1

2 This document was put together following the fourth round of public consultation for the Class Environmental Assessment study for this Project. In June 2011, the Project Team consulted with stakeholders about the alternative design concepts for the preferred solution, the evaluation process that was undertaken, and the preliminary preferred design for the preferred solution. A number of questions were asked frequently. These questions and the related answers are reflected in this document. A more lengthy set of questions and answers can be found in the Public Information Centre #4 report on the Project website, which can be accessed at GENERAL 1. Why is this Project needed? The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto. In 1987, Toronto s waterfront was identified by the International Joint Commission as an Area of Concern in the Great Lakes Basin, due to pollution caused in large part by combined sewer overflows (otherwise known as CSOs). There are 50 CSO outfalls in the study area that discharge a mixture of untreated sewage (18%) and polluted stormwater runoff (82%) directly into the Don River, including Taylor Massey Creek, and the Inner Harbour. Polluted stormwater runoff has been identified as the main contributor to degraded water quality in Toronto in previous studies such as the Toronto and Area Watershed Management Studies on the Don River (1989), various Remedial Action Plan reports and in the Wet Weather Flow Master Plan (WWFMP). The WWFMP was approved by City Council in 2003 and contained recommendations for a system of tunnels, storage and treatment to best address the problem of stormwater and combined sewer overflow discharges to the Don River and Central Waterfront area. The Don River and Central Waterfront Project, a Class Environmental Assessment study, began in 2008 to carry forward the recommendations of the WWFMP to control stormwater and CSO releases, with the goal of improving water quality in the watershed. The Project also addresses dry weather sanitary servicing needs for the existing Don Trunk and Waterfront Interceptor Sanitary Trunk Sewer (STS) systems to service future growth, and provide redundancy (i.e., an alternative sewage route) for the Coxwell Sanitary Trunk Sewer. The potential to integrate wet weather and sanitary sewer system solutions to reduce costs is a key component of the study. 2. What are the benefits of this Project? The implementation of this project will improve both the sanitary trunk sewer system and our environment. Page 2

3 Sanitary Trunk Sewer benefits include: Twinning of the Coxwell Sanitary Trunk Sewer (STS) to provide redundancy and to allow for periodic maintenance and ensure safe, ongoing operation of the Coxwell STS. Upgrading the City's critical Don Sanitary Trunk Sewer system to ensure the system has capacity to effectively service future population growth in the study area. Controlling wet weather flows will achieve the following benefits: Virtually eliminate untreated sewage (from CSOs) from entering the Don River and Central Waterfront through the capture and treatment of flows. This will reduce releases of pathogens and pollutants to waterways, leading to improvements in water quality, enhanced recreational opportunities, and improved aquatic habitat. Help reduce the "flashy" inputs of combined sewer overflows, which contribute to stream erosion and possible flooding. Support revitalization efforts for Toronto's waterfront. Ultimately move us closer to delisting the City of Toronto as a polluted Area of Concern in the Great Lakes Basin. Ensure the City meets Provincial requirements for the control of combined sewer overflows, and support commitments made by Federal and Provincial Governments, for the cleanup of the Areas of Concern through the Canada- Ontario Agreement and Federal Government s commitment through the Bi- National Great Lakes Water Quality Agreement. By bringing together the projected sanitary trunk sewer servicing needs with the wet weather flow control requirements as a complete and integrated system, all of the benefits of the Project will be achieved at a reduced cost. 3. How will this project impact tourism and recreational opportunities along the waterfront? When the proposed system is fully in place, water quality in the Lower Don River and Inner Harbour will be improved, which will support efforts to enhance tourism and recreational opportunities along the central waterfront. 4. How is the study being conducted and what process was used to get to this stage? The Project is being conducted as a Municipal Class Environmental Assessment (EA), Schedule C. There are five phases in the Class EA process. The phases include: Page 3

4 EA Phase What it involves When did/will it happen? Phase 1 Problem or Opportunity Phase 2 Alternative Solutions Phase 3 Alternative Design Concepts Phase 4 Environmental Study Report Phase 5 Implementation Defining the problem or opportunity. Identifying and evaluating alternative solutions to address the problem and establishing the preferred solution. Examining alternative design concepts for the preferred solution and establishing a preferred design concept, as well as identifying measures to minimize any adverse effects. Preparing an Environmental Study Report which summarizes the rationale, planning, design and consultation process for the Project. Implementation of the Project including construction and monitoring. Mid Early 2009 mid 2010 Mid 2011 Fall 2011 To Be Determined pending approvals of Class EA study The preferred solution to resolve the problem of wet weather flow discharges into the Don River and Central Waterfront was recommended in the Wet Weather Flow Master Plan, which was adopted by City Council in In Phase 2 of this Class EA study, the recommended solution in the Wet Weather Flow Master Plan for controlling wet weather flows was carried forward, and further evaluation and analysis was undertaken to identify a preferred solution that addressed both wet weather flow controls and dry weather servicing and capacity issues (which were identified in Phase 1 of the Class EA study) in one integrated manner. In Phase 3 of this Class EA Study, alternative design concepts for the Preferred Solution were considered. This phase focused on identifying preferred sites for various project elements including the offline dry weather and wet weather flow storage tanks, underground vertical storage shafts, tunnel boring machine shafts (i.e. construction shafts), and a wet weather flow treatment facility. Public consultation is an important part of the Class EA process and has taken place throughout all of the phases of this Class EA study. Information on the consultation process and the materials available are provided on the Project's website at: Page 4

5 5. How have the public and other stakeholders been consulted? Throughout the Class EA study process, extensive consultation has taken place with the public, residents' associations, environmental groups, and other stakeholders. Meetings and briefings have also been held with City Councillors, City Agencies, Boards and Commissions and Divisions including Parks, Forestry & Recreation, Transportation, City Planning, the Toronto and Region Conservation Authority (TRCA), Toronto Transit Commission, Public Health, and Waterfront Toronto, among others. Meetings with external review agencies such as the Ministry of the Environment, Ministry of Natural Resources, Department of Fisheries & Oceans, and Environment Canada have also taken place. Finally, First Nations have been engaged through correspondence and meetings during various phases of the study. Consultation and communications activities have included: Four rounds of Public Information Centres (9 open houses in total from 2008 to 2011) and other consultation events (e.g., workshop and public forum in 2010) were held at various stages of the EA study to receive input on the problem/opportunity, the preferred solution, and the preferred design; Individual meetings and briefings with community groups, ratepayers associations, etc.; Project display booths at various locations and events, e.g., local malls, Lake Ontario Evenings hosted by the TRCA; and, Project postcards and newsletters, as well as a project video and website - to raise awareness and provide information to the public. RECOMMENDED SOLUTION AND DESIGN 1. What is the preferred solution and design for the Project? Based on the extensive research and analysis, input from the public, agencies and other stakeholders, the preferred solution and design for the Project has been finalized. The integrated solution addresses wet weather flow controls and sanitary servicing needs in one complete system. The recommended solution and design includes the following components: Sanitary Trunk Sewer System A Lower Don/Coxwell Bypass Tunnel that will be used on a contingency basis as a bypass to the existing Coxwell Sanitary Trunk Sewer (STS) allowing for periodic maintenance and any necessary repairs of the Coxwell STS; Four underground storage tanks for offline storage of peak sanitary flows where additional capacity is needed; and Upgrades to the North Toronto Treatment Plant (NTTP). Page 5

