Doing Business with the Metropolitan Washington Airports Authority

Size: px
Start display at page:

Download "Doing Business with the Metropolitan Washington Airports Authority"

Transcription

1 Doing Business with the Metropolitan Washington Airports Authority MWMCA Quarterly Economic Summit Brown Advisory November 7, 2017

2 Introduction to MWAA Ronald Reagan Washington National Airport Washington Dulles International Airport Dulles Toll Road Dulles Corridor Metrorail MWAA Created MWAA Operates DCA & IAD Control of DTR Metrorail The Airports Authority was created with consent of U.S. Congress by Acts of D.C. Council and the Virginia GeneralAssembly MWAA assumed operating responsibility for DCA and IAD under a 50-year lease; subsequently extended through 2067 MWAA could access bond markets to finance capital development at the airports VDOT transferred operational and financial control of the Dulles Toll Road to MWAA for a term through 2058 to facilitate funding of a 23- mile Metrorail system extension Metrorail Phase 1 opened for passenger service in July 2014 Phase 2 will extend service to Dulles Airport and Loudoun County 2

3 Office of Supply Chain Management Procurement & Contracts Property Supplier Diversity Ensure integrity and fairness in the MWAA contracting process Oversee solicitations, vendor selection, negotiation, award, contract management, and reporting Corporate Asset Management Ensure maximum utilization of small, local, minority, and women-owned businesses Conduct SB outreach, certification, pre- and post-award compliance, and report on Small Business participation Business Integration & Optimization 3

4 MWAA Fact Sheet (FY2016) Over 500 active contracts and 7,000 annual requisitions Contract Awards (#) Average # of new opportunities each year: Awards By Type Architectural & Engineering Contract Awards ($ M) Construction Services Goods 4

5 MWAA Local Disadvantaged Business Enterprise (LDBE) Program LDBE Program participation requirements apply to non-federally funded contract opportunities: 25% participation on construction contracts 20% participation on goods and services contracts Certification available to: Small businesses (per US Small Business Administration sizestandards) organized for profit located within 100-mile radius of Washington, DC s Zero Mile Marker DSD reviews all solicitations with an estimated value > $25,000 to assign LDBE participation requirements where: Scope of work provides viable prime or subcontracting opportunities for LDBEs, and LDBE availability provides projected adequate competition To better improve chances of success, LDBEs should only list NAICS codes on their profile that best reflect their company s core capabilities and relevant work experience. 5

6 Procurement Planning & Upcoming Opportunities MWAA publishes a Quarterly Acquisition Forecast > Contracting Opportunities > Upcoming Contract Opportunities > Future Lists upcoming solicitations - Facilitates strategic outreach efforts - Provides small businesses the opportunity to be more prepared Near-term opportunities (through June 2017) are expected to include: - Legal Services-Employment-related litigation and non litigation services (Aviation Enterprise) - Airside Rubber and Paint Removal Services at Reagan National - Glass and Aluminum Curtain Wall Cleaning Services at Reagan - Chillers Maintenance and Preventive Maintenance Contract at Reagan National and Dulles International - LED Lamp Replacement at Dulles International - Pavement Marking at Dulles Toll Road - Police Vehicle Replacement 6

7 Small Business Quick Links MWAA Resources Supplier Diversity Management System MWAA Procurement Information (Updated frequently) Project elert Department of Supplier Diversity On-line certification application and renewal Real-time monitoring of certification applications in process Targeted outreach for contracting opportunities Buyer visibility into MWAA-certified firms Online contract compliance monitoring Overview of Contracting Programs Current & Upcoming Contracting Opportunities Project elert Link to Small Business Certification Applications Contracting Opportunities Newsletter Register Once and Receive Automatic UpdatesElectronically MWAA s certification offerings DSD Calendar of Events Department policies Federal goal methodologies Questions? Please call or supplierdiversity@mwaa.com 7

8 TURNER CONSTRUCTION NEW NORTH CONCOURSE PACKAGE #3 10/20/2017

9 Projects Overview New North Concourse Secure National Hall

10 New North Concourse The project primarily includes the construction of a new concourse facility: Three-levels 230,000 SF 14 aircraft gates New North Concourse will replace the existing ground-loaded regional jet aircraft hardstand operation. The building architecture generally remains consistent with the existing Terminal B/C facility with exposed super structure, glazed exterior curtain wall systems and similar interior finish systems.

