Business Plan: Wastewater Removal and Stormwater Management

Size: px
Start display at page:

Download "Business Plan: Wastewater Removal and Stormwater Management"

Transcription

1 Business Plan: Wastewater Removal and Stormwater Management How does this service contribute to the results identified in the City of London Strategic Plan? A Sustainable Infrastructure Compliance with all regulatory requirements to operate, sustain, expand and improve the wastewater and stormwater infrastructure for efficiently delivering high quality and reliable environmental and drainage services to London s customers for all residential, institutional, commercial, and industrial needs. Name the main activities done to provide this service: Name The Activities Done To Provide This Service 1. Operation, Maintenance and Repair of the Wastewater Conveyance and Treatment Systems and Stormwater Management System How Much Did We Do? (optional) 65-85B L of wastewater treated annually Up to 412B L of stormwater managed annually 700-1,000 km of sanitary sewers flushed annually 2. Renewal of Existing Infrastructure km of sewers rehabilitated annually 8-25 km of sewers installed annually (new and replacement) Approx. 1-2 stormwater management facilities rehabilitated annually Approx. 2 km of watercourses rehabilitated annually Approx. 3.5 ha of wetland reclamation completed annually Is The City Mandated To Provide This Service? Can The Level Of Service Be Changed? (with limitations) (with limitations) 1

2 Name The Activities Done To Provide This Service How Much Did We Do? (optional) 3. Extension of Services for Growth Approx. 30km of sanitary & storm sewers assumed annually Approximately 4.6 km of new storm sewer installed in areas that did not have storm sewers Approx. 5 stormwater management facilities constructed annually Approx. 5 stormwater management facilities assumed annually Is The City Mandated To Provide This Service? Can The Level Of Service Be Changed? (with limitations) What is the current state of this service? Current objectives of the Wastewater utility include: Achieving a financially sustainable 1 utility and addressing lifecycle renewal, growth and economic development objectives of the City while ensuring regulatory compliance Maintaining / improving the existing level of service provided to the citizens and businesses of London Maintaining best-in-class standings with the National Benchmarking Initiative Minimizing the number of sewer-related blockages Reducing the number of basement flooding occurrences Improving the health of the Thames River Providing support for the City s Industrial Land Development Strategy These objectives are being driven by a number of factors, including: Customer expectations of the services that should be provided 1 Financial Sustainability is defined as the movement toward annual rate increases that can be maintained at or near the annual rate of inflation based on a combination of CPI and the Construction Price Index with appropriate use of debt financing, adequate reserve funds and the appropriate investment in capital. 2

3 Council-approved level of service requirements Council-endorsed strategic initiatives City of London Strategic Plan Climate Change Adaptation Strategy A number of challenges are facing the Wastewater service area in the achievement of these objectives: Declining revenue base, aging infrastructure (much of which is reaching the end of its useful life at the same time), increasing cost drivers over which the utility has no direct control (power, labour, etc.), an aging workforce, and everincreasing regulatory requirements Extreme weather events associated with climate change are placing an additional burden on stormwater and wastewater collection systems and also pose a threat to many wastewater facilities located in close proximity to rivers and on floodplains. Changing climate conditions are also making the updating of subwatershed studies more challenging. Increasing customer expectations (e.g. many more homes are now utilizing their basements as living quarters and therefore there is a customer expectation that no damages to this space should occur via sewage backups even under changing climate conditions) The large and growing geographic size of London makes service delivery challenging (3,800 square kilometers of land drainage flows through London improving water quality in the Thames River therefore needs to have a watershed wide approach) Current economic climate demands that fully serviced industrial lands are available as opportunities arise Changing provincial and federal regulations Some of the challenges noted above have been managed with positive results in 2014 through the following achievements: Sewer Operations Completed five stormwater management pond rehabilitations Rehabilitated designated sections of the existing Ridout Street brick sewer, utilizing trenchless technology (multi-year project) Completed pipe rehabilitation on designated sections of the Gordon trunk sanitary sewer via trenchless technology Working towards a contract with a software vendor to undertake the implementation of a Computerized Maintenance Management System, which will bring the City s utility maintenance and work flow management up to industry standards. This will result in staff resource efficiencies, enhanced documentation, and cost tracking of maintenance activities, while also ensuring compliance with regulatory requirements 3

4 Wastewater Treatment Operations Completed construction of the Southern Ontario Water Consortium-London Wastewater Node at Greenway PCP Commenced Greenway PCP Expansion detailed design (multi-year project) to ensure sufficient treatment capacity is available to service future growth and manage wet weather flows Wastewater and Drainage Engineering Purchased and installed 13 permanent flow monitoring gauges to comply with Federal Fisheries Act Regulation for Municipal Wastewater Effluents Completed Phase 1 and commenced Phase 2 of Council s Climate Change Adaptation Strategy for the City s water resources and stormwater management strategy to deal with extreme storm events Completed Phase One of the Pollution Prevention and Control Plan and commenced Phase Two Stormwater Management Unit Designed and constructed multiple regional stormwater management facilities General Completed the Southwest Area Sanitary Servicing Master Plan Completed the 2014 Wastewater Servicing Master Plan Update, 2014 Stormwater Master Plan Update and Development Charges Background Study Supported the preparation and sale of serviced industrial lots Revised revenue and expenditure forecasts What has been done to manage the budget? The service area has been actively managing its budget by implementing management led initiatives aimed at creating efficiencies, avoiding costs and generating revenue. These include the following: Efficiencies / Costs Avoided Previous 3 Years Amended the catchbasin cleaning program with risk and Council approved quality standards as primary considerations. The recently implemented strategic plan frees existing staffing resources to meet the Sewer Operations Division s new work demands such as annual maintenance on assumed stormwater management facilities. 4