6 Wet Weather Flow Collection and Storage System Three integrated tunnels connected to an equivalent of 15 underground vertical storage shafts (30 metres in diameter) will collect and store combined sewer overflows and convey these flows to a new wet weather flow treatment facility; The three tunnels include the Lower Don Tunnel/Coxwell Bypass (10.9 km); Taylor Massey Creek Tunnel (5.9 km); and Inner Harbour Tunnel (5.6 km); and. Three underground storage tanks for offline storage of combined sewer overflows from 4 remote outfall locations. Treatment of Collected Wet Weather Flow A new wet weather treatment facility will provide high-rate treatment of wet weather flows and will be located on future lakefill in the waterlot south of the Ashbridges Bay Treatment Plant; A new pumping station in Ashbridges Grove Park with forcemains connecting to the new wet weather flow treatment facility; and Upgrade of an existing CSO tank at the North Toronto Treatment Plant. The preferred solution and design (i.e. recommended locations for siting project elements) is shown on the map on page 7. Page 6

7 Page 7

8 SITING OF FACILITIES 1. How were recommended sites identified and finalized in the study? This is an environmental assessment process; each step along the way has narrowed down the options. In Phase 2, a list of candidate sites was identified and narrowed down and in Phase 3, preferred sites and a specific siting location within each site was identified. There are a number of different types of facilities that needed to be sited including: underground storage shafts and tanks, tunnel boring machine construction shafts, underground tunnel routes and connection sites (where existing WWF outfalls will hook into the storage and treatment system) and the WWF treatment site. Possible tunnel routes were identified which were in close proximity to the WWF outfalls that need to be captured. Alternative routes were then evaluated based on a broad set of criteria including technical, social and land use and environmental considerations. Potential sites for locating vertical storage shafts, tunnel boring machine construction shafts, underground storage tanks, were identified based on the following "must have" criteria: 1) site is within close proximity to the tunnels, 2) site is owned by the City or a City-owned entity, and 3) site provides adequate land area for the shaft and construction. A set of screening criteria were then used to short-list sites. Short-listed sites have to have good access to public roads for construction and maintenance purposes, with no or limited potential for adverse environmental impacts. The site must allow for suspension of land use during construction, reinstatement of the land use after construction, and have efficient hydraulic capabilities. Preferred sites were then identified along with the specific recommended location of the facility within each site, giving consideration to technical, social and environmental impacts, and mitigation. To determine the specific location of connections of existing WWF outfalls to the proposed storage system, the following rules of thumb were applied: Where practical, locate the connection close to the outfall (i.e. near the end of the outfall). Reduce/minimize impacts on abutting roads, utilities and services and on future upgraded roads. Where practical, group existing sewers to reduce the number of connections. Input received through public, stakeholder and agency consultation throughout the process and in June 2011 in particular was also important in determining the sites included in the preferred design. Page 8

9 2. Why were sites along the Harbourfront considered for the siting of Project facilities? Fourteen sites were identified as possible sites for locating underground vertical storage shafts in the Inner Harbour West and East (this includes the area east of the Don River to the Ashbridges Bay Treatment Plant). Then, using the process described in the preceding response a preliminary preferred design was identified, including a number of sites in the Central Waterfront. All these sites fulfilled the must have criteria including that they are in close proximity to the proposed wet weather flow tunnel and CSO outfalls which need to be captured, they are on City-owned land, and they are large enough to accommodate the proposed facility. Based on the feedback received during public consultation, and a re-evaluation of the current and planned land uses and social impacts at or adjacent to Little Norway Park, the York Street off ramp, and the Rees Street parking lot, an alternative location for the vertical storage shafts at the Keating Railyard has been recommended in the final preferred design. A temporary tunnel boring machine construction shaft is still being proposed for the Rees Street parking lot to facilitate construction of the Inner Harbour tunnel. 3. Have any changes been made to the preferred design for the Project since the PICs? Yes, a number of changes have been made to the preliminary preferred design presented during the June 2011 consultation events including: - Underground vertical storage shaft at Little Norway Park moved to the Keating Railyard site - Underground vertical storage shaft at York Off Ramp moved to the Keating Railyard site - Underground vertical storage shaft at Rees St. Parking Lot at Queen's Quay has been moved to the Keating Railyard site. Temporary use of the Rees Street site as a tunnel boring machine construction shaft is being recommended. This is required for construction of the Inner Harbour West tunnel. A portion of the site will be disrupted temporarily for a 2 ½ to 3-year duration during construction. Following construction, the site will be restored, with only a small access hatch remaining. Page 9

10 FACILITY IMPACTS 1. Will there be any odours from the underground storage shafts and tanks? How will any odours be controlled? Odours are not expected. We are proposing to utilize carbon based odour control facilities, using proven technology, which will be installed for the new underground storage facilities. In addition, design considerations for the proposed system will include flushing and sediment transport mechanisms to ensure that solids are removed in an efficient and timely manner to further mitigate potential odour concerns. Carbon based filtration systems are currently used at the Western Beaches Storage Tunnel facility and at the Eastern Beaches Storage Tank facilities. The carbon based filters have worked well in controlling odours, which is evident by the lack of odour complaints from local residents. 2. What kind of noise can be expected once the facilities are operational? There will be pumps inside the control building associated with each of the 4 DWF and 3 WWF underground tanks. The pumps will run only following a heavy rainfall event or approximately 40 times per year. There will be a noise baffling system in the pump house so as to minimize any outside noise impacts. 3. What will appear on the surface after the construction of the various project facilities? Vertical Storage Shafts (capturing wet weather flows) Underground vertical storage shafts will be in the order of 30 metres in diameter. The geometry/shape of each underground facility may be unique to a specific site. It is estimated that approximately 75 to 80 per cent of the surface area above the vertical storage shafts can be landscaped or restored while the remaining 20 to 25% would be comprised of at grade vents and access hatches and an odour control housing unit that is approximately 3.7 m wide by 12 m long by 2 m to 3 m tall. Conceptual Image of an Odour Control Unit for an Underground Vertical Storage Shaft Page 10