11 NEW NORTH CONCOURSE #3: Potential Trades Division Package Name Division Package Name D i vision Package Name Division Package Name 1 Final Cleaning 6 Rough Carpentry 9 Paint 28 Radio System 1 Pest Control 6 Architectural Woodwork 10 Signage 31 Earthwork 1 Scaffolding 4 Masonry 10 Toilet Partitions and Accessories 31 Shoring 1 Surveying 7 Waterproofing 10 Wall Protection 31 Dewatering 1 Commissioning 7 Spray Foam Insulation 10 Fire Extinguishers/AED's 31 Driven Piles 1 Damage Survey 7 Air Barrier 10 Fire Accordion Partition 31 Auger Cast Piles 1 Industrial Hygienist 7 Roofing 8 Exterior Glass 32 Concrete Paving 1 Maintenance of Traffic 7 Glass 11 Fall Protection 32 Site Concrete 1 Scheduler 7 Metal Panels 12 Window Treatments 32 Asphalt 1 Temporary Facilities 7 Fireproofing 12 Furniture 32 Flooring 1 Testing and Inspection 7 Caulking 14 Elevators 32 Fencing 1 Utility Locator 7 Expansion Joints 14 Moving Walkways 27 Low Voltage 2 Select Demolition 8 Doors, Frames and Hardware 21 Sprinkler 27 Audio Visual 2 Abatement 8 Overhead Doors 22 HVAC/Plumbing 28 Security 2 Site Utilities 7 Waterproofing 23 HVAC/Plumbing 28 Radio System 3 CIP Concrete 8 Exterior Glass 23 HVAC BMS 34 PBB-Passenger Board Bridges 4 Masonry 8 Interior Glass 26 Electrical 34 Precast 5 Structural Steel 9 Terrazzo Flooring 11 Fall Protection 34 Baggage Handling 5 Drywall 9 Tile 27 Low Voltage 34 PBB-Passenger Board Bridges 5 Miscellaneous Metals 9 Resilient Flooring 27 Audio Visual 5 Ornamental Metals 9 Interior Wall Panels 28 Security

12 Anticipated Project Schedule: New North Concourse Package #3 Bid Documents Bid Period Pre-Bid & Site Walk RFI Cut Off SEALED Bids Due Anticipated NTP Nov 6, 2017 Nov 7 Dec 20, 2017 Nov 16, 2017, 2:00PM (Reagan National Airport) Nov 30, 2017 by 10:00AM Dec 20, 2017 by 7:00PM TBD Note: all dates are subject to change

13 Subcontractor Bid Process All Subcontractors MUST be prequalified with Turner Go to: Virginia State Law requires anyone engaging in contracting work to obtain a Contractor's License from the Virginia Board for Contractors. Go to:

14 Q&A For more information please visit our website:

WELCOME. NEW NORTH CONCOURSE PACKAGE #3 Open House 10/20/2017

WELCOME. NEW NORTH CONCOURSE PACKAGE #3 Open House 10/20/2017 WELCOME NEW NORTH CONCOURSE PACKAGE #3 Open House 10/20/2017 Today s with Turner Team Introductions Project Overview Pre-Qualification Requirements & Bid Process Contracting Opportunities Introductions:

More information

Prequalification Form

Prequalification Form 1.0 General Information Date: 1.1 Name of Firm _ County Telephone Toll Free Fax Website _ for Bid Purposes: Name Phone 1.2 Legal Identity: Sole Proprietorship Partnership Corporation Limited Liability

More information

Question 2: Regarding Section VII, part 10, which jurisdiction issues permits for work performed at Ronald Reagan Washington National Airport?

Question 2: Regarding Section VII, part 10, which jurisdiction issues permits for work performed at Ronald Reagan Washington National Airport? RONALD REAGAN WASHINGTON NATIONAL AIRPORT METROPOLITAN WASHINGTON AIRPORTS AUTHORITY SOLICITATION RFP 1-11-C138 TERMINAL B/C PRE-SECURITY RESTROOM RENOVATIONS RESPONSES TO CONTRACTOR QUESTIONS Question

More information

JMU Capital Projects SWaM Outreach Event Presentations

JMU Capital Projects SWaM Outreach Event Presentations JMU Capital Projects SWaM Outreach Event Presentations Kjellstrom + Lee Contact: Jessica Marcus jmarcus@kjellstromandlee.com Project: College of Business Renovation/Expansion Please contact Kjellstrom

More information

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,

More information

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding

More information

Division 00 Procurement and Contracting Requirements

Division 00 Procurement and Contracting Requirements SECTION 00 01 10 TABLE OF CONTENTS Division SECTION NO. VOLUME ONE Title SECTION TITLE Division 00 Procurement and Contracting Requirements 00 11 00 Invitation to Bidders 00 21 00 Instructions to Bidders

More information

AMENDMENT OF SOLICITATION

AMENDMENT OF SOLICITATION Metropolitan Washington Airports Authority PROCUREMENT AND CONTRACTS DEPT. AMENDMENT OF SOLICITATION PAGE 1 Metropolitan Washington Airports Authority 1A. AMENDMENT OF SOLICITATION NO. 1B. DATED Procurement