5 Implementation of a more aggressive approach to PDC replacement where lining is always given first consideration over the more costly and traditional open cut methods. Completed biosolids upgrades at Greenway Pollution Control Plant, resulting in reduced natural gas and chemical consumption in addition to labour savings. According to the PwC audit of this project, the total estimated annual operating savings associated with this initiative is approximately $700,000 per year, with total capital savings of $33 million. Implemented turbo blower upgrades at Adelaide, Oxford and Vauxhall Polluton Control Plants. These new and more efficient blowers were made possible through cooperation from London Hydro and incentives through the Ontario Power Authority. These blowers are anticipated to result in $170,000 in annual energy savings. Revenue Generation / User Fee Increases Previous 3 Years Implemented a new Water and Wastewater rate structure effective March 1, The purpose of this new rate structure was to ensure fairness and equity for all customers while also balancing conservation efforts, economic development and the need to provide a more stable, predictable revenue stream in response to declining consumption. Other rate increases over the past 3 years have been in keeping with the Council-endorsed rate plan in order to achieve financial sustainability in What is the future direction of this service? Core business objectives will remain consistent; however, specific attention will be given to opportunities for synergistic activities in four areas: regulatory compliance, growth, efficiency and best management practices, with sustainability being a common theme in all areas. The drivers for these four activity areas include: protecting public health and private property; meeting all regulatory requirements; supporting Council s objectives of economic development and growth; gaining efficiencies to reduce long term costs; investing in succession planning; harnessing innovative technologies; and maintaining a high level of service to consistently meet customers expectations. Continuing focus on delivering a financially sustainable utility in the near term and maintaining infrastructure levels of service at an appropriate level of risk as the 20-Year Capital Plan is implemented. 5

6 What future initiatives can be contained within the maintain existing service level budget? 2015 Budget Compliance Continue to advance the Pollution Prevention and Control Plan (PPCP) aimed at reducing the number of overflows in both the collection system and at the wastewater treatment plants while helping to ensure wet weather flows are treated to Ministry of Environment standards Continue to report system overflows and bypasses to comply with Federal Fisheries Act Regulation for Municipal Wastewater Effluents Efforts will continue to improve the health of the Thames River and support the Council-endorsed strategic initiatives underway, including: investigation of opportunities for long-term funding from other sources, strengthening collaboration with Western University and other research centres Complete three (3) stormwater management facility rehabilitations and undertake a full cost analysis based on actual work completed by others vs. by City forces. Continue to monitor ongoing stormwater management facility annual maintenance and associated costs. Continue to build a robust database for these City owned facilities to satisfy Ministry of Environment Certificate of Approval requirements Rehabilitate designated sections of the Gordon trunk sanitary sewer as the final phase of this multi-year project Rehabilitate designated sections of the deteriorating Ridout Street brick sanitary trunk sewer, as part of a multiphase/year project Start the process of reclaiming 30 hectares of wetland in the Dingman Creek Subwatershed Growth Continue construction on the Greenway WWTP expansion / CSO treatment project Construct the Hamlyn-Wonderland Sanitary Trunk sewer to accommodate growth in the southwest quadrant as per the 2014 Wastewater Servicing Master Plan Update and Development Charge Background Study and the Southwest Area Sanitary Servicing Master Plan Continue to undertake applicable studies, designs and construction of stormwater management facilities in accordance with the Growth Management Implementation Strategy (GMIS) 6

7 Complete updates to the water resources and slope stability components of subwatershed studies to establish water resources and stormwater management criteria for future growth under existing and climate change conditions Provide service area support for the Corporation s Industrial Land Development Strategy Efficiency Continue to implement a Computerized Maintenance Management System, to bring the utility s maintenance and work flow management up to industry standards. This will result in staff resource efficiencies, enhanced documentation, and cost tracking of maintenance activities, while also aiding in compliance with regulatory requirements Begin optimization projects at wastewater treatment facilities based on the results of the Wastewater Treatment optimization strategy Best Management Practices Measure and assess the effectiveness of the Sherwood Forest Disconnection Project while continuing to administer and promote the Sump Pump Grant Program to further alleviate basement flooding Consider implementing Storm Drainage Charges for vacant properties pending the outcome of a 2014 review. Implement the strategy for achieving an appropriate minimum reserve fund balance for the utility, consistent with corporate wide financial objectives Forecast Compliance Complete the first phase of a Thames River watershed-wide Water Management Study Complete the plan and commence work on measures identified as part of the Pollution Prevention and Control Plan Continue the stormwater management facility rehabilitation program, by rehabilitating an additional facility in 2016 and another in Timing of future rehabilitations will be determined by a report generated in 2015 Complete the Burbrook Trunk Storm Sewer (ES3054) project that will allow sewer separation works to advance, which will reduce the likelihood of sewer backups 7