11 Tunnel Boring Machine Construction Sites The tunnel boring machine requires a shaft diameter of approximately 15 metres to enter and exit from tunnel drilling. After completion of a particular segment of tunnel, the TBM shaft will be capped with an access hatch of approximately 2.0 metres by 2.0 metres in size. The remaining surface area can be restored. Underground Storage Tanks (capturing dry weather and wet weather) Underground storage tank sizes will vary in size depending upon the amount of flow to be captured, ranging from 3,000 cubic metres to 12,000 cubic metres. The above ground control building at each facility housing the mechanical, electrical and odour controls will be approximately 7 metres by 16 metres in size. The area above the tanks can be restored with plantings. Conceptual Image of Underground Storage Tank WWF Connection Sites Following construction at wet weather flow connection sites, there will be maintenance hole access covers and venting with odour control. The access covers will be approximately 0.8 metres by 1.2 metres in size. WWF Pumping Facility There will be a building to house the mechanical, electrical and odour controls. WWF Treatment Facility The footprint of the WWF treatment facility is anticipated to be approximately 8,2000 square metres in size. Page 11

12 Specific information about each site can be found in the Siting and Project Data Book. At the back of each section, artist renderings are included showing what surface structures could look like. These are for discussion purposes and can be viewed at 4. How long will construction take for various project elements? The length of time for construction will vary by project component as follows: - Offline, underground storage tanks: 9-12 months - Underground vertical storage shafts: months - Tunnel Boring Machine shafts: months - Wet Weather Flow Pumping Station: months - Wet Weather Flow Treatment Facility: months - Connection sites: 3-6 months 5. How will the Project facilities impact existing land uses on the recommended sites? The sites selected, along with the specific location of facilities, have been chosen to avoid impact on existing land uses to the greatest extent possible. For example, active use recreational areas have been avoided in the majority of cases. During construction, as with all construction projects, there will be some land use disruption requiring mitigation measures such as temporary rerouting of bicycle paths, pedestrian detours, loss or parking, etc. It is important to note that land use disruption will be temporary and previous land use will be reinstated after construction. 6. How will the facilities impact the natural environment, e.g. trees? With a project of this size, there will be some impacts to the natural environment. Toronto Water is committed to working with local communities, Parks and TRCA during detailed design and construction to minimize impacts on the natural environment, including trees and other vegetation. Mitigation measures will include tree protection zones, and specific siting of facility to minimize the loss of mature trees, among other possible considerations. Where tree removal is required, they will be replaced. Restoration and opportunities for post construction enhancements will be considered in consultation with the local community during detailed design (post EA). Page 12

13 WET WEATHER FLOW TREATMENT FACILITY 1. Where will the treatment facility be located? A new satellite treatment facility to treat captured wet weather flows is being proposed for the waterlot south of the Ashbridges Bay Treatment Plant. 2. Why has the satellite treatment facility been eliminated at Pharmacy Yard? Treatment of the WWF collected and stored in the Taylor-Massey system was previously contemplated at a new treatment facility at the City s Pharmacy Yard. By extending the Taylor-Massey tunnel westerly and connecting it to the Lower Don River tunnel, treatment can now be accomplished at the proposed new treatment facility for wet weather flows to be located in lakefill south of the Ashbridges Bay Treatment Plant. 3. What is the level of treatment proposed? High rate treatment technology is being proposed. This is considered a primary plus level of treatment and will ensure that the City meets all regulatory requirements. Treatment goals for combined sewer overflows (CSOs) are outlined in Ministry of Environment Procedure F-5-5 Determination of Treatment Requirements for Municipal and Private Combined and Partially Separated Sewer Systems. The treatment goal is to provide a treatment level equivalent to primary treatment at a minimum, or 30 percent Carbonaceous Biochemical Oxygen Demand (CBOD) removal and 50 percent Total Suspended Solids (TSS) removal, for an average year during the wet weather season (April to October). The proposed satellite high rate treatment facility will produce a higher quality effluent removing approximately 50% CBOD and 85% TSS. IMPLEMENTATION QUESTIONS 1. When will the project be built? There are a number of steps before the project can be built. First, this study needs to be approved by the Ministry of Environment. Then, preliminary engineering and detailed design will take place for each facility being proposed. Both design and construction are dependent upon City approvals and availability of sufficient funds. Implementation will be phased in over a 25 year timeframe, based on priorities and funding. The initial phases of implementation will focus on twinning of the Coxwell Sanitary Trunk Sewer and meeting minimum Provincial requirements for CSO control. Over the proposed 25-year implementation timeframe for the Project, additional elements would be constructed to provide the dry weather capacity required and to further improve the water quality and environmental benefits Page 13

14 2. What are the next steps in the project? The next steps in the project include: Completing the Environmental Study Report (ESR), Phase 4 of EA process. Seeking approval from City s Public Works and Infrastructure Committee and City Council for submission of ESR to the Ontario Ministry of the Environment. Submitting the ESR to the Ontario Ministry of Environment (MOE) for a 30 day public review period. Seeking all approvals and funding to implement the project. Pending approvals, preliminary and detailed design will be carried out in consultation with impacted local communities. Construction of project components. Some steps may take place simultaneously. Stay in touch. For additional information, visit our website at Send us a letter to: Cleaning Up Our Waterways, 55 John Street, 18 th floor, Metro Hall, Toronto ON M5V 3C6. Send a fax to us at cleanwaterways@toronto.ca or call Information will be distributed via wherever possible. Page 14

Controlling CSO Discharges in the City of Toronto: Don River and Central Waterfront Project

Controlling CSO Discharges in the City of Toronto: Don River and Central Waterfront Project Controlling CSO Discharges in the City of Toronto: Don River and Central Waterfront Project Michael D Andrea, M.E.Sc., P.Eng. Chief Engineer and Executive Director Engineering & Construction Services City

More information

Public Works & Infrastructure Committee. Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division

Public Works & Infrastructure Committee. Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division STAFF REPORT ACTION REQUIRED Contract Award - Request for Proposals No. 9117-13-7210 Professional Engineering Services for the Design and Construction Administration of the Wet Weather Flow System to Control

More information

Update The Don River and Central Waterfront Project and The Ashbridges Bay Treatment Plant outfall

Update The Don River and Central Waterfront Project and The Ashbridges Bay Treatment Plant outfall Cleaning Up Our Waterways: Update The Don River and Central Waterfront Project and The Ashbridges Bay Treatment Plant outfall Focus of projects : Lower Don River and Toronto s Inner Harbour & Ashbridges

More information

Ashbridges Bay Erosion and Sediment Control Class EA: ABTP NLC Presentation June 17, 2013

Ashbridges Bay Erosion and Sediment Control Class EA: ABTP NLC Presentation June 17, 2013 Ashbridges Bay Erosion and Sediment Control Class EA: ABTP NLC Presentation June 17, 2013 Background Problem Identification Mid-1970 s: Ashbridge s Bay Park constructed Early 1980 s: Start of dredging

More information

STAFF REPORT ACTION REQUIRED. Waterfront Landforms Study SUMMARY. Date: February 29, Public Works and Infrastructure Committee.

