1 Monthly Balance Report April 217
2 Content BRPs' imbalances How well have the BRPs traded into balance last report period? BRP imbalances, reserves and balancing power How did we manage the imbalances? Norwegian prices How did the prices develop during the last report period?
3 Balance Responsible Party Imbalances trading into balance A balance responsible party (BRP) will according to his physical obligations and rights have to achieve a planned balance latest when Elspot closes for bids (to trade into balance). Through bilateral trades and Elbas the BRP can until the trading deadline restore his balance if prognosis errors are discovered. System responsible and balance settlement cooperate when analyzing the BRPs' imbalances. The following is carefully monitored: How well do the BRPs trade into balance? (not to large hourly absolute imbalances and appropriate relative imbalances, monthly net imbalance should be near zero and thus not show a skewed distribution of positive and negative imbalances) whether BRPs use trades after Elspot to restore their balance or not As a result of the analysis the imbalances are diversified by generation and consumption imbalance and the BRPs are classified into three categories red, yellow and green. In the long run not acceptable In the short run acceptable Acceptable BRPs in this category might be breaching the balance agreement. The BRP is urged to improve his balance. A continued classification into this category can result in exclusion from the wholesale market. BRPs in this category are not balancing as well as they could. Although they during the reporting period are not breaching the balance agreement a continued classification or worsening imbalance in future periods can justify a classification as In the long run not acceptable. BRPs in this category are achieving a good balance. Although the balance is classified as acceptable the BRP still can reduce imbalance costs by improving his balance.
4 Balance Responsible Party Imbalances criteria for classification as red, yellow or green (only BRPs > 18 MWh/month abs imb) In the long run not acceptable (does not apply for BRPs < 18 MWh/month absolute imbalance) In the short run acceptable Acceptable Consumption Imbalance more than 1% relative imbalance and more than 2 times difference between negative and positive imbalances more than 12,5% relative imbalance more than 2,5 times difference between negative and positive imbalances Production Imbalance more than 5% relative imbalance and more than 2 times difference between negative and positive imbalances more than 6% relative imbalance more than 2,5 times difference between negative and positive imbalances Consumption Imbalance neither red or green Production Imbalance neither red or green Consumption Imbalance less than 6% relative imbalance and less than 18 MWh absolute monthly imbalance less than 6% relative imbalance and less than 1,5 times difference between negative and positive imbalances Production Imbalance less than 2,5% relative imbalance and less than 18 MWh absolute monthly imbalance less than 2,5% relative imbalance and less than 1,5 times difference between negative and positive imbalances
5 April 217: Norwegian BRPs' Imbalances Consumption Imbalance Generation Imbalance In the long run In the short run In the long run In the short run Acceptable not acceptable acceptable not acceptable acceptable Acceptable Agder Energi Vannkraft AS NO5 NO3 NO4 NO2 NO2 NO3 NO4 NO5 Akershus Energi Vannkraft AS NO1 NO3 NO2 NO5 NO2 NO1 Aktieselskabet Saudefaldene NO2 NO2 Aurland Energiverk AS NO5 AVINOR AS NO1 NO3 NO4 NO5 NO2 AXPO Nordic AS NO3 NO5 NO1 NO2 NO4 NO2 NO3 NO4 Bane NOR NO1 NO2 NO3 NO4 NO5 NO5 BKK Produksjon AS NO5 NO5 NO3 Boliden Odda AS NO2 Dalane Kraft AS NO2 NO2 E-CO Energi AS NO5 NO2 NO1 NO3 NO1 NO5 Eidefoss AS NO3 NO3 Eidsdal Kraft AS NO3 NO3 Eidsiva Marked AS NO2 NO3 NO4 NO5 NO1 NO1 Eidsiva Vannkraft AS NO1 NO3 NO1 NO3 Eiendomsspar Energi AS Elkem AS NO3 NO4 NO2 NO5 NO3 NO5 Elkraft AS NO1 NO2 NO3 NO4 NO5 Energi Danmark Energi Salg Norge AS NO1 NO2 NO5 NO3 NO4 ENI NORGE AS NO4 EVRY ASA NO1 NO2 Fjord Energi AS NO3 NO5 NO2 NO3 NO2 Fortum Markets AS NO1 NO2 NO3 NO4 NO5 Glitre Energi Produksjon AS NO1 NO1 Glitre Energi Strøm AS - Engros NO2 NO1 NO3 NO4 NO5 Gudbrandsdal Energi AS (utg) NO1 NO2 NO3 NO4 NO5 NO1 Hafslund Hedging AS NO1 NO4 NO3 NO2 NO5 NO1 NO2 Haugaland Kraft Energi AS NO2 NO1 NO3 NO4 NO5 Helgeland Kraft AS NO4 NO1 NO2 NO3 NO5 Helgeland Kraft AS Vannkraft NO4 NO4 Helse Sør-Øst RHF NO3 NO5 NO1 NO2 Hemsedal Energi (Balanseansvarlig) NO5 NO1 Hydro Energi AS NO5 NO4 NO1 NO2 NO3 NO4 NO5 NO2 Hålogaland Kraft Kunde AS NO4 NO4 Ishavskraft AS NO4 NO1 NO3 NO2 NO5 NO4 Istad Kraft AS NO3 NO5 NO1 NO2 NO4 NO3 JotunKraft A/S NO1 NO2 NO3 NO5 NO1 Kinect Energy Spot AS NO1 NO2 NO3 NO4 NO5 NO2 NO3 NO4 NO5 NO1 Konsesjonskraftfondet for Aust-Agder IKS NO2