More information

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project: RLS CONSTRUCTION GROUP Phone: 717-502-6680 Fax: 717-502-6681 www.rlscg.com Invitation to Bid RLS Construction Group requests your firm to submit a quotation on the following project: Project: Location:

More information

University of Central Florida Downtown Campus / Dr. Phillips Academic Commons Pre-Bid Phase II Package Structural, Architectural and MEP

University of Central Florida Downtown Campus / Dr. Phillips Academic Commons Pre-Bid Phase II Package Structural, Architectural and MEP University of Central Florida Downtown Campus / Dr. Phillips Academic Commons Pre-Bid Phase II Package Structural, Architectural and MEP Agenda Introduction (5 minutes) UCF Introduction (5 minutes) Project

More information

4.1.3 Project Manual

4.1.3 Project Manual 4.1.3 Project Manual (*Section requires Filed Sub-Bid) PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP Division 00 Procurement and Contracting Requirements Section 00 01 03 Project Directory Section 01

More information

Subcontractor Qualification Form

Subcontractor Qualification Form Subcontractor Qualification Form Date Submitted: General Information Company Name: Mailing Address: Physical Address: Email: Primary Contact: License Number (if applicable): Contracting Specialty: Street/PO

More information

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE TABLE OF CONTENTS SECTION TITLE DATE Division 00 Procurement and Contracting Requirements 000101... Project Title Page 000116... CAD Standards 001116... Invitation to Bid 002113... Instructions to Bidders

More information

Request for Qualifications Information (RFQI) No C146. Mechanical, Electrical, Plumbing and Fire Protection Engineering Design Services

Request for Qualifications Information (RFQI) No C146. Mechanical, Electrical, Plumbing and Fire Protection Engineering Design Services Request for Qualifications Information (RFQI) No. Mechanical, Electrical, Plumbing and Fire Protection Engineering Design Services At Ronald Reagan Washington National Airport and Washington Dulles International

More information

CONRAC Connections. CONRAC Breaks Ground! In This Issue

CONRAC Connections. CONRAC Breaks Ground! In This Issue CONRAC Connections CONRAC Connections Newsletter Summer/Fall 2015 CONRAC Breaks Ground! This August, officially broke ground and started the demolition of Parking Lot F to start building the five level,

More information

Work Performed Please see the attached list of Construction Codes and mark all that your company typically performs

Work Performed Please see the attached list of Construction Codes and mark all that your company typically performs SUBCONTRACTOR PROFESSIONAL SERVICES PREQUALIFICATION FORM Prequalification Form will NOT be accepted unless completed in its entirety. Business Information Company Name: Primary Address 1: Primary Address

More information

DOCUMENT B. 2. The low bidder shall submit this Expanded Subcontractors Listing to the Owner within 24 hours after the bid opening.

DOCUMENT B. 2. The low bidder shall submit this Expanded Subcontractors Listing to the Owner within 24 hours after the bid opening. DOCUMENT 00 43 36B EXPANDED SUBCONTRACTORS LISTING TO: CLARK COUNTY SCHOOL DISTRICT hereinafter called "Owner" FROM: ~AU;)"''"-' Oeve\,(;p,-...e,.,,... IA... t. ~o~ t>.m..e>u,i-j (Print Company Name) Pe-Mo1..,,,-t,:;>.tJ

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

Project Information Session / Meet and Greet # 3

Project Information Session / Meet and Greet # 3 ATL WEST DECK COMPONENT Project Information Session / Meet and Greet # 3 Holder-Austin-Moody-Bryson, a Joint Venture October 10 th, 2017 Agenda 1. HAMB, a JV Company Overview 2. ATL West Deck Project Description

More information

Project Manual Index of Specifications Shenandoah Schools Concession Building

Project Manual Index of Specifications Shenandoah Schools Concession Building INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions

More information

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies MasterFormat LEVEL TWO NUMBERS AND TITLES Introductory Information 00001 Project Title Page 00005 Certifications Page 00007 Seals Page 00010 Table of Contents 00015 List of Drawings 00020 List of Schedules

More information

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows: ADDENDUM NO. 1 TO THE DRAWINGS AND SPECIFICATIONS FOR THE New Dishman-McGinnis Elementary School Bowling Green Independent Schools Bowling Green, Kentucky BG 12-256 RTA 1209 March 11, 2013 To All Plan

More information

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements SECTION A CM INSTRUCTIONS TO BIDDERS SECTION B BID CATEGORY DESCRIPTIONS & BID FORMS BC-07: Building HVAC and Plumbing BC-08: Building Electric BC-09: General Trades BC-10: Masonry BC-11: Precast Structural

More information

APPLICATION AND CERTIFICATE FOR PAYMENT

APPLICATION AND CERTIFICATE FOR PAYMENT AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in