STAFF REPORT ACTION REQUIRED. Waterfront Landforms Study SUMMARY. Date: February 29, Public Works and Infrastructure Committee. STAFF REPORT ACTION REQUIRED Waterfront Landforms Study Date: February 29, 2012 To: From: Public Works and Infrastructure Committee General Manager, Toronto Water Wards: 6, 13, 14, 32 Reference Number:

More information

2017 Wet Weather Flow Master Plan Implementation Status Update

2017 Wet Weather Flow Master Plan Implementation Status Update PW21.6 REPORT FOR ACTION 2017 Wet Weather Flow Master Plan Implementation Status Update Date: April 24, 2017 To: Public Works and Infrastructure Committee From: General Manager, Toronto Water Wards: All

More information

Public Works & Infrastructure Committee. Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division

Public Works & Infrastructure Committee. Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division PW12.6 STAFF REPORT ACTION REQUIRED Amendment to Purchase Order No. 6038978 Professional Engineering Services During Construction and Post Construction for North Toronto Wastewater Treatment Plant CSO

More information

Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study

Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study Welcome to the Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study September 23, 2009 Please Sign In and take an Information Brief

More information

SUSTAINABLE MUNICIPAL WATER MANAGEMENT PROGRAM

SUSTAINABLE MUNICIPAL WATER MANAGEMENT PROGRAM THE CITY OF ST. CATHARINES SUSTAINABLE MUNICIPAL WATER MANAGEMENT PROGRAM SUSTAINABLE MUNICIPAL WATER MANAGEMENT PROGRAM THE CITY OF ST. CATHARINES Background As a member of the Great Lakes and St. Lawrence

More information

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Welcome Public Information Event Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Please sign in to be added to the study mailing list and receive

More information

City of Toronto s Climate Change Adaptation Strategy to Address Urban Flooding

City of Toronto s Climate Change Adaptation Strategy to Address Urban Flooding City of Toronto s Climate Change Adaptation Strategy to Address Urban Flooding Michael D Andrea, M.E.Sc., P.Eng. Chief Engineer and Executive Director Engineering & Construction Services City of Toronto

More information

Upper York Sewage Solutions Individual Environmental Assessment Project Update

Upper York Sewage Solutions Individual Environmental Assessment Project Update Upper York Sewage Solutions Individual Environmental Assessment Project Update Town of Georgina Committee of the Whole October 15, 2012 Daniel Kostopoulos Director, Capital Planning and Delivery Presentation

More information

Welcome South London Wastewater Servicing Study. Municipal Class Environmental Assessment Master Plan Public Information Centre.

Welcome South London Wastewater Servicing Study. Municipal Class Environmental Assessment Master Plan Public Information Centre. Welcome South London Wastewater Servicing Study Municipal Class Environmental Assessment Master Plan Public Information Centre February 26, 2018 The purpose of this Public Information Centre (PIC) is to:

More information

Public Information Centre No. 1

Public Information Centre No. 1 Public Information Centre No. 1 City of Timmins Schedule B Class Environmental Assessment for the WHITNEY TISDALE SANITARY SYSTEM UPGRADES Welcome Please Sign In Class EA Process & Public Consultation

More information

WEAO STUDENT DESIGN COMPETITION 2018 PROJECT STATEMENT

WEAO STUDENT DESIGN COMPETITION 2018 PROJECT STATEMENT Water Environment Association of Ontario Young Professionals Committee and Student Design Competition Sub- Committee and the Ontario Ministry of the Environment and Climate Change In Collaboration with

More information

The Halifax Harbour Solutions Project Provision of Sewage Treatment

The Halifax Harbour Solutions Project Provision of Sewage Treatment The Halifax Harbour Solutions Project Provision of Sewage Treatment ENVIRONMENTAL SCREENING PURSUANT TO THE CANADIAN ENVIRONMENTAL ASSESSMENT ACT Prepared by Halifax Regional Municipality June, 2000 Revised

More information

City of Toronto s Climate Change Adaptation Strategy to Mitigate Urban Flooding

City of Toronto s Climate Change Adaptation Strategy to Mitigate Urban Flooding City of Toronto s Climate Change Adaptation Strategy to Mitigate Urban Flooding Michael D Andrea, M.E.Sc., P.Eng. Chief Engineer and Executive Director, Engineering & Construction Services City of Toronto

More information

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT Downtown Ottawa Transit Tunnel: Tunney s Pasture to Blair Station via a Downtown LRT Tunnel Prepared for: City of Ottawa 110 Laurier Avenue West Ottawa, ON

More information

Preferred Elevated Tank Site

Preferred Elevated Tank Site Preferred Elevated Tank Site Preferred Site No. 3 is on private property owned by Hopewell Developments. Approximately 5 acres of land will be required, including lands required for a permanent access

More information

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles

More information

Table of Contents. List of Tables. 11. Advantages and Disadvantages

Table of Contents. List of Tables. 11. Advantages and Disadvantages Table of Contents 11. Advantages and Disadvantages... 11-1 page List of Tables... 11-1 11. Advantages and Disadvantages The overall advantages and disadvantages of the DMNP are articulated, summarized

More information

Sewer System Flood Reduction Measures in the Rockcliffe Area

Sewer System Flood Reduction Measures in the Rockcliffe Area PW28.6 REPORT FOR ACTION Sewer System Flood Reduction Measures in the Rockcliffe Area Date: March 26, 2018 To: Public Works and Infrastructure Committee From: General Manager, Toronto Water Wards: Ward

More information

Development in the City of Toronto

Development in the City of Toronto Development in the City of Toronto Water Infrastructure Challenges and Opportunities Graham Harding, P.Eng. Toronto Water, City of Toronto Urban Land Institute Leadership Program February 16, 2017 Toronto

More information

Executive Summary: Combined Sewer Overflow Management Study

Executive Summary: Combined Sewer Overflow Management Study Executive Summary: Combined Sewer Overflow Management Study Combined Sewer Overflow Management Study Report to: Water and Waste Department Combined Sewer Overflow Management Study 2 Table of Contents Introduction...4

More information

Promote fiscally responsible asset management of existing and proposed new infrastructure.