6 April 217: Norwegian BRPs' Imbalances Consumption Imbalance Generation Imbalance In the long run In the short run In the long run In the short run Acceptable not acceptable acceptable not acceptable acceptable Acceptable Kraftinor AS NO1 NO2 NO3 NO5 NO4 Kraftverkene i Orkla NO3 NO1 NO3 Kymppivoima Hankinta Oy Lofotkraft Produksjon AS NO4 NO4 LOS AS NO1 NO3 NO2 NO4 NO5 NO2 Lunds Energi Norge AS Luster Energiverk AS NO1 NO2 NO3 NO4 NO5 NO5 Lyse Energisalg AS NO1 NO3 NO4 NO5 NO2 Lyse Produksjon AS NO2 NO2 Lærdal Energi AS NO1 NO2 NO3 NO4 NO5 NO5 Markedskraft ASA NO5 NO1 NO2 NO3 NO4 NO1 NO2 NO3 NO5 Midtkraft Strøm AS NO1 NO2 NO3 NO4 NO5 NO1 Midt-Telemark Energi AS NO1 NO2 NO2 MØRENETT AS Regulert kraftleverandør NO3 Neas Energy A/S NO2 Nesset Kraft AS NO3 NO3 Nordkraft Produksjon AS NO4 NO3 NO5 NO4 NO3 NO5 Nordmøre Energiverk AS NO2 NO3 NO1 NO4 NO5 NO1 NO2 NO3 Nord-Østerdal Kraftlag Marked NO1 NO3 NO2 NO5 Notodden Energi Kraft AS NO1 NO2 NO5 NTE Energi AS NO3 NO4 NO3 NO4 NTE Marked AS NO4 NO1 NO2 NO3 NO5 Oppland Energi AS NO1 NO3 NO1 Otovo AS NO1 NO2 NO3 NO4 NO5 Powest AS NO3 NO1 NO2 NO4 NO5 NO2 NO3 NO5 RAO Nordic Oy Rapid Power AS Rauma Energi Kraft AS NO3 NO1 NO4 NO5 NO2 NO3 Ringeriks-Kraft Produksjon AS NO2 NO1 NO3 NO4 NO5 NO1 NO2 Røros Elektrisitetsverk Kraft NO1 NO2 NO3 NO5 NO1 Scandem Norge NO2 NO3 NO1 Selbu Energiverk NO3 SFE PRODUKSJON AS NO1 NO2 NO3 NO4 NO5 NO3 NO5 Shell Energy NO3 Sira-Kvina Kraftselskap Produksjon NO2 NO2 Skagerak Kraft AS NO1 NO2 NO3 NO4 NO5 NO2 NO3 NO1 NO5 SkandiaEnergi Omsetning AS NO2 NO3 NO4 NO1 NO5 SKS Kraftsalg AS NO4 NO1 NO2 NO3 NO5 NO4 SKS Produksjon AS NO4 NO4
7 April 217: Norwegian BRPs' Imbalances Consumption Imbalance Generation Imbalance In the long run In the short run In the long run In the short run Acceptable not acceptable acceptable not acceptable acceptable Acceptable Sogn og Fjordane fylkeskommune NO3 NO5 Sognekraft A/S NO2 NO1 NO3 NO4 NO5 NO3 NO5 Stange Energi AS NO1 NO2 NO3 NO4 NO5 Statkraft Energi AS NO1 NO2 NO4 NO3 NO5 NO3 NO1 NO5 NO2 NO4 Statoil ASA NO2 NO3 NO5 NO4 NO3 NO5 NO4 Sunndal Energi KF NO1 NO2 NO3 NO5 Sunnfjord Energi AS NO1 NO3 NO5 NO3 Tafjord Kraftproduksjon AS NO3 NO1 NO2 NO4 NO5 NO3 Telinet Energi AS NO1 NO2 NO3 NO4 NO5 Tinfos AS_RE_BRP NO2 NO4 NO5 NO2 NO4 NO5 TIZIR TITANIUM & IRON AS NO2 Trønderenergi Kraft AS NO1 NO2 NO3 NO4 NO5 NO3 Tussa Energi AS NO4 NO1 NO2 NO3 NO5 NO3 Tussa-24 AS NO3 NO1 NO2 NO4 NO5 Ustekveikja Energi AS NO4 NO1 NO2 NO3 NO5 NO5 Vardar vannkraft AS NO2 NO1 NO5 Vattenfall AB Filial Norge NO1 NO2 NO5 Østfold Energi AS NO1 NO4 NO5 NO1 NO4 NO5
8 MWh/h Consumption Imbalance Norway The diagram shows as blue area the overestimated BRP-consumption and as red area the underestimated BRP-consumption. (Wrongly reported bilateral trades can disturb the figures)
9 jan feb mar apr jun jul aug sep oct nov dec jan feb mar apr jun jul aug sep oct nov dec imbalance per consumption Norwegian BRPs Accumulated imbalances for the NO-area The BRP-imbalance is diversified into generation and consumption. Consumption includes all imbalances settled as consumption imbalance except for the main transmission grid's losses.,5 Monthly Imbalances BRPs Norway (relative to consumption),3,1 -,1 -,3 generated less or consumed more than planned generated more or consumed less than planned -, PositiveConsumptionImbalance PositiveProductionImbalance NegativeConsumptionImbalance NegativeProductionImbalance
10 Share of up- and down regulation hours April % 9 % 8 % up 7 % 6 % 5 % none 4 % 3 % 2 % down 1 % % NO1 NO2 NO3 NO4 NO5
11 NOK/month Imbalance Costs What did it cost to have 1 MWh/h imbalance during April 217? cost for imbalance NO1 cost for imbalance NO2 cost for imbalance NO3 cost for imbalance NO4 cost for imbalance NO average cost NO1 3 NOK/MWh NO2 28 NOK/MWh NO3 32 NOK/MWh NO4 35 NOK/MWh NO5 3 NOK/MWh BRPs will have the same cost if their hourly imbalances are opposite to the main direction of regulation.