More information

1.5 Other than persons listed above, number of full-time office employees: 1.6 Number of full-time, permanent field employees:

1.5 Other than persons listed above, number of full-time office employees: 1.6 Number of full-time, permanent field employees: 1.4 Names of officers, owners, partners and principals. Identify relationship of each to firm and if active in firm: 1.5 Other than persons listed above, number of full-time office employees: 1.6 Number

More information

Subcontractor Pre-Qualification Statement Hunt / Moss, A Joint Venture

Subcontractor Pre-Qualification Statement Hunt / Moss, A Joint Venture Subcontractor Pre-Qualification Statement Hunt / Moss, A Joint Venture 1. SUBMITTED BY: DATE: Name of Firm: Street Mailing Address (If different): Primary Fax: E-mail: Website: Address of the office that

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

PAULDING COLLEGE & CAREER ACADEMY

PAULDING COLLEGE & CAREER ACADEMY PAULDING COLLEGE & CAREER ACADEMY 000110 OF THE PROJECT MANUAL FOR THE CONSTRUCTION OF: PAULDING COLLEGE & CAREER ACADEMY DALLAS, GEORGIA DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000101 TITLE

More information

INVITATION TO TENDER ITT No. PS RODDAN LODGE CONSTRUCTION ADDENDUM NO. 16

INVITATION TO TENDER ITT No. PS RODDAN LODGE CONSTRUCTION ADDENDUM NO. 16 FINANCE, RISK AND SUPPLY CHAIN MANAGEMENT Supply Chain Management August 2, 2018 INVITATION TO TENDER ITT No. PS20180883 RODDAN LODGE CONSTRUCTION ADDENDUM NO. 16 RE: REVISIONS TO BASE PRICE TABLE IN SCHEDULE

More information

Concrete. Conveying Systems. Doors, Windows & Interiors

Concrete. Conveying Systems. Doors, Windows & Interiors Concrete Concrete : Cast-in-Place Concrete Concrete : Cementitious Decks Concrete : Concrete Accessories Concrete: Concrete Block & Brick Concrete : Concrete Coring & Sawing Concrete : Concrete Curing

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

TABLE OF CONTENTS SECTION TITLE PAGE. Bidder s Signature Page List of Subcontractors Construction Agreement Guaranty...

TABLE OF CONTENTS SECTION TITLE PAGE. Bidder s Signature Page List of Subcontractors Construction Agreement Guaranty... TABLE OF CONTENTS SECTION TITLE PAGE Forms Notice to Contractors... 1 Bid Proposal... 4 A. Unit Price Schedule... 5 B. Bid Form... 10 C. Reservation... 10 D. Subcontractors... 10 E. Notice... 10 F. Disclosure...

More information

Subcontractor Pre-qualification Statement

Subcontractor Pre-qualification Statement Subcontractor Pre-qualification Statement By submitting this Statement, Subcontractor affirms that the information provided herein is true and sufficiently complete so as not to be misleading. All fields

More information

DESIGN & CONSTRUCTION GUIDELINES

DESIGN & CONSTRUCTION GUIDELINES DESIGN & CONSTRUCTION GUIDELINES EDITION: USF FACILITIES MANAGEMENT - DC 5 DCG FACILITIES MANAGEMENT DESIGN & CONSTRUCTION PHONE: (813) 974-2845 4202 E. FOWLER AVENUE, OPM 1000 TAMPA, FLORIDA 33620-7550

More information

NOTICE TO BIDDERS / ADVERTISEMENT FOR BIDS GEORGE C. SIMKINS JR. ELEMENTARY SCHOOL

NOTICE TO BIDDERS / ADVERTISEMENT FOR BIDS GEORGE C. SIMKINS JR. ELEMENTARY SCHOOL Samet Corporation/SRS, Inc. -- a joint venture company NOTICE TO BIDDERS / ADVERTISEMENT FOR BIDS GEORGE C. SIMKINS JR. ELEMENTARY SCHOOL Samet Corporation / SRS, Inc. a joint venture (SSJV) as Construction

More information

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

ADDENDUM NO. 2 Consisting of 3 pages and Attachments 10404-125 Street, Edmonton, AB. T5N 1T2 Tel: 780.455.5975 Fax: 780.454.2397 info@cdyarchitect.com ADDENDUM NO. 2 Consisting of 3 pages and Attachments PROJECT: Maina Centre Ville Phase II, Beaumont, Alberta

More information

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS Watercrest - Sand Hill - Columbia, SC 00 0110-1 TABLE OF CONTENTS DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS INTRODUCTORY INFORMATION Document 00 0101 Document 00 0110 Project Title Page CONTRACTING