Promote fiscally responsible asset management of existing and proposed new infrastructure. 10.0 Infrastructure Goals Promote fiscally responsible asset management of existing and proposed new infrastructure. Promote all sources of water as a valuable resource through the conservation of water,

More information

PUBLIC INFORMATION CENTRE Class Environmental Assessment For. Black Creek Flood Management

PUBLIC INFORMATION CENTRE Class Environmental Assessment For. Black Creek Flood Management PUBLIC INFORMATION CENTRE Class Environmental Assessment For Conservation Ontario Class Environmental Assessment for Remedial Flood and Erosion Control Projects (2002) The Class EA for Remedial Flood and

More information

Public Information Centre September 19 th, 2017

Public Information Centre September 19 th, 2017 Public Information Centre September 19 th, 2017 WELCOME! Public Information Centre for the Maple Hill Creek Rehabilitation Class Environmental Assessment Please take the time to sign our sign in sheet

More information

Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update

Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update The 7 th Biennial Meeting of the Lake Erie Millennium Network Status of Lake Erie Management Needs & Research Questions

More information

Ottawa-Trussler Area Sewage Facility Class Environmental Assessment

Ottawa-Trussler Area Sewage Facility Class Environmental Assessment Welcome to the Ottawa-Trussler Area Sewage Facility Class Environmental Assessment Public Open House May 7, 2013 September 25, 2013 Welcome The purpose of this second Public Open House is to: Present the

More information

CASE STUDY. Cleanup of Toronto Harbour Leads to Waterfront Revitalization

CASE STUDY. Cleanup of Toronto Harbour Leads to Waterfront Revitalization CASE STUDY 10 Cleanup of Toronto Harbour Leads to Waterfront Revitalization Cleanup of Toronto Harbour Leads to Waterfront Revitalization By Valerie Francella, Toronto and Region Conservation Authority;

More information

Open House. Proposed Henderson Sewage Pumping Station Schedule B Municipal Class Environmental Assessment Study

Open House. Proposed Henderson Sewage Pumping Station Schedule B Municipal Class Environmental Assessment Study Proposed Henderson Sewage Pumping Station Schedule B Municipal Class Environmental Assessment Study Open House Thursday, February 21, 2019 6:30 p.m. to 8:30 p.m. Aurora Town Hall 100 John West Way, Aurora,

More information

CITY OF TORONTO WATER AND WASTEWATER UTILITY RATES

CITY OF TORONTO WATER AND WASTEWATER UTILITY RATES PUBLIC REPORT TO CORPORATE AFFAIRS, STRATEGIC PLANNING AND PROPERTY COMMITTEE CITY OF TORONTO WATER AND WASTEWATER UTILITY RATES I can do all this through Him who gives me strength. Philippians 4:13 (NIV)

More information

4. Description, Evaluation and Rationale for Alternatives To the Undertaking

4. Description, Evaluation and Rationale for Alternatives To the Undertaking 4. Description, Evaluation and Rationale for Alternatives To the Undertaking The EA Act requires the identification and evaluation of alternatives to the undertaking or functionally different ways of addressing

More information

c: Don Labossiere, Director, Environmental Compliance and Enforcement Public Registries

c: Don Labossiere, Director, Environmental Compliance and Enforcement Public Registries Climate Change and Environmental Protection Division Environmental Approvals Branch 123 Main Street, Suite 160, Winnipeg, Manitoba R3C 1A5 T 204 945-8321 F 204 945-5229 www.gov.mb.ca/conservation/eal CLIENT

More information

Business Plan: Wastewater Removal and Stormwater Management

Business Plan: Wastewater Removal and Stormwater Management Business Plan: Wastewater Removal and Stormwater Management How does this service contribute to the results identified in the City of London Strategic Plan? A Sustainable Infrastructure Compliance with

More information

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System Welcome to the NIAGARA REGION Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT Public Information Centre Please

More information

Ashbridges Bay Treatment Plant (ABTP) Neighbourhood Liaison Committee (NLC) Meeting #103

Ashbridges Bay Treatment Plant (ABTP) Neighbourhood Liaison Committee (NLC) Meeting #103 Ashbridges Bay Treatment Plant (ABTP) Neighbourhood Liaison Committee (NLC) Meeting #103 Mennonite New Life Centre, 1774 Queen Street East September 25, 2012 6:30 p.m. 8:30 p.m. ATTENDANCE: Karen Buck

More information

1. Introduction. 1.1 Project Background. E n v i r o n m e n t a l A s s e s s m e n t chapter 1. introduction

1. Introduction. 1.1 Project Background. E n v i r o n m e n t a l A s s e s s m e n t chapter 1. introduction 1. Introduction 1.1 Project Background Toronto and Region Conservation Authority (TRCA) is proceeding with the Environmental Assessment (EA) for the Don Mouth Naturalization and Port Lands Flood Protection

More information

ENVIRONMENTAL ASSESSMENT

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Project Identification Project Name: Elyria East Side Relief Sewer Phase 1B South (CS390337-0018), Phase 1C (CS390337-0014), Phase 1D (CS390337-0017) Applicant: The Honorable Holly

More information

Ministère de l'environnement et de l Action en matière de changement climatique. 40, avenue St. Clair ouest 7 e étage Toronto ON M4V 1M2

Ministère de l'environnement et de l Action en matière de changement climatique. 40, avenue St. Clair ouest 7 e étage Toronto ON M4V 1M2 Ministry of the Environment and Climate Change Standards Development Branch 40 St. Clair Ave. West 7 th Floor Toronto ON M4V 1M2 www.ene.gov.on.ca Tel.: 416 327-5519 Fax: 416 327-2936 Ministère de l'environnement

More information

Drainage Servicing Report - Terms of Reference

Drainage Servicing Report - Terms of Reference Urban Form and Corporate Strategic Development City Planning 7th Floor, Edmonton Tower 10111 104 Avenue NW Edmonton, AB T5J 0J4 edmonton.ca July 2018 1 Introduction: Drainage Servicing Reports Drainage