12 Content BRPs' imbalances How well have the BRPs traded into balance last report period? BRP imbalances, reserves and balancing power How did we manage the imbalances? Norwegian prices How did the prices develop during the last report period?
13 jan feb mar apr jun jul aug sep oct nov dec jan feb mar apr jun jul aug sep oct nov dec MWh/month Balancing with Norwegian Reserves The diagram shows the net activated energy from all available reserves in Norway, i.e. primary-, secondary- and tertiary-regulation, special regulation and adjusted generation schedules. Minus means that Norway used less water than planned, plus means that Norway used more water. 3 Net Balancing Power Norway used more water than planned used less water than planned (1. MWh/month 139 MWh/h)
14 jan feb mar apr jun jul aug sep oct nov dec jan feb mar apr jun jul aug sep oct nov dec MWh/month Imbalances and the joint Nordic Balancing An important "imbalance" is referring to the planned exchange with SE/DK/FI/NL. Basically an imbalance between planned and metered exchange is the result of exchange of reserves. Failures on the interconnectors are included in these volumes. Negative values indicate that Norway exported less or imported more than planned, positive that Norway exported more or imported less than planned. 3 Deviation between planned and metered exchange between NO and SE/FI/DK/NL regulated up for neighbors regulated down for neighbors (1. MWh/month 139 MWh/h)
15 jan feb mar apr jun jul aug sep oct nov dec jan feb mar apr jun jul aug sep oct nov dec MWh/month Norwegian imbalances Both BRP's imbalances and the exchange of reserves influence the flow in the grid and thus create an imbalance between Statnett's purchased and metered grid loss. Norwegian net monthly imbalance bought more than needed bought more or generated more than needed bought less than needed bought less or generated less than needed BRPs net.imb. Imbalance Grid Loss Statnett
16 Primary Reserves Secondary Reserves Tertiary Reserves Special Regulation Other Regulation Total Balance Power Net Balance Power MWh Norwegian Balance Power Activated reserves in the NO-area Activated Reserves NO (April 217) up-regulation down-regulation The during the report period activated reserves in Norway are shown above. Primary and secondary reserves are activated automatically when the frequency needs to be stabilized. Tertiary reserves are activated manually and in merit order when restoring the frequency. Special regulation also uses tertiary reserves, but not in a merit order. Other regulation is mainly the adjustment of generation schedules.
17 january february march april june july august september october november december january february march april june july august september october november december january february march april june july august september october november december MWh per month Primary Reserves (FFR/FNR) Historical activation down-regulation up-regulation
18 november december january february march april june july august september october november december MWh per month Secondary Reserves (LFC) Historical activation down-regulation up-regulation
19 january february march april june july august september october november december january february march april june july august september october november december january february march april june july august september october november december MWh per month Tertiary Reserves (RK - ordinary balancing) Historical activation down-regulation up-regulation
20 Tertiary Reserves (RK - special balancing) Historical activation MWh per month january february march april june july august september october november december january february march april june july august september october november december january february march april june july august september october november december down-regulation up-regulation
21 Content BRPs' imbalances How well have the BRPs traded into balance last report period? BRP imbalances, reserves and balancing power How did we manage the imbalances? Norwegian prices How did the prices develop during the last report period?
22 NOK/MWh NOK/MWh Norwegian Prices 7 Norwegian Balancing Power Prices Norwegian Spot Prices The colored area indicates the price spread between the lowest and highest price area
23 Norwegian Prices (NOK/MWh) 7 balancing power price NO1 Elspot area price NO balancing power price NO2 Elspot area price NO balancing power price NO3 Elspot area price NO3
24 Norwegian Prices (NOK/MWh) 7 balancing power price NO4 Elspot area price NO balancing power price NO5 Elspot area price NO5
25 Imbalance prices versus spot price (NOK/MWh) 3 April NO1 NO2 NO3 NO4 NO5 average spotprice average price for generation balance deficit average price for generation balance surplus average price for consumers' imbalance
26 Content END
Monthly Balance Report March 2015
Monthly Balance Report March 215 Content BRPs' imbalances How well have the BRPs traded into balance last report period? BRP imbalances, reserves and balancing power How did we manage the imbalances? Norwegian
More informationMonthly Balance Report March 2014
Monthly Balance Report March 214 Content BRPs' imbalances How well have the BRPs traded into balance last report period? BRP imbalances, reserves and balancing power How did we manage the imbalances? Norwegian
More informationMonthly Balance Report September 2013
Monthly Balance Report September 213 Content BRPs' imbalances How well have the BRPs traded into balance last report period? BRP imbalances, reserves and balancing power How did we manage the imbalances?