8 Growth Complete Greenway plant expansion / CSO treatment project Construct the next scheduled phases of sanitary trunk sewers to accommodate growth in the southwest quadrant as per the 2014 Wastewater Servicing Master Plan Update and Development Charge Background Study and the Southwest Area Sanitary Servicing Master Plan Continue to provide storm/drainage and stormwater management servicing for the growth and prosperity of the City Assume various stormwater management facilities constructed by developers Implement various Development Charges-funded growth projects to support the Industrial Land Development Strategy Efficiency Optimize the Computerized Maintenance Management System Initiate long-term strategic planning based on preliminary results of the CMMS implementation Continue optimization projects at wastewater treatment facilities which are expected to commence in 2015 Best Management Practices Initiate flood proofing works for Greenway and Vauxhall treatment facilities to reduce the risk of catastrophic flooding in extreme weather events Continue the reclamation and rehabilitation of watercourse functional performance and ecological health What service adjustments do you plan to make? 2015 Budget Addition of 2 new resources in the Stormwater Management Unit to support design and construction activities associated with the influx of additional stormwater management facilities to be constructed in new development areas over the next 10 years Forecast None anticipated at this time, although service adjustments may be required pending the outcome of the Pollution Prevention and Control Plan and Wastewater Treatment Optimization project 8

9 Key Performance Indicators How Much? Description of measure Volume of wastewater treated (billion litres) Volume of stormwater managed (billion litres) Percentage of sanitary sewer system flushed (1) 86% 86% 81% 76% 67% 67% 4. Percentage of sewer system replaced, 1.3% 1.5% 1.3% 1.4% 1.4% 1.4% rehabilitated or relined 5. Percentage of stormwater management facilities rehabilitated (2) 8.3% 16.6% 10.0% 3.3% 3.3% 13.3% How Well? Description of measure Average annual cost for residential customer (3) $426 $446 $475 $489 $504 $ Percentage of Bio-chemical Oxygen Demand 99% 99% 99% 99% 99% 99% removed 8. Percentage of stormwater management facilities constructed as per the Just in Time Design and Construction Process N/A N/A 100% 100% 100% 100% Is Anyone Better Off? Description of measure Number of MOE effluent violations (4) Percentage of flooding complaints addressed 100% 100% 100% 100% 100% 100% 11. Number of blocked sewers per 100km length NOTE: 2013 values represent actual amounts; values represent forecasts (1) Current level of service requires the sanitary sewer collection system to be completely flushed once every 2 years. (2) Based on 30 existing stormwater management facilities. (3) Based on 2014 projected consumption of m 3 and does not incorporate future projected consumption declines. Actual cost may be lower as a result. (4) Not necessarily indicative of a risk to public health. 9

Business Plan: Drinking Water Supply

Business Plan: Drinking Water Supply Business Plan: Drinking Water Supply How does this service contribute to the results identified in the City of London Strategic Plan? A Sustainable Infrastructure Compliance with all regulatory requirements

More information

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Reducing Flood Risk in Toronto David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Institute for Catastrophic Loss Reduction February 19, 2016 1 Agenda Reducing Flood Risk in Toronto 1) Overview

More information

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System Welcome to the NIAGARA REGION Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT Public Information Centre Please

More information

WEAO STUDENT DESIGN COMPETITION 2018 PROJECT STATEMENT

WEAO STUDENT DESIGN COMPETITION 2018 PROJECT STATEMENT Water Environment Association of Ontario Young Professionals Committee and Student Design Competition Sub- Committee and the Ontario Ministry of the Environment and Climate Change In Collaboration with

More information

Wastewater System Financial Plan. For the Corporation of the City of Thunder Bay

Wastewater System Financial Plan. For the Corporation of the City of Thunder Bay Wastewater System Financial Plan For the Corporation of the City of Thunder Bay Prepared January 2015 City of Thunder Bay 500 Donald Street East PO Box 800 Thunder Bay, Ontario, Canada P7C 5K4 Contents

More information

Storm Water and Sanitary Sewer

Storm Water and Sanitary Sewer Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements

More information

Town Hall Slide Presentation

Town Hall Slide Presentation Town Hall Slide Presentation John Braam, P.Eng. Managing Director Environmental & Engineering Services & City Engineer This is Julian... He was born in London in May 2011. When he's all grown up, with

More information

HALTON REGION Budget and Business Plan Water & Wastewater Overview

HALTON REGION Budget and Business Plan Water & Wastewater Overview HALTON REGION and Business Plan Water & Wastewater Overview Water & Wastewater Overview Operating Summary Water and wastewater services are not funded from property taxes. These services are fully funded

More information

10 Inflow and Infiltration Reduction Strategy Update

10 Inflow and Infiltration Reduction Strategy Update Clause 10 in Report No. 4 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on March 24, 2016. 10 Inflow and Infiltration

More information

Water, Wastewater and Stormwater 2017 Budget 2018 Plan

Water, Wastewater and Stormwater 2017 Budget 2018 Plan Executive Summary Water, Wastewater and Stormwater In May 2000, the E.coli outbreak and water contamination events in the Town of Walkerton led to an inquiry under Justice Dennis O Conner. The recommendations

More information

What is a stormwater utility fee?