More information

TOWNSHIP OF SPRINGWATER MIDHURST - WATER, WASTEWATER & TRANSPORTATION CLASS ENVIRONMENTAL ASSESSMENT PHASE 3 & 4. January 7, 2015 Education Meeting

TOWNSHIP OF SPRINGWATER MIDHURST - WATER, WASTEWATER & TRANSPORTATION CLASS ENVIRONMENTAL ASSESSMENT PHASE 3 & 4. January 7, 2015 Education Meeting TOWNSHIP OF SPRINGWATER MIDHURST - WATER, WASTEWATER & TRANSPORTATION CLASS ENVIRONMENTAL ASSESSMENT PHASE 3 & 4 January 7, 2015 Education Meeting 1 Overview of Presentation Overview of the Class Environmental

More information

City of Edmonton Drainage Services Summary Notes of Cloverdale Flood Mitigation Meeting Held May 13, 2015 at Cloverdale Hall

City of Edmonton Drainage Services Summary Notes of Cloverdale Flood Mitigation Meeting Held May 13, 2015 at Cloverdale Hall Presenters Miressa Fola, Project Manager, Drainage Planning Maxime Belanger, Project Manager, Sameng Inc. In attendance were approximately 40 residents. River Valley Neighbourhoods Flood Risk Study Please

More information

EAST-WEST TIE TRANSMISSION PROJECT

EAST-WEST TIE TRANSMISSION PROJECT Connecting Ontario s Northwest What s Inside? Answers to On: NextBridge Infrastructure and the East-West Tie Project Electricity in Northern Ontario Land issues Routing Project approval process Health

More information

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit Initiative

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit Initiative REGION OF WATERLOO TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit Initiative TO: Chair Jim Wideman and Members of the Planning and Works Committee DATE: FILE CODE: D10-20/RT SUBJECT: PROPOSED

More information

COMBINED SEWER OVERFLOWS (CSO) FREQUENTLY ASKED QUESTIONS

COMBINED SEWER OVERFLOWS (CSO) FREQUENTLY ASKED QUESTIONS COMBINED SEWER OVERFLOWS (CSO) FREQUENTLY ASKED QUESTIONS What is a Combined Sewer Overflow (CSO)? In Port Angeles, the sewer system is constructed the same as many older cities in the United States. Our

More information

Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood

Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood Purpose of this Public Information Centre Provide you with an update on Hydro One s infrastructure

More information

INFORMATION SHEET WINTER 2013 CLOVER PUMP STATION & CONVEYANCE PIPE. Road to Ogden Point, then under the. to the Treatment Plant planned for

INFORMATION SHEET WINTER 2013 CLOVER PUMP STATION & CONVEYANCE PIPE. Road to Ogden Point, then under the. to the Treatment Plant planned for INFORMATION SHEET WINTER 2013 CLOVER PUMP STATION & CONVEYANCE PIPE Project Background As part of the Seaterra Program, Clover A new conveyance pipe (forcemain) Pump Station will be upgraded and will run

More information

Section 3 General Development Policies

Section 3 General Development Policies 3.4.6 Substandard System Improvements The Municipality will actively encourage the participation of its residents in any program that the HKPRDHU or the MOE designed to upgrade or replace existing substandard

More information

RECOMMENDATION PREVIOUS REPORTS PERTINENT TO THIS MATTER STRATEGIC PLAN

RECOMMENDATION PREVIOUS REPORTS PERTINENT TO THIS MATTER STRATEGIC PLAN TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON NOVEMBER 21, 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES & CITY ENGINEER WASTEWATER

More information

BIOSOLIDS MASTER PLAN UPDATE

BIOSOLIDS MASTER PLAN UPDATE BIOSOLIDS MASTER PLAN UPDATE Prepared for the City of Toronto by: AECOM Canada Ltd. 220 Advance Boulevard Brampton, ON L6T 4J5 October 2009 Prepared by: AECOM Canada Ltd. 220 Advance Boulevard, Brampton,

More information

RECOMMENDATION. the financing for the project BE APPROVED in accordance with the Sources of Financing Report attached hereto as Appendix A ;

RECOMMENDATION. the financing for the project BE APPROVED in accordance with the Sources of Financing Report attached hereto as Appendix A ; TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JANUARY 9, 2018 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES & CITY ENGINEER APPOINTMENT

More information

Please complete the sign-in sheet and review display materials.

Please complete the sign-in sheet and review display materials. Municipal Class Environmental Assessment Please complete the sign-in sheet and review display materials. As you move through the information presented today, we encourage you to ask questions and provide

More information

Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters

Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters PROCEDURE F-5-1 (formerly referenced by 08-01) Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters PROCEDURE F-5-1 DETERMINATION OF TREATMENT

More information

Hydraulic Modeling of Deep Tunnel Provides Cost Savings

Hydraulic Modeling of Deep Tunnel Provides Cost Savings 5 Hydraulic Modeling of Deep Tunnel Provides Cost Savings Taymour El-Hosseiny, Karen Reinhart and M. P. Cherian In 2005, the City of Columbus, Ohio submitted a plan to the Ohio Environmental Protection

More information

March 29, to the. Please sign in and take a Comment Sheet

March 29, to the. Please sign in and take a Comment Sheet elcome to the Public Information Centre for the River Street Pump Station Twin- Forcemain Extension and Ravensview Trunk Sewer Twinning Please sign in and take a Comment Sheet Utilities Kingston staff

More information

APPENDIX C. Public Consultation Centre (PCC) Displays. Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3

APPENDIX C. Public Consultation Centre (PCC) Displays. Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3 APPENDIX C Public Consultation Centre (PCC) Displays Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3 Appendix C1 PCC#1 Appendix C2 PCC#2 Township of Red Rock Class Environmental

More information

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY Project #08223 CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY PREPARED FOR: City of Crystal Lake 100 West Woodstock Street Crystal Lake, Illinois 60014 FEBRUARY 11, 2009 26575 W. COMMERCE DRIVE, SUITE 601,

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED METROPOLITAN COUNCIL ENVIRONMENTAL SERVICES ST. LOUIS

More information

NJ Future CSO Permittee Meeting

NJ Future CSO Permittee Meeting NJ Future CSO Permittee Meeting 1 Best Practices Carter Strickland, JD HDR 2 Getting the Best LTCP CSO controls will be expensive Include Best Practices to Maximize visible and tangible benefits Create

More information

Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility Plans

Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility Plans Maine State Library Maine State Documents Land and Water Quality Documents Environmental Protection 9-1-1994 Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility

More information

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law ADMINISTRATIVE REPORT Report Date: November 27, 2018 Contact: Daniel Roberge Contact No.: 604.873.7360 RTS No.: 12725 VanRIMS No.: 08-2000-20 Meeting Date: December 11, 2018 TO: FROM: SUBJECT: Vancouver

More information

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Reducing Flood Risk in Toronto David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Institute for Catastrophic Loss Reduction February 19, 2016 1 Agenda Reducing Flood Risk in Toronto 1) Overview

More information

2017 Annual Performance Report

2017 Annual Performance Report Newcastle Water Pollution Control Plant The Regional Municipality of Durham Newcastle Water Pollution Control Plant Environmental Compliance Approval (ECA): 3-2189-87-946 Dated July 26, 1994 Amendments:

More information

The City of Edmonton Combined Sewer Overflow (CSO) Control Strategy. Implementation Plan. Prepared for: Alberta Environment.