More informationHafslund a pure play utility
Hafslund a pure play utility Swedbank Nordic Energy Summit 2014 20 March 2014 Finn Bjørn Ruyter CEO, Hafslund ASA Disclaimer Certain statements included within this presentation contain (and oral communications
More informationData packages. Basic information in addition to full list
Data packages Basic information in addition to full list Basic information Data packages contain imbalance settlement data for those Market Participants that are entitled to see them (DSOs and BRPs) esett
More informationCalifornia Independent System Operator Corporation. California ISO. Import resource adequacy. Department of Market Monitoring
k California Independent System Operator Corporation California ISO Import resource adequacy September 10, 2018 Department of Market Monitoring Summary This report provides an update of analysis and trends
More informationCongestion and Marginal Losses
Section 10 Congestion and Marginal Losses Congestion and Marginal Losses The Locational Marginal Price (LMP) is the incremental price of energy at a bus. The LMP at any bus is made up of three components:
More informationWoking. q business confidence report
Woking q1 business confidence report Woking q1 report headlines saw a new record in company registrations in Woking when compared to any previous. was a record quarter for company registrations in Woking
More informationData collected February 2019 Report published March 2019
Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 GW Data collected February 2019 Report published March 2019 The wholesale market report and the
More informationEnergy Management at Statkraft. Short Term Energy Management
Energy Management at Statkraft Tbilisi, 19 November 2012 David Hornidge Short Term Energy Management Outline Statkraft generation fleet in Europe Active markets Energy management for hydro power plants
More informationCongestion and Marginal Losses
Section 10 Congestion and Marginal Losses Congestion and Marginal Losses The Locational Marginal Price (LMP) is the incremental price of energy at a bus. The LMP at a bus is made up of three components:
More informationReservoir inflow and storage
Reservoir inflow and storage Week number - 1 jan - jan year 19, version: A Hydropower inflow per week /week 7 6 5 1 % 1 9 7 6 5 1 % 1 9 7 6 5 1 Reservoir storage level in (1%=,7 GWh) Reservoir storage
More informationLoad-Frequency Control and Reserves Network Code. David Bunney JESG 15 January 2013
Load-Frequency Control and Reserves Network Code David Bunney JESG 15 January 2013 Agenda Overview and Timescales Key Requirements of the Network Code Key Issues Stakeholder Engagement 2 Overview One of
More informationCalifornia ISO. Q Report on Market Issues and Performance. February 10, Prepared by: Department of Market Monitoring
California Independent System Operator Corporation California ISO Q4 2013 Report on Market Issues and Performance February 10, 2014 Prepared by: Department of Market Monitoring Department of Market Monitoring
More informationThe Green Transition of the Danish energy system
The Green Transition of the Danish energy system Brazilian Delegation - Smart Grid Tour Visit to Energinet.dk 24 November 2014 Peter Jørgensen, Vice President 2014.10.20 The Green Transition of the Danish
More informationAncillary Service Markets
Section 9 Ancillary Services Ancillary Service Markets The United States Federal Energy Regulatory Commission (FERC) defined six ancillary services in Order No. 888: 1) scheduling, system control and dispatch;
More informationReservoir inflow and storage
Reservoir inflow and storage Week number 5 - dec - dec year 1, version: A Hydropower inflow per week /week 7 6 5 1 % 1 9 7 6 5 1 % 1 9 7 6 5 1 Reservoir storage level in (1%=,7 GWh) Reservoir storage level
More informationThe Future of Electricity: A Market with Costs of Zero? Marginal
The Future of Electricity: A Market with Costs of Zero? Marginal Richard Green, IAEE European Conference, 217 1 Supply /MWh Marginal Cost Nuclear CCGT OCGT GW 2 Demand and Supply Prices reflect Marginal
More informationElectric Forward Market Report
Mar-01 Mar-02 Jun-02 Sep-02 Dec-02 Mar-03 Jun-03 Sep-03 Dec-03 Mar-04 Jun-04 Sep-04 Dec-04 Mar-05 May-05 Aug-05 Nov-05 Feb-06 Jun-06 Sep-06 Dec-06 Mar-07 Jun-07 Sep-07 Dec-07 Apr-08 Jun-08 Sep-08 Dec-08
More information2017 Draft Policy Initiatives Roadmap
2017 Draft Policy Initiatives Roadmap Prepared by and Infrastructure Development November 4, 2016 CA/M&ID Table of Contents 1 Introduction... 2 2 2017 Roadmap Initiative Ranking Process... 2 3 Draft High
More informationBalancing Wind with Large Scale Hydro. Håkon Egeland, Vice-President, Statkraft Energy, Norway London 6 June 2011
