRUCTION SPECIFICATIONS INSTITUTE (CSI) THREE-PART SECTION FORMAT (1998)

More information

The City of Winnipeg NEWPCC Lab Renovation

The City of Winnipeg NEWPCC Lab Renovation Bid Opportunity 253-2011 Page 1 of 6 Part 1 General 1.1 SUMMARY.1 Work under this contract includes, but is not necessarily limited to:.1 Surface preparation of substrates as required for acceptance of

More information

SECTION PORTLAND CEMENT TERRAZZO FLOORING

SECTION PORTLAND CEMENT TERRAZZO FLOORING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 66 13 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //---// if not applicable to project. Also delete any other item or paragraph

More information

SECTION CERAMIC TILING

SECTION CERAMIC TILING SECTION 09 3013 CERAMIC TILING PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install ceramic tile and tile setting materials and accessories as described in Contract Documents.

More information

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE MANNINGTON COLORFIELDS SHEET RUBBER FLOORING Section 09 65 16 Sheet rubber Flooring (Thermoset Rubber) Created May 2012 Mannington Mills, Inc. P. O. Box

More information

SECTION CERAMIC TILE

SECTION CERAMIC TILE SECTION 09300 CERAMIC TILE PART 1 GENERAL 1.1 SCOPE A. Drawings and general provisions of the Contract, including General and Supplementary General Conditions, Division 00 & 01 Specification Sections,

More information

ARDEX GUIDE SPECIFICATION ARDEX FEATHER FINISH Self-Drying, Cement-Based Finish Underlayment

ARDEX GUIDE SPECIFICATION ARDEX FEATHER FINISH Self-Drying, Cement-Based Finish Underlayment ARDEX GUIDE SPECIFICATION ARDEX FEATHER FINISH Self-Drying, Cement-Based Finish Underlayment SECTION 03 01 30 Maintenance of Cast-In-Place Concrete PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings, general

More information

This Section includes surface preparation and field application of anti-graffiti coating systems for the following vertical and horizontal surfaces:

This Section includes surface preparation and field application of anti-graffiti coating systems for the following vertical and horizontal surfaces: 0 0 0 0 0 0 SECTION 0 ANTI- GRAFFITI COATINGS PART - GENERAL RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division Specification

More information

ADDENDUM NO. 6. Acknowledge receipt of this Addendum in the space provided in the Proposal Form. Failure to do so may disqualify the Bidder.

ADDENDUM NO. 6. Acknowledge receipt of this Addendum in the space provided in the Proposal Form. Failure to do so may disqualify the Bidder. PROJECT: Lovington Fire Station # 2 WDG PROJECT NO: 445-01 DATE: July 120, 2018 ADDENDUM NO. 6 NOTICE TO PROPOSERS: This Addendum forms a part of the Contract Documents and modifies the original Specifications

More information

SECTION RESINOUS FLOORING

SECTION RESINOUS FLOORING SECTION 09705 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section includes all materials and installation necessary to provide resinous flooring system with integral cove base and top finish

More information

***************************************************************************************************************

*************************************************************************************************************** 09330 QUARRY TILE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 09 30 16 ***************************************************************************************************************

More information

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9080 - Concrete Steps, Handrails, and Safety Rail CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART - GENERAL.0 SECTION INCLUDES

More information

A. Prepare formwork shop drawings using qualified professional engineer. Include detail of fabrication, assembly, and support of formwork.

A. Prepare formwork shop drawings using qualified professional engineer. Include detail of fabrication, assembly, and support of formwork. DIVISION 03 CONCRETE 03 0100 MAINTENANCE OF CONCRETE 03 0505 UNDER SLAB VAPOR BARRIER A. Sheet vapor retarder shall be polyethylene sheet, ASTM D 4397, 10 mils thick minimum. Consult with Facilities Management

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

SECTION UNIT PAVERS

SECTION UNIT PAVERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Concrete pavers. 2. Detectable warning pavers. 3. Warning stripe pavers. 1.2 SUBMITTALS A. Product Data: For the following: 1. Pavers.

More information

FLUID APPLIED WATERPROOFING

FLUID APPLIED WATERPROOFING SECTION 07120 FLUID APPLIED WATERPROOFING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-In-Place Concrete. 2. 09200 - Metal Studs, Metal Lath, Suspension Ceilings, Plaster, and Stucco.