The City of Edmonton Combined Sewer Overflow (CSO) Control Strategy. Implementation Plan. Prepared for: Alberta Environment. The City of Edmonton Combined Sewer Overflow (CSO) Control Strategy Prepared for: Alberta Environment June 2000 Prepared by: City of Edmonton Asset Management and Public Works Drainage Services TABLE OF

More information

Comparison of Two Methods of End-of-pipe Control for CSO and Stormwater

Comparison of Two Methods of End-of-pipe Control for CSO and Stormwater Chapter 20 Comparison of Two Methods of End-of-pipe Control for CSO and Stormwater Mario Conetta, MacViro Consultants Inc. 7270 Woodbine Avenue, Markham, Ontario L3R 4B9 Werner Wichmann, Deputy Commissioner,

More information

Sustainable Halton Water & Wastewater Master Plan. Public Information Centre #1

Sustainable Halton Water & Wastewater Master Plan. Public Information Centre #1 Sustainable Halton Water & Wastewater Master Plan Public Information Centre #1 Welcome to Public Information Centre #1 Please sign in on the sheet provided. Our representatives will be pleased to discuss

More information

Comparative Evaluation Option #1 & Option #2

Comparative Evaluation Option #1 & Option #2 Comparative Evaluation Option #1 & Option #2 Option #1 Existing Landfill Approx. 47 metres/14 stories Proposed Layout Approx. 31 metres/9.5 stories Option #2 Existing Landfill Approx. 47 metres/14 stories

More information

Consent Decree Appendix 1. Control Measures and Performance Criteria

Consent Decree Appendix 1. Control Measures and Performance Criteria Case: 1:10-cv-02895-DCN Doc #: 2-2 Filed: 12/22/10 1 of 6. PageID #: 82 United States and State of Ohio v. Northeast Ohio Regional Sewer District Consent Decree Appendix 1 Control Measures and Performance

More information

Sustainability Statement

Sustainability Statement Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Sustainability Statement Doc Ref: 7.07 Appendix B.21 Greenwich Pumping Station

More information

Ministry of the Environment and Climate Change. Transfer of Review. Presentation for Wastewater Practitioners Group.

Ministry of the Environment and Climate Change. Transfer of Review. Presentation for Wastewater Practitioners Group. Ministry of the Environment and Climate Change Transfer of Review Presentation for Wastewater Practitioners Group November 29, 2017 Outline of Presentation Transfer of Review (TOR) Program Context TOR

More information

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by Milwaukee Metropolitan Sewerage District Conveyance and Treatment System MACRO made available by Eric Loucks,, CDM MMSD Collection System Operations MMSD operates an extensive system of sanitary sewers

More information

This page is blank to facilitate double-sided printing.

This page is blank to facilitate double-sided printing. Supplement No. 2 September 2013 This page is blank to facilitate double-sided printing. Introduction and Purpose The Metropolitan St. Louis Sewer District (MSD) prepared an update to its Combined Sewer

More information

Introduction. 1.3 Study Overview and Purpose. 1.1 Overview of Environmental Project Report. 1.2 Overview of Environmental Project Report

Introduction. 1.3 Study Overview and Purpose. 1.1 Overview of Environmental Project Report. 1.2 Overview of Environmental Project Report 1. Introduction The Toronto Transit Commission (TTC) and the City of Toronto are undertaking an Environmental Assessment (EA) for the new Ashbridges Bay Maintenance and Storage Facility (MSF) for Light

More information

ENVIRONMENTAL ASSESSMENT

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Project Identification Project: Cleveland E. 185 th Street & Marcella Road Relief Sewer (Phase 1) Applicant: Robert L Davis, Director of Public Utilities City of Cleveland 12302

More information

DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN

DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN Submitted to: Town of Milton Regional Municipality of Halton Submitted by: AMEC Earth & Environmental 3215 North Service Road

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 19, 2014 SUBJECT: TPAP AMENDMENT FOR TRAIN STORAGE FACILITY YONGE SUBWAY EXTENSION ACTION ITEM RECOMMENDATION It is recommended

More information

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac) Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17

More information

APPENDIX C TECHNICAL MEMORANDUM NO.2 ALTERNATIVE DESIGN CONCEPTS FOR PROSPECT PARK WPP EXPANSION

APPENDIX C TECHNICAL MEMORANDUM NO.2 ALTERNATIVE DESIGN CONCEPTS FOR PROSPECT PARK WPP EXPANSION Prospect Park Well Field Re-rating and Water Purification Plant Expansion ESR APPENDICES APPENDIX C TECHNICAL MEMORANDUM NO.2 ALTERNATIVE DESIGN CONCEPTS FOR PROSPECT PARK WPP EXPANSION R030059505500101001_FINAL_FE2015

More information

Natural Systems Planning Primer

Natural Systems Planning Primer Natural Systems Planning Primer Lise.Guevremont@ottawa.ca Amy.Macpherson@ottawa.ca Land Use and Natural Systems Unit Planning and Growth Management November 2015 1 Welcome Policy Framework Development

More information

Cost Estimating Framework

Cost Estimating Framework Cost Estimating Framework Water and Wastewater Master Study Prepared by: GM BluePlan Engineering for: Project No. 717022 TABLE OF CONTENTS 1 Introduction... 1 2 Cost Estimation Framework... 2 2.1 Approach

More information

Queensville Holland Landing Sharon Sanitary Servicing. York Region Project Update

Queensville Holland Landing Sharon Sanitary Servicing. York Region Project Update Queensville Holland Landing Sharon Sanitary Servicing York Region Project Update Daniel Kostopoulos Director, Capital Planning and Delivery Town of East Gwillimbury Committee of the Whole May 22, Presentation

More information

Capital Facilities Element

Capital Facilities Element Capital Facilities Element Purpose The Growth Management Act requires cities to prepare a capital facilities element consisting of: 1. An inventory of current capital facilities owned by public entities,

More information

GRAND VALLEY WATER AND WASTEWATER SERVICING MASTER PLAN CLASS ENVIRONMENTAL ASSESSMENT

GRAND VALLEY WATER AND WASTEWATER SERVICING MASTER PLAN CLASS ENVIRONMENTAL ASSESSMENT GRAND VALLEY WATER AND WASTEWATER SERVICING MASTER PLAN CLASS ENVIRONMENTAL ASSESSMENT Public Information Centre Wednesday, November 1, 2017 6:00 PM 8:00 PM Grand Valley District Community Centre Grand

More information

COLE ENGINEERING GROUP LTD.