What is a stormwater utility fee? What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville

More information

Management of Aging Wastewater Infrastructure -- Challenges and Strategies --

Management of Aging Wastewater Infrastructure -- Challenges and Strategies -- Management of Aging Wastewater Infrastructure -- Challenges and Strategies -- Jerry N. Johnson, General Manager District of Columbia Water and Sewer Authority Washington, D.C. Overview of the Aging Situation

More information

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles

More information

OMBI 2012 Data Dictionary Wastewater Services

OMBI 2012 Data Dictionary Wastewater Services C CAO ( ) WASTEWATER SERVICES WWTR001 Population This result feeds from the Municipal data input area. Population is as per FIR Schedule 90, line 0020 column 2 WWTR002 WWTR005 WWTR006 Override Population

More information

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008 ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6 BEST PRACTICE SUMMARY REPORT February, 2008 Water and Wastewater PROJECT APPROACH The focus of the

More information

Engineering Department

Engineering Department Engineering Department Stormwater Mission: To provide for the efficient and effective cleaning and repair of the stormwater collection system and implement the federally mandated Stormwater Pollution Prevention

More information

2017 Wet Weather Flow Master Plan Implementation Status Update

2017 Wet Weather Flow Master Plan Implementation Status Update PW21.6 REPORT FOR ACTION 2017 Wet Weather Flow Master Plan Implementation Status Update Date: April 24, 2017 To: Public Works and Infrastructure Committee From: General Manager, Toronto Water Wards: All

More information

Sewer System Flood Reduction Measures in the Rockcliffe Area

Sewer System Flood Reduction Measures in the Rockcliffe Area PW28.6 REPORT FOR ACTION Sewer System Flood Reduction Measures in the Rockcliffe Area Date: March 26, 2018 To: Public Works and Infrastructure Committee From: General Manager, Toronto Water Wards: Ward

More information

CITY OF TORONTO WATER AND WASTEWATER UTILITY RATES

CITY OF TORONTO WATER AND WASTEWATER UTILITY RATES PUBLIC REPORT TO CORPORATE AFFAIRS, STRATEGIC PLANNING AND PROPERTY COMMITTEE CITY OF TORONTO WATER AND WASTEWATER UTILITY RATES I can do all this through Him who gives me strength. Philippians 4:13 (NIV)

More information

Development in the City of Toronto

Development in the City of Toronto Development in the City of Toronto Water Infrastructure Challenges and Opportunities Graham Harding, P.Eng. Toronto Water, City of Toronto Urban Land Institute Leadership Program February 16, 2017 Toronto

More information

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008 ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6 BEST PRACTICE SUMMARY REPORT February, 2008 Water and Wastewater INFLOW AND INFILTRATION DOWNSPOUT

More information

City of Markham 2018 Proposed Water/Wastewater Rates. General Committee November 6, 2017

City of Markham 2018 Proposed Water/Wastewater Rates. General Committee November 6, 2017 City of Markham 2018 Proposed Water/Wastewater Rates General Committee November 6, 2017 2 Agenda 1. About Markham s Environmental Services Department 2. 2017 Comparative Municipal Water/Wastewater Rates

More information

The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto.

The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto. This document was put together following the fourth round of public consultation for the Class Environmental Assessment study for this Project. In June 2011, the Project Team consulted with stakeholders

More information

Sault Ste. Marie Ratepayers Association Meeting of February 27, 2013

Sault Ste. Marie Ratepayers Association Meeting of February 27, 2013 Sault Ste. Marie Ratepayers Association Meeting of February 27, 2013 PUC Structure 1917 to 2000 Corporation of the City of Sault Ste. Marie (the City) City Council (Mayor & 12 Councillors) Public Utilities

More information

4 Desired Levels of Service (LOS)

4 Desired Levels of Service (LOS) 4 Desired Levels of Service (LOS) LOS are a key business driver and influence all asset management decisions. LOS statements describe the outputs Halton intends to deliver to its residents and commonly

More information

CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Hamilton Water Division

CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Hamilton Water Division CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Hamilton Water Division TO: Chair and Members Public Works Committee COMMITTEE DATE: March 17, 2014 SUBJECT/REPORT NO: Accelerated Remediation of Illegal Sewer

More information

Ministry of the Environment and Climate Change. Transfer of Review. Presentation for Wastewater Practitioners Group.