More information

SECTION PAINTING Ultra Premium

SECTION PAINTING Ultra Premium SECTION 09 90 00 PAINTING Ultra Premium PART 3-EXECUTION 3.01 PREPARATION: A. Perform preparation and cleaning procedures in strict accordance with coating manufacturer s instructions for each substrate

More information

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO SECTION 09 65 16 - RESILIENT SHEET FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION CERAMIC TILING

SECTION CERAMIC TILING SECTION 093013 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

A. Drawings and general provisions of the Contract apply to this Section including all documentation provided in RFP#

A. Drawings and general provisions of the Contract apply to this Section including all documentation provided in RFP# SECTION 096466 - WOOD ATHLETIC FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section including all documentation provided in. 1.2 SUMMARY

More information

C. Module Size: Actual tile size plus joint width indicated.

C. Module Size: Actual tile size plus joint width indicated. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

More information

CSI GUIDE Countertops

CSI GUIDE Countertops CSI GUIDE Countertops Part 1 General 1.0 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including general and supplementary conditions and Division 1 Specification Sections, apply

More information

Editing notes to assist users are separated from specification text by rows of asterisks. Delete these notes prior to final printing.

Editing notes to assist users are separated from specification text by rows of asterisks. Delete these notes prior to final printing. SECTION 09635 LIMESTONE FLOORING This guide specification has been prepared by TexaStone Quarries LLC to assist design professionals in the preparation of a specification section covering cut limestone

More information

ROOF REPLACEMENT AND ALTERATIONS TO WOODSTOCK Barrett Architecture, PC WASTE WATER TREATMENT FACILITY - Woodstock, VT February 28, 2019 SECTION

ROOF REPLACEMENT AND ALTERATIONS TO WOODSTOCK Barrett Architecture, PC WASTE WATER TREATMENT FACILITY - Woodstock, VT February 28, 2019 SECTION SECTION 079200 PART 1 - GENERAL 1.1 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS which are hereby made a

More information

A. Section includes surface preparation and the application of high-performance coating systems on the following substrates:

A. Section includes surface preparation and the application of high-performance coating systems on the following substrates: ILLINOIS STATE UNIVERSITY CORDOGAN, CLARK & ASSOCIATES, INC. WATTERSON DINING EXPANSION PROJECT 960 RIDGEWAY AVENUE NORMAL, ILLINOIS AURORA, ILLINOIS CCA PROJECT NUMBER: 14362 630-896-4678 BID SET JULY

More information

SECTION COMMON WORK RESULTS FOR CONCRETE SSPECIALTY COATINGS

SECTION COMMON WORK RESULTS FOR CONCRETE SSPECIALTY COATINGS SECTION 03 05 00 COMMON WORK RESULTS FOR CONCRETE 09 97 00 SSPECIALTY COATINGS Weld Crete ************************************************************************************************************************

More information

SECTION GRANITE TILING

SECTION GRANITE TILING SECTION 09 30 33.13 GRANITE TILING This guide specification utilizes recommendations and formats contained in references of the Construction Specifications Institute (CSI), including the CSI Practice Guides

More information

A. Product Data: For each joint-sealant product indicated. D. Joint-Sealant Schedule: Include the following information:

A. Product Data: For each joint-sealant product indicated. D. Joint-Sealant Schedule: Include the following information: SECTION 079200 - JOINT SEALANTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

DIVISION 7 THERMAL AND MOISTURE PROTECTION SECTION PENETRATION FIRESTOPPING

DIVISION 7 THERMAL AND MOISTURE PROTECTION SECTION PENETRATION FIRESTOPPING DIVISION 7 THERMAL AND MOISTURE PROTECTION SECTION 07 84 13 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Rust-Oleum Industrial Brands Specification

Rust-Oleum Industrial Brands Specification Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 44 A solvent based coating system High Performance 7400 System 450 VOC DTM Alkyd Enamel

More information

SECTION STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 08110 - STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division 1 Specification

More information

1. Division 09 Section "Rough Carpentry."

1. Division 09 Section Rough Carpentry. GREENSPOINT AND LAUDER RD. EC/PRE-KlK PAGE 1 SECTION 096400 - WOOD FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

POLYACRYLATE MODIFIED THINSET TERRAZZO 1

POLYACRYLATE MODIFIED THINSET TERRAZZO 1 PART 1 - GENERAL GUIDE SPECIFICATION POLYACRYLATE MODIFIED THINSET TERRAZZO - REVISED AUG 02 1.1 RELATED DOCUMENTS A. Section includes thin set Polyacrylate Modified Terrazzo flooring (and integral cove

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 09 6613 - PORTLAND CEMENT TERRAZZO FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

1/16 Single Broadcast Polymer Flooring System

1/16 Single Broadcast Polymer Flooring System specification 1/16 Single Broadcast Polymer Flooring System Part 1 - GENERAL General Provisions A. Work to be covered by this section, under written specification or by drawing, shall comply with all provisions

More information

SECTION BRICK FLOORING

SECTION BRICK FLOORING SECTION 09 63 13 BRICK FLOORING SPEC WRITER NOTE: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Brick flooring

More information

A. This Section includes traffic coatings for the following applications:

A. This Section includes traffic coatings for the following applications: SECTION 071800 - TRAFFIC COATINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes traffic coatings for the following applications: 1. Interior and exterior, pedestrian traffic. 2. Vehicular traffic.