More information

LEED TM POINT DOCUMENTATION

LEED TM POINT DOCUMENTATION LEED TM POINT DOCUMENTATION 1100 SUMMARY LEED PROGRAM 1101 REQUIREMENTS 1125 SUMMARY OF MULTIPLE CONTRACTS WORK 1140 RESTRICTIONS 1210 ALLOWANCES 1230 ALTERNATES 1250 CONTRACT MODIFICATION PROCEDURES 1270

More information

Aviation Capital Construction Program Update

Aviation Capital Construction Program Update Aviation Capital Construction Program Update 2012 Completed Projects 2013 Active Projects Bern Seals Program Manager Parsons Management Consultants April 2013 0 Discussion Agenda Program Safety Performance

More information

Voorhees Replacement Facility Schedule Summary Classic WBS Layout 29-Sep-09 13:50 Activity Name Original Start Finish Duration Voorhees Replacement F 1136 17-Nov-06 31-Mar-11 Schematic Design 87 17-Nov-06

More information

DOCUMENT BID DOCUMENT

DOCUMENT BID DOCUMENT DOCUMENT 00 40 00 BID DOCUMENT 1 Submit bids in compliance with Document 00 21 00Instructions to Bidders. Fill in blanks which pertain to the project or indicate N/A. The Owner reserves the right to reject

More information

Outreach Meeting September 29, 2016

Outreach Meeting September 29, 2016 Outreach Meeting September 29, 2016 Introductions Project Overview Heavy Civil GC/CM Process S/DBE Goals Bid Package Breakdown SDBE Opportunities Working w/kiewit-hoffman E130 is initial section of Eastlink

More information

TABLE OF CONTENTS. (Δ = Rev 06/08)

TABLE OF CONTENTS. (Δ = Rev 06/08) TABLE OF CONTENTS (Δ = Rev 06/08) INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-9 Record Drawings B-10 Variance Procedure B-11 Surface Water Procedures (New Section)

More information

Subcontractor & Vendor Outreach & Information Session. September 20, 2016

Subcontractor & Vendor Outreach & Information Session. September 20, 2016 Subcontractor & Vendor Outreach & Information Session September 20, 2016 Agenda Introductions Project Overview Orientation to the GC-CM Contracting Method Project Bidding Requirements Procurement Packages

More information

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7 TABLE OF CONTENTS ( = Rev 11/15) Update #7 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes (New) B-9 Record Drawings B-10 Variance Procedure

More information

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders

More information

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8 TABLE OF CONTENTS ( = Rev 04/17) Update #8 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes B-9 As-Builts and Record Drawings B-10 Variance

More information

TURNER-KIEWIT JOINT VENTURE

TURNER-KIEWIT JOINT VENTURE TURNER-KIEWIT JOINT VENTURE Subcontractor Monthly Community Outreach 9:00-9:30 Breakfast & Networking 9:30-10:00 Presentation and Q&A 10:00-10:15 Business Introduction Opportunity 10:15-11:00 Meet & Greet

More information

THE UNIVERSITY OF ALABAMA AT BIRMINGHAM (UAB) BIRMINGHAM, ALABAMA

THE UNIVERSITY OF ALABAMA AT BIRMINGHAM (UAB) BIRMINGHAM, ALABAMA Print Form THE UNIVERSITY OF ALABAMA AT BIRMINGHAM (UAB) BIRMINGHAM, ALABAMA PROJECT NAME/NO: Bartow Arena Roof Replacement 617 13th Street South Birmingham, AL STANDING ADDENDUM NO. 1 MINORITY BUSINESS

More information

Metropolitan Washington Airports Authority

Metropolitan Washington Airports Authority Metropolitan Washington Airports Authority Custodial Outreach and Information Session Ronald Reagan Washington National Airport Terminal A Lobby Tuesday, June 18, 2013, 10:00 am to Noon Session Notes/Comments/Q&As

More information

Prestage Farms Subcontractor and Vendor Outreach Fair

Prestage Farms Subcontractor and Vendor Outreach Fair Prestage Farms Subcontractor and Vendor Outreach Fair Architecture Interiors Engineering Construction December 13, 2016 www.epsteinglobal.com Agenda Epstein s Role Project Description Project Location

More information

ABC Membership Application (2018)

ABC Membership Application (2018) ABC Membership Application (2018) General Information Northern Ohio Chapter 2018 Membership Application & Investment Schedule Company Name Phone Fax Street City State Zip Web Address Field Employees #

More information

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Billing Requirements G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Sitework / Paving Excavation and Grading Labor

More information

Metropolitan Washington Airports Authority. Request for Qualifications Information (RFQI) RFQI No C084. for

Metropolitan Washington Airports Authority. Request for Qualifications Information (RFQI) RFQI No C084. for Request for Qualifications Information (RFQI) RFQI No. for Project Controls Task Contract for Project Support & Management at Washington Dulles International Airport and Ronald Reagan Washington National