Ministry of the Environment and Climate Change. Transfer of Review. Presentation for Wastewater Practitioners Group. Ministry of the Environment and Climate Change Transfer of Review Presentation for Wastewater Practitioners Group November 29, 2017 Outline of Presentation Transfer of Review (TOR) Program Context TOR

More information

CAPACITY MANAGEMENT OPERATIONS & MAINTENANCE

CAPACITY MANAGEMENT OPERATIONS & MAINTENANCE CAPACITY MANAGEMENT OPERATIONS & MAINTENANCE LOCAL LAW Joanne M. Mahoney County Executive Issues Created by Inflow/Infiltration Creates sanitary sewer overflows in the environment which is prohibited by

More information

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE PLAN SUMMARY AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE The Pennsylvania Sewage Facilities Act (Act 537) was enacted by the Pennsylvania

More information

Sewerage and Water Board of New Orleans Strategic Plan

Sewerage and Water Board of New Orleans Strategic Plan Sewerage and Water Board of New Orleans Strategic Plan 2011-2020 Mission, Vision, and Values Our mission is to provide safe drinking water to everyone in New Orleans; to remove waste water for safe return

More information

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights

More information

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 MSD is delivering Phase 1 is under the original cost estimate Improving Trends in Water Quality MSDGC has completed

More information

Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan

Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan Public Meeting and Open-House March 27, 2013 Agenda The Master Plan Process History of the Area Draft Servicing Strategy

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

Greater Vancouver Regional District Liquid Waste Management Plan

Greater Vancouver Regional District Liquid Waste Management Plan Greater Vancouver Regional District Liquid Waste Management Plan February 2001 Greater Vancouver Regional District Liquid Waste Management Plan February 2001 GREATER VANCOUVER REGIONAL DISTRICT LIQUID

More information

Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities

Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities Diane W. Duva, Office of Energy Demand May 6, 2015 Connecticut Department of Energy and Environmental Protection Benefits of

More information

Summary of Findings. Bridge Inspection and Monitoring. Introduction. Findings

Summary of Findings. Bridge Inspection and Monitoring. Introduction. Findings Summary of s Introduction The Province s bridges are aging and their related condition is deteriorating. This situation highlights the need for an adequate system of bridge inspection and planning for

More information

On-Site Sewage Systems Maintenance Inspections

On-Site Sewage Systems Maintenance Inspections Ministry of Municipal Affairs and Housing Ministère des Affaires municipales et du Logement On-Site Sewage Systems Maintenance Inspections Source Protection Committee Chairs Meeting January 17, 2010 On-Site

More information

Kane County Natural Hazards Mitigation Committee

Kane County Natural Hazards Mitigation Committee Kane County Natural Hazards Mitigation Committee Annual Report For 2004 TO: Members of the Kane County Board FROM: Kane County Natural Hazards Mitigation Committee SUBJECT: Annual Report for 2004 Date:

More information

Infrastructure Asset Management in Action at Onondaga County Department of Water Environment Protection (WEP)

Infrastructure Asset Management in Action at Onondaga County Department of Water Environment Protection (WEP) Infrastructure Asset Management in Action at Onondaga County Department of Water Environment Protection (WEP) Onondaga County Department of Water Environment Protection June 2016 Joanne M. Mahoney County

More information

WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: WATER SUPPLY AND DISTRIBUTION INTRODUCTION

WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: WATER SUPPLY AND DISTRIBUTION INTRODUCTION WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: Greenway Connections Protect and enhance drainage corridors Compact Development Continue efficient,

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF Mutchmor Public School Addition 185 Fifth Avenue Ottawa, Ontario Report No. 12073-SB February 15, 2013 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage

More information

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,

More information

Customer Conference Speedway, IN 46224

Customer Conference Speedway, IN 46224 Customer Conference Speedway, IN 46224 DigIndy and Citizens Capital Investment Plan Updates Mark C. Jacob Vice President Capital Programs & Engineering September 18, 2014 A Matter of Trust Challenges Annually

More information

Infiltration and Inflow. Michael Sassaman Phone

Infiltration and Inflow. Michael Sassaman Phone Infiltration and Inflow Michael Sassaman msassaman@entecheng.com Phone 610-373-3345 Inflow and Infiltration PA DEP Learning Objectives Do you have Excessive I/I? Sources of Inflow and Infiltration I/I

More information

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT Goal 7.0. To optimize integrated stormwater management in order to reduce damage and impacts from sea level rise and flooding, promotes recharge to the Surficial Aquifer System (SAS), improve and protect

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual Design Specifications & Requirements Manual 10 SEDIMENT AND EROSION CONTROL 10.1 INTRODUCTION... 1 10.2 REFERENCE... 1 10.3 GENERAL INFORMATION REQUIREMENTS... 1 10.3.1 ESC Plan... 1 10.3.2 Servicing Drawings...