More information

ARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment

ARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment ARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment SECTION 03 01 30 Maintenance of Cast-In-Place Concrete PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings,

More information

Copyright 2018, The Sherwin-Williams Company ISSUED MAY OTC PHASE II INTERIOR HIGH PERFORMANCE COATINGS INDUSTRIAL COATINGS

Copyright 2018, The Sherwin-Williams Company ISSUED MAY OTC PHASE II INTERIOR HIGH PERFORMANCE COATINGS INDUSTRIAL COATINGS Copyright 2018, The Sherwin-Williams Company ISSUED MAY 2018 09 96 00 OTC PHASE II INTERIOR HIGH PERFORMANCE COATINGS INDUSTRIAL COATINGS THE SHERWIN-WILLIAMS COMPANY INDUSTRIAL PAINTING SCHEDULE GUIDE

More information

Orangeburg County Sheriff s Department: Storage & K-9 Facility

Orangeburg County Sheriff s Department: Storage & K-9 Facility SECTION 09900-1 INTERIOR, EXTERIOR AND INDUSTRIAL PAINTS AND COATINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Interior paint and coatings systems (LEED-09 NC/CI/CS Compliant) including surface preparation.

More information

Olde Hickory 1, 2 & Hickory Hill Court Fort Myers, Fl Revised June 10, 2015

Olde Hickory 1, 2 & Hickory Hill Court Fort Myers, Fl Revised June 10, 2015 Prepared For: Tony Roller P and M Property Management 14360 South Tamiami Trail # B Fort Myers Fl. 33912 Fort Myers (239) 481-1577 / Naples (239) 596-7887 Fax # (239) 481-1789 Tony Roller

More information

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces. SECTION 05500- METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

D. Maintenance data for resilient floor tile to include in Operating and Maintenance Manual specified in Division 1.

D. Maintenance data for resilient floor tile to include in Operating and Maintenance Manual specified in Division 1. SECTION 09660 RESILIENT TILE FLOORING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION PAVER TILE

SECTION PAVER TILE SECTION 09340 PAVER TILE PART 1 - GENERAL 1.01 DESCRIPTION: A. This section specifies providing paver tiles, typically in patron areas as shown. These tiles are noted on Drawings as: 1. Paver tile. 2.

More information

ARDEX GUIDE SPECIFICATION ARDEX GPS GENERAL PATCH & SKIMCOAT Trowelable underlayment

ARDEX GUIDE SPECIFICATION ARDEX GPS GENERAL PATCH & SKIMCOAT Trowelable underlayment ARDEX GUIDE SPECIFICATION ARDEX GPS GENERAL PATCH & SKIMCOAT Trowelable underlayment SECTION 03 01 30 Maintenance of Cast-In-Place Concrete PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings, general provisions

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 09 - FINISHES

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 09 - FINISHES SECTION 099113 - EXTERIOR PAINTING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes surface preparation and the application of paint systems on the following exterior substrates: 1. Concrete. 2. Concrete

More information

For residential housing projects the use of reinforced gypsum wallboards is required in all public and common areas.

For residential housing projects the use of reinforced gypsum wallboards is required in all public and common areas. SECTION 09 00 00 FINISHES DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES 09 00 00 SECTION 09 20 00 - PLASTER AND GYPSUM BOARD Use 5/8 gypsum wallboard for walls and ceilings. For residential

More information

Spec Master 5/7/ For each product requiring color and texture selection, provide full size samples.

Spec Master 5/7/ For each product requiring color and texture selection, provide full size samples. SECTION 04812 (042012) MECHANICALLY ATTACHED BRICK PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

EPOXY TERRAZZO 1 REV. 8/02

EPOXY TERRAZZO 1 REV. 8/02 PART 1 - GENERAL GUIDE SPECIFICATIONS section 9400 EPOXY THINSET TERRAZZO (Without A Crack Suppression Membrane) REVISED MAY 2003 1.1 RELATED DOCUMENTS A. Section includes thin-set epoxy terrazzo flooring

More information

Copyright 2018, The Sherwin-Williams Company ISSUED MAY SCAQMD HIGH PERFORMANCE COATINGS INDUSTRIAL PAINTING

Copyright 2018, The Sherwin-Williams Company ISSUED MAY SCAQMD HIGH PERFORMANCE COATINGS INDUSTRIAL PAINTING Copyright 2018, The Sherwin-Williams Company ISSUED MAY 2018 09 96 00 - SCAQMD HIGH PERFORMANCE COATINGS INDUSTRIAL PAINTING THE SHERWIN-WILLIAMS COMPANY INDUSTRIAL PAINTING SCHEDULE GUIDE This Painting

More information