Balancing Wind with Large Scale Hydro Håkon Egeland, Vice-President, Statkraft Energy, Norway London 6 June 2011 Outline Short about Statkraft Some relevant experiences Expected development in the future
More informationThe catalog is updated at least when new data is published in the Energi Data Service, and consists of the following two parts:
This data catalog provides a comprehensive overview of the data and datasets in Energi Data Service. The data catalog is based entirely on metadata, and is aimed at all present and potential users of Energi
More informationTertiary reserve: 15 min 1 h
DESCRIPTION OF THE REQUIRED POSITIVE TERTIARY RESERVE ENERGY ABSTRACT Eva Marie Kurscheid Transmission system operators need tertiary to guarantee reliable grid operation. The used tertiary energy varies
More informationEvaluation of the ramping restriction in the energy market. Nordic Operations Development group (NOD)
Evaluation of the ramping restriction in the energy market Nordic Operations Development group (NOD) 20 December 2010 Table of contents: 1 Summary... 3 2 Introduction... 3 3 Ramping rules... 4 4 Socioeconomic
More informationPJM ENERGY PRICES 2005 Response to Howard M. Spinner Paper
PJM ENERGY PRICES 2005 Response to Howard M. Spinner Paper Joseph Bowring PJM Market Monitor Response to Howard M. Spinner Paper Re: PJM Energy Prices 2005 A March 13, 2006 paper ( Spinner paper ) by Howard
More informationUniversity of Michigan Eco-Driving Index (EDI) Latest data: August 2017
University of Michigan Eco-Driving Index () http://www.ecodrivingindex.org Latest data: August 2017 Developed and issued monthly by Michael Sivak and Brandon Schoettle Sustainable Worldwide Transportation
More informationThe Future of Electricity: A Market with Costs of Zero? Marginal
The Future of Electricity: A Market with Costs of Zero? Marginal Imperial College Business School Richard Green, IAEE European Conference, 217 1 Running your mouse over the bubble in the top left corner
More informationAvailable online at ScienceDirect. Energy Procedia 87 (2016 ) 11 18
Available online at www.sciencedirect.com ScienceDirect Energy Procedia 87 (2016 ) 11 18 5th International Workshop on Hydro Scheduling in Competitive Electricity Markets Determinants of Regulated Hydropower
More informationPay for Performance Regulation Year 1 Design Changes. Draft Final Proposal
Pay for Performance Regulation Year 1 Design Changes Draft Final Proposal September 26, 2014 Pay for Performance Regulation Year 1 Design Changes Draft Final Proposal Table of Contents 1 Introduction...
More informationAncillary Service Markets
Section 9 Ancillary Services Ancillary Service Markets The United States Federal Energy Regulatory Commission (FERC) defined six ancillary services in Order No. 888: 1) scheduling, system control and dispatch;
More informationBy Gjert H. Rosenlund, SKM Market Predictor
By Gjert H. Rosenlund, SKM Market Predictor Abstract The variability and low predictability of wind speed makes handling of balances a difficult task for wind power producers. With increased investments
More informationThe Texas Experience: Implications of 8,000+ MW Wind Generation Resources In ERCOT. David Campbell CEO, Luminant 2009 Summer Seminar August 3, 2009
The Texas Experience: Implications of 8,000+ MW Wind Generation Resources In ERCOT David Campbell CEO, Luminant 2009 Summer Seminar August 3, 2009 Growth of Wind Generation in ERCOT MW 12,000 10,000 8,000
More informationTransmission and Interconnectors
Transmission and Interconnectors Peter Børre Eriksen Head of Systems Analysis Energinet.dk 1 ENTSO-E: 41 TSOs from 34 countries Founded on 19 Dec 2008 and fully operational since July 2009 A trans-european
More informationVattenfall s views on the electricity market 2005
Vattenfall s views on the electricity market 25 Stockholm, Lars G. 25-11-16 Josefsson, President and CEO, Vattenfall AB Effects of the Swedish market reform (1) New study: Regulatory Reform in the Swedish
More informationSECTION 6 - ANCILLARY SERVICE MARKETS
2010 Quarterly State of the Market Report for PJM: January through March ANCILLARY SERVICES 6 SECTION SECTION 6 - ANCILLARY SERVICE MARKETS The United States Federal Energy Regulatory Commission (FERC)
More informationVirtual Workshop on PJM ARR and FTR Market 2017/2018
Virtual Workshop on PJM ARR and FTR Market 2017/2018 PJM State & Member Training Dept. Webex February 10, 2017 PJM 2017 Disclaimer: PJM has made all efforts possible to accurately document all information
More informationNORDIC AND BALTIC HVDC UTILI- SATION AND UNAVAILABILITY STATISTICS 2015
NORDIC AND BALTIC HVDC UTILI- SATION AND UNAVAILABILITY STATISTICS 2015 16.01.2017 REGIONAL GROUP NORDIC Table of Contents 1 SUMMARY... 3 2 INTRODUCTION AND BACKGROUND... 4 3 SCOPE... 5 CONTACT PERSONS...