More information

CONSTRUCTION COST BREAKDOWN THIS IS FORM CCB

CONSTRUCTION COST BREAKDOWN THIS IS FORM CCB CONSTRUCTION COST BREAKDOWN Property Owner s Name or Borrowers Name Brief Description of Project John Homeowner Build single family residence Property Address Property City Property Zip Code 4625 Jillbarr

More information

Name of company: Mailing Address: City: State: Zip: - Street Address: City: State: Zip: -

Name of company: Mailing Address: City: State: Zip: - Street Address: City: State: Zip: - SUBCONTRACTOR QUALIFICATION FORM Instructions: Elaboration of the following requested information or additional information deemed to be useful for evaluation of your firm s capabilities may be attached

More information

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50 Project #1139 Budget #82 $ Budgeted $ Billed to Date $ Paid to Date $ Due 210,087.68 120,979.20 120,979.20 77,158.50 Deposit Paid Deposit Due Phase I: Project Programming and Research $ Budgeted $ Billed

More information

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS 669.7403.001 West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS Page C-111 Advertisement for Bids 1-2 C-200 Instruction to Bidders 1-10 C-410 Bid Form for Construction Projects

More information

Schedule T5. Tender Documents. This tender is for: Tender Documents: The documents issued for this tender include the following: Tender Schedules

Schedule T5. Tender Documents. This tender is for: Tender Documents: The documents issued for this tender include the following: Tender Schedules Schedule T Tender Documents T This tender is for: Contract: Location: Tender Documents: Norrie Home 56 Hardinge Road The documents issued for this tender include the following: Tender Schedules Schedule

More information

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #158 Douthit Hills Student Community, Clemson University Project Tony Greene

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #158 Douthit Hills Student Community, Clemson University Project Tony Greene February 16, 2018 Page 1 CURRENT CONSTRUCTION ACTIVITIES WEST ZONE Completed 1 ST Coat of Paint in C5 Corridors. Completed Test & Balance in Building C. Completed Final Paint in B1 Corridors. Completed

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

Goal Period: October 1, September 30, 2019

Goal Period: October 1, September 30, 2019 MASSACHUSETTS PORT AUTHORITY PROPOSED DISADVANTAGED BUSINESS ENTERPRISE ( DBE ) GOALS FFY 2017 - FFY 2019 Airport Sponsor: Massachusetts Port Authority Airports: Boston Logan International Airport (BOS)

More information

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services Request for Qualifications Information Architectural / Engineering Task Contract Design Services At Ronald Reagan Washington National Airport Washington Dulles International Airport Dulles Toll Road System

More information

Auburn University Construction Project Update March 2010

Auburn University Construction Project Update March 2010 New Basketball Arena: Construction Cost: $68.5 million. The Arena is currently 91% complete. Contract completion is July 25, 2010, but the project is on schedule to complete by May 2010. Interior finish

More information

Johns Hopkins University APL Building 201 December 5, Rob Dahms,

Johns Hopkins University APL Building 201 December 5, Rob Dahms, INVITATION TO BID BID DUE DATE: January 5, 2018 TO: 1:00 PM Rob Dahms, rdahms@tcco.com MWSDBE OUTREACH/ PRE-BID CONFERENCE: LOCATION: December 19, 2017 Tentative 9:00 AM JHU APL Building 200, 1 st Floor

More information

BALTIMORE COUNTY PUBLIC SCHOOLS Joe A. Hairston, Superintendent 6901 Charles Street Towson, Maryland

BALTIMORE COUNTY PUBLIC SCHOOLS Joe A. Hairston, Superintendent 6901 Charles Street Towson, Maryland SECTION 001000 NOTICE TO CONTRACTORS The Board of Education of Baltimore County invites Contractors to bid on the CONSTRUCTION OF A NEW SCHOOL PACKAGE 2 PHASE 2 - DUNDALK AND SOLLERS POINT HIGH SCHOOL.

More information

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment & Convention Authority

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

This presentation was prepared by TeHota Construction Management, LLC. on behalf of Hunt Construction Group for the AT&T Center Renovation Project.

This presentation was prepared by TeHota Construction Management, LLC. on behalf of Hunt Construction Group for the AT&T Center Renovation Project. February 11, 2015 This presentation was prepared by TeHota Construction Management, LLC. on behalf of Hunt Construction Group for the AT&T Center Renovation Project. It is provided, as a courtesy, to those

More information

Bryant Denny Stadium Bryant Denny Stadium September 15, 2009

Bryant Denny Stadium Bryant Denny Stadium September 15, 2009 Bryant Denny Stadium Bryant Denny Stadium September 15, 2009 Project Status September Report 15, 2009 #13 April 27, 2012 TABLE OF CONTENTS SECTION 1: PROJECT SUMMARY SECTION 2: OVERALL PROJECT SCHEUDLE

More information

OVERALL & CONTRACT DBE GOAL METHODOLOGY. Goal Period FY /01/15 to 9/30/18 AIP Projects Overall DBE Goal: 2.