More information

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT SUBMITTED BY: TREATMENT FACILITY: NPDES #: MUNICIPALITY: COUNTY: CONTACT PERSON: Responsible Official Title Telephone #: Fax #: Email Address:

More information

Wastewater System Master Plan and SSO Initiative

Wastewater System Master Plan and SSO Initiative Wastewater System Master Plan and SSO Initiative Project Drivers Rapid Population Growth in Fort Worth 800000 700000 46% Increase in Population Over the Last 10-Years 702,850 600000 Population 500000 400000

More information

You have applied in accordance with Section 53 of the Ontario Water Resources Act for approval of:

You have applied in accordance with Section 53 of the Ontario Water Resources Act for approval of: Ministry of the Environment Ministère de l Environnement St. Lawrence Cement Inc. 2300 Steeles Ave W Concord, Ontario L4K 5X6 AMENDED CERTIFICATE OF APPROVAL INDUSTRIAL SEWAGE WORKS NUMBER 1491-7K8JH8

More information

SURFACE WATER UTILITY FEE

SURFACE WATER UTILITY FEE The Surface Water Utility Fee section of the FY2014 Budget Message provides background, impacts and actions associated with the County s prior and new surface water level of service in the unincorporated

More information

1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change

1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change 1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change 1.1 Background Within the First National Engineering Vulnerability Assessment, the Public Infrastructure

More information

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning) Page: 1 Date: May 27, 2014 Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full Title of the Project 2. Type of the study (e.g. Master

More information

Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility Plans

Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility Plans Maine State Library Maine State Documents Land and Water Quality Documents Environmental Protection 9-1-1994 Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility

More information

Potable Water Supply, Wastewater & Reuse Element

Potable Water Supply, Wastewater & Reuse Element Potable Water Supply, Wastewater & Reuse Element GOAL ONE: HIGH QUALITY AND AFFORDABLE POTABLE WATER WILL BE AVAILABLE TO MEET THE EXISTING AND PROJECTED DEMANDS OF PINELLAS COUNTY UTILITY CUSTOMERS. 1.1.

More information

E D M O N T O N. Edmonton Wastewater Source Control Program

E D M O N T O N. Edmonton Wastewater Source Control Program Edmonton Wastewater Source Control Program 1 Source Control Program To Protect City sewer collection system To protect GB Wastewater Treatment Plant To protect quality of biosolids To protect environment

More information

FY2018 CIRP Detailed Summary

FY2018 CIRP Detailed Summary FY2018 CIRP Detailed Summary 1 FY 2018 CIRP New Allocations Type of Project Number % Budget Asset Management Renewal 15 6 19,562,000 Cityshed 6 6 19,238,000 CSO 12 16 50,470,000 SSO 87 61 195,696,000 Treatment

More information

Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016

Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016 Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control OWEA Conference June 29, 2016 WWTP Average Daily Flow 6 MGD Peak Flow (Primary Only) 12 MGD Collection System 123 Miles (8 to

More information

Kitchener s Stormwater Utility

Kitchener s Stormwater Utility Kitchener s Stormwater Utility Nick Gollan, C.E.T. City of Kitchener Southern Ontario Stream Monitoring and Research Team December 2, 2013 Seneca College Presentation Agenda 1. Stormwater Funding Review

More information

OVERVIEW CAPACITY & CONDITION

OVERVIEW CAPACITY & CONDITION OVERVIEW The nation s 14,748 wastewater treatment plants protect public health and the environment. Years of treatment plant upgrades and more stringent federal and state regulations have significantly

More information

National Water Demand Management Policy

National Water Demand Management Policy National Water Demand Management Policy Introduction In 1997, the Ministry of Water and Irrigation developed Jordan s Water Strategy and the following four policies, which include: Water Utility Policy;

More information

E1/92. D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds. Green Evaluation. Transaction Overview. Green Evaluation Overview

E1/92. D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds. Green Evaluation. Transaction Overview. Green Evaluation Overview Green Evaluation D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds Transaction Overview In January 2017, the District of Columbia Water & Sewer Authority issued $100 million in series

More information

Funding Stormwater Services

Funding Stormwater Services Funding Stormwater Services Public Works Officers Institute March 10, 2016 By Mitch Avalon Consultant, County Engineers Association of California Pine Creek Flooding, Concord 1958 Overview Ballot Measure

More information

TOWNSHIP OF SPRINGWATER MIDHURST - WATER, WASTEWATER & TRANSPORTATION CLASS ENVIRONMENTAL ASSESSMENT PHASE 3 & 4. January 7, 2015 Education Meeting

TOWNSHIP OF SPRINGWATER MIDHURST - WATER, WASTEWATER & TRANSPORTATION CLASS ENVIRONMENTAL ASSESSMENT PHASE 3 & 4. January 7, 2015 Education Meeting TOWNSHIP OF SPRINGWATER MIDHURST - WATER, WASTEWATER & TRANSPORTATION CLASS ENVIRONMENTAL ASSESSMENT PHASE 3 & 4 January 7, 2015 Education Meeting 1 Overview of Presentation Overview of the Class Environmental

More information

Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria

Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria INTERIM PROTOCOL Authority Meeting #10/07, Res. #A293/07, January 4, 2008 1. The works outlined in Table 1 must classify

More information

c: Don Labossiere, Director, Environmental Compliance and Enforcement Public Registries

c: Don Labossiere, Director, Environmental Compliance and Enforcement Public Registries Climate Change and Environmental Protection Division Environmental Approvals Branch 123 Main Street, Suite 160, Winnipeg, Manitoba R3C 1A5 T 204 945-8321 F 204 945-5229 www.gov.mb.ca/conservation/eal CLIENT