COLE ENGINEERING GROUP LTD. CITY OF MARKHAM PROJECT FILE Stormwater Management Facilities Retrofit Municipal Class EA ES12-0316 COLE ENGINEERING GROUP LTD SEPTEMBER 2015 [ Month Year ] HEAD OFFICE 70 Valleywood Drive Markham, ON

More information

Executive Summary. Introduction

Executive Summary. Introduction Executive Summary Introduction The City of Terre Haute has developed a (CSO LTCP), which describes the measures they will take to reduce the combined sewer overflows and improve water quality in the Wabash

More information

The Scope of Integrated Stormwater Management

The Scope of Integrated Stormwater Management Stormwater Planning Guidebook The Scope of Integrated Stormwater Management Chapter Three 3.1 Overview and Context Connecting the Natural and Built Environments Integration Means Tackling Water Quantity

More information

Long-Term CSO Control Plan for North Dorchester Bay and the Reserved Channel

Long-Term CSO Control Plan for North Dorchester Bay and the Reserved Channel Massachusetts Water Resources Authority Long-Term CSO Control Plan for North Dorchester Bay and the Reserved Channel Frederick A. Laskey Executive Director March 8, 2004 How Sewer Separation Works 2 How

More information

11. Public Utilities. Key Terminology: OVERVIEW STORMWATER MANAGEMENT WATERSHED MANAGEMENT ORGANIZATIONS AND COMMISSIONS. Inventory and Analysis

11. Public Utilities. Key Terminology: OVERVIEW STORMWATER MANAGEMENT WATERSHED MANAGEMENT ORGANIZATIONS AND COMMISSIONS. Inventory and Analysis Inventory and Analysis 11. Public Utilities Urbanized (drainage): Defined as an area where natural soils, waterways, and environmental functions are replaced with impervious surfaces (roads, parking lots,

More information

Appendix M. Criteria, Measures and Indicators for Effects Assessment

Appendix M. Criteria, Measures and Indicators for Effects Assessment Appendix M Criteria, Measures and Indicators for Effects Assessment Appendix M. Criteria, Measures and Indicators for Effects Assessment Objective 1: Naturalization Changes to Aquatic Habitat Disruption,

More information

Community Affairs and Planning Committee. Paul Allore, MCIP, RPP Director of Planning and Development Services

Community Affairs and Planning Committee. Paul Allore, MCIP, RPP Director of Planning and Development Services TOWN OF AJAX REPORT REPORT TO: SUBMITTED BY: PREPARED BY: SUBJECT: Community Affairs and Planning Committee Paul Allore, MCIP, RPP Director of Planning and Development Services Russ Corby, C.E.T. Site

More information

VILLAGE OF CASSELMAN CASSELMAN WASTEWATER TREATMENT SYSTEM MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT PHASE 2 REPORT (DRAFT) DRAFT AUGUST 8, 2017

VILLAGE OF CASSELMAN CASSELMAN WASTEWATER TREATMENT SYSTEM MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT PHASE 2 REPORT (DRAFT) DRAFT AUGUST 8, 2017 VILLAGE OF CASSELMAN CASSELMAN WASTEWATER TREATMENT SYSTEM MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT PHASE 2 REPORT (DRAFT) DRAFT AUGUST 8, 2017 Prepared for: VILLAGE OF CASSELMAN 751 St-Jean Street PO

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

Rainfall Comparison Summary

Rainfall Comparison Summary Review of the July 12, 2017 Storm/Flooding Event Rainfall Comparison Summary 2010 2013 2014 2017 Event Date May 11 13 April 17 18 May 12 13 July 12-13 Rainfall Total 5.55 4.95 3.31 6.70 Basement Flooding

More information

SANITARY SEWAGE & WATER INFRASTRUCTURE IMPACTS CITY OF KINGSTON URBAN GROWTH STRATEGY

SANITARY SEWAGE & WATER INFRASTRUCTURE IMPACTS CITY OF KINGSTON URBAN GROWTH STRATEGY SANITARY SEWAGE & WATER INFRASTRUCTURE IMPACTS CITY OF KINGSTON URBAN GROWTH STRATEGY March 8, 2004 Submitted to: Planning & Development Services City of Kingston 216 Ontario Street Kingston, Ontario K7L

More information

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session #2 June 15 to July 13, 2018

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session #2 June 15 to July 13, 2018 WELCOME Eastern Subwatersheds Stormwater Management Retrofit Study Online Information Session #2 June 15 to July 13, 2018 1 Eastern Subwatersheds Stormwater Management Retrofit Study This study is one

More information

How we would build the proposed storm relief sewer

How we would build the proposed storm relief sewer Counters Creek storm relief sewer How we would build the proposed storm relief sewer We would build the proposed Counters Creek storm relief sewer using the most advanced construction methods and we would

More information

MOSLEY STREET URBANIZATION TH

MOSLEY STREET URBANIZATION TH Public Information Centre 1 (PIC 1) MOSLEY STREET URBANIZATION TH 45 BEACHWOOD ROAD TO STREET Class Environmental Assessment November 29, 2016 Welcome 2 This Public Information Centre will: establish channels

More information

Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria

Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria INTERIM PROTOCOL Authority Meeting #10/07, Res. #A293/07, January 4, 2008 1. The works outlined in Table 1 must classify

More information

Lake Creek Watershed Management Plan Public Meeting. Arrowhead Lake May 3, :00 PM

Lake Creek Watershed Management Plan Public Meeting. Arrowhead Lake May 3, :00 PM Lake Creek Watershed Management Plan Public Meeting Arrowhead Lake May 3, 2018 6:00 PM Agenda I. Welcome and Introductions II. III. IV. Watershed Basics Overview of Lake Creek Watershed Elements of a Successful

More information