More informationesett Customer Committee meeting
Minutes 1 (11) esett Customer Committee meeting Date Place 10.04.2018 12:00-16:00 EET Helsinki Hilton Airport hotel Present Espen Fjeld Energi Salg Norge Tom Backman Fortum Markets Oy Lena Ingårda Vattenfall
More informationAnalysing the relationship between wholesale and end-user prices in the Nordic electricity market
Philip E. Lewis Tor A. Johnsen Teemu Närvä Salman Wasti Analysing the relationship between wholesale and end-user prices in the Nordic electricity market Ministry of Trade and Industry Finland MTI Financed
More informationCongestion and Marginal Losses
Section 11 Congestion and Marginal Losses Congestion and Marginal Losses The locational marginal price (LMP) is the incremental price of energy at a bus. The LMP at a bus is the sum of three components:
More informationImpacts of the EU ETS on Electricity Prices
Impacts of the EU ETS on Electricity Prices Prof. P. Capros E3Mlab - NTUA, kapros@central.ntua.gr Presented to Final Meeting of ETRES - Life Project Athens, March 31, 2006 The EU ETS - definition Cap and
More informationEnergy Uplift (Operating Reserves)
Section 4 Energy Uplift Energy Uplift (Operating Reserves) Energy uplift is paid to market participants under specified conditions in order to ensure that resources are not required to operate for the
More informationREGIONAL FORECASTING OF GENERATION FROM SMALL HYDROPOWER PLANTS
REGIONAL FORECASTING OF GENERATION FROM SMALL HYDROPOWER PLANTS Professor Ånund Killingtveit NTNU/CEDREN Workshop on Hydro Scheduling in Competitive Electricity Markets Trondheim, Norway, September 17-18
More informationCongestion and Marginal Losses
Section 11 Congestion and Marginal Losses Congestion and Marginal Losses The locational marginal price (LMP) is the incremental price of energy at a bus. The LMP at a bus is made up of three components:
More informationMarket Monitor Report
Market Monitor Report MC Webinar February 19, 2019 Joe Bowring PJM Load 2019 www.monitoringanalytics.com 2 180,000 170,000 RT Monthly Average Hourly Load 2017 2018 160,000 150,000 140,000 Demand (MWh)
More informationCHP Managing Commodity Price Risk
An Introduction to Combined Heat and Power CHP 100 1 Acknowledgements 2 Overview! High and Volatile Natural Gas Prices do not preclude a good CHP project! Managing Commodity Price Risk must be Part of
More informationesett Customer Committee meeting
Minutes 1 (7) esett Customer Committee meeting Date Place 6.11.2018 11:30-16:00 EET Helsinki esett s office Present Tom Backman Fortum Markets Oy Tommi Pyhähuhta Caruna Oy Kristian Bernseter Statnett SF
More informationAdministration Division Public Works Department Anchorage: Performance. Value. Results.
Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,
More informationCO2, SO2 and NOX Emission Rates. March 15, 2018
March 15, 2018 This page is intentionally left blank. PJM 2018 www.pjm.com 1 P age Introduction To support the efforts of regulators, stakeholders, and other interested parties as they work towards achieving
More informationUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION California Independent System ) Docket Nos. ER12-1630 Operator Corporation ) ER14-971 Informational Report of the California Independent System
More informationSection 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.
Section 3 Operating Reserve Operating Reserve Day-ahead and real-time operating reserve credits are paid to market participants under specified conditions in order to ensure that resources are not required
More informationCO2, SO2 and NOX Emission Rates. August 21, 2015
August 21, 2015 This page is intentionally left blank. PJM 2015 www.pjm.com 1 P age Introduction In recent years, federal and state environmental regulations have applied or will apply more stringent restrictions
More informationElhub. BRS Reporting for Imbalance Settlement. Grants of rights and limitations
Elhub BRS Reporting for Imbalance Settlement Grants of rights and limitations This product is the sole property of Statnett, and Statnett holds all intellectual property rights therein. You may download
More informationTHERMAL STORAGE ENABLING DISTRICT HEATING PLANTS TO SERVE AS FLEXIBILITY PROVIDERS IN THE ENERGY SYSTEM
THERMAL STORAGE ENABLING DISTRICT HEATING PLANTS TO SERVE AS FLEXIBILITY PROVIDERS IN THE ENERGY SYSTEM Dr.ing. Monica Havskjold, Statkraft AS R&D Symposium District Heating Days, Fornebu, 14.-15. October
More informationPresentation for the Local Government Commission and the Community Environmental Council. July 13, 2007
Community Choice Aggregation Presentation for the Local Government Commission and the Community Environmental Council July 13, 2007 1 Community Choice Aggregation (CCA) CCA Legislation (AB117) allows cities
More informationNordic Market report DEVELOPMENTS IN THE NORDIC ELECTRICITY MARKET
Nordic Market report 2007 - DEVELOPMENTS IN THE NORDIC ELECTRICITY MARKET Report 3/2007 Nordic Market Report 2007 - DEVELOPMENT IN THE NORDIC ELECTRICITY MARKET 1 PREFACE...3 2 SUMMARY...4 3 INTRODUCTION:
More informationTiming of Markets- the Key Variable in Design of Ancillary Service Markets for Power Reserves
Timing of Markets- the Key Variable in Design of Ancillary Service Markets for Power Reserves Alireza Abbasy 1, Reinier A. C. van der Veen, Rudi A. Hakvoort Faculty of Technology, Policy and Management,
More informationTraffic Department Anchorage: Performance. Value. Results.
Traffic Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements.