More information

GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES

GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 185 NOVEMBER 2012 GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES TABLE OF CONTENTS 185.01 SCOPE 185.02 REFERENCES

More information

Natural Systems Planning Primer

Natural Systems Planning Primer Natural Systems Planning Primer Lise.Guevremont@ottawa.ca Amy.Macpherson@ottawa.ca Land Use and Natural Systems Unit Planning and Growth Management November 2015 1 Welcome Policy Framework Development

More information

INFRASTRUCTURE ELEMENT

INFRASTRUCTURE ELEMENT Goals, Objectives and Policies INFRASTRUCTURE ELEMENT SANITARY SEWER GOAL 4.A.1.: PROVIDE ADEQUATE CENTRAL SANITARY SEWAGE FACILITIES FOR RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT AND REDEVELOPMENT IN

More information

City of Ottawa Water, Wastewater and Stormwater Rate Structure Review

City of Ottawa Water, Wastewater and Stormwater Rate Structure Review City of Ottawa Water, Wastewater and Stormwater Rate Structure Review The City of Ottawa is developing a new rate structure to fund its water, wastewater and stormwater infrastructure. We need your help

More information

Blueprint Columbus. Clean Streams. Strong Neighborhoods.

Blueprint Columbus. Clean Streams. Strong Neighborhoods. Blueprint Columbus Clean Streams. Strong Neighborhoods. Columbus Plan to Eliminate Sewer Overflows Blueprint Columbus is born Pilot projects Community Outreach Plan Development (prioritization) Columbus

More information

Handout 5: Stormwater Cost of Service

Handout 5: Stormwater Cost of Service Handout 5: Stormwater Cost of Service Introduction The purpose of this handout is to describe the current cost allocation methodology for the stormwater program. The existing Stormwater Management Service

More information

MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities

MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities MaryLynn Lodor MSD of Greater Cincinnati Sharon Jean-Baptiste CH2M HILL April 4, 2013 Overview MSD s Environmental

More information

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM I. General Information A. Agency Name B. Agency Address

More information

Updating the MWRD s Excessive Infiltration and Inflow Control Program. February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois

Updating the MWRD s Excessive Infiltration and Inflow Control Program. February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois Updating the MWRD s Excessive Infiltration and Inflow Control Program February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois MWRD SEPARATE SEWER AND COMBINED SEWER AREAS LEGEND: Separate/Unsewered

More information

Figure 2 shows the monthly SSO Volumes within the system from 2007 through 2008 reported in million gallons (MG).

Figure 2 shows the monthly SSO Volumes within the system from 2007 through 2008 reported in million gallons (MG). 28 Annual Report January 27, 29 As required by Section XIX.B., of the pending Consent Decree, the Metropolitan Government of Nashville and Davidson County, Tennessee (Metro) has prepared the enclosed Annual

More information

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS Revised: June 4, 2014 Requirements for obtaining a site alteration permit vary depending on the type of project being proposed. This information

More information

Ten Steps to Implementing ROW LID

Ten Steps to Implementing ROW LID connecting drops the Ten Steps to Implementing ROW LID UTRCA Symposium Low Impact Development: Opportunities for Municipalities Implementing LID on a Watershed Basis and Making a Difference: A 10 Step

More information

Master Environmental Servicing Plan and Secondary Plan

Master Environmental Servicing Plan and Secondary Plan East Side Lands Stage 2 Master Environmental Servicing Plan and Secondary Plan Public Consultation Centre (PCC) December 5, 2016 Today s Agenda 6:00 pm 6:30 pm: Open House 6:30 pm 7:00 pm: Presentation

More information

Streamlining I/I Repairs in Berlin Charter Township

Streamlining I/I Repairs in Berlin Charter Township Case Study: Streamlining I/I Repairs in Berlin Charter Township Presented by: Rich Grant, PE Agenda Discussion of the problems & the SAW I/I Evaluation & SSES = Asset Management Groundtruthing of Results

More information

Volume 1 Executive Summary

Volume 1 Executive Summary 2013 Cheyenne Water and Wastewater Master Plans Final November 27, 2013 Prepared for: City of Cheyenne Board of Public Utilities 2416 Snyder Ave. Cheyenne, WY 82001 Prepared by: HDR Engineering AMEC Earth

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

DATE: September 8, 2014 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

DATE: September 8, 2014 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration PUBLIC WORKS COMMISSION DATE: September 8, 2014 REPORT NO. PW2014-047 TO: FROM: Chair and Members Committee of the Whole Operations and Administration Geoff Rae, MBA, P.Eng. General Manager, Public Works

More information

Watershed master planning, City of Griffin, Georgia, USA

Watershed master planning, City of Griffin, Georgia, USA Water Resources Management VII 3 Watershed master planning, City of Griffin, Georgia, USA J. K. Kaplan & B. J. Watson Tetra Tech, Water Resources Group, Atlanta, Georgia, USA Abstract Tetra Tech has assisted