OVERALL & CONTRACT DBE GOAL METHODOLOGY. Goal Period FY /01/15 to 9/30/18 AIP Projects Overall DBE Goal: 2. OVERALL & CONTRACT GOAL METHODOLOGY Airport Sponsor City of Airport Name Boise Airport Goal Period FY 2016-2018 10/01/15 to 9/30/18 Projects AIP Projects-2016-2018 Name of Preparer John Anderson, T-O Engineers

More information

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 012900 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract including General and Supplementary Conditions and other Division 01 Specifications Sections apply

More information

Activity Date Time. Re Bid Submission Date Tuesday, February 10, a.m.

Activity Date Time. Re Bid Submission Date Tuesday, February 10, a.m. -REBID JAN. 20, 2015 University of Connecticut Health Center Academic Bldg. Addition and Renovation Project Farmington, CT (Project #901729) Skanska USA Building Inc, the Construction Manager, is currently

More information

1. FROM (Bidder): (Name)

1. FROM (Bidder): (Name) Tender No. [ ] Tender Forms Page 1 1. FROM (Bidder): (Name) (Address) TO: Alberta Transportation, Strategic Procurement Branch Main Floor, Twin Atria Building 4999 Avenue 5000 Edmonton, Alberta, T6B 2X3

More information

Subcontractor Prequalification Form

Subcontractor Prequalification Form Subcontractor Prequalification Form Project: Company Name: Address: City: State: Zip: Contact: Phone #: Fax #: Email: Company Type: If Certified: Type of Work: Corporation Partnership Individual Joint

More information

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6 PROJECT MANUAL for: FRANKLIN VILLAGE APARTMENTS Building I Morristown, NJ 07960 Block: 3901 Lots: 4,5,6 Owner: Atlantic Health Investment Corp. 200 American Road Morris Plains, NJ 07950 Architect NETTA

More information

SUB PREQUAL FORM. prequalificatiom form information WE USE TEXTURA! Who requested prequal from R. C. Stevens? Check it out at

SUB PREQUAL FORM. prequalificatiom form information WE USE TEXTURA! Who requested prequal from R. C. Stevens? Check it out at SUB 2014 PREQUAL FORM WE USE TEXTURA! Check it out at www.texturacorp.com R. C. Stevens Construction Company has automated our monthly payment application process by leveraging an online application provided

More information

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages TABLE OF CONTENTS VOLUME 1 DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages SCHEDULE OF DRAWINGS...... 1 PROJECT PERSONNEL & DIRECTORY......

More information

Bryant Denny Stadium Bryant Denny Stadium September 15, 2009

Bryant Denny Stadium Bryant Denny Stadium September 15, 2009 Bryant Denny Stadium Bryant Denny Stadium September 15, 2009 Project Status September Report 15, 2009 #16 July 31, 2012 TABLE OF CONTENTS SECTION 1: PROJECT SUMMARY SECTION 2: OVERALL PROJECT SCHEUDLE

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

CSO / BSU NW2 NORTH RESIDENTIAL NEIGHBORHOOD PHASE #2 VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

CSO / BSU NW2 NORTH RESIDENTIAL NEIGHBORHOOD PHASE #2 VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 01 Project Title Page 00 01 10 Table of Contents 00 01 15 List of Drawing Sheets 00 21

More information

MPA Project No. L1429-C1 Project Title: Terminal C Enhancements Location: Logan International Airport

MPA Project No. L1429-C1 Project Title: Terminal C Enhancements Location: Logan International Airport MPA Project No. L1429-C1 Project Title: Terminal C Enhancements Location: Logan International Airport RESPONSES TO QUESTIONS and/or RFI s Date: 6/1/2018 The attention of Contractors submitting Filed Sub-Bids

More information

PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No C

PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No C PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No. 20140101C CONSTRUCTION ESTIMATE AND PROJECT BUDGET Dated June 7. 2014 Estimated Cost HARD COSTS $ 1,560,284 Core Renovations (Toilet Rooms, Ceilings

More information

New Hall High School Project Summary Report to the Board of Education June 3, 2015

New Hall High School Project Summary Report to the Board of Education June 3, 2015 New Hall High School Project Summary Report to the Board of Education June 3, 2015 Trade Procurement Status: Bid Package# Description Status Firm 1 Mass Excavation Awarded John Pohar & Sons 2 Concrete