More informationCustomer Committee 4/2018. Agenda. Agenda 1 (17) Markus Eklund 23 October 2018 Public :30 EET
Agenda 1 (17) Customer Committee 4/2018 Date Place 6.11.2018 11:30 EET esett s office Läkkisepäntie 23, 00620 Helsinki Finland Agenda Time (EET) Topic 11:30 12:30 Lunch 1 12:30 12:45 Welcome 2 12:45 13:15
More informationBidding Strategy I Day-Ahead Market 8 th February 2017 I New Delhi
Bidding Strategy I Day-Ahead Market 8 th February 2017 I New Delhi Rajesh K Mediratta Business Development +91-9654125157 I rajesh.mediratta@iexindia.com 1 For office use In this presentation Type of Market
More informationPower System & Markets introduction
Power System & Markets introduction Lars Henrik Hansen DONG Energy Smart & Cool project Skærbæk, January 18 th, 2012 Outline Current power markets in DK VPP market integration BRP Price signal market integration
More informationSystem Needs: An Energy Planning Perspective. Randy Reimann
System Needs: An Energy Planning Perspective Randy Reimann TOPICS BCUC 2006 IEP/LTAP Decision 2008 LTAP Workplan Resource Options Update System Planning and Criteria 2 BCUC IEP/LTAP DECISION Key findings:
More informationDemand Response. Overview. Recommendations
Section 6 Demand Response Demand Response Markets require both a supply side and a demand side to function effectively. The demand side of wholesale electricity markets is underdeveloped. Wholesale power
More information2001 Annual Report on the New York Electricity Markets
2001 Annual Report on the New York Electricity Markets Presented to: New York ISO Management Committee David B. Patton, Ph.D. Independent Market Advisor April 16, 2002 Conclusions and Recommendations The
More informationChapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero
Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories Learning Objectives At the end of the class the student will be able to: 1. Describe the production budget process
More informationFjordkraft Holding ASA Company introduction. March 2018
Fjordkraft Holding ASA Company introduction March 218 Fjordkraft at a glance a leading Norwegian electricity retailer for both consumer and business customers Deregulated: Energy production Transmission
More informationOperational and SO Cost Update
Operational and SO Cost Update Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Jo Faulkner
More informationSolar, Wind and Market Power in the New Zealand Electricity Market (and hydro lake dynamics) Mina Bahrami Gholami and Stephen Poletti
Solar, Wind and Market Power in the New Zealand Electricity Market (and hydro lake dynamics) Mina Bahrami Gholami and Stephen Poletti University of Auckland Economic Paradox Energy Only Markets. Low-carbon
More informationElhub BRS Reporting for Imbalance Settlement
Elhub BRS Reporting for Imbalance Settlement Grants of rights and limitations This product is the sole property of Statnett, and Stanett holds all intellectual property rights therein. You may download
More informationSETTLEMENT ESTIMATION AND REVISIONS POLICY CONSULTATION PAPER. AeN 94 on Oh) 327 Wv'IW.oemo.oo m.ou infofffoemo.corr.ou VERSION: 1. DATE: 4 April 2012
SETTLEMENT ESTIMATION AND REVISIONS POLICY CONSULTATION PAPER PREPARED BY: Market Performance VERSION: 1 DATE: 4 April 2012 FINAL Am,ttolion l:nergy 1\_.n,ketOpe rctor Ltd AeN 94 on Oh) 327 Wv'IW.oemo.oo
More informationFLEXIBILITY HOW TO CONTRIBUTE TO THE STABILITY OF THE GRID THANKS TO THE FLEXIBILITY OF YOUR PRODUCTION PROCESSES?
FLEXIBILITY HOW TO CONTRIBUTE TO THE STABILITY OF THE GRID THANKS TO THE FLEXIBILITY OF YOUR PRODUCTION PROCESSES? 1 The energy transition: decentralized power generation Past situation Current situation
More informationThe Call Center Balanced Scorecard
The Call Center Balanced Scorecard Your Overall Measure of Call Center Performance! MetricNet Best Practices Series Some Common Call Center KPIs Cost Cost per Contact Cost per Minute of Handle Time Quality
More informationAs Transmission System Operator in the Norwegian energy system, Statnett has a clear and distinct role:
This is Statnett Statnett is responsible for developing and operating the Norwegian power grid to ensure that it meets society s expectations for the energy sector at all times. Our role As Transmission
More informationPJM ARR and FTR Market
PJM ARR and FTR Market PJM State & Member Training Dept. PJM 2017 Objectives At the completion of this training, you should be able to describe the concepts and principles of Auction Revenue Rights and
More informationNORDIC AND BALTIC HVDC UTILI- SATION AND UNAVAILABILITY STATISTICS 2014
NORDIC AND BALTIC HVDC UTILI- SATION AND UNAVAILABILITY STATISTICS 2014 27.10.2015 REGIONAL GROUP NORDIC Table of Contents 1 SUMMARY... 3 2 INTRODUCTION AND BACKGROUND... 4 3 SCOPE... 5 4 METHODS, DEFINITIONS
More informationGlobal Market Pulp Statistics
Global Market Pulp Statistics Bleached Kraft Pulp November Data 217 Global Statistics for Bleached Kraft Market Pulp The statistics in this file is based on EPIS (European Pulp Industry Sector) data, distributed
More informationThe power market. How the power market functions Power trading Price formation International power trading Electricity output un the Nordic countries
The power market How the power market functions Power trading Price formation International power trading Electricity output un the Nordic countries 7 82 The power supply sector in Norway is regulated
More informationPORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS
PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS Edwin Castro CNEE Guatemala Viena, september 2009 What is the reason to develop this model? In our own electricity market
More informationWinter Outlook 2009/10. 8 th October 2009 Peter Parsons
Winter Outlook 29/1 8 th October 29 Peter Parsons Agenda Winters 28/9 & 29/1 Gas Demand Gas Supply Electricity Demand Electricity Supply 28/9 Overview Winter 28/9 characterised by: Periods of cold weather,
More informationShort-term Electricity Markets and Imbalance Settlement. What is Demand Side Management (DSM) Valuing Flexibility for DSM
Short-term Electricity Markets and Imbalance Settlement What is Demand Side Management (DSM) Valuing Flexibility for DSM 2 EU Unbundling has created 4 different roles: Electricity Producer (competition
More informationTraffic Division Public Works Department Anchorage: Performance. Value. Results.
Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements. Direct Services Design, operate and maintain the
More informationBacton Entry Capacity Retaining flexibility through modification to overrun regime. Nick Wye
Bacton Entry Capacity Retaining flexibility through modification to overrun regime Nick Wye Splitting Bacton Capacity Ofgem is proposing that capacity at Bacton should be allocated to the UKCS ASEP or
More informationAUSTIN AREA SUMMARY REPORT ON BUSINESS February 2018
INSTITUTE FOR SUPPLY MANAGEMENT- ISM AUSTIN, INC. P.O. Box 26155 Austin, Texas 78755-0155 Steven Leatherwood, CPSM, MCIPS Econ-report@ism-austin.org AUSTIN AREA SUMMARY REPORT ON BUSINESS Region Economy
More informationElectricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)
For the first quarter of 2015, Ontario experienced overall demand that was typical for the province in winter, and strong generator output. Demand for Ontario electricity increased as a result of cold
More informationISO-New England s Generating Unit Availability Study: Where s the Beef?
ISO-New England s Generating Unit Availability Study: Where s the Beef? Restructuring Roundtable June 29, 2001 David Schlissel 22 Pearl Street Cambridge, MA 02139 617.661.3248 dschlissel@synapse-energy.com
More informationData Viewer, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps
Data Viewer, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps As of March 20, 2018 www.pjm.com 2018 Roadmap Data Viewer, Voting, Account Manager, DR Hub and Power Meter, Data
More informationCIP Routine/Small Purchasing Team Close-out
CIP Routine/Small Purchasing Team Close-out Define Ken Koebel Control Measure January 26, 2011 Improve Analyze Cross Functional Team 2 Charter / Business Case Define Measure Routine purchasing (orders
More informationThailand Power Development Plan ( ) TANONGSAK WONGLA
Thailand Power Development Plan (2010-2030) TANONGSAK WONGLA August 2013 GOV. POLICY Structure of Thailand Power Sector Regulators EGAT (44%) IPPs (38%) Imports (7%) SPPs (10%) VSPPs (
More informationERCOT Public LTRA Probabilistic Reliability Assessment. Final Report
ERCOT Public 2016 LTRA Probabilistic Reliability Assessment Final Report November 21, 2016 Contents Summary... 1 Software Model Description... 3 Demand Modeling... 3 Controllable Capacity Demand Response
More informationElectricity market regulation: lessons learnt (by me) a 20 years journey
Electricity market regulation: lessons learnt (by me) a 20 years journey Turin School of Regulation (8 September 2014) Jean-Michel Glachant - Director Florence School [& Marcelo Saguan - Microeconomix]
More informationGB Balancing Arrangements
GB Balancing Arrangements 25 th April 2014 Mike Edgar Contracts Manager National Grid GB SO Residual Balancer UK and US Electricity and Gas Transmission & Distribution 2 GB Market Arrangements Forwards
More informationElhub. BRS Reporting for Imbalance Settlement. Grants of rights and limitations
Elhub BRS Reporting for Imbalance Settlement Grants of rights and limitations This product is the sole property of Statnett, and Statnett holds all intellectual property rights therein. You may download
More informationCalifornia ISO. Q Report on Market Issues and Performance. November 1, Department of Market Monitoring
California Independent System Operator Corporation California ISO Q3 2018 Report on Market Issues and Performance November 1, 2018 Department of Market Monitoring TABLE OF CONTENTS Executive summary...
More informationPower Market and the role of the Clean Energy
Power Market and the role of the Clean Energy Power and Alternative Energy Changes under Mexico s Energy Reform US-Mexico Bar Association 2015 Marco Nieto Baker & McKenzie November 6, 2015 Baker & McKenzie
More informationF. Kabus, G. Möllmann, F. Hoffmann and J. Bartels GTN Geothermie Neubrandenburg GmbH, Seestrasse 7A, Neubrandenburg, Germany
The Tenth International Conference on Thermal Energy Storage TWO-YEAR EXPERIENCE IN THE OPERATION OF AN AQUIFER THERMAL ENERGY STORE BASED ON SURPLUS HEAT ARISING FROM A GAS AND STEAM COGENERATION PLANT
More informationTL 9000 Quality Management System. Measurements Handbook. BRR Examples
Quality Excellence for Suppliers of Telecommunications Forum (QuEST Forum) TL 9000 Quality Management System Measurements Handbook Copyright 2012 QuEST Forum Version 1.0 7.2 7.2.1 Basic Calculation Example
More informationHANDLING OF FLUCTUATING WIND PRODUCTION ON THE EL SPOT MARKET,
HANDLING OF FLUCTUATING WIND PRODUCTION ON THE EL SPOT MARKET, A CASE STORY FROM A PBA. CREATING MORE VALUE IN WIND EWEA2012 PRE-CONFERENCE SEMINAR BY THE DANISH WIND INDUSTRY ASSOCIATION APRIL 15 TH,
More informationMATERIALS AND SUPPLIES INVENTORY
Filed: August, 0 EB-0-0 Exhibit D Schedule Page of MATERIALS AND SUPPLIES INVENTORY.0 STRATEGY Hydro One Distribution is committed to optimizing materials and supplies inventory in support of our customer
More informationTargeting premium opportunities. Adam Cheetham Global Market Analyst - Industry Insights & Market Intelligence
Targeting premium opportunities Adam Cheetham Global Market Analyst - Industry Insights & Market Intelligence Demand for red meat Beef consumption Sheepmeat consumption Demand for red meat 5% 4% Beef and
More informationPathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid
Greening the Grid Andhra Pradesh Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid State-specific results from Volume II, which includes all of India. The full reports
More information