More information

System Evaluation and Capacity Assurance Plan

System Evaluation and Capacity Assurance Plan City of Cedar Hills System Evaluation and Capacity Assurance Plan The City of Cedar Hills believes that one of the keys to preventing sanitary sewer overflows is to evaluate system capacity and to monitor

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

Sustainable Halton Water & Wastewater Master Plan. Public Information Centre #1

Sustainable Halton Water & Wastewater Master Plan. Public Information Centre #1 Sustainable Halton Water & Wastewater Master Plan Public Information Centre #1 Welcome to Public Information Centre #1 Please sign in on the sheet provided. Our representatives will be pleased to discuss

More information

The City of Adel. Chapter 8 - Utilities Investment Plan. Prepared February 2009 by:

The City of Adel. Chapter 8 - Utilities Investment Plan. Prepared February 2009 by: The City of Adel Chapter 8 - Utilities Investment Plan Prepared February 2009 by: Adel Comprehensive Plan CHAPTER 8 Utilities Investment Plan Adel operates its own potable water system and facultative

More information

Alternative Rouge River CSO Control Program Executive Summary

Alternative Rouge River CSO Control Program Executive Summary Alternative Rouge River CSO Control Program Executive Summary Updated as of February 2011 A revised approach to pollution control that controls stormwater runoff before it gets into the sewer system and

More information

Standards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities

Standards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities Standards for SWMF s (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities August 2017 PREAMBLE Development results in a great amount of impervious area,

More information

EFFLUENT DOMINATED WATER BODIES, THEIR RECLAMATION AND REUSE TO ACHIEVE SUSTAINABILITY

EFFLUENT DOMINATED WATER BODIES, THEIR RECLAMATION AND REUSE TO ACHIEVE SUSTAINABILITY EFFLUENT DOMINATED WATER BODIES, THEIR RECLAMATION AND REUSE TO ACHIEVE SUSTAINABILITY Chapter 9 Vladimir Novotny DEFINITION Effluent dominated water body Predominantly contains waste water effluents during

More information

Summary of LAKE ONTARIO Policies. 1. Requiring SPC approval: LO SEW 3 LO FUEL 2

Summary of LAKE ONTARIO Policies. 1. Requiring SPC approval: LO SEW 3 LO FUEL 2 Summary of LAE ONTARIO 1. Requiring SPC approval: LO SEW 3 LO FUEL 2 2. Information (editorial, revised, new): LO G 1 (revised) LO NGS 1 (revised) LO G 2 (revised) LO SEW 2 (revised) LO G 6 (revised) LO

More information

ORANGE WATER AND SEWER AUTHORITY Quality Service Since 1977

ORANGE WATER AND SEWER AUTHORITY Quality Service Since 1977 ORANGE WATER AND SEWER AUTHORITY Quality Service Since 1977 Mayor Kevin Foy Town of Chapel Hill 306 North Columbia Street Chapel Hill, NC 27516 Chairman Barry Jacobs Orange County Board of Commissioners

More information

Kanata West Overall Monitoring Plan

Kanata West Overall Monitoring Plan Kanata West Overall Monitoring Plan Background On November 24, 2009 the Ministry of Environment advised that the City of Ottawa (City) and the Kanata West Owner s Group (KWOG) had satisfied the requirements

More information

Buffalo Sewer Authority. David P. Comerford General Manager

Buffalo Sewer Authority. David P. Comerford General Manager Buffalo Sewer Authority David P. Comerford General Manager Introduction Like it has since its inception in 1938, the Buffalo Sewer Authority has successfully safeguarded the public health and protected

More information

City of Hamilton Public Works Asset Management Plan Version 1.0

City of Hamilton Public Works Asset Management Plan Version 1.0 Version 1.0 April 2014 Prepared by: WBG041414072354TOR Version 1.0 April 2014 Prepared By: Table of Contents Table of Contents... i Section 1 Executive Summary... 1 1.1 Background... 1 1.2 State of Local

More information

Planning Analytics for Asset Lifecycle Management (PALM)

Planning Analytics for Asset Lifecycle Management (PALM) Thursday, October 25, 2012 Shilpa Mahatma IBM Research Planning Analytics for Asset Lifecycle Management (PALM) City agencies need to co-ordinate the planning and management of assets to improve the quality

More information

Executive Summary Introduction Five Year Goals Performance Measure Types Performance Plan Logic Model Benchmarking, Strategic Planning, Performance

Executive Summary Introduction Five Year Goals Performance Measure Types Performance Plan Logic Model Benchmarking, Strategic Planning, Performance Section Page Executive Summary i Introduction iii Five Year Goals iii Performance Measure Types iv Performance Plan Logic Model v Benchmarking, Strategic Planning, Performance Accountability vi Presentation

More information

Interim Interconnector Sewer Operational Plan

Interim Interconnector Sewer Operational Plan Interim Interconnector Sewer Operational Plan Gary Hickman Plant Manager Jackson Pike Wastewater Treatment Plant Jeff Hall Assistant Plant Manager Southerly Wastewater Treatment Plant Columbus Area Collection

More information