More information

TABLE OF CONTENTS ENGINEERING SPECIFICATIONS AND STANDARDS

TABLE OF CONTENTS ENGINEERING SPECIFICATIONS AND STANDARDS 2 Cutting and Patching 01 73 29 n-a Susanne Terharn 12/21/11 2 Demolition 02 40 00 n-a Susanne Terharn 10/03/11 2 Concrete 03 00 00 n-a Rich Vlasak 12/21/11 2 Cementitious Underlayment 03 54 00 n-a Rich

More information

CREC ACADEMY OF AEROSPACE AND ENGINEERING PHASE 2 GENERAL CONSTRUCTION STATE PROJECT # EA WINDSOR, CT. INVITATION TO BID

CREC ACADEMY OF AEROSPACE AND ENGINEERING PHASE 2 GENERAL CONSTRUCTION STATE PROJECT # EA WINDSOR, CT. INVITATION TO BID CREC ACADEMY OF AEROSPACE AND ENGINEERING PHASE II GENERAL CONSTRUCTION STATE PROJECT # 241-0099EA WINDSOR, CT. 1. Sealed proposals for the trade contracts listed below will be received by Capitol Region

More information

Schedule of Values Cruise Terminal 2 Expansion

Schedule of Values Cruise Terminal 2 Expansion Schedule of Values The Schedule of Values outlined below is intended to reflect the standard format that would be used in a Contractors Application for Payment. Values reflect materials and labor. General

More information

GROSSMONT COLLEGE ARTS & COMMUNICATION COMPLEX PHASE 1 TEACHING AND PERFORMANCE THEATER LIST OF PRE-QUALIFIED CONTRACTORS BY TRADE

GROSSMONT COLLEGE ARTS & COMMUNICATION COMPLEX PHASE 1 TEACHING AND PERFORMANCE THEATER LIST OF PRE-QUALIFIED CONTRACTORS BY TRADE May 10, 2017 To: Re: All Pre-Qualification Respondents GROSSMONT COLLEGE ARTS & COMMUNICATION COMPLEX PHASE 1 TEACHING AND PERFORMANCE THEATER LIST OF PRE-QUALIFIED CONTRACTORS BY TRADE The District has

More information

A. Remove Table of Contents and insert new attached Table of Contents.

A. Remove Table of Contents and insert new attached Table of Contents. ADDENDUM NO. 01 PROJECT Colby Glass E.S. Window Upgrades and ADA Work PROJECT NO. 16043 DATE February 07, 2018 TO: All Prime Contract Bidders and all others to whom Drawings and Specifications have been

More information

Yardmen Arena Expansion & Renovation Project Update

Yardmen Arena Expansion & Renovation Project Update For Immediate Release 25, September,2017 Yardmen Arena Expansion & Renovation Project Update BELLEVILLE ON With 33 days until puck drop of the home opening game of the American Hockey League s Belleville

More information

PREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR

PREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR 1. PROJECT TICE PREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR York Hall Biology/Chemistry Renovation UNIVERSITY OF CALIFORNIA SAN DIEGO a) BNBuilders, Inc. (BNB) intends to award lump sum contracts

More information

Chase Center and Warriors Mixed Use Office and Retail Development. Project Tip Off Meeting Procurement Package #2 November 16, 2016

Chase Center and Warriors Mixed Use Office and Retail Development. Project Tip Off Meeting Procurement Package #2 November 16, 2016 Chase Center and Warriors Mixed Use Office and Retail Development Project Tip Off Meeting Procurement Package #2 November 16, 2016 AGENDA Welcome Key Stakeholders Mortenson Clark Overview Project Team

More information

Kimberly School District New Elementary School

Kimberly School District New Elementary School Kimberly School District New Elementary School Bids to complete work as defined will be accepted, from invited contractors, by Starr Corporation until March 21st, 2017 at 2:00 PM. Bids may be delivered

More information

STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC

STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC PREPARED BY: Metropolitan Washington Airports Authority Washington Dulles International Airport Engineering

More information

VOLUME 4 DIVISION SPECIFICATIONS

VOLUME 4 DIVISION SPECIFICATIONS Page 1 Section Title Consultant Pages VOLUME 4 DIVISION 00-01 SPECIFICATIONS Division 00 - Procurement and Contracting Requirements 00 01 07 SEALS PAGE All 5 00 01 11r6 TABLE OF CONTENTS All 7 00 21 13r1

More information

Bryant Denny Stadium Bryant Denny Stadium September 15, 2009

Bryant Denny Stadium Bryant Denny Stadium September 15, 2009 Bryant Denny Stadium Bryant Denny Stadium September 15, 2009 Project Status September Report 15, 2009 #15 June 27, 2012 TABLE OF CONTENTS SECTION 1: PROJECT SUMMARY SECTION 2: OVERALL PROJECT SCHEUDLE

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information